CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

Upload: others

Post on 25-Feb-2020

31 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSOLIDATED CONSTRUCTORS

PERFORMANCE SUMMARY REPORT (CPES REPORTS)

11TH RELEASE

(ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

Page 2: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

BA

im(CCoReReEvcocooff US

seaganbaco

theCoCoFoIncpepro

ACKGROUND

This repplementation PES) pursua

ontractors Peegulations (IReform Act). Ivaluation Resunsolidate the mpleted profices/agencies/

SES OF CPESThe CPE

rve the informencies undertd decision m

anking and finnsulting firms,

Informatio

e following puronstructors; b) ontrol; d) Issuormulation/Revcentives/Award

erformance of ojects.

C

5/F Exec

COCPES R

D: port is prepof Constructont to Section

erformance oR) of RA NoItem 4 - Su

ults of Section CPES evalu

ojects and /corporations c

S INFORMATIOES rating andmation needsaking infrastru

makers, c) conancing institu h) professiona

on on contractrposes: a) PreAwarding of C

uance of Ceview; f) Indusds, and in ad

contractors i

CONSTRUCTIOPHILIPP

cutive BuildingTeleph

ONSOLIDATEDReports - On-g

pared in cors Performancn 12, Annex

of the Impleo. 9184 (Goveubmission an12, specificall

uation results disseminate concerned.

ON: d other informs of the followucture projectsonstructors, d)utions, f) insual associations

tors CPES rate-qualification/EContracts; c) Prtificate of C

stry Planning; opting measuin the prosec

ON INDUSTRYPINE DOMEST

Center, 369 Shone Nos. 896

D CONSTRUCgoing and Com

onnection wice Evaluation x E - Evaluamenting Ruleernment Procund Disseminaly mandated P

of all ongoithe same

mation is desigwing: a) gove

s; b) industry p) project ownrance compas, and i) embas

ings shall be uEligibility ScreeProject MonitorCompletion; e)

and g) Granure to further cution of gove

Y AUTHORITYTIC CONSTRUSen. Gil J. Puy6-1801; 897-07

CTORS PERFOmpleted Projec

ith the System

ation of es and urement ation of PDCB to ing and

to all

gned to ernment planners ners, e) nies, g) ssies.

used for ening of ring and ) Policy nting of improve ernment

REP

inforlocaeithepresportproje

REP

arraclas(3) Proj

PCA

namproje

Y OF THE PHIUCTION BOARyat Avenue cor791; Fax No. 8

ORMANCE SUcts from July 1

PORT COVERThis report

rmation of on-ally funded (LFer local, foreigsented in thesets and harbor,ects.

PORT CONTE

Presented anged alphabssification. Info

parts, as follect Data; and

Part 1 of the

AB License Nu

Information me, Implement

ect (on-going o

ILIPPINES (CIRD (PDCB) r. Makati ave. M897-0791

UMMARY REP, 2007 to June

RAGE: contains CPEgoing and comF) infrastructugn or joint vee report cover irrigation and

ENTS:

in this report betically with

ormation availalows: 1) Cons3) CPES Ratin

e report includumber.

contained inting Agency, or completed).

IAP)

Makati City

PORT e 30, 2009

S rating and ompleted foreignre projects be

enture construs: road, bridged flood control

are the namh the correable in this repstructor Geneng.

des the name o

n Part 2 pertacontract amo

.

other project-ren assisted (FAeing undertakectors. The pro

e, housing, bul, and water s

mes of construesponding p

port comprises eral Informatio

of constructor/

ains to the pount, and stat

1

elated A) and en by ojects ilding, supply

uctors project

three on; 2)

/s and

project tus of

Page 3: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

2

Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental,

safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.

SOURCES OF INFORMATION

Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority (NHA), Development Bank of the Philippines (DBP), Bases Conversion Development Authority (BCDA), Philippine Ports Authority (PPA), Polytechnic of the Philippines (PUP) and University of the Philippines (U.P.) covering the period January 1, 2007 to December 31, 2009

As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter

may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.

For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned

implementing agencies listed below:

Melrose Pailma (DPWH) Wilfredo C. Borbor (DOTC) Arnaldo C. Reyes (DOST) Tess Pantalla (NIA) Atty. Elvira V. Estanislao (BCDA)

Tel No. 304-3511 Tel No. 726-3508 Tel No. 837-2071 Tel No. 927-0923 Tel No. 816-6666 loc: 167

Ma. Otelia F. Eclavea (NHA) Atty. Ma. Hiyasmin H. Delos Santos (PPA) Engr. Clarito C. Magsino (DBP)

Tel No. 928-4561 Tel No. 527-8356 loc:356/541 Tel No. 892-4467/818-9511 loc: 2632

Roland C. Viray (PUP) Ariel S. Betan (U.P) Tel No. 716-9153 Tel No. 925-0984

loc:2525 For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph.

Page 4: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

3

CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES

I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood

Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit.

2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing

Office reported 100% completion.

II. CRITERIA FOR EVALUATION

Amended Guidelines as Approved by NEDA InfraCom 27 August 2008

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Materials 0.20 Time 0.15 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety and 0.07 Health (ESH) Resources Deployment 0.05 TOTAL 1.00

Page 5: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

4

As approved by NEDA InfraCom

19 May 2005 During Construction Upon Completion

Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 TOTAL 1.00

As approved by NEDA InfraCom

30 January 1998

During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Time 0.50 Time 0.10 TOTAL 1.00 Facilities 0.03 Environmental, Safety

and Health (ESH) 0.07 Resources Deployment 0.10 TOTAL 1.00

Page 6: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

5

III. CPES RATING & ITS QUALITATIVE DESCRIPTION

CPES Implementing Guidelines as Approved on 27 August 2008

As Approved on May 2005 and 30 January 1998

*CPES RATING Ranges Rating Qualitative Description

>96% Outstanding

>89% but < 96% Very Satisfactory >82% but < 89% Satisfactory >75% but < 82% Unsatisfactory < 75% Poor

*CPES RATING Ranges Rating Qualitative Description

>90% Outstanding

>80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor

Page 7: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

6

*CAUSES OF DELAY

CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS

C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds

C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation

of utilities, (i.e. PLDT, MERALCO posts and other similar cases)

Page 8: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

7

*CAUSES OF DELAY OTHER-RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural calamities; occurrence of flooding/ siltation on site; unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)

Page 9: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 05/30/08 NCR 3.341 90 C 0.393 0.149 0.300 - - - 84.20 *84.20%

V. Satisfactory

121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00%

Satisfactory

121 Construction Corporation (Formerly: 121 Construction) 21686 Impvt. of MPB at Sta. Maria Agro-Industrial

High School 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding

121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of Multi-Purpose Bldg., Brgy. Mabini

J. Rizal 02/24/10 NCR 9.315 180 O 0.379 0.240 0.150 0.030 0.047 0.050 89.60 -

2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 -

2H2L Construction 16293 Const. of MPB @ Jacinto St. 09/05/07 XI 0.471 105 C 0.365 0.300 0.300 - - - 96.50 *96.50% Oustanding

2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90%

V. Satisfactory

2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20%

V. Satisfactory

2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory

2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86%

V. Satisfactory

2-R Construction & Supply 15304 Const. of Additional Classroom @ Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 *86.80%

Satisfactory

2-R Construction & Supply 15304 Impvt./Rehab. of PMA Road, PMA Cut=off Road 1&2 11/26/07 CAR 4.811 30 C 0.260 0.200 0.300 - - - 76.00 *76.00%

Satisfactory

2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%

V. Satisfactory

310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge Approaches

(Across Pasig River) 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory

3E Construction 19588 Completion of Multi-Purpose Bldg., (Water District, Phase IV) Tankulan 03/03/08 X 2.365 120 C 0.335 0.136 0.000 - - - 47.10 71.44%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page1

Page 10: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road, Brgy. Bacong 06/10/09 VIII 19.289 210 O 0.365 0.240 0.150 0.030 0.033 0.033 85.10 -

3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory

3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road, Brgy. Bacong 09/18/09 VIII 19.289 230 O 0.356 0.250 0.150 0.030 0.051 0.033 87.00 -

3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.60 91.07%

V. Satisfactory

3K Builders 27277 Const. of 1 Unit 1 CL Dullao E/S 03/06/08 II 0.410 90 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

3K Builders 27277 Const. of FMR @ Brgy. Bobonan 11/23/07 I 0.478 45 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding

3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 *95.80%

V.Satisfactory

3K Rock Engineering 27908 Const. of Cultural Tourism Center, Saguday NHS 05/26/08 II 0.954 45 C 0.233 0.200 0.300 - - - 73.30 81.14%

V. Satisfactory

3K Rock Engineering 27908 Const. of Flood Control, Sangbay 08/18/08 II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 *82.50% V. Satisfactory

3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School 08/18/08 II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 *89.30%

V. Satisfactory

3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S 11/25/08 II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

3K Rock Engineering 27908 Const./Impvt. of Nat'l Road along Echague-Jones Maddela Road 08/28/07 II 2.722 140 C 0.319 0.200 0.300 - - - 81.90 *81.90%

V. Satisfactory

3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70 *90.70%

V. Satisfactory

3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 *91.10%

V. Satisfactory

3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.80 89.64%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page2

Page 11: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

3RB Construction & Supply 19541 Road Concreting & Impvt. of Brgy. Road 05/18/09 V 0.959 160 O 0.333 0.300 0.150 0.015 0.035 0.050 88.30 -

3RB Construction & Supply 19541 Const. of Almine-Bagacay Road, Almine Section 02/23/07 V 4.625 210 O 0.184 0.059 0.100 0.015 0.027 0.100 48.50 -

3RB Construction & Supply 19541 Const./Rehab. of Water Supply, Level 1 and II System 08/19/08 IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 73.94%

Satisfactory

3RB Construction & Supply 19541Road Upgrading along DM Jct.-Leg.-Sto.

Domingo-Tab.-Cam. Sur Bdry., Tiwi-Tabaco Section

02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30% Satisfactory

3RB Construction & Supply 19541 Impvt. of San Fernando North Road, San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -

3RB Construction & Supply 19541 Road Conc. & Impvt. of Barangay Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50 86.38% Satisfactory

3RB Construction & Supply/Ajan Jaeda, Inc. (JV) JV-08-209 Const. of Tagas-Divino Rostro Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -

3RB Construction and Supply 19541 Rehabilitation of Canal Network (phase 1) 08/14/07 NIA-V 11.008 150 O 0.276 0.200 0.100 0.018 0.033 0.200 82.70 -

3RB Construction and Supply 19541 Rehabilitation of Canal Network (phase 2) 08/14/07 NIA-V 8.856 150 O 0.291 0.200 0.100 0.018 0.033 0.200 84.20 -

3S Builders 18009 Completion of Drainage System 05/29/08 VII 0.634 60 C 0.333 0.300 0.300 - - - 93.30 91.50% Outstanding

4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory

4 A's Construction 9446 Construction of Road 08/11/08 II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory

4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory

4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

4B Construction Corporation 23445 Upgrading and Concreting of Subic-Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 83.76%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page3

Page 12: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

4B Construction Corp. 23445Rehab./Reconst./Upgrading of Damaged

Paved National Road, Olongapo-Bugallon Road

05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%Satisfactory

525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%

V. Satisfactory

525 Construction / MGSCC (JV)JV-07-095/

SLI-SN-005104

Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50 *90.50%

V.Satisfactory

525 Construction/MGSCC Joint Venture JV-08-235 Rehabilitation of Sta. Maria-Norzagaray

Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20 86.64% Satisfactory

558 Builders & Construction Supply 25751 Conc. Sarangani-Davao del Sur Coastal Road (Taluya Section) 05/28/08 XII 9.435 189 C 0.346 0.300 0.000 - - - 64.60 67.68%

Fair

628 Construction Enterprises 30049 Construction of Two Classroom School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70 *90.70%

V. Satisfactory

722 Construction 21923 Rehab/Reconst./Upgrading of Old Cagayan Valley Road (Pulilan Section) 05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%

Satisfactory

722 Construction 21923 Conc. of Road @ at Brgy. Palo Alto 11/19/07 IV-A 2.400 49 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory

722 Construction 21923Const. of Multi-Purpose Bldg. Malinta E/S Lawang Bato E/S, Brgy. Lawang Bato &

Natividad Homes03/03/09 NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10%

Satisfactory

722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.50 89.52%

V.Satisfactory

722 Construction 21923 Const. of Water System @ Northville II 08/19/08 NCR 1.424 60 C 0.278 0.177 0.300 - - - 75.50 *75.50% Satisfactory

722 Construction 21923 Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada Section 08/29/08 III 3.807 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

722 Construction 21923 Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos Road (Barihan Section) 08/27/08 III 4.957 10 C 0.361 0.200 0.300 - - - 86.10 *86.10%

V. Satisfactory

722 Construction 21923 Repair/Rehab. of Road, Brgy. Perez 05/20/08 III 0.618 70 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

722 Construction 21923 Rehab./Reconst./Upgrading along Rizal Avenue Extension 05/27/09 NCR 9.494 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page4

Page 13: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

722 Construction 10221 Const. of MPB (Day Care) at Brgy. Polo 09/16/09 NCR 1.901 75 C 0.486 0.133 0.300 - - - 91.90 *91.90% V. Satisfactory

739 Builders 31174 Completion of MPB, Brgy. Capangpangan 11/13/08 I 1.518 54 C 0.327 0.200 0.300 - - - 82.70 *82.70% V. Satisfactory

739 Builders 31174 Conc. of Caparacadan Road 05/17/08 I 0.189 7 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory

739 Builders 31174 Const. of MPB @ Brgy. Sabang 05/17/08 I 4.750 150 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory

739 Builders 31174 Const. of MPB @ San Lorenzo Village 02/28/08 I 1.087 68 C 0.261 0.200 0.300 - - - 76.10 *76.10% Satisfactory

739 Builders 31174 Repair of Bantay West E/S 11/19/07 I 0.380 26 C 0.240 0.300 0.300 - - - 84.00 *83.90% V. Satisfactory

739 Builders 31174 Road Concreting, Brgy. Napo 02/28/09 I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory

739 Builders 31174 Construction of School Building, Pila E/S, Brgy. Pila 09/07/09 I 0.950 60 C 0.454 0.154 0.300 - - - 90.80 *90.80%

V. Satisfactory

747 Builder & Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 05/18/09 IV-A 19.213 180 O 0.371 0.240 0.150 0.030 0.030 0.050 87.10 -

747 Builders & Trader 16892 Conc./Impvt. of Manila East Road 03/05/08 IV-A 6.236 150 C 0.275 0.200 0.300 - - - 77.50 83.44% V. Satisfactory

747 Builders & Trader 16892 Impvt. of Roads with Drainage System along Dalaging Bukid St. 08/22/07 NCR 14.255 150 C 0.276 0.200 0.300 - - - 77.60 *77.60%

Satisfactory

747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank 03/12/09 IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.60 86.97%

Satisfactory

747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. 11/21/08 NCR 9.589 120 C 0.355 0.200 0.300 - - - 85.50 78.96%

Satisfactory

747 Builders and Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 08/26/09 IVA 19.213 180 C 0.411 0.200 0.300 - - - 91.10 88.70%

Satisfactory

811 Trading & Construction 21215 Const. of MPB at Sitio Simbahan, Brgy. Bagong Bayan II 05/15/08 IV-B 0.477 60 C 0.342 0.200 0.300 - - - 84.20 *84.20%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page5

Page 14: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

811 Trading & Construction 21215Const. of Two (2) Storey Bldg. Six (6)

Classroom Sch. Bldg. @ Dona Asuncion Reyes Memorial E/S

05/14/08 IV-B 0.948 80 C 0.304 0.300 0.300 - - - 90.40 91.73% Outstanding

811 Trading & Construction 21215 Repair/Rehab. of Multi-Purpose Building (Phase II) 02/26/09 IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60 *89.60%

V.Satisfactory

811 Trading & Construction 21215 Repair/Rehab. of National Roads & Bridges, Mansalay Section 11/19/08 IV-B 4.710 90 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V. Satisfactory

888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ. Road,

Calatrava-San Agustin Road (Intermittent Section)

11/25/08 IV-B 9.999 32 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

888 ACY Enterprises 32898Reconst.(Conc. Paving) of loay Interior Rd.,

Trinidad and San Miguel Sect., Trinidad and San Miguel

09/10/09 VII 14.320 232 O 0.341 0.300 0.017 0.030 0.037 0.050 77.50 -

888 ACY Enterprises 32898Reconst. (Conc. Paving) of Jct. LIR

Buenavista, Carmen-Danao-Getafe Rd. Poblacion Danao Sect.

09/09/09 VII 9.541 246 O 0.342 0.300 0.000 0.030 0.037 0.050 75.90 -

A C J Construction Resources 10635 Concreting of Poblacion Magpet-Nowa-Basak Road (Basak Section) 05/30/09 R-XII 18.797 180 O 0.336 0.300 0.000 0.024 0.055 0.050 76.50 -

A C O Construction 13105Const. of Rotonda along National Highway

(Zamboanga Peninsula) Cross Rd. Upgrading Project @ Poblacion Ipil

02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -

A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.20 86.90%

Satisfactory

A. Ballesta Construction 8446 Const. of Road Network along E. Balite Boulevard Ext. 08/30/08 VIII 14.393 160 C 0.242 0.200 0.300 - - - 74.20 61.12%

Fair

A. D. P. Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 09/04/09 XI 58.261 290 O 0.360 0.240 0.150 0.030 0.041 0.033 85.40 -

A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO 309+300 - KO 309+878 05/27/09 II 18.811 130 O 0.330 0.300 0.150 0.030 0.051 0.050 91.10 -

A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road 11/20/08 II 9.648 180 C 0.344 0.200 0.300 - - - 84.40 82.84% V. Satisfactory

A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Naguilian-San Mariano Rd., Villapaz Section 08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page6

Page 15: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.00 91.42%

V. Satisfactory

A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.10 91.10%

V. Satisfactory

A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.50 88.78%

Satisfactory

A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.80 86.78%

Satisfactory

A. Montalbo Trading and Construction 32684 Const. of Multi-Purpose Building at Bigain

1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory

A. Seva Construction 20124 Const. of Building at San Fernando H/S 08/30/07 V 0.468 120 C 0.358 0.200 0.300 - - - 85.80 83.91% V. Satisfactory

A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater 06/27/08 PUP 1.389 60 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater 01/04/08 PUP 1.361 60 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A.A. De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20 *99.20%

Outstanding

A.A. De Vera Construction 6191Completion of Tagbilaran City Puericulture

Center & Maternity House and Related Facilities

06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding

A.A. De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.70 95.52%

V. Satisfactory

A.A. De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%Satisfactory

A.A. De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S 11/21/08 VII 4.175 120 C 0.367 0.300 0.300 - - - 96.70 94.18%

Outstanding

A.A. De Vera Construction 6191 Const. of Loon South CES-SPED Center Bldg. 11/20/07 VII 2.780 140 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

A.A. De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory

A.B. Aponesto Construction, parts & Supply 22998 Concreting of Montevista-DNAS Road 06/04/09 XI 32.460 300 O 0.356 0.300 0.150 0.030 0.037 0.033 90.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page7

Page 16: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.B. Aponesto Construction, Parts & Supply 22998 Concreting of Montevista-DNAS Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30 88.48%

Satisfactory

A.B. Taylan Construction & Development 25273 Const. of RCBC and Canal along Manila

North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory

A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer and Drainage System at Northwing and

Eastwing07/23/08 PUP 1.241 67 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus 11/08/07 PUP 1.120 60 C 0.400 0.300 0.300 - - - 100.00 100.00% Outstanding

A.C. Rivero Development Corporation 5122 Const./Impvt. of Multi-Purpose Bldg. at

Maasin City (Legislative Building) 03/06/09 VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory

A.C. Rivero Development Corporation 5122 Widening of Cabalagnan Bridge I 02/27/08 VI 7.946 215 C 0.323 0.200 0.300 - - - 82.30 81.31%

V. Satisfactory

A.C. Rivero Development Corporation 5122

Rehab./Reconst./Upgrading of Bacolod South Road Km. 6+862-Km. 8+350 w/

exception09/12/09 VI 26.470 280 O 0.331 0.282 0.150 0.030 0.045 0.033 87.10 -

A.C. Rivero Development Corporation (Formerly: A.C. Rivero

Construction)5122

Rehab./Reconst./Upgrading of Bacolod South Rd. Km. 6+862 to Km. 8+350 with

exceptions03/06/10 VI 26.337 280 C 0.393 0.200 0.300 - - - 89.30 87.98%

Satisfactory

A.C. Soliven Construction & General Merchandise 19278 Construction of 2 CL S.B. at La Paz H/S 09/01/09 III 0.974 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%

V. Satisfactory

A.C. Soliven Construction & General Merchandise 19278

Channel Impvt./Slope Protection @ San Roque Creek, Camias Creek & San Vicente

Creek02/23/10 III 4.781 60 C 0.445 0.177 0.300 - - - 92.20 92.20%

V. Satisfactory

A.D. Construction 6946 Const. of Sch. Bldg. at Nato E/S 11/20/07 V 0.372 90 C 0.372 0.171 0.300 - - - 84.30 *84.30% V. Satisfactory

A.D. Construction 6946 Conc. of Line Canal along National Road, Concepcion 09/09/09 IVA 1.442 90 C 0.371 0.200 0.300 - - - 87.10 *87.10%

Satisfactory

A.D.L. Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School 08/21/08 IV-B 0.481 69 C 0.360 0.200 0.300 - - - 86.00 84.11%

V. Satisfactory

A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road 12/01/07 VI 18.918 200 C 0.228 0.300 0.300 - - - 82.80 82.80% V. Satisfactory

A.D.P. Const. & Supply 3466 Const. of Bugasong-Valderrama Road, Liaures Section (Alternate Route) 11/27/08 VI 14.426 178 C 0.335 0.087 0.300 - - - 72.20 81.05%

V. Satisfactory

A.D.P. Const. & Supply 3466 Const. of Magballo Bridge (Phase III) 03/06/07 VI 10.561 220 O 0.356 0.300 0.070 0.030 0.030 0.067 85.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page8

Page 17: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.D.P. Const. & Supply 3466 Reconst. of Dumaguete North Road 03/12/09 VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20 82.14%Satisfactory

A.D.S. San Juan Construction 12853 Conc. of Dionisio Anore St., Brgy. Mambog 02/16/10 IVA 1.728 90 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory

A.F.G. Construction and Construction Supply 17161 Conc. of Road @ Brgy. Mansilingan 02/27/08 VI 1.861 150 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

A.F.G. Construction and Construction Supply 17161 Const. of Diversion/By Pass Road along

Kalibo-Iloilo Highway, Banga Section 11/30/08 VI 14.461 180 C 0.351 0.300 0.300 - - - 95.10 90.90% Outstanding

A.F.G. Construction and Construction Supply 17161 Const. of MPB (covered court) at San

Enrique National High School 03/05/09 VI 1.924 78 O 0.309 0.298 0.150 0.023 0.018 0.050 84.80 -

A.F.G. Construction and Construction Supply 17161 Rehab. of Dumaguete North Road 11/27/08 VII 4.894 42 C 0.324 0.200 0.300 - - - 82.40 73.10%

Satisfactory

A.F.G. Construction and Construction Supply 17161 Rehab. of Bacolod South Rd. (Hingaran

Section) 09/15/09 VI 14.221 222 C 0.398 0.133 0.300 - - - 83.10 83.88% Satisfactory

A.F.G. Construction and Construction Supply 17161 Const. of MPB (Covered Court) at San

Enrique NHS 03/10/10 VI 1.925 78 C 0.405 0.200 0.300 - - - 90.50 87.08% Satisfactory

A.G. Cosipag Construction 12700 Balogo CIS 06/1-6/09 NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68 *84.68% Satisfactory

A.G. Herrera Construction Corp. 26307 Construction of Multi-Purpose Building, Sto. Cristo 06/01/09 III 2.381 80 C 0.488 0.133 0.300 - - - 92.10

90.42%

V. Satisfactory

A.I.P. Construction 32458 Road Concreting at Pinget Barangay 03/13/09 CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60% Satisfactory

A.J. Lava Builders 22265 Const. of the Makinabang Baliuag FMR 11/24/08 III 4.769 62 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory

A.J. Lava Builders 22265 Rehab. of Road @ Brgy. San Isidro 08/30/07 IV-A 1.922 60 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory

A.J. Lava Builders 22265 Repair & Rehab. of Daang Maharlika Road (Guiguinto & Plaridel Section) 08/28/08 III 9.930 20 C 0.257 0.211 0.300 - - - 76.80 *76.80%

Satisfactory

A.J. Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway 11/24/08 III 9.927 18 C 0.255 0.300 0.300 - - - 85.50 *85.50%

V. Satisfactory

A.J. Lava Builders 22265 Impvt./Rehab. of MPB, Brgy. San Antonio 09/14/09 NCR 2.021 90 C 0.412 0.133 0.300 - - - 84.50 *84.50% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page9

Page 18: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.J. Taylan Construction Corporation 2336 Const. of San Mateo Bridge 05/22/08 I 16.502 331 C 0.236 0.269 0.300 - - - 80.50 *80.50% V. Satisfactory

A.J. Taylan Construction Corporation 2336 Const. of Seawall 08/25/08 II 14.173 270 C 0.323 0.226 0.000 - - - 54.90 74.58% Satisfactory

A.J. Taylan Construction Corporation 2336 Impvt. of Ilocos Norte-Kalinga Apayao Road 02/29/08 I 19.283 270 C 0.215 0.200 0.300 - - - 71.50 77.80%

Satisfactory

A.J. Taylan Construction Corporation 2336Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road,

Ilocos Norte Side09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

A.L. Dare Construction 11932 Const./Rehab./Replacement/ Completion/ and Repair of Plaridel E/S 02/27/08 NCR 1.718 120 O 0.324 0.168 0.100 0.020 0.047 0.100 75.90 -

A.L. Dare Construction 11932 Impvt./Rehab. of Brgy. Roads @ Sindalan and Dolores 05/12/08 III 4.753 50 C 0.313 0.200 0.300 - - - 81.30 *81.30%

V. Satisfactory

A.L. Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

A.L. Salazar Construction, Inc. 3899 Conc. of Taytay (Pancol)-El Nido National Road 05/29/08 IV-B 28.821 255 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V. Satisfactory

A.L. Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong Bukawe, Phase II 11/27/08 IV-A 14.346 120 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

A.L.R. Construction 24110 Const. of 2 CL S/B @ Dungon E/S 11/19/07 IV-B 0.852 75 O 0.329 0.236 0.100 0.015 0.032 0.100 81.20 81.20% V.Satisfactory

A.L.R. Construction 24110 Const. of Schl. Bldg. 2 Storey, 4 CL @ Gulod NHS, Brgy. Gulod Phase I) 11/19/07 IV-A 0.960 45 C 0.254 0.200 0.300 - - - 75.40 *75.40%

Satisfactory

A.L.R. Construction Corporation 24110 Construction of Overpass (Phase I), Pagsawitan 05/30/09 IV-A 3.849 129 C 0.482 0.133 0.300 - - - 91.50 *91.50%

V. Satisfactory

A.L.R. Construction Corporation 24110Const. of Pedestrian Overpass at Brgy. San

Antonio and Biñan-Carmona Road Intersection

06/01/09 IV-A 19.203 241 C 0.466 0.133 0.300 - - - 89.90 90.86% V. Satisfactory

A.L.R. Construction Corporation 24110 Conc.of Road, Inday Subdivision 03/13/09 IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40 89.40% V. Satisfactory

A.L.R. Construction Corporation 24110 Const. of Pedestrian Overpass along Calamba-Sto. Tomas 05/22/08 IV-A 9.601 120 C 0.352 0.200 0.300 - - - 85.20 83.22%

V. Satisfactory

A.L.R. Construction Corporation 24110 Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino M. Santos NHS 03/13/09 IVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page10

Page 19: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.L.R. Construction Corporation 24110 Const. of Pedestrian Overpass (Phase II) Brgy. Pagsawitan 09/01/09 IVA 2.882 35 C 0.484 0.185 0.300 - - - 96.90 *96.90%

Outstanding

A.L.R. Construction Corporation 24110 Const. of Multi-Purpose Building at Brgy. Timugan 09/03/09 IVA 2.111 40 C 0.389 0.155 0.300 - - - 84.40 *84.40%

Satisfactory

A.L.R. Construction Corporation 24110 Conc. of Roads, Brgy. San Luis 02/15/10 IVA 3.358 90 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory

A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) 7096

Kalibo Airport Development Project (Asphalt Overlay of Runway, Extension of

Apron and Construction of Drainage Canal)04/14/10 DOTC 283.188 360 C 0.449 0.200 0.300 - - - 94.90 92.40%

V. Satisfactory

A.M. Ayunan Construction 13983 Const. of MPB at Datu Usman E/S 11/18/08 XII 1.908 75 C 0.319 0.182 0.300 - - - 80.10 65.40% Fair

A.M. Oreta - IBC (JV) JV-07-097 Conc. of Iloilo City-Caticlan Highway (Pototan-Passi-Capiz Bdry. Section) 03/17/09 VI 158.000 540 O 0.356 0.299 0.150 0.030 0.060 0.033 92.80 -

A.M. Oreta & Co. Inc. / IBC Int'l Builders Corp. (JV) JV-05-011 Const. of Ibajay Bridge & Approaches 05/26/08 VI 138.616 611 C 0.370 0.278 0.000 - - - 64.80 78.74%

Satisfactory

A.M. Oreta & Co., INC./IBC. Int'l Builders Corp. (JV) JV-07096 Kalibo Airport Development Project 04/23/09 DOTC 283.188 360 O 0.318 0.300 0.150 0.030 0.059 0.050 90.70 -

A.M. Oreta-IBC Joint Venture JV-07-097 Conc. of Iloilo City-Caticlan Highway (Pototan-Passi-Capiz Bdry. Section) 09/09/09 VI 158.000 540 O 0.319 0.300 0.150 0.030 0.060 0.050 90.90 -

A.M. Robles Construction 28056 Conc. of FMR, Brgy. Colo 11/17/08 I 1.926 55 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

A.M. Robles Construction 28056 Completion of Multi-Purpose Building at Pinaglabanan 05/28/09 NCR 4.776 90 C 0.487 0.133 0.300 - - - 92.00 *92.00%

V. Satisfactory

A.M. Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon 03/02/09 I 0.530 40 C 0.415 0.184 0.300 - - - 89.90 *89.90%

V. Satisfactory

A.M.P. Construction 16574 Const. of 2 Cl , CLSU 11/21/07 III 0.657 60 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

A.P. Palacios Construction 29021 Completion/Conc. of Road, Buhangin to ANSHS Road 08/25/08 III 2.170 150 C 0.347 0.206 0.300 - - - 85.30 *85.30%

V. Satisfactory

A.P. Palacios Construction 29021 Conc. of Road from Brgy. Bacong to Brgy. San Jose 11/26/08 III 0.702 75 C 0.316 0.300 0.300 - - - 91.60 *92.50%

Outstanding

A.P. Palacios Construction 29021 Const. of Drainage System, Public Market (Ph-2) 05/26/08 III 0.934 60 C 0.284 0.274 0.300 - - - 85.80 *85.80%

V. Satisfactory 07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page11

Page 20: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.P. Palacios Construction 29021 Const. of Flood Control (Gabion Type) @ Brgy. Caragsacan 11/24/07 III 0.930 120 C 0.340 0.200 0.300 - - - 84.00 *88.20%

V. Satisfactory

A.P. Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

A.P.B. Construction 17055 Conc. of Kisad Road (km. 249+303 - km. 249+399) 08/29/07 CAR 2.807 72 C 0.313 0.224 0.300 - - - 83.70 *83.70%

V. Satisfactory

A.P.B. Construction 17055 Road Opening at Middle Quirino Hill Brgy. 08/28/08 CAR 0.953 45 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

A.P.B. Construction 17055 Rehab. and Conc. of Road at Brgy. Balligi, Kias Barangay 03/03/10 CAR 1.248 60 C 0.384 0.158 0.300 - - - 84.20 84.20%

Satisfactory

A.Q. Loisaga Construction & General Services 32691 Const. of 2 CL in Quillo-Quillo E/S 09/01/09 IVA 2.023 120 C 0.470 0.133 0.300 - - - 90.30 *90.30%

V. Satisfactory

A.R. & Mark Builders 31673 Const. of 1 CL Sch. Bldg. @ Talahiron ES 11/20/08 X 0.495 60 C 0.236 0.300 0.300 - - - 83.60 *83.60% V. Satisfactory

A.R. & Mark Builders 31673 Const. of @-CL Maramag CES 02/25/10 X 0.989 105 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory

A.R. Lustre Jr. Construction 7680 Puerto Princesa Airport Development Project 8/13-14/09 DOTC 28.874 240 C 0.488 0.200 0.300 - - - 98.80 98.80%

Outstanding

A.R. Lustre Jr. Construction 7680 Puerto Princesa Airport Development Project 8/13-14/09 DOTC 90.817 270 C 0.488 0.200 0.300 - - - 98.80 98.80%

Outstanding

A.R. Lustre Jr. Construction 7680 Rehab/Reconst./Upgrading of Bigaa-Plaridel via Bulacan and Malolos Road 05/28/09 III 13.077 75 C 0.449 0.196 0.300 - - - 94.50 *94.50%

V. Satisfactory

A.R. Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-Canigaran Road 11/17/08 IV-B 9.697 60 C 0.332 0.300 0.300 - - - 93.20 91.16%

Outstanding

A.R. Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge, PPSR 08/11/08 IV-B 20.378 240 C 0.374 0.200 0.300 - - - 87.40 85.06% V. Satisfactory

A.R. Lustre Jr. Construction 7680 Const./Rehab. of Iwahig-Tacduan Diversion Road National Highway 11/29/07 IV-B 11.430 150 C 0.289 0.239 0.300 - - - 82.80 82.80%

V. Satisfactory

A.R. Lustre Jr. Construction 7680 Construction of Multi-Purpose Building 03/07/09 IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80 *88.80% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page12

Page 21: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.R. Lustre Jr. Construction 7680 Repair/Rehab/Impvt. of Santiago-Syjuco E/S 09/17/09 NCR 0.482 45 C 0.482 0.000 0.300 - - - 78.20 *78.20%

Unsatisfactory

A.R. Lustre Jr. Construction 7680 Conc. of Puerto-Princesa-Sabang Road 09/11/09 IVB 48.140 284 C 0.419 0.200 0.300 - - - 91.90 90.61%V. Satisfactory

A.R.L. Construction 27645 Rehab/Impvt./Upgrading of Pulilan-Calumpit Road (Pulilan Section) 05/28/09 III 9.542 60 C 0.376 0.200 0.300 - - - 87.60 *87.60%

Satisfactory

A.R.L. Construction 27645 Conc. of Brgy. Road Caniogan 08/27/08 III 0.956 12 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

A.R.L. Construction 27645 Package IV-MRA-08 Asphalt Overlay of Road @ Poblacion 11/24/08 III 0.500 20 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

A.R.L. Construction 27645 Riprapping of Access Road @ Poblacion 11/24/08 III 0.477 35 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory

A.R.L. Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40 *86.40%

Satisfactory

A.R.L. Construction 27645Const. of Flood Control (Revetrment),

Poblacion, San Sebastian, San Jose, Sta. Monica,

09/04/09 III 6.697 80 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory

A.R.L. Construction 27645 Repair/Rehab. of School Building BSU 03/03/10 III 0.989 18 C 0.454 0.148 0.300 - - - 90.20 90.20% V. Satisfactory

A.S. Obquia Construction 19844 Completion of MPB 09/03/08 VII 0.175 120 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding

A.S.S Construction 31509 Completion of Alaremil Building II 03/2-3/10 DOST 9.607 250 C 0.496 0.200 0.300 - - - 99.60 97.64% Outstanding

A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

A.S.S. Construction 31509 Construction of Sports Complex 05/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding

A.S.S. Construction 31509 Partial Completion of vast set, pcastrd & pccerd bldg. 07/08/09 DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30 *98.30%

Outstanding

A.S.V. Construction Supply and Services 13490 Const. of Daang Liputan FMR 08/14/07 III 0.471 60 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

A.SM. Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting of Sotejo

Hall, College of Dentistry 03/20/09 U.P. 1.528 120 O 0.400 0.300 0.070 0.030 0.047 0.100 94.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page13

Page 22: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

A.SM. Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting Works 03/24/09 U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00 90.00%

V. Satisfactory

A.Y.U. Engineering and Construction 25632 Conc. of Road at Brgy. Dumoy 12/03/08 XI 9.435 90 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

Abesco Construction & Development Corp. 2934 Construction of Multi-Purpose Building @

Cupang Elem. School 05/21/09 III 3.273 88 C 0.484 0.133 0.300 - - - 91.70 90.23%V. Satisfactory

Abu Construction 22313 Const. of Tantangan RCDG Bridge 03/06/08 XII 3.858 154 C 0.323 0.237 0.300 - - - 86.00 83.48% V. Satisfactory

Abu Construction 22313 Rehab. of Potable Water System @ Brgy. Saravia 08/29/08 XII 0.873 120 C 0.338 0.300 0.300 - - - 93.80 87.57%

V. Satisfactory

Abulug Construction 5593 Construction of Canal and Canal Structures (LMC-ARIP-10-06) 07/02/07 II 4.877 210 C 0.400 0.300 - - - - 70.00 70.00%

Fair

Abulug Construction Co., Inc. 5593 Matuno-Sto. Domingo CIS 2/11-12/2008 NIA 3.126 150 O 0.3515 0.1619 0.1 0.03 0.035 0.2 87.84 -

Abulug Construction Company, Inc. 5593 Concreting of Jct. Claveria-Dibalio-Luzon Road 05/21/09 II 9.648 273 C 0.485 0.133 0.300 - - - 91.80 88.95%

Satisfactory

Abulug Construction Company, Inc. 5593 Concrete Paving of Ballesteros Road (Washington & Luna St.,) 05/21/09 II 1.929 150 C 0.375 0.240 0.150 0.030 0.051 0.033 87.90 -

Abulug Construction Company, Inc. 5593 Conc. of Jct. Cadcadir-Cabugao Road 02/19/08 II 8.199 180 C 0.269 0.300 0.300 - - - 86.90 84.92% V. Satisfactory

Abulug Construction Company, Inc. 5593 Conc. of Jct. Claveria-Dibalio-Luzon Road 02/24/09 II 9.648 259 O 0.344 0.287 0.150 0.015 0.040 0.050 88.60 -

Abulug Construction Company, Inc. 5593 Conc. of Larion-Cabbo Road, Tuguegarao City & Penablanca 08/27/08 II 13.884 240 C 0.358 0.200 0.300 - - - 85.80 84.30%

V. Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

Abulug Construction Company, Inc. 5593 Const. of Public Market (Phase II) 02/23/09 II 1.446 269 C 0.476 0.133 0.300 - - - 90.90 87.40% Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Punta Seawall 02/19/08 II 0.298 60 C 0.310 0.200 0.300 - - - 81.00 79.26% Satisfactory

Abulug Construction Company, Inc. 5593 Lucban River Control Project 02/29/09 II 3.858 347 C 0.417 0.133 0.300 - - - 85.00 83.35% Satisfactory

Abulug Construction Company, Inc. 5593 Matuno- Sto. Domingo CIS 2/11-12/08 NIA 3.126 150 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -

Abulug Construction Company, Inc. 5593 Reblocking along MNR 08/26/08 II 19.296 180 C 0.295 0.215 0.300 - - - 81.00 82.08% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page14

Page 23: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Abulug Construction Company, Inc. 5593 Regravelling of Allasitan-Biduang-Nagattatan Road 08/15/07 II 1.923 90 C 0.300 0.200 0.300 - - - 80.00 78.38%

Satisfactory

Abulug Construction Company, Inc. 5593 Rehab. of Abra-Kalinga Road. Km. 423+500-Km. 426+500 11/13/07 CAR 1.878 100 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

Abulug Construction Company, Inc. 5593 Rehab. of Multi-Purpose Hall 11/13/07 CAR 0.944 121 O 0.246 0.184 0.300 - - - *73.00 -

Abulug Construction Company, Inc. 5593 Repair of Cristina H/S and Rehab. of Bucay C/S 05/30/07 CAR 0.474 76 O 0.381 0.264 0.100 0.020 0.029 0.100 89.40 -

Abulug Construction Company, Inc. 5593 Replacement of Langagan Bridge along MNR 08/26/08 II 4.814 150 C 0.370 0.201 0.300 - - - 87.10 86.20%

V. Satisfactory

Abulug Construction Company, Inc. 5593Reblocking along Bangag-Allapacan-Magapit Road (BAMR), KO686+400-

KO687+20009/08/09 II 7.999 150 C 0.406 0.200 0.300 - - - 90.60 *90.60%

V. Satisfactory

Abulug Construction Company, Inc. 5593 Concrete Paving of Ballesteros Road (Wasahington & Luna St.) 09/08/09 II 1.930 150 C 0.405 0.200 0.300 - - - 90.50 88.94%

Satisfactory

Abulug Construction Company, Inc. 5593 Const. of Zitanga Brgy. Roads 02/17/10 II 9.648 132 C 0.370 0.200 0.300 - - - 87.00 88.14% Satisfactory

Abulug Construction Company, Inc. 5593 Rehab. of Ballesteros Central School Building 02/17/10 II 0.192 60 C 0.437 0.133 0.300 - - - 87.00 87.00%

Satisfactory

Abulug Construction Company, Inc. 5593 Construction of Deepwell 02/18/10 II 0.289 60 C 0.396 0.133 0.300 - - - 82.90 82.90% Satisfactory

Abulug Developers and Builders Co., Inc. 2366 Reblocking along Manila North Road (Fugu

Bdry.-Bangag Section) 05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -

Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas

Construction)2366 Retrofitting of Pamplona Bridge, Manila

North Road 02/24/09 II 10.290 180 C 0.386 0.200 0.300 - - - 88.60 82.96% Satisfactory

Abulug Developers and Builders, Co. Inc. 2366 Reblocking along Manila North Road

(Ballesteros-Abulug Section) 09/08/09 II 18.527 210 C 0.407 0.200 0.300 - - - 90.70 89.38% V. Satisfactory

Abulug Developers and Builders, Co. Inc. 2366 Construction of 1-CL Bessang E/S 09/08/09 II 0.484 60 C 0.404 0.181 0.300 - - - 88.50 *88.50%

Satisfactory

Abulug Developers and Builders, Co., Inc. 2366 Emergency/Rehab. of Slope Protection KO

590+640, MNR 02/17/10 II 1.495 90 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory

Abulug Developers and Builders, Co., Inc. 2366 Emergency/Rehab. of Slope Protection KO

590+340, MNR 02/17/10 II 0.995 90 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page15

Page 24: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Abulug Developers and Builders, Co., Inc. 2366 Emergency Rehab. of Slope Protection KO

600+525-KO 602+200, MNR 3/16-17/2010 II 4.195 90 O 0.372 0.269 0.150 0.030 0.041 0.033 89.50 -

Abulug Developers and Builders, Co., Inc. 2366 Concrete Paving of Jones Street 02/12/10 II 0.868 90 C 0.384 0.200 0.300 - - - 88.40 88.40%

Satisfactory

Abulug Developers and Builders, Co., Inc. 2366 Reblocking along Manila North Road

(/Fugu Bdry. - Bangag Sect.) 02/17/10 II 19.299 234 C 0.394 0.200 0.300 - - - 89.40 88.08% Satisfactory

Abulug Developers and Builders, Co., Inc. 2366 Rehab./Regravelling of Curva to

Capallepaan Farm-to-Market Road 02/18/10 II 0.675 60 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory

Abulug Developers and Builders, Co., Inc. 2366 Road Opening of Pimpila Farm-to-Market

Road 02/17/10 II 0.820 75 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory

Aca Construction & Supply 10784 Conc. of Esperanza Road 05/27/08 I 0.382 30 C 0.262 0.300 0.300 - - - 86.20 * 86.20% V. Satisfactory

Aca Construction & Supply 10784 Construction of Multi-Purpose Building, Bancagan 02/26/09 I 0.096 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%

Satisfactory

Aca Construction & Supply 10784 Construction of Water Supply 02/26/09 I 0.096 30 C 0.338 0.188 0.300 - - - 82.60 *82.60%Satisfactory

Aca Construction & Supply 10784 Repair of Farm-to-Market Road 02/26/09 I 0.480 30 C 0.343 0.200 0.300 - - - 84.30 *84.30%Satisfactory

Accuracy Builders Enterprise 27507 River Impvt. of Cabalisian River, Brgy. Sta. Lucia 11/24/08 I 4.485 75 C 0.400 - 0.500 - - - 90.00 * 90.00%

V. Satisfactory

Acer Industrial/Solid Rock Construction Joint Venture

SLI-SN-005433/JV-

08-217

Rehabilitation of Libingan ng mga Bayani Road-MRT Road 05/27/09 NCR 4.694 75 C 0.396 0.133 0.300 - - - 82.90 *82.90%

Satisfactory

ACJ Construction Resources 10635 Concreting of Paco-Roxas-Arakan Road (Luhong-Kiyaab Section) 05/30/09 R-XII 18.566 205 C 0.338 0.200 0.300 - - - 83.80 88.42%

Satisifactory

ACJ Construction Resources 10635 Conc. of Paco-Roxas-Arakan Valley National Road, (Luhong-Kiyaab Section) 03/01/08 XII 12.751 170 C 0.365 0.102 0.300 - - - 76.70 *76.70%

Satisfactory

ACJ Construction Resources 10635 Concreting of Poblacion Magpet-Nowa Road (Nowa Basak Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -

ACJ Construction Resources 10635Const. of Malaang PSG Bridge inc. Conc.

Paving of Bridsge Approaches along Davao-Cotabato Road

05/17/08 XII 42.684 300 C 0.376 0.200 0.300 - - - 87.60 84.02% V. Satisfactory

ACJ Construction Resources 10635 Const. of MPB 08/23/08 XII 9.634 100 C 0.335 0.270 0.300 - - - 90.50 83.22% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page16

Page 25: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ACJ Construction Resources 10635 Rechanneling of Malamote River 11/22/08 XII 1.443 45 C 0.375 0.188 0.300 - - - 86.30 *86.30% V. Satisfactory

ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road Kiyaab-

Antipas Section (Km. 1648+300-Km.1649+385.63)

09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -

ACJ Construction Resources 10635 Conc. of Poblacion-Magpet-Nowa Road, Nowa-Basak Section w/ exception 09/05/09 XII 18.798 200 C 0.358 0.200 0.300 - - - 85.80 84.30%

Satisfactory

ACJ Construction Resources 10635 Asphalt Overlay along Davao-Cotabato Rd., Saguing Section 03/01/10 XII 6.765 68 C 0.429 0.200 0.300 - - - 92.90 92.90%

V. Satisfactory

ACJ Construction Resources 10635 Asphalt Overlay along Davao-Cotabato Rd., Paco Section 03/01/10 XII 7.711 71 C 0.429 0.200 0.300 - - - 92.90 92.90%

V. Satisfactory

ACJ Construction Resources 10635Const. of Kinamalig Bridge including

Concrete Paving of Approach along Paco-Roxas-Arakan

03/02/10 XII 12.815 202 C 0.384 0.142 0.300 - - - 82.60 86.08% Satisfactory

ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road, Kiyab-

Antipas Section, Km. 1648+300-Km. 1649+385.63

03/02/10 XII 16.826 175 C 0.379 0.143 0.300 - - - 82.20 85.71% Satisfactory

ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road,

inclined Gap Ipuan Section, Km. 1640+374.10 - Km. 1646+794.28

03/02/10 XII 13.144 189 C 0.394 0.145 0.300 - - - 83.90 83.90% Satisfactory

Acme Builders Corp./MWJ Construction JV JV-08-243 Conc. of Burauen-Albuena Road Km.

98+986.50-Km. 986+857.50 w/ exceptions 02/22/10 VIII 46.887 240 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisactory

Acme Builders Corporation 6442 Construction of Sinugbuhan Bridge 06/04/09 VI 33.384 676 C 0.441 0.133 0.300 - - - 87.40 85.20% Satisfactory

Acme Builders Corporation 6442 Asphalt Overlay along Tigbao-Pulak-Sta. Fe Road, Km 925+370-Km 926+379 03/18/09 VIII 11.310 90 C 0.393 0.133 0.300 - - - 82.60 *82.60%

Satisfactory

Acme Builders Corporation 6442 Clearing and Rehab. of Mangonbangon & Burayan River 11/25/08 VIII 9.635 150 C 0.312 0.200 0.300 - - - 81.20 *81.20%

V. Satisfactory

Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI 09/03/07 VIII 48.160 240 O 0.352 0.300 0.100 0.022 0.045 0.100 91.90 -

Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI 11/28/07 VIII 48.160 240 O 0.394 0.261 0.000 0.022 0.038 0.100 81.50 -

Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road 05/20/08 VI 33.383 600 O 0.323 0.196 0.100 0.030 0.050 0.100 79.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page17

Page 26: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road 12/05/08 VI 33.384 600 O 0.389 0.225 0.100 0.030 0.043 0.067 85.40 -

Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road 03/12/09 VI 33.384 600 O 0.315 0.291 0.150 0.030 0.040 0.033 85.90 -

Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

Acme Builders Corporation 6442 Rehab. of Guimbal Bridge along Iloilo-Antique Road 03/04/08 VI 33.372 600 C 0.267 0.200 0.300 - - - 76.70 78.59%

Satisfactory

Acme Builders Corporation 6442 Rehabilitation of Mahayahay Creek 03/03/09 VIII 6.709 170 C 0.375 0.133 0.300 - - - 80.80 84.10%Satisfactory

Acme Builders Corporation 6442 Construction of Palo East By-Pass Road 09/18/09 VIII 19.260 180 O 0.369 0.240 0.150 0.030 0.050 0.033 87.20 -

Acme Builders Corporation 6442 Const. of Palo East By-Pass Road 03/11/10 VIII 19.260 240 C 0.436 0.200 0.300 - - - 93.60 89.76% V. Satisfactory

Acme Builders Corporation / B. Vicencio Construction JV-07-066 Const. of Palo East By Pass Road (Const.

of Bernard Reed II Bridge) 08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -

Acme Builders Corporation / MWJ Construction (JV) JV-08-243 Const. of Albuera-Burauen Road including

Bridges, Burauen Sect. 09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -

Acme Builders Corporation/B. Vicencio Const. (JV) JV-07-067

Conc. of Oras-San Policarpio-Arteche Road, Brgy. Baras-Arteche (Poblacion)

Section05/19/08 VIII 59.291 315 C 0.338 0.300 0.300 - - - 93.80 93.02%

Outstanding

Acme Builders Corporation/B. Vicencio Construction (JV) JV-07-066 Const. of Palo East By-Pass Road (Const.

of Bernard Reed II Bridge) 06/09/09 VIII 57.823 566 O 0.367 0.281 0.150 0.030 0.037 0.050 91.50 -

ACO Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 11/21/08 IX 14.306 120 O 0.362 0.240 0.100 0.030 0.035 0.100 86.70 -

ACV Construction & Surveying 10903 Concreting of FMR @ Various Brgys., Urbiztondo and Mangatarem 03/09/09 I 3.838 60 C 0.353 0.200 0.300 - - - 85.30 *85.30%

Satisfactory

ADB Dynamic Builders & Supply 33359

Repair/Rehab. of St., Brgy. Dalupirit; Rehab. of San Roque St., Brgy.

Vinisitahan; Rehab./Repair of St., Brgy. Pilar

03/07/09 VIII 1.437 60 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding

Adelfa & Charlie Enterprises 11569

Completion/Continuation of Unfinished/Ongoing Bridges, Calaguise

Steel Bridge along Sambolawan-Calaguise-Calubian Road

08/22/08 VIII 34.810 290 C 0.338 0.200 0.300 - - - 83.80 82.15% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page18

Page 27: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Adelfa & Charlie Enterprises 11569 Conc. of Sambulawan-Calaguise-Calubian Road 11/23/07 VIII 4.744 120 C 0.376 0.200 0.300 - - - 87.60 *87.60%

V. Satisfactory

Adelfa & Charlie Enterprises 11569 Const. of Buho II Bridge 08/25/07 VIII 5.597 210 C 0.384 0.300 0.300 - - - 98.40 93.42% Outstanding

Adelfa & Charlie Enterprises 11569 Construction of MPP Brgy. Hibulangan 03/11/09 VIII 0.142 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%Satisfactory

Adelfa & Charlie Enterprises 11569 Mapuyo CIS 10/6-10/08 NIA 1.485 45 C 0.375 0.180 0.300 - - - 85.50 85.50% V.Satisfactory

Adelfa & Charlie Enterprises 11569 Rehab. of Palompon-Villaba Road 08/25/07 VIII 9.490 210 C 0.383 0.220 0.300 - - - 90.30 87.24% V. Satisfactory

Adelfa & Charlie Enterprises 11569Repair of Roads along Tabango-Villaba-Palompon Road & Sto. Rosario-Villaba

Road11/23/07 VIII 9.641 150 C 0.336 0.200 0.300 - - - 83.60 87.60%

V. Satisfactory

Adfil / RID Corporation Joint Venture JV-06-022 Repair/Rehab. of Patin-ay Bridge along Agusan-Davao Road, Patin-ay 06/08/09 XIII 23.749 658 C 0.458 0.200 0.300 - - - 95.80 91.84%

V. Satisfactory

Adfil Corporation 14437 Rehab./Reconst. of NRJ Bahbah-Talacogon Road 06/09/09 XIII 19.263 220 C 0.485 0.200 0.300 - - - 98.50 *98.50%

Outstanding

Adfil Corporation 14437 Rehab. of NRJ-Bahbah-Talacogon Road 06/02/09 XIII 14.427 210 O 0.380 0.300 0.150 0.030 0.061 0.050 97.10 -

Adfil Corporation 14437

Repair/Rehab./Impvt. of Roads & Bridges along the National Highway Epoxy Sealing of Cracks in concrete girder, deck slab & conc. Pavement (injectable epoxy) along

Bahbah, Talacogon Road

06/09/09 XIII 9.429 180 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding

Adfil Corporation 14437 Rehabilitation/Concreting of Tagcatong-Vinapor Road 05/25/09 XIII 9.629 210 C 0.489 0.133 0.300 - - - 92.20 *92.20%

V. Satisfactory

Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches 12/02/08 XIII 26.210 210 C 0.348 0.200 0.300 - - - 84.80 88.70%

V. Satisfactory

Adfil Corporation 14437 Conc. of Butuan City-Pianing/Tandag Road 12/03/08 XIII 4.012 105 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory

Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road 03/07/09 XIII 28.451 241 C 0.414 0.200 0.300 - - - 91.40 88.94% Satisfactory

Adfil Corporation 14437 Conc. of Gap along La Paz-Loreto Road 03/10/08 XIII 4.791 185 C 0.367 0.200 0.300 - - - 86.70 81.12% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page19

Page 28: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Adfil Corporation 14437 Const. of Cabadbaran River Dike (Downstream) 11/20/07 XIII 9.413 195 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

Adfil Corporation 14437 Const. of Cabadbaran River Dike (Upstream) 02/26/08 XIII 9.548 180 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) 05/17/08 XIII 22.141 280 C 0.360 0.300 0.300 - - - 96.00 96.00%

Outstanding

Adfil Corporation 14437 Rehab. of Camagong Flood Control 05/28/08 XIII 9.440 150 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

Adfil Corporation 14437 Rehab./Reconst. of Damaged Paved National Road along Agusan-Misamis Road 03/02/09 XIII 9.634 180 C 0.405 0.200 0.300 - - - 90.50 86.36%

Satisfactory

Adfil Corporation 14437 Rehab./Reconst. of Damaged Paved National Road along Agusan-Surigao Road 03/03/09 XIII 9.635 180 C 0.408 0.200 0.300 - - - 90.80 87.50%

Satisfactory

Adfil Corporation 14437Repair/Reconst. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Misamis Oriental

Road) inc. Bridge03/18/09 XIII 19.198 210 C 0.402 0.200 0.300 - - - 90.20 89.06%

V.Satisfactory

Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road 03/20/09 XIII 9.633 188 C 0.431 0.200 0.300 - - - 93.10 87.04%

Satisfactory

Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads Gingoog-Calveria-

Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -

Adfil Corporation 14437

Rehab./Reconst. of Damaged Paved National Rd. along Butuan City-CDO-Iligan

Rd.,(Agusan-Misamis Oriental Sect.)Libertad-Bancasi Sect.

09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -

Adfil Corporation 14437Rehab./Reconst. Along Daang

Maharlika(Surigao-Agusan Rd.) Ampayon-Taguibo Sect.

