Craig CoombsCraig CoombsDirector, Project DevelopmentDirector, Project Development

Project UpdateProject Update

Page 2: Craig Coombs

COLORADONEW MEXICO

TEXAS

KANSAS

WYOMINGMONTANA

UTAH

ARIZONA

CIG, WIC, andCheyenne Plains

CampoCampo

NaturalNaturalButtesButtes

OpalOpal

RatonRaton

CheyenneCheyenne YumaYumaCountyCountyPiceancePiceance

LateralLateral

CheyennePlains

CheyenneCheyennePlainsPlains

2

Page 3: Craig Coombs

ProjectsProjects

►► CIG Raton expansionCIG Raton expansion►► WIC Piceance Lateral extensionWIC Piceance Lateral extension►► WIC Opal extensionWIC Opal extension►► CIG Natural Buttes to WamsutterCIG Natural Buttes to Wamsutter►► Cheyenne Plains expansionCheyenne Plains expansion►► Cheyenne Plains Bitter Creek extensionCheyenne Plains Bitter Creek extension

Page 4: Craig Coombs

COLORADONEW MEXICO

TEXAS

KANSAS

WYOMINGMONTANA

UTAH

ARIZONA

CampoCampo

RatonRaton

CheyenneCheyenne

CIG, WIC, andCheyenne Plains

4

Page 5: Craig Coombs

CIG RatonCIG RatonExpansionExpansion

Page 6: Craig Coombs

6

Page 7: Craig Coombs

2005 Raton Expansion2005 Raton ExpansionSummary of WorkSummary of Work

►► 102 miles of pipeline loops102 miles of pipeline loops–– 64 miles of 1664 miles of 16””–– 7 miles of 207 miles of 20””–– 31 miles of 2431 miles of 24””

►► 1,770 hp added at Beaver, Oklahoma1,770 hp added at Beaver, Oklahoma►► Two new receipt point meter stationsTwo new receipt point meter stations

–– Silver Mountain Meter StationSilver Mountain Meter Station–– Culebra Meter StationCulebra Meter Station

►► $60.6 million$60.6 million

Page 8: Craig Coombs

2005 Raton Expansion2005 Raton ExpansionCapacity, Costs, TimetableCapacity, Costs, Timetable

►► Coal bed methane production, first developed in 1994 with 11 Coal bed methane production, first developed in 1994 with 11 MDth/d of throughputMDth/d of throughput

►► 105 MDth/d of incremental capacity105 MDth/d of incremental capacity►► 381 MDth/d of total Campo Lateral capacity, post expansion381 MDth/d of total Campo Lateral capacity, post expansion►► 8 Raton shippers8 Raton shippers►► MidMid--Continent delivery points off the Morton to Mocane mainlineContinent delivery points off the Morton to Mocane mainline

–– Forgan (NGPL)Forgan (NGPL)–– Beaver (ANR)Beaver (ANR)

►► Received and accepted certificate earlier this month; permissionReceived and accepted certificate earlier this month; permissionto construct granted; into construct granted; in--service October 1, 2005 (est.)service October 1, 2005 (est.)

Page 9: Craig Coombs

COLORADONEW MEXICO

TEXAS

KANSAS

WYOMINGMONTANA

UTAH

ARIZONA

CampoCampo

CheyenneCheyenne

PiceancePiceanceLateralLateral

CIG, WIC, andCheyenne Plains

9

Page 10: Craig Coombs

WIC PiceanceWIC PiceanceLateral ExtensionLateral Extension

Page 11: Craig Coombs

Piceance BasinPiceance BasinPiceance Basin

Wellhead Supply

0

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

1,300

1,400

1,500

1,600

1,700

1,800

1,900

2,000

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

MM

cf/D

ay

Page 12: Craig Coombs

143 mi.24”

12

Page 13: Craig Coombs

Piceance PipelinePiceance PipelineFacilities and CapacityFacilities and Capacity►► WIC incremental lateralWIC incremental lateral►► 143 miles of 24143 miles of 24”” pipeline from Greasewood to Wamsutterpipeline from Greasewood to Wamsutter►► 4,700 hp compression at Greasewood4,700 hp compression at Greasewood►► Investment of $120.2 MMInvestment of $120.2 MM►► Initial capacity of 350 MDth/dInitial capacity of 350 MDth/d►► Greasewood compression inlet pressure of 1,280 psig / Greasewood compression inlet pressure of 1,280 psig /

