Page 1: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Gary Matthews, JWST AI&T Program Director

Tom Scorse, JWST OTIS Program Manager

November 2014

Cryo Test Configuration Staus

Page 1

Page 2: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

General Program Status

Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM)

[OTIS] Cryo Test Equipment and Cryo Test

– Optical Ground Support Equipment (OGSE) Integration complete at JSC

– Started Chamber Commissioning on schedule on 10/10

Page 2

Page 3: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Schedule Overview

Page 3

Page 4: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Cryo Test Configuration

Page 4

Minus-K Isolation System

(6 places)Center of Curvature

Optical Assembly

(COCOA)

Upper Support

Frame (USF)

Autocollimating Flat

Assemblies

(3 Places)

Helium Ceiling

LN2 Outer Shroud

GHe Inner Shroud

Photogrammetry

Camera Systems

(4 Places)

Space Vehicle

Thermal Simulator

(SVTS)

Rail System

Hardpoint/Offloader

Support Structure

(HOSS)

Deep Space Edge

Radiation Sink

(DSERS) Frame

Page 5: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Space Vehicle Thermal Simulator

(SVTS)

and Sunshield Simulator

Procurements and fabrication

OTIS Test GSE Status

Center of Curvature Optical Assembly (COCOA)

• Multiwavelength interferometer (MWIF), null,

calibration equipment, coarse/fine PM

phasing tools, Displacement Measuring

Interferometer – Installed in Chamber

3 Auto collimating Flat Mirrors (ACFs)

1.5 M Plano for Pass and Half Testing

ACF 1 installed in Chamber, ACF 4 in

final cryo test, ACF 5 waiting for final

cryo test.

Cryo Position Metrology (CPM)

Photogrammetry System

Integration Complete

Chamber Isolator Units

Dynamically isolates OTIS

Optical Test – Integration of

6 units complete

AOS Source Plate

Sources for Pass and Half Test

In test at Ball

Deep Space Edge Radiation Sink (DSERS)

Frame integrated

MSFC-XRCF

ADM

Leica system

delivered to

JHU

Mag Damper

Cryo Test

Article

Delivered

USF Structural Frame – supports Metrology

Installed in Chamber

HOSS – OTIS support structure

Installed on Telescope Rods

Page 6: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Level 7 – Top of Chamber

Page 6

Page 7: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Level 7 – Tight Spaces

Page 7

Page 8: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Isolation System

Page 8

Page 9: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Photogrammetry System

Page 9

Page 10: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

ACU Assembly

Page 10

ACF/COCOA/USF (ACU)

Assembly on the transport

dolly.

Note that the COCOA

thermal plug is also

attached

Total assembly will be lifted

to the top of the chamber

Page 11: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

ACF#1 Integration

Page 11

Integration of the ACF onto the ACU assembly. Actuator assembly seen in left

photograph

Page 12: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Integrated ACF#1

Page 12

Page 13: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

ACU Lift in Chamber A

Page 13

Lifting the ACF/COCOA/USF (ACU) assembly into the top of the

chamber using the Direct Lift System

Note: Lift

operations took

3+ days to

complete

Page 14: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Level 5 – Above the He Shroud

Page 14

Page 15: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

COCOA in place on Level 5

Page 15

Page 16: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

ACU and Telescope Rods

Page 16

The USF and one ACF (with the other two ACF Mass Simulators) can be

seen with the PG booms.

Page 17: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

PG Targets and Code Plates

Page 17`

Recent picture

showing the

Photogrammetry

code plates and

targets in a flash

picture

Page 18: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

HOSS in Clean Room

Page 18

HOSS sitting on the pedestals with load cells

Page 19: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

HOSS Details

Page 19Thermal Diode connectors around the OD of the HOSS

Leveling Jacks OTIS Interface Blocks

Page 20: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

HOSS with 2X OTIS Mass Sim

Page 20

Page 21: Cryo Test Configuration Staus

This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

Summary

Currently in Chamber Commissioning

– Full checkout of Optical Ground Support Equipment in process

– Many issues found and punch list developed

.

Page 21