09/16/09 XIII 56.884 180 O 0.365 0.300 0.150 0.030 0.060 0.050 95.50 -

Adfil Corporation 14437Const./Completion/Continuation of

Unfinished Bridge and Approaches, Brgy. Libertad

09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -

Adfil Corporation 14437 Rehab. of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 14.427 210 C 0.416 0.194 0.300 - - - 91.00 94.66% V.Satisfactory

Adfil Corporation 14437 Const./Conc. of NRJ-San Francisco-Bahi-Barobo Rd. 09/12/09 XIII 28.884 330 O 0.351 0.297 0.150 0.030 0.065 0.050 94.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page20

Page 29: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Adfil Corporation 14437 Conc./Repair of Slip along NRJ-Cuevas-Sta. Josefa-Sampaguita 09/14/09 XIII 47.951 350 O 0.357 0.290 0.150 0.030 0.060 0.050 93.70 -

Adfil Corporation 14437 Upgrading of NRJ-Cuevas-Bislig Rd. 09/13/09 XIII 28.874 315 O 0.373 0.277 0.150 0.030 0.055 0.050 93.50 -

Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -

Adfil Corporation (Formerly: Adfil Construction) 14437 Rehab./Reconst. of Damaged Rd. Gingoog-

Claveria-Villanueva Rd. 03/10/10 X 96.400 405 C 0.437 0.200 0.300 - - - 93.70 89.71% V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Const. of River Dike Protection, Brgy. Agao 03/10/10 XIII 9.556 90 C 0.485 0.133 0.300 - - - 91.80 91.80%

V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Impv't./Rehab. of Iligan-Cagayan-Butuan

Rd. (Agusan-Misamis Oriental Section) 02/23/10 XIII 67.446 180 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Const./Conc. of NRJ San Francisco-Bahi

Rd. 03/07/10 XIII 28.892 330 C 0.431 0.133 0.300 - - - 86.40 91.20% V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Upgrading/Conc. of NRJ Cuevas-Bislig Rd. 03/07/10 XIII 28.874 315 C 0.485 0.133 0.300 - - - 91.80 90.66%

V.Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Conc./Repair of Slip along WRJ Cuevas-

Sampaguita Rd. 03/09/10 XIII 47.951 410 O 0.374 0.240 0.150 0.030 0.051 0.050 89.50 -

Adfil Corporation (Formerly: Adfil Construction) 14437 Conc. of Dapa-Del Carmen (Sayak-Airport

Rd.) 02/26/10 XIII 75.947 390 C 0.456 0.133 0.300 - - - 88.90 88.90% Satisfactory

Adfil Corporation (Formerly: Adfil Construction) 14437 Rehabilitation of River Dike 02/22/10 XIII 9.650 120 O 0.375 0.240 0.150 0.030 0.055 0.033 88.30 -

Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032 DPWH Component Project under the HELP

for Catubig Agricultural Project (HCAAP) 11/22/07 VIII 448.581 734 O 0.392 0.300 0.050 0.030 0.055 0.100 92.70 -

Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032 DPWH Component Project under the HELP

for Catubig Agricultural Project (HCAAP) 05/16/08 VIII 448.581 734 O 0.367 0.300 0.050 0.030 0.051 0.100 89.80 -

Adige-Sta. Clara (Joint Venture) JV-06-032 DPWH Component Project under the Help for Catubig Agricultural Advancement Proj. 05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page21

Page 30: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Adige-Sta. Clara (JV) JV-06-032 DPWH Component Project under the HELP for Catubig Agricultural Project (HCAAP) 08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

Adige-Sta. Clara (JV) JV-06-032 DPWH Component Project under the HELP for Catubig Agricultural Project (HCAAP) 12/01/08 VIII 519.663 959 O 0.350 0.299 0.100 0.030 0.060 0.067 90.60 -

Adimre Construction 25534 Marilao Port Development Project 08/20/09 DOTC 2.862 60 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory

Adimre Construction 25534 Sta. Cruz Port Development Project 08/20/09 DOTC 0.960 30 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory

Adimre Construction 25534 Sasmuan Port Development Project 08/20/09 DOTC 2.871 60 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

Adimre Construction 25534 Hagonoy Port Development Project 10/02/09 DOTC 0.949 30 C 0.460 0.200 0.300 - - - 96.00 96.00% Outstanding

Adimre Construction 25534 Baguio Airport Development Project 04/04/09 DOTC 861.940 60 C 0.435 0.181 0.300 - - - 91.60 91.60% V. Satisfactory

Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) 08/28/08 III 1.907 56 C 0.334 0.200 0.300 - - - 83.40 83.61% V. Satisfactory

Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase IV) 05/19/08 III 1.907 56 O 0.342 0.240 0.100 0.030 0.025 0.100 83.70 -

Adimre Construction 25534 Const. of Standard One Classroom School Building (Modified) at GITMES 09/05/09 III 0.526 24 C 0.442 0.133 0.300 - - - 87.50 *87.50%

Satisfactory

Adimre Construction 25534

Dumaguete Airport Dev't Project (Completion of Imprv't of Terminal Building

and Purchase/ Installation of Bagage Conveyor)

01/21/10 DOTC 13.500 90 C 0.402 0.199 0.300 - - - 90.10 90.10% V.Satisfactory

Adimre Construction 25534 Tuguegarao Airport Dev't Project (Continuation of Widening of Runway) 03/04/10 DOTC 9.588 90 C 0.452 0.200 0.300 - - - 95.20 95.20%

V.Satisfactory

Adimre Construction 25534Tuguegarao Airport Dev't Project

(Continuation of Widening of Runway and Improvement of Fire Station Building)

03/04/10 DOTC 12.490 90 C 0.458 0.200 0.300 - - - 95.80 95.80% V.Satisfactory

Adimre Construction 25534

Laoag Airport Development Project (Upgrading of Radar Area, Continuation of Perimeter Fence Construction of Drainage

System)

04/09/10 DOTC 9.604 120 C - 0.419 0.200 0.300 - - 91.90 91.90% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page22

Page 31: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Adimre Construction 25534 Laoag Airport Development Project (Improvement of Fire Station Building) 04/09/10 DOTC 4.821 120 C 0.464 0.200 0.300 - - - 96.40 96.40%

Outstanding

Adimre Construction 25534Laoag Airport Development Project

(Shoulder Grade Correction including Drainage System)

04/09/10 DOTC 4.793 75 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory

ADL General Construction 30604 Conc. of San Antonio Palpaltogan 11/14/07 CAR 0.285 28 C 0.303 0.000 0.300 - - - 60.30 *60.30% Fair

Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase 03/02/09 III 3.026 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%

Satisfactory

Adroit Construction 11169 Concreting of Brgy. Maligaya Road 03/02/09 III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory

Adroit Construction 11169 Const. of 1 CL @ San Pascual E/S 08/23/07 III 0.475 30 C 0.299 0.245 0.300 - - - 84.40 *84.40% V. Satisfactory

Adroit Construction 11169 Const. of 2 CL @ Cumabol E/S 08/23/07 III 0.749 60 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

Adroit Construction 11169 Const. of 4 CL, Central Luzon State University 11/17/08 III 1.800 90 C 0.319 0.300 0.300 - - - 91.90 *91.90%

Outstanding

Advanced Foundation Construction Systems Corp. 15449

Const. of Baguio Flyover & Approaches (Phase V), BGH-Rotonda Marcos Highway-Gov. Pack-Kisad Road, Kennon Road Jct.

03/06/08 CAR 61.894 100 C 0.385 0.300 0.300 - - - 98.50 93.10% Outstanding

Agafer Construction 7912 Const. of Cagayan River Control 08/25/08 II 14.241 240 O 0.334 0.160 0.100 0.022 0.028 0.200 84.40 -

Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB (Phase III) 08/21/08 VIII 1.896 120 C 0.373 0.187 0.300 - - - 86.00 79.07%

Satisfactory

Aison Dominique Construction & Supply 32805 Const. of Multi-Purpose Building

(Cooperative) 02/23/10 VIII 0.473 86 C 0.399 0.200 0.300 - - - 89.90 77.79% Unsatisfactory

Aison Dominique Construction Supply 32805 Construction of Multi-Purpose Building

(Cooperative) 06/04/09 VIII 0.473 60 O 0.388 0.242 0.000 0.030 0.033 0.033 72.60 -

Ajan Jaeda, inc. 17869 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page23

Page 32: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of Engineering

Campus 02/24/09 V 16.149 240 C 0.457 0.133 0.300 - - - 89.00 89.80% V. Satisfactory

AJYSC Marketing 26924Const. of Office and Storage Bldg. and other Office/Quarter Requirements of

DPWH Regional Office XII06/06/09 R-XII 10.437 150 C 0.477 0.200 0.300 - - - 97.70 *97.70%

Outstanding

AJYSC Marketing 26924 Rehab./Improvement of Bulok Bridge along Marbel-Makar Road 06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -

AJYSC Marketing 26924 Const. of River Bank Protection Allah River (Kolambog Section) 08/27/08 XII 2.874 112 C 0.266 0.300 0.300 - - - 86.60 82.22%

V. Satisfactory

AJYSC Marketing 26924 Const./Widening of Matin-ao Bridge & Widening of Approaches 03/06/08 XII 3.848 184 C 0.351 0.115 0.300 - - - 76.60 81.82%

V. Satisfactory

AJYSC Marketing 26924 Matin-ao Bridge along Marbel-Tupi-Makar Road 11/30/07 XII 7.513 175 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

AJYSC Marketing 26924 Repair of Multi-Purpose Building at San Emmanuel 03/12/09 XII 0.960 105 C 0.433 0.200 0.300 - - - 93.30 *93.30%

V. Satisfactory

AJYSC Marketing 26924 Road Upgrading (Gravel to concrete) along Surallah-Lake Sebu-Maitum Road 03/15/09 XII 16.034 289 C 0.476 0.200 0.300 - - - 97.60 90.14%

V. Satisfactory

AJYSC Marketing 26924 Widening/Conc. of Kalandagan Bridge I, along Dulawan-Marbel Road 03/04/08 XII 11.332 277 C 0.352 0.200 0.300 - - - 85.20 84.90%

V. Satisfactory

AJYSC Marketing 26924Road Upgrading (Gravel to Paved) along

Isulan-H-way Jct. Dukay-Dagumbayan-Sen. Ninoy Aquino Road (Sarmiento Sect.)

09/09/09 XII 19.094 235 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory

AJYSC Marketing 26924 Rehab./Impvt. of Bulok Bridge along Marbel-Makar Rd. Km. 1710+722 09/10/09 XII 4.764 90 C 0.400 0.200 0.300 - - - 90.00 87.60%

Satisfactory

AJYSC Marketing 26924Const. of Sapali River Bank

Protection/River Control Along Lamsugod to Lamian Section

03/07/10 XII 4.803 140 O 0.360 0.240 0.150 0.030 0.040 0.033 85.30 -

AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches Phase II 03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page24

Page 33: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

AKH Construction and Trading Corporation 20759

Repair/Maintenance of Waiting Area / Lounge of Secretary's Office DPWH Central

Office05/19/09 NCR 7.230 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

AKH Construction and Trading Corporation 20759 Construction of Multi-Purpose Building

Phase I, T. Paez Elem. School 02/27/09 NCR 9.645 60 C 0.389 0.013 0.300 - - - 70.20 *70.20% Poor

AKH Construction and Trading Corporation 20759 Proposed Rehab./Repair of Drainage

System 08/14/07 NCR 1.915 60 C 0.242 0.200 0.300 - - - 74.20 *74.20% Satisfactory

AKH Construction and Trading Corporation 20759 Rehab. of Taft Ave. 11/14/07 NCR 1.915 60 C 0.316 0.300 0.300 - - - 91.60 *91.60%

Outstanding

AKH Construction and Trading Corporation 20759 Rehab./Reconst. of Damaged Pavement of

Legarda St. 08/14/08 NCR 6.713 90 C 0.346 0.235 0.300 - - - 88.10 *88.10% V. Satisfactory

AKH Construction and Trading Corporation 20759 Proposed Rehab. of MPB at T. Paez Elem.

School (Phase 2) 09/01/09 NCR 10.609 90 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory

AKH Construction and Trading Corporation 20759 Proposed Repair/Rehab. of Roads &

Drainage at Brgy. 598/600 02/16/10 NCR 2.888 90 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory

AKN Construction Corporation (Formerly: AKN Const.) 11845

Proposed Impvt. of Road inc. Drainage System along Magallanes St., Brgy.

Tunasan02/25/09 NCR 19.089 162 C 0.341 0.184 0.300 - - - 82.50 83.88%

Satisfactory

AKN Construction Corporation (Formerly: AKN Construction) 11845 Rehab./Reconstruction/Upgrading of Ninoy

Aquino Avenue 06/02/09 NCR 19.092 45 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory

AKN Construction Corporation (Formerly: AKN Construction) 11845

Rehab./Reconstruction of Muntinlupa Insular Prison Road and its Vicinity, Brgy.

Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -

Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) 03/01/08 VII 4.536 115 C 0.352 0.300 0.000 - - - 65.20 58.48%

Poor

Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) 08/28/08 VII 4.492 85 C 0.316 0.042 0.000 - - - 35.80 55.18%

Poor

Al Chris Construction 12406 Const. of Two (2) CL Sch. Bldg. w/o Toilet, San Roque H/S 11/18/08 VII 0.841 240 C 0.390 0.200 0.300 - - - 89.00 *89.00%

V. Satisfactory

AL Chris Construction 12406 Tagbilaran Airport Development Project 03/27/09 NIA 5.756 120 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page25

Page 34: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Al Fahdel Const. and Services 17953Conc./Impvt. of Tubod-Ganassi Road

(Caniogan Section) Sta. 1602+0000-Sta. 1603+000 w/ exception

09/14/09 X 18.126 150 C 0.429 0.200 0.300 - - - 92.90 89.18% V. Satisfactory

Al Hussein Construction 18438 Const. of Cagascas Bridge and Approaches 12/03/07 X 11.983 280 C 0.380 0.300 0.300 - - - 98.00 98.00%

Outstanding

Al Hussein Construction 18438 Const. of Kapatagan Drainage System along Iligan-Aurora Road 09/02/07 X 3.682 60 C 0.285 0.200 0.300 - - - 78.50 79.28%

Satisfactory

Al Hussein Construction 18438 Rehab. of Linamon-Zamboanga Road, Baroy Section 08/30/08 X 4.525 90 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

Al Hussien Construction 18438 Concreting of Kibawe-Kadilingan-Kalilangan Road, Kadilingan Section 09/03/09 X 73.672 330 O 0.352 0.268 0.150 0.030 0.042 0.050 89.20 -

Al Niño Construction Supply 18378 Construction of Diversion Work 07/12/07 NIA 4.048 120 C 0.381 0.124 0.100 0.018 0.029 0.200 85.20 85.20% V.Satisfactory

Alajeno Construction and Supplies 28713 Construction of MPB (Municipal Building) Phase II 06/02/09 IX 2.480 120 C 0.440 0.133 0.300 - - - 87.30 *87.30%

Satisfactory

Alajeño Construction and Supplies 28713 Const. of MPB (Municipal Bldg.) Phase I 11/27/08 IX 4.595 160 C 0.373 0.164 0.300 - - - 83.70 75.30% Satisfactory

Alajeño Construction and Supplies 28713 Const. of Sch. Bldg. @ Antonio NHS 08/30/08 IX 0.481 30 C 0.209 0.200 0.300 - - - 70.90 75.45% Satisfactory

Alberich Builders 27987 Repair/Impvt. of Masarawang-Mabatano-Pamasan Road 11/13/08 V 0.956 30 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

Alberto Uy Construction & Development 20924 Repair/Rehab. of Multi-Purpose Building @

Sitio Facoma, Bagong Bayan II 05/27/09 IV-B 0.476 45 C 0.424 0.170 0.300 - - - 89.40 *89.40% V. Satisfactory

Alberto Uy Construction & Development 20924 Concreting of Cantil-Dayhagan Road 02/26/09 IV-B 0.947 69 C 0.436 0.133 0.300 - - - 86.90 *86.90%

Satisfactory

Alberto Uy Construction & Development 20924 Const. of 1 CL Sch. Bldg. @ Carmundo

NHS 05/15/08 IV-B 0.470 120 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding

Alberto Uy Construction & Development 20924 Const. of Bongabong River Front (Phase II) 09/05/07 IV-B 4.707 80 C 0.266 0.300 0.300 - - - 86.60 *86.60%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page26

Page 35: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Alberto Uy Construction & Development 20924 Const. of Drainage Canal 11/19/08 IV-B 1.889 91 C 0.358 0.200 0.300 - - - 85.80 89.40%

V. Satisfactory

Alberto Uy Construction & Development 20924 Const. of Protection Dike at Mapang 11/13/07 IV-B 0.471 30 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

Alcel Construction 15129 Construction of School Building at Cayucay NHS 03/10/09 I 0.913 75 C 0.394 0.181 0.300 - - - 87.50 *87.50%

Satisfactory

Alcel Construction 15129 Const. of San Vicente-Pogo Bridge, San Vicente 03/01/10 I 22.182 380 C 0.333 0.200 0.300 - - - 83.30 83.30%

Satisfactory

Alcel Construction 15129Asphalt Overlay of Sta. Barbara-Mangaldan

Road Km. 203+700-Km. 205+300 w/exception

05/26/09 I 14.473 25 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory

Alcel Construction 15129 Completion of MPB, PSU Bamban 08/29/08 I 0.474 60 C 0.292 0.200 0.300 - - - 79.20 *79.20% Satisfactory

Alcel Construction 15129 Conc. of FMR, Brgy. Licsi 11/27/08 I 0.568 30 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory

Alcel Construction 15129 Const. of MPB, Phase VI 05/30/08 I 0.812 70 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory

Alcel Construction 15129 Impvt. of Pangasinan-Zambales Road 05/30/08 I 27.954 255 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory

Alcel Construction 15129 Rehab./Reconst./Upgrading of Mangaldan-Manaoag-Binalonan Road 08/28/09 I 48.250 240 C 0.422 0.200 0.300 - - - 92.20 *92.20%

V. Satisfactory

Aldana Construction 21736 Construction Perimeter Fence Gate & Score Protection 05/14-15/09 DOST 6.363 90 O 0.383 0.295 0.000 0.030 0.061 0.050 81.90 -

Aldana Construction 21763 Construction of Perimeter Fence Gate, Slope Protection 03/2-3/10 DOST 6.363 75 C 0.491 0.20 0.30 - - - 99.10 87.13%

Satisfactory

Aldana Construction 21736 Const. of Drainage Poblacion Zone II 03/04/10 I 2.407 90 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory

Aldana Construction 31174 Road Conc. of Farm-to-Market Road, Brgy. Sallacong (San Mariano) 02/19/10 I 1.901 70 C 0.329 0.200 0.300 - - - 82.90 82.90%

Satisfactory

Ale Builders Construction & Development Corp. 5180 Proposed Const. of Roads and Drainage at

Baseco Compound 09/02/09 NCR 72.325 180 O 0.331 0.200 0.150 0.008 0.040 0.033 76.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page27

Page 36: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Ale Builders Construction & Development Corp. 5180 Drainage Impvt. along Boni-Serrano

Avenue 03/02/10 NCR 4.754 90 C 0.440 0.133 0.300 - - - 87.30 87.30% Satisfactory

Ale Builders Construction & Development Corp. 5180 Proposed Const. of Roads and Drainage at

Baseco Compound 02/16/10 NCR 72.324 303 C 0.368 0.190 0.300 - - - 85.80 85.98% Satisfactory

Ale Builders Construction & Development Corp. 5180 Proposed Const./Rehab./Repair of School

Bldg. at Manuel A. Roxas High School 02/16/10 NCR 4.818 120 O 0.332 0.240 0.150 0.022 0.035 0.050 82.90 -

ALE Builders Construction and Development Corp. 5180 Impvt./Upgrading of Paraiso ng Batang

Maynila Multi-Purpose Building 05/18/09 NCR 0.964 30 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory

ALE Builders Construction and Development Corp. 5180 Const. of MPB at Brgy. 34 & 35 08/16/07 NCR 4.666 120 C 0.325 0.122 0.300 - - - 74.70 81.35%

V. Satisfactory

ALE Builders Construction and Development Corp. 5180 Proposed Repair/Rehab. of Epifanio Delo

Santos Elem. School 05/13/08 NCR 1.444 60 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

ALE Builders Construction and Development Corp. 5180 Repair/Rehab. Roads with Drainage Impv't,

Brgy. 34, Zone 3 03/03/09 NCR 5.254 90 C 0.342 0.200 0.300 - - - 84.20 *84.20% Satisfactory

Ale-J Construction & Trading 26445 Const. of Multi-Purpose Bdlg. @ Veterans Memorial Medical Center 03/09/09 NCR 3.819 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%

Satisfactory

Al-Fahdel Const. and Eng'g 17953Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta. 1602+000-Sta.

1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -

Al-Fahdel Const. and Eng'g. 17953 Road Upgrading (Gravel to Paved) Iligan City-Marawi City via Bito-Abaga Rd. 09/11/09 X 14.361 115 C 0.339 0.200 0.300 - - - 83.90 *83.90%

Satisfactory

Al-Fahdel Construction & Engineering 17953

Conc. of Iligan-Bukidnon Road, Sta. Felomina-Bobonon-Digkilaan-Rogongon,

Lambaguhon Sect.11/29/07 X 9.027 210 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. at Kulasihan

Primary School 08/30/08 X 0.417 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. At SADMIS 03/14/09 X 0.944 111 C 0.408 0.133 0.300 - - - 84.10 *84.10%

Satisfactory

Al-Fahdel Construction & Engineering 17953 Const. of Tugar Bridge 09/01/07 X 4.678 295 C 0.314 0.300 0.300 - - - 91.40 83.39%

V. Satisfactory

Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga Road,

Maigo Section 03/15/09 X 13.492 261 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road (Intermittent Section) 05/26/09 CAR 7.590 200 C 0.407 0.200 0.300 - - - 90.70 82.60%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page28

Page 37: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Alfalfa Construction 29712Conc./Widening of Banaue-Mayoyao-

Aguinaldo-A. Lista Bdry. Road (Ibayong-Guihob Section)

08/19/07 CAR 1.901 60 C 0.310 0.000 0.300 - - - 61.00 *61.00% Fair

Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road 11/11/08 CAR 7.590 200 O 0.335 0.240 0.100 0.010 0.020 0.067 77.20 -

Alfalfa Construction 29712Restoration of Road along Banaue-

Mayoyao-Aguinaldo-A Lista-Isabela Bdry. Road

03/06/09 CAR 4.277 179 C 0.443 0.200 0.300 - - - 94.30 92.80% V.Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162 Completion of Binalbagan Bridge 2 - Km.

66+910 along Hinigaran-Isabela Road 03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162 Completion of Isio Bridge 09/05/07 VI 46.478 380 O 0.397 0.300 0.100 0.023 0.059 0.100 97.90 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162

Conc. of Road at Bacolod-Murcia-D.S. Benedicto-San Carlos Road, D.S.

Benedicto 12/04/07 VI 11.986 175 C 0.329 0.300 0.300 - - - 92.90 *92.90%

Outstanding

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout,

Campsite Road 11/20/08 VI 64.700 553 O 0.319 0.300 0.100 0.015 0.032 0.067 83.30 -

Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &

Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout,

Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -

Alfie's Construction 17162 Construction and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.762 408 C 0.441 0.200 0.300 - - - 94.14 *94.14%

Satisfactory

Alfie's Construction 17162 Const. and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.289 408 C 0.350 0.161 0.300 - - - 81.05 81.05%

Unsatisfactory

Alfie's Construction 17162 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 7.699 271 C 0.427 0.300 0.200 - - - 92.70 92.70%

V. Satisfactory

Alfie's Construction & Construction Supply Inc. (Formerly: Alfie's

Construction & Construction Supply)17162 Conc. of Jct. Bearin-Salong-Tapi-Bantayan

Rd. (Salong Section), Brgy. Salong 03/08/10 VI 14.301 110 O 0.317 0.300 0.150 0.030 0.028 0.033 85.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page29

Page 38: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Alfie's Construction & Construction Supply Inc. (Formerly: Alfie's

Construction & Construction Supply)17162

Conc. of Jct. Bearin-Salong-Tapi-Dacongcogon-Bantayan Rd. (Km. 99+675-

Km. 131+142.75 w/ exceptions) Brgy. Salong & Bantayan

03/08/10 VI 79.400 400 C 0.363 0.192 0.300 - - - 85.50 85.50% Satisfactory

Alfies Construction & Construction Supply, Inc. 17162 Completion of Binalbagan Bridge 2 along

Hinigaran-Isabela Road 09/15/09 VI 45.049 850 C 0.465 0.133 0.300 - - - 89.80 86.22% Satisfactory

Alfies Construction & Construction Supply, Inc. 17162

Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-Bantayan Raod (Km.

99+675.50-Km.131+142.75 w/ exception, Brgy. Salong & Batayan

09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -

Alfie's Construction & Construction Supply, Inc. 17162

Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-Bantayan Road (Km.

99+675.5-Km. 131+142.75 with exception), Brgy. Salong & Batayan

05/30/09 VI 79.400 400 O 0.310 0.300 0.150 0.030 0.035 0.033 85.80 -

Alfrego Builders & Supply 19284 Improvement/Riprapping of Sasa Creek Second Congressional District 06/11/09 XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -

Alfrego Builders & Supply 19284 Conc. of Road at Alambre 08/19/08 XI 0.933 90 C 0.342 0.300 0.300 - - - 94.20 85.74% V. Satisfactory

Alfrego Builders & Supply 19284 Conc. of Road at Mercedes 03/11/08 XI 0.935 90 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding

Alfrego Builders & Supply 19284Conc. of Road from Davao-Agusan

National Road Jct. passing through Iliong up to Purok Communal

12/04/08 XI 1.882 90 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Alfrego Builders & Supply 19284 Improvemant/Riprap of Sasa Creek 06/11/09 XI 4.721 160 C 0.476 0.133 0.300 - - - 90.90 91.56% V. Satisfactory

Alfrego Builders & Supply 19284 Construction of Mandug River Control 03/08/10 XI 4.720 90 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory

Algamon Construction 30704 Const./Widening/Gravelling of Roads from Brgy. R. Ecleo-Brgy. Del Pilar 06/01/09 XIII 1.927 209 C 0.385 0.168 0.300 - - - 85.30 84.52%

Satisfactory

Algamon Construction 30704 Const. of Sch. Bldg., Cantilan East Elem. Sch. 11/26/08 XIII 1.848 90 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Algamon Construction 30704 Const. of MPB (Covered Court) Brgy. Anticala 03/10/10 XIII 2.226 90 C 0.478 0.133 0.300 - - - 91.10 91.10%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page30

Page 39: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Algimar Construction 1523 Esperanza Port Development Project 07/08/09 DOTC 8.637 120 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

Algimar Construction 15232 Concreting of Tablas Circumferential Road (Hinugasan-Camantaya Section) 05/21/09 IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 -

Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road, Nabangig-Pawican Sect. 05/26/09 V 14.249 120 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V. Satisfactory

Algimar Construction 15232Const. of 1 Unit 7x7 S/B at Teofilo

Tamabago E/S, Palanas South realigned to Dimasalang C/S

05/26/09 V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 -

Algimar Construction 15232 Conc. of Lubi-Binoog Road 11/24/08 IV-B 9.398 100 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory

Algimar Construction 15232 Const. of Bridge Approaches @ Maingaran Bridge 02/27/09 V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -

Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod 08/25/08 V 9.597 45 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

Algimar Construction 15232Const. of Lined Canal with Cover from

Quezon St. infornt of MNCHS, JZES and Jollibee Store

08/23/08 V 3.798 180 C 0.297 0.200 0.300 - - - 79.70 78.50% Satisfactory

Algimar Construction 15232 Const. of Sta. Cruz NHS 08/17/07 V 0.441 120 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory

Algimar Construction 15232 Const.of Multi-Purpose Building (Balai Alumni) 02/28/09 V 0.480 120 C 0.480 0.133 0.300 - - - 91.30 *91.30%

V. Satisfactory

Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road 02/28/09 V 9.598 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V. Satisfactory

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Doña Juana-Binunga-an Section) 08/27/09 IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 -

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Hinugusan-Camantaya Section) 08/27/09 IVB 19.676 180 O 0.311 0.300 0.150 0.030 0.042 0.033 86.60 -

Algimar Construction 15232 Conc. of Buenavista-Cawayan Road, San Jose-Tuburan 08/28/09 V 18.998 131 C 0.432 0.150 0.300 - - - 88.20 *88.20%

Satisfactory

Algimar Construction 15232 Concreting of Jct. Buenavista-Cawayan Road, Cabungahan-Madbad Section 08/28/09 V 19.000 130 C 0.427 0.151 0.300 - - - 87.80 *87.80%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page31

Page 40: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Doña Juana-Binongaan Section) 02/22/10 IVB 19.652 180 C 0.388 0.200 0.300 - - - 88.80 87.72%

Satisfactory

Algimar Construction 15232 Conc. of Tablas Circumferential Road (Hinugusan-Camantaya Section) 02/23/10 IVB 19.676 180 C 0.395 0.200 0.300 - - - 89.50 85.81%

Satisfactory

Algimar Construction 15232 Conc. of Milagros-Cataingan-Esperanza Road, Malamag Section 02/19/10 V 38.585 150 C 0.429 0.133 0.300 - - - 86.20 86.20%

Satisfactory

Algimar Construction/Hi-Tone Construction & Development

Corporation JVJV-07-078 Concreting of Cataingan-Esperanza Road 02/19/10 V 90.015 453 C 0.438 0.133 0.300 - - - 87.10 87.10%

Satisfactory

Algon Eng'g Construction Corp. 270 Construction of Laboratory Building 02/02/10 DOST 16.635 210 C 0.468 0.20 0.30 - - - 96.80 97.43% Outstanding

Algon Engineering Construction Corp. 270 Construction of Overhead Water Tank with

Cistern 8/12/09 DOST 3.193 138 C 0.500 0.200 0.100 - - - 80.00 80.00% Unsatisfactory

Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-Makar

Road 05/30/09 XI 31.136 180 C 0.498 0.140 0.300 - - - 93.80 *93.80% V. Satisfactory

Algon Engineering Construction Corporation 270

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road, (Manay-Boston), Caraga-

Baganga Section06/09/09 XI 172.481 537 O 0.338 0.284 0.150 0.030 0.056 0.050 90.80 -

Algon Engineering Construction Corporation 270 Asphalt Overlay of Davao-Cotabato By

Pass Road 05/16/08 XI 12.771 150 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory

Algon Engineering Construction Corporation 270 Bridge Component of CP 6, Mindanao

Bridges, Rawa-an and Sagadan Bridges 03/14/09 ADB 37.809 1,078 O 0.365 0.300 0.000 0.030 0.045 0.050 79.00 -

Algon Engineering Construction Corporation 270

CP 5: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston)

Caraga-Baganga Section11/25/08 XI 172.481 537 O 0.380 0.239 0.100 0.030 0.055 0.100 90.40 -

Algon Engineering Construction Corporation 270 Impv't./Conc. of La Fortuna Tagum

Terminal-Capitol, Canocotan Road 03/01/08 XI 34.314 226 C 0.303 0.300 0.300 - - - 90.30 88.56% V. Satisfactory

Algon Engineering Construction Corporation 270 Repair and Rehab. of Toril-Bayabas-Eden

Road 11/17/08 XI 4.816 90 C 0.366 0.300 0.300 - - - 96.60 94.26% Outstanding

Algon Engineering Construction Corporation 270

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road,(Manay-Boston) Caraga-

Baganga Section Contract Package No. 509/06/09 XI 172.481 537 O 0.387 0.300 0.150 0.030 0.051 0.050 96.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page32

Page 41: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Algon Engineering Construction Corporation 270

Rehab. of Sumlog Bridge and Approaches along Davao-Oriental-Surigao Coastal

Road03/05/10 XI 52.988 270 C 0.485 0.133 0.300 - - - 91.80 91.80%

V. Satisfactory

Algon Engineering Construction Corporation 270

CP-5: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-

Boston) Caraga-Baganga Section03/04/10 XI 172.836 537 C 0.359 0.200 0.300 - - - 85.90 89.02%

V. Satisfactory

Allen Construction 12584 Regravelling of Various Barangays 05/26/09 III 1.875 25 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory

Allen Construction 12584 Conc. of Estrella-Cabubucan Road 11/21/07 III 1.885 40 C 0.371 0.200 0.300 - - - 87.10 *87.10 V. Satisfactory

Allen Construction 12584 Const. of 2 CL, Guimba National High Sch. 05/22/08 III 0.751 60 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding

Allen Construction 12584 Construction of MPB, Baloc Nat'l Trade School 03/02/09 III 1.892 45 C 0.479 0.178 0.300 - - - 95.70 *95.70%

V. Satisfactory

Allen Construction 12584 Rehab./Reconst. of Nueva Ecija-Pangasinan Road 09/03/09 III 12.165 61 C 0.479 0.133 0.300 - - - 91.20 *91.20%

V. Satisfactory

Allencon Development Corporation 12302Asphalt Pavement along Guimaras

Circumferential Road, Brgy. East Valencia-Brgy. Lebas

08/31/07 VI 4.604 120 C 0.310 0.100 0.300 - - - 71.00 *71.00% Satisfactory

Allencon Development Corporation 12302Asphalt Pavement along Guimaras

Circumferential Road, Brgy. M. Chavez Sect., San Lorenzo Sect.

12/06/07 VI 4.604 120 C 0.353 0.300 0.300 - - - 95.30 *95.30% Outstanding

Alleyway Construction 15310 Conc. With Drainage Impvt. Along F. Cayco St. & vicinity 11/28/07 NCR 5.646 120 C 0.265 0.200 0.300 - - - 76.50 79.02%

Satisfactory

Alleyway Construction 15310 Cons. of Multi-Purpose Building, Brgy. 204, Zone 18 02/27/09 NCR 3.839 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%

Satisfactory

Allied Trade Resources 31667 Construction of Site Dev't. Projects 04/29/09 DOST 3.178 120 O 0.374 0.300 0.150 0.030 0.070 0.050 97.40 -

Allied Trade Resources 31667 Construction of Site Development Projects 8/12/09 DOST 3.065 131 C 0.475 0.182 0.300 - - - 95.70 95.70% Outstanding

Allied Trade Resources Multi Purpose Cooperative 31667 Const./Impv't of 2-CL School Building @

Malitbog E/S, Brgy. New Malitbog 03/12/09 XI 2.352 60 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory

Allied Trade Resources Multi Purpose Cooperative 31667 Rehab./Impvt. of MPB @ Brgy. Ising 11/30/08 XI 2.356 90 C 0.301 0.233 0.300 - - - 83.40 87.53%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page33

Page 42: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Allied Trade Resources Multi-Purpose Cooperative 31667 DOTC-CARAGA Regional Office Dev't

Project (Phase 1) 07/30/09 DOTC 3.953 150 C 0.426 0.200 0.300 - - - 92.60 92.60% V. Satisfactory

Allied Trade Resources Multi-Purpose Cooperative 31667 Repair & Waterproofing of Central

Administration Building 07/08/09 U.P. 1.154 60 C 0.450 0.200 0.300 - - - 95.00 *95.00% V. Satisfactory

Allied Trade Resources Multi-Purpose Cooperative 31667 Completion of Multi-Purpose Buiding at

Davao City National H/S 03/10/10 XI 0.940 90 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory

Almakar Builders & Metal Works 21929 Completion of 2 CL Sch. Bldg. at Gahak Marulas E/S 11/10/08 IV-A 0.669 75 C 0.344 0.300 - - - - 64.40 *64.40%

Fair

Almakar Builders & Metal Works 21929 Const. of Concrete Pathway 05/26/08 IV-A 0.258 45 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

Alnino Construction & Supply 18378 Const. of Access Road to RORO Terminal, Guiron-San Antonio Section 08/19/08 V 4.750 90 C 0.201 0.200 0.300 - - - 70.10 *70.10%

Satisfactory

Alnino Construction & Supply 18378 Const. of Buenavista Seawall 05/13/08 V 4.751 90 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

Alnino Construction & Supply 18378 Const. of Multi-Purpose Building 11/14/07 V 0.960 40 C 0.296 0.200 0.300 - - - 79.60 *79.60% Satisfactory

Alnino Construction & Supply 18378 Const. of River Bank Protection at Brgy. Macawayan 08/15/07 V 2.400 45 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

Alnino Construction & Supply 18378 Repair of FMR at Brgy. Cabiguhan 08/15/07 V 0.960 65 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

Alnino Construction & Supply 18378 Repair of Gabaldon Bldg. @ San Roque E/S 08/13/07 V 0.190 20 C 0.381 0.200 0.300 - - - 88.10 *88.10%

V. Satisfactory

Alnino Construction & Supply 18378 Repair of Patag FMR 11/14/07 V 2.400 40 C 0.291 0.186 0.300 - - - 77.70 *77.70% Satisfactory

Alnino Construction & Supply 18378 Concreting of Bayawas Road 02/15/10 V 1.882 120 C 0.370 0.200 0.300 - - - 87.00 87.00% Satisfactory

Alnor Construction & Const. Supplies 26705 Completion of MPB at Brgy. Cagdianao 11/21/07 XIII 0.463 45 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

Alnor Construction & Const. Supplies 26705 Const. of 2 Cl Magpayang NHS 08/28/07 XIII 0.801 60 C 0.235 0.194 0.300 - - - 72.90 83.19%

V. Satisfactory

Alnor Construction & Const. Supplies 26705 Conc. of Kinalablaban Bridge Approaches

and Road, Surigao-Davao Coastal Road 08/23/08 XIII 7.643 180 C 0.236 0.300 0.300 - - - 83.60 *83.60% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page34

Page 43: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Alnor Construction & Const. Supplies 26705 Const. of MPB @ Brgy. Binocaran 05/14/08 XIII 0.926 60 C 0.377 0.200 0.300 - - - 87.70 87.67%

V. Satisfactory

Alnor Construction & Const. Supplies 26705 Const./Widening of Dinagat-Loreto Road

(Tag-abaca Sect.) 11/19/08 XIII 14.390 195 C 0.375 0.300 0.000 - - - 67.50 61.74% Fair

Alpha Ryder Construction and Supplies 12197 Conc. of Jamislagan-Buhatan Road 11/19/08 V 4.682 60 C 0.346 0.200 0.300 - - - 84.60 *84.60%

V. Satisfactory

Alpha Ryder Construction and Supplies 12197 Conc. of Legazpi Manito-Punta De Jesus

Road, Malabago-Tinapian Section 03/03/09 V 32.545 210 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory

Alpha Ryder Construction and Supplies 12197 Const. of Dancalan Bridge & Approaches 08/14/07 V 11.709 200 C 0.361 0.200 0.300 - - - 86.10 85.08%

V. Satisfactory

Alpha Tech Builders 26072 Asphalt Overlay of Gutlang-Alumbijud Road 05/23/08 VII 0.915 10 C 0.376 0.300 0.300 - - - 97.60 *97.60%

Outstanding

Alpha Tech Builders 26072 Asphalt Overlay of Tabayag-Lapay Road 08/22/08 VII 0.915 10 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

Alphin Trading & Construction 26260 Rehab. of DPWH Pangasinan 3rd DEO Building, Tumana 05/19/09 I 2.884 75 O 0.375 0.300 0.150 0.030 0.023 0.050 92.80 -

Alphin Trading & Construction 26260 Conc. of FMR (Sonquil Section) 03/04/08 I 0.289 60 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory

Alphin Trading & Construction 26260 Conc./Impvt. of Sta. Barbara-Malasiqui-Bayambang Road, Sapanga Section 08/25/07 I 4.694 120 C 0.298 0.300 0.300 - - - 89.80 *89.80%

V. Satisfactory

Alphin Trading & Construction 26260 Construction of 1 Classroom, Payas NHS 03/06/09 I 0.482 150 C 0.456 0.154 0.300 - - - 91.00 *91.00%V. Satisfactory

Alphin Trading & Construction 26260 Repair/Impvt. of San Carlos-Calasiao Road 08/27/08 I 2.891 75 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding

Alphin Trading & Construction 26260 Construction of 2-CL @ Mabulitek 08/27/09 I 0.972 65 C 0.488 0.200 0.300 - - - 98.80 *98.80% Outstanding

Alphin Trading & Construction 26260 Rehab. of DPWH Pangasinan 3rd DEO Building, Tumana 08/25/09 I 2.885 75 C 0.442 0.139 0.300 - - - 88.10 91.39%

V. Satisfactory

Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zamboanga City-Pagadian Road 05/26/09 IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 -

Alraf Construction & Enterprises 17297Rehab./Reconst. of Damaged Paved

National Road (Pagadian-Zamboanga City Road)

05/26/09 IX 14.152 132 O 0.385 0.300 0.150 0.030 0.047 0.050 96.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page35

Page 44: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Alraf Construction & Enterprises 17297Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment II

Manguso-Mulawin Section11/17/08 IX 36.137 290 C 0.365 0.200 0.300 - - - 86.50 88.27%

V. Satisfactory

Alraf Construction & Enterprises 17297 Impvt./Conc. of Isabela-Maluso National Road, Bañas-Garlayan Section 05/15/08 IX 7.605 131 C 0.219 0.300 0.300 - - - 81.90 80.61%

V. Satisfactory

Alraf Construction & Enterprises 17297 Rehab./Const./Impv't of Zamboanga City-Pagadian City Road 03/03/09 IX 44.695 253 O 0.387 0.240 0.150 0.030 0.050 0.050 90.70 -

Alraf Construction & Enterprises 17297 Rehabilitation of Brgy. Mercedes Road (Phase II) 03/03/09 IX 4.651 60 C 0.426 0.200 0.300 - - - 92.60 *92.60%

V. Satisfactory

Alraf Construction & Enterprises 17297Rehab./Reconst. of Damaged Paved

National Road (Pagadian-Zamboanga City Road)

09/01/09 IX 14.152 132 C 0.429 0.200 0.300 - - - 92.90 94.88% V. Satisfactory

Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with Intermittent Section) 09/02/09 IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 -

Alraf Construction & Enterprises 17297

Const./Opening of Zamboanga West Coast Rd., Napolan-Cawit-Anonga Sect. Sta.

14+700 - Sta. 18+780 w/ exceptions Sta. 18+420 - Sta. 18+500

02/23/10 IX 95.698 360 O 0.396 0.300 0.000 0.300 0.047 0.033 80.60 -

Alro Construction & Development Corp. 18361 Conc. of Bulusan Lake Road with Drainage

& Slope Protection 08/15/07 V 9.504 75 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge 11/21/09 V 13.202 200 C 0.400 0.200 0.300 - - - 90.00 87.90%

V. Satisfactory

Alro Construction & Development Corp. 18361 Road Opening/Improvement of Montinegro

Cabanbanan Road 03/09/09 V 19.108 90 C 0.458 - 0.500 - - - 95.80 *95.80% V. Satisfactory

Alro Construction & Development Corporation 18361 Rehabilitation of Goyundan to Payak Road 05/29/09 V 4.777 158 C 0.357 0.200 0.300 - - - 85.70 *85.70%

Satisfactory

Alro Construction & Development Corporation 8361 Concreting of FMR from Macad to Tilnac 06/01/09 V 9.459 150 C 0.418 0.133 0.300 - - - 85.10 *85.10%

Satisfactory

Alro Construction & Development Corporation 18361

Rehab./Reconst. of Iriga City-San Isidro-Sagrada-San Ramon Road (San Pedro

Section)09/09/09 V 15.275 179 C 0.401 0.174 0.300 - - - 87.50 *87.50%

Satisfactory

Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 08/21/08 VIII 4.775 120 O 0.354 0.240 0.000 0.022 0.019 0.067 70.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page36

Page 45: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 03/17/09 VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -

Alt Construction 32365 Const. of Access Road to RORO Terminal, Sta. Fe-Guiron Section 08/19/08 V 4.754 90 C 0.251 0.200 0.300 - - - 75.10 *75.10%

Satisfactory

Alt Construction 32365 Const. of Sorsogon State College Flood Control/Drainage System 05/21/08 V 4.800 45 C 0.375 0.177 0.300 - - - 85.20 *85.20%

V. Satisfactory

Alt Construction 32365Rehab. of Malusak Bridge & Approaches along Talaba-Summit-Panaon National

Road08/22/07 IVA 1.726 60 C 0.294 0.231 0.300 - - - 82.50 *82.50%

V. Satisfactory

Alzam Enterprises 19113Rehab./Recons./Upgrading of Damaged

Paved National Roads at Davao City Diversion Road, La Verna Section

06/11/09 XI 19.272 210 O 0.371 0.300 0.150 0.030 0.056 0.050 95.70 -

Alzam Enterprises 19113 Conc. of Additional 2 Lanes along Quimpo Boulevard ABS-CBN to Ecoland 12/04/07 XI 7.001 210 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

Alzam Enterprises 19113

Demolition/Reconst. of Approaches & Dranaige incl. Bridge Protection Works,

Reconst. of Gov. Generoso (Bankerohan) Br.

09/04/08 XI 30.557 180 C 0.358 0.300 0.300 - - - 95.80 89.95% V. Satisfactory

Alzam Enterprises 19113 Impv't/Conc. of Biao Guianga-Biao Escuela Road 11/19/07 XI 4.799 210 C 0.339 0.300 0.300 - - - 93.90 91.86%

Outstanding

Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road 03/02/09 XI 19.280 210 C 0.365 0.200 0.300 - - - 86.50 85.66% Satisfactory

Alzam Enterprises 19113 Road Impvt./Conc. of Additional Two Lanes along Maa Rd. Section 09/04/08 XI 18.870 210 C 0.329 0.300 0.300 - - - 92.90 87.14%

V. Satisfactory

Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section 03/18/09 XI 28.925 210 C 0.439 0.200 0.300 - - - 93.90 93.42%

V. Satisfactory

Alzam Enterprises 19113Rehab./ Reconst./Upgrading of Damaged

Paved National Roads at Davao City Diversion Road, La Verna Section

09/16/09 XI 19.272 210 C 0.476 0.200 0.300 - - - 97.60 97.60% Outstanding

Alzam Enterprises 19113Widening of Agusan-Davao Road for

Package 2-A, Bunawan Section, Brgy. Bunawan

09/16/09 XI 9.639 150 C 0.484 0.148 0.300 - - - 93.20 *93.20% V. Satisfactory

Alzam Enterprises 19113 Construction of Road Network Camp Catitipan, PNP 03/11/10 XI 22.145 180 C 0.400 0.200 0.300 - - - 90.00 90.00%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page37

Page 46: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Alzam Enterprises 19113

Rehab./Reconst./Upgrading of Damaged paved National Roads at Davao City Diversion Road for Package 2-C at a) Junction Davao-Agusan to Panacan

Relocation Section

03/11/10 XI 19.275 210 C 0.397 0.200 0.300 - - - 89.70 89.70% V. Satisfactory

Alzen Engineering & Construction Supplies 13911

Conc. of Kidapawan-Calunasan-M'lang National Road inc. ROW Acquisition

(Magsaysay-Kalaisan Section)11/24/07 XII 7.314 90 C 0.347 0.300 0.300 - - - 94.70 *94.70%

Outstanding

Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Ilomavis Tourist Road

(Mua-an Section) 08/24/08 XII 5.760 55 C 0.301 0.288 0.300 - - - 88.90 88.48% V. Satisfactory

Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Magpet-Pangao-An

Road (Sumawan-Gubatan Section) 08/24/08 XII 11.338 143 C 0.270 0.287 0.300 - - - 85.70 85.58% V. Satisfactory

AMA Construction 10015 Const. of MPB, Brgy. Victoria 08/29/08 XIII 0.737 60 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory

Ameg Construction & Supply 21556 Conc. of Gogon-Tiris Road 08/19/08 V 0.944 90 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory

Ameg Construction & Supply 21556 Construction of 1-Cl School Bldg. Panlayaan 02/25/09 V 0.575 90 O 0.256 0.300 0.150 0.030 0.060 0.050 84.60 -

Ameg Construction & Supply 21556 Repair/Impvt. of DPWH Bldg. 11/19/08 V 1.910 90 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory

Ameg Construction & Supply 21556 Construction of 1-CL School Building 08/24/09 V 0.575 90 C 0.398 0.162 0.300 - - - 86.00 85.02% Satisfactory

Amopia Construction and Supplies 27511 Conc. of Davao-Cotabato Road, KPES-UCCP Section both sides 03/02/08 XII 9.398 120 C 0.291 0.100 0.000 - - - 39.10 57.76%

Poor

Amopia Construction and Supplies 27511 Conc. of Kidapawan-Ilomavis Tourist Road 05/17/08 XII 8.079 90 O 0.337 0.240 0.000 0.030 0.035 0.067 70.90 -

Angel & Sam Construction & General Merchandise 19968 Const. of 2-Classroom School Building,

Kibungsod NHS 06/01/09 X 1.188 134 C 0.435 0.098 0.300 - - - 83.30 83.93% Satisfactory

Angel & Sam Construction & General Merchandise 19968 Conc. of Cadre Rd. Camp Evangelista Main

Road going to Hospital Section 02/26/08 X 9.548 180 C 0.305 0.200 0.300 - - - 80.50 87.04% V. Satisfactory

Angel & Sam Construction & General Merchandise 19968 Const. of 4 Cl School Bldg. @ Kauswagan

E/S 08/21/07 X 1.682 90 C 0.362 0.200 0.300 - - - 86.20 86.37% V. Satisfactory

Angel & Sam Construction & General Merchandise 19968 Rehab. of ICBR Puerto-Cugman Section 03/02/09 X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page38

Page 47: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Angel & Sam Construction & General Merchandise 19968 Rehab./Upgrading of National Road-South

Divisiria (RN Abejuela St.-Corrales St.) 09/01/09 X 3.564 130 C 0.446 0.200 0.300 - - - 94.60 *94.60% V. Satisfactory

Angel & Sam Construction & General Merchandise 19968 Repair of ICBR Puerto-Cugman Section 09/01/09 X 14.311 207 C 0.459 0.133 0.300 - - - 89.20 83.80%

Satisfactory

Angel & Sam Construction & General Merchandise 19968 Rehabilitation/Upgrading of Sayre Highway 09/01/09 X 16.173 210 O 0.255 0.300 0.150 0.030 0.047 0.033 81.50 -

Angel & Sam Construction & General Merchandise 19968 Rehab./Upgrading of Sayre Highway 02/22/10 X 16.172 240 O 0.341 0.200 0.300 - - - 84.10 83.53%

Satisfactory

Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS 11/13/08 IV-B 0.568 120 O 0.280 0.240 0.070 0.030 0.043 0.100 76.30 -

Anilos Trading & Construction 31557 Const. of MPB (H.E.) in ASMES Brgy. 1 09/20/07 IV-B 0.651 80 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory

Anilos Trading & Construction 31557 Const. of MPB @ Poblacion 05/30/08 IV-B 1.919 110 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding

Anilos Trading & Construction 31557 Const. of Puerto Princesa Pilot E/S 03/05/08 IV-B 1.540 90 C 0.393 0.200 0.300 - - - 89.30 82.93% V. Satisfactory

Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS 03/06/09 IV-B 0.568 180 C 0.493 0.200 0.300 - - - 99.30 83.20% Satisfactory

Anilos Trading & Construction 31557 Const. of Multi-Purpose Building, Phase II, Brgy. Bagong Sikat 03/07/09 IV-B 0.549 90 C 0.473 0.127 0.300 - - - 90.00 *90.00%

V.Satisfactory

Anilos Trading & Construction 31557 Const.of MPB 1st Engineering District, Poblacion Roxas 03/06/09 IV-B 0.947 100 C 0.482 0.105 0.300 - - - 88.70 *88.70%

Satisfactory

Anilos Trading & Construction 31557 Construction of Farm to Market Road 03/07/09 IV-B 1.378 104 C 0.442 0.110 0.300 - - - 85.20 *85.20% Satisfactory

Anilos Trading and Construction 31557 Construction of MPB Relocation Site Brgy. Matahimik 06/05/09 IV-B 0.387 75 C 0.385 0.155 0.300 - - - 84.00 *84.00%

Satisfactory

Anilos Trading and Construction 31557 Rehab./Impvt. of Palawan 1st Engineering District Office Building 06/04/09 IV-B 1.895 120 O 0.367 0.200 0.000 0.030 0.029 0.000 62.60 -

Anilos Trading and Construction 31557 Const. of Don Ramon Roces MES (partial) 09/11/09 IVB 3.766 210 O 0.391 0.000 0.150 0.030 0.048 0.050 66.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page39

Page 48: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Anilos Trading and Construction 31557 Rehab./Impvt. of DPWH-Palawan 1st DEO Bldg. inc. Employees Quarters, 09/07/09 IVB 1.895 120 C 0.500 0.110 0.000 - - - 61.00 62.12%

Poor

Anilos Trading and Construction 31557 Const. of 4-CL Don Ramon Roces MES (Partial) 03/05/10 IVB 3.766 210 C 0.330 0.200 0.300 - - - 83.00 77.51%

Unsatisfactory

Annasor Construction & Trading 30825 Const. of MPB 08/13/08 III 1.909 60 C 0.391 0.300 0.000 - - - 69.10 58.18% Poor

Annasor Construction & Trading 30825 Impvt./Rehab. of Porac District Hospital 11/12/07 III 1.898 160 C 0.220 0.249 0.300 - - - 76.90 *76.90% Satisfactory

Anrol Construction 10136 Rehab. of Manila East Road, Morong-Pililla Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.446 0.133 0.300 - - - 87.90 *87.90%

Satisfactory

Anrol Construction 10136 Rehab. of Manila East Road, Baras Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.429 0.133 0.300 - - - 86.20 *86.20%

Satisfactory

Anrol Construction 10136 Rehab. of San Mateo-Rodriguez Road 11/27/08 IV-A 9.587 45 C 0.265 0.284 0.300 - - - 84.90 *84.90% V. Satisfactory

Anrol Construction 10136 Impvt./Rehab. of MPB Brgy. West Triangle 03/01/10 NCR 3.372 120 C 0.486 0.133 0.300 - - - 91.90 91.90% V.Satisfactory

Antonio V. Nidea Construction 6382 Conc. of Camalig-Inarado-Gapo-Peñaranda Road 08/15/08 V 9.430 200 C 0.323 0.221 0.300 - - - 84.40 80.86%

V. Satisfactory

Antonio V. Nidea Construction 6382 Opening/Const. of Banao-Calpi Road 11/13/08 V 19.176 120 C 0.397 0.294 0.300 - - - 99.10 *99.10% Outstanding

Antonio V. Nidea Construction 6382 Repair/Restoration of Awang River Control, Awang River 02/26/08 V 9.499 378 C 0.371 0.200 0.300 - - - 87.10 *87.10%

V. Satisfactory

Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-Sabang Road 08/13/08 V 14.358 120 C 0.386 0.282 0.300 - - - 96.80 75.02% Satisfactory

Antonio V. Nidea Construction 6382Const. of Iriga Flood Control Project

(Consolidation Dam, Ground Sill, Slope Protection & Damage Canal)

02/28/10 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 -

Antonio V. Nidea Construction 6382 Construction/Imvpt. Of Ponso-San Agustin FMR 02/28/10 V 4.808 180 C 0.403 0.133 0.300 - - - 83.60 83.60%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page40

Page 49: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Opening/Impvt. of Brgy. Manika-Sitio Tina

Rd. (Phase II) 02/27/10 VI 36.658 340 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Opening/Imprv't. of Sitio Babangan-Sito

Igtulukon Rd. (Phase I) 02/26/10 VI 19.297 270 C 0.383 0.162 0.300 - - - 84.50 84.50% Satisfactory

Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea

Construction)6382 Opening/Imprv't. of Brgy. Manika-Sitio Tina

Rd. (Phase I) 02/27/10 VI 40.517 360 O 0.323 0.282 0.150 0.020 0.033 0.033 84.10 -

AOG Construction 29758

Rehab. of National Arterial Secondary & Local Roads Brdy. Maasin-Macrohon-

Sogod, Daang Maharlika Road with exception

05/26/09 VIII 19.088 270 C 0.337 0.200 0.300 - - - 83.70 82.98% Satisfactory

AOG Construction 29758 Conc. of Basak-Rizal-Matinao Rizal FMR 08/30/08 VIII 9.437 260 C 0.303 0.200 0.300 - - - 80.30 83.30% V. Satisfactory

AOG Construction 29758 Const. of Basak II UK Bridge 11/30/07 VIII 3.342 120 C 0.385 0.200 0.300 - - - 88.50 82.08% V. Satisfactory

AOG Construction 29758 Const./Impvt. of Rizal-Matin-ao FMR (Basak-Matin-ao Phase IV) 11/30/07 VIII 11.276 360 C 0.296 0.200 0.300 - - - 79.60 82.60%

V. Satisfactory

AP Mercado Trading and Construction 25269 Rehabilitation of Lateral D (Sta. 0+000-

4+666) 9/10-14/07 NIA-I 7.483 150 C 0.250 0.300 0.300 - - - 85.00 85.09% V.Satisfactory

AP Mercado Trading and Construction 25269 Road Surfacing along Lat D (Sta. 12+957-

17+068) 9/10-14/07 NIA-I 1.502 30 C 0.240 0.300 0.300 - - - 84.00 84.00% V.Satisfactory

APD Construction 17467 Addalam River Irrigation Project 2/13-15/2008 NIA 7.466 180 O 0.3369 0.1871 0.03 0.03 0.0408 0.2 82.48 -

APD Construction 17467 Conc. of Cordon-Aurora Bdry. National Road (Maddela Jct.-Dumabato Sect.) 08/28/07 II 4.774 107 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

APD Construction 17467 Conc. of Ilagan-Delfin-Albano-Mallig National Road, Olango Section 11/13/07 II 7.719 150 C 0.363 0.300 0.300 - - - 96.30 *96.30%

Outstanding

APD Construction 17467 Conc. of Ilagan-Delfin-Albano-Mallig National Road, Villa Cacho Section 11/13/07 II 11.868 240 C 0.335 0.300 0.300 - - - 93.50 89.78%

V. Satisfactory

APD Construction 17467 Conc. of Naguilian-San Marcelino Road (Alibadbad Section) 05/21/08 II 9.648 90 C 0.376 0.202 0.300 - - - 87.80 *87.80%

V. Satisfactory

APD Construction 17467 Conc. of Villa Sur Brgy. Road 05/26/08 II 2.720 90 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page41

Page 50: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

APD Construction 17467 Const. of Pigalo Bridge (Phase II) 02/28/08 II 2.820 195 C 0.362 0.200 0.300 - - - 86.20 86.95% V. Satisfactory

APD Construction 17467

Const./Impvt./Rehab. of Cordon-Diffun-Maddela-Aurora (CDMA) Road & ist related

Roads & Bridges (Cab-Diffun Section) Cualo Blvd Road

03/04/08 II 0.959 100 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-04-06) 07/03/07 NIA-II 5.490 210 C 0.400 0.300 0.000 - - - 70.00 *70.00%

Fair

APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-06-06) 07/02/07 NIA-II 2.529 180 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

APD Construction 17467Impvt. of Cordon-Diffun-Maddela-Aurora

(CDMA) Bdry. Road & its related Roads & Bridges (Rehab. Of Ramos Bridge Phase II)

08/18/08 II 2.604 110 C 0.371 0.243 0.300 - - - 91.40 *91.40% Outstanding

APD Construction 17467 Impvt./Conc. of Cordon-Aurora Bdry. Road (Maddela Jct.-Dumabato Section) 08/18/08 II 13.274 200 C 0.366 0.262 0.300 - - - 92.80 *92.80%

Outstanding

APD Construction 17467 Impv't/Rehab of Ricarte Norte-Ifugao Villa Road, Ganano ARC 03/07/09 II 9.646 180 C 0.454 0.200 0.300 - - - 95.40 *95.40%

V.Satisfactory

APD Construction 17467 Repair/Impvt./Reblocking along Jct. Mangandingay-Saguday Rd. 11/25/08 II 9.576 180 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

APD Construction 17467

Impvt./Conc. along Cordon-Diffun-Madella-Aurora Bdry. Rds. & its related roads (San Marcos-Gundaway Section & its Related

Road

09/03/09 II 19.300 150 C 0.437 0.200 0.300 - - - 93.70 94.30% V. Satisfactory

APD Construction 17467Rehab./Reconst./Upgrading of Damaged

Paved National Roads with Widening, Daang Maharlika KO346+610-KO347+290

08/26/09 II 13.006 132 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory

APD Construction 17467 Upgrading/Concreting of Ilagan-Delfin-Mallig Road 08/25/09 II 12.540 104 C 0.421 0.200 0.300 - - - 92.10 92.10%

V. Satisfactory

APD Construction 17467Impvt./Conc. along Divisoria-Panang Bdry. Road & Its Related Roads (Divisoria Rd. &

its related roads)02/25/10 II 19.223 150 C 0.419 0.200 0.300 - - - 91.90 91.90%

V. Satisfactory

Apex Builders 32329Repair/Rehab. of Scoured Slope Protection

along DM Jct. Legazpi-Sto. Domingo Tabaco-CamSur Bdry.