Wamsutter delivery pressure of 1,000 psigWamsutter delivery pressure of 1,000 psig►► Expandable with compression to 580 MDth/dExpandable with compression to 580 MDth/d►► Interconnects with TransColorado and Williams gathering at Interconnects with TransColorado and Williams gathering at

GreasewoodGreasewood►► Interconnects with WIC mainline and CIG at WamsutterInterconnects with WIC mainline and CIG at Wamsutter►► Inlet Btu spec of 1,050 Btu vs. 950 Btu for WIC mainlineInlet Btu spec of 1,050 Btu vs. 950 Btu for WIC mainline

Page 14: Craig Coombs

Piceance PipelinePiceance PipelineStatusStatus►► Open season held June 2004Open season held June 2004

–– Successfully contracted 350 MDth/dSuccessfully contracted 350 MDth/d–– Supplemental Open Season for 30Supplemental Open Season for 30”” amendment not contractedamendment not contracted

►► Docket No. CP05Docket No. CP05--54 filed February 2, 200554 filed February 2, 2005–– Draft EIS issued May 2005Draft EIS issued May 2005–– Pipe currently being delivered to construction storage sitesPipe currently being delivered to construction storage sites–– Final approval anticipated September 2005Final approval anticipated September 2005–– Construction anticipated to start October 2005Construction anticipated to start October 2005–– Incremental maximum recourse rate requested Incremental maximum recourse rate requested –– 17.317.3¢¢

►► InIn--service anticipated January 2006service anticipated January 2006►► Economic expansions with compression to 580 MDth/dEconomic expansions with compression to 580 MDth/d►► Tentatively plan to hold an expansion open season in July time fTentatively plan to hold an expansion open season in July time framerame

Page 15: Craig Coombs

COLORADONEW MEXICO

TEXAS

KANSAS

WYOMINGMONTANA

UTAH

ARIZONA

CampoCampo

OpalOpal

CheyenneCheyenne

CIG, WIC, andCheyenne Plains

15

Page 16: Craig Coombs

WIC West toWIC West toOpal ExtensionOpal Extension

Page 17: Craig Coombs

Cheyenne

Natural ButtesC.S.

GreasewoodC.S.

WamsutterKanda

Opal

MuddyCreek

Blacks Fork

WIC Opal West ExtensionWIC Opal West ExtensionOpen Season SchematicOpen Season Schematic

6 mi.

15 mi.

Entrega 36”(proposed in-service

November 2005)

Entrega 42”(proposed in-service

2nd-3rd Qtr. 2006)WIC Piceance

(proposed in-serviceJanuary 2006)

CIGWICEntregaOverthrust

17

Page 18: Craig Coombs

WIC West FlowWIC West FlowProject SummaryProject Summary►► Capacity agreement with Overthrust PipelineCapacity agreement with Overthrust Pipeline

–– 21 mile Overthrust extension to Opal21 mile Overthrust extension to Opal–– New west flow capacity on WICNew west flow capacity on WIC–– Uses underutilized west flow capacity on Uses underutilized west flow capacity on OverthrustOverthrust

►► Primary receipt point Primary receipt point –– Wamsutter or points east as far as CheyenneWamsutter or points east as far as Cheyenne►► Primary delivery point Primary delivery point –– OpalOpal

–– Secondary delivery Secondary delivery –– CheyenneCheyenne►► Prepare to roll into WIC mainline; seamless transaction via WICPrepare to roll into WIC mainline; seamless transaction via WIC►► Anticipated rate of $0.0993 per Dth (100% LF); systemwide FL&UAnticipated rate of $0.0993 per Dth (100% LF); systemwide FL&U►► Up to 350 MDth/d available, possibly moreUp to 350 MDth/d available, possibly more►► Anticipated inAnticipated in--service early 2007service early 2007►► Open Season anticipated to begin week of June 27Open Season anticipated to begin week of June 27

Page 19: Craig Coombs

WIC East toWIC East toOpal ExpansionOpal Expansion

Page 20: Craig Coombs

Cheyenne

Natural ButtesC.S.

GreasewoodC.S.

WamsutterKanda

Opal

MuddyCreek

Blacks Fork

WIC Opal East ExpansionWIC Opal East ExpansionOpen Season SchematicOpen Season Schematic

6 mi.

15 mi.

