discussion points tbm meeting 23/09/2015. updates global 3d assembly updated, no severe...

10
Discussion points TBM meeting 23/09/2015

Upload: winfred-ellis

Post on 04-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

Discussion pointsTBM meeting23/09/2015

Page 2: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

Updates

• Global 3D assembly updated, no severe problems/clashes• T1 RF network dimensions updated• WPS arms machined• Mock-ups under machining, brazing starts next week

Page 3: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

Adjustable DBQ support

• Supports for T0 ready• The rotation of the magnets has some implications

(adjusting knobs on the inside)• Some modifications might be required – investigation

needed• Design for T1 tricky to implement due to Epucret

design

Page 4: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

Adjustable V-supports

• Finalised design and drawings

• Adequate for proof of concept, still a bit rough

• Fixed supports already on Epucret

Stay with fixed supports (both V and DBQ) and organise a side project, perhaps on second Epucret girder with dummy loads?

Page 5: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

BPM deletion drift tube• Clash 15mm

• Bellow compression 7mm

• Drift tube play in magnet 5mm

• If decided to be replaced, needs to be done before magnet assembly

5mm

Page 6: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

Vacuum

• ‘Baseline’ design almost ready

• Vacuum forces are significant

• Shall we proceed with baseline design or launch a design project for force cancelation?

• 2 quick proposals

Page 7: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

MBQ support

• Only piece missing before floor drilling

• Concrete block needs to be replaced

• Shall we assume the base plate as reference and produce steel support block?

Page 8: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

U-clamps

• For MB:• In principle CLEX design can be used• Compatibility check pending

• For DB:• Same design as T0.1• Probably not compatible with adjustable

V-supports

• Redesign needed?

Mysterious additional support in CLEX

Page 9: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

DAQ

# Description1 SAS 1 water in temperature2 SAS 1 component temperature3 SAS 1 water out temperature4 SAS 2 water in temperature5 SAS 2 component temperature6 SAS 2 water out temperature7 SAS 3 water in temperature8 SAS 3 component temperature9 SAS 3 water out temperature

10 SAS 4 water in temperature11 SAS 4 component temperature12 SAS 4 water out temperature13 PETS 1 in14 PETS 1 out / 2 in15 PETS 2 out16 DBQ 1 in17 DBQ 1 component18 DBQ 1 out/ 2 in19 DBQ 2 component20 DBQ 2 out21 Ambient 122 Ambient 223 Spare 124 Spare 225 Spare 326 Spare 427 Spare 528 Spare 629 Spare 730 Spare 831 Spare 932 Spare 10

• According to test plan, 22 temperature sensors are foreseen for each TBM

• Current architecture (NI cDAQ) allows 32 sensors per box

• Remaining signals (flow meters, control valves, heaters) will be connected to 4th electronics box

• Total of 4 boxes, connected via USB to central PC

• Room for expansion• Optional upgrade to cRIO system with

embedded CPU for increased robustness

TBM 1 TBM 2 TBM 3

Cooling rack

PC

32x Temp sensors

32x Temp sensors

32x Temp sensors

Flow meterControl Valve

Heater

Usb x4

Page 10: Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined

Next tasks

• Critical path:• WPS arms assembly• T1 MB cradles machining• Girders fiducialisation• Floor drilling• Girders installation

• In parallel:• Cooling rack assembly – already started• PETS T0.2 fiducialisation