02/26/10 V 3.019 90 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory

APU Trading & Construction (Formerly: APU Const.) 8379

Const. of Farm-to-Market Road at Brgy. Doña Anicia Road, Brgy. Dau, Mabalacat

and San Ildefonso06/04/09 III 1.897 30 C 0.411 0.200 0.300 - - - 91.10 *91.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page42

Page 51: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Aqualine Construction 11555 Rehab. of Tamalarong-Libertad FMR, Sta. 0+000-Sta. 1+500 06/03/09 IV-B 2.690 90 C 0.358 0.171 0.300 - - - 82.90 83.70%

Satisfactory

Aqualine Construction 11555 Allen CIS (Irrigation) 12/04/07 NIA 2.547 120 C 0.353 0.176 0.300 - - - 82.90 *82.90% V.Satisfactory

Aqualine Construction 11555 Const. of Limopoca CIP 08/23/07 NIA-VII 3.232 150 C 0.321 0.300 0.300 - - - 92.10 92.10%

Aqualine Construction 11555 Rehab. of Tamalarong-Libertad FMR, Sta. 0+000 - Sta. 1+500 03/05/09 IV-B 2.690 90 O 0.362 0.229 0.150 0.030 0.025 0.033 82.90 -

Aquino-Dela Cruz Eng'g & Construction 16751 Rehabilitation of Farm-to-Market Road 03/05/09 I 1.250 25 C 0.371 0.200 0.300 - - - 87.10 *87.10%

Satisfactory

Aquino-Dela Cruz Eng'g & Construction 16751 Const. of One Unit, 2-CL S/B at Enrico T.

Prado NHS 03/02/10 I 0.965 60 C 0.401 0.133 0.300 - - - 83.40 83.40% Satisfactory

Aquino-Dela Cruz Eng'g. & Construction 16751

Road Upgrading (Gravel to Paved) San Nicolas-Natividad-San Quintin-Umingan-

Guimba Road05/20/09 I 10.598 89 O 0.380 0.240 0.150 0.030 0.050 0.033 88.30 -

Aquino-Dela Cruz Eng'g. & Construction 16751

Road Upgrading (Gravel to Paved) of San Nicolas-San Quintin-Umingan-Guimba

Road08/25/09 I 10.598 89 C 0.407 0.200 0.300 - - - 90.70 89.26%

V. Satisfactory

Aquino-Dela Cruz Engineering & Construction 16751 Conc./Impvt. of San Carlos-Calasiao Road

(Bolingit-Cruz Section) 08/25/07 I 9.162 135 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory

AR Adlawan Construction 13108 Road Upgrading (Gravel to Paved), Sibonga-Dumanjug Road 06/01/09 VII 9.531 45 C 0.413 0.200 0.300 - - - 91.30 *91.30%

V. Satisfactory

AR Adlawan Construction 13108 Concreting of Sibonga-Dumanjug Road 06/01/09 VII 28.915 210 C 0.440 0.200 0.300 - - - 94.00 83.14% Satisfactory

AR Adlawan Construction 13108Conc. of Sibonga-Dumanjug Road, Starting at Boundary Cebu 2nd DEO and Cebu 4th

DEO (Km. 65+968-Km.64+988)06/01/09 VII 18.391 120 C 0.426 0.200 0.300 - - - 92.60 74.48%

Poor

AR Adlawan Construction 13108 Conc. of Cebu-Toledo Wharf Road 09/04/08 VII 34.318 210 C 0.322 0.300 0.300 - - - 92.20 85.14% V. Satisfactory

AR Adlawan Construction 13108 Const. of 2 CL Sch. Bldg. @ Can-Asujan NHS 03/08/08 VII 34.320 60 C 0.351 0.200 0.300 - - - 85.10 *85.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page43

Page 52: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

AR Adlawan Construction 13108 Const. of Lower Calajo-an Pakigne Bridge 09/03/07 VII 0.949 80 C 0.302 0.300 0.300 - - - 90.20 *90.20% Outstanding

Arago Construction & Supply 31324 Const. of 1 Unit 1 CL Sch. Bldg. @ Bagtong C/S 03/17/09 VIII 0.460 75 C 0.461 0.200 0.300 - - - 96.10 *96.10%

Outstanding

Arcinue Commercial 6746 Rehab./Asphalt Overlay of Manaoag Cadre Road, Km. 0+000-Km. 0+587 05/26/09 I 3.857 20 C 0.432 0.133 0.300 - - - 86.50 *86.50%

Satisfactory

Arcinue Commercial 6746Rehab./Reconts./Upgrading along Bacnoton-Luna-Balaoan Road, Km. 283+221-Km. 307+896 w/exception

05/27/09 I 16.169 90 O 0.358 0.207 0.150 0.030 0.040 0.033 81.80 -

Arcinue Commercial 6746 Const. of 2 CL Sch. Bldg. Anduyan NHS 02/20/08 I 0.899 90 C 0.373 0.207 0.300 - - - 88.00 83.73% V. Satisfactory

Arcinue Commercial 6746 Const. of 2 CL School Bldg. @ Lloren E/S 08/11/08 I 0.764 90 C 0.324 0.200 0.300 - - - 82.40 *82.40% V. Satisfactory

Arcinue Commercial 6746 Const. of Mangato Bridge under Austrian Assisted DPWH Const. Project 11/18/08 I 27.553 360 O 0.323 0.289 0.000 0.030 0.033 0.067 74.20 -

Arcinue Commercial 6746 Const. of MangatoBridge under Austrian Assisted DPWH Const. Project 08/21/08 I 27.553 360 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -

Arcinue Commercial 6746 Const. of Maypalic Bridge 02/29/08 I 12.048 200 C 0.292 0.200 0.000 - - - 49.20 61.59% Fair

Arcinue Commercial 6746 Impv't of Pias-Currimao-Balacad Road, Paoay Section 03/04/09 I 31.831 360 O 0.296 0.300 0.150 0.030 0.045 0.050 87.10 -

Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road, Brgy. Paoay Section 11/17/08 I 31.831 360 O 0.331 0.293 0.100 0.024 0.037 0.100 88.50 -

Arcinue Commercial 6746 Impvt./Repair/Rehab. of Pangasinan-Zambales Road 08/25/08 I 9.468 90 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Arcinue Commercial 6746 Opening of Farm-to-Market Road, Brgy. Namonitan 08/11/08 I 0.478 45 C 0.386 0.289 0.300 - - - 97.50 *97.50%

Outstanding

Arcinue Commercial 6746 Rehab. & Impvt. of Cabaroan Bridge along San Juan-San Gabriel Road 08/22/08 I 1.897 50 C 0.305 0.200 0.300 - - - 80.50 *80.50%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page44

Page 53: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Arcinue Commercial 6746 Rehab./Reconst. of Damaged Nat'l Road, San Fernando-Bagulin Road 08/22/08 I 19.219 90 C 0.363 0.200 0.300 - - - 86.30 83.96%

V. Satisfactory

Arcinue Commercial 6746 Replacement of Cuenca NHS 02/02/08 I 0.899 90 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory

Arcinue Commercial 6746 Rehab./Reconst./Upgrading of Bacnotan-Luna-Balaoan Road 09/02/09 I 16.169 99 C 0.425 0.200 0.300 - - - 92.50 86.08%

Satisfactory

Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road with exception, Paoay Section 09/09/09 I 31.831 360 C 0.364 0.168 0.300 - - - 83.20 85.96%

Satisfactory

Arcinue Commercial 6746 Const. of Mangato Bridge, Brgy. Mangato 09/10/09 I 27.553 519 C 0.459 0.133 0.300 - - - 89.20 82.96% Satisfactory

Arcinue Commercial 6746 Construction of School Building @ Sto. Rosario E/S 09/01/09 I 2.148 210 C 0.440 0.086 0.300 - - - 82.60 *82.60%

Satisfactory

Arcinue Commercial 6746 Const./Repair of Tavora E/S 02/27/10 I 4.982 180 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory

Aretas Development & Supply 25669 Const. of MPB, Sampaguita Hills, Brgy. Marcelo Green 02/17/10 NCR 3.837 75 C 0.497 0.133 0.300 - - - 93.00 93.00%

V.Satisfactory

Argealis Construction 16122 Construction of Fence for the San Fernando Runway Strip (Western Portion) 07/11/07 BCDA 3.747 120 C 0.310 0.300 0.300 - - - 91.02 *91.02%

V.Satisfactory

Argealis Construction 16122 Construction of PPMC Motorpool Shed 8/19-22/08 PPA 1.200 45 C 0.342 0.300 0.300 - - - 94.19 94.19% Outstanding

Arik Construction 32786 Conc. of Shoulder along Daet-Bagasbas Airport Road 11/27/08 V 0.467 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Arky Construction and Supply 32692 Rehab./Reconst. of Damaged Masbate Capitol-Cadre National Road 05/25/09 V 11.566 144 O 0.327 0.240 0.150 0.030 0.050 0.033 83.00 -

Arky Construction and Supply 32692 Const. of Circ. Road, Brgy. Ibinigay-Bagumbayan 05/19/08 V 4.750 90 C 0.325 0.200 0.300 - - - 82.50 82.38%

V. Satisfactory

Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) 08/23/08 V 0.475 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page45

Page 54: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) 08/23/08 V 0.948 75 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

Arky Construction and Supply 32692Rehab./Reconst. of Damaged Masbate-

Cataingan-Placer National Road (Intermittent Section)

08/27/09 V 17.364 150 C 0.387 0.200 0.300 - - - 88.70 *88.70% Satisfactory

Arky Construction and Supply 32692 Rehab./Reconst. of Damaged Masbate Capitol-Cadre National Road 08/27/09 V 11.566 145 O 0.375 0.300 0.000 0.030 0.051 0.033 78.90 -

Arky Construction and Supply 32692 Rehab./Reconst. of Damaged Masbate Capitol-Cadre National Road 02/18/10 V 11.566 253 C 0.418 0.160 0.300 - - - 87.80 83.69%

Satisfactory

Arlor Construction 30822 Const./Rehab. of Road at Natunuan North-Kaingin 02/26/10 IVA 0.497 30 C 0.442 0.133 0.300 - - - 87.50 87.50%

Satisfactory

Armando U. Khong General Contractor 16163 Proposed Repair/Rehab. of Araulio High

School 11/14/07 NCR 14.384 150 C 0.316 0.300 0.300 - - - 91.60 *91.60% Outstanding

Armando U. Khong General Contractor 16163 Upgrading/Conc. with Drainage Impvt. of

M. dela Fuente St. 05/16/08 NCR 15.936 150 C 0.365 0.268 0.300 - - - 93.30 94.20% Outstanding

Armando U. Khong Hun General Contractor 16163

Rehab./Reconst./Upgrading of Diokno Ave., including Approach of Diokno Bridge

(Phase I)05/19/09 NCR 19.290 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

Armando U. Khong Hun General Contractor 16163 Construction of Pedestrian Overpass

along Domestic Road 05/19/09 NCR 11.573 120 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory

Armando U. Khong Hun General Contractor 16163 Const./Improvement of Slope Protection of

San Dionisio River (Phase I, II & III) 06/02/09 NCR 33.720 90 C 0.443 0.133 0.300 - - - 87.60 *87.60% Satisfactory

ARN Builders 18930 Rehab./Recons. of Aklan East Road 06/06/09 VI 19.283 180 C 0.438 0.200 0.300 - - - 93.80 84.32% Satisfactory

ARN Builders 18930 Road to Complete Nautical Highway, Rehabilitation of Daang Maharlika Road 05/27/09 VIII 47.490 365 O 0.357 0.240 0.150 0.030 0.042 0.033 85.20 -

ARN Builders 18930Impvt./Conc. of Kapalong-Talaingod-

Valencia, Bukidnon Road, Brgy. Sto. Nino Section, Phase I

06/03/09 XI 152.645 500 O 0.376 0.300 0.150 0.030 0.047 0.050 95.30 -

ARN Builders 18930Impvt./Conc. of Kapalong-Talaingod-

Valencia, Bukidnon Road, Brgy. Sto. Nino Section, Phase II

06/03/09 XI 172.551 540 O 0.392 0.300 0.141 0.030 0.047 0.033 94.30 -

ARN Builders 18930 Conc. of Altavas Diversion Road 03/06/08 VI 16.521 160 C 0.328 0.200 0.300 - - - 82.80 85.11% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page46

Page 55: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ARN Builders 18930 Construction of Kinawahan Bridge & Approaches 03/06/09 VII 25.238 210 C 0.269 0.192 0.300 - - - 76.10 *76.10%

Unsatisfactory

ARN Builders 18930CP 5: Impvt./Conc. of Kapalong-Talaingod-Valencia Bukidnon Road, Brgy. Sto. Niño

Phase II12/01/08 XI 172.550 540 O 0.400 0.300 0.100 0.024 0.055 0.067 94.60 -

ARN Builders 18930CP 8: Const. of Six (6) Bridges inc.

Approaches along Kapalong-Talaingod-Valencia Bukidnon Road

12/01/08 XI 123.199 360 O 0.384 0.282 0.100 0.030 0.055 0.100 95.10 -

ARN Builders 18930CP 8: Const. of Six (6) Bridges inc.

Approaches along Kapalong-Talaingod-Valencia Bukidnon Road

03/14/09 XI 123.199 360 O 0.375 0.300 0.150 0.030 0.065 0.033 95.30 -

ARN Builders 18930 Rehab./Reconstruction of Aklan East Road 05/23/08 VI 19.283 240 O 0.330 0.240 0.100 0.030 0.055 0.100 85.50 -

ARN Builders 18930 Rehab./Reconstruction of Aklan East Road 11/30/08 VI 19.283 180 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -

ARN Builders 18930 Rehab./Reconst./Upgrading of Aklan East Road 09/05/09 VI 31.795 240 O 0.335 0.240 0.150 0.023 0.050 0.033 83.10 -

Arn Builders 18930 Const. of Multi-Purpose Building at Cabadiangan 09/14/09 VII 1.776 90 C 0.485 0.200 0.300 - - - 98.50 *98.50%

Outstanding

ARN Builders 18930 Road to Complete Nautical Highway, Rehab. of Daang Maharlika Road 09/08/09 VIII 47.490 365 O 0.368 0.246 0.150 0.030 0.050 0.033 87.70 -

ARN Builders 18930CP-4: Impvt./ Conc. of Kapalong-Talaingod-Valencia Bukidnon Road, Brgy. Sto. Niño

Section, Phase I09/06/09 XI 152.645 500 O 0.373 0.240 0.150 0.030 0.048 0.033 87.40 -

ARN Builders 18930CP-5: Impvt./ Conc. of Kapalong-Talaingod-Valencia Bukidnon Road, Brgy. Sto. Niño

Section, Phase II09/06/09 XI 172.511 540 O 0.364 0.240 0.150 0.030 0.048 0.033 86.50 -

ARN Builders 18930 Const. of Cabancalan-Canduman Bridge (E. Cortes Bridge) 03/08/10 VII 30.409 255 C 0.444 0.078 0.300 - - - 82.20 73.92%

Poor

ARN Builders 18930 Road to Complete Nautical Highway, Rehab. of Daang Maharlika Road 02/28/10 VIII 47.490 365 C 0.392 0.200 0.300 - - - 89.20 88.58%

Satisfactory

ARN Builders 18930CP-4: Imprvt./Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Niño

Section Phase I02/27/10 XI 153.445 530 C 0.387 0.200 0.300 - - - 88.70 90.29%

V. Satisfactory

ARN Builders 18930CP-5: Impvt. / Conc. Of Kapalong-

Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Nino Section Phase II

02/27/10 XI 173.459 540 C 0.363 0.200 0.300 - - - 86.30 89.60% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page47

Page 56: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ARN Builders 18930CP-8: Const. of Six (6) Bridges inc.

Approaches along Kapalong-Talaingod-Valencia-Bukidnon Road

02/26/10 XI 123.463 540 C 0.355 0.133 0.300 - - - 78.80 89.52% V. Satisfactory

ARN Builders 18930Repair/Rehab. of Caraga Gov. LN Lopez and Quinonoan Bridges along Baganga-

Mati Road03/04/10 XI 93.754 375 C 0.402 0.133 0.300 - - - 83.50 83.50%

Satisfactory

ARSVI Construction 23518 Conc. and Impvt. of San Andres Road 09/09/09 IVA 2.893 90 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

ARSVI Construction 23518 Const. of School Building at Elementary School, Brgy. Banjo East 03/03/10 IVA 0.998 90 C 0.484 0.133 0.300 - - - 91.70 91.70%

V. Satisfactory

Asanco Gen. Merchandising & Construction 30517 Const. of Multi-Purpose Pavement,

Barangay New Guinlo 03/04/10 IVB 0.775 54 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory

Asand Construction and Development 21691 Construction of Academic Building II 12/2/09 DOST 10.309 210 C 0.455 0.195 0.300 - - - 95.00 95.00%

V. Satisfactory

ASC Construction 26788 Construction of Canal and Canal Structures (LMC-ARIP-08-06) 07/02/07 NIA-II 3.448 180 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

ASC Construction and Concrete Products 26788 Addalam River Irrigation Project 2/13-15/08 NIA 5.013 150 C 0.308 0.240 0.300 84.77 *84.77%

V. Satisfactory

ASC Construction and Concrete Products 26788 Const./Completion of Secondary Sch. Bldg.

@ Cagayan NHS 05/19/07 II 0.784 60 O 0.388 0.135 0.100 0.020 0.011 0.100 75.40 -

ASC Construction and Concrete Products 26788 Const./Completion of Secondary Sch. Bldg.

@ Cagayan NHS 08/14/07 II 0.784 60 O 0.372 0.184 0.100 0.015 0.018 0.100 78.90 -

ASC Construction and Concrete Products 26788 Reha./Impvt. of National Road along

Cagayan-Apayao Road, Solana Section 05/21/07 II 1.896 205 O 0.315 0.212 0.100 0.030 0.028 0.100 78.50 -

ASC Construction and Concrete Products 26788 Reha./Impvt. of National Road along

Cagayan-Apayao Road, Solana Section 08/14/07 II 1.896 205 O 0.283 0.300 0.000 0.023 0.028 0.067 70.10 -

Asian Pearl Construction & Development Corporation 9059 Completion of Multi-Purpose Building,

Sitio Parang, Brgy. San Marcos 03/03/09 I 1.414 34 C 0.416 0.133 0.300 - - - 84.90 *84.90%Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059 Conc. along Ilocos Norte-Apayao Road 11/17/08 I 11.226 152 C 0.340 0.200 0.300 - - - 84.00 85.20%

V. Satisfactory

Asian Pearl Construction & Dev't. Corp. 9059 Const. of First Floor of the Proposed Three

(3) Storey Bldg., Ilocos Norte NHS 08/21/08 I 8.356 180 C 0.334 0.200 0.000 - - - 53.40 74.22% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page48

Page 57: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Asian Pearl Construction & Dev't. Corp. 9059 Const. of Gabaldon Bldg. & Grounds @

Ilocos Norte NHS 02/15/07 I 7.594 150 O 0.349 0.300 0.100 0.020 0.060 0.100 92.90 -

Asian Pearl Construction & Dev't. Corp. 9059 Rehab. of Gabaldon Bldg. at Ilocos Norte

NHS 08/14/07 I 7.596 116 C 0.355 0.278 0.300 - - - 93.30 *93.30% Outstanding

ASS Construction 31509 Construction of Sports Complex 5/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding

Asugas Builders 32764 Const. & Completion of MPB (Municipal Bldg.) Phase II 11/27/08 IX 2.300 120 C 0.355 0.133 0.300 - - - 78.80 *78.80%

Satisfactory

Asugas Builders 32764 Const./Impvt. of MPB (Municipal Bldg.) Phase III, Poblacion Tigbao 03/14/09 IX 1.835 120 C 0.415 0.133 0.300 - - - 84.80 *84.80%

Satisfactory

Asugas Builders 32764 Construction and Completion of Multi-Pupose Building (Phase III) 03/14/09 IX 1.835 120 C 0.447 0.133 0.300 - - - 88.00 *88.00%

Satisfactory

Atlanta Construction Company, Inc. 31290Const./Rehab./Replacement/ Completion/ and Repair of Elem. And Secondary Sch.

Bldg.at Sugod P/S08/23/07 X 5.214 75 C 0.373 0.200 0.300 - - - 87.30 84.01%

V. Satisfactory

Atlantic Construction 24232 Const. of 1 CL Std. Sch. Bldg. at Manaring E/S 02/26/08 II 0.473 35 C 0.318 0.200 0.300 - - - 81.80 *81.80%

V. Satisfactory

Atlantic Construction 24232 Const. of 1 H/S CL at Brgy. Cabannungan 05/20/08 II 0.421 55 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Atlantic Construction 24232 Const. of Sta. Maria MPB 03/02/09 II 3.816 120 C 0.410 0.200 0.300 - - - 91.00 82.04% Satisfactory

Atlantic Construction 24232 Rehab./Impvt. of Road Jct. Santiago-Tuguegarao to Sta. Maria Town Proper 03/02/09 II 4.765 146 C 0.406 0.200 0.300 - - - 90.60 85.38%

Satisfactory

Atlantic Construction 24232 Repair/Maintenance of Baculud River Control (Phase I) 08/13/08 II 0.743 35 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

Atlantic Construction 24232 Repair/Rehab. of Sta. Maria E/S 08/21/07 II 0.380 42 C 0.347 0.116 0.300 - - - 76.30 *76.30% Satisfactory

Atlantic Construction 24232Road Concreting of Brgys. Quibal, San Andres, Visitacion, San Roque and San

Juan03/02/09 II 4.772 120 C 0.389 0.200 0.300 - - - 88.90 84.10%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page49

Page 58: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Atlantic Construction 24232 Road Concreting of Sto. Tomas-Bagutari 11/18/08 II 2.865 70 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

Atlantic Construction 24232 Construction of 2-CL Naguilian Bacolod E/S 09/05/09 II 1.816 60 C 0.482 0.133 0.300 - - - 91.50 *91.50%

V. Satisfactory

Atlantic Erectors Builders Inc. / Brostan Construction & Development

JV-99-167 / 12360

Construction of Diversion Dam & Intake Barrel 08/22/07 NIA-II 232.105 1853 C 0.381 0.300 0.000 - - - 68.10 69.20%

Fair

Atlantic Erectors Builders Inc. / Brostan Construction & Development

JV-99-167 / 12360

Construction of Main Canal, Laterals & Appurtenant 08/23/07 NIA-II 73.392 544 O 0.385 0.248 0.000 0.023 0.047 - 70.30 -

Atlas Enterprises 4953 Construction of Cabanatuan-Gen. Trinidad Road 09/04/09 III 4.752 90 C 0.458 0.133 0.300 - - - 89.10 *89.10%

V. Satisfactory

ATR Construction 15968 Conc. of Roads at Quirino District 11/20/08 XI 1.884 75 C 0.195 0.300 0.300 - - - 79.50 *79.50% Satisfactory

ATR Construction 15968 Concreting of Roads at Brgy., Tres De Mayo, Quirino St.-Perfect 03/07/09 XI 1.884 45 C 0.462 0.192 0.300 - - - 95.40 *95.40%

V. Satisfactory

ATR Construction 15968 Const. of Drainage along Digos-Makar Road 05/15/08 XI 4.701 90 C 0.393 0.200 0.300 - - - 89.30 90.68%

Outstanding

Avatar Construction Company 31455 Const./Widening/Gravelling of Roads from Brgy. Glenville to Brgy. Gomez 06/02/09 XIII 1.902 234 C 0.497 0.169 0.300 - - - 96.60 *96.60%

Outstanding

Avatar Constructions Company 31455Rehab./Reconstruction of Damaged Paved National Road along Dinagat-Loreto Road

(San Jose Section)06/02/09 XIII 5.717 240 C 0.464 0.200 0.300 - - - 96.40 85.69%

Satisfactory

Avatar Constructions Company 31455 Completion of Brgy. Aurelio MPB 11/20/08 XIII 2.892 180 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory

Avatar Constructions Company 31455 Completion of Road from Brgy. Mahayahay Road to Shrine Road 03/05/09 XIII 2.364 180 C 0.385 0.200 0.300 - - - 88.50 *88.50%

Satisfactory

Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road (San Jose-Mahayahay Section) 08/21/08 XIII 10.411 322 C 0.374 0.200 0.300 - - - 87.40 76.48%

Satisfactory

Avatar Constructions Company 31455 Const. of Sta. Cruz Beach Road 03/05/09 XIII 3.855 210 C 0.473 0.132 0.300 - - - 90.50 *90.50% V. Satisfactory

Avatar Constructions Company 31455Rehab./Reconst. of Damaged Paved

National Road along Dinagat-Loreto Road (San Jose Section)

11/20/08 XIII 5.717 240 O 0.377 0.141 0.070 0.030 0.032 0.067 71.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page50

Page 59: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Avatar Constructions Company 31455Rehab./Reconst. of Damaged Paved

National Road along Dinagat-Loreto Road (San Jose Section)

03/05/09 XIII 5.717 240 O 0.337 0.252 0.150 0.030 0.035 0.050 85.40 -

Avatar Constructions Company 31455 Const./Widening of Rds. From Brgy. Poblacion to Brgy. Jacquez 09/04/09 XIII 1.897 332 C 0.497 0.133 0.300 - - - 93.00 *93.00%

V.Satisfactory

Avatar Constructions Company 31455 Rd. Conc. With Drainage along Jct. Nat. Rd. to Brgy. Justiniana Rd. 09/05/09 XIII 4.773 210 O 0.369 0.263 0.150 0.030 0.051 0.033 89.60 -

Avatar Constructions Company 31455 Opening of Brgy. Matingbe - Brgy. Gomez Farm to Market Rd. 02/24/10 XIII 4.813 150 C 0.491 0.133 0.300 - - - 92.40 92.40%

V.Satisfactory

Avatar Constructions Company 31455 Road Conc. with Drainage along Jct. National Rd. to Brgy. Justiniana Rd. 02/24/10 XIII 4.773 210 C 0.473 0.133 0.300 - - - 90.60 90.00

V.Satisfactory

Avatar Constructions Company 31455 Repair/Rehab. of Brgy. Sta. Cruz-Brgy. Wilson, Farm to Market Rd. 02/24/10 XIII 9.452 210 O 0.351 0.233 0.150 0.030 0.047 0.050 86.10 -

Avatar Constructions Company 31455 Const. of MPB Phase IV 02/24/10 XIII 14.473 210 O 0.333 0.240 0.150 0.030 0.051 0.050 85.40 -

Aylan Construction and Trading 11884 Rehab. of Commonwealth E/S & GSIS E/S 05/26/08 NCR 3.818 60 C 0.228 0.300 0.300 - - - 82.80 *82.80% V. Satisfactory

Aylan Construction and Trading 11884 Repair/Rehab. of Flora Ylagan H/S 02/29/08 NCR 0.710 45 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory

Aylan Construction and Trading 11884 Completion of Academic Bldg., San Roque Elem. School 09/10/09 NCR 9.591 90 C 0.337 0.133 0.300 - - - 77.00 *77.00%

Unsatisfactory

Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame High School, Brgy. Lipunan ng Crame 02/26/10 NCR 1.781 90 C 0.493 0.133 0.300 - - - 92.60 92.60%

V.Satisfactory

Aylan Construction and Trading 11884 Const./Completion of School Bldg. at Leodegario Victorino E/S 02/24/10 NCR 14.450 200 O 0.347 0.240 0.150 0.030 0.041 0.050 85.80 -

Azul Builders 21870 Conc. of Roads at Brgy. Sta. Cruz 08/22/07 III 0.948 65 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding

B B C Construction 16510 Const. of Multi-Purpose Building (Covered Court) Agusan National High School 06/10/09 XIII 3.737 150 C 0.478 0.200 0.300 - - - 97.80 *97.80%

Outstanding

B L F Construction 15829 Const. of School Building (CNM) Phase III @ Bataan, Peninsula State University 08/28/09 III 1.870 36 C 0.420 0.133 0.300 - - - 85.30 *85.30%

Satisfactory

B. Bernardo Construction 6196 Improvement of Farm-to-Market Road, Brgy. Catmon 06/01/09 III 3.524 90 C 0.446 0.200 0.300 - - - 94.60 *94.60%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page51

Page 60: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road 03/06/09 III 9.566 90 C 0.346 0.200 0.300 - - - 84.60 84.72% Satisfactory

B. Bernardo Construction 6196 Rehab. of Amang Rodriguez Ave. 08/24/07 NCR 14.343 60 C 0.319 0.277 0.300 - - - 89.60 *89.60% V. Satisfactory

B. Bernardo Construction 6196 Rehab. of Sumulong Highway 08/21/08 NCR 19.220 150 C 0.266 0.298 0.300 - - - 86.40 *86.40% V. Satisfactory

B. Bernardo Construction 6196 Completion of Riprapping along Malanday Creek, Brgy. Malanday 02/23/10 NCR 4.785 60 C 0.371 0.200 0.300 - - - 87.10 87.10%

Satisfactory

B. M. Marketing 9852 Guiuan Airport Development Project 10/07/09 DOTC 38.995 150 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding

B. Valencerena Trading & Construction 22147 Const./Impvt. of Various MPB, Brgy.

Teachers Village West 09/11/09 NCR 2.861 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory

B. Valencerina Trading & Construction 22147 Rehabilitation of Alley at Sweet Dreams

Compound, Brgy. Parang 05/28/09 NCR 0.675 90 C 0.389 0.133 0.300 - - - 82.20 *82.20% Satisfactory

B. Valencerina Trading & Construction 22147 Completion of MPB 11/18/08 NCR 1.903 60 C 0.375 0.252 0.300 - - - 92.70 *92.70%

Outstanding

B. Valencerina Trading & Construction 22147 Conc. of FMR, Brgy. San Pedro 11/17/08 I 1.637 50 C 0.243 0.200 0.300 - - - 74.30 *74.30%

Satisfactory

B. Valencerina Trading & Construction 22147 Rehab. of Road @ Sitio Anawin at Brgy.

San Isidro 03/06/08 IVA 0.957 30 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

B. Valencerina Trading & Construction 22147 Rehab. of Sch. Bldg. @ Brgy. San Rafael 11/27/08 IV-A 0.960 45 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

B. Valencerina Trading and Construction 22147 Conc. of Bungon Farm-to-Market Road 02/22/10 I 1.927 75 C 0.293 0.133 0.300 - - - 72.60 72.60%

POOR

B. Valencia Trading and Construction 22147 Const. of MPB., Brgy. Rosario 02/24/10 NCR 5.271 90 C 0.427 0.200 0.300 - - - 92.70 92.70%

V.Satisfactory

B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road 05/27/09 VIII 7.517 180 C 0.432 0.200 0.300 - - - 93.20 86.54%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page52

Page 61: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

B. Vicencio Construction 9687 Rehab./Impvt. of Brdy. Mahaplag-Sogod Road (Dampoy) 05/27/09 VIII 9.446 310 O 0.345 0.258 0.150 0.030 0.047 0.033 86.30 -

B. Vicencio Construction 9687 Concreting of Villaba-Leyte Road Km. 1015+820-Km. 1017+420 06/02/09 VIII 31.694 330 O 0.339 0.240 0.150 0.022 0.037 0.033 82.10 -

B. Vicencio Construction 9687Rehab. of Sambulawan-Calaguise-Calubian

Road (Concreting of Calaguise Section), Tigbawan Section

06/02/09 VIII 17.942 220 C 0.292 0.139 0.300 - - - 73.10 70.43% Poor

B. Vicencio Construction 9687 Concreting of Calbayog Diversion Road 06/02/09 VIII 18.794 240 C 0.364 0.133 0.300 - - - 79.70 82.28% Satisfactory

B. Vicencio Construction 9687Rehab./Reconst./Upgrading of Damaged

Paved National Roads Calbayog-Catarman Road

06/02/09 VIII 94.550 300 O 0.303 0.238 0.089 0.030 0.045 0.033 73.80 -

B. Vicencio Construction 9687Const. (Road Opening) of Missing Link of Calbayog Diversion Road, Cagsalaosao-

Gadgaran Road Section06/02/09 VIII 18.794 150 O 0.223 0.240 0.150 0.030 0.050 0.033 72.60 -

B. Vicencio Construction 9687 Calbayog Airport Development Project 05/28/09 DOTC 19.247 120 O 0.364 0.300 0.150 0.020 0.047 0.050 93.10 -

B. Vicencio Construction 9687 Completion of 8 CL E/S Bldg., Remedios T. Romualdez E/S 03/18/09 VIII 4.337 90 C 0.399 0.200 0.300 - - - 89.90 *89.90%

V. Satisfactory

B. Vicencio Construction 9687 Conc. of Calbayog Diversion Road, Sta. 0+000-Sta. 0+500 08/23/08 VIII 11.132 120 C 0.380 0.300 0.000 - - - 68.00 82.76%

V. Satisfactory

B. Vicencio Construction 9687 Conc. of Calbayog Diversion Road, Sta. 16+477.95 - Sta. 15+257.96 11/27/08 VIII 18.795 240 O 0.317 0.232 0.100 0.030 0.028 0.100 80.70 -

B. Vicencio Construction 9687 Conc. of Calbayog Diversion Road, Sta. 16+477.95 - Sta. 15+257.96 03/10/09 VIII 18.795 240 O 0.359 0.237 0.150 0.030 0.047 0.050 87.30 -

B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road 03/06/09 VIII 18.897 367 C 0.379 0.173 0.300 - - - 85.20 82.44%Satisfactory

B. Vicencio Construction 9687 Conc. of Naval-Calibiran Cross-Country Road (Mohon-Pulang Yuta Section) 03/13/09 VIII 18.920 300 C 0.317 0.032 0.300 - - - 64.90 76.66%

Unsatisfactory

B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road 03/06/09 VIII 7.517 180 O 0.338 0.238 0.150 0.015 0.030 0.050 82.10 -

B. Vicencio Construction 9687 Const. of Maasin Shore Protection/Seawall 08/29/08 VIII 3.809 240 O 0.300 0.100 0.100 0.000 0.022 0.200 72.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page53

Page 62: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

B. Vicencio Construction 9687 Const. of Tagbilaran City-San Jose St. Drainage Project (Outfall) 08/22/07 VII 14.174 190 C 0.294 0.300 0.300 - - - 89.40 89.34%

V. Satisfactory

B. Vicencio Construction 9687 Const./Opening of Calbayog Diversion Road, Monbon-Naga Road Section 11/28/07 VIII 13.715 210 C 0.400 0.236 0.395 - - - 103.10 93.92%

Outstanding

B. Vicencio Construction 9687 Const./Replacement of Tabugon Bridge 03/04/08 VIII 9.439 390 C 0.394 0.240 0.300 - - - 93.40 *93.40% Outstanding

B. Vicencio Construction 9687 Construction of Maasin Shore Protection/Seawall 03/06/09 VIII 3.809 270 C 0.250 0.200 0.300 - - - 75.00 73.32%

Poor

B. Vicencio Construction 9687 Rechanneling of Subang Daku River 05/26/08 VIII 4.718 120 C 0.250 - 0.500 - - - 75.00 82.98% V. Satisfactory

B. Vicencio Construction 9687 Rehab. of Daang Maharlika Highway, Calbayog-Allen Section 11/26/08 VIII 19.150 240 C 0.193 0.200 0.300 - - - 69.30 82.53%

V. Satisfactory

B. Vicencio Construction 9687Rehab. of Sambulawan-Calaguise-Calubian

Road, (Conc. of Calaguise Section) Tigbauan Sect.

11/20/08 VIII 17.942 220 O 0.344 0.240 0.100 0.030 0.042 0.100 85.60 -

B. Vicencio Construction 9687Rehab. of Sambulawan-Calaguise-Calubian

Road, (Conc. of Calaguise Section) Tigbauan Sect.

03/12/09 VIII 17.942 220 O 0.227 0.023 0.150 0.030 0.037 0.050 51.70 -

B. Vicencio Construction 9687 Rehab./Impv't of Brgy. Mahaplag-Sogod Road (Dampoy) 03/06/09 VIII 9.446 310 O 0.300 0.180 0.150 0.015 0.033 0.050 72.80 -

B. Vicencio Construction 9687 Rehab./Repair of Liloan Steel Bridge 11/30/07 VIII 15.838 150 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

B. Vicencio Construction 9687 Rehab.Impvt. of Calbayog-Catarman Road, Calbayog-Sinidman Sect. 09/03/07 VIII 9.330 270 C 0.368 0.200 0.300 - - - 86.80 82.78%

V. Satisfactory

B. Vicencio Construction 9687 Concreting of Antequera-Catagbacan (Loon) Rd. 09/01/09 VII 18.313 172 O 0.375 0.246 0.150 0.030 0.042 0.050 89.30 -

B. Vicencio Construction 9867 Road Upgrading of Junction Himay-Angan-Silago-Abuyog Road 09/08/09 VIII 53.210 365 O 0.350 0.300 0.150 0.008 0.035 0.050 89.30 -

B. Vicencio Construction 9867 Rehab./Reconst./Upgrading of Calbayog-Catarman Road 09/10/09 VIII 94.551 300 O 0.320 0.300 0.150 0.023 0.050 0.050 89.30 -

B. Vicencio Construction 9687 Conc. of Villaba-Leyte Road, Km. 1015+820-Km. 1017+420 09/05/09 VIII 31.695 330 O 0.354 0.248 0.150 0.018 0.045 0.050 86.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page54

Page 63: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

B. Vicencio Construction 9687 Rehab./Impvt. of Boundary Mahaplag-Sogod Road (Dampoy Sect.) 09/08/09 VIII 9.446 280 C 0.401 0.200 0.300 - - - 90.10 83.77%

Satisfactory

B. Vicencio Construction 9687Const. (Road Opening) of Missing Link of Calbayog Diversion Road, Cagsalaosao-

Gadgaran Sect.09/10/09 VIII 18.795 120 C 0.395 0.200 0.300 - - - 89.50 79.36%

Unsatisfactory

B. Vicencio Construction 9687 Calbayog Airport Development Project 11/16/09 DOTC 19.247 120 C 0.391 0.200 0.300 - - - 89.10 89.10% V. Satisfactory

B. Vicencio Construction 9687 Calbayog Airport Development Project 11/17/09 DOTC 9.121 150 O 0.329 0.300 0.150 0.030 0.063 0.050 92.20 -

B. Vicencio Construction 9687 Calbayog Airport Development Project 12/14/09 DOTC 9.121 150 C 0.462 0.200 0.300 - - - 96.20 -

B. Vicencio Construction 9687 Const. of River Control of Anitao Creek 03/02/10 VIII 14.016 270 C 0.347 0.189 0.300 - - - 83.60 83.48% Satisfactory

B. Vicencio Construction 9687 Rehab./Reconst./Upgrading of Calbayog-Catarman Road 03/03/10 VIII 94.550 300 C 0.389 0.134 0.300 - - - 82.30 82.58%

Satisfactory

B.C.T. Trading & Construction 15199 Cuyo Airport Development Project 04/14/09 DOTC 16.066 120 C 0.467 0.200 0.300 - - - 96.70

B.C.T. Trading and Construction 15199 Replacement of Umalad Bridge along Langogan-Roxas Road 05/28/08 IV-B 28.813 270 C 0.337 0.300 0.000 - - - 63.70 71.50%

Satisfactory

B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section 08/28/07 VI 8.819 300 C 0.014 0.100 0.300 - - - 41.40 58.77%

Poor

B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section 08/28/07 VI 8.819 300 C 0.014 0.100 0.300 - - - 41.40 58.77%

Poor

B.E. Construction 2730 Conc. of Concepcion-Ajuy Road 11/27/07 VI 4.761 245 C 0.252 0.100 0.300 - - - 65.20 74.18% Satisfactory

B.E. Construction 2730 Conc. of Guimaras Circ. Road 03/13/08 VI 23.087 200 O 0.370 0.225 0.100 0.015 0.040 0.100 85.00 -

B.E. Construction 2730 Conc. of Guimaras Circ. Road 05/29/08 VI 23.667 200 O 0.250 0.240 0.100 0.022 0.056 0.100 76.80 -

B.E. Construction 2730 Const. of Lanag River Control 01/22/07 VI 14.450 300 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -

B.E. Construction 2730 Const. of Leonora Salapandan NHS Phase II 08/30/07 VI 0.948 110 C 0.400 0.100 0.300 - - - 80.00 60.96%

Fair

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page55

Page 64: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

B.E. Construction 2730 Const. of MPB at UP Visayas Gender Studies Center Bldg. 05/19/08 VI 11.446 217 C 0.388 0.200 0.000 - - - 58.80 75.25%

Satisfactory

B.E. Construction 2730 Const. of Sch. Bldg. @ Melchor L. Nava NHS 11/17/08 VI 1.753 150 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

B.E. Construction 2730Conc. of Oton-Buray-Sta. Rita-Sta. Monica-

Rizal-Sta. Clara-San Antonio-San Miguel Rd.

02/23/10 VI 15.338 600 O 0.069 0.219 0.150 0.010 0.025 0.033 50.60 -

B.G. Giron Construction & Supply 15197 Rehab./Reconst. & Impvt. of Concepcion-Capas Road 05/20/09 III 9.561 45 C 0.492 0.199 0.300 - - - 99.10 *99.10%

Outstanding

B.G. Giron Construction & Supply 15197 Const. of FMR, Purok Sampaguita, Brgy. San Agustin 05/22/09 III 1.505 60 C 0.415 0.139 0.300 - - - 85.40 *85.40%

Satisfactory

B.G. Giron Construction & Supply 15197 Const. of 1 CL Sch. Bldg. at Sto. Cristo Primary School 08/20/08 III 0.426 60 C 0.385 0.153 0.300 - - - 83.80 *83.80%

V. Satisfactory

B.G. Giron Construction & Supply 15197 Const. of FMR @ Brgy. Malupa 08/28/07 III 1.421 90 C 0.280 0.300 0.300 - - - 88.00 79.90% Satisfactory

B.G. Giron Construction & Supply 15197 Const. of MPB & other Facilities @ Brgy. Rizal 11/15/08 III 1.422 60 C 0.303 0.300 0.300 - - - 90.30 *90.30%

Outstanding

B.M.K. Construction 8292 Widening/Concreting of McArthur Highway (MNR) including Traffic Management 05/19/09 I 28.947 120 O 0.383 0.200 0.070 0.030 0.035 0.033 75.10 -

B.M.K. Construction 8292 Widening/Concreting of McArthur Highway (MNR) including Traffic Mgt. 08/25/09 I 28.947 174 O 0.338 0.300 0.150 0.030 0.045 0.050 91.30 -

B.M.K. Construction 8292 Rehab./Reconst./Upgrading of Dagupan-Bonuan-San Fabian Rd. 08/28/09 I 46.320 240 C 0.395 0.200 0.300 - - - 89.50 *89.50%

V. Satisfactory

B.M.K. Construction 8292 Impvt. of Lingayen-Binmaley (via Matalava), Lingayen-Binmaley 08/28/09 I 23.809 359 O 0.349 0.300 0.077 0.030 0.055 0.033 84.40 -

B.M.K. Construction 8292 Widening/Conc. of McArthur Highway (MNR) including Traffic Mgt. 03/05/10 I 28.947 211 C 0.307 0.200 0.300 - - - 80.70 82.20%

Satisfactory

B.M.K. Construction / R.V. Laborte Builders (JV) JV-08-046

Const. of Canda Bridge Phase I, Quezon Eco-Tourism Road (Lucena City Batangas Coastal Road) inc. RROW Acquisition &

Other Related Activities, Guisguis-Talaan Section

09/01/09 IVA 47.445 300 C 0.419 0.200 0.300 - - - 91.90 91.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page56

Page 65: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

B.M.K. Construction / Royal Crown Monarch Const. & Supplies

Corporation (JV)JV-07-093

Impvt./Widening/Conc. of McArthur Highway (MNR) Tarlac Section Phase IV,

Package III, San Manuel Section02/27/09 III 95.033 210 C 0.450 0.200 0.300 - - - 95.00 *95.00%

V. Satisfactory

B.Q. Construction & Supply 10217 Const. of Urdaneta Flood Control Drainage, Phase I 11/23/07 I 11.773 90 C 0.333 0.300 0.300 - - - 93.30 93.30%

Outstanding

B.R.G. Construction 21931 Concreting of Aritao-Quirino Road, Bua Section 06/04/09 II 9.650 104 O 0.375 0.240 0.150 0.030 0.047 0.050 89.20 -

B.R.G. Construction 21931 Conc. of Aritao-Quirino Road, Bua Section 03/04/10 II 9.650 104 C 0.343 0.200 0.300 - - - 84.30 87.24% Satisfactory

B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk 09/01/07 XIII 1.912 150 C 0.364 0.204 0.300 - - - 86.80 84.94% V. Satisfactory

B.S.U. Construction, Inc. 8457Rehab./Reconst. of Damaged Pavement

along Surigao-Davao Coastal Road, Lingig Section

08/31/08 XIII 4.798 90 C 0.364 0.199 0.300 - - - 86.30 86.36% V. Satisfactory

B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy. Pandan 11/21/07 III 0.934 30 C 0.308 0.285 0.300 - - - 89.30 *89.30%

V. Satisfactory

Baby E Construction 19773 Repair/Rehab. of Drainage Canal 02/28/08 III 2.857 75 C 0.253 0.200 0.300 - - - 75.30 *75.30% Satisfactory

Baby Santiago Construction & Supply 31662 Const. of 2-Storey 4-CL @ San Antonio

Elem. School 02/24/10 IVA 4.103 80 C 0.420 0.200 0.300 - - - 92.00 92.00% V. Satisfactory

Bacho Construction & Design Engineering 15945 Const. of MPB 09/06/07 IX 0.187 45 C 0.391 0.263 0.300 - - - 95.40 *95.40%

Outstanding

Badoc Builders & Supply 31564 Concreting of Farm-to-Market Road, Brgy. Balioeg 03/02/09 I 1.442 45 C 0.371 0.200 0.300 - - - 87.10 *87.10%

Satisfactory

Badoc Builders & Supply (Formerly: Badoc Builders) 31564 Conc. of FMR, Brgy. Tartarabang 11/17/08 I 1.444 45 C 0.283 0.200 0.300 - - - 78.30 *78.30%

Satisfactory

Badoc Builders/Busilac Builders Joint Venture JV-08-223 Road Upgrading of Batac-Espiritu (Banna)

Road 09/08/09 I 13.493 130 C 0.344 0.200 0.300 - - - 84.40 84.94% Satisfactory

Badsbro Construction and General Merchandise 32876 Construction of 2-Cl School Building at

MSU 03/05/09 IX 0.945 80 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory

Baicamar Construction and Supplies 19248 Repair/Impvt. of Bonbon Road 09/05/07 XIII 4.458 120 C 0.246 0.204 0.300 - - - 75.00 *75.00% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page57

Page 66: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Baje Construction 33252 Construction of Road, Patucannay-Dangdangla 09/08/09 CAR 0.710 43 C 0.458 - 0.500 - - - 95.80 *95.80%

V. Satisfactory

Bap Construction 16215 Conc. of Road at Brgy. Luta Sur 08/28/08 IV-A 0.482 60 C 0.371 0.216 0.300 - - - 88.70 *88.70% V. Satisfactory

Bap Construction 16215 Conc. of San Juan-San Andres Road 11/21/07 IV-A 1.927 60 C 0.311 0.200 0.300 - - - 81.10 *81.10% V. Satisfactory

BAQUE Corporation 15235 Construction of Ramps/Approaches in Tarlac 7/9-11/08 BCDA 103.233 336 O 0.365 0.300 0.000 - - - 66.54 80.35%

V.Satisfactory

Barillo Construction & Enterprises 23836 Const. of MPB at Brgy. Suclema 08/24/07 IX 0.375 85 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

Barillo Construction & Enterprises 23836 Const. of 2 CL School Building @ Magdaup NHS 02/27/10 IX 1.155 80 C 0.410 0.200 0.300 - - - 91.00 91.00%

V.Satisfactory

Barillo Construction & Enterprises 23836 Completion of MPB @ Provincial Capitol Ground Ipil Heights 02/27/10 IX 0.958 45 C 0.353 0.200 0.300 - - - 85.30 85.30%

Satisfactory

Barman Construction Corporation 7974 Conc. of East Coast Road, Calapan-Mansalay Section, Mabaho Section 11/13/07 IV-B 28.868 240 O 0.357 0.293 0.050 0.030 0.033 0.067 83.00 -

Barman Construction Corporation 7974 Completion of Mindoro Oriental/Occidental East Coastal Road, Bulalacao Port Section 02/18/10 IVB 28.551 210 O 0.277 0.300 0.150 0.030 0.047 0.050 85.40 -

Bascon Bros & Dev. Corp. 31387 Rehab. of Poblacion Water System 05/29/08 II 1.927 75 C 0.382 0.200 0.300 - - - 88.20 85.82% V. Satisfactory

Batch 81 Engineering & Construction 31311 Completion of MPB, Brgy. Nansuagao 11/13/08 I 0.950 52 C 0.308 0.200 0.300 - - - 80.80 *80.08% V. Satisfactory

Batch 81 Engineering & Construction 31311 Const. of 2 CL Bldg. at Banaoang PS 08/15/08 I 0.832 60 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Batch 81 Engineering & Construction 31311 Road Concreting, Brgy. Naguilian 02/27/09 I 1.425 40 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory

Batch 81 Engineering & Construction 31311 Completion of Gongogong Bridge, MNR 09/07/09 I 3.254 88 C 0.393 0.200 0.300 - - - 89.30 86.84% Satisfactory

Batch 81 Engineering & Construction 31311 Const. of Multi-Purpose Building, Brgy. Tamurong 02/10/10 I 0.776 43 C 0.412 0.133 0.300 - - - 84.50 84.50%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page58

Page 67: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

BBC Construction (Formerly: BBC Sand & Gravel) 16510 Completion of Ngilan Bridge along Agusan-

Surigao Road 08/19/08 XIII 8.545 105 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of MPB 09/05/07 XIII 2.787 120 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of MPB (covered court) 12/03/08 XIII 1.875 120 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of MPB (covered court) 03/18/09 XIII 2.240 120 C 0.458 0.200 0.300 - - - 95.80 *95.80%

V. Satisfactory

BBC Construction (Formerly: BBC Sand & Gravel) 16510

Rehab. of Ngilan Bridge along Daang Maharlika Highway (Agusan-Surigao

Section)12/05/07 XIII 9.104 180 C 0.337 0.300 0.300 - - - 93.70 87.82%

V. Satisfactory

BCT Trading & Const./F. Alarcon Const. Corp/ JV 17612 San Vicente Airport Development Project 03/13/09 DOTC 81.790 240 C 0.424 0.200 0.300 - - - 92.40 92.40%

V. Satisfactory

BCT Trading & Construction 15199 San Vicente Airport Development Project 04/26/10 DOTC 28.788 150 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

BCT Trading and Construction 15199 San Vicente Airport Development Project 08/12/09 DOTC 96.293 300 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory

BCT Trading and Construction 15199 San Vicente Airport Development Project 03/14/09 DOTC 48.138 210 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory

BCT Trading and Construction 15199 Impvt. of Quezon-Punta Baja Road, Km. 171+400-Km. 175+200 09/10/09 IVB 18.985 282 C 0.398 0.200 0.000 - - - 59.80 *59.80%

Poor

BCT Trading and Construction 15199 Construction Of MPB, Brgy. Princesa 03/05/10 IVB 0.329 75 C 0.481 0.133 0.300 - - - 91.40 85.45% Satisfactory

BCT Trading and Construction 15199 Const. of MPB, Brgy. Model 03/05/10 IVB 1.425 90 C 0.477 0.133 0.300 - - - 91.00 84.98% Satisfactory

BDL Santos Construction and Supply 17535 Repair/Rehab. of Damaged River Control

(Cadacan River), Anog-Sangkayan Section 11/14/07 V 4.728 90 C 0.210 0.064 0.300 - - - 57.40 *57.40% Poor

Bedun Construction 15130 Const./Impv't. of Batangas-Lobo Road, Malapad na Parang-San Miguel Section 11/22/07 IV-A 9.497 150 C 0.315 0.200 0.300 - - - 81.50 75.32%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page59

Page 68: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Bedun Construction 15130 Const./Rehab. of Road, Brgy. Nagtoctoc 02/27/10 IVA 0.399 30 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory

Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. 11/28/08 II 2.337 90 C 0.390 0.200 0.300 - - - 89.00 *89.00% V. Satisfactory

Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. 05/29/08 II 2.377 90 C 0.338 0.200 0.300 - - - 83.80 81.56% V. Satisfactory

Bell Construction 27851 Const. of Gate and Stage @ Mambugan NHS 02/15/10 IVA 1.352 150 C 0.474 0.200 0.300 - - - 97.40 97.40%

Outstanding

Bell Construction 27851 Completion of MPB Arcillana Compound 05/30/08 NCR 0.931 60 C 0.389 0.107 0.300 - - - 79.60 *79.60% Satisfactory

Belvic Enterprises & Construction 25337 Const. of Drainage System @ Poblacion 08/24/07 IX 0.485 60 C 0.186 0.218 0.300 - - - 70.40 *70.40% Satisfactory

Bemkar Construction 33047 Conc. of Talobatib-Jose Panganiban Pob. Port Road, Dalnac Section 06/04/09 V 4.361 150 O 0.314 0.300 0.150 0.023 0.045 0.033 86.50 -

Bemkar Construction 33047 Conc. of Talobatib-Jose Panganiban Pob. Port Road, Dalnac Section 09/12/09 V 4.361 150 C 0.371 0.200 0.300 - - - 87.10 86.74%

Satisfactory

Bemkar Construction 33047Repair/Rehab. of Bagong Silang-Capalonga Road, Bagong Silang Section, Km. 300+342-

Km.300+414 with Intermittent Section09/12/09 V 1.810 80 C 0.434 0.133 0.300 - - - 86.70 *86.70%

Satisfactory

Bemkar Construction 33047 Const. of Slope Protection Sitio Paraiso Bulala Section 03/05/10 V 9.526 150 C 0.464 0.133 0.300 - - - 89.70 89.70%

V. Satisfactory

Bemkar Construction 33047 Impvt. of Daang Maharlika Road Sitio Paraiso Maharlika Road 03/05/10 V 14.114 120 C 0.456 0.133 0.300 - - - 88.90 88.90%

Satisfactory

Bendimil Construction and Development Corp. 6135 Impvt./Gravelling of Siocon-Sirawai Road

(Sirawai Side) 08/26/08 IX 47.894 300 O 0.158 0.225 0.000 0.030 0.033 0.067 51.30 -

Benny's Trading & Construction 8762 Concreting of Irawan-Tagburos Road, Km. 11+910-Km. 13+120 w/ (exceptions). 09/17/07 IV-B 5.245 70 C 0.366 0.300 0.300 - - - 96.60 58.74%

Poor

Beny's Trading & Construction 8762Conc. of Irawan-Tagburos Road, Km. 11+910 - Km. 13+120 (with exception),

Irawan-Ragburos Road06/05/09 IV-B 14.012 217 C 0.369 0.191 0.300 - - - 86.00 83.70%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page60

Page 69: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Berson's Construction & Trading 31181 Asphalt Overlay of Pangasinan-La Union Road Km. 381+300-Km. 302+500 05/23/09 I 19.297 30 C 0.451 0.200 0.300 - - - 95.10 *95.10%

V.Satisfactory

Berson's Construction & Trading 31181Rehab./Reconst./Upgrading of Villasis-

Malasiqui-San Carlos Road, Km. 182+422-Km. 1999+527 w/ exception

05/22/09 I 9.647 120 O 0.356 0.251 0.150 0.030 0.040 0.050 87.70 -

Berson's Construction & Trading 31181 Impvt./Concrete Paving of Brgy. Road, Sitio Sipitan-Bocboc East 03/05/08 I 9.615 150 C 0.236 0.200 0.300 - - - 73.60 80.86%

V. Satisfactory

Berson's Construction & Trading 31181 Impvt./Concrete Paving of Camiling-Wawa Road & Drainage Structures 11/26/08 I 9.641 110 C 0.288 0.276 0.300 - - - 86.40 85.98%

V. Satisfactory

Berson's Construction & Trading 31181Rehab./Reconst./Upgrading of Damaged

Road, Villasis-Malasiqui-San Carlos Road (Km. 182+422-Km. 199+527 w/ exception)

08/27/09 I 9.647 120 C 0.461 0.200 0.300 - - - 96.10 91.06% V. Satisfactory

Berson's Construction & Trading 31181 Const. of One (1) Classroom @ Sta. Maria E/S 03/04/10 I 0.484 45 C 0.427 0.133 0.300 - - - 86.00 86.00%

Satisfactory

Berson's Construction & Trading 31181 Const./Rehab. of Infanta Seawall 03/04/10 I 9.648 120 O 0.360 0.240 0.150 0.030 0.035 0.033 84.80 -

Besao Unltd Enterprises 33007 Construction of Shaded Walk from KA to HKA Bldg. 01/20-22/2010 UP -

Baguio 0.209 60 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory

Besao Unltd Enterprises 33007 Construction of Proposed Studio at the College of Arts and Communication 01/20-22/2010 UP -

Baguio 0.247 30 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding

Bestech Construction & Development & Development

Corporation17725

Emergency Repair of Tigaon-Goa-San Jose Lagonoy via San Vicente Rd. KO 498+500-

KO 505+800 w/ exceptions05/30/09 V 1.316 60 C 0.429 0.200 0.300 - - - 92.90 83.84%

Satisfactory

BET Construction & Supply 31764Const. of Multi-Purpose Building

(Mangaldan Public Market Vegetable Section)

05/25/09 I 2.894 103 O 0.347 0.240 0.150 0.030 0.040 0.033 84.00 -

Bet Construction & Supply 31764 Impvt./Conc. of Pangasinan-Tarlac Road (Socony Jct.-Lingayen Section) 11/27/08 I 9.453 84 C 0.294 0.200 0.300 - - - 79.40 80.12%

V. Satisfactory

Bet Construction & Supply 31764 Const. of MPB (Mangaldan Public Market Vegetable Sect.) 08/28/09 I 2.894 103 C 0.366 0.200 0.300 - - - 86.60 84.78%

Satisfactory

Bet Construction & Supply 31764 Asphalt Overlay along Pangasinan-La Union Road 03/02/10 I 4.823 8 C 0.407 0.133 0.300 - - - 84.00 84.00%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page61

Page 70: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Beta Construction 9829 Conc. of Tarusanan Road 11/25/08 V 1.880 60 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

Beta Construction 9829 Road Concreting of Dominorog Road 03/05/08 V 1.405 75 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory

Beta Construction 9829 Road Concreting of Lidong-Hibago Road 03/12/09 V 2.837 75 C 0.443 0.200 0.300 - - - 94.30 *94.30% V. Satisfactory

Better Work Construction 24432 Construction of School Building, Tantangan National High School 06/06/09 R-XII 0.476 63 C 0.456 0.200 0.300 - - - 95.60 *95.60%

V. Satisfactory

Better Work Construction 24432 Restoration/Protection Works of Scoured Abutment A of Glan Jumbo Bridge 09/16/09 XII 9.642 110 C 0.352 0.200 0.300 - - - 85.20 *85.20%

Satisfactory

Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-Baras

Section 03/04/09 V 4.787 241 C 0.442 0.200 0.300 - - - 94.20 88.68% Satisfactory

Bicol Goldrock Construction Corporation 32376 Const. of Bagamanoc Seawall 11/15/08 V 4.800 150 C 0.293 0.200 0.300 - - - 79.30 76.54%

Satisfactory

Bicol Goldrock Construction Corporation 32376 Road Conc. At San Jose Road 08/22/08 V 1.891 60 C 0.271 0.300 0.300 - - - 87.10 *87.10%

V. Satisfactory

Bicol Goldrock Construction Corporation 32376 Concreting of San Lucas-Sabang Road 03/02/10 V 4.774 150 C 0.426 0.133 0.300 - - - 85.90 85.90%

Satisfactory

Bien Marian Construction Corporation 21871 Construction of 2 Storey 4 CL @ Sitio

Tapayan E/S 08/11/08 IV-A 4.180 120 C 0.283 0.298 0.300 - - - 88.10 83.76% V. Satisfactory

Bigfoot Construction and Supply 24769 Impvt. of Water Works System, Brgy. Milagrosa 05/30/09 VII 1.918 138 C 0.494 0.133 0.300 - - - 92.70 *92.70%

V. Satisfactory

Bigfoot Construction and Supply 24769 Conc. of Bais-Kabankalan Road km. 83+000 - km. 85+000 03/03/08 VII 2.254 60 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V. Satisfactory

Bigfoot Construction and Supply 24769 Conc. of Calayugan Brgy. Road 11/26/07 VII 0.426 130 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding

Bigfoot Construction and Supply 24769 Const. of Drainage along DSR 11/25/08 VII 4.684 170 C 0.380 0.190 0.300 - - - 87.00 84.72% V. Satisfactory

Bigfoot Construction and Supply 24769 Const. of Mantiquil-Tamlang Road 08/30/07 VII 4.708 173 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page62

Page 71: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Bigfoot Construction and Supply 24769 Const. of River Control Dike along Canaway River 03/05/08 VII 4.680 210 C 0.313 0.200 0.300 - - - 81.30 *81.30%

V. Satisfactory

Bigfoot Construction and Supply 24769

Const./Installation of Water System a)Deepwell, Brgy. Palanas, Tanjay City

b)Water Supply, Brgy. Penabonan, Mabinay

08/29/07 VII 0.996 110 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

Bigfoot Construction and Supply 24769 Repair/Rehabilitation of Farm-to-Market Road, Mayabon-Najandig 03/13/09 VII 0.889 40 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

Bigfoot Construction and Supply 24769Road Upgrading (gravel to concrete) at Masulog (missing link) Section (VLCR)

(Sta. 171+541.00-Sta.172+208.10)03/18/09 VII 7.920 157 C 0.415 0.130 0.300 - - - 84.50 *84.50%

Satisfactory

Bigfoot Construction and Supply 24769Rehab./Recons./Upgrading of Damaged

National Rds. HDM-4, Dumaguete North Rd, San Jose Rd. Sect.