Entrega 36”(proposed in-service

November 2005)

Entrega 42”(proposed in-service

2nd-3rd Qtr. 2006)WIC Piceance

(anticipated in-serviceearly 2006)

20

CIGWICEntregaOverthrustAdditional horsepower

Page 21: Craig Coombs

WIC East FlowWIC East FlowProject SummaryProject Summary►► Capacity agreement with Overthrust PipelineCapacity agreement with Overthrust Pipeline

–– Incremental horsepower at Opal and WamsutterIncremental horsepower at Opal and Wamsutter–– Pressure must be increased to 1,000 psig at WamsutterPressure must be increased to 1,000 psig at Wamsutter

►► Primary receipt point Primary receipt point –– OpalOpal►► Primary delivery point Primary delivery point –– WamsutterWamsutter (potential for primary to (potential for primary to

Cheyenne at additional rate)Cheyenne at additional rate)–– Secondary delivery Secondary delivery –– CheyenneCheyenne

►► Propose to roll into WIC mainline; seamless transaction via WICPropose to roll into WIC mainline; seamless transaction via WIC►► Anticipated rate of $0.0993 per Dth (100% LF); systemwide FL&UAnticipated rate of $0.0993 per Dth (100% LF); systemwide FL&U►► 350350--500 MDth/d available500 MDth/d available►► Anticipated inAnticipated in--service early 2007service early 2007►► Open Season anticipated to begin late summer / early fallOpen Season anticipated to begin late summer / early fall

Page 22: Craig Coombs

COLORADONEW MEXICO

TEXAS

KANSAS

WYOMINGMONTANA

UTAH

ARIZONA

CampoCampo

NaturalNaturalButtesButtes

CheyenneCheyenne

CIG, WIC, andCheyenne Plains

22

Page 23: Craig Coombs

CIG Natural ButtesCIG Natural Buttesto Wamsutterto Wamsutter

Page 24: Craig Coombs

Uinta Basin Uinta Basin –– TotalTotalUinta Basin

Wellhead Supply

0

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

1,300

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

MM

cf/D

ay

Page 25: Craig Coombs

Cheyenne

Natural ButtesC.S.

GreasewoodC.S.

WamsutterKanda

Opal

MuddyCreek

Blacks Fork

CIG Uinta ExtensionCIG Uinta ExtensionOpen Season SchematicOpen Season Schematic

6 mi.

15 mi.Opal Expansion

Uinta Expansion24” pipelineProjected in-service early 2007

Proposed 24” WIC Piceance ExpansionAdditional Horsepower

ProposedEntrega 36”

ProposedEntrega 42”

86 mi., 24”SandSprings

25

CIGWICEntregaOverthrustAdditional horsepower

Page 26: Craig Coombs

Existing FacilitiesExisting Facilities

►► CIGCIG’’s existing Uinta Laterals existing Uinta Lateral–– Natural Buttes to Wamsutter capacity of 200 MDth/dNatural Buttes to Wamsutter capacity of 200 MDth/d–– Fully contracted forward haulFully contracted forward haul

►► 221 miles of 20221 miles of 20”” pipepipe►► CIG processes and compresses at Natural ButtesCIG processes and compresses at Natural Buttes►► Secondary point of delivery to Northwest at Sand Secondary point of delivery to Northwest at Sand

Springs with NorthwestSprings with Northwest

Page 27: Craig Coombs

Project SummaryProject Summary

►► Project to be pursued as CIG rollProject to be pursued as CIG roll--inin►► 86 miles of 2486 miles of 24”” pipeline from Natural Buttes to pipeline from Natural Buttes to

Greasewood and 7,000 hp at Natural ButtesGreasewood and 7,000 hp at Natural Buttes►► Additional compression at Greasewood and midpoint Additional compression at Greasewood and midpoint

WIC Piceance LateralWIC Piceance Lateral►► No incremental processing at Natural Buttes by CIGNo incremental processing at Natural Buttes by CIG

–– New receipt lateral point requirements of 1,000 New receipt lateral point requirements of 1,000 psig, minimum 1,050 Btu and 15psig, minimum 1,050 Btu and 15oo F. hydrocarbon F. hydrocarbon dewpointdewpoint

►► 230 MDth/d capacity230 MDth/d capacity

Page 28: Craig Coombs

Project DescriptionProject Description

►► Open Season anticipated in August 2005Open Season anticipated in August 2005►► Anticipated CIG rate of $0.33Anticipated CIG rate of $0.33¢¢ (max rate) and (max rate) and

systemwide FL&Usystemwide FL&U–– Primary point of delivery at Wamsutter to WIC and Primary point of delivery at Wamsutter to WIC and

proposed west to east Entrega lineproposed west to east Entrega line–– Secondary points of delivery at Green River / Opal, Secondary points of delivery at Green River / Opal,