09/13/09 VII 7.667 100 C 0.436 0.133 0.300 - - - 86.90 *86.90% Satisfactory

Bigfoot Construction and Supply 24769 Impv't. of Water System 09/15/09 VII 6.452 190 O 0.267 0.300 0.150 0.030 0.047 0.033 82.70 -

Bigfoot Construction and Supply 24769 Cons./Impvt. of Bulado Sect. (DNR) 09/14/09 VII 9.112 124 O 0.383 0.300 0.000 0.023 0.037 0.033 77.60 -

Bigfoot Construction and Supply 24769 Impv't. of Water System 03/05/10 VII 6.427 190 C 0.489 0.067 0.300 - - - 85.60 83.86% Satisfactory

Bill Hill Construction and Supply 18046 Conc. of Brgy. Villafranca 05/14/08 XIII 5.731 180 C 0.332 0.300 0.300 - - - 93.20 88.49% V. Satisfactory

Bill Hill Construction and Supply 10846 Conc. of Capalayan-Mapawa-Quezon Road (Phase 38) 03/10/09 XIII 11.814 650 C 0.443 0.200 0.000 - - - 64.30 74.98%

Poor

Bill Hill Construction and Supply 18046 Conc. of Lake Mainit Circ. Road, Phase 14, Mainit to Matin-ao Section 11/24/08 XIII 9.261 180 C 0.310 0.200 0.300 - - - 81.00 *81.00%

V. Satisfactory

Billco Construction 18191 Conc. Reblocking along Surigao-Agusan Road 11/21/07 XIII 0.955 65 C 0.354 0.200 0.300 - - - 85.40 80.24%

V. Satisfactory

Billena Construction / D.M. House Construction, Inc. (JV) JV-08-145 Concreting of Bantayan-San Pedro-Cubay

Road 06/04/09 VI 27.016 360 O 0.335 0.251 0.150 0.015 0.025 0.050 82.60 -

Billena Construction/D.M. House Construction, Inc. (JV) JV-08-145 Conc. of Bantayan-San Pedro-Cubay Road,

San Jose and Sibalom 09/02/09 VI 27.016 360 O 0.356 0.239 0.150 0.015 0.025 0.033 81.80 -

BLF Construction 15829Const. of Proposed CNM Laboratory Bldg.

Phase I at Bataan Peninsula State University

02/25/09 III 1.869 60 C 0.433 0.200 0.300 - - - 93.30 *93.30% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page63

Page 72: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Blimex Construction and Supply 27259 Construction of MPB at Bai-Saripinang 06/03/09 R-XII 0.479 84 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory

BMJ Construction 14571 Rehab./Improvement of Santiago-Tuguegarao Road 05/23/09 II 28.651 120 O 0.360 0.300 0.083 0.030 0.051 0.033 85.70 -

BMJ Construction 14571 Rehab. of Daang Maharlika Road, Ilagan-San Pablo 05/23/09 II 19.136 209 O 0.374 0.300 0.007 0.030 0.051 0.033 79.50 -

BMJ Construction 14571 Concrete Paving of Cabagan-Sta. Maria Road 05/23/09 II 19.132 209 O 0.350 0.300 0.005 0.030 0.051 0.033 76.90 -

BMJ Construction 14571Completion of Sto. Tomas-Cabagan Overflow Bridge (Phase V), Cansan-

Bagutari Overflow Bridge08/21/07 II 14.394 365 C 0.267 0.300 0.300 - - - 86.70 91.56%

Outstanding

BMJ Construction 14571 Conc. of Ilagan-Bagao-Palanan National Road (Fuyo-Rang-ayan-Ayan Gap) 11/19/07 II 9.360 365 C 0.345 0.292 0.300 - - - 93.70 *93.70%

Outstanding

BMJ Construction 14571 Conc. of Ilagan-Delfin Albano-Mallig National Road (Pilitan-Paragu Sect.) 05/20/08 II 9.649 375 C 0.282 0.200 0.300 - - - 78.20 *78.20%

Satisfactory

BMJ Construction 14571 Rehab. of Cansan-Cabagan-Sto. Tomas Road 11/18/08 II 4.674 182 C 0.307 0.200 0.300 - - - 80.70 79.56%

Satisfactory

BMJ Construction 14571 Rehab. of Pinacanauan Br. App. "A" & River Bank Protection works 08/13/07 II 11.699 272 C 0.363 0.300 0.300 - - - 96.30 88.24%

V. Satisfactory

BMJ Construction 14571 Rehab. of Sto. Tomas-Delfin Albano Road 08/13/08 II 4.679 180 C 0.020 0.300 0.000 - - - 32.00 63.80% Fair

BMJ Construction 14571 Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road 11/19/07 II 14.366 280 C 0.268 0.300 0.300 - - - 86.80 86.80%

V. Satisfactory

BMJ Construction 14571 Rehab. of Daang Maharlika Road 09/04/09 II 19.135 209 C 0.418 0.200 0.300 - - - 91.80 86.34% Satisfactory

BMJ Construction 14571 Rehab./Improvement of Santiago-Tuguegarao Road 09/04/09 II 28.651 120 C 0.366 0.200 0.300 - - - 86.60 86.06%

Satisfactory

BMJ Construction 14571 Concrete Paving of Cabagan - Sta. Maria Road 09/04/09 II 19.132 209 C 0.428 0.200 0.300 - - - 92.80 83.26%

Satisfactory

BMK Construction 8292 Const. of Mitura Bridge along Urdaneta-Manaoag Road 05/19/07 I 24.737 420 O 0.300 0.300 0.000 0.020 0.025 0.067 71.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page64

Page 73: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

BMK Construction 8292Impvt./Rehab. of Urdaneta Jct,-Dagupan-

Lingayen Road via Zambales, Tapuac Section

08/28/08 I 19.259 180 C 0.350 0.200 0.300 - - - 85.00 85.30% V. Satisfactory

BMK Construction 8292 Rehab./Reconst. of Damaged National Road, Alaminos-Lucap Road 08/29/08 I 7.599 66 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

BN Builders & Construction Supplies 28232 Const. of MPB Nasipit Vocational School 02/22/10 XIII 0.964 45 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory

BN Builders & Construction Supply 28232 Concreting of Purok 3, Patin-ay 11/29/08 XIII 2.825 150 C 0.203 0.200 0.300 - - - 70.30 83.62% V. Satisfactory

BN Builders & Construction Supply 28232 Construction of Multi-Purpose Building, (Covered Court) 03/18/09 XIII 2.243 120 C 0.435 0.200 0.300 - - - 93.50 *93.50%

V. Satisfactory

BNG Construction and General Services 18503 Completion of Brgy. Oslao MPB 05/14/08 XIII 1.485 90 C 0.381 0.200 0.300 - - - 88.10 *88.10%

V. Satisfactory

BNG Construction and General Services 18503 Conc. of Caglanipa Brgy. Road 08/22/08 XIII 1.900 90 C 0.337 0.209 0.300 - - - 84.60 *84.60%

V. Satisfactory

BNG Construction and General Services 18503 Const./Conc. of Municipal Rd. 09/03/09 XIII 0.960 181 C 0.426 0.150 0.300 - - - 87.60 *87.60%

Satisfactory

BNG Construction and General Services 18503

Rd. Upgrading (Gravel to Concrete), Quezon-Capalayan-Espina-Navarro Rd.,

Arellano Dist.09/07/09 XIII 9.231 253 O 0.378 0.225 0.150 0.030 0.054 0.033 87.00 -

BNG Construction and General Services 18503 Const. of Brgy. Sayak-Domoyog-San

Fernando FTMR 09/03/09 XIII 0.950 264 C 0.392 0.150 0.300 - - - 84.20 *84.20% Satisfactory

BNG Construction and General Services 18503

Rd. Upgrading (Gravel to Concrete) Quezon-Capatayan-Espina-Navarro Rd.

Arellano District03/01/10 XIII 9.231 285 C 0.488 0.200 0.300 - - - 98.80 85.36%

Satisfactory

BNR Construction & Development Corporation 12903 Construction of Bonbon-Sinsin Road 06/10/09 VII 10.782 120 C 0.465 0.015 0.300 - - - 78.00 *78.00%

Unsatisfactory

BNR Construction and Development Corporation 12903 Conc. Cebu-Toledo Wharf Road (Nautical

Highway) 03/09/08 VII 27.753 252 C 0.363 0.200 0.300 - - - 86.30 87.35% V. Satisfactory

BNYU Enterprises & Construction 27725 Concrete Paving of Cortes-Balilihan-Macaas Road (Broken Section) 05/13/08 VII 7.425 140 C 0.343 0.300 0.000 - - - 64.30 76.15%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page65

Page 74: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

BNYU Enterprises & Construction 27725 Impvt. (Conc.) of Catigbian-Balilihan-Tagbilaran Road (Broken Section) 02/27/08 VII 7.426 155 C 0.361 0.300 0.000 - - - 66.10 *66.10%

Fair

BNYU Enterprises and Construction 27725 Talibon Small Reservoir Irrigation Project 9/29/08 10/3/08 NIA 4.990 210 O 0.328 0.173 0.100 0.030 0.047 0.200 87.80 -

BNYU Enterprises and Construction 27725 Const. of Multi-Purpose Building 09/02/09 VII 8.719 240 C 0.387 0.200 0.300 - - - 88.70 *88.70% Satisfactory

BNYU Enterprises and Construction 27725 Improvement of Causeway, Panggahan 09/01/09 VII 7.339 240 C 0.483 0.133 0.300 - - - 91.60 85.90% Satisfactory

Bonibal Construction 9371 Asphalt Overlay of Mariveles Talaga Bay Road 08/14/08 III 6.944 15 C 0.314 0.200 0.300 - - - 81.40 *81.40%

V. Satisfactory

Bonibal Construction 9371 Impv't. of Daan Pare Road 08/15/07 III 1.870 40 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding

Bonicab Builders 28100 Construction of Two (2) Classrooms, Dardarat E/S 02/28/09 I 0.950 60 C 0.439 0.133 0.300 - - - 87.20 *87.20%

Satisfactory

Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South Road, Calategas Section 09/18/07 IV-B 5.671 120 C 0.346 0.300 0.300 - - - 94.60 88.84%

V. Satisfactory

Bonimar Construction Enterprises 23760Rehab./Asphalt Overlay of Lingayen-

Labrador Diversion Road, Km. 364+000-Km. 366+000 w/exception

05/25/09 I 19.299 30 C 0.396 0.133 0.300 - - - 82.90 *82.90% Satisfactory

Bonimar Construction Enterprises 23760 Concreting of Brgy. Burgos to Demtal 03/09/09 I 1.929 45 C 0.424 0.186 0.300 - - - 91.00 *91.00%V. Satisfactory

Bonimar Construction Enterprises 23760 Const. of 1 CL Sch. Bldg. @ Bolaen E/S 11/27/07 I 0.493 60 C 0.336 0.251 0.300 - - - 88.70 *88.70% V. Satisfactory

Bonimar Construction Enterprises 23760 Const. of 1 CL Standard Sch. Bldg. @ Salomague NHS 11/27/07 I 0.493 60 C 0.320 0.278 0.300 - - - 89.80 *89.80%

V. Satisfactory

Bonimar Construction Enterprises 23760 Const. of 1 CL Std. Sch. Bldg. @ Binmaley School of Fisheries 11/27/08 I 0.507 60 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

Bonimar Construction Enterprises 23760 Upgrading & Construction of Drainage of Lingayen Cadre Road 08/28/09 I 19.298 90 C 0.449 0.200 0.300 - - - 94.90 *94.90%

V. Satisfactory

Bontoc Builders 33306 Const. of Abatan Drainage (Part of Cluster 5) 08/28/09 CAR 0.864 60 C 0.455 0.133 0.300 - - - 88.80 91.26%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page66

Page 75: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Borderline Construction and Supply 24433 Conc. of Dualing-New-Panay-Midsayap Road (Sta. Cruz-Katalicanan Section) 02/28/08 XII 4.779 74 C 0.358 0.126 0.300 - - - 78.40 79.42%

Satisfactory

Borderline Construction and Supply 24433 Concreting of Dualing-New Panay-Midsayap Road, Sta. Cruz Section 03/04/09 XII 9.405 165 C 0.422 0.133 0.300 - - - 85.50 *85.50%

Satisfactory

Borderline Construction and Supply 24433 Const. of MPB 11/20/08 XII 0.287 45 C 0.334 0.239 0.300 - - - 87.30 *87.30% V. Satisfactory

Borderline Construction and Supply 24433 Const. of Water System 08/22/08 XII 0.467 45 C 0.385 0.215 0.300 - - - 90.00 *90.00% V. Satisfactory

Borderline Construction and Supply 24433 Concreting of Road at Brgy. Ulamian 02/26/10 XII 0.901 45 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory

BPDG Construction & Trading 16167 Const. of MPB at Brgy. San Jose Proper 11/19/07 III 3.612 80 C 0.357 0.300 0.300 - - - 95.70 *95.70% Outstanding

BRC Construction 21931 PSHS CVC Academic Building Phase III 07/30/08 DOST 6.482 216 C 0.375 0.300 0.300 - - - 97.50 97.50% Outstanding

Brillantes Construction 26447Provision of Lined Canal along Jct.

Dologan-Busco-Quezon Road, Nabanganan Section

02/28/08 X 0.462 45 C 0.381 0.200 0.300 - - - 88.10 86.60% V. Satisfactory

Brima Construction and Enterprises 8746 Rehab./Impvt./Conc. of Tubod-Ganassi National Road 09/01/07 X 9.142 78 C 0.287 0.300 0.300 - - - 88.70 86.06%

V. Satisfactory

Bros Construction and Supply 10507 Conc. of Surigao-Davao Coastal Road (Bad-as SDN Section) 02/29/08 XIII 6.509 90 C 0.320 0.215 0.300 - - - 83.50 79.72%

Satisfactory

Bros Construction and Supply 10507 Rehab. of Balingasag By-Pass Road 08/29/07 X 4.640 150 C 0.314 0.200 0.300 - - - 81.40 81.22% V. Satisfactory

Bros Construction and Supply 10507Repair/Rehab. of Damaged Slope

Protection Structure due to Erosion along Roadside of ICBR

08/26/08 X 2.593 180 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory

Bros Construction and Supply 10507 Repair/Rehab. of del Monte PSCG Bridge 12/04/07 XIII 1.635 198 C 0.152 0.300 0.000 - - - 45.20 58.91% Poor

Brostan Construction & Development 12360 Addalam River Irrigation Project 04/27/09 05/01/09 NIA 9.225 235 O 0.351 0.300 0.077 0.023 0.038 0.033 82.27 -

Brostan Construction & Development 12360 Conc. of Pila-Poblacion Road 11/19/08 IV-A 9.630 60 C 0.298 0.215 0.300 - - - 81.30 *81.30% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page67

Page 76: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Brostan Construction & Development 12360 Conc. of Road 03/03/08 II 2.885 90 C 0.268 0.300 0.300 - - - 86.80 87.88% V. Satisfactory

Brostan Construction & Development 12360 Conc. of Road, Leading to Eco-Tourism Project (Caliraya Lake) 08/19/08 IVA 19.298 150 C 0.291 0.300 0.300 - - - 89.10 93.96%

Outstanding

Brostan Construction & Development 12360 Const. of MPB (Phase I), Cagayan State University 08/28/08 II 9.640 300 O 0.304 0.240 0.070 0.024 0.033 0.100 77.10 -

Brostan Construction & Development 12360 Const. of MPB (Phase I), Cagayan State University 11/14/08 II 9.640 300 O 0.316 0.240 0.100 0.030 0.037 0.100 82.30 -

Brostan Construction & Development 12360 Impvt./Rehab. of Jct. Dumabato-Baligui Road 05/26/08 II 19.280 180 C 0.339 0.200 0.300 - - - 83.90 *83.90%

V. Satisfactory

Brostan Construction & Development 12360 Rehab. of Burgos-Aurora FMR 08/22/07 II 3.365 50 C 0.400 0.225 0.300 - - - 92.50 *92.50% Outstanding

Brostan Construction & Development 12360 Rehab. of Farm to Market Road 08/23/07 II 0.657 80 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

Brostan Construction & Development 12360 Rehab. of FMR 08/12/08 II 1.438 60 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory

Brostan Construction & Development 12360 Rehab. of Roads along Gamu-Roxas Road 05/21/08 II 11.564 60 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

Brostan Construction & Development 12360 Rehab. of Roads along Santiago-Tuguegarao Road (Conc. Reblocking) 11/20/08 II 19.274 90 C 0.357 0.200 0.000 - - - 55.70 72.32%

Satisfactory

Brostan Construction & Development 12360 Rehab. of Sibunag Bridge along Guimaras Circumferential Road 08/31/07 VI 2.178 95 C 0.389 0.100 0.300 - - - 78.90 *78.90%

Satisfactory

Brostan Construction & Development 12360 Rehab./Reconst. of Damaged Nat'l Road 08/15/08 II 15.235 90 C 0.341 0.275 0.000 - - - 61.60 78.40% Satisfactory

Brostan Construction & Development 12360 Rehab./Replacement of Damaged Bridges along CDMA Road, Pinaripad Bridge 11/20/07 II 13.472 285 C 0.400 0.300 0.000 - - - 70.00 71.44%

Satisfactory

Brostan Construction & Development 12360 Repair/Rehab. of Farm to Market Road, Brgy. San Leonardo-Pinaripad 11/20/07 II 4.054 60 C 0.363 0.300 0.300 - - - 96.30 96.30%

Outstanding

Brostan Construction & Development 12360 Replacement of Laoag Bridge along Jct. Ipil-Quirino Bdry. Road 11/24/08 II 4.792 150 C 0.338 0.200 0.300 - - - 83.80 85.36%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page68

Page 77: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Brostan Construction & Development 12360 Concreting of Junction Ipil-Quirino Boundary Road 08/27/09 II 8.581 100 C 0.419 0.200 0.300 - - - 91.90 93.28%

V. Satisfactory

Brostan Construction & Development 12360 Rehab./Reconst./Upgrading of Naguilian-San Mariano Road Santa Filomena Section 08/25/09 II 19.292 120 C 0.448 0.133 0.300 - - - 88.10 90.08%

V. Satisfactory

Brostan Construction & Development 12360 Const. of Road, Graceville, Brgy. Maulawin 09/01/09 IVA 0.573 30 C 0.329 0.145 0.300 - - - 77.40 *77.40% Unsatisfactory

Brostan Construction & Development 12360 Const. of MPB at Brgy. Primera Pulo 02/22/10 IVA 0.494 40 C 0.414 0.137 0.300 - - - 85.10 85.10% Satisfactory

Brostan Construction & Development 12360 Construction of Public Market 02/22/10 IVA 0.494 78 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory

Brostan Construction & Development 12360 Repair/Rehab. of Multi-Purpose Building Brgy. Poblacion 02/22/10 IVA 0.995 65 C 0.396 0.133 0.300 - - - 82.90 82.90%

Satisfactory

Brostan Construction & Development 12360 Const. of Multi-Purpose Building (Phase I), Cagayan State University, Carig 05/19/09 II 9.640 368 C 0.493 0.133 0.300 - - - 92.60 83.57%

Satisfactory

Brostan Construction & Development 12360Rehab./Reconst./Upgrading of Damaged National Roads along Pagsanjan-Lucban

Road05/30/09 IV-A 12.538 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V. Satisfactory

Brostan Construction and Development 12360 Rehab./Reconst./Upgrading of Santiago-

Tuguegarao Road (Roxas Section) 02/23/10 II 19.290 228 O 0.339 0.300 0.150 0.030 0.050 0.050 91.90 -

Bruno C. Bangao Construction/DJCM Construction (JV) JV-08-298 Conc. along Apayao-Ilocos Norte Road,

Parina Section 02/19/10 CAR 18.503 385 O 0.348 0.240 0.150 0.030 0.035 0.033 83.60 -

Brylle Trading & Construction Supplies 32880 Construction of Drainage System along

Rizal St., Poblacion 08/28/09 I 0.578 30 C 0.481 0.200 0.300 - - - 98.10 90.66% V. Satisfactory

Brylle Trading & Construction Supplies 32880 Const. of Drainage System at Brgy.

Amancoro 03/02/10 I 0.482 30 C 0.257 0.200 0.300 - - - 75.70 75.70% Unsatisfactory

BS Chang Builders 22745 DBM South Linear Park 07/05/07 PRRC 7.088 120 C 0.46 0.0815 0.300 - - - 84.15 *84.15% V. Satisfactory

BS Chang Builders 22745 DBM South Linear Park III 07/05/07 PRRC 2.235 70 C 0.42 0.200 0.300 - - - 92.00 *92.00% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page69

Page 78: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

BSP & Company, Inc. / E. Gardiola Const./Readycon Trading & Const.

Corp. (JV)JV-08-017

Const. of Pres. Garcia Ave. Ext. (C-5) Fly-Over, Crossing Sucat Road, SLEX to Sucat

Road10/22/09 NCR 192.873 330 C 0.425 0.200 0.300 - - - 92.50 *92.50%

V. Satisfactory

BSP & Company, Inc. / E. Gardiola Const./Readycon Trading & Const.

Corp. (JV)JV-08-084 Const. of Circ. Road (C-5) Ext. Project,

(Sucat Road to SLEX) 10/22/09 NCR 380.589 482 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

Busilac Builders, Inc. 7701 ACA Bldg. 2 10/01/08 DOST 9.651 180 C 0.389 0.300 0.300 - - - 98.90 98.90% Outstanding

Busilac Builders, Incorporated 7701 Conc. of Batac-Pinili Road, Batac Section 11/16/08 I 21.291 331 O 0.327 0.240 0.100 0.018 0.047 0.067 79.90 -

Busilac Builders, Incorporated 7701 Rehab./Reconst./Upgrading of Damaged National Road, Ilocos Norte-Apayao Road 09/09/09 I 24.758 206 O 0.295 0.300 0.150 0.030 0.050 0.033 85.80 -

Busilac Builders, Incorporated 7701 Improvement of Batac-Pinili Road with exception, Batac Section 09/09/09 I 21.291 331 C 0.411 0.200 0.300 - - - 91.10 84.38%

Satisfactory

Busilac Builders, Incorporated 7701 Rehab./Reconst./Upgrading of Manila North Road, Nagsurot 09/11/09 I 14.462 150 C 0.346 0.190 0.300 - - - 83.60 *83.60%

Satisfactory

C & F Construction & Development Corporation 3509 Repair/Rehab. of Bocaue-San Jose Road 08/28/08 III 9.860 100 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V. Satisfactory

C & F Construction & Development Corporation 3509 Widening & Impvt. of Quirino Highway 08/22/07 III 4.749 110 C 0.246 0.245 0.300 - - - 79.10 *79.10%

Satisfactory

C & F Construction & Development Corporation 3509 Rehab./Impvt. of Paradise Farm, FMR,

Tungkong Mangga, Phase I 09/07/09 III 9.528 150 C 0.439 0.133 0.300 - - - 87.20 83.30% Satisfactory

C A Miguel Construction Incorporated (Formerly: C.A. Miguel

Construction)10221 Widening/Concrete Blocking of North

Avenue 06/01/09 NCR 4.797 90 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory

C D U Construction 13915 Conc. of Laoang-Calomotan Road 11/29/08 VIII 19.065 180 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page70

Page 79: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C D U Construction 13915 Conc. of Pangpang-Palapag-Mapanas-Gamay-Lapinig Road 11/29/08 VIII 9.517 150 C 0.331 0.200 0.300 - - - 83.10 *83.10%

V. Satisfactory

C D U Construction 13915 Const. of 1 CL Sch. Bldg. @ Brgy. Bansud 03/10/09 VIII 0.454 60 C 0.372 0.200 0.300 - - - 87.20 *87.20% Satisfactory

C D U Construction 13915 Const. of MPB @ Brgy. Carayman 03/10/09 VIII 0.963 90 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory

C D U Construction 13915Const./Rehab./Replacement/Completion and Repair of Elem. & Secondary Sch.

Bldg., Bliss Primary School03/10/09 VIII 0.433 60 C 0.379 0.200 0.300 - - - 87.90 *87.90%

Satisfactory

C D U Construction 13915 Repair/Rehab. of Ferry Terminal-Allen Road (Roadslip) Daang Maharlika 08/27/08 VIII 3.835 90 C 0.282 0.200 0.300 - - - 78.20 84.26%

V. Satisfactory

C D U Construction 13915 Repair/Rehab. of Laoang-Calomotan (Road Slip) Km. 790+800 to Km. 797+013 08/31/08 VIII 4.719 90 C 0.366 0.300 0.300 - - - 96.60 92.34%

Outstanding

C D U Construction 13915 Const./Impvt. of Talisay Bridge (Phase I), Brgy. Talisay 03/06/10 VIII 2.398 180 C 0.500 0.133 0.300 - - - 93.30 93.30%

V. Satisfactory

C D U Construction 13915 Const. of Shoreline Protection Brgy. Tomaligues 03/03/10 VIII 0.963 60 C 0.357 0.200 0.300 - - - 85.70 85.70%

Satisfactory

C D U Construction 13915 Upgrading of Allen-Cabacungan National Road 03/05/10 VIII 19.231 180 C 0.330 0.193 0.300 - - - 82.30 83.05%

Satisfactory

C D U Construction 13915 Const. of One (1) Classroom School Building Gadgaran Elementary School 03/03/10 VIII 0.544 60 C 0.392 0.133 0.300 - - - 82.50 82.50%

Satisfactory

C E K Construction and Water Supply 13713 Const. of 2-CL School Building, Cebuano

National High School, Brgy. Cebuano 09/15/09 XII 1.144 60 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory

C E K Construction and Water Supply 13713 Construction of Hanging Bridge at Brgy.

Midtungok 06/03/09 R-XII 0.481 65 C 0.323 0.200 0.300 - - - 82.30 *82.30% Satisfactory

C E K Construction and Water Supply 13713 Construction of Multi-Purpose Building,

Brgy. Sinawilan 05/29/09 XI 2.191 125 C 0.455 0.200 0.300 - - - 95.50 90.46% V. Satisfactory

C E K Construction and Water Supply 13713 Completion of School Bldg. at Binwang E/S 05/20/08 XII 0.274 60 C 0.310 0.200 0.300 - - - 81.00 *81.00%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page71

Page 80: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C E K Construction and Water Supply 13713 Const. of MPB @ Brgy. Lamlahak 03/15/09 XII 0.667 70 C 0.478 0.200 0.300 - - - 97.80 82.68%

Satisfactory

C E K Construction and Water Supply 13713 Const. of MPB at Brgy. Sinawilan 03/06/09 XI 2.191 110 O 0.378 0.237 0.143 0.030 0.045 0.050 88.30 -

C E K Construction and Water Supply 13713 Const. of MPB at Paligue 11/20/08 XI 0.953 75 C 0.368 0.223 0.300 - - - 89.10 *89.10%

V. Satisfactory

C E K Construction and Water Supply 13713 Const. of Multi-Purpose Building @ Aplaya

(Madrasha) 02/25/10 XI 0.494 45 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory

C L Carandang Enterprises 29494 Rehab./Reconst. of Damaged Masbate Port National Road 05/25/09 V 7.715 150 O 0.317 0.300 0.150 0.023 0.040 0.033 86.30 -

C L Carandang Enterprises 29494 Rehab./Impvt. of DPWH Bldg., Masbate 1st DEO 05/25/09 V 1.926 80 O 0.331 0.240 0.150 0.030 0.040 0.033 82.40 -

C L Carandang Enterprises 29494 Rehab./Impvt. of Masbate Circumferential Road 02/18/10 V 32.805 264 C 0.408 0.133 0.300 - - - 84.10 87.64%

Satisfactory

C L Carandang Enterprises 29494 Rehab./Reconst. of Damaged Masbate Port National Road 02/18/10 V 7.715 208 C 0.327 0.197 0.300 - - - 82.40 85.25%

Satisfactory

C L V Enterprises 18512 Const. of Multi-Purpose Building, Cawayan 05/27/09 X 0.939 119 O 0.300 0.300 0.150 0.020 0.025 0.033 82.80 -

C L V Enterprises 18512 Const. of Multi-Purpose Building, Bukidnon State University 09/02/09 X 3.372 150 O 0.388 0.240 0.150 0.030 0.047 0.033 88.80 -

C&F Construction & Development Corporation 3509 Impvt./Rehab. of MPB Brgy. Sta. Cruz 03/01/10 NCR 3.372 120 C 0.484 0.133 0.300 - - - 91.70 87.99%

Satisfactory

C&F Construction and Dev't Corporation 3509 Plaridel Airport Development Project 09/25/09 DOTC 4.800 45 C 0.450 0.200 0.300 - - - 95.00 95.00%

V. Satisfactory

C. Brotonel Construction 9727 Completion of the Const. of Taal Lake Circ. Road (Talisay-Laurel-Agoncillo Section) 03/09/09 IV-A 9.643 145 C 0.465 0.133 0.300 - - - 89.80 88.18%

Satisfactory

C. Brotonel Construction 9727 Impvt. of MPB 11/27/08 IV-A 0.192 45 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding

C. Brotonel Construction 9727 Riprapping of Tumaway-Quiling Creek, Brgy. Tumaway 03/10/09 IV-A 0.481 45 C 0.450 0.200 0.300 - - - 95.00 *95.00%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page72

Page 81: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C. Dy Builders and General Merchandise (Formerly: CD

Construction)17003 Const. of 10 units CL, Mancahan NHS 03/02/09 X 4.668 120 C 0.418 0.058 0.300 - - - 77.60 82.15%

Satisfactory

C. Dy Builders and General Merchandise (Formerly: CD

Construction)17003 Conc. of Road, Brgy. Nazareth 02/22/10 X 2.777 90 C 0.427 0.133 0.300 - - - 86.00 86.00%

Satisfactory

C. E. Padilla Construction 11278 Partial Const. of 3-Storey Medical and Parking Bldg. with Roofdeck 02/26/08 PRRC 94.626 295 C 0.323 0.200 0.300 - - - 82.30 *82.30%

V. Satisfactory

C. Lara Construction 17304 Const. of 1 Storey 2 CL Modified SB at Ajong NHS 08/20/08 VII 0.871 75 C 0.282 0.300 0.300 - - - 88.20 86.38%

V. Satisfactory

C.A. Betalac Construction & Gen. Mdse. 28222 Construction of Roads at Brgy. San

Agustin, Calean 03/12/09 XII 0.962 65 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory

C.A. Betalac Construction & Gen. Mdse. 28222 Partial Const. of Academic Classroom at

Ma. Z. Bayya Memorial E/S 05/19/08 XII 0.480 75 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory

C.A. Betalac Construction & Gen. Mdse. 28222 Repair/Rehab. of MPB @ DPWH 09/08/09 XII 0.964 64 C 0.408 0.200 0.300 - - - 90.80 *90.80%

V. Satifactory

C.B Garay Philwide Builders 6004 Construction of 1 Unit 3-Storey, 15-Classroom School Building 01/18/10 NHA 18.115 150 O 0.3596 0.2756 0.00 0.0150 0.0255 0.0167 69.24 -

C.B. Garay Philwide Builders 6004 Rehab./Impvt. of Masbate City Multi-Purpose Building and Social Center 08/27/09 V 3.083 208 O 0.383 0.250 0.150 0.030 0.042 0.033 88.80 -

C.B. Garay Philwide Builders 6004 Rehab./Impvt. of Masbate City Multi-Purpose Building and Social Center 02/18/10 V 3.083 247 C 0.471 0.133 0.300 - - - 90.40 89.28%

V. Satisfactory

C.B. Tampengco Construction & Supply 18505 Const. of Velasquez Health Center

Nepomuceno Cor. F. Varona St., 02/27/09 NCR 2.880 178 C 0.423 0.200 0.300 - - - 92.30 *92.30% V.Satisfactory

C.B. Tampengco Construction & Supply 18505 Upgrading/Conc. of Roads with Drainage

Improvement 03/04/09 NCR 0.476 45 C 0.336 0.200 0.300 - - - 83.60 *83.60% Satisfactory

C.B. Tampengco Construction & Supply 18505 Conct./Rehab./Impvt. of T. Paez High

School 09/08/09 NCR 1.913 90 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory

C.B. Tampengco Construction & Supply 18505 Completion of School Bldg., Tampo E/S

Main, Brgy. Tampo 09/03/09 NCR 1.904 60 O 0.328 0.225 0.150 0.030 0.041 0.033 80.70 -

C.B. Tampengco Construction & Supply 18505 Repair/Rehab. of Amadeo V. Hernandez E/S 02/22/10 NCR 1.691 60 C 0.487 0.133 0.300 - - - 92.00 92.00%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page73

Page 82: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C.B. Tampengco Construction & Supply 18505

Const./Rehab./Completion and Repair of School Bldg. at Silvestre Lazaro Elem.

School, Brgy. Ugong03/02/10 NCR 4.178 120 C 0.486 0.133 0.300 - - - 91.90 91.90%

V.Satisfactory

C.B. Tampengco Construction & Supply 18505 Const. of Multi-Purpose Pavement, MPTC 03/01/10 III 1.872 30 C 0.467 0.176 0.300 - - - 94.30 94.30%

V. Satisfactory

C.B. Tampengco Construction and Supply 18505 Completion of MPB at Brgy. Marulas 11/20/08 NCR 1.044 60 C 0.369 0.231 0.300 - - - 90.00 *90.00%

V. Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. (Partial) of MPB 08/11/08 IV-A 4.800 150 C 0.385 0.265 0.300 - - - 95.00 *95.00%

Outstanding

C.B. Tampengco Construction and Supply 18505 Const. of Conc. Pathwalk in Sch. Grounds

of Caruhatan West E/S 11/20/08 NCR 0.949 60 C 0.205 0.248 0.300 - - - 75.30 *75.30% Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. of Health Center at Brgy. Canlalay 08/21/08 IV-A 0.960 60 C 0.312 0.231 0.300 - - - 84.30 75.83%

Satisfactory

C.B. Tampengco Construction and Supply 18505 Const. of Two (2) CL Sch. Bldg. @

Mariveles H/S 11/12/07 III 0.877 52 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory

C.C.M. Construction 11043 Const./Repair/Rehab. of Roads and Bridges 06/08/09 VII 0.367 169 C 0.460 0.200 0.300 - - - 96.00 *96.00%

V. Satisfactory

C.C.M. Construction 11043 Concreting & Const. of Farm to Market Roads, Guiwanon 06/08/09 VII 0.183 120 C 0.496 0.135 0.300 - - - 93.10 *93.10%

V. Satisfactory

C.C.M. Construction 11043 Concreting & Const of Farm-to-Market Road, San Isidro 06/08/09 VII 0.183 120 C 0.490 0.135 0.300 - - - 92.50 *92.50%

V. Satisfactory

C.C.M. Construction 11043 Impvt./Concrete Paving, Panglao Airport Road 06/08/09 VII 2.785 70 C 0.472 0.142 0.300 - - - 91.40 *91.40%

V. Satisfactory

C.C.M. Construction 11043 Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) Road 03/03/09 VII 13.714 238 C 0.415 0.200 0.300 - - - 91.50 87.93%

Satisfactory

C.C.M. Construction 11043 Conc. Paving of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) Road 11/20/07 VII 4.485 120 C 0.371 0.000 0.300 - - - 67.10 78.32%

Satisfactory

C.C.M. Construction 11043 Concreting of Multi-Purpose Pavement 03/04/09 VII 0.137 130 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page74

Page 83: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C.C.M. Construction 11043 Const. of Brgy. Lumangog Road 03/05/09 VII 2.806 188 C 0.466 0.200 0.300 - - - 96.60 85.20%Satisfactory

C.C.M. Construction 11043Rehab. of Settled Approaches of Damaiao

and Taguimtim Bridges along Bohol Circumferential Road

11/21/07 VII 2.842 90 C 0.391 0.200 0.300 - - - 89.10 81.72% V. Satisfactory

C.C.M. Construction 11043 Rehab. and Impvt. of Tajang Causeway leading to Sandingan Island 02/23/10 VII 9.191 233 C 0.437 0.133 0.300 - - - 87.00 87.00%

Satisfactory

C.C.M. Construction / IBC International Builders Corporation

Joint VentureJV-08-242

Imprv't/Widening of Causeway, Sitio Ubos, Tagbilaran City-Totolan, Dauis

Rd.,including Ambassador Suarez Bridge09/03/09 VII 52.529 270 O 0.381 0.240 0.150 0.030 0.042 0.033 87.60 -

C.C.M. Construction/IBC International Builders Corporation

Joint Venture JV-08-242

Impvt./Widening of Causeway. Sitio Ubos, Tagbilaran City-Totulan, Dauis Road

including Ambassador Suarez Bridge, Sta. 0+080-Sta. 0-920

02/24/10 VII 55.915 270 C 0.471 0.130 0.300 - - - 90.10 88.18% Satisfactory

C.D. Valbuena Construction 26794 Const. of Foot Bridge, Brgy. Malinao Ilaya 05/15/08 IV-A 0.142 60 C 0.305 0.263 0.300 - - - 86.80 *86.80% V. Satisfactory

C.D. Valbuena Construction 26794 Const. of Multi-Purpose Building at Brgy. Concepcion I, 02/17/10 IVA 1.249 30 C 0.439 0.200 0.300 - - - 93.90 93.90%

V. Satisfactory

C.E. Padilla Construction 11278 Guadalupe Viejo Linear Park cum Revetment Wall Project 10/10/07 PRRC 49.604 210 O 0.390 0.297 0.100 0.030 0.049 0.100 96.60 -

C.F. Trinidad / 2H2L Construction Joint Venture JV-07-059 Widening of Taytay Diversion Road 11/25/08 IVA 19.223 150 C 0.341 0.300 0.300 - - - 94.10 85.16%

V. Satisfactory

C.F. Trinidad Construction 9199 Riprapping of Creek, Peñafrancia 05/18/09 IV-A 1.437 120 C 0.464 0.133 0.300 - - - 89.70 92.22% V. Satisfactory

C.F. Trinidad Construction 9199 Const. of Box Culvert at P. Gomez Extension 11/29/07 IV-A 1.050 60 C 0.363 0.200 0.300 - - - 86.30 *86.30%

V.Satisfactory

C.F. Trinidad Construction 9199 Dredging/Riprapping of Angono River 03/05/08 IV-A 2.882 90 C 0.368 0.268 0.300 - - - 93.60 *93.20% Outstanding

C.F. Trinidad Construction 9199 Widening of Taytay Diversion Road (Phase I) 08/26/09 IVA 9.611 150 C 0.435 0.200 0.300 - - - 93.50 88.82%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page75

Page 84: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C.F. Trinidad Construction 9199 Riprapping of Creek @ Robinson 02/15/10 IVA 1.925 120 C 0.449 0.200 0.300 - - - 94.90 94.90% V. Satisfactory

C.F. Trinidad Construction 9199 Conc. of BCI Compound, Brgy. Dalig 02/15/10 IVA 0.961 120 C 0.446 0.200 0.300 - - - 94.60 94.60% V. Satisfactory

C.G.I. Construction 10606 Const. of Road @ General Luna 08/15/08 III 0.475 60 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

C.L. Carandang Enterprises 29494 Conc. of Masbate-Milagros Road 02/21/08 V 13.855 150 C 0.260 0.300 0.300 - - - 86.00 76.768% Satisfactory

C.L. Carandang Enterprises 29494 Conc. of Sitio Calumpang Road 02/27/09 V 0.956 120 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory

C.L. Carandang Enterprises 29494 Concreting of Barangay Kalipay Road 02/27/09 V 0.956 120 C 0.471 0.133 0.300 - - - 90.40 *90.40% V. Satisfactory

C.L. Carandang Enterprises 29494 Rehab. of Jct., Crossing-Mandaon Road 08/23/08 V 18.810 120 C 0.277 0.200 0.300 - - - 77.70 *77.70% Satisfactory

C.L. Carandang Enterprises 29494 Rehab./Impvt./Const. of DEO 11/18/08 V 2.886 90 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

C.L. Carandang Enterprises 29494 Replacement/Reblocking of Concrete Pavement along Masbate-Cataingan Road 02/21/08 V 9.488 120 C 0.298 0.300 0.300 - - - 89.80 82.48%

V. Satisfactory

C.L. Carandang Enterprises 29494 Rehab./Reconst. of Masbate Circumferential Road 08/26/09 V 32.805 210 O 0.371 0.279 0.150 0.030 0.037 0.033 90.00 -

C.L. Carandang Enterprises 29494 Rehab./Reconst. of Damaged Masbate Port National Road 08/26/09 V 7.715 180 O 0.320 0.300 0.150 0.030 0.047 0.033 88.00 -

C.L. Carandang Enterprises 29494 Rehab./Impvt. of DPWH Bldg. Masbate 1st DEO 08/26/09 V 1.926 72 C 0.462 0.157 0.300 - - - 91.90 85.25%

Satisfactory

C.L. Carandang Enterprises 29494 Const. of Multi-Purpose Pavement at District III 08/26/09 V 0.661 60 C 0.415 0.133 0.300 - - - 84.80 *84.80%

Satisfactory

C.L. Carandang Enterprises 29494 Impvt. of Canvanez-Nasandig Brgy. Road 09/26/09 V 4.725 120 O 0.293 0.300 0.150 0.030 0.033 0.033 83.90

C.M. Dancel Construction & Supply 12640 Rehab./Reconst./Upgrading of Damaged Paved National Road, Bonifacio Road 06/05/09 I 10.260 130 O 0.358 0.225 0.150 0.030 0.045 0.033 35.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page76

Page 85: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C.M. Dancel Construction & Supply 12640 Impvt. of Pasuquin-Sapat Air Station Road 02/29/08 I 19.284 210 C 0.248 0.187 0.300 - - - 73.50 76.08% Satisfactory

C.M. Dancel Construction & Supply 12640 Rehab./Reconst. of Damaged Nat'l Road, MNR, Maoini-Baduang Road 05/21/08 I 18.963 150 O 0.400 0.300 0.100 0.015 0.020 0.100 93.50 -

C.M. Dancel Construction & Supply 12640 Rehab./Reconst./Upgrading of Bonifacio Road 09/10/09 I 10.260 130 C 0.369 0.200 0.300 - - - 86.90 85.22%

Satisfactory

C.M. Dancel Construction & Supply 12640 Asphalt Overlay along Laoag-Sarrat-Piddig-Solsona Road 02/24/10 I 13.678 90 O 0.300 0.300 0.150 0.030 0.055 0.033 86.80 -

C.M. De Villa Construction & Supply (Formerly: C.M. De Villa Const.) 22778 Conc. of Roads in Sitio Kay Reyna 08/23/07 IV-A 0.471 60 C 0.304 0.221 0.300 - - - 82.50 *82.50%

V. Satisfactory

C.M. Pancho Construction Incorporated 183

Bohol Circumferential Road Improvement Project, CP-2, Candijay-Jagna-Valencia

Sect.Sat. 169+240-Sta. 221+04011/14/07 PJHL 856.115 944 C 0.355 0.300 0.300 - - - 95.50 95.50%

Outstanding

C.M. Pancho Construction Incorporated 183 Const. of Aloragat Bridge & Approaches 08/31/07 I 51.651 300 O 0.389 0.300 0.100 0.030 0.061 0.100 98.00 -

C.M. Pancho Construction Incorporated 183 Rehab. of Surigao-Davao Coastal Road,

Jct. Bacuag-Claver Section 05/19/08 XIII 661.069 540 O 0.351 0.300 0.100 0.030 0.060 0.100 94.10 -

C.M. Pancho Construction Incorporated 183 Rehab. of Surigao-Davao Coastal Road,

Jct. Bacuag-Claver Section 11/23/08 XIII 661.069 540 O 0.338 0.300 0.070 0.030 0.070 0.100 90.80 -

C.R. Domingo Construction 2992 Conc. of Naguilian-San Mariano Road (Binatug Section) 08/12/08 II 9.646 90 C 0.333 0.200 0.300 - - - 83.30 82.16%

V. Satisfactory

C.R. Domingo Construction, Inc. (Formerly C.R. Domingo Contruction) 2992 Concreting of Potia, A Lista, Ifugao-Mt.

Province Boundary Road 03/06/09 CAR 19.123 140 C 0.461 0.200 0.300 - - - 96.10 *96.10% Outstanding

C.S. Garcia Construction 1901 Rehabilitation of Tipas-Napindan Road 05/29/09 NCR 9.593 105 C 0.421 0.200 0.300 - - - 92.10 *92.10% V. Satisfactory

C.S. Garcia Construction 1901 Rehab. of Sagbat-Pililla Diversion Road 11/26/08 IV-A 9.598 45 C 0.364 0.286 0.300 - - - 95.00 *95.00% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page77

Page 86: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

C.S. Garcia Construction 1901 Road Repair/Rehabilitation of Cadena de Amor St. 03/05/09 III 0.477 10 C 0.437 0.200 0.300 - - - 93.70 93.70%

V.Satisfactory

C.S. Garcia Construction 1901 Completion of Pateros (Aguho) Bridge Approaches, Brgy. Aguho 02/24/10 NCR 14.395 274 O 0.291 0.237 0.150 0.030 0.065 0.033 80.60 -

C.S. Rayos Construction & General Services 9790 Const. (Concreting) of Ternate-Nasugbu

Road, Ternate-Kaybiang Section 08/29/08 IV-A 28.934 240 C 0.321 0.300 0.300 - - - 92.10 85.56% V. Satisfactory

C.S. Rayos Construction & General Services 9790 Const./Impvt. of Bauan-Mabini Circ. Road 02/28/08 IV-A 9.496 170 C 0.220 0.195 0.300 - - - 71.50 *71.50%

Satisfactory

C.S. Rayos Construction and General Services 9790

Rehab./ Reconst./ Impvt. of Batangas -Tabangao-Lobo Road (Intermittent Section)

Pinamucan Simlong Section, Phase II09/04/09 IVA 9.638 107 C 0.437 0.133 0.300 - - - 87.00 *87.00%

Satisfactory

C.V. Construction & Development 8334 Const./Completion of Doña Helene Bridge 1 & Approaches 03/05/09 XIII 7.007 529 C 0.485 0.200 0.000 - - - 68.50 71.11%

Poor

C.V. Construction & Development 8334Impv't/Conc. of Additional Two (2) Lanes along Davao City Diversion Road (Airport

Section)05/28/08 XI 15.407 266 C 0.345 0.200 0.300 - - - 84.50 89.69%

V. Satisfactory

C.V. Construction & Development 8334Replacement of Sayug Bailey Bridge to RCBC (Jct. del Carmen-Sta. Monica-San

Isidro Road)08/26/08 XIII 9.548 212 C 0.353 0.212 0.000 - - - 56.50 62.98%

Fair

CA Miguel Construction, Incorporated (Formerly: C.A. Miguel

Const.)10221 Const. of MPB @ J.E. Pama St. 08/21/07 NCR 0.373 45 C 0.326 0.200 0.300 - - - 82.60 *82.60%

V. Satisfactory

Caana Construction 12905 Repair/Rehab. of Manila High Sch. 11/10/08 NCR 0.962 30 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

Cabilauan Construction and Supply (Formerly: JS Mondejar

Construction)18823 Const. of MPB at NIPSC, Lemery Campus 03/04/10 VI 0.948 60 C 0.384 0.200 0.300 - - - 88.40 88.40%

Satisfactory

Cad-Era Design and Builders 33076 Const. Of MPB at Middle Rock Quarry Brgy. 03/03/10 CAR 1.930 80 C 0.431 0.133 0.300 - - - 86.40 86.40%

Satisfactory

Camia Construction 20506 Concreting along Kabugao-Pudtol-Luna Road, Nagsungbatan Section 06/01/09 CAR 14.117 277 O 0.400 0.300 0.150 0.030 0.045 0.033 95.80 -

Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Swan Section 06/01/09 CAR 18.862 277 O 0.357 0.240 0.150 0.030 0.056 0.033 86.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page78

Page 87: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Lenning Section 05/30/09 CAR 13.870 366 O 0.294 0.300 0.150 0.030 0.035 0.033 84.20 -

Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol Poblacion Section 05/30/09 CAR 18.562 391 O 0.288 0.300 0.150 0.030 0.040 0.033 84.10 -

Camia Construction 20506 Completion of Matuyem Bridge (Phase II) 08/25/08 II 4.695 150 C 0.373 0.215 0.000 - - - 58.80 71.34% Satisfactory

Camia Construction 20506 Conc. of Dugo-San Vicente Road with Drainage 05/18/07 II 5.630 150 O 0.352 0.264 0.030 0.020 0.023 0.033 72.20 -

Camia Construction 20506 Conc. of Simpatuyo Brgy. Road 11/11/08 II 0.942 90 C 0.281 0.187 0.300 - - - 76.80 *76.80% Satisfactory

Camia Construction 20506 Const. of Balluyan Bridge, Phase II 08/25/07 CAR 2.830 210 C 0.330 0.214 0.300 - - - 84.40 88.42% V.Satisfactory

Camia Construction 20506 Const. of Caglayan Flood Control Phase II 11/20/08 CAR 2.360 65 C 0.316 0.195 0.300 - - - 81.10 80.80% V.Satisfactory

Camia Construction 20506 Const. of Conner National High School 11/19/07 CAR 0.473 71 C 0.339 0.200 0.300 - - - 83.90 *83.90% V.Satisfactory

Camia Construction 20506Maint./Rehab. & Impvt. of Nat'l Arterial Sec. Roads Public Infratructure along Cagayan-

Apayao Road, Tuao Pob. Sect.05/16/08 II 4.998 150 C 0.324 0.195 0.300 - - - 81.90 *81.90%

V.Satisfactory

Camia Construction 20506 Maintenance/Rehab. Along Apayao-Calanasan Road 02/26/09 CAR 4.588 241 C 0.363 0.200 0.300 - - - 86.30 82.64%

Satisfactory

Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol-Poblacion Section 02/28/09 CAR 18.563 390 O 0.351 0.300 0.150 0.030 0.035 0.033 89.90 -

Camia Construction 20506 Repair/Rehab of Priority FMR (Municipal Wide) 11/19/07 CAR 1.856 35 C 0.217 0.200 0.300 - - - 71.70 *71.70%

Satisfactory

Camia Construction 20506 Replacement/Const. of Malabanig Bridge 05/16/08 CAR 15.218 300 C 0.385 0.200 0.300 - - - 88.50 87.12% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page79

Page 88: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road, Lenneng Section 02/28/09 CAR 13.870 385 O 0.344 0.300 0.150 0.030 0.052 0.025 90.10 -

Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Sect.) 09/04/09 CAR 13.870 402 O 0.331 0.240 0.150 0.024 0.056 0.033 83.40 -

Camia Construction 20506 Concreting along Kabugao-Pudtol-Luna Road, Nagsungbatan Section 02/18/10 CAR 14.352 337 O 0.369 0.240 0.150 0.030 0.045 0.050 88.40 -

Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol Poblacion Section 02/20/10 CAR 18.922 421 C 0.400 0.200 0.300 - - - 90.00 88.20%

Satisfactory

Camia Construction 20506Road Upgrading of Abbut-Conner-

Kabugao Road (Gravel to Concrete), Manag-Guina-ang Section

02/20/10 CAR 9.358 360 O 0.381 0.234 0.150 0.030 0.040 0.033 86.80 -

Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Swan Section 02/18/10 CAR 18.862 277 C 0.417 0.133 0.300 - - - 85.00 85.96%

Satisfactory

Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Sect.) 02/20/10 CAR 13.870 402 C 0.423 0.133 0.300 - - - 85.60 85.78%

Satisfactory

Camia Construction 20506Const./Road Opening of Solosona-

Kabugao Road (Kabugao Side), Lenneng-Guina-ang Section

02/20/10 CAR 14.081 360 O 0.369 0.232 0.150 0.030 0.035 0.033 84.90 -

Camori Builders & Supply 30084 Impvt.Widening of Cainta-Kaytickling-Antipolo-Teresa Road 08/26/09 IVA 4.801 120 C 0.484 0.200 0.300 - - - 98.40 92.58%

V. Satisfactory

Carlo Joseph Construction 21017 Const. of School Building at Mawaque Resettlement Elementary School 06/04/09 III 0.952 30 C 0.469 0.200 0.300 - - - 96.90 *96.90%

Outstanding

Carlo Joseph Construction 21017 Repair of Brgy. Roads @ Magnolia St. 02/26/09 III 0.462 15 C 0.448 0.133 0.300 - - - 88.10 *88.10%Satisfactory

Carlo Joseph Construction 21017 Const. of 2-CL at Culubasa PS Floridablanca East 08/24/09 III 0.958 60 C 0.465 0.133 0.300 - - - 89.80 *89.80%

V. Satisfactory

Carlo Joseph Construction 21017 Dredging of Balagtas River and Creeks 09/04/09 III 4.774 45 C 0.375 - 0.500 - - - 87.50 *87.50% Satisfactory

Carlo Joseph Construction 21017Drainage Canal along San Antonio-Floridablanca Road, Mabical-Valdez

Section02/17/10 III 4.774 60 C 0.446 0.142 0.300 - - - 88.80 88.80%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page80

Page 89: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Carlyz Construction 19776 Const./Repair of DepEd Division Office Phase II 11/15/08 CAR 0.946 73 C 0.205 0.200 0.300 - - - 70.50 *70.50%

Satisfactory

Carlyz Construction 19776Widening/Conc. of Banaue-Mayoyao

Alfonso Lista-Isabela Boundary Road, Kinakin Section

05/21/08 CAR 1.895 90 C 0.378 0.200 0.300 - - - 87.80 88.20% V. Satisfactory

Carrascal Integrated Enterprises 4764 Completion of Carrascal MPB 05/20/08 XIII 1.844 120 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Carrascal Integrated Enterprises 4764 Completion of Public Market 05/20/08 XIII 1.844 120 C 0.393 0.200 0.300 - - - 89.30 87.55% V. Satisfactory

Carrascal Integrated Enterprises 4764 Conc.of Sibahay-Nurcia Section (SDCR) 03/11/09 XIII 19.285 150 C 0.428 0.115 0.300 - - - 84.30 84.06% Satisfactory

Carrascal Integrated Enterprises 4764 Const. of Adlay Bridge and Approaches 08/28/08 XIII 23.683 315 C 0.305 0.300 0.300 - - - 90.50 *90.50% Outstanding

Carrascal Integrated Enterprises 4764 Const. of Kayawyawan and Approaches Bridge 1 05/20/08 XIII 13.806 285 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

Carrascal Integrated Enterprises 4764 Const. of Carrascal Seawall 03/02/10 XIII 9.240 120 C 0.478 0.133 0.300 - - - 91.10 91.10% V.Satisfactory

Carrascal Integrated Enterprises 4764 Const. of MPB Brgy. Panikian 03/02/10 XIII 0.458 84 C 0.477 0.133 0.300 - - - 91.00 91.00% V.Satisfactory

Carry-on Construction 8014 Const./Rehab. of Roads at Road 3 05/27/09 NCR 0.662 45 C 0.333 0.200 0.300 - - - 83.30 *83.30% Satisfactory

Carry-on Construction 8014 Const./Impvt. of MPB 11/21/08 NCR 1.916 75 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory

Carry-on Construction 8014 Upgrading/Conc. of Roads with Drainage Improvement, Brgy. Sipac 03/04/09 NCR 0.477 45 C 0.325 0.200 0.300 - - - 82.50 *82.50%

Satisfactory

Carry-on Construction 8014 Const. of Multi-Purpose Building, Lena Subd., Brgy. Dalandan 09/16/09 NCR 3.134 90 C 0.455 0.133 0.300 - - - 88.80 *88.80%

Satisfactory

Casigayan Construction 26796 Const. of MPB, KASC (Phase I) 11/23/07 CAR 0.945 120 C 0.316 0.195 0.300 - - - 81.10 *81.10% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page81

Page 90: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Casipit Construction & Supply 11623 Const. of Multi-Purpose Building at Brgy. Maawi 03/04/10 I 0.388 25 C 0.350 0.200 0.300 - - - 85.00 85.00%

Satisfactory

Cauayan United Enterprises & Const. Builders/Alcel Const. (JV) JV-08-235 Rehab./Reconst./Upgrading of Naguilian-

San Mariano Road (San Manuel Section) 08/25/09 II 18.716 104 C 0.455 0.133 0.300 - - - 88.80 89.40% V. Satisfactory

Cauayan United Enterprises & Const. Builders/Brostan Construction and

Developmentn (JV) JV-07-168 Concreting of Ilagan-Delfin Albano-Mallig

Road (Manano Section) 05/25/09 II 19.290 404 C 0.475 0.133 0.300 - - - 90.80 89.12% V. Satisfactory

Cauayan United Enterprises and Builders 8816 Construction of Canal and Canal

Structures (LMC-ARIP-09-06) 07/02/07 NIA-II 1.983 210 C 0.329 0.133 0.000 0.015 0.028 0.200 70.50 70.51% Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Conc. of Ilagan-Delfin Albano-Mallig Road

(Olango Section) 05/21/08 II 9.648 90 C 0.335 0.196 0.300 - - - 83.10 *83.10% V. Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Construction of Flood Control Project 03/03/09 II 4.821 116 C 0.460 0.200 0.300 - - - 96.00 91.02%

V.Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. Along Cauayan-Cabatuan

Road, Cauayan-Luna-Cabatuan 08/14/08 II 14.346 100 C 0.390 0.225 0.300 - - - 91.50 *91.50% Outstanding

Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. Along Gamu-Roxas Road 08/11/08 II 9.646 60 C 0.343 0.300 0.300 - - - 94.30 *94.30%

Outstanding

Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. of Baguio Country Club Km.

252+768-Km. 254+155 11/26/07 CAR 6.844 60 C 0.385 0.200 0.300 - - - 89.50 *88.50% V.Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Repair/Rehab Along Daang Maharlika, KO

364+591 to KO 370+500 03/04/09 II 4.780 180 C 0.411 0.200 0.300 - - - 91.10 *91.10% V.Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Repair/Rehab. of Alaminos-Bolinao Road,

Km. 321+204 - Km. 323+000 03/06/08 I 9.647 27 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Asphalt Overlay along Alicia-San Mateo

Road KO 357+000 to 358+000 02/24/10 II 3.818 90 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Asphalt Overlay Daang Maharlika KO

376+000 - KO 379+000 02/24/10 II 5.511 90 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page82

Page 91: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Cauayan United Enterprises and Construction Builders 8816 Rehab./Reconst./Upgrading of Santiago-

Tuguegarao Road (Muñoz Section) 02/22/10 II 19.294 180 C 0.431 0.133 0.300 - - - 86.40 86.34% Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Rehab./Reconst./Upgrading of Santiago-

Tuguegarao Road (Bantug-Nuesa Section) 02/22/10 II 19.295 180 C 0.397 0.133 0.300 - - - 83.00 86.30% Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Rehab./Reconst./Upgrading of Santiago-

Tuguegarao Road (Victoria-Casili Section) 02/22/10 II 14.470 205 C 0.425 0.133 0.300 - - - 85.80 86.04% Satisfactory

Cauayan United Enterprises and Construction Builders 8816 Repair/Rehab. of Santiago-Tuguegarao

Road Ko 0407+055-Km. 413+000 02/22/10 II 9.998 70 C 0.408 0.148 0.300 - - - 85.60 85.60% Satisfactory

Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622

Const. (Conc.) of Daang Hari Ext. inc. RROW Acquisition, Jct. Molino Blvd. to Aguinaldo Highway Jct., Imus Section

08/28/08 IV-A 31.784 300 C 0.325 0.300 0.300 - - - 92.50 87.07% V. Satisfactory

Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622 Const. of Ditale Bridge and Approaches,

Brgy. Ditale 11/26/07 III 50.474 345 O 0.338 0.300 0.100 0.024 0.054 0.100 92.00 -

Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622 Const. of Ditale Bridge and Approaches,

Brgy. Ditale 02/23/08 III 50.474 345 O 0.353 0.269 0.070 0.030 0.059 0.067 84.80 -

Cavat Capitol Merchandising & Construction 3112 Conc. of Cagayan-Apayao National Road,

Tuao-Rizal Sect. 02/27/09 II 11.859 59 C 0.438 0.200 0.300 - - - 93.80 83.06% Satisfactory

Cavat Capitol Merchandising & Construction 3112 Conc. of Naruangan-Culong Road 02/27/09 II 6.266 210 C 0.446 0.200 0.300 - - - 94.60 82.18%

Satisfactory

CAVDEAL-Cavite Ideal International Construction and Development

Corporation5599

Const. of El Nido-Bataraza Road, CP 3B-1, Segments 1-8, Abo-abo-Brooke's Point-Rio

Tuba Section, (Sta. 128+026.93 to Sta. 247+923 w/ exception)

06/01/09 PJHL 1,988.008 730 O 0.325 0.300 0.150 0.030 0.042 0.050 89.70 -

CAVDEAL-Cavite Ideal International Construction and Development

Corporation5599

Const. of El Nido-Bataraza Road, CP 2A, El Nido-Taytay-Roxas Road Section, Segment 1-10 (Sta. 147+417.000 to Sta. 260+258.00)

09/08/09 PJHL 1831.020 730 O 0.385 0.294 0.150 0.030 0.065 0.050 97.40 -

Cavdeal-Cavite Ideal International Construction and Development

Corporation 5599

Const. of El Nido-Bataraza Road, Contract Package 2A, El Nido-Taytay-Roxas Road

Section, Segment 1-10 (Sta.147+417.000 to Sta. 260+258.00)

03/04/10 PJHL 1,831.020 730 O 0.348 0.300 0.150 0.030 0.061 0.050 93.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page83

Page 92: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Cavdeal-Cavite Ideal International Construction and Development

Corporation 5599

Const of El Nido-Bataraza Road, Contract Package 3B-3, Segment 1-8, Abo-abo

Brooke's Point-Rio Tuba Section, (Sta. 128+026.93 to Sta. 247+293.00 w/

exception)

03/02/10 PJHL 1,988.008 730 O 0.327 0.300 0.150 0.030 0.060 0.050 91.70 -

Cavite Ideal International Const. & Development Corp. 5599

Contract Package I, Baguio-Pangawan, Kayapa Section under Cordillera Road

Improvement Project (Baguio-Aritao Road Improvement Project)

02/23/07 PJHL 1,562.663 1,047 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -

Cavite Ideal International Const. & Development Corp. 5599

CP II, Abuyog-Silago Sect. Under the Arterial Road Links Dev't. Proj., Phase IV (Himayangan-Silago-Abuyog Road and

Liloan-San Ricardo Road Projects)

08/29/07 PJHL 942.477 1,133 C 0.353 0.300 0.300 - - - 95.30 94.66% Outstanding

Cavite Ideal International Const. & Development Corp. 5599

MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East & West Service Roads and

Pasong Tamo Ext.

02/18/08 URPO 524.467 752 O 0.367 0.300 0.100 0.030 0.060 0.100 95.70 -

Cavite Ideal International Const. & Development Corp. 5599

MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East & West Service Roads and

Pasong Tamo Ext.

05/28/08 URPO 629.011 752 O 0.345 0.300 0.100 0.030 0.047 0.100 92.20 -

Cavite Ideal International Const. & Development Corp. 5599

MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East & West Service Roads and

Pasong Tamo Ext.

11/15/08 URPO 629.011 752 O 0.360 0.300 0.100 0.030 0.042 0.100 93.20 -

Cavite Ideal International Const. & Development Corp. 5599 Naga-Toledo Road Project ARLDP Phase IV 08/24/07 PJHL 802.856 836 C 0.378 0.300 0.300 - - - 97.80 97.02%

Outstanding

CBN Construction 16851 Construction and Improvement of Sibud Main Drainage 3/16-21/09 NIA 6.299 408 C 0.368 0.200 0.300 - - - 86.75 86.75%

Satisfactory

CBN Construction & Supply 16851Conc. of Dancalan-Candoni-Damutan Valley Road, Talacdan Section, Brgy.

Talacdan05/30/09 VI 13.419 180 O 0.375 0.270 0.150 0.023 0.030 0.050 89.80 -

CBN Construction & Supply 16851 Conc. of Jct. San Enrique-Pontevedra By-Pass Road 03/01/08 VI 9.245 230 C 0.367 0.200 0.300 - - - 86.70 85.59%

V. Satisfactory

CBN Construction & Supply 16851 Const. and Improvement of Sibud Main Drainage 3/16-21/09 NIA 6.299 298 O 0.369 0.216 0.150 0.030 0.064 0.050 87.86 -

CBN Construction & Supply 16851 Road Upgrading, Jct. Palencia-Ara Al Campsite Road 11/20/08 VI 6.510 92 C 0.319 0.214 0.300 - - - 83.30 84.62%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page84

Page 93: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

CBN Construction & Supply 16851Conc. of Dancalan-Candoni-Damutan

Valley Road, Talacdan Sect., Brgy. Talacdan

09/17/09 VI 13.419 180 O 0.345 0.300 0.150 0.023 0.035 0.033 88.60 -

CBN Construction & Supply 16851Conc. of Dancalan-Candoni-Damutan Valley Rd., Talacdan Section, Brgy.

Talacdan03/08/10 VI 13.419 209 C 0.364 0.200 0.300 - - - 86.40 88.08%

Satisfactory

CCM Construction 11043 Tagbilaran Airport Development Project 03/27/09 DOTC 6.704 120 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory

CCM Construction 11043 Tagbilaran Airport Development Project 06/20/09 DOTC 18.481 150 O 0.356 0.300 0.150 0.020 0.045 0.050 92.10 -

CCM Construction 11043Tagbiliran Airport Development Project (Expansion/ Rehabilitation of Terminal

Building)2/25/2010 DOTC 4.809 120 C 0.463 0.200 0.300 - - - 96.30 96.30 %

Outstanding

CCM Construction 11043

Tagbiliran Airport Development Project (Shoulder Grade Correction of Runway,

Resurfacing of Vehicular Parking Area and Construction of Covered Sidewalk

2/25/2010 DOTC 18.481 150 C 0.449 0.199 0.300 - - - 93.20 93.20% V.Satisfactory

CCM Construction 11043Tagbiliran Airport Dev't Project

(Completion of Shoulder Grade Correction and Resealing of Cracks and Joints)

2/25/2010 DOTC 6.694 120 C 0.448 0.200 0.300 - - - 94.80 94.80% V. Satisfactory

CDC Construction and Supplies 28275Asphalting and Const. of Drainage System, Ilang Ilang St., Prk. 5, Brgy. New Cabalan,

Olongapo City05/23/09 III 1.901 45 C 0.431 0.200 0.000 - - - 63.10 70.96%

Poor

CDC Construction and Supplies 28275 Asphalting and Construction of Drainage System at Ilang-Ilang St. 03/04/09 III 1.901 45 O 0.356 0.298 0.000 0.030 0.028 0.050 76.20 -

CDC Construction and Supplies 28275 Completion of MPB @ Pamatawan 05/27/08 III 0.470 45 C 0.294 0.194 0.300 - - - 78.80 *78.88% Satisfactory

CDC Construction and Supplies 28275 Const. of 1 Cl 1 Storey Sch. Bldg. @ Manggahan E/S (Partial) 11/12/08 III 0.492 45 C 0.362 0.300 0.300 - - - 96.20 *96.20%

Outstanding

CDC Construction and Supplies 28275 Const. of 3 CL 1 Storey Sch. Bldg. @ Balaybay E/S (Partial) 11/12/08 III 1.319 120 C 0.346 0.290 0.300 - - - 93.60 *93.60%

Outstanding

CDC Construction and Supplies 28275 Const. of 3 CL Sch. Bldg. @ San Rafael E/S 03/04/08 III 1.721 120 C 0.359 0.276 0.300 - - - 93.50 81.88% V. Satisfactory

CDC Construction and Supplies 28275 Const. of Box Culvert at Tambac-Viga 05/30/08 I 1.140 90 C 0.260 0.300 0.300 - - - 86.00 *86.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page85

Page 94: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

CDC Construction and Supplies 28275 Const. of MPB (Phase I) 08/18/08 III 1.317 60 C 0.303 0.197 0.300 - - - 80.00 *80.00% Satisfactory

CDC Construction and Supplies 28275 Const. of Multi-Purpose Building, San Nicolas 03/04/09 III 1.419 60 C 0.496 0.200 0.300 - - - 99.60 *99.60%

Outstanding

CDC Construction and Supplies 28275 Const. of Sch. Bldg. @ Candelaria Sch. Of Fisheries 11/14/08 III 0.490 60 C 0.306 0.300 0.300 - - - 90.60 *90.60%

Outstanding

CDC Construction and Supplies 28275 Const. of School Building @ Iba E/S 03/03/09 III 0.894 60 C 0.388 0.133 0.300 - - - 82.10 *82.10% Satisfactory

CDC Construction and Supplies 28275 Construction of Multi-Purpose Building National High School 11/16/07 III 1.853 90 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

CDC Construction and Supplies 28275 Repair/Rehab. Along Olongapo-Bugallon Road 05/26/08 III 9.800 25 C 0.304 0.000 0.300 - - - 60.40 *60.40%

Fair

CDC Construction and Supplies 28275 Asphalt Overlay along Manila North Road, Km. 233+000-Km. 235+000 02/27/10 I 14.182 60 C 0.371 0.183 0.300 - - - 85.40 85.40%

Satisfactory

CDU Construction 13915Rehab./Reconst./Upgrading of Damaged Paved National Roads, along Catarman-

Calbayog Road05/27/09 VIII 19.010 210 C 0.395 0.133 0.300 - - - 82.80 *82.80%

Satisfactory

CDU Construction 13915 Const. of One CL School Building, Tarangnan NHS 11/28/07 VIII 0.382 90 C 0.385 0.100 0.300 - - - 78.50 *78.50%

Satisfactory

CDU Construction 13915Road Upgrading (Gravel to Paved)

Pangpang-Palapag-Mapanas-Gamay-Lapinig Road, Pangpang-Tinampo Section

09/12/09 VIII 18.900 200 C 0.425 0.144 0.300 - - - 86.90 87.02% Satisfactory

CDU Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Binaticlan-Magsaysay Sect. 09/12/09 VIII 18.770 200 O 0.340 0.240 0.150 0.030 0.050 0.050 86.00 -

CDU Construction 13915 Upgrading of Allen-Frederick National Road 09/14/09 VIII 8.652 120 O 0.337 0.240 0.150 0.030 0.050 0.050 85.70 -

CDU Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Laoang-Binaticlan Sect. 09/12/09 VIII 18.756 200 O 0.331 0.240 0.150 0.030 0.050 0.050 85.10 -

CDU Construction 13915 Upgrading of Allen-Cabacungan National Road 09/14/09 VIII 19.231 150 O 0.334 0.240 0.150 0.015 0.050 0.050 83.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page86

Page 95: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

CDU Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Magsaysay-Calomotan Sect. 09/12/09 VIII 18.788 200 C 0.395 0.144 0.300 - - - 83.90 *83.90%

Satisfactory

Cebu 7H Technochem Industries Inc. 31578 Construction of Two(2) units Classroom, Dapa National High School 03/07/09 XIII 0.964 90 C 0.415 0.128 0.300 - - - 84.30 *84.30%

Satisfactory

Cebu 7H Technochem Industries Inc. 31578

Rehab/Improvement of Road Leading to the Chocolate Hills (Asphalt Overlay) Loay

Interior Road, Km. 152.430-Km. 183.300 (w/ exception)

03/08/09 VII 28.319 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory

Cebu 7H Technochem Industries Inc. 31578 Conc. of Barangay Poblacion Rd. (with exception) 09/05/09 VII 0.952 50 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

Cebu 7H Technochem Industries, Inc. 31578 Impvt./Rehab. Along JCT. (TER) Loay

Interior Road 08/28/08 VII 8.806 50 C 0.180 0.300 0.300 - - - 78.00 *78.00% Satisfactory

Cebu Haydter Construction 31630 Const. of Drainage System @ Brgys. San Nicolas and Basak Pardo 09/06/07 VII 0.958 45 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

Cebu Haydter Construction 31630 Impvt. of MPB, Brgy. San Antonio 09/15/09 VII 0.482 75 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory

Cebu Haydter Construction 31630 Impvt. of Multi-Purpose Building, Brgy. Cogon Ramos 09/15/09 VII 0.482 75 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V. Satisfactory

Cedan Construction 10172 Rehab/Improvement of San Marcelino-San Antonio-San Narciso Road 05/26/09 III 19.011 30 C 0.385 0.200 0.300 - - - 88.50 *88.50%

Satisfactory

Cedan Construction 10172 Rehab./Reconst./Upgrading of San Marcelino-San Antonio-San Narciso Road 05/23/09 III 11.400 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%

Satisfactory

Cedan Construction 10172 Rehab./Impvt. of Mogpog-Sta. Cruz Road (Phase I) 11/27/08 IV-B 14.243 80 C 0.265 0.200 0.300 - - - 76.50 *76.50%

Satisfactory

Cedan Construction 10172Rehab./Reconst. of Damaged National

Road, Pangasinan-Zambales Road (Sual & Infanta Sect.)

11/27/08 I 21.229 80 C 0.212 0.201 0.300 - - - 71.30 *71.30% Satisfactory

Cedan Construction 10172 Repair of Dikes along Alusiis Creek 11/14/08 III 28.517 120 C 0.213 0.300 0.300 - - - 81.30 80.34% V. Satisfactory

Cedan Construction 10172Const./Replacement/Comp. and Repair of

Elementary And Secondary S/B at San Vicente E/S

09/02/09 III 1.338 120 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

Cedan Construction 10172Const./Replacement/Comp. and Repair of

Elementary and Secondary S/B at Bani NHS-Annex

09/02/09 III 0.955 120 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page87

Page 96: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Cedar Construction 24865 Rehab./Impvt. of Farm-to-Market Road, Brgy. San Antonio 05/18/09 III 4.005 44 C 0.360 0.200 0.300 - - - 86.00 84.50%

Satisfactory

Cedar Construction 24865 Impvt. of Angeles-Porac-Dinalupihan Road 11/10/08 III 9.601 105 C 0.236 0.300 0.300 - - - 83.60 90.26% Outstanding

Cedar Construction 24865 Impvt./Rehab. of Brgy. Roads at Quebiawan, San Agustin & Dolores 08/16/08 III 6.656 50 C 0.332 0.200 0.300 - - - 83.20 *83.20%

V. Satisfactory

Cedar Construction 24865 Impvt./Rehab. of Cabalantian Road 11/11/08 III 6.674 60 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

Cedar Construction 24865 Rehab/Improvement of Del Carmen Creek (Paskuhan Village Section) 02/23/09 III 4.786 60 C 0.375 - 0.500 - - - 87.50 *87.50%

Satisfactory

Cedar Construction 24865 Rehabilitation/Improvement of Farm-to-Market Road 02/23/09 III 4.005 44 O 0.385 0.200 0.150 0.030 0.020 0.050 83.50 -

Cedar Construction 24865 Repair/Rehab. of Jose Abad Santos Ave. (Formerly Gapan-Olongapo Road) 08/11/08 III 4.728 35 C 0.341 0.225 0.300 - - - 86.60 *86.60%

V. Satisfactory

Cedar Construction 24865Repair/Rehab. of Jose Abad Santos Ave.

(Formerly Gapan-Olongapo Road) Bacolor to City of San Fernando

08/11/08 III 4.771 35 C 0.346 0.226 0.300 - - - 87.20 *87.20% V. Satisfactory

Cedar Construction 24865 Repairs/Rehab. of Sapalibutad (Farm to Market Road) 02/26/09 III 4.703 45 C 0.388 0.133 0.300 - - - 82.10 *82.10%

Satisfactory

Celso C. Ferrer Contractor 10643 Concreting of Bambang-Kasibu-Quezon-Solano Road, (San Fernando Section) 06/01/09 II 14.224 120 C 0.419 0.133 0.300 - - - 85.20 84.24%

Satisfactory

Celso C. Ferrer Contractor 10643 Rehablitation of Daang Maharlika Road 06/02/09 III 28.950 74 C 0.325 0.200 0.300 - - - 82.50 *82.50% Satisfactory

Celso C. Ferrer Contractor 10643 Conc. of Bambang-Kasibu-Quezon-Solano Road (San Fernando Sect.) 11/27/08 II 47.758 120 O 0.366 0.240 0.100 0.030 0.033 0.067 83.60 -

Celso C. Ferrer Contractor 10643 Impvt./Conc. of Baler-Casiguran Road (Lobbot-Gupa Section) 11/26/08 III 47.860 180 C 0.314 0.300 0.300 - - - 91.40 93.92 %

Outstanding

Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of MPB @ Pilot Provincial Science

and Technology H/S 11/07/08 XII 1.907 65 O 0.211 0.300 0.100 0.030 0.016 0.067 72.40 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page88

Page 97: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Central Mindanao Const. Multi-Purpose Cooperative 23697

Slope Protection along Marbol River (Marbol Bridge), Kidapawan Magpet-

Pangao-an Road11/24/08 XII 1.149 72 C 0.200 0.300 0.300 - - - 80.00 * 80.00%

Satisfactory

Central Mindanao Construction Multi-Purpose Cooperative 23697 Conc. of Roxas-Arakan Valley Road,

Doroluman Section 05/30/09 R-XII 14.988 150 C 0.368 0.200 0.300 - - - 86.80 88.24% Satisfactory

Central Mindanao Construction Multi-Purpose Cooperative 23697 Concreting of Paco-Roxas-Arakan Valley,

Doroluman Section 03/10/09 XII 14.988 150 O 0.391 0.300 0.078 0.030 0.060 0.033 89.20 -

Central Mindanao Construction Multi-Purpose Cooperative 23697 Const. of MPB @ Pilot Provincial Science

and Technology H/S 03/02/09 XII 1.907 79 C 0.427 0.133 0.300 - - - 86.00 76.48% Unsatisfactory

Central Mindanao Construction Multi-Purpose Cooperative 23697

Conc. of Paco-Roxas-Arakan Road, Pontevedra Section Km. 1656+100-Km.

1656+75009/05/09 XII 9.337 150 O 0.376 0.300 0.150 0.015 0.047 0.050 93.80 -

Central Mindanao Construction Multi-Purpose Cooperative 23697 Conc. of Paco-Roxas-Arakan Road, CFCST

Section (KM. 1667+200-Km. 1667+963.65 09/05/09 XII 9.251 120 O 0.362 0.300 0.150 0.015 0.047 0.050 92.40 -

Central Mindanao Construction Multi-Purpose Cooperative 23697

Conc. of Paco-Roxas-Arakan Road, inclined Section, Km. 1641+043.38 - Km.

1641+900.7603/02/10 XII 15.167 180 C 0.336 0.200 0.300 - - - 83.60 83.60%

Satisfactory

Cesar T. Carpio Construction 20833 Concreting of Naval-Caibiran Cross County Road, So. Cansceso Section 06/04/09 VIII 4.815 150 C 0.362 0.200 0.300 - - - 86.20 *86.20%

V. Satisfactory

Cesar T. Carpio Construction 20833Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-Canjumadal

Road05/15/08 VIII 9.295 180 O 0.240 0.225 0.100 0.030 0.037 0.100 73.20 -

Cesar T. Carpio Construction 20833Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-Canjumadal

Road08/31/08 VIII 9.295 180 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -

Cesar T. Carpio Construction 20833 Repair/Rehab. of Catarman-Calbayog Road 08/26/08 VIII 9.594 150 O 0.364 0.240 0.100 0.030 0.032 0.100 86.60 -

CGGA Builders & Enterprises 23762 Const. of 1-CL @ Esperansa E/S 02/27/10 VIII 0.486 90 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory

Cha Construction & Supply 28420 Construction of San Francisco-San Vicente 03/02/10 V 3.820 120 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory

Cha Construction and Supply 28420 Const. of Roads, San Antonio-Siembre Road 03/12/09 V 11.347 90 C 0.422 0.200 0.300 - - - 92.20 *92.20%

V. Satisfactory

Cha Construction and Supply 28420 Repair of One CL Sch. Bldg., La Purisima E/S 11/25/08 V 0.283 75 C 0.387 0.200 0.300 - - - 88.70 *88.70%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page89

Page 98: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Cha Construction and Supply 28420 Road Concreting at San Lucas-Poro Access Road 03/05/08 V 1.405 75 C 0.312 0.300 0.300 - - - 91.20 *91.20%

Outstanding

Cha Construction and Supply 28420 Road Concreting at Talidtid-Sta. Cruz 08/31/07 V 1.891 90 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

Cha Construction and Supply 28420 Road Concreting of Bonot-Sta. Rosa Road 05/29/08 V 1.891 60 C 0.297 0.200 0.300 - - - 79.70 *79.70% Satisfactory

Charlmelday Construction Supply & Services 32181 Rehabilitation of Sta. Cruz RIS 3/3-7/2008 NIA 4.531 150 C 0.364 0.18 0.300 - - - 84.40 84.40%

V. Satisfactory

Charlz Construction 8709 Construction of Tagbao Road, Brgy. Tagbao 06/10/09 VII 2.831 60 C 0.350 0.134 0.300 - - - 78.40 *78.40%

Unsatisfactory

Charlz Construction 8709 Const. of DPWH Bukidnon 3rd DEO Building (Phase III), Diklum 05/29/09 X 4.795 90 O 0.350 0.263 0.150 0.030 0.011 0.033 83.70 -

Charlz Construction 8709 Completion of Brgy. Azucena MPB 08/24/08 XIII 0.961 90 C 0.328 0.200 0.000 - - - 52.80 71.91% Satisfactory

Charlz Construction 8709 Completion of MPB @ Brgy. 18 11/19/07 X 0.456 50 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding

Charlz Construction 8709 Conc. of N.G. Escario Extension (from Gorordo Ave. to Arch. Reyes Ave.) 09/06/07 VII 7.715 180 O 0.309 0.300 0.100 0.030 0.040 0.100 87.90 -

Charlz Construction 8709 Conc. of N.G. Escario Extension (from Gorordo Ave. to Arch. Reyes Ave.) 12/03/07 VII 7.715 180 O 0.330 0.200 0.100 0.023 0.033 0.100 78.60 -

Charlz Construction 8709 Const. of 2 Units, 2 Storey, 10 CL @ Taptap E/S Bldg. 03/03/09 VII 13.360 195 C 0.281 0.177 0.300 - - - 75.80 83.29%

Satisfactory

Charlz Construction 8709 Const. of 3 CL for the Camaman-an NHS 08/21/07 X 1.402 120 C 0.348 0.184 0.300 - - - 83.20 *83.20% V. Satisfactory

Charlz Construction 8709 Const. of Covered Canal, Misamis Oriental-Bukidnon-Agusan Road 08/20/08 X 4.729 140 C 0.290 0.200 0.300 - - - 79.00 81.64%

V. Satisfactory

Charlz Construction 8709Const. of Pedestrian Overpass (Skywalk) across Imus St., near Sikatuna St. Jct.,

Brgy. Zapatera-T. Padilla03/12/08 VII 4.695 150 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page90

Page 99: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Charlz Construction 8709 Const. of Tertiary Sch. Bldg. (NBCC Phase II) 08/25/07 X 2.360 90 C 0.262 0.157 0.300 - - - 71.90 73.44%

Satisfactory

Charlz Construction 8709 Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang Road 03/07/07 X 22.146 270 O 0.291 0.151 0.100 0.023 0.045 0.100 71.00 -

Charlz Construction 8709 Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang Road 06/06/07 X 22.155 300 O 0.308 0.056 0.100 0.030 0.065 0.100 65.90 -

Charlz Construction 8709 Const. of Two (2) Storey DPWH Office Building 03/06/09 X 2.888 180 C 0.373 0.133 0.300 - - - 80.60 82.84%

Satisfactory

Charlz Construction 8709 Const. of Two-Storey DPWH Office Bldg. 03/04/08 X 2.878 145 C 0.393 0.200 0.300 - - - 89.30 84.19% V. Satisfactory

Charlz Construction 8709Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving

along Balingasag-Binuangan Sect.)03/05/08 X 38.539 240 O 0.243 0.300 0.050 0.030 0.047 0.033 70.30 -

Charlz Construction 8709Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving

along Balingasag-Binuangan Sect.)05/20/08 X 38.539 289 O 0.263 0.300 0.100 0.030 0.050 0.100 84.30 -

Charlz Construction 8709Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving

along Balingasag-Binuangan Sect.)08/24/08 X 38.527 379 O 0.316 0.300 0.100 0.015 0.041 0.100 87.20 -

Charlz Construction 8709 Replacement of Datu Bailey Bridge to RCBC (Jct. Osmeña-Pilar Road) 08/26/08 XIII 11.567 165 C 0.328 0.300 0.000 - - - 62.80 69.70%

Fair

Charlz Construction 8709 Const. of DPWH 1st DEO Building 09/03/09 X 4.812 150 C 0.455 0.172 0.300 - - - 92.70 *92.70% V. Satisfactory

Charlz Construction 8709Rehab./Reconst. (Asphalt to Concrete) of Jct. S.H. Manolo Fortich Libona-Indahag

Rd., (Kiliog Section)09/04/09 X 19.210 150 O 0.394 0.236 0.150 0.030 0.047 0.033 89.00 -

Charlz Construction 8709 Const. of DPWH Bukidnon 3rd DEO Building (Phase III), Dicklum 09/04/09 X 4.795 90 C 0.499 0.165 0.300 - - - 96.40 87.51%

Satisfactory

Charlz Construction 8709

Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving

along Balingasag-Binuangan Section w/ exceptions)

09/17/09 X 38.527 379 C 0.372 0.133 0.300 - - - 80.50 80.56% Unsatisfactory

Chedmaryl Construction & Supplies 27073 Const./Repair of MPB 12/03/08 VI 1.903 75 C 0.289 0.000 0.300 - - - 58.90 76.75% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page91

Page 100: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Che-riss Construction & Trading 26557 Repair/Maintenance of Public School Teachers Association, Catalina St. 09/09/09 NCR 0.720 45 C 0.428 0.133 0.300 - - - 86.10 *86.10%

Satisfactory

Che-Riss Constructon & Trading 26557 Riprapping of Creek 08/28/07 IVA 1.918 120 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Chiara Construction 8736 Const. of 18 LM RCDG Bridge along San Fernando Bypass Road 02/24/09 I 9.399 270 C 0.366 0.200 0.300 - - - 86.60 82.58%

Satisfactory

Chiara Construction 8736 Const. of Two (2) Storey Building / Library at Tarlac State University, Lucinda Campus 11/13/08 III 14.416 270 O 0.388 0.180 0.100 0.030 0.022 0.100 82.00 -

Chiara Construction 8736 Construction of 2-Storey Building / Library at Tarlac State University 02/27/09 III 14.399 270 C 0.439 0.176 0.300 - - - 91.50 84.85%

Satisfactory

Chico Engineering and Construction 32395 Const. of Multi-Purpose Building, Sitio Pospos, Brgy. Caluttit 05/23/09 CAR 1.445 120 O 0.400 0.300 0.000 0.020 0.029 0.025 77.40 -

Chico Engineering and Construction 32395 Const. of Multi-purpose Building, Sitio Pospos, Brgy. Caluttit 08/28/09 CAR 1.445 248 O 0.355 0.263 0.150 0.020 0.038 0.033 85.90 -

Chico Engineering and Construction 32395 Const. of Multi-Purpose Building, Sitio Pospos, Brgy. Caluttit 02/26/10 CAR 1.445 246 C 0.392 0.200 0.300 - - - 89.20 83.92%

Satisfactory

Chief Construct Trading & Supplies, Inc. 30094

Road Conc. of Provincial Road Cacarong Matanda-Pandi & Daungan, Guiguinto,

Bagong Silang11/19/07 III 0.952 14 C 0.265 0.200 0.300 - - - 76.50 *76.50%

Satisfactory

China Geo-Engineering (Phil.) Corporation

SL2-SN-00054

Const. of Super Diversion Canal(Sta. 19+200 to Sta. 26+600) 08/01/07 NIA-III 1215.409 1386 O 0.343 0.200 0.100 0.024 0.042 0.200 90.90 -

China Geo-Engineering (Phils.) Corporation FC-03-021 Casecnan Multi-purpose Irrigation & Power

Project-IC 12/10-12/08 NIA 1.242 1,605 C 0.340 0.300 0.300 - - - 93.96 93.96% Outstanding

China Harbour Engineering Company

SL1-SN-005059/FC-

07-005CP5, Cervantes-Mankayan-Abatan, Phase V 03/11/09 PJHL 682.076 812 O 0.365 0.300 0.150 0.030 0.070 0.050 96.50 -

China Harbour Engineering Company FC-98-264 CP5, Cervantes-Mankayan-Abatan, Phase V 11/14/08 PJHL 682.000 812 O 0.369 0.300 0.100 0.030 0.051 0.100 95.00 -

China Harbour Engineering Company FC-07-005

Contract Package 5, Cervantes-Mankayan-Abatan under Arterial Road Links

Development Project, Phase V, Sta.383+135 to Sta. 414+679.38

08/27/09 PJHL 682.076 812 O 0.373 0.240 0.150 0.030 0.056 0.033 88.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page92

Page 101: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

China International Water & Electric Company

SL1-SN-004851

Bago River Irrigation System Rehabilitation & Improvement Project (Rehabilitation,

Improvement and Cons. Of BRIS Facilities)12/10-16/07 NIA-VI 731.862 1,080 O 0.317 0.244 0.050 0.024 0.033 0.033 70.00 -

China International Water & Electric Corp. FC-05-0003 IFCP Phase II, Package II, Impvt. Of Jaro

Mouth, Iloilo River & Upper Ignore Creek 03/13/08 MFCP-I 556.925 1,080 O 0.368 0.200 0.100 0.030 0.065 0.200 96.30 -

China International Water & Electric Corp. FC-03-028 IFCP Phase II, Package II, Impvt. of Jaro

Mouth, Iloilo River & Upper Ingore Creek 03/02/07 MFCP-I 507.803 1,080 O 0.383 0.200 0.100 0.030 0.060 0.200 97.30 -

China International Water & Electric Corp. FC-05-0003 IFCP Phase II, Package II, Impvt. Of Jaro

Mouth, Iloilo River & Upper Ingore Creek 11/21/07 MFCP-I 549.395 1,080 O 0.383 0.200 0.100 0.030 0.061 0.200 97.40 -

China International Water & Electric Corporation

SLI-SN-004852

Casecnan Multi-purpose Irrigation & Power Project 9/15-19/08 NIA 476.722 798 C 0.376 0.300 0.300 - - - 93.05 93.05%

Outstanding

China International Water & Electric Corporation FC-05-003 Const. of Package No.2 Impvt. of Jaro River

Mouth, Iloilo River and Upper Ignore Creek 03/03/10 MFCP1 1,136.205 1,440 C 0.414 0.200 0.300 - - - 91.40 94.94% V. Satisfactory

China International Water and Electric Company

SL1-SN-004851

Bago River Irrigation System Rehabilitation & Improvement of Project 10/19-21/09 NIA 0.820 1,263 C 0.428 0.191 0.300 - - - 91.90 91.90%

Satisfactory

China Road & Bridge CorporationSL-I-SN-

004585/FC-03-029

Contract Package I, Himayangan Silago Sect., Arterial road links Dev't. Project,

Phase IV12/01/07 PJHL 914.127 1,169 C 0.346 0.300 0.300 - - - 0.95 94.60%

Outstanding

China Road & Bridge Corporation SL-2-SN-000631

Contract Package III, Calbayog-Gatanguit Road Sect., Arterial road links Dev't.

Project, Phase VI05/18/08 PJHL 1,397.424 1,020 O 0.398 0.300 0.100 0.030 0.070 0.100 99.80 -

China Road & Bridge Corporation SL-2-SN-000631

Contract Package III, Calbayog-Gatanguit Road Sect., Arterial road links Dev't.

Project, Phase VI12/02/08 PJHL 1,397.424 1,020 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -

China Road & Bridge Corporation SL2-SN-000479

CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) Km.175+423-

Km.204+609/Km.0+000-Km.50+53703/05/07 PJHL 1,135.918 1,100 O 0.352 0.300 0.100 0.030 0.070 0.100 95.20 -

China Road & Bridge Corporation SL2-SN-000479

CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) Km.175+423-

Km.204+609/Km.0+000-Km.50+53708/24/07 PJHL 1,135.918 1,100 O 0.349 0.300 0.100 0.030 0.070 0.100 94.90 -

China State (Phils.) Construction Eng'g. Corp. FC-02-072

CP 2, Catarman-Calbayog via Lope de Vega Road under the Arterial Road Links

Development Project, Phase V09/04/07 PJHL 643.720 1,092 C 0.349 0.300 0.300 - - - 94.90 92.07%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page93

Page 102: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

China State (Phils.) Construction Eng'g. Corp.

SL1-SN-004865

CP No. C-5, Metro Manila Urban Transport Integration Project (MMURTRIP), NLEX

Junction to North Fairview02/18/08 URPO 486.343 720 O 0.271 0.250 0.100 0.020 0.060 0.100 80.10 -

China State (Phils.) Construction Eng'g. Corp.

SL1-SN-004865

CP No. C-5, Metro Manila Urban Transport Integration Project (MMURTRIP), NLEX

Junction to North Fairview05/27/08 URPO 486.343 720 O 0.360 0.243 0.100 0.030 0.047 0.100 88.00 -

China State (Phils.) Construction Eng'g. Corp.

SL1-SN-004865

CP No. C-5, Metro Manila Urban Transport Integration Project (MMURTRIP), NLEX

Junction to North Fairview11/24/08 URPO 606.345 720 O 0.340 0.300 0.050 0.030 0.056 0.067 84.30 -

China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)

SL1-SN-004611/FC-

03-045

Metro Manila Urban Transport Integration Project (MMURTRIP), Phase I, Package 3:

Marikina Bridge and Access Road08/30/07 URPO 1,178.833 861 C 0.387 0.300 0.300 - - - 98.70 94.56%

Outstanding

China State Construction Engineering Corporation FC-02-039 Casecnan Multi-purpose Irrigation & Power

Project 9/15-19/08 Casecnan MIPP 562.647 1,380 C 0.360 0.300 0.300 - - - 96.00 96.00%

Outstanding

CHL Construction and Development Enterprises, Inc. 15001

Conc. of Road and Reblocking, Marbel-makar Road, Matin-ao Silway 8, (Km.

1664+527.76 - Km. 1665+895)06/09/09 R-XII 15.114 180 O 0.322 0.300 0.000 0.030 0.055 0.033 74.00 -

CHL Construction and Development Enterprises, Inc. 15001 Conc./Widening of Marbel-Tupi-Makar

Road (Glamang-Silway 8 Section) 03/06/08 XII 8.674 252 C 0.385 0.214 0.300 - - - 89.90 88.22% V. Satisfactory

CHL Construction and Development Enterprises, Inc. 15001 Concreting of Road & Reblocking, Marbel-

Makar Road 03/20/09 XII 15.114 180 O 0.368 0.300 0.150 0.030 0.054 0.050 95.20 -

CHL Construction and Development Enterprises, Inc. 15001 Const. of Circumferential Road (Western

Section) 09/03/08 XII 3.822 90 C 0.328 0.285 0.300 - - - 91.30 *91.30% Outstanding

CHL Construction and Development Enterprises, Inc. 15001 Conc. of Road & Reblocking, Marbel-Makar

Road, Matin-ao, Silway 8 03/12/10 XII 15.114 180 C 0.378 0.200 0.000 - - - 57.80 73.88% Poor

Cholo Construction & Trading 32138 Construction of Multi-Purpose Building 05/19/09 III 1.427 35 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding

Cholo Construction & Trading 32138 Const./Conc./Rehab./Completion of San Miguel Brgy. Road 11/11/08 III 0.472 30 C 0.328 0.200 0.300 - - - 82.80 81.90%

V. Satisfactory

Cholo Construction & Trading 32138 Const./Repair/Completion of San Juan FMR 08/31/07 III 0.952 35 C 0.298 0.300 0.300 - - - 89.80 *89.80% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page94

Page 103: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Chrisman Construction and Supplies 33274 Concreting of San Pedro Road 09/04/09 V 1.437 180 C 0.420 0.141 0.300 - - - 86.10 *86.10% Satisfactory

Christian Ian Construction Corporation 8191

Impvt. (Widening/Conc.) of McArthur Highway (MNR) Tarlac Section, Phase IV,

Package I (Bamban-Capas Section)06/05/09 III 63.849 240 C 0.336 0.200 0.300 - - - 83.60 88.34%

Satisfactory

Christian Ian Construction Corporation 8191

Const. of Dibunog Bridge & App. and Sambay Bridge & App. (CP 1) along Baler-

Casiguran Road03/06/09 III 24.826 150 C 0.458 0.200 0.300 - - - 95.80 *95.80%

V. Satisfactory

Christian Ian Construction Corporation 8191 Const., Repair, Rehab. and Completion of

MPB at Brgy. Lawy 03/09/09 III 2.378 90 C 0.459 0.139 0.300 - - - 89.80 *89.80%V. Satisfactory

Christian Ian Construction Corporation 8191

Impvt./Widening of McArthur Highway Phase III, Package IV, Replacement of

Tiaong Bridge11/30/07 III 38.596 190 C 0.240 0.180 0.300 - - - 72.00 *72.00%

Satisfactory

Christian Ian Construction Corporation 8191

Rehab./Replacement of San Luis Bridge and App. along San Luis-Sto. Domingo

Road03/11/09 III 113.287 546 C 0.464 0.200 0.300 - - - 96.40 89.56%

V. Satisfactory

Christian Ian Construction Corporation 8191 Improvement/Rehab.of Daang Maharlika

Road 09/05/09 III 41.225 180 O 0.342 0.300 0.150 0.030 0.050 0.033 90.50 -

Cielito A. Bay-ag Construction 19032 Const. of Jct. National-Bitnong-Belance-NV Bdry. Rd. Belance Section 06/03/09 II 9.645 180 C 0.430 0.133 0.300 - - - 86.30 *86.30%

Satisfactory

Cielito A. Bay-ag Construction 19032 Concreting of Aritao-Quirino Road, Lupa Section 06/04/09 II 9.606 120 O 0.338 0.240 0.150 0.030 0.051 0.033 84.20 -

Ciriaco Corporation 6932 Construction of Delfin Albano Bridge (SA #2), Along Tumauini-Delfin Albano Road 05/22/09 II 234.155 360 O 0.377 0.300 0.150 0.030 0.051 0.050 95.80 -

Ciriaco Corporation 6932Const. of Cansaga Bay Bridge, Contract

Package I, Cebu North Coastal Road Project, Metro Cebu

06/06/09 MCDP 2,366.958 600 O 0.395 0.294 0.150 0.030 0.060 0.033 96.20 -

Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfin Albano Road (SA #1) 08/13/08 II 234.155 360 O 0.400 0.296 0.100 0.030 0.060 0.100 98.60 -

Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfin Albano Road (SA #1) 05/20/08 II 198.304 360 O 0.350 0.263 0.100 0.030 0.032 0.100 87.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page95

Page 104: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfin Albano Road (SA #2) 11/18/08 II 234.155 360 O 0.391 0.300 0.100 0.030 0.061 0.067 94.90 -

Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfin Albano Road (SA #2) 03/05/09 II 234.155 360 O 0.388 0.300 0.150 0.030 0.050 0.050 96.80 -

Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfina Albano Road 05/21/07 II 198.304 360 O 0.380 0.000 0.100 0.030 0.033 0.100 64.30 -

Ciriaco Corporation 6932

Reconstruction of Governor Generoso I (Bankerohan) Bridge over Davao River along Davao-Cotabato Road McArthur

Highway

09/03/08 XI 206.649 210 C 0.376 0.300 0.300 - - - 97.60 94.66% Outstanding

Ciriaco Corporation 6932 Proposed Const. of Underpass along Mindanao Ave. crossing Quirino Highway 02/21/10 NCR 304.940 180 O 0.361 0.262 0.150 0.030 0.056 0.033 89.20 -

Clifford Construction Corporation 3724 Road Upgrading (Gravel to Concrete) Altavas-Jamindan Road 06/06/09 VI 3.849 150 O 0.362 0.246 0.150 0.023 0.045 0.033 85.90 -

Clifford Construction Corporation 3724 Road Upgrading / Concreting along Altavas-Jamindan Road 06/06/09 VI 22.278 336 O 0.357 0.300 0.080 0.023 0.045 0.017 82.20 -

Clifford Construction Corporation 3724 Conc. of Iloilo East-West Road, San Rafael-Passi Section 03/14/08 VI 19.094 180 C 0.364 0.200 0.300 - - - 86.40 85.20%

V. Satisfactory

Clifford Construction Corporation 3724 Conc. of Jct. Bancal-Leon-Antique Bdry. Road, Alimodian-Leon Section 05/21/08 VI 4.833 180 C 0.294 0.226 0.300 - - - 82.00 85.30%

V. Satisfactory

Clifford Construction Corporation 3724Road Upgrading (Gravel to Concrete),

Mandurriao-San Miguel-Alimodian-Maasin Rd.

03/19/09 VI 25.700 240 O 0.346 0.300 0.150 0.030 0.045 0.033 90.40 -

Clifford Construction Corporation 3724 Road Upgrading / Concreting along Altavas-Jamindan Road 03/14/09 VI 21.841 210 O 0.330 0.294 0.150 0.030 0.055 0.033 89.20 -

Clifford Construction Corporation 3724 Road Upgrading of Altavas-Jamindan Road 09/05/09 VI 3.849 150 C 0.438 0.139 0.300 - - - 87.70 86.62% Satisfactory

Clifford Construction Corporation 3724 Road Upgrading/Conc. along Altavas-Jamindan Road 09/05/09 VI 22.278 349 O 0.336 0.287 0.110 0.023 0.040 0.017 81.30 -

Clifford Construction Corporation 3724 Road Upgrading of Mandurriao-San Miguel-Alimodian-Maasin Rd. 03/05/10 VI 25.699 291 C 0.386 0.196 0.300 - - - 88.20 89.52%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page96

Page 105: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

CLTG Builders 16852 Construction of Mandug River Control 06/11/09 XI 9.442 180 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory

CLTG Builders 16852 Concrete Revetment of Sasa Creek along Davao-Agusan Road 09/03/08 XI 3.770 165 C 0.214 0.300 0.300 - - - 81.40 80.32%

V. Satisfactory

CLTG Builders 16852 Impv't/Conc. of Toril-Bayabas-Eden Road 11/20/07 XI 2.788 120 C 0.340 0.300 0.300 - - - 94.00 92.80% Outstanding

CLTG Builders 16852Rehab./Reconst. of Damaged Paved National Roads at Daang Maharlika,

Bunawan Section, Davao City09/16/09 XI 9.642 180 C 0.488 0.133 0.300 - - - 92.10 *92.10%

V. Satisfactory

CLTG Builders 16852Rehab./Reconst./Uograding of Damaged Road National Roads @ Daang Maharlika

(MN), Ilang Tibungco Sec.09/16/09 XI 9.652 180 C 0.481 0.133 0.300 - - - 91.40 *91.40%

V. Satisfactory

CLTG Builders 16852 Const. of Multi-Purpose Building at Bunawan Aplaya E/S 03/10/10 XI 2.358 112 C 0.345 0.200 0.300 - - - 84.50 84.50%

Satisfactory

CLV Enterprises 18512 Completion of MPB (Phase III) 11/19/08 X 0.267 30 C 0.367 0.231 0.300 - - - 89.80 *89.80% V. Satisfactory

CLV Enterprises 18512 Const. of Multi-Purpose Bldg. Cawayan 02/24/10 X 0.939 119 C 0.403 0.133 0.300 - - - 83.60 83.04% Satisfactory

CM Tan Construction (Formerly: CM Tan Const. Supplies) 28087 Const./Widening of Dinagat-Loreto Road

(Busay-Pangi Sect.) 08/24/07 XIII 2.500 180 C 0.320 0.300 0.000 - - - 62.00 67.88% Faiir

Coastland Construction and Development Corp. 11487 Conc. of Bilawan Road 11/27/08 XI 0.945 90 C 0.262 0.300 0.300 - - - 86.20 83.68%

V. Satisfactory

Coastland Construction and Development Corp. 11487 Conc. of Mati-Maragusan Road (Tawas-

Taguibo Section) 03/11/09 XI 14.021 145 C 0.361 0.200 0.300 - - - 86.10 86.40% Satisfactory

Coastland Construction and Development Corp. 11487 Const./Impvt. of Poblacion-Pintatagan

Section along Mati-Tagum Road 08/26/08 XI 9.441 120 C 0.274 0.285 0.300 - - - 85.90 84.10% V. Satisfactory

Coastland Construction and Development Corp. 11487

Maint./Rehab. & Impv't. of National Roads of Davao Oriental-Surigao del Sur Road,

Piso Sect.09/01/07 XI 9.784 120 C 0.280 0.200 0.300 - - - 78.00 *78.00%

Satisfactory

Coastland Construction and Development Corp. 11487 Mati Airport Development Project 06/19/09 DOTC 13.459 120 C 0.418 0.200 0.300 - - - 91.80 91.80%

V. Satisfactory 07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page97

Page 106: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Coastland Construction and Development Corporation 11487

Rehab./Reconst./Upgrading of Damaged Paved National Road along Davao Oriental Surigao Del Sur Coastal Road (Pintatagan-

Puntalinao Road)

09/14/09 XI 14.465 100 C 0.421 0.133 0.300 - - - 85.40 89.30% V. Satisfactory

Coastland Construction and Development Corporation 11487

Maintenance and Rehab. of Davao Oriental-Surigao del Sur Coastal Rd., Km. 718.057-

Km. 722+100 w/ exception)03/02/10 XI 4.921 45 C 0.466 0.133 0.300 - - - 89.90 89.90%

V. Satisfactory

Cofejok Construction and Supply 27493 Const. of One (1) Unit Two (2) CL Academic S/B at Pres. Quirino NHS 06/02/09 R-XII 0.929 100 C 0.456 0.200 0.300 - - - 95.60 *95.60%

V. Satisfactory

Cofejok Construction and Supply 27493 Completion of MPB at Brgy. Estrella 11/25/08 XII 1.190 120 C 0.33 0.261 0.300 - - - 89.10 *89.10% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of 1 CL Sch. Bldg. at San Emmanuel NHS 03/04/08 XII 0.492 75 C 0.399 0.131 0.300 - - - 83.00 *83.00%

V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB 05/16/08 XI 1.714 110 C 0.332 0.200 0.300 - - - 83.20 88.03% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB @ Esperanza NHS 08/27/08 XII 0.922 90 C 0.33 0.257 0.300 - - - 88.70 86.04% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB @ New Panay NHS 08/27/08 XII 0.920 90 C 0.365 0.267 0.300 - - - 93.20 82.00% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of MPB at Bayya E/S 08/29/07 XII 0.481 75 C 0.374 0.072 0.300 - - - 74.60 81.46% V. Satisfactory

Cofejok Construction and Supply 27493 Const. of Sch. Bldg. at Brgy. Biwang E/S 08/29/07 XII 0.461 75 C 0.281 0.072 0.300 - - - 65.30 *65.30% Fair

Cofejok Construction and Supply 27493 Impvt. of MPB, Poblacion 03/15/09 XII 1.882 84 C 0.457 0.200 0.300 - - - 95.70 83.45% Satisfactory

Cofejok Construction and Supply 27493 Repair of MPB @ Municipal Trial Court Poblacion 03/13/09 XII 0.288 55 C 0.485 0.133 0.300 - - - 91.80 86.48%

Satisfactory

Cofejok Construction and Supply 27493 Repair/Rehab. of One (1) Unit Three (3) CL Academic S/B at Arsenio E/S 09/09/09 XII 0.464 45 C 0.445 0.200 0.300 - - - 94.50 *94.50%

V. Satisfactory

Colina Construction 18841 Const. of 1 unit School Building 08/23/08 V 0.461 120 C 0.286 0.200 0.300 - - - 78.60 *78.60% Satisfactory

Collera's Construction 13246 Construction/Impvt. of Liloan-San Ricardo-Bahay Circumferential Road 05/26/09 VIII 18.680 300 C 0.354 0.200 0.300 - - - 85.40 *85.40%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page98

Page 107: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Collera's Construction 13246 Concrete Paving of Sta. Fe-San Isidro-Pulak Road 08/21/07 VIII 4.748 120 C 0.333 0.300 0.300 - - - 93.30 88.02%

V. Satisfactory

Collera's Construction 13246 Rehab. of Government Center Road Network 09/02/08 VIII 9.640 120 C 0.370 0.200 0.300 - - - 87.00 86.76%

V. Satisfactory

Columbian Construction Services 27865 Impvt. of Camalog FMR 05/28/09 CAR 0.276 70 C 0.341 0.066 0.300 - - - 70.70 -

Compact Builders, Inc 14492 Const. of 1 unit 3-Storey, 15-Classroom School Building 12/10/09 NHA 21.491 210 O 0.291 0.300 0.121 0.030 0.038 0.050 83.00 -

Compact Builders, Inc 14492 Construction of Livehood, Productivity & Training Center 02/09/10 NHA 4.992 120 O 0.334 0.300 0.150 0.030 0.059 0.923 92.30 -

Compact Construction & Development, Inc. 2358

Const. of Multi-Purpose Building (Cancer Care Institute), Cotabato Regional Medical

Center Compound05/26/09 R-XII 9.539 145 C 0.417 0.200 0.300 - - - 91.70 88.76%

Satisifactory

Compass Rose Builders 27024 Conc. of Bua FMR 11/11/08 CAR 0.189 10 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory

Compass Rose Builders 27024 Const. of Poblacion Water System Phase II 03/02/08 CAR 0.939 49 C 0.365 0.000 0.300 - - - 66.50 *66.50% Fair

Compass Rose Builders 27024 Repair/Rehab. of Pacalso E/S 11/11/08 CAR 0.286 30 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory

Concepcion Basic Builders inc. 5255 Const. of Tago-Lapaz Bridge along Surigao-Davao Coastal Rd. (Alternate Rd.) 09/08/09 XIII 106.050 420 O 0.390 0.240 0.150 0.030 0.060 0.050 92.00 -

Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along Surigao-

Davao Coastal Road 06/06/09 XIII 81.615 365 O 0.400 0.300 0.097 0.030 0.056 0.050 93.30 -

Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge, Surigao-

Davao Coastal Road 06/04/09 XIII 106.050 390 O 0.326 0.300 0.150 0.030 0.056 0.050 91.20 -

Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge Approaches

and Access Road 08/21/08 X 29.128 330 C 0.356 0.252 0.300 - - - 90.80 88.82% V. Satisfactory

Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along Surigao-

Davao Coastal Road 11/27/08 XIII 81.615 365 O 0.286 0.300 0.100 0.030 0.059 0.100 87.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page99

Page 108: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Concepcion Basic Builders, Incorporated 5255 Const. of Tago-La Paz Bridge along SDCR

(Alternate Route) 11/26/08 XIII 106.050 390 O 0.276 0.300 0.070 0.030 0.059 0.100 83.50 -

Concepcion Basic Builders, Incorporated 5255 Construction of Tago-Lapaz Bridge 03/11/09 XIII 106.050 390 O 0.320 0.300 0.150 0.030 0.042 0.050 89.20 -

Concepcion Basic Builders, Incorporated 5255 Repair/Rehab. of Patin-ay Bridge 2, Agusan-

Davao Road 09/01/08 XIII 10.468 305 C 0.370 0.293 0.300 - - - 96.30 94.53% Outstanding

Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge (Completion) along

Surigao-Davao Coastal Rd. 03/03/10 XIII 92.432 340 O 0.373 0.235 0.150 0.030 0.050 0.033 87.10 -

Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge 03/04/10 XIII 92.639 285 C 0.426 0.133 0.300 - - - 85.90 85.90%

Satisfactory

Congimar Mechanical Services 31490 Const. of Multi-Purpose Building @ Bacnono 05/22/09 I 0.957 96 C 0.489 0.122 0.300 - - - 91.10 *91.10%

V.Satisfactory

Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase I 05/29/08 II 0.961 60 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase II 05/29/08 II 0.770 45 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

Constructicon's Inc. 31632 Partial Completion of Multi-Purpose (Covered Court) Building 08/24/09 IVA 6.740 150 C 0.370 0.200 0.300 - - - 87.00 83.85%

Satisfactory

Constructicons, Inc. 31632 Conc. of Unisan-Panaon-Talaba-Summit Road 08/15/07 IV-A 5.106 70 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

Constructors Development Multi-Purpose Cooperative 31538 Construction of Bual River Flood Control 06/01/09 R-XII 8.611 180 C 0.385 0.157 0.300 - - - 84.20 *84.20%

Satisfactory

Constructors Development Multi-Purpose Cooperative 31538 Const. of 1-Unit, 4-CL, 2-Storey Building

Phase I at M'lang Central District 03/02/10 XII 2.813 120 C 0.487 0.137 0.300 - - - 92.40 92.40% V. Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538

Conc. of Bual Bridge Approaches including Slope Protection along Makilala Jct.