Cheyenne Plains, Front Range, and MidCheyenne Plains, Front Range, and Mid--Continent Continent pipelinespipelines

Page 29: Craig Coombs

CheyenneCheyennePlainsPlains

ExpansionExpansion

Page 30: Craig Coombs

KANSAS

COLORADO

CURLEY (CUR)(WIC-Med. Bow)

RED CLOUD (RCD)(CIG)

THUNDERCHIEF (TDC)WIC-Mainline

WASHCO (WSH)(Delta)

SCOTT (SCT)(KMI)

FORD (FMS)(NGPL)

SAND DUNE (SDM)(Southern Star)

COSSELL (CSL)(KGS)

MULLINVILLE (MVL)(NNG)

GREENSBURG(GBG) (ANR)

S. RATTLESNAKECREEK (SRC)

(PEPL)

Receipt

Delivery

Receipt / Delivery

Additional horsepower

ProposedWindy Hills

StorageProject

Cheyenne PlainsGas Pipeline Company, LLC

30

Page 31: Craig Coombs

►► Incremental 170 MDth/d of capacityIncremental 170 MDth/d of capacity–– Brings total CP capacity to 730 MDth/dBrings total CP capacity to 730 MDth/d

►► Incremental horsepower at CheyenneIncremental horsepower at Cheyenne►► New CONew CO22 processing at Sand Dunes (into Southern Star)processing at Sand Dunes (into Southern Star)

–– Brings COBrings CO22 from 2% down to 1%from 2% down to 1%►► Received FERC approval to construct in September 2004Received FERC approval to construct in September 2004►► Construction started in early June on processing plantConstruction started in early June on processing plant►► Anticipated inAnticipated in--service date of January 2007service date of January 2007

Cheyenne Plains ExpansionCheyenne Plains ExpansionFacilities and CapacityFacilities and Capacity

Page 32: Craig Coombs

Cheyenne PlainsCheyenne PlainsYuma CountyYuma County

Supply LateralSupply Lateral

Page 33: Craig Coombs

COLORADONEW MEXICO

TEXAS

KANSAS

WYOMINGMONTANA

UTAH

ARIZONA

CampoCampo

CheyenneCheyenne YumaYumaCountyCounty

CIG, WIC, andCheyenne Plains

33

Page 34: Craig Coombs

KANSAS

COLORADO

CURLEY (CUR)(WIC-Med. Bow)

RED CLOUD (RCD)(CIG)

THUNDERCHIEF (TDC)WIC-Mainline

WASHCO (WSH)(Delta)

SCOTT (SCT)(KMI)

FORD (FMS)(NGPL)

SAND DUNE (SDM)(Southern Star)

COSSELL (CSL)(KGS)

MULLINVILLE (MVL)(NNG)

GREENSBURG(GBG) (ANR)

S. RATTLESNAKECREEK (SRC)

(PEPL)

Receipt

Delivery

Receipt / Delivery

ProposedSupplyLateral

ProposedWindy Hills

StorageProject

Cheyenne PlainsGas Pipeline Company, LLC

34

Page 35: Craig Coombs

Cheyenne Plains Supply LateralCheyenne Plains Supply Lateral

►► Cheyenne Plains lateral to Niobrara FieldCheyenne Plains lateral to Niobrara Field►► Approximately 30 miles of 10Approximately 30 miles of 10--inch pipe, 1,480 MAOPinch pipe, 1,480 MAOP►► Initial capacity 20,000 Dth/d; maximum capacity 50,000 Dth/d Initial capacity 20,000 Dth/d; maximum capacity 50,000 Dth/d

with mainline compressionwith mainline compression►► Late fall 2006 inLate fall 2006 in--serviceservice►► Lateral to be rolledLateral to be rolled--in with mainline servicein with mainline service►► Receipt point flexibility for existing shipper to access new Receipt point flexibility for existing shipper to access new

source of gassource of gas►► Interconnect with Bitter Creek Gathering and Yuma Interconnect with Bitter Creek Gathering and Yuma

Gathering systemsGathering systems

Yuma County, ColoradoYuma County, Colorado

Page 36: Craig Coombs

Craig CoombsCraig CoombsDirector, Project DevelopmentDirector, Project Development

Project UpdateProject Update