National Road11/26/07 XII 7.625 165 C 0.347 0.200 0.300 - - - 84.70 85.42%

V. Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538

Const. of 1 unit 1 CL Modified Sch. Bldg., @ Ray Buenaventura Sabulao Memorial

E/S11/22/08 XII 0.515 45 C 0.374 0.233 0.300 - - - 90.70 *90.70%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page100

Page 109: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control 03/10/09 XII 4.741 288 C 0.445 0.200 0.300 - - - 94.50 83.58%

Satisfactory

Constructor's Development Multi-Purpose Cooperative 31538 Const. of Gabaldon Bldg. at M'lang Pilot

Central School 08/23/08 XII 0.463 40 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory

Crazy Cut Construction 18324 Conc. of Outlook Drive, km. 254+887-Km. 254.987 11/26/07 CAR 2.892 75 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V.Satisfactory

Crazy Cut Construction 18324 Const. of Wanga FMR, Tetep-an 11/14/08 CAR 4.786 120 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory

Crazy Cut Construction 18324

Rehab. of Drainage Chanum Street & Lake Drive of Balili River Control along Manuel

Roxas St. & Flood Control along Brgy. Amparo Heights Camp 7

03/05/08 CAR 0.311 90 C 0.311 0.271 0.300 - - - 88.20 *88.20% V. Satisfactory

Crazy Cut Construction 18324 Repair of Maba-ay NHS Bldg. 11/13/08 CAR 0.738 120 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory

Crest Construction 15240 Asphalt overlay of Cagayan-Apayao Road, Ugac-Buntun Section 02/27/09 II 4.782 45 C 0.475 0.200 0.300 - - - 97.50 *97.50%

Outstanding

Crest Construction 15240 Const. of San Pedro Bridge (Phase 1) 08/28/07 II 4.782 180 C 0.343 0.300 0.300 - - - 94.30 94.72% Outstanding

Crest Construction 15240 Const. of San Pedro Bridge (Phase II) 11/25/08 II 14.322 220 C 0.371 0.200 0.300 - - - 87.10 87.55% V. Satisfactory

Crest Construction 15240Rehab./Reconst./Upgrading of Damaged

Paved National Roads CAR, Villa Rey-Piat Section KO507+000-KO508+600

09/10/09 II 19.289 120 C 0.432 0.200 0.300 - - - 93.20 91.88% V. Satisfactory

Crest Construction 15240Rehab./Reconst./Upgrading of Damaged

Paved National Roads KO523+000-KO524+180, Alabug-Tuao Section

09/10/09 II 14.223 120 C 0.429 0.133 0.300 - - - 86.20 *86.20% Satisfactory

Crest Construction 15240Const./Completion/Continuation of

Unfinished On-going Bridges San Pedro Bridge

02/25/10 II 16.394 215 C 0.474 0.133 0.300 - - - 90.70 88.78% Satisfactory

Crest Construction 15240Asphalt Overlay along Cagayan Apayao

Road Iguig Section, KO 496+798-KO 497+000

02/15/10 II 2.889 45 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory

Crest Construction 15240Asphalt Overlay along Cagayan Apayao Road Alimanao Section, KO 480+127-KO

481+00002/15/10 II 4.818 45 C 0.435 0.133 0.300 - - - 86.80 86.80%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page101

Page 110: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Crest Construction 15240Asphalt Overlay along Cagayan Apayao

Road Tuguegarao Section, KO 482+1512-KO 482+430

02/15/10 II 6.995 90 C 0.421 0.133 0.300 - - - 85.40 85.40% Satisfactory

Crest Construction 15240 Conc. of Cagayan Valley Agricultural College (CVAC) Road 02/19/10 II 17.367 203 C 0.420 0.133 0.300 - - - 85.30 84.52%

Satisfactory

Crishelle Construction 17108 Rehabilitation of Road Section, Brgy, Magkakaibigan 06/05/09 IV-B 0.201 70 C 0.427 0.200 0.300 - - - 92.70 *92.70%

V. Satisfactory

Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road 03/03/09 IV-B 18.990 252 C 0.385 0.133 0.300 - - - 81.80 75.44% Unsatisfactory

Crishelle Construction 17108 Strengthening of General Luna Bridge along Puerto Princesa South Road (PPSR) 11/29/07 IV-B 4.792 269 C 0.285 0.200 0.300 - - - 78.50 78.50%

Satisfactory

Crishelle Construction 17108 Const. of Multi-Purpose Pavement, Brgy. Iwahig 03/05/10 IVB 0.291 70 C 0.357 0.200 0.300 - - - 85.70 83.84%

Satisfactory

Crishelle Construction 17108 Rehab. of Sitio Bitas & Sitio Capisaan FMR 03/03/10 IVB 0.834 90 C 0.402 0.133 0.300 - - - 83.50 83.50% Satisfactory

Crishelle Construction 17108 Impvt./Regravelling of Sitio Balintang to Amili Isugod FMR 03/03/10 IVB 0.816 90 C 0.401 0.133 0.300 - - - 83.40 83.40%

Satisfactory

CS Construction and Supply (Formerly: CS Construction) 24237 Road Upgrading (Gravel to Concrete)

Panyalam, Sultan Kudarat 06/03/09 R-XII 14.036 267 C 0.394 0.200 0.300 - - - 89.40 86.13% Satisfactory

CS Construction and Supply (Formerly: CS Construction) 24237 Const. of 1 unit 2 Cl Sch. Bldg. @ Kawag III

E/S 08/29/07 XII 0.939 160 C 0.381 0.100 0.300 - - - 78.10 *78.10% Satisfactory

CS Construction and Supply (Formerly: CS Construction) 24237 Const. of MPB 11/25/08 XII 2.892 110 C 0.315 0.264 0.300 - - - 87.90 *87.90%

V. Satisfactory

CSR Construction and Supply (Formerly: CSR Const.) 14427 Const. of Rizal Flood Control 11/15/07 IV-B 0.278 40 C 0.293 0.298 0.300 - - - 89.10 *89.10%

V.Satisfactory

CTC Builder and Supplies Inc./Sunwest Const. & Dev. Corp.

(JV)JV-06-070 Const. of Dancalan Bridge 05/13/08 V 57.031 720 O 0.367 0.240 0.050 0.020 0.019 0.067 76.30 -

CTC Builder and Supplies Inc./Sunwest Const. & Dev. Corp.

(JV)JV-06-070 Const. of Dancalan Bridge 11/19/08 V 57.031 720 O 0.400 0.240 0.100 0.020 0.023 0.033 81.60 -

CTC Builder and Supplies Inc./Sunwest Const. & Dev. Corp.

(JV)JV-06-070 Const. of Dancalan Bridge 02/25/09 V 57.031 720 O 0.352 0.240 0.150 0.030 0.061 0.033 86.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page102

Page 111: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

CTC Builder and Supplies Incorporated 12088 Asphalt Overlay of Daan Maharlika,

Abuyog, Sorsogon City-Casiguran 11/19/08 V 22.210 120 C 0.367 0.200 0.300 - - - 86.70 80.40% V. Satisfactory

CTC Builder and Supplies Incorporated 12088 Const. of Bucalbucalan Seawall 08/19/08 V 0.941 30 C 0.275 0.200 0.300 - - - 77.50 *77.50%

Satisfactory

CTC Builder and Supplies Incorporated 12088 Rehab. of Buhatan Bridge, Sorsogon-

Casiguran Road 11/12/07 V 9.403 120 C 0.264 0.200 0.300 - - - 76.40 81.68% V. Satisfactory

CTC Builder and Supplies Incorporated (Formerly: CTC

Builder)12088 Concreting of Malbog-Siuton Road 05/22/09 V 4.704 120 C 0.401 0.133 0.300 - - - 83.40 *83.40%

Satisfactory

CTC Builders & Supplies, Inc./Sunwest Construction and Development Corporation (JV)

JV-06-070 Construction of Dancalan Bridge 02/15/10 V 57.031 720 C 0.441 0.133 0.300 - - - 87.40 86.03% Satisfactory

CTC Builders and Supplies, Inc./Sunwest Construction and

Development JV-06-070 Construction of Dancalan Bridge 08/25/09 V 57.031 720 O 0.335 0.300 0.150 0.030 0.051 0.050 91.60 -

Culasi Gen. Mdsg. And Construction Services 22157 Const. of 2-CL Building at San Roque E/S 05/30/08 VI 0.735 210 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

Currimao Integrated Builders and Const. 8738 Conc. of Pangil-Poblacion Farm-to-Market

Road, Brgy. Pangil 02/22/10 I 1.734 35 C 0.353 0.133 0.300 - - - 78.60 78.60% Unsatisfactory

D. Morales Engineering Works 8531 Construction of Multi-Purpose Pavement 08/27/07 VIII 0.473 60 C 0.307 0.144 0.300 - - - 75.10 *75.10% Satisfactory

D.C.E. Construction 29347 Const. of Conner Public Market 02/22/08 CAR 4.611 240 C 0.375 0.290 0.300 - - - 96.50 87.14% V. Satisfactory

D.C.E. Construction 29347 Const. of Dagupan Flood Control 05/19/08 CAR 4.766 120 C 0.398 0.200 0.300 - - - 89.80 86.62% V. Satisfactory

D.C.E. Construction 29347Implementation of Various Projects under Package 9, Conc. of Gen. Luna-Mayangao

Streets11/11/08 CAR 1.888 120 C 0.322 0.200 0.300 - - - 82.20 *82.20%

V. Satisfactory

D.C.E. Construction 29347 Proposed Concreting along Calanasan-Claveria Road, Poblacion Section 02/27/09 CAR 14.879 414 O 0.356 0.300 0.150 0.030 0.043 0.033 91.20 -

D.C.E. Construction 29347 Proposed Concreting along Calanasan-Ilocos Norte Road, Tanglagan Section 02/26/09 CAR 14.116 360 O 0.348 0.300 0.150 0.030 0.045 0.033 90.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page103

Page 112: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

D.C.E. Construction 29347 Proposed Concreting along Calanasan-Ilocos Norte Road, Tanglagan Section 02/18/10 CAR 14.116 418 C 0.457 0.133 0.300 - - - 89.00 89.96%

V. Satisfactory

D.C.M. Construction 5641Completion of the Const. of Agus II Bridge (Pumping Bridge) & Approaches, Phase II

Raya Madaya-Pumping Road09/13/09 X 22.952 2,868 O 0.383 0.185 0.150 0.030 0.051 0.033 83.20 -

D.G. Chico Trading & Construction Corporation 8748 Const. of MPB 08/21/08 NCR 4.769 120 C 0.348 0.225 0.300 - - - 87.30 86.25%

V. Satisfactory

D.G. Sarmenta Construction 13024 Sumacab-San Josef-Bonifacio Road 06/01/09 III 22.195 43 C 0.373 0.200 0.300 - - - 87.30 *87.30% Satisfactory

D.G. Sarmenta Construction 13024 Const. of Maligaya NHS 02/22/08 III 0.855 60 C 0.353 0.214 0.300 - - - 86.70 *86.70% V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of MPB at Old Capital 11/24/08 III 1.892 90 C 0.306 0.200 0.300 - - - 80.60 *80.60% V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of Multi-Purpose Bldg. at Palayan Central School 03/04/09 III 3.121 90 C 0.425 0.174 0.300 - - - 89.90 *89.90%

V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of Valdefuente-Fortaleza Rd., Km. 121+300 to Km. 125=750 03/04/09 III 28.378 300 C 0.096 0.200 0.300 - - - 59.60 *59.60%

Poor

D.G. Sarmenta Construction 13024 Rehab. of Peñaranda Flood Control along Peñaranda River 05/28/08 III 3.276 150 C 0.285 0.300 0.300 - - - 88.50 *88.50%

V. Satisfactory

D.G. Sarmenta Construction 13024 Rehab./Reconst. of Daang Maharlika KO312+000-KO313+000 08/27/09 II 14.468 125 C 0.416 0.200 0.300 - - - 91.60 91.24%

V. Satisfactory

D.G. Sarmenta Construction 13024 Const. of two (2) CL School Building at Cabu E/S 09/05/09 III 1.240 60 C 0.472 0.133 0.300 - - - 90.50 *90.50%

V. Satisfactory

D.G. Sarmenta Construction 13024 Jct. Tablang-Gabaldon Road 09/10/09 III 38.600 120 C 0.458 0.133 0.300 - - - 89.10 *89.10% V. Satisfactory

D.G. Sarmenta Construction 13024 Digmata Flood Control Pilot Project 09/07/09 III 8.170 90 C 0.333 0.200 0.300 - - - 83.30 *83.30% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page104

Page 113: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

D.G. Sarmenta Construction 13024 Const. of Rural Health Center, Gen. M. Natividad 02/25/10 III 1.427 90 C 0.480 0.133 0.300 - - - 91.30 87.52%

Satisfactory

D.G. Sarmenta Construction 13024 Road Conc. of Various Barangays 03/01/10 III 0.468 30 C 0.358 0.200 0.300 - - - 85.80 85.80% Satisfactory

D.G. Sarmenta Construction 13024Asphalt Overlay of Marbel-Allah Valley-

Cotabato Road, Km. 1781+000-Km. 1784+000 w/ exception

03/04/10 XII 14.371 110 C 0.414 0.200 0.300 - - - 91.40 91.40% V. Satisfactory

D.G.O. Construction 6788 Completion of MPB @ Sto. Niño Brgy. 11/27/07 CAR 0.938 44 C 0.308 0.206 0.300 - - - 81.40 *81.40% V. Satisfactory

D.J.D. Construction 32217 Conc. of Enrile St. 11/27/07 II 0.937 90 C 0.342 0.286 0.300 - - - 92.80 92.80% Outstanding

D.J.D. Construction 32217 Installation of two (2) lines RCCP, Magapit Mission Road 08/17/07 II 0.348 30 C 0.400 0.100 0.300 - - - 80.00 * 80.00%

Satisfactory

D.K. Jocson Construction 6896 Const. of Flood Control Project, Approach "A" of Malabong Bridge 11/22/08 VI 8.455 180 C 0.343 0.200 0.300 - - - 84.30 82.20%

V. Satisfactory

D.K. Jocson Construction / TSD Builders Const. and Supply JV JV-08-024 Conc. of Road along Bacolod North Road

(Toboso Section) 03/09/09 VIII 18.174 281 O 0.333 0.297 0.150 0.030 0.050 0.033 89.30 -

D.L. Aureo Construction 24894 Const. of 1CL School Building @ Manlurip Primary School 03/01/10 VIII 0.623 45 C 0.475 0.092 0.300 - - - 86.70 86.70%

Satisfactory

D.M. Catignas Enterprises 20149 Asphalt Overlay of Road Zone III, IV, VI, VII 08/21/07 IVA 1.911 15 C 0.294 0.300 0.300 - - - 89.40 *89.40% V. Satisfactory

D.M. Catignas Enterprises 20149 Const. of MPB at Brgy. San Isidro 08/21/07 IVA 0.478 45 C 0.391 0.200 0.300 - - - 89.10 *89.10% V. Satisfactory

D.M. Catignas Enterprises 20149 Const./Rehab. of Drainage System along CSCF Jct. 11/17/07 IVA 1.504 90 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V.Satisfactory

D.M. Consunji, Inc. 101Opening/Conc. of Taguig Diversion Rd.

(Linking Maestrang Pinang Gen. Luna St. to C-5)

02/25/10 NCR 9.271 1,081 C 0.410 0.133 0.300 - - - 84.30 84.30% Satisfactory

D.M. House Const. Inc. 25810Asphalt Overlay along Gapan-San

Fernando-Olongapo Road, San Benito Section

08/15/08 III 4.801 30 C 0.287 0.207 0.300 - - - 79.40 *79.40% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page105

Page 114: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

D.M. House Const. Inc. 25810 Asphalt Overlay along Olongapo-Bungallon Road (100mm thickness) 03/02/09 III 6.945 30 C 0.423 0.133 0.300 - - - 85.60 *85.60%

Satisfactory

D.M. House Const. Inc. 25810 Asphalt Overlay along Olongapo-Bungallon Road (80 mm thickness) 03/02/09 III 7.385 30 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

D.M. House Const. Inc. 25810 Const. of Mulawin Tala Farm-to-Market Road 02/25/09 III 2.391 70 C 0.329 0.200 0.300 - - - 82.90 *82.90%

Satisfactory

D.M. House Const. Inc. 25810 Const. of Road 11/17/08 III 2.340 90 C 0.227 0.300 0.300 - - - 82.70 *82.70% V.Satisfactory

D.M. House Const. Inc. 25810 Rehab. & Impv't. of Angeles-Porac-Floridablanca-Dinalupihan Road 08/14/07 III 14.925 120 C 0.215 0.293 0.300 - - - 80.80 *80.80%

V.Satisfactory

D.M. House Const. Inc. 25810 Repair/Rehab. of Slope Protection along along Tenejero River Control 05/14/08 III 1.494 32 C 0.357 0.137 0.300 - - - 79.40 *79.40%

Satisfactory

D.M. House Const. Inc. 25810 Repair/Rehab. of Slope Protection along Pentor-Balsik River Sta. Isabel Section) 05/13/08 III 1.417 60 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

D.M. House Construction, Inc. 25810Asphalt Overlay/Concrete Reblocking along Manila North Road Intermittent

Section (Km. 465+000-Km. 482+80006/03/09 I 4.884 55 C 0.470 0.133 0.300 - - - 90.30 *90.30%

V.Satisfactory

D.M. House Construction, Inc. 25810 Improvement/Rehabilitation of Roman Expressway 05/21/09 III 71.955 150 O 0.378 0.300 0.150 0.030 0.037 0.050 94.50 -

D.M. House Construction, Inc. 25810 Imprvt./Rehab. of Roman Expressway 08/29/09 III 100.263 150 C 0.446 0.200 0.300 - - - 94.60 94.54% V. Satisfactory

D.M. House Construction, Inc. 25810 Const./Completion of DPWH-Bataan 1st District Eng'g Office Bldg. 08/27/09 III 12.143 120 C 0.486 0.133 0.300 - - - 91.90 *91.90%

V. Satisfactory

D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Montalban Heights NHS 11/27/08 IVA 5.000 120 C 0.377 0.200 0.300 - - - 87.70 *87.70%

V. Satisfactory

D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Morong NHS 11/26/08 IVA 5.000 120 C 0.372 0.280 0.300 - - - 95.20 90.09%

Outstanding

D.R. Robles Construction 28559 Const. of River Control @ Brgy. J.P. Rizal 05/19/08 IV-A 2.866 80 C 0.267 0.200 0.300 - - - 76.70 77.54% Satisfactory

D.R. Robles Construction 28559 Impvt. of Flood Control, So. Labangan, Brgy. Matambugan 03/13/09 IVA 1.730 120 C 0.472 0.133 0.300 - - - 90.50 *90.50%

V. Satisfactory

D.R. Robles Construction 28559 Rehab. of Assencion, Zarzuela, Sagada Sts. & Various Roads 08/15/08 NCR 9.548 30 C 0.228 0.300 0.300 - - - 82.80 *82.80%

V. Satisfactory 07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page106

Page 115: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

D.R. Robles Construction 28559 Rehab. of San Jose-Rodriguez-Quezon City Road 11/30/07 IV-A 9.582 45 C 0.328 0.200 0.300 - - - 82.80 *82.80%

V.Satisfactory

D.R. Robles Construction 28559 Repair of Sch. Bldg. @ University of Rizal System 03/13/09 IVA 0.962 45 C 0.423 0.200 0.300 - - - 92.30 *92.30%

V. Satisfactory

D.R. Robles Construction 28559 Rehab./Reconst./Upgrading of Antipolo-Teresa Road 08/26/09 IVA 19.207 180 C 0.460 0.200 0.300 - - - 96.00 91.68%

V. Satisfactory

D.R. Robles Construction 28559 Repair & Impvt. of Brgy. San Guillermo Road 02/17/10 IVA 9.612 45 C 0.337 0.200 0.300 - - - 83.70 83.70%

Satisfactory

D.S.O. Enterprises 10733 Completion of MPB Brgy. Pangil 02/22/10 IVA 0.396 30 C 0.387 0.200 0.300 - - - 88.70 88.70% Satisfactory

D.V. Salud Construction 6564 Construction of a 3-storey School Building 08/29/08 SLB-LPO 18.889 180 C 0.387 0.300 0.300 - - - 98.70 98.70% Outstanding

D.W. G & A Developers 27573 Const. of Seawall 03/04/08 VII 0.458 50 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

Dadoy Freight Services Construction & Supply 28465 Const. of RSC Alumni Library Building 11/15/07 IV-B 0.571 40 C 0.309 0.278 0.300 - - - 88.70 * 88.70%

V. Satisfactory

Dadoy Freight Services Construction & Supply 28465 Repair & Rehab. of access roads to Tugdan

Airport to Poblacion Alcantara 02/26/08 IV-B 9.998 105 C 0.353 0.300 0.300 - - - 95.30 *95.30% Outstanding

Daewoo Engineering & Construction Co., Ltd. FC-01-108

Agno River Flood Control Project II, Package II-Guide Channel to Bayambang,

Alcala-Bautista08/26/09 MFCDP 1,511.681 1,492 O 0.376 0.300 0.150 0.030 0.065 0.050 97.10 -

Daewoo Engineering & Construction Company, Ltd. FC-01-108

Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood

Control Project, Phase II11/29/07 NIA 1,156.435 1,340 O 0.367 0.195 0.100 0.030 0.065 0.200 95.70 -

Daewoo Engineering & Construction Company, Ltd. FC-01-108

Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood

Control Project, Phase II05/27/08 NIA 1,156.435 1,340 O 0.364 0.200 0.100 0.030 0.065 0.200 95.90 -

Daewoo Engineering & Construction Company, Ltd. FC-01-108

Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood

Control Project, Phase II11/20/08 NIA 1,480.299 1,340 O 0.365 0.200 0.100 0.030 0.070 0.200 96.50 -

Daewoo Engineering & Construction Company, Ltd.

SL2-SN-000543/FC-

98-113

Metro Manila Flood Control Project-West of Mangahan Floodway, CP1 02/16/07 NIA 740.742 2,419 O 0.316 0.200 0.100 0.024 0.061 0.200 90.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page107

Page 116: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Daewoo Engineering & Construction, Ltd. FC-03-047

Philippine-Japn Friendship Highway Mindanao Section, Rehabilitation Project,

Phase II, CP-II, Km.130+000-Km.1376+805.34

06/04/07 PJHL 1,586.357 1,306 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -

Dahl Construction 8931 Const./Completion of MPB in Brgy. Paso de Blas, Bagbaguin and Mapulang Lupa 11/19/07 NCR 1.507 60 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V.Satisfactory

Dahl Construction 8931 Rehab./Impvt. of Taytay Diversion Road 03/12/09 IV-A 14.402 162 C 0.476 0.133 0.300 - - - 90.90 91.26% V. Satisfactory

Dahl Construction 8931 Repair/Rehab. of C-3 Road inc. Drainage 08/20/08 NCR 14.239 120 C 0.071 0.300 0.300 - - - 67.10 *67.10% Fair

Dakay Construction & Development Corporation 8838 Dapitan Port Development Project 2/19-22/08 PPA 222.922 1,004 C 0.39 0.300 0.300 - - - 98.67 98.67%

Outstanding

Dalanon Construction Refregiration Supply & Service 11205 Conc./Widening of Dulawan-Marbel Road

(New Carmen Sect. with Bridge Exception) 11/27/07 XII 9.583 175 C 0.336 0.285 0.300 - - - 92.10 *92.10% Outstanding

Dalanon Construction Refrigeration Supply & Service 11205 Conc./Widening of Dulawan-Marbel Road

(New Carmen Sect. with Bridge Exception) 06/03/09 R-XII 0.289 15 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory

Dalanon Construction Refrigeration Supply & Service 11205 Road Upgrading (Gravel to Concrete)

Sewod-Bunay Section 09/09/09 XII 19.837 378 C 0.373 0.200 0.300 - - - 87.30 90.43% V. Satisfactory

Dalanon Construction Refrigeration Supply & Services 11205 Rehab./Reconst. of Dulawan-Marbel

(Tacurong-New Carmen Sect.) 03/04/10 XII 12.222 254 O 0.338 0.240 0.150 0.030 0.055 0.033 84.60 -

Dalebo Construction & General Merchandise 32699 Const. of Drainage System at San Rafael III 05/26/08 IVA 0.239 20 C 0.250 0.200 0.300 - - - 75.00 *75.00%

Satisfactory

Dalebo Construction & General Merchandise 32699 Repair/Rehab. of Academic and TLE

Building at Cavite Nat'l High School 03/01/10 IVA 1.169 60 C 0.404 0.200 0.300 - - - 90.40 90.40% V. Satisfactory

Damico Builders & Supplies 30355 Concreting of Brgy. Road from Brgy. San Agustin to Brgy. Bantog 09/02/09 III 1.687 87 O 0.365 0.240 0.150 0.030 0.047 0.033 86.50 -

Damico Builders & Supplies 30355 Rehab. of FMR at San Juan De Valdez 02/24/10 III 0.477 30 C 0.363 0.200 0.300 - - - 86.30 86.30% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page108

Page 117: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Damico Builders & Supplies 30355 Rehab. of FMR at San Agustin 02/24/10 III 0.716 45 C 0.359 0.200 0.300 - - - 85.90 85.90% Satisfactory

Damico Buildes & Supplies 30355 Const. of one (1) CL Sch. Bldg. at Aranguren E/S 11/15/08 III 0.438 60 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

Damico Buildes & Supplies 30355 Const./Completion/Repair and Rehab. of MPB at PNRC 11/23/07 III 0.904 90 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

Danimerh Construction and Supply 17376 Const. of MPB (Block Tienda), Poblacion Montevista 12/02/08 XI 1.701 60 C 0.343 0.300 0.300 - - - 94.30 *94.30%

Outstanding

Danvic Construction 24439 Const. of MPP for Package 1-D (Brgy. Dumoy & Brgy. Ballok) 03/11/08 XI 0.753 60 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

Danvic Construction 24439 Rehab./Impvt. of DPWH Davao City 1st DEO Bldg. inc. Employees Quarters 03/18/09 XI 7.560 198 C 0.493 0.200 0.300 - - 99.30 98.46%

Outstanding

Danvic Construction 24439Improvement/ Rehab. for Package 1-D

Catalunan Grande Rd., Brgy. Catalunan Grande

09/17/09 XI 4.718 115 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory

Darynn Construction & Supply 22322 Const. of MPB at Bitaug 03/06/09 XI 1.714 110 C 0.450 0.200 0.300 - - - 95.00 86.46% Satisfactory

Darynn Construction & Supply 22322 Construction of Drainage at R. Castillo National Road, Brgy. R. Castillo 03/08/10 XI 1.883 105 C 0.422 0.200 0.300 - - - 92.20 92.20%

V. Satisfactory

Darynn Construction & Supply 22322 Const. of Multi-Purpose Building @ Brgy. San Isidro 02/25/10 XI 2.861 110 C 0.463 0.133 0.300 - - - 89.60 89.60%

V. Satisfactory

Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Kaputian, Island Garden 06/02/09 XI 33.719 90 O 0.366 0.300 0.150 0.030 0.037 0.050 93.30 -

Davao Concrete Products 12090 Const. of Multi-Purpose Building, Muslim, Jama-a Brgy. Maputi 06/05/09 XI 0.352 60 C 0.497 0.121 0.300 - - - 91.80 *91.80%

V. Satisfactory

Davao Concrete Products 12090Impvt./Widening of Agusan-Davao Road

(Daang Maharlika), Pob. Carmen and Pob. Panabo Sections

06/01/09 XI 14.459 120 O 0.362 0.255 0.150 0.030 0.047 0.050 89.40 -

Davao Concrete Products 12090 Conc. of Additional 2 lanes along F. Torres Jct. Bajada DCNHS Section 12/05/07 XI 4.621 210 C 0.270 0.300 0.300 - - - 87.00 92.28%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page109

Page 118: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Davao Concrete Products 12090 Conc. of Additional 2 lanes along Surigao-Davao Coastal Road 11/23/07 XI 9.819 180 C 0.276 0.300 0.300 - - - 87.60 87.60%

V.Satisfactory

Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road 08/28/07 XI 14.165 202 C 0.318 0.225 0.300 - - - 84.30 *84.30% V. Satisfactory

Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road, Kaputian Sect. 05/19/08 XI 19.287 210 C 0.346 0.300 0.300 - - - 94.60 87.58%

V. Satisfactory

Davao Concrete Products 12090 Const. of Hagonoy National High School (Padada Annex) 11/22/07 XI 1.271 90 C 0.247 0.200 0.300 - - - 74.70 *74.70%

Satisfactory

Davao Concrete Products 12090 Impvt./Conc. Inawayan-Baracatan Road, Toril District 11/17/08 XI 14.922 210 O 0.315 0.300 0.100 0.010 0.040 0.100 86.50 -

Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Katipunan Road, Katipunan Section 03/13/09 XI 34.712 286 O 0.327 0.274 0.150 0.022 0.060 0.050 88.30 -

Davao Concrete Products 12090 Impvt./Rehab. of Agusan River Channel 12/02/08 XI 14.448 280 C 0.345 0.300 0.300 - - - 94.50 88.98% V. Satisfactory

Davao Concrete Products 12090 Impv't/Conc. of Inawayan-Baracatan Road 03/02/09 XI 14.922 210 C 0.314 0.200 0.300 - - - 81.40 84.46% Satisfactory

Davao Concrete Products 12090Protection Works @ Pier 1& Pier 2 of

Lasang Bridge along Davao Road (Daang Maharlika)

08/21/08 XI 8.489 180 C 0.294 0.300 0.300 - - - 89.40 88.74% V. Satisfactory

Davao Concrete Products 12090 Repair/Rehab. of MPB at Brgy. 76-A 03/18/09 XI 18.908 225 C 0.418 0.170 0.300 - - - 88.80 94.19% V. Satisfactory

Davao Concrete Products 12090Road Upgrading ( Gravel to Paved) of Babak-Samal-Kaputian Road Anonang Section Island Garden City of Samal

09/07/09 XI 5.775 60 C 0.476 0.151 0.300 - - - 92.70 93.48% V. Satisfactory

Davao Concrete Products 12090 Const. of Speech Laboratory Building Digos City NHS 09/05/09 XI 1.632 60 C 0.488 0.133 0.300 - - - 92.10 *92.10%

V. Satisfactory

Davao Concrete Products 12090Impvt./Widening of Agusan-Davao Road

(Daang Maharlika), Poblacion Carmen and Poblacion Panabo Sections

09/08/09 XI 14.459 120 C 0.433 0.200 0.300 - - - 93.30 90.96% V. Satisfactory

Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Katipunan Road (Km. 1522+100) Katipunan Section 09/08/09 XI 34.712 286 C 0.461 0.151 0.300 - - - 91.20 84.69%

Satisfactory

Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Kaputian 02/27/10 XI 34.266 121 C 0.317 0.200 0.300 - - - 81.70 88.66% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page110

Page 119: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Davao Contractor Development Cooperative 28542 Completion of unfinished work in the multi-

purpose gynasium 8/12/09 DOST 2.374 - C 0.500 0.200 0.00 - - - 70.00 70.00% Poor

Davao Contractors Development Cooperative (DACODECO) 28542 Completion of the unfinished works in the

multipurpose gymnasium 04/29/09 DOST 2.374 95 O 0.384 0.299 0.050 0.030 0.058 0.017 83.80 -

Davao Contractors Development Cooperative (DACODECO) 28542 Conc. of Bucac Road Section along Bucac-

Marcelina Road 11/29/08 XIII 2.810 150 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Conc. of Road at Brgy. Subasta 11/18/08 XI 0.944 70 C 0.395 0.300 0.300 - - - 99.50 *99.50%

Outstanding

Davao Contractors Development Cooperative (DACODECO) 28542 Const. of Lined Canal 12/02/08 XII 0.468 60 C 0.390 0.300 0.300 - - - 99.00 *99.00%

Outstanding

Davao Contractors Development Cooperative (DACODECO) 28542 Const. of MPB (Phase II) 05/21/08 XIII 0.552 60 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Const. of MPB, Brgy. Mabini 03/14/09 XII 0.667 70 C 0.475 0.133 0.300 - - - 90.80 83.52%

Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542

Const. of one (1) unit concrete Multi-Purpose/Workshop Bldg. @ Guadalupe

CES03/10/08 XIII 1.514 75 C 0.368 0.300 0.000 - - - 66.80 *66.80%

Fair

Davao Contractors Development Cooperative (DACODECO) 28542 Const./Rehab. of Health Center Building @

Brgy. Magupising 05/19/08 XI 0.610 60 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding

Davao Contractors Development Cooperative (DACODECO) 28542 Impvt. of Riverbank Protection of Hanipaan

Bridge (Box Culvert) 08/31/08 XIII 4.785 90 C 0.360 0.300 0.000 - - - 66.00 66.90% Fair

Davao Contractors Development Cooperative (DACODECO) 28542

Rehab. of San Benito-Sta. Monica Road Section, along Dapa-Del Carmen-San Benito-Sta. Monica-Burgos-San Isidro

Road

08/26/08 XIII 4.815 45 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Rehab./Impvt. of DPWH Davao del Norte

DEO Bldg. inc. Employees Quarters 03/12/09 XI 9.642 280 C 0.478 0.146 0.300 - - - 92.40 90.44% V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Repair/Rehab. Damaged Roadway

Nabunturan-Mainit Park Road 08/22/08 XI 2.408 145 C 0.304 0.232 0.300 - - - 83.60 84.98% V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Repair/Rehab. of Tugpan PSCG Bridge 05/27/08 XIII 3.810 215 C 0.369 0.200 0.000 - - - 56.90 66.62%

Fair

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page111

Page 120: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Davao Contractors Development Cooperative (DACODECO) 28542 Completion of Multi-Purpose Building @

Brgy. Limbaan 02/27/10 XI 1.082 60 C 0.434 0.200 0.300 - - - 93.40 93.40% V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Const. of MPB @ Purok 4, Bliss, Brgy. San

Miguel 02/27/10 XI 2.359 90 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Completion of Multi-Purpose Building,

Brgy. Calumpang 03/11/10 XII 1.410 60 C 0.403 0.165 0.300 - - - 86.80 86.80% Satisfactory

Davao Contractors Development Cooperative (DACODECO) 28542 Const. of MPB Brgy. Linintian 03/02/10 XIII 0.369 88 C 0.453 0.133 0.300 - - - 88.60 88.60%

Satisfactory

Davao Engineers Contractors Cooperative (DECC) 30944 Concreting of Road @ Brgy. Tawan-Tawan 05/25/09 XI 0.940 90 C 0.456 0.133 0.300 - - - 88.90 *88.90%

Satisfactory

Davao Engineers Contractors Cooperative (DECC) 30944 Concreting of Road @ Brgy. Balengaeng,

Tugbok District 05/25/09 XI 0.938 90 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory

Davao Engineers Contractors Cooperative (DECC) 30944 Completion of 4-CL, 2-Storey SB, @ E.B.

Lopez NHS 09/01/09 XI 1.141 120 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory

Davao Engineers Contractors Cooperative (DECC) 30944 Const. of DPWH-DCSDEO Bldg. including

Employees Quarter, Mintal 09/01/09 XI 4.810 180 C 0.481 0.187 0.300 - - - 96.80 88.75% Satisfactory

Davao Engineers Contractors Cooperative (DECK) 30944 Const. of 1 CL 1 Storey Bldg. @ Quezon

E/S 11/20/07 XI 0.465 90 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

Davao Engineers Contractors Cooperative (DECK) 30944 Const. of MPB at Brgy. Ma-a 12/03/08 XI 0.375 60 C 0.356 0.300 0.300 - - - 95.60 *95.60%

Outstanding

Davao Engineers Contractors Cooperative (DECK) 30944 Construction of 3CL, 3-Storey at Bangoy

NHS, Brgy. Sasa 09/16/09 XI 3.362 115 O 0.390 0.300 0.150 0.020 0.025 0.050 93.50 -

Davao Engineers Contractors Cooperative (DECK) 30944 Construction of 3CL, 3-Storey at Bangoy

NHS 03/10/10 XI 3.362 115 C 0.470 0.133 0.300 - - - 90.30 92.54% V. Satisfactory

Davao Engineers Contractors Cooperative (DECK) 30944 Package C - Const. of Multi-Purpose

Building @ Brgy. Los Amigos 02/23/10 XI 0.975 150 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory

Davao Engineers Contractors Cooperative (DECK) 30944 Package B-Const. of Multi-Purpose

Building @ Brgy. Suawan 02/23/10 XI 2.263 150 C 0.414 0.133 0.300 - - - 84.70 84.70% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page112

Page 121: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Davao Rock Mixer Enterprises 19250 Concreting of Road of Poblacion-Pangutusan Section 03/16/09 XI 9.629 120 C 0.335 0.200 0.300 - - - 83.50 *83.50%

Satisfactory

Davhez Trading and Construction 9833 Const./Completion of Las Pinas Nat'l High School (Main) 08/28/07 NCR 0.709 30 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V. Satisfactory

Davhez Trading and Construction 9833 Completion of Multi-Purpose Building at Talon 3 (Caseria Mariposa) 06/04/09 NCR 2.209 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

Davhez Trading and Construction 9833 Const./Completion of Las Pinas Nat'l High School (Main) 08/28/07 NCR 0.709 30 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V. Satisfactory

Davhez Trading and Construction 9833 Repair/Rehab. of School Bldg. at Moonwalk E/S Phase 5 03/04/08 NCR 2.946 60 C 0.268 0.200 0.300 - - - 76.80 *76.80%

Satisfactory

Davhez Trading and Construction 9833 Const. of Three (3) Storey, Nine (9) CL Sch. Bldg., Las Piñas Science High School 09/04/09 NCR 10.049 140 O 0.331 0.225 0.150 0.020 0.058 0.033 81.70 -

DCE Construction 29347 Conc. along Calanasan-Claveria Road, Poblacion Section 09/06/09 CAR 14.877 438 O 0.357 0.240 0.150 0.030 0.056 0.033 86.60 -

DCE Construction 29347 Conc. along Calanasan-Claveria Road, Poblacion Section 02/19/10 CAR 14.875 538 O 0.353 0.240 0.150 0.030 0.035 0.033 84.10 -

De Jesus Construction 11452 Concreting of Road, Sitio Bato-Bato and Malimatac, Brgy. Mabuco 08/27/09 III 0.475 60 C 0.394 0.133 0.300 - - - 82.70 *82.70%

Satisfactory

De La Cruz Construction and Supply 20775 Const. of Multi-Purpose Building at Hibago Elementary School 03/02/10 V 3.342 120 C 0.459 0.154 0.300 - - - 91.30 91.30%

V. Satisfactory

Deabsres Construction & Supply 10392 Const. of 1 unit 7m x 9m Sch. Bldg. @ Umingan NHS 03/07/08 I 0.491 70 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V. Satisfactory

Deabsres Construction & Supply 10392 Const. of 6 Units S/B @ San Vicente E/S 05/27/08 I 0.428 85 C 0.369 0.256 0.300 - - - 92.50 83.89% V. Satisfactory

Decks Construction, Inc. 25860 Const. of MPB at Apitong 08/19/08 IV-B 0.668 60 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Dela Cruz Construction and Supply 20775 Const. of Two (2) Cl, Bldg., San Jose Pili H/S 11/25/08 V 0.962 120 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page113

Page 122: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Design Setter Construction Corporation 32136 Const. of Overpass in Agusan NHS,

Agusan Phase I 11/17/08 X 0.280 90 C 0.287 0.200 0.300 - - - 78.70 85.42% V. Satisfactory

Dhayang Construction Firm 12805 Const. of MPB, Brgy. Lanzuran 11/18/08 IX 2.333 60 C 0.312 0.176 0.300 - - - 78.80 *78.80% Satisfactory

Digos Tesston Construction & Supplies 8921 Impv't/Conc. of Lacson-Lamanan Road 08/21/07 XI 3.850 180 O 0.368 0.300 0.100 0.030 0.058 0.100 95.60 -

Digos Tesston Construction & Supplies (Formerly: ACT

Construction)8921

Conc. of Additional 2-Lanes along Davao-Cotabato Road, Talomo Intersection and

Talomo Bridge Section12/04/07 XI 5.394 200 C 0.341 0.300 0.300 - - - 94.10 *94.10%

Outstanding

Digos Tesston Construction & Supplies (Formerly: ACT

Construction)8921 Concreting of Roads at Package B-1 Brgy.

76-A, Candelaria St. 03/18/09 XI 0.956 120 C 0.380 0.200 0.300 - - - 88.00 *88.00% Satisfactory

Digos Tesston Construction & Supplies (Formerly: ACT

Construction)8921 Const./Completion of DPWH-DCSDEO

Bldg., Tugbok District 03/02/09 XI 9.635 210 C 0.414 0.200 0.300 - - - 91.40 89.16% V. Satisfactory

Digos Tesston Construction & Supplies (Formerly: ACT

Construction)8921 Impv't/Conc. of Lacson-Lamanan Road 11/19/07 XI 3.850 180 C 0.355 0.300 0.300 - - - 95.50 95.50%

Outstanding

Digos Tesston Construction & Supplies (Formerly: ACT

Constructuion)8921 Raod Upgrading of Bansalan-Mt. Apo

National Park Road 09/05/09 XI 24.104 175 C 0.482 0.133 0.300 - - - 91.50 90.78% V. Satisfactory

Dimson (Manila), Inc. 112 Const. of Jones 2 Bridge and Approaches 02/29/08 II 111.929 826 C 0.354 0.300 0.300 - - - 95.40 86.02% V. Satisfactory

Diplahan Commercial & Construction 32037 Const. of MPB (Covered Court) 08/22/08 IX 0.931 60 C 0.302 0.300 0.300 - - - 90.20 61.50% Fair

Diplahan Commercial & Construction 32037 Const. of MPB @ Poblacion Malangas 08/24/07 IX 0.128 20 C 0.343 0.162 0.300 - - - 80.50 *80.50% V. Satisfactory

Dipolog Top Construction and Development Corporation 6678 Road Upgrading of Dipolog-Punta

Dansullan-Sergio Osmeña Road 03/18/09 IX 18.879 400 O 0.380 0.263 0.150 0.030 0.048 0.050 92.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page114

Page 123: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Dipolog Top Construction and Development Corporation 6678

Upgrading (Gravel to Concrete) of Sindangan-Siayan-Dumingag-Mahayag

Road (Lagag-Denoyan Section)03/11/10 IX 38.147 335 O 0.251 0.300 0.150 0.030 0.056 0.050 83.70 -

Dipolog Top Construction and Devt. Corp. 6678 Const. of MPB 09/05/08 IX 0.425 55 C 0.349 0.200 0.300 - - - 84.90 76.92%

Satisfactory

Dipolog Top Construction and Devt. Corp. 6678 Road Upgrading of Dipolog-Punta

Dansullan-Sergio Osmeña Road 12/03/08 IX 9.438 200 C 0.351 0.300 0.300 - - - 95.10 *95.10% Outstanding

Dipolog Top Construction and Dev't. Corporation 6678

Road Upgrading (Gravel to Concrete) along Dipolog-Punta-Dansullan-Sergio Osmeña Road, Km. 1850+544.16-Km.

185+720

06/10/09 IX 18.879 400 C 0.443 0.133 0.300 - - - 87.60 88.26% Satisfactory

DJCM Construction 27678Continuation of the Const. of Health

Facility, Gov. Roque, Ablan Sr. Memorial Hospital

06/05/09 I 0.850 34 C 0.473 0.067 0.300 - - - 84.00 *84.00% Satisfactory

DK Construction 19367 Construction of Multi-Purpose Building at Ordovilla 06/25/09 IV-B 0.865 60 C 0.428 0.131 0.300 - - - 85.90 *85.90%

Satisfactory

DL Enterprises 18155 Conc. of Ozamis City-Oroquieta City Road, Sinacaban Section 03/12/08 X 19.014 240 O 0.275 0.300 0.000 0.030 0.047 0.100 75.20 -

DL Enterprises 18155 Conc. of Tudela Road (Municipal Ground) 09/04/07 X 0.952 90 C 0.327 0.200 0.300 - - - 82.70 86.18% V. Satisfactory

DL Enterprises 18155 Const. of Road 03/16/09 X 1.906 204 C 0.471 0.200 0.300 - - - 97.10 82.13% Satisfactory

DL Enterprises 18155 Const. of Tangub City-Don Victoriano Road 03/12/08 X 22.914 270 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -

DL Enterprises 18155 Const. of Tangub City-Don Victoriano Road, Tangub City Section 03/17/09 X 22.914 723 O 0.331 0.300 0.150 0.030 0.045 0.050 90.60 -

DMJ Construction & Supply 17211 Rehab./Improvement of Amungan-Palauig-Banlog Road 05/26/09 III 28.517 30 C 0.403 0.200 0.300 - - - 90.30 *90.30%

V. Satisfactory

DMJ Construction & Supply 17211

Package III: Rehab/Improvement of Olongapo-Bugallon Road

1. Masinloc Section2. Palauig Section

05/26/09 III 45.858 50 C 0.401 0.200 0.300 - - - 90.10 *90.10%V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page115

Page 124: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

DMJ Construction & Supply 17211 Asphalt Overlay along Olongapo-Bugallon Road 08/16/08 III 13.576 25 C 0.355 0.194 0.300 - - - 84.90 *84.90%

V. Satisfactory

DMJ Construction & Supply 17211 Completion of RMTU Admin. Bldg. 08/17/07 III 1.911 45 C 0.284 0.300 0.300 - - - 88.40 *88.40% V. Satisfactory

DMJ Construction & Supply 17211 Const. of 6 CL @ Uacon E/S 11/16/07 III 4.243 180 C 0.330 0.290 0.300 - - - 92.00 *92.00% Outstanding

DMJ Construction & Supply 17211 Const./Impvt. of MPB 03/02/09 III 9.423 120 C 0.436 0.133 0.300 - - - 86.90 84.98% Satisfactory

DMJ Construction & Supply 17211 Impvt./Conc. of Dingalan National Road 11/27/08 III 18.803 240 C 0.355 0.194 0.300 - - - 84.90 *84.90% V. Satisfactory

DMJ Construction & Supply 17211 Rehab. of Amungan-Palauig-Banlog Rd., Palauig Section 11/14/08 III 19.011 30 C 0.317 0.300 0.300 - - - 91.70 *91.70%

Outstanding

DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road 05/19/08 III 18.817 20 C 0.302 0.201 0.300 - - - 80.30 *80.60% V. Satisfactory

DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road 05/19/08 III 18.815 33 C 0.311 0.022 0.300 - - - 63.30 *63.30% Fair

DMJ Construction & Supply 17211 Repair/Rehab. of Olongapo-Bungallon Road, Sindal Section 03/02/09 III 9.796 12 C 0.422 0.133 0.300 - - - 85.50 *85.50%

Satisfactory

DMJ Construction & Supply 17211Package I-Rehab./Impvt. of Olongapo-

Bugallon Rd., 1 San Felipe Sect. 2, Botolan Sect.

09/02/09 III 47.769 90 C 0.434 0.133 0.300 - - - 86.70 84.96% Satisfactory

DMJ Construction & Supply 17211 Const. of Drainage Box Culvert & Slope Protection Works, Bayanti 02/19/10 III 7.605 32 C 0.418 0.200 0.300 - - - 91.80 91.80%

V. Satisfactory

DMJ Construction & Supply 17211 Rehab. of BMC Road Phase I & II, Brgy. San Agustin 02/19/10 III 28.430 45 C 0.471 0.133 0.300 - - - 90.40 90.40%

V. Satisfactory

DMM Construction Indsutries 31136 Redecking of Divisoria Bridge 11/30/07 VIII 3.763 280 C 0.354 0.200 0.300 - - - 85.40 *85.40% V.Satisfactory

Domarax Construction and Development 5502 Impvt. of Road Slip and other related

activities, (Gamut-San Miguel Sect.) 11/27/07 XIII 3.850 93 C 0.305 0.200 0.300 - - - 80.50 *80.50% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page116

Page 125: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Domarax Construction and Development 5502 Completion of DPWH Employee's Quarter

& Conferrence Hall DPWH Compound 09/08/09 XIII 2.893 90 C 0.489 0.150 0.300 - - - 93.90 95.93% V.Satisfactory

Domarax Construction and Development 5502 Const. of San Juan National High School,

Brgy. San Juan 09/06/09 XIII 1.432 76 O 0.358 0.227 0.150 0.030 0.051 0.033 84.90 -

Domarax Construction and Development 5502 Const. of San Juan National High School,

Brgy. San Juan 03/01/10 XIII 1.432 86 C 0.422 0.133 0.300 - - - 85.50 85.08% Satisfactory

Double L Construction & Development Enterprises 9834 Completion of MPB 11/25/08 VII 1.282 70 C 0.270 0.241 0.300 - - - 81.10 *81.10%

V. Satisfactory

Double L Construction & Development Enterprises 9834 Conc. of Brgy. Roads a)Brgy. Cangmating,

Sibulan b)Brgy. Naiba, San Jose 08/29/07 VII 0.944 50 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory

Double L Construction & Development Enterprises 9834 Concreting of Bio-os-Jantianon Road

(Intermittent Section) 03/12/09 VII 8.926 100 O 0.367 0.222 0.150 0.030 0.037 0.050 85.60 -

Double L Construction & Development Enterprises 9834 Const. of River Control, Brgy. Tandayag 11/23/07 VII 0.473 35 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Double L Construction & Development Enterprises 9834 Const. of Water System (Phase I) 08/21/08 VII 9.497 143 C 0.307 0.300 0.300 - - - 90.70 93.04%

Outstanding

Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport Road

(Intermittent Section) 03/12/09 VII 10.395 185 C 0.477 0.133 0.300 - - - 91.00 82.48%Satisfactory

Double L Construction & Development Enterprises 9834 Widening of Dumaguete North Road at

Intermittent Section 11/26/08 VII 21.558 165 C 0.306 0.284 0.300 - - - 89.00 *89.00% V. Satisfactory

Double L Construction and Development Enterprises 9834

Rehab./Reconst./Upgrading of DSR Real Dumaguete Public Market Section

Dumaguete South Road05/28/09 VII 36.450 280 O 0.367 0.238 0.150 0.030 0.051 0.050 88.60 -

Double L Construction and Development Enterprises 9834 Concreting of Bios-os-Jantianon Road

(Intermittent Section) 05/26/09 VII 9.400 130 C 0.363 0.200 0.300 - - - 86.30 85.88% Satisfactory

Double L Construction and Development Enterprises 9834 Rehab./ Reconst./ Upgrading Dumaguete

North, Mainit-Ajong Road Section 09/12/09 VII 38.320 280 O 0.387 0.300 0.150 0.030 0.042 0.050 95.90 -

Double L Construction and Development Enterprises 9834

Rehab./Reconst./Upgrading of DSR Real Dumaguete Public Market Section

Dumaguete South Road03/02/10 VII 36.480 310 C 0.437 0.133 0.300 - - - 87.00 87.96%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page117

Page 126: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Double R Double M Construction 25385 Const. of Cagayan River Control @ Catayauan 08/17/07 II 9.640 260 C 0.400 0.200 0.300 - - - 90.00 72.48%

Satisfactory

Double R Double M Construction 25385 Reblocking of Road & Const. of Shoulder & Drainage with Sidewalk 08/17/07 II 0.938 120 C 0.374 0.099 0.300 - - - 77.30 *77.30%

Satisfactory

Doulos Construction 30759 Road Upgrading along Kalinga-Cagayan Road (Calanan-Enrile Section) 03/02/09 CAR 3.665 150 C 0.318 0.200 0.300 - - - 81.80 72.20%

Poor

DQT Builders 7950 Conc. of Boac-Mogpog Nat'l Road (Bantauyan Section) 09/09/07 IV-B 4.272 110 C 0.292 0.300 0.300 - - - 89.20 *89.20%

V. Satisfactory

DQT Builders Corp. 7950 Const. of 1 CL School Building San Roque Ilaya NHS 08/26/09 IVA 0.601 60 C 0.483 0.133 0.300 - - - 91.60 *91.60%

V.Satisfactory

DQT Builders Corporation 7950 Const. of 1 CL School Building Cogorin Ibaba NHS 08/26/09 IVA 0.601 60 C 0.466 0.133 0.300 - - - 89.90 *89.90%

V.Satisfactory

DQT Builders Corporation 7950Conc. of San Francisco -San Andres- San

Narciso Road Barangay Binay Section, Km. 381+457.50-Km. 382+164

08/25/09 IVA 19.086 150 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory

DQT Builders Corporation 7950 Const. of 2 CL School Building Palsabangon E/S 09/10/09 IVA 0.999 60 C 0.492 0.073 0.300 - - - 86.50 *86.50%

Satisfactory

DQT Builders Corporation 7950 Rehab./Reconst. of MSR - Diversion Road 08/27/09 IVA 27.964 114 C 0.406 0.133 0.300 - - - 83.90 *83.90% Satisfactory

DQT Builders Corporation 7950 Const. of 1CL School Building at Villa Padua Elementary Sch. 02/19/10 IVA 0.523 120 C 0.464 0.200 0.300 - - - 96.40 96.40%

Outstanding

DQT Builders Corporation 7950 Const./Conc. of Candelaria-By-Pass Road, Brgy. Pahinga Norte, incl. RROW 02/17/10 IVA 17.629 180 O 0.329 0.300 0.150 0.030 0.042 0.050 90.10 -

DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Infanta-Marikina Road, Km.

130+843-Km. 130+078 08/21/08 IV-A 14.467 180 C 0.337 0.300 0.300 - - - 93.70 91.72% Outstanding

DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Kay Duke FMR 11/27/08 IV-B 0.380 90 C 0.339 0.200 0.300 - - - 83.90 *83.90%

V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Const./Repair of Mabuhay MPB 11/27/08 IV-B 0.380 100 C 0.310 0.200 0.300 - - - 81.00 *81.00%

V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Impvt. of Lucena Bdry.-Tayabas-Lucban-

Sampaloc-Mauban Road (Sampaloc Side) 02/26/09 IVA 19.199 222 C 0.435 0.133 0.300 - - - 86.80 84.46% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page118

Page 127: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab. of Balagasan Bridge & App. Along

Talaba-Summit-Panaon National Road 11/15/07 IV-A 2.305 40 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impv't of Infanta-Dinahican Road 11/25/07 IV-A 14.468 180 C 0.324 0.200 0.300 - - - 82.40 82.40%

V.Satisfactory

DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impvt. of MSR-Diversion Road 08/12/08 IV-A 18.216 100 C 0.381 0.300 0.300 - - - 98.10 93.96%

Outstanding

DQT Builders Corporation (Formerly:DQT Builders) 7950

Rehab./Reconstruction and Concrete Paving of Catanauan-Buenavista Nat'l Road

Phase I- Buenavista Sect.08/14/08 IV-A 14.460 120 C 0.347 0.300 0.300 - - - 94.70 93.50%

Outstanding

DQT Builders Corporation (Formerly:DQT Builders) 7950 Widening/Asphalting of Luyang-Poo-Lazi

National Road 05/16/08 VII 6.473 172 C 0.359 0.300 0.000 - - - 65.90 75.53% Satisfactory

DSB Construction & Supply, Inc. 16126 San Vicente-San Carlos Road Linking Tabaco-Ligao to Legazpi-Tabaco-Tiwi Road 05/18/09 V 38.400 283 O 0.313 0.300 0.150 0.015 0.040 0.033 85.10 -

DSB Construction & Supply, Inc. 16126 Completion of San Jose Multi-Purpose Building (Phase VII) 09/01/09 V 7.188 160 C 0.473 0.169 0.300 - - - 94.20 92.45%

V. Satisfactory

DSB Construction & Supply, Inc. 16126 Rechanneling/Deepening of River in San Vicente 09/01/09 V 19.288 105 C 0.416 - 0.500 - - - 91.60 *91.60%

V. Satisfactory

DSB Construction & Supply, Inc. 16126Rehab./Reconst. of National Road along

Ligao-Tabaco Road Km. 516+845-Km. 529+460

09/01/09 V 38.589 150 C 0.419 0.159 0.300 - - - 87.80 *87.80% Satisfactory

DSB Construction & Supply, Inc. 16126 Conc. of San Fernando North Road, Sta. 10+560, Washington 08/27/09 V 18.898 270 C 0.441 0.133 0.300 - - - 87.40 87.64%

Satisfactory

DSB Construction & Supply, Inc. 16126 Construction of Multi-Purpose Building 09/08/09 V 9.553 189 O 0.289 0.300 0.150 0.030 0.043 0.033 84.50 -

DSB Construction & Supply, Inc. 16126 San Vicente-San Carlos Road Linking Tabaco-Ligao to Legazpi-Tabaco-Tiwi Road 09/01/09 V 38.400 390 O 0.314 0.256 0.150 0.030 0.037 0.050 83.70 -

DSB Construction & Supply, Inc. 16126 Construction of Multi-Purpose Building 02/27/10 V 9.553 189 C 0.452 0.133 0.300 - - - 88.50 85.70% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page119

Page 128: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

DSB Construction & Supply, Inc. 16126

Repair of Bridge Approach/Abutment Protection and Rechannelization of River

Course, Taboc Bridge & along Juban Magallanes Road

02/16/10 V 4.770 83 O 0.321 0.240 0.150 0.015 0.035 0.033 79.40 -

DSB Construction & Supply, Inc./N Four General Contractor and Supply

(JV)JV-08-236 Tabaco-Ligao Road (San Vicente,

Bangkilingan & Bantayan Section) 02/22/09 V 9.636 120 C 0.468 0.133 0.300 - - - 90.10 90.10% V. Satisfactory

DSB Construction and Supply 16126 Conc. of Bical Road 05/15/08 V 14.163 120 O 0.325 0.236 0.100 0.020 0.023 0.100 80.40 -

DSB Construction and Supply 16126 Conc. of Bical Road 08/12/08 V 14.163 120 O 0.318 0.240 0.070 0.030 0.028 0.067 75.30 -

DSB Construction and Supply 16126 Conc. of Mt. Mayon Park Road 02/26/08 V 4.721 140 C 0.293 0.300 0.300 - - - 89.30 *89.30% V. Satisfactory

DSB Construction and Supply 16126 Const. of Virac Seawall 02/27/08 V 8.645 180 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

DSB Construction and Supply 16126 Repair/Rehab. of Virac Seawall 05/22/08 V 4.736 180 C 0.370 0.200 0.300 - - - 87.00 79.74% Satisfactory

DSB Construction and Supply 16126 Repair/Restoration of Concrete Dike at Bulawan River 11/27/07 V 14.260 180 C 0.340 0.200 0.300 - - - 84.00 84.00%

V.Satisfactory

DSB Construction and Supply 16126 Repair/Restoration of Concrete Revetment of Baclayon 02/26/08 V 9.500 180 C 0.311 0.300 0.300 - - - 91.10 *91.10%

Outstanding

DSB Construction and Supply 16126 Road Opening of Tanawan-Cumagingking Falls 11/11/08 V 28.505 240 C 0.372 0.286 0.300 - - - 95.80 93.52%

Outstanding

DSB Construction and Supply, Inc. 16126 Completion of Multi-Purpose Building Phase VII 02/24/09 V 7.188 160 O 0.391 0.240 0.150 0.030 0.056 0.050 91.70 -

DSB Construction and Supply, Inc. 16126 Conc. of Bical Road 02/24/09 V 14.163 163 C 0.461 0.133 0.300 - - - 89.40 82.47% Satisfactory

DSB Construction and Supply, Inc. 16126 Conc. of San Fernardo North Road 03/01/09 V 18.898 270 O 0.356 0.236 0.150 0.030 0.056 0.050 87.80 -

DSB Construction and Supply, Inc. (Formerly: DSB Const. & Supply) 16126 Const. of Multi-Purpose Center, Tabaco

NHS 11/10/08 V 5.787 150 C 0.369 0.200 0.300 - - - 86.90 82.21% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page120

Page 129: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

DSO Enterprises 10733 Const. of MPB DPWH Compound, Laguna 1st DEO 05/30/09 IV-A 1.921 45 C 0.464 0.133 0.300 - - - 89.70 *89.70%

V. Satisfactory

DSO Enterprises 10733 Conc. of CSCF Jct. Road, Pagsanjan Section 08/21/07 IV-A 5.254 75 C 0.357 0.200 0.300 - - - 85.70 89.18%

V. Satisfactory

DSO Enterprises 10733 Const. of FMR at Sitio Bunliw 02/22/08 IV-A 0.477 36 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory

DSO Enterprises 10733Const./Replacement & Repair of Elem. & Secondary Sch. Bldg., Alaminos Central

Sch. 03/03/09 IV-A 0.812 60 C 0.433 0.200 0.300 - - - 93.30 *93.30%

V. Satisfactory

DSO Enterprises 10733 Construction of Road, Brgy. Pook 09/01/09 IVA 0.287 30 C 0.412 0.139 0.300 - - - 85.10 *85.10% Satisfactory

Duros Development Corp. 22729 Concreting of Baloc-Isabelo Road 05/29/09 VII 14.220 260 O 0.299 0.237 0.150 0.030 0.051 0.033 80.00 -

Duros Development Corp. 22729Impvt./Asphalting and Widening of Cebu-

Toledo Wharf Road (Central Nautical Highway), Tabunok-Lagtang Section

08/26/08 VII 19.575 120 C 0.218 0.300 0.300 - - - 81.80 79.64% Satisfactory

Duros Development Corp. 22729 Concreting of Baloc-Isabela Rd. 09/14/09 VII 14.220 260 O 0.396 0.240 0.150 0.022 0.037 0.033 87.80 -

Duros Development Corp. 22729 Conc. of Baloc-Isabela Rd. 03/05/10 VII 14.375 260 C 0.321 0.140 0.300 - - - 76.10 80.71% Unsatisfactory

Duros Development Corporation 22729 Impvt./Conc. of Access Road to RORO Port at Maya Daan Bantayan Road 06/04/09 VII 19.004 163 O 0.252 0.047 0.150 0.030 0.025 0.033 53.70 -

Duros Development Corporation 22729 Impvt./Conc. of Access Road to RORO Port at Maya-Daan Bantayan Road 09/01/09 VII 19.005 162 O 0.247 0.300 0.106 0.030 0.045 0.033 76.10 -

Duros Development Corporation 22729Road Upgrading (Gravel to Paved) along National Road at Bogo-Curva-Medellin-

Daan Bantayan-Maya Road09/01/09 VII 14.240 100 C 0.335 0.200 0.300 - - - 83.50 68.38%

Poor

DVB Construction 23769 Const. of Drainage Canal @ Brgy. Manloy 11/20/07 VIII 0.188 30 C 0.304 0.200 0.300 - - - 80.40 *80.40% V.Satisfactory

Dynamic Builders & Construction 24712 Rehabilitation of Sibud Main Drainage 8/10-18/09 NIA 7.961 381 C 0.384 0.200 0.300 - - - 88.35 *88.35% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page121

Page 130: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Dynamic Builders & Construction Co. (Phil) Inc. 24712

Rehab/Reconst./Upgrading of Damaged Paved National Roads along Bacolod-San Carlos Road, Km. 3+990-Km. 13+610 with

exception

06/01/09 VI 20.800 210 O 0.346 0.300 0.150 0.030 0.065 0.050 94.10 -

Dynamic Builders & Construction Co. (Phil) Inc. 24712 Rehab. of Bacolod South Road (Caradio-An

Section) 05/28/09 VI 42.774 392 O 0.396 0.240 0.150 0.030 0.060 0.050 92.60 -

Dynamic Builders & Construction Co. (Phil) Inc. 24712 Rehab./Recons/Upgrading of Concreting of

Bacolod North road, Caduha-an Section 05/26/09 VI 18.331 140 O 0.355 0.300 0.130 0.030 0.045 0.050 91.00 -

Dynamic Builders & Construction Co. (Phil.), Inc. 24712 Rehab. of Bacolod South Rd. (Caradio-an

Section) 03/09/10 VI 43.225 402 C 0.355 0.200 0.300 - - - 85.50 89.76% V. Satisfactory

Dynamic Builders & Construction Co. (Phil.), Inc. 24712

Rehab./Reconst./Upgrading along Bacolod-San Carlos Rd., Km. 3+990 to Km. 13+610

w/ exceptions03/07/10 VI 20.866 280 C 0.357 0.194 0.300 - - - 85.10 89.42%

V. Satisfactory

Dynamic Builders & Construction Co. (Phil.), Inc. 24712

Rehab./Reconst. of Damaged Paved National Rd., Jct. San Enrique-Pontevedra

By Pass Rd. and its Access Rd (Intermittent Sections) with exceptions

03/10/10 VI 46.579 444 C 0.342 0.196 0.300 - - - 83.80 88.00% Satisfactory

Dynamic Builders & Construction Co. (Phil.), Inc. 24712 Rehab./Reconst./Upgrading of Bacolod

South Rd 03/09/10 VI 92.065 540 O 0.317 0.286 0.150 0.030 0.037 0.050 87.00 -

Dynamic Builders & Construction Co., (Phil.) Inc. 24712

Rehab./Reconst./Upgrading along Bacolod-San Carlos Road, Km. 3+990-Km. 13+610

with exception09/12/09 VI 20.800 235 O 0.320 0.300 0.150 0.030 0.055 0.050 90.50 -

Dynamic Builders & Construction Co., (Phil.) Inc. 24712 Rehab./Reconst./Upgrading of Bacolod

North Road, Caduha-an Sect., 09/14/09 VI 18.528 154 C 0.353 0.200 0.300 - - - 85.30 88.72% Satisfactory

Dynamic Builders & Construction Co., (Phil.) Inc. 24712 Rehab./Reconst./Upgrading of Bacolod

South Road (Tibsok-Ponte Bridge Section) 09/18/09 VI 33.415 210 C 0.437 0.133 0.300 - - - 87.00 88.20% Satisfactory

Dynamic Builders & Construction Co., (Phil.), Inc. 24712 Reblocking of Bacolod Circumferential

Road 11/19/08 VI 19.046 360 C 0.249 0.200 0.300 - - - 74.90 79.72% Satisfactory

Dynamic Builders & Construction Co., (Phil.), Inc. 24712

Rehab./Reconst. of Damaged Paved Nat'l Road, Jct. San Enrique-Pontevedra By

Pass Road & its Access Road03/05/09 VI 46.230 395 O 0.313 0.300 0.150 0.030 0.065 0.050 90.80 -

Dynamic Builders & Construction Co., (Phil.), Inc. 24712 Repair & Maintenance Road, Highways &

Bridges at Bacolod Circumferential Rd. 02/26/08 VI 19.040 310 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page122

Page 131: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Dynamic Builders & Construction Co., (Phil.), Inc. 24712

Widening/Impvt. of Bacolod South Kabankalan Road, Km.5+200 - Km.5+775.5

with exception09/03/07 VI 9.538 180 C 0.370 0.290 0.300 - - - 96.00 96.56%

Outstanding

Dynamic Builders & Construction Co., (Phil.), Inc. 24712

Widening/Impvt. of Bacolod South Kabankalan Road,Tangub Section,

Km.5+775.5- Km.5+937.5 with exception03/03/09 VI 9.476 452 C 0.407 0.200 0.300 - - - 90.70 86.08%

Satisfactory

E & D Construction 32064 Conc. Widening of Cotabato-Alla-Marbel-General Santos Road, Malagapas Section 11/18/08 XII 4.824 105 C 0.345 0.300 0.000 - - - 64.50 73.23%

Satisfactory

E & L Reyes Construction 15338 Conc. of Brgy. II Municipal Road 05/23/08 VII 0.932 30 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding

E & L Reyes Construction 15338 Conc. of Maya-Daanbantayan Road, Agujo Section 11/29/07 VII 3.779 55 C 0.351 0.200 0.300 - - - 85.10 *85.10%

V. Satisfactory

E & L Reyes Construction 15338 Const. of President C.P. Garcia H/S 08/30/08 VII 0.452 120 C 0.334 0.300 0.300 - - - 93.40 85.00% V. Satisfactory

E and D Construction 32064 Conc. Widening of Cotabato-Alla-Marbel-General Santos Road, Malagapas Section 08/21/07 XII 4.784 105 O 0.327 0.221 0.100 0.010 0.023 0.100 78.10 -

E and D Construction 32064 Conc. Widening of Cotabato-Alla-Marbel-General Santos Road, Malagapas Section 11/20/07 XII 4.784 105 O 0.346 0.240 0.100 0.022 0.025 0.067 80.00 -

E and D Construction 32064 Repair/Rehab. of Cotabato-Lanao Road, PC Hill-Quezon Avenue-Parang Road Section 03/02/09 XII 9.419 65 C 0.278 0.133 0.300 - - - 71.10 *71.10%

Poor

E & L Reyes Construction 15338 Construction of Multi-Purpose Building, Canlaas 06/09/09 VII 0.137 120 C 0.438 0.133 0.300 - - - 87.10 *87.10%

Satisfactory

E & L Reyes Construction 15338 Impvt. of Multi-Purpose Bldg., Sto. Rosario 06/09/09 VII 0.138 120 C 0.422 0.133 0.300 - - - 85.50 82.49% Satisfactory

E & L Reyes Construction 15338 Repair of School Building at San Roque E/S 03/03/09 VII 0.276 120 O 0.366 0.200 0.150 0.030 0.019 0.033 79.80 -

E & L Reyes Construction 15338 Const. of 1-CL @ Clarin School Of Fisheries 09/10/09 VII 0.496 179 C 0.465 0.133 0.300 - - - 89.80 *89.80%

V. Satisfactory

E E I Corporation 333NAIA Expressway and its Related Roads

Project, Phase I, CP-II, Skyway Interchange Ramps 1 & 4

08/29/07 URPO 601.681 1,392 C 0.328 0.300 0.300 - - - 92.80 91.71% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page123

Page 132: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E E I Corporation 333

NAIA Expressway and its Related Roads Project, Phase I, Package IV-A, Sales St.

Viaduct and Ramp Structure (MSE Retaining Wall)

11/15/08 URPO 368.005 240 O 0.360 0.300 0.100 0.030 0.065 0.100 95.50 -

E E I Corporation 333

NAIA Expressway and its Related Roads Project, Phase I, Package IV-A, Sales St.

Viaduct and Ramp Structure (MSE Retaining Wall)

03/12/09 URPO 368.005 270 O 0.364 0.300 0.000 0.030 0.065 0.050 80.90 -

E F C Enterprises 11795 Rehab./Reconstruction/Upgrading of Sen. Gil Puyat Avenue 06/03/09 NCR 9.593 45 C 0.492 0.200 0.300 - - - 99.20 *99.20%

Outstanding

E M L Const. & Trading 10151 Const. of FMR at Brgy. San Vicente 05/18/09 III 0.950 30 C 0.402 0.200 0.300 - - - 90.20 *90.20% V. Satisfactory

E M L Construction & Trading 10151 Const. of Jetty Protection Walls at the Mouth of Kalaklan River 11/12/08 III 19.107 120 C 0.267 0.300 0.300 - - - 86.70 80.04%

V. Satisfactory

E M L Construction & Trading 10151 Impvt. of San Antonio-Floridablanca Road 11/10/08 III 4.758 74 C 0.371 0.300 0.300 - - - 97.10 *97.1% Outstanding

E M L Construction & Trading 10151 Rehab./Impvt./Asphalt Overlay of Angeles-Magalang Road 11/12/08 III 9.478 11 C 0.325 0.200 0.300 - - - 82.50 *82.50%

V. Satisfactory

E M L Construction & Trading 10151 Rehab/Improvement of Brgy. San Matias 02/24/09 III 4.753 60 C 0.366 0.200 0.300 - - - 86.60 *86.60%Satisfactory

E M L Construction & Trading 10151 Repair/Rehab. of Porac Public Market 02/28/08 III 2.402 90 C 0.302 0.291 0.300 - - - 89.30 *89.30% V. Satisfactory

E M L Construction & Trading 10151 Rehab. of Angeles-Porac-Floridablanca-Dinalupihan Road 08/24/09 III 19.053 100 C 0.463 0.123 0.300 - - - 88.60 86.08%

Satisfactory

E M L Construction & Trading 10151 Rehab. of Gapan-San Fernando-Olongapo Road 08/24/09 III 19.189 104 C 0.430 0.133 0.300 - - - 86.30 83.96%

Satisfactory

E S De Guzman Construction 17494 Const. of NVSU Multi-Purpose Bldg., Phase III 08/29/07 II 0.369 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

E S De Guzman Construction 17494 Const. of Quirino MPB 11/22/07 II 0.464 55 C 0.386 0.238 0.300 - - - 92.40 *92.40% Outstanding

E S De Guzman Construction 17494 Construction of Multipurpose Bldg. 04/16/09 DOST 30.986 120 O 0.361 0.264 0.150 0.030 0.052 0.050 90.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page124

Page 133: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E S De Guzman Construction 17494 Replacement of Oriwong Bridge and Approaches 08/19/08 II 7.123 140 C 0.398 0.300 0.000 - - - 69.80 80.18%

V. Satisfactory

E S De Guzman Construction 17494 Const. of San Pablo, Multi-Purpose Building 03/03/10 II 0.469 40 C 0.457 0.133 0.300 - - - 89.00 89.00%

Satisfactory

E&L Reyes Construction 15338 Repair of School Building, San Roque E/S 09/02/09 VII 0.276 120 C 0.500 0.133 0.300 - - - 93.30 83.85% Satisfactory

E. Cañeda Construction 22168 Conc. of Bogo-Polambato Wharf Road 11/29/07 VII 9.313 135 C 0.296 0.110 0.300 - - - 70.60 *70.60% Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Sipocot-Cabusao Road 11/24/08 V 8.555 150 C 0.376 0.190 0.300 - - - 86.60 89.00%

V. Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Reblocking of Road to Libmanan form

Daang Maharlika 05/28/08 V 9.498 150 C 0.309 0.233 0.300 - - - 84.20 84.92% V. Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand 7243 Road Concreting of Zone 3 and Zone 4,

Brgy. Malinao 03/09/09 V 0.946 120 C 0.432 0.200 0.300 - - - 93.20 *93.20% V. Satisfactory

E. Garcia Construction & E. Garcia Gravel & Sand /HGG Builders &

SupplyJV-08-311 Concreting of San Isidro-Bahao Road 03/03/10 V 37.826 385 O 0.352 0.230 0.150 0.030 0.050 0.050 86.20 -

E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 43.333 150 C 0.404 0.200 0.300 - - - 90.40 90.40%

V. Satisfactory

E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 67.456 180 C 0.470 0.200 0.300 - - - 97.00 97.00%

Outstanding

E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 14.421 90 C 0.478 0.200 0.300 - - - 97.80 97.80%

Outstanding

E. Garcia Construction and E. Garcia Gravel and Sand 7243 Naga Airport Development Project 03/07/09 PMS 43.333 150 O 0.373 0.300 0.150 0.020 0.063 0.050 95.60 -

E. Gardiola Construction 17542 Impvt./Asphalting of Lipa-Cuatro Santos Road 05/22/09 IV-A 14.470 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab./Asphalting of City Park Road 05/22/09 IV-A 14.469 60 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab./Asphalting of Municipal Street 05/28/09 IV-A 19.295 90 C 0.475 0.133 0.300 - - - 90.80 *90.80%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page125

Page 134: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E. Gardiola Construction 17542 Impvt./Rehab./Asphalting of Tangco Drive, Maraouy-Balintawak Road 05/22/09 IV-A 14.472 60 C 0.472 0.133 0.300 - - - 90.50 *90.50%

V. Satisfactory

E. Gardiola Construction 17542 Asphalt Overlay of Road at Brgy. Antipolo del Norte, Gov't Cemetary Section 05/22/09 IV-A 14.467 60 C 0.461 0.133 0.300 - - - 89.40 *89.40%

V. Satisfactory

E. Gardiola Construction 17542Asphalt Overlay of Banay-banay-Muzon

Road, Brgy. Poblacion West, Brgy. Muzon 2

05/20/09 IV-A 14.991 60 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

E. Gardiola Construction 17542Asphalt Overlay/Rehab. of Manila-Batangas Rd., Malvar Section, Brgy. San Fernando &

Santiago Phase II08/28/08 IVA 19.290 120 C 0.246 0.287 0.300 - - - 83.30 *83.30%

V. Satisfactory

E. Gardiola Construction 17542 Impv't. of Road at Nangkaan-Ki Santol Road Phase II 02/27/08 IVA 9.644 90 C 0.276 0.200 0.300 - - - 77.60 80.12%

V. Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of Batangas-Quezon Road 03/01/08 IVA 19.236 120 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Carmen Road 11/22/07 III 9.553 60 C 0.284 0.300 0.300 - - - 88.40 *88.40%

V.Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Circumferential Road 11/22/07 III 9.553 60 C 0.293 0.300 0.300 - - - 89.30 *89.30%

V.Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of Line Canal at Brgy. 2 03/09/09 IVA 14.471 150 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Aplaya Sect. 03/06/09 IVA 19.293 120 C 0.485 0.133 0.300 - - - 91.80 87.48%

Satisfactory

E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Hugom Sect. 03/06/09 IVA 19.294 120 C 0.486 0.133 0.300 - - - 91.90 87.52%

Satisfactory

E. Gardiola Construction 17542Asphalting/Shouldering of Manila-

Batangas Road, Banay-Banay Sect. & Lipa-Mataas na Kahoy Road, Bdry. Sect.

09/02/09 IVA 14.464 120 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory

E. Gardiola Construction 17542 Impvt. of Drainage System along Manila - Batangas Road Maraouy Section 09/02/09 IVA 9.644 120 C 0.461 0.133 0.300 - - - 89.40 *89.40%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page126

Page 135: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E. Gardiola Construction 17542Rehab./Impvt./Regravelling along Davao-

Bukidnon Road, Km. 1632+185 -Km. 1643+685,with exception

09/02/09 XI 19.289 90 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory

E. Gardiola Construction 17542Impvt./Regravelling of National Roads

along Surallah-Lake Sebu-Maitum Road (Hway. Jct. Dajay to Lake Section)

03/05/10 XII 19.289 65 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory

E. Lapus Enterprises 10813 Const. of Vocational Building at Pedro Diaz High School, Brgy. Alabang 06/04/09 NCR 20.042 150 C 0.465 0.193 0.300 - - - 95.80 82.50%

Satisfactory

E. Lapus Enterprises 10813 Rehab./Impvt./Widening of Road at Old MSR, Brgy. Tagapo 06/01/09 IV-A 19.198 90 C 0.494 0.133 0.300 - - - 92.70 92.70%

V. Satisfactory

E. Lapuz Enterprises 10813Impvt./Rehab. of Roads in Western Samar,

Oquendo-Pilar Road, Sta. 00+000-Sta. 05+405 with exceptions

03/09/08 VIII 2.865 45 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory

E. Lapuz Enterprises 10813 Rehab./Impvt./Widening of Road at Brgy. Tagapo 03/02/09 VIII 19.198 247 O 0.369 0.300 0.150 0.030 0.028 0.050 92.70 -

E. Simba Marketing and Construction Supply 16398 Conc. of Sarangani-Davao del Sur Coastal

Road (Kalatungan Sect.) 05/28/08 XII 5.645 180 C 0.311 0.300 0.000 - - - 61.10 60.30% Fair

E.A Ramirez Construction 11631 Construction of 3-Storey School Building 02/11/10 NHA 18.110 150 C 0.468 0.151 0.300 - - - 91.90 85.25% V. Satisfactory

E.A. Igno Construction & Trading 32517 Construction of Classroom @ De Ocampo Elementary School 08/23/07 IV-A 0.382 30 C 0.310 0.200 0.300 - - - 81.00 *81.00%

V. Satisfactory

E.A. Igno Construction & Trading 32517 Impvt. of MPB 08/26/08 IV-A 0.478 60 C 0.374 0.291 0.300 - - - 96.50 *96.50% Outstanding

E.A. Ramirez Construction 11631 Construction of 3-Storey School Building 09/08/09 NHA 19.080 204 O 0.364 0.271 0.053 0.030 0.056 0.050 82.40 -

E.A. Sancho Construction 5648 Impvt.(Conc.) of Bolao-Balite-Cawaynan-Canayuman Road 11/24/08 V 4.145 165 C 0.350 0.200 0.300 - - - 85.00 83.38%

V. Satisfactory

E.A. Sancho Construction 5648 Impvt.(Conc.) of Cagliling-Matang-Buenavista-Union-Salvacion Road 03/10/09 V 3.791 151 C 0.444 0.133 0.300 - - - 87.70 83.08%

Satisfactory

E.A. Sancho Construction 5648

Impvt. of Jct. Binalay (Tinambac)-Tamban Road (Olag-Pequeno-Antipolo-Bataan-

Banga Section) Km. 514+255-Km. 526+024 w/ exceptions

09/10/09 V 18.817 210 C 0.394 0.192 0.300 - - - 88.60 88.06% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page127

Page 136: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.A. Sancho Construction 5648Impvt. of Tinambac-Siruma Road

(Salvacion-San Roque-San Ramon Section) Km. 515+615-Km. 550+510 w/ exception

03/01/10 V 18.817 210 C 0.403 0.133 0.300 - - - 83.60 87.32% Satisfactory

E.B.A. Construction 6210 UP OU Centennial Center for Digital Learning 07/20/09 U.P. 12.948 60 O 0.361 0.261 0.150 0.020 0.020 0.050 86.20 -

E.B.J.R. Construction 19780 Const. of 15 units Multi-Purpose Pavements (Ripang MPP) 11/20/08 CAR 0.093 120 C 0.333 0.000 0.300 - - - 63.30 76.20%

Satisfactory

E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906

CP III, Iloilo East Coast-Capiz Road Improvement Project, Estancia-Ajuy

Section11/27/07 PJHL 530.586 935 O 0.377 0.300 0.100 0.030 0.056 0.100 96.30 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 CP IV, Gatanguit-Calbiga Road Sect. Phase

IV 06/03/07 PJHL 1,458.041 1,080 O 0.367 0.300 0.100 0.030 0.051 0.100 94.80 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 CP IV, Gatanguit-Calbiga Road Sect. Phase

VI 03/06/08 PJHL 1,458.041 1,080 O 0.372 0.300 0.100 0.018 0.065 0.100 95.50 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 CP IV, Gatanguit-Calbiga Road Sect. Phase

VI 12/03/08 PJHL 1,466.751 1,080 O 0.350 0.300 0.100 0.030 0.065 0.100 94.50 -

E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 Road Leading to Subic Public Market 11/14/07 III 14.028 60 C 0.231 0.200 0.300 - - - 73.10 *73.10%

Satisfactory

E.C. De Luna Construction Corporation 11906

Const. of El Nido-Bataraza Road, CP 3B-1, Puerto Princesa-Aborlan-Abo-abo Section,

Segments 1-7 06/02/09 PJHL 1,792.809 730 O 0.334 0.280 0.150 0.030 0.065 0.050 90.90 -

E.C. De Luna Construction Corporation 11906

Marikina-Infanta Road Project, Km. 91+910-Km. 120+925 under SONA Projects in

Luzon Beltway03/05/10 PJHL 1,915.106 720 O 0.368 0.300 0.150 0.030 0.056 0.050 95.40 -

E.C. De Luna Construction Corporation (Formerly: E.C. De Luna

Construction)11906

Const. of El Nido-Bataraza Road, CP 3B-1, Puerto Princesa-Aborlan-Abo-abo Section,

Segment 1-7 (Km. 02+376 to Km. 128+026.93 w/ exceptions)

03/01/10 PJHL 1,792.809 730 O 0.339 0.300 0.150 0.030 0.056 0.050 92.50 -

E.C. Samonte Construction 31019 Const. of MPB (Gymnasium) Phase III 08/29/07 IX 0.944 85 C 0.370 0.274 0.300 - - - 94.40 *94.40% Outstanding

E.D. Angas Construction 32106 Completion of Multi-Purpose Building (Phase II) 03/10/09 VII 0.703 75 C 0.459 0.133 0.300 - - - 89.20 *89.20%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page128

Page 137: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road 03/10/09 VII 3.816 227 C 0.429 0.200 0.300 - - - 92.90 78.06%

Unsatisfactory

E.D. Angas Construction 32106Const./Cont. of 2 Classroom, 2 Storey

(7mx8m) School Building At Junob National High School

09/13/09 VII 1.199 85 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory

E.D. Angas Construction 32106 Const. of 1 unit, 1-CL School Building at Candigum P/S 09/07/09 VII 0.507 60 C 0.461 0.142 0.300 - - - 90.30 *90.30%

V. Satisfactory

E.D. Angas Construction 32106 Const./Impvt. of Multi Purpose Center 08/28/07 VII 0.944 120 C 0.302 0.282 0.300 - - - 88.40 *88.40% V. Satisfactory

E.D. Denosta Construction & Supply 28355 Const. of 2 CL Tigbalua E/S 11/27/08 VI 0.889 75 C 0.275 0.200 0.300 - - - 77.50 *77.50% Satisfactory

E.D. Denosta Construction and Supply 28166 Const. of 2-CL Building at Villafont E/S 09/02/09 VI 1.039 90 C 0.494 0.109 0.300 - - - 90.30 *90.30%

V. Satisfactory

E.D. Solano Construction & Engineering Services 14758 Construction of Multi-Purpose Building 03/09/09 I 0.723 30 C 0.477 0.133 0.300 - - - 91.00 *91.00%

V. Satisfactory

E.D. Tabangay Consruction 31978 Const. of 1-School Building @ Aborlan C/S 03/04/09 IV-B 0.946 150 C 0.473 0.097 0.300 - - - 87.00 *87.00% Satisfactory

E.D. Tabangay Consruction 31978 Const. of MPB Candawaga 05/27/08 IV-B 0.408 90 C 0.318 0.268 0.300 - - - 88.60 *88.60% V. Satisfactory

E.D. Tabangay Consruction 31978

Const./Repair of CY Dep-Ed Sch. Bldg. Projects, Various Municipalities in

Southern Palawan (Const of 1 CL S/B, Narra NHS)

02/29/08 IV-B 0.549 90 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding

E.D. Tabangay Const. / Bonifacio M. Carlos Const. (JV) JV-07-099 Impvt. of Quezon-Punta Baja Road 08/12/08 IVB 18.950 252 O 0.320 0.150 0.100 0.030 0.033 0.100 73.30 -

E.D. Tabangay Const. / Bonifacio M. Carlos Const. (JV) JV-07-099 Impv't. of Quezon-Punta Baja Road 03/03/09 IV-B 18.950 252 C 0.329 0.133 0.300 - - - 76.20 75.39%

Unsatisfactory

E.G. Canabe Const. 27358 Construction of Concrete Footbridge, Brgy. Lower Hiraan 03/16/09 VIII 0.944 120 C 0.400 0.133 0.300 - - - 83.30 *83.30%

Satisfactory

E.G. Canabe Construction 27358 Const. of 1-CL Sch. Bldg. at A.S. Melgar NHS 02/27/08 VIII 0.499 60 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page129

Page 138: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.G. Guillen Builders 14174 Conc. along Kabugao-Pudtol-Luna Road, Kapanikian Section 06/01/09 CAR 9.338 277 O 0.293 0.300 0.150 0.023 0.045 0.050 86.10 -

E.H. Mantuhac Construction 21334 Const. of 1 unit 1 CL Modified Standard Sch. Bldg., Madugo E/S 08/19/08 VII 0.440 75 C 0.281 0.147 0.300 - - - 72.80 *72.80%

Satisfactory

E.H. Mantuhac Construction 21334 Const. of 1 unit 1 CL Sch. Bldg. @ Sinsing NHS 08/20/08 VII 0.482 60 C 0.245 0.200 0.000 - - - 44.50 *44.50%

Poor

E.H. Mantuhac Construction 21334Const./Rehab./Replacement / Completion & Repair of Elem. & Secondary SB, Matabang

HS05/22/08 VII 0.488 60 C 0.187 0.300 0.300 - - - 78.70 *78.70%

Satisfactory

E.I. Templonuevo & Associates, Incorporated 1090 Rehab. of Multi-Purpose Building Barangay

Poblacion 06/05/09 VI 1.925 90 C 0.426 0.133 0.300 - - - 85.90 *85.90% Satisfactory

E.I. Templonuevo and Associates, Incorporated 1090 Const. of Numancia Multi-Purpose

Building, Brgy. Poblacion 02/26/10 VI 1.926 90 O 0.381 0.300 0.150 0.030 0.038 0.033 93.20 -

E.I. Templonuevo and Associates. Inc. 1090 Rehab. of MPB @ Poblacion 03/15/09 VI 1.920 65 C 0.361 0.200 0.300 - - - 86.10 *86.10%

Satisfactory

E.K.C. Construction & Aggregates 14833 Impvt. of Baguio-Bontoc-Banaue Road 11/13/08 CAR 13.750 108 O 0.329 0.240 0.000 0.020 0.035 0.033 65.70 -

E.K.C. Construction & Aggregates 14833 Repair/Rehab. Along Abatan-Mankayan Road 11/24/07 CAR 0.337 30 C 0.386 0.000 0.300 - - - 68.60 *68.60%

Fair

E.K.C. Construction and Aggregates 14833Impvt. of Baguio-Bontoc-Banaue Road,

Conc. of Mt. Data-Bontoc Road, Km. 367+228 - Km. 368+444 (one section),

03/08/09 CAR 13.750 657 O 0.300 0.300 0.000 0.030 0.045 0.033 70.80 -

E.L. Gomez Construction 31522 Construction of Four (4) CL (2-Units) Bldg. at Dolores H/S 02/25/09 III 1.896 60 C 0.408 0.109 0.300 - - - 81.70 *81.70%

Unsatisfactory

E.L. Gomez Construction 31522 Rehab. of MPB @ Brgy. Lourdes Northwest 05/19/08 III 0.189 30 C 0.387 0.145 0.300 - - - 83.20 *83.20% V. Satisfactory

E.L. Torres Construction and Trading 31406 Completion of MPB along Zone 15 03/03/09 NCR 0.949 60 C 0.369 0.200 0.300 - - - 86.90 83.68% Satisfactory

E.L. Torres Construction and Trading 31406 Construction of SOJR Library 03/23/09 U.P. 950.715 45 C 0.445 0.200 0.300 - - - 94.50 94.50% V. Satisfactory

E.L.R. Everybody's Construction 6336 Rehab./Reconst./Upgrading of Damaged National Roads, Lipa-Rosario Road 05/28/09 IV-A 9.654 120 C 0.459 0.133 0.300 - - - 89.20 *89.20%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page130

Page 139: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.L.R. Everybody's Construction 6336Rehab./Reconst. of Damaged National

Roads, Banay-Banay-Cuenca-Mojon Road, Lipa City Section

11/24/08 IV-A 9.644 120 C 0.340 0.270 0.300 - - - 91.00 *91.00% Outstanding

E.M Palomares Construction 23471 Construction of Road Network & Parking Area I & II 03/2-3/10 DOST 2.592 180 C 0.469 0.10 0.30 - - - 86.90 86.90%

Satisfactory

E.M Palomares Construction 23471 Land Development & Landscaping 03/2-3/10 DOST 1.895 180 C 0.50 0.20 0.00 - - - 70.00 70.00% Poor

E.M. Angeles Enterprises 10150 Const. of MPB at Brgy. Talon 2 11/13/08 NCR 1.912 45 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory

E.M. Angeles Enterprises 10150 Widening of CAA Road Including Installation of Drainage System 09/04/09 NCR 19.089 100 C 0.446 0.133 0.300 - - - 87.90 88.98%

Satisfactory

E.M. Angeles Enterprises 10150 Const. of Multi-Purpose Pavement at Lakeview E/S 02/18/10 NCR 4.762 60 C 0.495 0.133 0.300 - - - 92.80 88.66%

Satisfactory

E.M. Angeles Enterprises 10150 Const. of Multi-Purpose Pavement at Bayanan E/S 02/18/10 NCR 5.239 86 O 0.342 0.240 0.150 0.030 0.029 0.033 82.40 -

E.M. Aragon Enterprises 3314 Conc./Widening of Manila-Cavite Road 11/27/07 IV-A 9.580 168 C 0.381 0.200 0.300 - - - 88.10 88.10% V.Satisfactory

E.M. Aragon Enterprises 3314 Const. (Conc.) /Widening of Governor's Drive, Dasmariñas-Carmona 09/10/09 IVA 35.678 224 C 0.421 0.200 0.300 - - - 92.10 85.80%

Satisfactory

E.M. Bayatan Construction 21332 Const. of Pawak P/S, 1 CL Sch. Bldg. 03/06/08 II 0.406 70 C 0.387 0.200 0.300 - - - 88.70 *88.70% V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Phil. Science High Sch. Bldg. 11/22/07 II 1.877 60 C 0.308 0.239 0.300 - - - 84.70 84.70% V.Satisfactory

E.M. Bayatan Construction 21332 Const. of Quirino MPB 05/27/08 II 0.470 55 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Solano MPB 08/20/08 II 0.939 83 C 0.371 0.200 0.300 - - - 87.10 85.98% V. Satisfactory

E.M. Bayatan Construction 21332 Const. of Sta. Rosa MPB 08/20/08 II 0.470 30 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory

E.M. Bayatan Construction 21332 Construction of NVGCHS Main, 4 CL-2 Storey Building 03/10/09 II 3.055 137 C 0.464 0.200 0.300 - - - 96.40 96.40%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page131

Page 140: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.M. Bayatan Construction 21332 Const. of NVGCHS Four CL 2 Storey Building (Phase 2) 03/03/10 II 2.849 95 C 0.464 0.133 0.300 - - - 89.70 89.70%

V. Satisfactory

E.M. Cuerpo 30963 San Joaquin Ferry Station and Linear Park Project 07/12/07 PRRC 22.333 180 O 0.378 0.231 0.100 0.010 0.025 0.100 84.40 -

E.M. Cuerpo, Inc. 30963 Rehab./Reconst./Upgrading of Mindoro Oriental/Occidental East Coastal Road 02/19/10 IVB 57.898 275 O 0.339 0.300 0.000 0.030 0.051 0.050 77.00 -

E.M. Palomares Construction 23471 Rehabilitation of San Ildefonso Port Road 02/28/09 I 0.951 25 C 0.358 0.200 0.300 - - - 85.80 *85.80%Satisfactory

E.M. Palomares Construction 23471 Rehab./Reconst. of Bayuhay-Sta. Catalina Road, San Vicente-Sta. Catalina 09/07/09 I 11.983 150 C 0.406 0.200 0.300 - - - 90.60 85.92%

Satisfactory

E.M.L. Construction & Trading 10151 Rehabilitation of Angeles-Porac-Floridablanca-Dinalupihan Road 05/18/09 III 19.053 75 O 0.368 0.211 0.150 0.030 0.035 0.050 84.40 -

E.P. Manantan Construction and Development Corp. 6457 Completion of MPB, Purok Villa Paraiso,

Brgy. Visayan Village 03/13/09 XI 0.468 45 C 0.459 0.133 0.300 - - - 89.20 89.20% V. Satisfactory

E.P. Manantan Construction and Development Corp. 6457

Const./Rehab./Replacement/Completion and Repair of Elem. Sch. Bldg. at Luis Lina

PS11/29/08 XI 2.035 120 C 0.322 0.273 0.300 - - - 89.50 *89.50%

V. Satisfactory

E.P. Manantan Construction and Development Corp. 6457 Construction of Multi-Purpose Building,

Brgy. Jovellar 03/10/09 XI 1.469 180 C 0.364 0.157 0.300 - - - 82.10 82.10% Satisfactory

E.P. Manantan Construction and Development Corp. 6457 Impvt./Conc. of 4 lanes at Tuganay Bridge

& Approaches 11/23/07 XI 7.699 180 C 0.336 0.200 0.300 - - - 83.60 83.60% V.Satisfactory

E.P. Manantan Construction and Development Corp. 6457

Rehab./Impv't. (Conc.) of La Fortuna-Tagum Terminal-Capitol-Canocotan-

Laureta Sect. 03/03/08 XI 14.975 180 C 0.297 0.300 0.300 - - - 89.70 87.12%

V. Satisfactory

E.P. Manantan Construction and Development Corporation 6457 Construction of Multi-Purpose Bldg., Brgy.

Poblacion 06/08/09 XI 1.887 209 O 0.366 0.240 0.150 0.030 0.032 0.050 86.80 -

E.P. Manantan Construction and Development Corporation 6457

Road Upgrading (Gravel to Paved) of Tagum Diversion Road, Mankilam-San

Miguel Section06/01/09 XI 4.813 45 C 0.435 0.133 0.300 - - - 86.80 *87.00%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page132

Page 141: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.P. Manantan Construction and Development Corporation 6457 Rehab./Reconstruction of Davao-Agusan

Road-Dapecol Compound Channelization 06/01/09 XI 5.025 45 C 0.429 0.133 0.300 - - - 86.20 *86.20% Satisfactory

E.P. Manantan Construction and Development Corporation 6457 Const. of 4-CL, 2-Storey SB @ Crossing

Bayabas NHS 09/01/09 XI 3.775 150 O 0.354 0.300 0.150 0.015 0.023 0.050 89.20 -

E.P. Manantan Construction and Development Corporation 6457 Road Leading to Baganga Jcyt. National

Highway Brgy. Lambajon 09/11/09 XI 16.245 220 C 0.438 0.133 0.300 - - - 87.10 87.40% Satisfactory

E.P. Manantan Construction and Development Corporation 6457 Const. of Multi-Purpose Building, Brgy.

Poblacion 03/03/10 XI 1.887 209 C 0.477 0.133 0.300 - - - 91.00 88.06% Satisfactory

E.P. Manantan Construction and Development Corporation 6457 Const. of 4CL, 2-Storey Building @

Crossing Bayabas NHS, Piedad 02/23/10 XI 3.775 150 C 0.459 0.133 0.300 - - - 89.20 89.20% V. Satisfactory

E.P. Manantan Construction and Development Corporation 6457 Road Leading to Baganga Port Jct.

Highway, Brgy. Lambajon 03/03/10 XI 16.245 220 C 0.402 0.133 0.300 - - - 83.50 85.96% Satisfactory

E.P.L. General Construction 15559 Conc. of Road, Zone 6, New San Roque 05/28/08 V 0.937 60 C 0.327 0.200 0.300 - - - 82.70 *82.70% V. Satisfactory

E.P.L. General Construction 15559Const. of 2 Storey Sch. Bldg. with CR, roof

Deck Complete Electrical Fixtures and Paintings, Bell-San Francisco E/S

03/05/08 V 3.327 90 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

E.P.L. General Construction 15559 Construction of Road Binanuaanan 03/02/10 V 6.683 150 C 0.412 0.133 0.300 - - - 84.50 84.50% Satisfactory

E.R. Dela Cruz Construction & Supply 32158 Construction of Multi-Purpose Building,

Brgy. Buenavista 05/23/09 III 0.570 90 C 0.440 0.200 0.300 - - - 94.00 *94.00%V. Satisfactory

E.R. Dela Cruz Construction & Supply 32158 Widening of Olongapo-Bugallon Road,

Castillejos Section 05/23/09 III 9.499 30 C 0.402 0.200 0.300 - - - 90.20 *90.20%V. Satisfactory

E.R. Dela Cruz Construction & Supply 32158 Iba Airport Road 05/26/09 III 4.729 90 C 0.337 0.200 0.300 - - - 83.70 *83.70%

Satisfactory

E.R. Dela Cruz Construction & Supply 32158 Const. of Classroom @ Sto. Rosario E/S 11/14/08 III 0.951 60 C 0.337 0.168 0.300 - - - 80.50 * 80.50%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page133

Page 142: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

E.R. Dela Cruz Construction & Supply 32158 Conc. of Binabalian Road 02/19/10 III 9.506 60 C 0.441 0.133 0.300 - - - 87.40 87.40%

Satisfactory

E.R. Dela Cruz Construction Supply 32158 Conc. of Brgy. Malabago Road 11/16/07 III 0.944 21 C 0.286 0.200 0.300 - - - 78.60 *78.60% Satisfactory

E.R. Venzon Construction (Formerly: Lion Const.) 19013

Const. of One (1) Classroom School Building at Balon Anito ES, Brgy. Balon

Anito08/28/09 III 0.513 32 C 0.473 0.133 0.300 - - - 90.60 *90.60%

V. Satisfactory

E.S. De Guzman Construction 17494 Construction of Multipurpose Building 7/23/09 DOST 3.406 160 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory

E.S. Quillo Mini Enterprises 28854 Const. of Multi-Purpose Bldg. Little Baguio 02/24/10 X 0.972 75 C 0.370 0.174 0.300 - - - 84.40 84.40% Satisfactory

E.S.L. Builders and Parts Supply 9014 Road Opening @ Malad 05/25/09 IV-B 1.444 40 C 0.345 0.200 0.300 - - - 84.50 *84.60% Satisfactory

E.S.R. Construction and Supplies 10451 Gadakinsur CIP 10/6-10/08 MOPIO 10.740 270 O 0.360 0.160 0.100 0.020 0.040 0.200 88.00 -

E.S.R. Construction and Supplies 10451 Gadakinsur Communal Irrigation Project, Package II 10/6-10/08 MOPIO 13.049 977 O 0.371 0.160 0.050 0.010 0.050 0.200 84.11 -

E.T. Latawan Construction 13919 Const. of Tigil-Betwagan FMR 08/17/07 CAR 4.765 90 C 0.361 0.254 0.300 - - - 91.50 93.00% Outstanding

E.T. Latawan Construction 13919 Impvt. of Mt. Data Bridge along Baguio-Bontoc 08/14/08 CAR 9.263 242 C 0.371 0.100 0.300 - - - 77.10 74.72%

Satisfactory

E.T.V.R. Trading and Construction 14581Road Upgrading @ CNR Km. 37+177 to Km.

37+348 & Km. 38+744 to Km. 39+185 (Intermittent Section)

05/26/09 IV-B 14.204 150 C 0.454 0.145 0.300 - - - 89.90 85.88% Satisfactory

E.T.V.R. Trading and Construction 14581 Rehab./Impvt. of DPWH Office Bldg., Regional Office 12/04/08 XI 19.250 300 O 0.389 0.300 0.100 0.030 0.058 0.100 97.70 -

E.T.V.R. Trading and Construction 14581 Road Upgrading of Calapan North Road (Intermittent Section) 02/16/10 IVB 19.299 180 C 0.446 0.144 0.300 - - - 89.00 86.24%

Satisfactory

E.U. Jingco Construction 31486 Proposed Access Road-PUP Main 01/04/08 SPO 2.487 124 C 0.400 0.241 0.300 - - - 94.10 94.10% V. Satisfactory

E.V. & E. Construction 31176 Repair/Rehab. of School Bldg. F.G. Calderon Integrated School, Hermosa St. 02/26/10 NCR 0.481 45 C 0.433 0.133 0.300 - - - 86.60 86.60%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page134

Page 143: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

EA-EC Construction 15737 Rehabilitation of Santiago-Sagrada Road 05/29/09 V 0.382 60 C 0.357 0.200 0.300 - - - 85.70 *85.70% Satisfactory

EA-EC Constuction 15737 Completion of MPB 03/03/08 V 0.376 45 C 0.340 0.200 0.300 - - - 84.00 81.48% V. Satisfactory

EA-EC Constuction 15737 Const. of 1 CL Rm. Modified Sch. Bldg. 11/22/08 V 0.531 90 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory

EA-EC Constuction 15737 Construction of Camp Elias Angeles MPB 03/09/09 V 2.405 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory

Earl Construction 8461 Const. of 2 Storey MPB @ Block 38 Brgy. Addition Hills 03/05/08 NCR 19.096 120 C 0.361 0.300 0.300 - - - 96.10 85.95%

V. Satisfactory

Earth Movers Construction 27145 San Antonio Airport Development Project 05/29/09 DOTC 2.870 90 C 0.413 0.200 0.300 - - - 91.30 91.30% Very Satisfactory

East Asia Construction Inc. 4904 Const./Rehab./Repair of Zaldivar Road @ Brgy. Zaldivar 03/11/09 VI 1.525 60 C 0.394 0.200 0.300 - - - 89.40 *89.40%

V. Satisfactory

East Asia Construction, Inc. 1904 Construction of Guimaras District Engineering Office, San Miguel 06/01/09 VI 2.846 90 C 0.440 0.200 0.300 - - - 94.00 *94.00%

V. Satisfactory

East Asia Construction, Inc. 1904Repair/Rehab. of Guimaras Circumferential

Rd., Nueva Valencia to Jordan Rd. Km. 108+759 with exception

02/22/10 VI 10.273 120 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory

East Asia Construction, Inc. 1904 Completion of Multi-Purpose Building (Justice Hall) 02/22/10 VI 3.748 200 C 0.423 0.200 0.300 - - - 92.30 84.53%

Satisfactory

EC Samonte Construction 31019 Concreting of Pathway Liloy Central School 06/01/09 IX 0.962 88 O 0.387 0.240 0.150 0.030 0.047 0.050 90.40 -

EC Samonte Construction 31019 Const. of Liloy-Siocon Dansalan-Lopoc, Km. 1982+123.50-Km.1983+390 06/01/09 IX 28.654 314 C 0.495 0.133 0.300 - - - 92.80 87.49%

Satisfactory

EC Samonte Construction 31019 Conc. of Sirawai Boulevard (Phase II) 05/20/08 IX 1.908 60 C 0.298 0.052 0.300 - - - 65.00 75.02% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page135

Page 144: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

EC Samonte Construction 31019 Const. of Liloy-Siocon Road, Dansalan-Lopoc 11/25/08 IX 28.654 155 O 0.304 0.238 0.100 0.030 0.025 0.067 76.40 -

EC Samonte Construction 31019 Const. of Liloy-Siocon Road, Dansalan-Lopoc 03/09/09 IX 28.654 311 O 0.369 0.281 0.150 0.030 0.035 0.050 91.50 -

EC Samonte Construction 31019 Proposed/Impvt. of Multi-Purpose Building (Gym), Kalawit 09/08/09 IX 1.445 70 C 0.457 0.200 0.300 - - - 95.70 *95.70%

V. Satisfactory

EC Samonte Construction 31019 Const. of MPB at Jose Rizal Memorial State College (Covered Court) 09/08/09 IX 1.927 100 C 0.435 0.200 0.300 - - - 93.50 *93.50%

V. Satisfactory

EC Samonte Construction 31019 Concreting of Pathway Liloy Central School 09/08/09 IX 0.962 98 C 0.429 0.200 0.300 - - - 92.90 91.40%

V. Satisfactory

EC Samonte Construction 31019Impvt./Rehab. of Farm-to-Market Road at Sarawagan Godod (Guisapong-Rambon-

Dipopor Road)09/08/09 IX 4.815 110 C 0.375 0.200 0.300 - - - 87.50 *87.50%

Satisfactory

EC Samonte Construction 31019 Const. of Tilubog E/S 1 unit (2) Classroom School Building 03/03/10 IX 0.929 60 C 0.367 0.200 0.300 - - - 86.70 86.70%

Satisfactory

ECDA Construction 7013 Channeling Works @ Sta. Lucia Creek 05/20/08 III 0.473 28 C 0.298 0.257 0.300 - - - 85.50 *85.50% V.Satisfactory

Ed Fabro Construction 18726 Const. of 2-Classroom @ La Union National High School 05/27/09 I 1.143 80 C 0.492 0.163 0.300 - - - 95.50 *95.50%

V.Satisfactory

Ed Fabro Construction 18726 Rehab. of Damaged Cover & Sidewalk of North & South Central Sch. 11/11/08 I 0.760 35 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

Ed Fabro Construction 18726 Rehabilitation of Multi-Purpose Pavement at PNR Biday-Mameltac and Bangbangolan 02/24/09 I 1.882 120 C 0.345 0.200 0.300 - - - 84.50 83.48%

Satisfactory

Ed Fabro Construction 18726 Construction of Multi-Purpose Building 09/02/09 I 1.882 90 C 0.474 0.200 0.300 - - - 97.40 87.81% Satisfactory

Ed Fabro Construction 18726 Improvement of MPB 02/26/10 I 0.976 90 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page136

Page 145: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Eddie G. Guillen Builders 14174 Concrete Reblocking at KO 571+000 - KO 585+000, along Dugo-San Vicente Road 05/20/09 II 14.215 210 C 0.482 0.133 0.300 - - - 91.50 87.51%

Satisfactory

Eddie G. Guillen Builders 14174 Conc. of Appari Airport Road 08/17/07 II 2.150 120 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

Eddie G. Guillen Builders 14174 Conc. of Dugo-San Vicente Road with Drainage 02/22/08 II 13.174 260 C 0.355 0.200 0.300 - - - 85.50 87.72%

V. Satisfactory

Eddie G. Guillen Builders 14174 Conc. of M. Antiporda Road, Municipal St. 08/25/08 II 0.945 120 C 0.249 0.168 0.300 - - - 71.70 *71.70% Satisfactory

Eddie G. Guillen Builders 14174 Concrete Reblocking along Dugo-San Vicente Road 11/11/08 II 14.215 210 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -

Eddie G. Guillen Builders 14174 Concrete Reblocking along Dugo-San Vicente Road 02/25/09 II 14.216 210 O 0.341 0.300 0.087 0.030 0.040 0.050 84.80 -

Eddie G. Guillen Builders 14174 Reblocking of Cagayan Valley Road (Magupit Junction Aparri Section) 09/09/09 II 16.402 180 C 0.411 0.200 0.300 - - - 91.10 88.76%

Satisfactory

Eddie G. Guillen Builders 14174 Conc. along Kabugao-Pudtol-Luna Road, Kapanikian Section 02/18/10 CAR 9.338 277 C 0.383 0.139 0.300 - - - 82.20 84.54%

Satisfactory

Eddie G. Guillen Builders 14174 Restoration of Collapsed Revetment at Sapping River Control 02/20/10 II 13.356 360 O 0.362 0.248 0.150 0.030 0.041 0.033 86.40 -

Eddmari Const. & Trading / Cholo Const. & Trading (JV) JV-07-091 Candaba-San Miguel Road 02/24/09 III 25.964 234 O 0.335 0.300 0.150 0.030 0.042 0.050 90.70 -

Eddmari Const./Christian Ian Corp. Joint Venture JV-07-133 Upgrading/Concreting of Tulaoc-Sto.

Domingo Road (San Simon Section) 06/05/09 III 91.773 230 C 0.307 0.200 0.300 - - - 80.70 87.48% Satisfactory

Eddmari Construction and Trading 20301 Const./Repair/Completion of Multi-Purpose Building, Bebe Anac 05/19/09 III 0.571 40 C 0.477 0.200 0.300 - - - 97.70 *97.70%

Outstanding

Eddmari Construction and Trading 20301 Candaba-San Miguel Road 02/24/09 III 45.764 193 O 0.379 0.299 0.150 0.030 0.037 0.050 94.50 -

Eddmari Construction and Trading 20301Maintenance/Rehab. & Impv't. of Nat'l

Arterial Secondary Roads, Apalit-Macabebe-Masantol Road

08/31/07 III 0.951 30 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page137

Page 146: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Eddmari Construction and Trading 20301 Repair of Slope Protection of San Miguel Bridge 11/11/08 III 9.534 60 C 0.240 0.300 0.300 - - - 84.00 *84.00%

V. Satisfactory

Eddmari Construction and Trading 20301 Sct. Ranger Housing Project, Phase IV 04/27/07 NHA 46.983 180 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -

Eddmari Construction and Trading 20301 Const/Conc./Rehab/Completion of San Gabriel Multi-Purpose Bldg. 08/24/09 III 0.667 45 C 0.475 0.133 0.300 - - - 90.80 *90.80%

V. Satisfactory

Eddmari Construction and Trading 20301 Rehab./Reconst./Upgrading of Damaged Pavement at Candaba-San Miguel Road 02/15/10 III 19.030 104 C 0.423 0.200 0.300 - - - 92.30 92.30%

V. Satisfactory

Eddmari Construction and Trading 20301 Slope Protection Works along Sta. Ana-Candaba Road 02/15/10 III 4.777 30 C 0.470 0.133 0.300 - - - 90.30 90.30%

V. Satisfactory

Eddmari Construction and Trading/Cholo Const. & Trading (JV) JV-07-091 Candaba-San Miguel Road 02/15/10 III 25.794 234 C 0.427 0.200 0.300 - - - 92.70 91.50%

V. Satisfactory

Edelcriz Construction 30864 Conc. of Road @ Brgy. Bagong Buhay 1 05/20/08 III 0.954 75 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory

Edelsons Builders, Inc. 24826 Asphalting/Concrete Blocking of Del Monte Avenue 06/01/09 NCR 9.550 90 C 0.489 0.133 0.300 - - - 92.20 *92.20%

V. Satisfactory

Edelsons Builders, Inc. 24826 Asphalt Overlay/Conc. Reblocking at Tandang Sora Ave. 03/09/09 NCR 9.600 60 C 0.345 0.200 0.300 - - - 84.50 *84.50%

Satisfactory

Edelsons Builders, Inc. 24826 Rehab. of Road at Brgy. San Isidro 03/06/08 IV-A 0.956 30 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory

Edriel Enterprises 32500 Const. of Bislig Flood Control 08/12/08 V 1.915 120 C 0.282 0.200 0.300 - - - 78.20 *78.20% Satisfactory

EDT Construction 10225 Maintenance/Rehab. & Impv't. of GSO Road 11/13/07 III 0.980 40 C 0.364 0.200 0.300 - - - 86.40 *86.40% V. Satisfactory

EDT Construction 10225 Restoration of Slope Protection at Pentor Balsik River 02/24/09 III 0.951 60 C 0.350 0.200 0.300 - - - 85.00 *85.00%

Satisfactory

EEI Corporation 333

NAIA Expressway and its' Related Road Project Phase I, Contract Package IV-A

Sales St. Viaduct and Ramp Structure (MSE Retaining Wall)

03/05/10 URPO 400.774 656 C 0.410 0.200 0.300 - - - 91.00 89.32% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page138

Page 147: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

EFC Enterprises 11795 Conc. Blocking of EDSA (Northbound) 08/15/07 NCR 8.876 60 C 0.149 0.200 0.300 - - - 64.90 *64.90% Fair

EFC Enterprises 11795 Const. of MPB @ Brgy. San Vicente 08/16/07 IVA 1.921 60 C 0.349 0.200 0.300 - - - 84.90 85.32% V. Satisfactory

EFC Enterprises 11795 Const. of Quirino Ave. near Don Galo La Huerta Bridge 08/12/08 NCR 9.617 60 C 0.270 0.290 0.300 - - - 86.00 92.54%

Outstanding

EFC Enterprises 11795 Const. of Bridge at Brgy. Talon 1 (Phase I) 09/04/09 NCR 3.841 61 C 0.409 0.133 0.300 - - - 84.20 *84.20% Satisfactory

EFC Enterprises 11795Asphalt Overlay along Gil Puyat Ave. East

Bound (Phase II) EDSA to Ayala with exception

02/17/10 NCR 9.591 30 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory

EG & I Construction Corporation 16225 Impvt./Rehab. of Argao-Moalboal Road (Taloot-Anahaw Sect.) 08/22/08 VII 4.694 16 C 0.309 0.300 0.300 - - - 90.90 *90.90%

Outstanding

EG & I Construction Corporation 16225 Impvt./Rehab. of Various Sts. At Lamacan 09/05/07 VII 4.782 17 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding

EG & I Construction Corporation 16225

Rehab./Reconst. of Damaged National Roads Generated from Pavement

Management Sys., along Bacalso Ave. (NBA-Cebu South Rd.)

12/01/08 VII 15.873 120 C 0.367 0.211 0.300 - - - 87.80 *87.80% V. Satisfactory

EGB Construction 13722 Rehab./Concreting of San Antonio-Cabisera Road 05/22/09 II 4.673 120 C 0.439 0.200 0.300 - - - 93.90 91.92%

V. Satisfactory

EGB Construction 13722Rehab./Reconst./Upgrading of Damaged Paved National Road CAR, Sampaguita-

Solano Section, KO 502+000-KO 503+60005/18/09 II 19.289 120 O 0.388 0.240 0.150 0.030 0.056 0.050 91.40 -

EGB Construction 13722 Conc. of Jct. Nat'l to Sta. Victoria Road 08/13/08 II 13.098 90 C 0.306 0.294 0.300 - - - 90.00 88.68% V. Satisfactory

EGB Construction 13722 Conc./Impvt. of Cabannungan 1st Brgy. Road 02/25/08 II 0.942 62 C 0.344 0.200 0.300 - - - 84.40 *84.40%

V. Satisfactory

EGB Construction 13722 Const. of MPB 08/26/08 II 1.923 200 C 0.378 0.248 0.300 - - - 92.60 87.56% V. Satisfactory

EGB Construction 13722 Const. of MPB 11/14/08 II 1.926 200 C 0.385 0.200 0.300 - - - 88.50 87.63% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page139

Page 148: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

EGB Construction 13722 Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road, Ilagan-Delfin Albano 11/19/07 II 9.439 107 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

EGB Construction 13722 Rehab/Recons. of Damaged National Road 02/27/09 II 19.132 288 C 0.429 0.200 0.300 - - - 92.90 85.58% Satisfactory

EGB Construction 13722 Road Conc. of Cabisera 11/18/08 II 3.815 80 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

EGB Construction 13722 Road Concreting of Bliss to Namnama 08/12/08 II 1.925 115 C 0.316 0.300 0.300 - - - 91.60 *91.60% Outstanding

EGB Construction 13722Rehab./Reconst./Upgrading of Damaged

Paved National Roads, CAR, Sampaguita-Solano Section KO502+000-KO503+600

09/10/09 II 19.285 146 C 0.471 0.200 0.300 - - - 97.10 93.68% V. Satisfactory

EGB Construction 13722 Concreting of Jct. National to Sta. Victoria Road 09/05/09 II 22.144 120 C 0.434 0.200 0.300 - - - 93.40 91.84%

V. Satisfactory

EJR Builders & Construction Supply 24255 Construction of School Building (Phase I) at Ranao NHS 03/11/09 I 0.507 40 C 0.389 0.200 0.300 - - - 88.90 *88.90%

Satisfactory

EJR Builders and Construction Supply 24255 Conc. of Road @ Nayom 03/06/08 I 0.475 44 C 0.324 0.200 0.300 - - - 82.40 *82.40%

V. Satisfactory

EJR Builders and Construction Supply 24255 Const. of MPB @ Maliga E/S 03/04/10 I 0.387 37 C 0.466 0.133 0.300 - - - 89.90 89.90%

V. Satisfactory

El Kapitan Construction Service 33123 Const./Conc./Rehab./Completion of Sto. Tomas Multi-purpose Bldg. 08/24/09 III 0.475 35 O 0.356 0.240 0.150 0.030 0.051 0.050 87.70 -

El Kapitan Construction Services 33123 Rehab./Impvt. of San Agustin Road 08/24/09 III 3.327 40 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory

El Nido Construction & Trading 25814 Const. of Pinagupitan-Daungan FMR 03/04/08 IVB 1.860 45 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory

Eldico Builders 26601 Improvement/Rehab. of Anao-San Pablo FMR 02/24/09 III 2.852 25 C 0.375 0.200 0.300 - - - 87.50 *87.50%

Satisfactory

Eleazar V. Adlawan Construction 576 Rehab., Reconst. of Natalio Bacalso Avenue, Carcar-Sibonga Section 06/01/09 VII 9.647 35 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page140

Page 149: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Eleazar V. Adlawan Construction 576 Conc. of Panglao National Road 03/13/08 VII 19.049 185 C 0.337 0.200 0.300 - - - 83.70 89.04% V. Satisfactory

Eleazar V. Adlawan Construction 576 Const. of Seawall, Brgy. South Poblacion 12/02/08 VII 4.778 90 C 0.211 0.300 0.300 - - - 81.10 79.06% Satisfactory

Elkan Konstrak & Aggregates 26220 Const. of Drainage System along Inascan-Paulog Road 08/13/08 V 9.576 90 C 0.340 0.200 0.300 - - - 84.00 *84.00%

V. Satisfactory

Elkan Konstrak & Aggregates 26220 Const. of P. Basas Elem. School Building 08/22/08 V 0.453 60 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Elkan Konstrak & Aggregates 26220 Seal/Widening/Rehab./Impv't. of Road Shoulder along MSR 11/23/07 V 0.230 20 C 0.364 0.200 0.300 - - - 86.40 86.40%

V.Satisfactory

EM Paule Construction and Trading 19006 Const. of 1-unit 1 CL Sch. Bldg. @ Maydolong NHS 09/06/07 VIII 0.373 50 C 0.380 0.200 0.300 - - - 88.00 *88.00%

V. Satisfactory

EMS Sarmiento Construction 29097 Const. of Caban 1 Bridge and its Approaches along Danao-Getafe Rd. 08/30/08 VII 4.265 130 C 0.306 0.300 0.300 - - - 90.60 91.68%

Outstanding

EMS Sarmiento Construction 29097 Impvt. (Conc. Paving) of Danao-Getafe Road 08/25/07 VII 9.470 210 C 0.359 0.300 0.300 - - - 95.90 94.64%

Outstanding

EMS Sarmiento Construction 29097 Talibon Small Reservoir Irrigation Project 9/29/08 10/3/08 NIA 5.170 299 O 0.385 0.176 0.030 0.030 0.047 0.200 86.80 -

Enrique A. Flores Contractor 2421 Rehab./Conc. Of Road of SLU-SVP Brgy. 03/03/10 CAR 1.446 30 C 0.357 0.200 0.300 - - - 85.70 85.70% Satisfactory

Enrique A. Flores Jr. Contractor 2421 Rehab./Conc. of Roads @ Irisan Brgy. 11/26/07 CAR 2.863 120 C 0.221 0.200 0.300 - - - 72.10 *72.10% Satisfactory

EPN Builders & Developers 30341 Const. of One (1) CL SB, Gomez Primary School 09/03/09 II 0.484 60 C 0.358 0.200 0.300 - - - 85.80 *85.80%

Satisfactory

EPN Builders & Developers 30341 Const. of One (1) CL School Building (7m x 7m) at Maligaya E/S 02/22/10 II 0.499 60 C 0.441 0.123 0.300 - - - 86.40 86.40%

Satisfactory

EPN Builders & Developers 30341 Const./Repair of Multi-Purpose Building 02/25/10 II 1.350 60 C 0.430 0.133 0.300 - - - 86.30 86.30% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page141

Page 150: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

EPN Builders and Developers 30341 Completion of Multi-Purpose Building 03/06/09 II 1.491 60 C 0.417 0.200 0.300 - - - 91.70 *91.70% V.Satisfactory

EPN Builders and Developers 30341 Const. MPB @ Roxas East C/S (Phase II) 08/11/08 II 1.926 90 C 0.392 0.200 0.300 - - - 89.20 84.72% V. Satisfactory

EPN Builders and Developers 30341 Const. of School Bldg. @ San Leonardo E/S 05/26/08 II 0.527 60 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

EPN Builders and Developers 30341Repair/Rehab. of Eroded Embankment & Damaged Slope Protection @ Babanuang Bridge along Santiago-Tuguegarao Road

05/22/08 II 0.964 45 C 0.280 0.200 0.300 - - - 78.00 81..84% V. Satisfactory

EPN Builders and Developers 30341Repair/Rehab. of Tungcab Bridge

Approach "B" along Cordon-Aurora Bdry. Road

11/20/07 II 0.964 45 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding

Equilibrium Engineering 13606 Concreting of Access Road (Shouldering) Daet-Mercedes Road 06/04/09 V 2.820 150 C 0.464 0.133 0.300 - - - 89.70 *89.70%

V. Satisfactory

Equi-Parco Construction 14332 Butuan Airport Development Project 03/17/09 DOTC 48.145 240 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory

Equi-Parco Construction Co. 14332 Asphalt Overlay along Butuan City-Cagayan de Oro-Iligan Road 09/05/07 XIII 14.450 180 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

Equi-Parco Construction Co. 14332 Asphalt Overlay of Agusan-Misamis Oriental Road 03/18/09 XIII 14.446 90 C 0.460 0.200 0.300 - - - 96.00 *96.00%

V.Satisfactory

Equi-Parco Construction Co. 14332 Conc. of Agusan del Norte-Surigao del Sur (Cabadbaran-Puting Bato Section) 11/18/08 XIII 95.698 540 O 0.393 0.272 0.100 0.030 0.050 0.100 94.50 -

Equi-Parco Construction Co. 14332 Conc. of Agusan del Norte-Surigao del Sur (Cabadbaran-Puting Bato Section) 03/03/09 XIII 95.698 540 O 0.335 0.300 0.150 0.030 0.056 0.050 92.10 -

Equi-Parco Construction Co. 14332 Conc. of Kinabjangan By-Pass National Secondary Road 03/02/09 XIII 13.876 180 C 0.398 0.200 0.300 - - - 89.80 85.96%

Satisfactory

Equi-Parco Construction Co. 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road 03/19/09 X 91.466 330 O 0.347 0.300 0.100 0.030 0.045 0.050 87.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page142

Page 151: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Equi-Parco Construction Co. 14332 Conc.of Agusan-Bukidnon National Road 03/02/09 XIII 15.034 207 C 0.435 0.200 0.300 - - - 93.50 90.14% V.Satisfactory

Equi-Parco Construction Co. 14332 Const. of Palapay Bridge and Approaches, Gingoog Claveria Road 08/29/07 X 21.713 300 C 0.359 0.300 0.300 - - - 95.90 92.84%

Outstanding

Equi-Parco Construction Co. 14332 Construction of Butuan City By-Pass Road, Bonbon-Kinamlutan Section 03/19/09 XIII 24.594 195 O 0.353 0.300 0.150 0.030 0.042 0.050 92.50 -

Equi-Parco Construction Co. 14332 Impvt. of JSH-Bagontaas-Lurogan-MVC-Lilingayeon Road, MVC Section 08/23/07 X 24.697 205 C 0.370 0.230 0.300 - - - 90.00 85.44%

V. Satisfactory

Equi-Parco Construction Co. 14332 Impvt./Conc. of Aglayan-Zamboanguita Road, Managoc Section 11/19/08 X 66.953 329 C 0.361 0.300 0.300 - - - 96.10 91.00%

Outstanding

Equi-Parco Construction Co. 14332 Impvt./Conc. of Gingoog-Claveria-Villanueva Road 11/26/07 X 19.064 180 C 0.383 0.300 0.300 - - - 98.30 *98.30%

Outstanding

Equi-Parco Construction Co. 14332 Nasipit Port Expansion Project 9/6/07 5/20/08 PPA 215.144 540 O 0.3984 0.3 0.1 0.03 0.07 0.1 99.84 -

Equi-Parco Construction Co. 14332 Rechanneling of Cabadbaran River, Putting Bato, Phase 1 03/03/09 XIII 19.280 180 O 0.334 0.000 0.200 0.050 0.067 0.250 90.10 -

Equi-Parco Construction Co. 14332 Rechannelization of Mamkas River 11/20/07 XIII 14.455 120 C 0.213 0.022 0.300 - - - 53.50 73.84% Satisfactory

Equi-Parco Construction Co. 14332 Rehab./Reconst. of Butuan City-Masao Port Road 12/03/08 XIII 19.276 225 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

Equi-Parco Construction Co. 14332Repair & Rehab. of Butuan-Cagayan de Oro-

Iligan Road (Agusan-Misamis Oriental Road)

05/28/08 XIII 14.457 150 C 0.343 0.300 0.300 - - - 94.30 94.42% Outstanding

Equi-Parco Construction Co. 14332Repair & Rehab. of Butuan-Cagayan de Oro-

Iligan Road (Sta. 1240+746-Sta. 1241+276 with exceptions)

05/28/08 XIII 14.454 150 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Equi-Parco Construction Co. 14332Road Upgrading (Gravel to concrete) Jct., SH Bangcud-Mailag By Pass Road (Mailag

Section)11/19/08 X 12.329 210 C 0.372 0.300 0.300 - - - 97.20 93.48%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page143

Page 152: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Equi-parco Construction Co. 14332 Butuan Airport Development Project 07/31/09 DOTC 9.606 120 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

Equi-Parco Construction Co. / Gicar Construction (JV) JV-08-062 Conc. of Dinagat Island Rd. Network

Dinagat-Loreto Rd. (Basilisa-Albor Section) 02/24/10 XIII 161.114 417 O 0.358 0.240 0.150 0.030 0.051 0.050 87.90 -

Equi-Parco Construction Co./Gicar Construction JV JV-08-062 Conc. of Dinagat Island Rd. Network,

Dinagat-Loreto Rd. (Basilisa-Albor Sect.) 09/05/09 XIII 161.114 390 O 0.386 0.274 0.150 0.030 0.051 0.050 94.10 -

Equi-Parco Construction Company 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road 06/10/09 X 91.466 330 O 0.271 0.300 0.150 0.030 0.043 0.050 84.40 -

Equi-Parco Construction Company 14332 Upgrading of Agusan-Bukidnon National Road 05/25/09 XIII 14.326 210 O 0.393 0.300 0.150 0.030 0.047 0.050 97.00 -

Equi-Parco Construction Company 14332 Construction of Camingawan-Canticol Road, Phase VI 05/26/09 XIII 19.278 180 C 0.459 - 0.500 - - - 95.90 *95.90%

V. Satisfactory

Equi-Parco Construction Company 14332 Rehab./Reconst. of Buenavista-Bunaguit Road Section 05/25/09 XIII 7.572 180 O 0.376 0.300 0.150 0.030 0.047 0.050 95.30 -

Equi-Parco Construction Company 14332 Const. of Butuan City Bypass Road (Bon-bon) Kinamlutan Section 06/11/09 XIII 24.594 195 C 0.478 0.200 0.300 - - - 97.80 94.62%

V. Satisfactory

Equi-Parco Construction Company 14332 Const. of Camingawan-Canticol Road Phase V 05/26/09 XIII 19.280 180 C 0.445 0.000 0.500 - - - 94.50 *94.50%

V. Satisfactory

Equi-Parco Construction Company 14332 Conc. of Agusan Del Norte-Surigao Del Sur (Cabadbaran-Puting Bato Sect.) 05/26/09 XIII 95.698 540 C 0.487 0.170 0.300 - - - 95.70 94.26%

V. Satisfactory

Equi-Parco Construction Company 14332 Rechanneling of Cabadbran River Puting Bato, Phase I 05/26/09 XIII 19.279 180 C 0.445 0.000 0.500 - - - 94.50 91.86%

V. Satisfactory

Equi-Parco Construction Company 14332 Nasipit Port Expansion Project 11/4-7/08 FCMD 217.925 540 C 0.400 0.300 0.300 - - - 99.44 99.44% Outstanding

Equi-Parco Construction Company 14332 Conc. of Gingoog-Calveria-Villanueva Road, Samay Section 09/08/09 X 13.721 180 C 0.484 0.180 0.300 - - - 96.40 *96.40%

Outstanding

Equi-Parco Construction Company 14332 Rehab./Reconst. of Butuan City-Cagayan De Oro City- Iligan Road 09/09/09 X 145.175 405 O 0.357 0.300 0.150 0.030 0.056 0.050 94.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page144

Page 153: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Equi-Parco Construction Company 14332 Rehab./Reconst. of Butuan City-Cagayan de Oro City-Iligan City (BCIR) Road 09/07/09 X 474.722 360 O 0.378 0.248 0.150 0.030 0.070 0.050 92.60 -

Equi-Parco Construction Company 14332Rehab./Asphalt Overlay along Butuan-Cagayan de Oro-Iligan Rd. along Brgy.

Ampayon-Brgy. Baan Sec.09/16/09 XIII 48.164 250 C 0.457 0.200 0.300 - - - 95.70 *95.70%

V.Satisfactory

Equi-Parco Construction Company 14332 Const. of Butuan City Bypass Rd. 09/08/09 XIII 143.662 375 O 0.400 0.240 0.150 0.030 0.065 0.050 93.50 -

Equi-Parco Construction Company 14332 Upgrading of Buenavista-Bunaguit Rd.(Malpoc-Rizal Sect.) 09/01/09 XIII 14.326 210 C 0.409 0.189 0.300 - - - 89.80 92.56%

V.Satisfactory

Equi-Parco Construction Company 14332 Rehab./Reconst. of Damaged Paved National Rd.,Buenavista-Bunaguit Rd. Sect. 09/01/09 XIII 7.572 160 C 0.400 0.174 0.300 - - - 87.40 92.14%

V.Satisfactory

Equi-Parco Construction Company 14332 Concreting of Butuan City-Masao Port Rd., Jct. Doongan Bridge 09/16/09 XIII 14.213 195 O 0.378 0.240 0.150 0.030 0.060 0.050 90.80 -

Equi-Parco Construction Company 14332 Const./Conc. of SDCR(Lingig Boundary-Boston Sect.) along Bislig-Boston Sect. 09/11/09 XIII 325.527 585 O 0.383 0.225 0.150 0.030 0.065 0.050 90.30 -

Equi-Parco Construction Company 14332 Upgrading of Agusan-Bukidnon National Rd. 09/01/09 XIII 14.326 210 O 0.394 0.216 0.150 0.030 0.050 0.050 89.00 -

Equi-Parco Construction Company 14332 Asphalt overlay-Daang Maharlika (cracks & joints Sealing) Sibagat and Bayugan Sect. 09/13/09 XIII 14.292 97 C 0.417 0.133 0.300 - - - 85.00 *85.00%

Satisfactory

Equi-Parco Construction Company 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Rd. 03/11/10 X 96.040 330 C 0.410 0.200 0.000 - - - 61.00 75.88%

Unsatisfactory

Equi-Parco Construction Company 14332 Asphalt Overlay along Butuan City-Masao Port Rd. 03/10/10 XIII 8.640 90 C 0.488 0.133 0.300 - - - 92.10 92.10%

V.Satisfactory

Equi-Parco Construction Company 14332 Asphalt Overlay along Agusan-Misamis Rd. Carmen-Tagcatong Section 02/22/10 XIII 18.528 75 C 0.479 0.133 0.300 - - - 91.20 91.20%

V.Satisfactory

Equi-Parco Construction Company 14332 Const. of Butuan City By Pass Road 02/23/10 XIII 143.662 375 C 0.340 0.200 0.300 - - - 84.00 89.70% V.Satisfactory

Equi-Parco/Adfil Joint Venture JV-09-023 Conc./Impv't. of Tiniwisan-Maguinwall Rd. (Lemon-Pigdanlan Section) 02/23/10 XIII 335.031 51 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -

Eric Van P. Sesbreno Construction 26243 Conc. of Tactac-Atbu Road 08/21/08 II 0.479 30 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page145

Page 154: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Eric Van P. Sesbreno Construction 26243 Const. of Imugan MPB (Gymnasium) 11/23/07 II 0.902 75 C 0.222 0.300 0.300 - - - 82.20 *82.20% V. Satisfactory

Eric Van P. Sesbreno Construction 26243 Construction of Mabasa Flood Control 09/01/09 II 0.473 30 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory

Ermy Construction 15741 Const. of 3 CL at San Isidro E/S 08/31/07 III 1.136 45 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding

Ermy Construction and Trading 15741 Rehab/Improvement of Sta. Lucia Farm to Market Road 02/23/09 III 4.753 50 C 0.406 0.200 0.300 - - - 90.60 *90.60%

V. Satisfactory

Ermy Construction and Trading (Formerly:Ermy Construction) 15741 Rehab. of Brgy. Road at St. Niño 11/11/08 III 0.956 30 C 0.312 0.300 0.300 - - - 91.20 *91.20%

Outstanding

ES De Guzman Construction 17494 Const. of NVGCHS, 6CL,3-Storey Building, Bontal Annex 08/28/09 II 1.604 90 O 0.325 0.240 0.150 0.030 0.018 0.050 81.30 -

ESD Cruz Construction & Supply 32368 Asphalt Overlay of Catarman-Laoang Road, Pambujan-Rawis Sect. 05/25/09 VIII 14.719 120 C 0.479 0.133 0.300 - - - 91.20 *91.20%

V. Satisfactory

ESD Cruz Construction & Supply 32368 Repair of Secondary Sch. Bldg., Rawis NHS 11/22/07 VIII 0.648 60 C 0.379 0.100 0.300 - - - 77.90 *77.90%

Satisfactory

ESD Cruz Construction & Supply 32368 Repair/Rehab. of National Road (Pangpang-Mapanas-Gamay-Lapinig Road 03/04/09 VIII 9.789 120 C 0.465 0.133 0.300 - - - 89.80 84.22%

Satisfactory

ESD Cruz Construction & Supply 32368 Concrete Paving along Brgy. San Roque-Balud-Coroconog FMR 09/12/09 VIII 9.618 90 C 0.387 0.200 0.300 - - - 88.70 *88.70%

Satisfactory

ESD Cruz Construction & Supply 32368 Const. of Multi-Purpose Pavement Brgy. Dale 03/06/10 VIII 0.968 180 C 0.389 0.200 0.300 - - - 88.90 88.90%

Satisfactory

Eser Enterprises-Burot 23902 Const./Repair of Multi-Purpose Building at Brgy. Oloybuaya 05/22/09 III 1.229 60 C 0.392 0.200 0.300 - - - 89.20 *89.20%

V. Satisfactory

Eser Enterprises-Burot 23902 Const. of 1 Cl Sch. Bldg. @ Capas East CES 11/26/07 III 0.424 35 C 0.362 0.275 0.300 - - - 93.70 *93.70%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page146

Page 155: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Eser Enterprises-Burot 23902 Const. of MPB at Sitio Tarvet 11/14/08 III 0.564 45 C 0.234 0.200 0.300 - - - 73.40 *73.40% Satisfactory

ESN Construction and Trading 32720 Impvt. of Roads (Tibagan) 08/27/08 III 0.475 12 C 0.277 0.200 0.300 - - - 77.70 *77.70% Satisfactory

ESN Construction and Trading 32720 Impvt. of Roads (Tilapayong) 08/27/08 III 0.477 14 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

ESR Construction and Supplies 10451 Construction of 109 Duplex Housing Units 05/19/09 NHA 25.499 120 C 0.299 0.300 0.300 - - - 89.90 89.90% V. Satisfactory

ESR Construction and Supplies 10451

Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-SergionOsmeña, Zambo. Del Norte-Sur Bdry., Km.1876+000-

Km.1877+000, De Venta Perla Section

06/08/09 IX 18.674 120 O 0.390 0.238 0.150 0.010 0.037 0.050 87.50 -

ESR Construction and Supplies 10451 Dapitan-Dakak Road (Sto. Niño-Taguilon Section) Phase IV 06/09/09 IX 54.983 300 O 0.381 0.240 0.150 0.010 0.033 0.050 86.40 -

ESR Construction and Supplies 10451 Road Upgrading (Gravel to Concrete) , Jct. Blancia-Molave-Josefina Road 06/04/09 IX 46.470 300 O 0.342 0.240 0.150 0.030 0.051 0.050 86.30 -

ESR Construction and Supplies 10451 Conc. of Mahayag-Dumingag Road (Kaangayan Section) 05/23/08 IX 13.931 290 C 0.270 0.257 0.300 - - - 82.70 85.84%

V. Satisfactory

ESR Construction and Supplies 10451 Construction of 109 Duplex Housing Units 6/2-6/08 NHA 25.295 120 O 0.390 0.171 0.100 0.024 0.030 0.100 81.44 -

ESR Construction and Supplies 10451 Impv't/Conc. Paving of Gutalac-Baliguian-Siocon Road, Sta. Maria-Siocon Section 03/07/09 IX 48.189 552 C 0.445 0.158 0.300 - - - 90.30 *90.30%

V. Satisfactory

ESR Construction and Supplies 10451Rehab./Reconst. of Damaged Paved

National Road along Sindangan-Liloy-Ipil Road, Liloy-Ipil Section

09/04/09 IX 108.028 400 C 0.457 0.200 0.300 - - - 95.70 93.78% V. Satisfactory

ESR Construction and Supplies 10451 Road Upgrading (Gravel to Concrete) Jct. Blancia-Molave-Josefina Road 09/12/09 IX 46.470 300 O 0.365 0.300 0.150 0.030 0.055 0.033 93.30 -

ESR Construction and Supplies 10451 Conc./Widening of Jct. Dumalinao-Margosatubig Intermittent Section 09/09/09 IX 18.073 247 O 0.372 0.300 0.150 0.030 0.040 0.033 92.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page147

Page 156: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ESR Construction and Supplies 10451Rehab./Impvt. of Dipolog-Punta-Dansullan-

Sergio Osmeña Road (De Venta Perla-Poblacion Alto Section)

09/14/09 IX 28.120 210 O 0.360 0.300 0.150 0.030 0.045 0.033 91.80 -

ESR Construction and Supplies 10451

Reblocking/Asphalt Overlaying of Junction Dumalinao-Margosatubig Road,

Margosatubig Section, Sta. 1714+920.00-Sta. 1719+739.10 with exception

09/10/09 IX 20.215 168 O 0.384 0.300 0.100 0.030 0.040 0.033 88.70 -

ESR Construction and Supplies 10451 Dapitan-Dakak Road (Sto. Niño-Taguilon Section) Phase IV 09/15/09 IX 54.983 300 O 0.283 0.300 0.150 0.030 0.040 0.033 83.60 -

ESR Construction and Supplies 10451Rehab./Impv't. of Dipolog-Punta-Dansullan-

Sergio Osmena Road (Dilawa-De Venta Perla Section)

03/08/10 IX 94.138 540 O 0.368 0.280 0.150 0.030 0.037 0.033 89.80 -

ESR Construction and Supplies 10451Reconst. of Lanao-Pagadian-2Z Road Km. 1724+940 - Km. 1750+000, Concreting of Unpaved Shoulder @ Poblacion Imelda

02/26/10 IX 4.426 155 C 0.412 0.139 0.300 - - - 85.10 85.58% Satisfactory

ESR Construction and Supplies 10451 Dumingag-Siayan Road (Road Upgrading Gravel to Concrete) 03/06/10 IX 46.778 300 O 0.295 0.300 0.150 0.030 0.047 0.033 85.50 -

ESR Construction and Supplies 10451Completion of Kagawasan, Dimataling-Pitogo Provincial Road Sta. 0+000 - Sta.

3+540 with exception03/04/10 IX 27.575 263 O 0.300 0.281 0.150 0.030 0.042 0.050 85.30 -

ESR Construction and Supplies 10451

Reconst. of Lanao-Pagadian-Zamboanga City Road Km. 1724+940 - Km. 1750+000, Installation of RCCP and Reblocking @

Basalem

02/26/10 IX 1.070 57 C 0.307 0.200 0.300 - - - 80.70 83.82% Satisfactory

ESR Construction and Supplies 10451Rehab./Impvt. of Dimataling-Tabina

Provincial Road Sta. 0+800 - Sta. 11+602.75 with exception

03/04/10 IX 101.168 735 O 0.307 0.257 0.150 0.030 0.033 0.050 82.70 -

ESR Construction and Supply/Mindanao Rock (JV) JV-07-170 Ozamis Airport Development Project 09/03/09 DOTC 41.400 240 C 0.451 0.200 0.300 - - - 95.10 95.10%

V. Satisfactory

ESR-MCDC Joint Venture JV-08-074Rehab./Impvt. of Dipolog-Punta-Dansullan-

Sergio Osmeña Road De Venta Peral-Poblacion Alto Section

06/08/09 IX 95.149 543 O 0.374 0.240 0.150 0.010 0.047 0.050 87.10 -

ETM Construction 16285 Rehab. of Multi-Purpose Building at 304th Provincial Mobile Group, Brgy. Lamao 08/28/09 III 0.465 40 C 0.415 0.133 0.300 - - - 84.80 *84.80%

Satisfactory

Euluz Construction and Supply 32080 Const./Rehab. of Drainage System and Gutter along KG and K-9th 08/17/07 NCR 1.433 45 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page148

Page 157: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Euluz Construction and Supply 32080 Const./Rehab. of MPB 08/17/07 NCR 2.254 100 C 0.318 0.251 0.300 - - - 86.90 *86.90% V. Satisfactory

Euluz Construction and Supply 32080 Const. of R.C. Box Culvert with Drainage System, Kaingin I, Brgy. Pansol 02/26/10 NCR 0.712 30 C 0.495 0.133 0.300 - - - 92.80 92.80%

V.Satisfactory

Everlast Construction 2364 Construction of Zamboanga City Schools Division Office 05/26/09 IX 14.182 150 O 0.389 0.240 0.150 0.030 0.051 0.050 91.00 -

Everlast Construction 2364 Const. of Zamboanga City Schools Division Office 09/01/09 IX 14.182 305 O 0.370 0.300 0.150 0.030 0.035 0.033 91.80 -

Everlast Construction 2364Const. of 2-Storey 4-Classroom School Building (Partial) at Southcom National

High School02/22/10 IX 3.628 120 O 0.348 0.300 0.150 0.020 0.041 0.050 90.90 -

Excel C's Builders 24445 Const./Rehab. of Laray Multi-Purpose Pavement (MPP) Javier, Brgy. Laray 05/28/09 VIII 0.944 25 O 0.376 0.246 0.150 0.030 0.042 0.033 87.70 -

Excel C's Builders 24445 Repair of Brgy. Roads, Brgy. Poblacion-Odiong 05/28/09 VIII 1.909 20 C 0.250 0.200 0.300 - - - 75.00 -

Excel C'S Builders 24445 Const./Rehab. of Laray Multi-Purpose Pavement (MPP) Javier 02/26/10 VIII 0.944 70 C 0.363 0.200 0.300 - - - 86.30 87.14%

Satisfactory

Express Construction 29649 Conc./Impvt. of Sto. Tomas Ext. 11/26/07 NCR 1.456 60 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

Express Construction 29649 Repair of School Bldg. at General Roxas E/S, Brgy. Roxas 02/26/10 NCR 1.412 15 C 0.472 0.133 0.300 - - - 90.50 90.50%

V.Satisfactory

F & A Construction and Supplies 29524 Completion of MPB 03/06/08 XIII 4.547 165 C 0.359 0.300 0.300 - - - 95.90 67.34% Fair

F & A Construction and Supplies 29524 Impvt. of Road Slip and other related activities, Cortes-Igang Sect. 08/30/07 XIII 2.885 60 C 0.231 0.265 0.300 - - - 79.60 *79.60%

Satisfactory

F & J General Construction and Supply Corporation 31963

Repair/Rehab./Impvt. of Roadways (Inst. of Road Traffic Safety Devices), Nueva Ecija-Aurora Road (Dimani to Dimabayo Sect.)

11/24/07 III 4.625 25 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page149

Page 158: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

F. Alarcon Construction Corporation 17612 Inabangan Port Development Project 06/19/09 DOTC 2.888 90 C 0.473 0.200 0.300 - - - 97.30 97.30% Outstanding

F. Alarcon Construction Corporation 17612 Sagay Port Development Project (Extension of Causeway) 02/05/10 DOTC 4.798 120 C 0.468 0.200 0.300 - - - 96.80 96.80%

Outstanding

F. Gurrea Construction 6995 Sibunag Port Improvement Project 8/5-8/08 FCMD 101.207 416 C 0.397 0.300 0.300 - - - 99.70 99.65% Outstanding

F. Gurrea Construction, Inc. 6995 Bago River Irrigation System Rehabilitation & Improvement Project 12/10-16/07 NIA 12.603 114 C 0.258 0.300 0.300 - - - 85.80 85.80%

V. Satisfactory

F. Gurrea Construction, Incorporated 6995

Conc. of Oton-Mambog-Caboloan-Abilay-SanJose-San Miguel Road leading to Iloilo

International Airport Km. 11+436.25-Km. 15+96.25 w/ exception

05/25/09 VI 57.850 462 O 0.295 0.300 0.150 0.030 0.065 0.050 89.00 -

F. Gurrea Construction, Incorporated 6995 Asphalt Overlay along Guimaras Central Road Brgy. Bugnay-San Miguel Section 05/29/08 VI 5.715 50 C 0.380 0.200 0.300 - - - 88.00 88.30%

V. Satisfactory

F. Gurrea Construction, Incorporated 6995 Asphalt Paving of Lambunao-Pototan Road 03/18/09 VI 9.525 120 C 0.444 0.200 0.300 - - - 94.40 89.96% V. Satisfactory

F. Gurrea Construction, Incorporated 6995 Completion of Anahawon 12/01/08 VI 9.423 180 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -

F. Gurrea Construction, Incorporated 6995Conc. of Oton-Mambog-Caboloan-Abilay-

San Jose-San Miguel Road leading to International Airport

11/27/08 VI 57.850 420 O 0.291 0.212 0.100 0.023 0.048 0.100 77.40 -

F. Gurrea Construction, Incorporated 6995 Const. of Pociento Bridge 05/30/08 VI 12.443 403 C 0.289 0.300 0.000 - - - 58.90 71.11% Satisfactory

F. Gurrea Construction, Incorporated 6995 Rehab./Reconst. of Damaged Paved Nat'l Road, Jct. Bancal-Leon-Antique Bdry. Road 03/19/09 VI 9.577 195 C 0.393 0.200 0.300 - - - 89.30 *89.30%

V. Satisfactory

F. Gurrea Construction, Incorporated 6995 Repair/Rehab. of Iloilo-Antique Road 03/13/09 VI 9.642 50 C 0.424 0.200 0.300 - - - 92.40 *92.40% V. Satisfactory

F. Gurrea Construction, Incorporated 6995

Conc. of Oton-Mambog-Caboloan-Abilay-San Jose-San Miguel Road leading to Iloilo

International Airport Km. 11+436.25-Km.15+96.25 w/ exception

09/10/09 VI 57.894 467 O 0.314 0.300 0.150 0.030 0.060 0.050 90.40 -

F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center 06/05/07 X 349.995 938 O 0.333 0.240 0.050 0.030 0.065 0.033 75.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page150

Page 159: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center 12/03/07 X 289.732 938 O 0.363 0.300 0.000 0.030 0.065 0.100 85.80 -

F. Gutirrez Const./Gener R. Flancia and Associates 4572 Design and Const. of Cagayan De Oro

Convention and Civic Center 03/12/10 X 337.982 3,020 C 0.427 0.200 0.000 - - - 62.70 75.13% Unsatisfactory

F. R. Ignacio Construction and Incorporated 687 Pasay City LTO District Office Building

Project 11/14/09 DOTC 11.937 255 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory

F. S. Sugay Construction & Supplies 28489 Const. of MPB at Poblacion 11/17/08 IV-B 2.005 75 C 0.381 0.200 0.300 - - - 88.10 85.30% V. Satisfactory

F. Vargas Construction 2366 Cagayan River Basin Bank Protection Works, San Vicente Section 11/17/07 II 13.722 262 C 0.333 0.300 0.300 - - - 93.30 *93.30%

Outstanding

F. Vargas Construction 2366 Const. of Bunot Bridge and its Approaches 08/23/08 CAR 12.586 210 C 0.364 0.200 0.300 - - - 86.40 92.10% Outstanding

F. Vargas Construction 2366 Const. of Cadondongan Bridge 05/15/08 II 6.754 180 C 0.346 0.200 0.300 - - - 84.60 86.64% V. Satisfactory

F. Vargas Construction 2366 Const. of Guising Bridge & Approaches 05/13/08 II 18.407 331 C 0.361 0.200 0.300 - - - 86.10 86.31% V. Satisfactory

F. Vargas Construction 2366 Const. of Tupang Bridge & Approaches 05/13/08 II 15.951 255 C 0.356 0.200 0.000 - - - 55.60 72.28% Satisfactory

F.A. Asprer Construction 21579 Construction/Repair of Multi-Purpose Building at Brgy. Caturay 05/22/09 III 1.227 60 C 0.389 0.200 0.300 - - - 88.90 *88.90%

V. Satisfactory

F.A. Asprer Construction 21579 Const. of Flood Control (Drainage System) Villa Aglipay E/S 05/23/09 III 0.489 45 C 0.358 0.200 0.300 - - - 85.80 *85.80%

Satisfactory

F.A. Asprer Construction 21579 Conc. Of Brgy. Road with Drainage Canal at Block 5 02/24/10 III 1.473 70 C 0.425 0.200 0.300 - - - 92.50 92.50%

V. Satisfactory

F.A. Construction 9837 Const. of 1 CL Bldg. @ Sta.Lucia and Dapdap E/S 11/21/07 III 0.840 45 C 0.347 0.265 0.300 - - - 91.20 *91.20%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page151

Page 160: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

F.A. Construction 9837 Const. of MPB (Covered Court) 08/13/07 III 1.886 45 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding

F.A. Sison Trading and Construction 13725 Const./Rehab./Improvement of Magat Salamat Elem. School 05/20/09 NCR 2.404 120 C 0.471 0.200 0.300 - - - 97.10 *97.10%

Outstanding

F.A. Sison Trading and Construction 13725 Rehab./Impv't./Const. of MPB in Brgy. 354, Zone 36 02/26/10 NCR 0.624 60 C 0.481 0.133 0.300 - - - 91.40 91.40%

V.Satisfactory

F.C. Martinez Construction 31243 Const. of 1 CL, Murcon E/S 05/22/08 III 0.410 30 C 0.352 0.164 0.300 - - - 81.60 *81.60% V. Satisfactory

F.F. Cruz & Co., Inc. / Filipinas (Pre-Fab. Bldg.) Systems, Inc. Joint

Venture JV-08-138

Conc. of Mindoro Oriental East Coastal Road (Intermittent Sections), Mansalay-

Bdry. Mindoro Occidental Sect.09/05/09 IVB 192.400 562 O 0.363 0.300 0.150 0.030 0.042 0.033 91.80 -

F.F. Cruz and Company, Incorporated 123 Construction of Magsaysay Viaduct 03/12/08 CARBDP 496.818 1,129 C 0.387 0.300 0.300 - - - 98.70 98.47%

Outstanding

F.F. Galang Construction 26801 Const. of 1-CL Bato C/S, Barangay Bato 03/04/10 IVB 0.681 75 O 0.364 0.233 0.150 0.030 0.029 0.033 83.90 -

F.F. Robles General Contractor 8814Concrete Paving of Mulanay-San Francisco

Road (Mulanay Side), Solcom-Botaniog Road Sect., inc. Length of Botaniog Bridge

05/27/09 IV-A 18.675 208 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory

F.F. Rosales Construction 8814 Const. of Eco-Tourism Road 02/18/08 IV-A 8.908 100 C 0.332 0.200 0.300 - - - 83.20 83.68% V. Satisfactory

F.F. Rosales General Contractor 8814Concrete Paving of Mulanay-San Francisco

Road (Mulanay Side), Solcom-Botaniog Road Sect., inc. Length of Botaniog Bridge

05/27/09 IV-A 18.919 208 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

F.F. Rosales General Contractor 8814 Impvt. (Rehab.) of Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Road 06/01/09 IV-A 25.072 382 C 0.409 0.133 0.300 - - - 84.20 *84.20%

Satisfactory

F.L. Reguyal Construction 3315 Const. of MPB Brgy. San Mariano 05/28/08 III 1.872 90 C 0.349 0.289 0.300 - - - 93.80 *93.80% Outstanding

F.L. Reguyal Construction 3315 Const. of Single Barrel Box Culvert along Sta. Rosa-Tarlac Road 05/28/08 III 0.951 60 C 0.400 0.200 0.300 - - - 90.00 88.20%

V. Satisfactory

F.L. Reguyal Construction 3315 Repair/Rehab. of Gapan-Peñaranda-Fort Magsaysay Road 11/23/07 III 7.303 45 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page152

Page 161: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

F.L. Reguyal Construction Corp. (Formerly: F.L. Reguyal Const.) 3315 Jct. Tablang-Gabaldon Road (Upgrading) 06/02/09 III 11.580 60 C 0.327 0.200 0.300 - - - 82.70 *82.70%

Satisfactory

F.P. De Guzman Construction, Inc. 10296 Const. of Multi-Purpose Building, Brgy. 307 05/20/09 NCR 1.918 60 C 0.490 0.133 0.300 - - - 92.30 *92.30% V. Satisfactory

F.P. De Guzman Construction, Inc. 10296 Const. of School Bldg. @ Smokey Mountain Resettlement Area 11/28/07 NCR 13.999 180 C 0.369 0.200 0.300 - - - 86.90 83.66%

V. Satisfactory

F.P. De Guzman Construction, Inc. 10296 Rehab. of MPB @ Brgy. 393, Zone 40 05/16/08 NCR 1.709 120 C 0.343 0.300 0.300 - - - 94.30 88.56% V. Satisfactory

F.P. De Guzman Construction, Inc. 10926 Rehab. of Marikina-San Mateo Road 09/10/09 NCR 9.605 120 C 0.406 0.133 0.300 - - - 83.90 *83.90% Satisfactory

F.P. de Guzman Construction, Inc. 10296 Const. of Pedestrian Overpass along Blumentritt St. crossing España Blvd. 02/22/10 NCR 9.608 236 C 0.484 0.133 0.300 - - - 91.70 91.70%

V.Satisfactory

F.R. Ignacio Construction Incorporated 687 Pasay City LTO District Office Building

Project 09/18/09 DOTC 11.937 255 O 0.384 0.300 0.150 0.030 0.039 0.050 95.30 -

F.R. Mapilisan Construction 13804 Construction of School Building Bambang Elementary School, Bambang 05/29/09 III 1.908 56 C 0.442 0.200 0.300 - - - 94.20 *94.20%

V. Satisfactory

F.S. Sugay Construction & Supplies 28489 Const. of MPB at Poblacion 2 02/15/10 IVB 0.891 90 O 0.352 0.240 0.138 0.030 0.032 0.050 84.20 -

F.V. Chua Construction and Supply 27267 Road Conc. At Camachilihan & Tumana-Talampas, Bustos, Banga 1st & Tabang 08/21/07 III 1.520 24 C 0.280 0.300 0.300 - - - 88.00 *88.00%

V. Satisfactory

Fairchild Builders & Developers Incorporated 10024 Rehab. along Tacloban-Baybay South

Road along Tacloban South Road 05/28/09 VIII 9.486 150 O 0.336 0.239 0.150 0.030 0.037 0.033 82.50 -

Fairchild Builders & Developers, Inc. 10024 Const. of River Bank Protection at San Joaquin 12/05/07 VIII 1.928 90 C 0.373 0.200 0.300 - - - 87.30 *87.30%

V. Satisfactory

Fairchild Builders & Developers, Inc. 10024 Const./Impvt. of Malitbog (MPB) Livelihood Center 03/04/08 VIII 6.673 270 C 0.398 0.200 0.300 - - - 89.80 84.41%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page153

Page 162: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Fairchild Builders & Developers, Inc. 10024 Const./Rehab./Impvt. of Drainage System @ Brgy. 87 03/14/08 VIII 1.899 120 C 0.358 0.200 0.300 - - - 85.80 *85.80%

V. Satisfactory

Fatima Builders 27939 Repair of Municipal Water System 08/28/07 VII 0.940 120 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory

FCVS Construction & Supply 32518 Repair of (1CL) School Building Aramaywan NHS 06/05/09 IV-B 0.317 90 C 0.377 0.169 0.300 - - - 84.60 *84.60%

Satisfactory

FEAJ Construction and General Services 13609 Completion of MPB 11/17/08 IV-B 0.954 65 C 0.349 0.200 0.300 - - - 84.90 *84.90%

V. Satisfactory

FEAJ Construction and General Services 13609 Concreting of Road @ Katwiran II 02/23/09 IV-B 0.961 40 C 0.406 0.133 0.300 - - - 83.90 *83.90%

Satisfactory

FEAJ Construction and General Services 13609 Concreting of Road, Dulangan 1-2 08/19/08 IV-B 1.899 59 C 0.304 0.200 0.300 - - - 80.40 79.68%

Satisfactory

FEAJ Construction and General Services 13609 Conc. of Road at Brgy. Bacungan 02/16/10 IVB 1.157 60 C 0.353 0.200 0.300 - - - 85.30 85.30%

Satisfactory

Feldan Construcion & Enterprises 30572 Const. of 1 CL Sch. Bldg. at Mansilingan Agro Industrial School 11/18/08 VI 0.500 80 C 0.325 0.117 0.300 - - - 74.20 72.80%

Satisfactory

Ferdstar Builders Contractor 4965 Rehab. of Farm to Market Road @ Brgy. San Roque, Bitas 08/25/09 III 4.776 107 C 0.426 0.133 0.300 - - - 85.90 *85.90%

Satisfactory

Ferdstar Builders Contractors 4965 Impvt/Rehab. of MBP @ Brgy. St. Peter, Brgy. Project 6 06/01/09 NCR 3.756 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%

V. Satisfactory

Ferdstar Builders Contractors 4965 Rehab./Regraveling of Dolitan Farm-to-Market Road (FMR), Nagbunga, Dolitan 05/23/09 III 4.755 45 C 0.352 0.200 0.300 - - - 85.20 *85.20%

Satisfactory

Ferdstar Builders Contractors 4965 Improvement/Rehabilitation of Brgy. San Pedro Polcarangan FMR 05/18/09 III 4.767 60 C 0.335 0.200 0.300 - - - 83.50 83.68%

Satisfactory

Ferdstar Builders Contractors 4965Const. of Drainage along Don Bonifacio-Gueco Avenue, Brgy. Balibago, Pulung

Maragul 06/04/09 III 23.535 120 O 0.355 0.239 0.150 0.030 0.025 0.050 84.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page154

Page 163: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Ferdstar Builders Contractors 4965 Concrete Paving of Biliran Circumferential Road (Ariquin-Julita Section) 06/04/09 VIII 38.395 300 O 0.256 0.300 0.150 0.030 0.047 0.050 83.30 -

Ferdstar Builders Contractors 4965 Completion Works of Arayat Public Market 02/23/09 III 14.330 60 C 0.481 0.171 0.300 - - - 95.20 *95.20%V. Satisfactory

Ferdstar Builders Contractors 4965 Conc. of El Nido-Bataraza Road (Aboabo-Bataraza Sect.) (Isumbo Section) 11/26/07 IV-B 18.228 180 C 0.319 0.293 0.300 - - - 91.20 88.98%

V. Satisfactory

Ferdstar Builders Contractors 4965 Const. of Anao Bridge along San Jose Malino-Anao Road 08/16/08 III 19.015 100 C 0.350 0.300 0.300 - - - 95.00 83.72%

V. Satisfactory

Ferdstar Builders Contractors 4965 Const. of Brgy. Road @ Brgy. Cutcut 11/21/07 III 1.884 45 C 0.313 0.285 0.300 - - - 89.80 *89.80% V.Satisfactory

Ferdstar Builders Contractors 4965 Const. of Pampanga 2nd District Engineering Office Building 02/23/09 III 14.394 150 C 0.446 0.200 0.300 - - - 94.60 *94.60%

V.Satisfactory

Ferdstar Builders Contractors 4965 Improvement / Rehabilitation of Brgy. San Pedro Polcarangan FMR 02/23/09 III 4.767 60 O 0.324 0.259 0.150 0.030 0.025 0.050 83.80 -

Ferdstar Builders Contractors 4965 Impvt./Rehab. of Brgy. Roads at Calulut & Baliti 05/12/08 III 4.757 50 C 0.318 0.219 0.300 - - - 83.70 *83.70%

V. Satisfactory

Ferdstar Builders Contractors 4965 Const. of Multi-Purpose Building at San Roque 08/25/09 III 5.254 93 O 0.384 0.240 0.150 0.030 0.051 0.033 88.80 -

Ferdstar Builders Contractors 4965 Const./Completion of Rafael Lazatin Memorial N/S (3rd level), Brgy. Balibago 08/26/09 III 2.750 60 C 0.448 0.133 0.300 - - - 88.10 *88.10%

Satisfactory

Ferdstar Builders Contractors 4965 Rehab./Reconst & Impvt. of Bamban-Poblacion Road 09/01/09 III 19.003 120 C 0.478 0.133 0.300 - - - 91.10 86.90%

Satisfactory

Ferdstar Builders Contractors 4965 Impvt./Rehab. of Abacan River (Culubasa Section) 08/25/09 III 9.553 60 C 0.417 0.133 0.300 - - - 85.00 *85.00%

Satisfactory

Ferdstar Builders Contractors 4965Const. of Drainage along Don Bonifacio-

Gueco Ave. @ Brgy. Balibago, Pulung Maragui

08/27/09 III 23.535 120 C 0.416 0.133 0.300 - - - 84.90 84.90% Satisfactory

Ferdstar Builders Contractors 4965 Concrete Paving of Biliran Circ. Road, Ariquin-Julita Sect. 09/04/09 VIII 38.395 300 O 0.318 0.300 0.150 0.030 0.045 0.033 87.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page155

Page 164: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Ferdstar Builders Contractors 4965 Const./Rehab./Impvt. of FMR in Bamban 02/25/10 III 4.821 150 C 0.379 0.186 0.300 - - - 86.50 86.50% Satisfactory

Ferdstar Builders Contractors 4965 Rehab./Reconst./Upgrading of Tacloban-Baybay South Road, Pawing Section 03/11/10 VIII 12.357 180 C 0.456 0.192 0.300 - - - 94.80 92.70%

V. Satisfactory

Ferdstar Builders Contractors 4965 Concrete Paving of Biliran Circumferential Road, (Ariuin-Julita Section) 02/23/10 VIII 38.395 300 C 0.392 0.133 0.300 - - - 82.50 84.27%

Satisfactory

Fernz Construction Corporation 28238 Const. of MPB, Relocation Site 08/21/07 X 1.401 75 C 0.357 0.195 0.300 - - - 85.20 *85.20% V. Satisfactory

Fernz Construction Corporation 28238 Impvt. of FMR, Brgy. Lumbia to Brgy. Taglimao 02/26/08 X 2.794 90 C 0.303 0.200 0.000 - - - 50.30 70.34%

Satisfactory

Ferrer Construction and Engineering Services 16711 Proposed Exterior Repainting of PAZ

Mendoza & Med. Lib. 03/20/09 U.P. 751.116 120 O 0.366 0.300 0.000 0.030 0.054 0.050 80.00 -

Ferreze Const. Supply & Manufacturing 26968 Impvt./Conc. Paving of Isabela-Maluso Nat'l

Road @ Maluso Proper Section 02/26/08 IX 1.682 35 C 0.336 0.299 0.000 - - - 63.50 70.40% Satisfactory

Ferreze Const. Supply & Manufacturing 26968 Rehab. of Brgy. Mercedes Road 03/03/09 IX 4.733 106 C 0.395 0.200 0.300 - - - 89.50 85.90%

Satisfactory

Ferreze Construction Supply & Manufacturing 26968

Construction of MPB (Reno./Rehab. of Psychiatric Ward) at Zamboanga City

Medical Center05/25/09 IX 5.192 120 O 0.358 0.240 0.150 0.020 0.050 0.050 86.80 -

Ferreze Construction Supply & Manufacturing 26968

Const. of MPB (Renov./Rehab. of Psychiatric Ward) Zamboanga City Medical

Center09/02/09 IX 5.220 126 O 0.327 0.300 0.150 0.030 0.053 0.050 91.00 -

FF Cruz & Co. Inc./Filipinas (Prefab. Bldg.) Systems, Inc. Joint Venture JV-08-139 Impvt./Const. of Roads and Bridges along

Baler-Casiguran Road (CP I) 05/28/09 III 1.074 450 O 0.327 0.300 0.150 0.030 0.056 0.050 91.30 -

FF Cruz & Co. Inc./Filipinas (Prefab. Bldg.) Systems, Inc. JV JV-08-139 Impvt./Const. of Roads and Bridges along

Baler-Casiguran Road (CP1) 09/09/09 III 1,703.61 450 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

FFJJ Construction 16712 Rehab./Conc. of Road Junction Mana-Ticulon Lagumit Little Baguio Road 05/28/09 XI 19.293 262 C 0.425 0.200 0.300 - - - 92.50 82.12%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page156

Page 165: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FFJJ Construction 16712Rehab./Recons/Upgrading of Digos-Makar

Road, Baluyan-Tagansule Section, Km. 1587+500-Km. 1589+000

05/28/09 XI 19.289 210 O 0.320 0.225 0.150 0.030 0.046 0.050 82.10 -

FFJJ Construction 16712 Concreting of Paco-Roxas-Arakan Valley Road, New Pontevedra Section 05/30/09 R-XII 15.095 206 O 0.327 0.300 0.000 0.024 0.045 0.033 72.90 -

FFJJ Construction 16712 Conc. of Davao del Sur-Sarangani Coastal Road, Kitayo-Balangonan Section 11/22/08 XI 28.900 300 O 0.274 0.241 0.100 0.022 0.035 0.067 73.90 -

FFJJ Construction 16712 Conc. of Paco-Roxas-Arakan Rd. (New Ponteverdra Section) 03/10/09 XII 15.095 150 O 0.378 0.300 0.000 0.030 0.060 0.033 80.10 -

FFJJ Construction 16712Const. of Kiblis Bridge with Bridge and Approaches, Sarangani-Sultan Kudarat

Coastal Road05/28/08 XII 21.574 280 O 0.392 0.300 0.070 0.030 0.032 0.067 89.10 -

FFJJ Construction 16712Const. of Kiblis Bridge with Bridge and Approaches, Sarangani-Sultan Kudarat

Coastal Road09/02/08 XII 21.574 280 O 0.342 0.273 0.000 0.030 0.028 0.067 74.00 -

FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches 05/15/08 XI 18.593 332 O 0.300 0.300 0.100 0.015 0.035 0.100 85.00 -

FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches 09/02/08 XI 18.593 332 O 0.304 0.240 0.070 0.015 0.035 0.100 76.40 -

FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches 09/02/08 XI 22.868 454 O 0.280 0.240 0.070 0.012 0.025 0.100 72.70 -

FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches 11/23/08 XI 22.868 454 O 0.307 0.151 0.100 0.030 0.030 0.067 68.50 -

FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches 02/27/08 XI 12.593 332 O 0.292 0.300 0.100 0.022 0.030 0.100 84.40 -

FFJJ Construction 16712 Const./Replacement of Malalag Bridge 08/22/07 XI 14.265 245 O 0.335 0.285 0.100 0.030 0.023 0.100 87.30 -

FFJJ Construction 16712 Impvt./Conc. of Jct. Mana-Ticulon-Lagumi-Little Baguio Road 11/21/07 XI 19.250 300 O 0.335 0.300 0.050 0.030 0.023 0.067 80.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page157

Page 166: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FFJJ Construction 16712 Rehab/Conc. of Road Jct. Mana-Ticulon Lagumit Little Baguio Road 03/04/09 XI 19.293 262 O 0.279 0.252 0.110 0.030 0.048 0.033 75.20 -

FFJJ Construction 16712Rehab./Reconst. of Damaged Paved

National Rd along NRJ-Bahbah-Talacogon Rd.

09/15/09 XIII 4.753 160 C 0.390 0.150 0.300 - - - 84.00 *84.00% Satisfactory

FFJJ Construction 16712

Rehab./Reconst./Upgrading of Damaged Paved National Road, Digos-Makar Road Tagansule Section, Km. 1587+500-Km.

1589+000

09/03/09 XI 19.289 210 C 0.434 0.133 0.300 - - - 86.70 83.94% Satisfactory

FFJJ Construction 16712 Conc. of Davao del Sur-Sarangani Coastal Kitayo-Balangonan Section 09/03/09 XI 28.906 360 C 0.401 0.133 0.000 - - - 53.40 65.70%

Poor

FGM Builders Resources & Development Corp. 31807 Completion of Daniel Aguinaldo NHS 03/11/08 XI 0.474 60 C 0.299 0.300 0.300 - - - 89.90 *89.90%

V. Satisfactory

FGM Builders Resources & Development Corporation 31807 Completion of MPB at Brgy. T. Monteverde,

Package 2-D 03/09/10 XI 1.227 120 O 0.462 0.225 0.150 0.030 0.035 0.050 95.20 -

FGW Construction Corp. 7436 Conc. of Brgy. Rd. Purok 8, Brgy. Del Monte 09/14/09 XIII 2.791 135 C 0.427 0.125 0.300 - - - 85.20 89.40%

V.Satisfactory

FGW Construction Corporation 7436 Const./Rehab. of MPB PNP Provincial Headquarter Patin-ay 03/06/10 XIII 1.883 170 O 0.370 0.240 0.150 0.030 0.047 0.033 87.00 -

FGW Construction Corporation 7436 Conc. of Road, Brgy. Zamora 03/09/10 XIII 1.880 120 C 0.421 0.133 0.300 - - - 85.40 85.40% Satisfactory

FGW Construction Corporation (Formerly: FWG Construction) 7436 Road/Upgrading (Gravel to Paved),

Loguilo-Alubijid By-Pass Road 06/03/09 X 7.353 150 C 0.404 0.148 0.300 - - - 85.20 *85.20% Satisfactory

Fiat Construction & Services 5463 Conc. of SDCR: Cortes-Tandag-Marihatag Road (Unaban-Sumo-Sumo Section) 06/04/09 XIII 130.968 375 O 0.362 0.300 0.150 0.030 0.061 0.050 95.30 -

Fiat Construction Services 5463 Conc. of SDCR: Cortes-Tandag-Marihatag Road, (Unaban-Sumo-sumo) 11/26/08 XIII 130.968 375 O 0.293 0.215 0.100 0.030 0.032 0.100 77.00 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page158

Page 167: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Fiat Construction Services 5463Conc. of Dinagat Island Rd. Network(San

Jose-Basilisa Sect. with 1 Bridge and 1 Box Culvert)

09/05/09 XIII 188.939 465 O 0.382 0.253 0.150 0.030 0.047 0.033 89.50 -

Fiat Construction Services 5463 Conc. of SDCR Cortes-Tandag-Marihatag Rd. (Unaban-Sumo-sumo Sect.) 09/09/09 XIII 130.968 375 O 0.347 0.225 0.144 0.030 0.065 0.033 84.40 -

Fiat Construction Services 5463Conc. of Surigao-Davao Coastal Rd. :

Cortes-Tandag-Marihatag Rd. (Unaban-Sumo-sumo Section)

03/03/10 XIII 130.968 435 C 0.437 0.133 0.300 - - - 87.00 86.18% Satisfactory

Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof Deck

for DBM Building 02/26/08 Sp. Bldgs. 224.176 365 O 0.264 0.243 0.100 0.030 0.070 0.067 77.40 -

Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof Deck

for DBM Building 05/27/08 Sp. Bldgs. 229.100 410 O 0.335 0.270 0.100 0.030 0.038 0.100 87.30 -

Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof Deck

for DBM Building 11/26/08 Sp. Bldgs. 445.429 710 O 0.372 0.300 0.100 0.030 0.061 0.067 93.00 -

Filipinas Construction Supply 11644 Repair/Rehab. of Bukal Sur E/S 05/13/08 IV-A 0.335 40 C 0.248 0.271 0.300 - - - 81.90 81.06% V. Satisfactory

First Northway Development and Construction Corporation 11645 Const. of Banayoyo Road 08/13/08 I 0.934 20 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

First Northway Development and Construction Corporation 11645 Repair and Maintenance of Candon-

Salcedo Road, Various Sections 05/14/08 I 0.983 31 C 0.264 0.300 0.300 - - - 86.40 *86.40% V. Satisfactory

First Northway Development and Construction Corporation 11645 Repair/Rehabilitation of Candon City Road 02/27/09 I 0.942 31 C 0.380 0.193 0.300 - - - 87.30 *87.30%

Satisfactory

First Northway Development and Construction Corporation 11645 Sulvec Port Road 02/27/09 I 6.358 149 C 0.340 0.200 0.300 - - - 84.00 82.14%

Satisfactory

First Northway Development and Construction Corporation 11645 Rehab./Reconst./Upgrading of Damaged

Paved National Roads, Candon Section 09/05/09 I 19.095 265 C 0.355 0.200 0.300 - - - 85.50 83.28% Satisfactory

First Northway Development and Construction Corporation 11645 Const. of Lubong Road 02/17/10 I 0.956 32 C 0.458 0.133 0.300 - - - 89.10 89.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page159

Page 168: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

First Northway Development and Construction Corporation 11645 Completion of Candon-Salcedo Road 02/18/10 I 14.320 225 O 0.279 0.129 0.150 0.030 0.051 0.050 68.90 -

Flordale Construction 31683 Installation of Traffic Signs at Manila South Road-Daang Maharlika (Tiaong Section) 05/25/09 IV-A 4.777 65 C 0.482 0.133 0.300 - - - 91.50 *91.50%

V. Satisfactory

Flordes Construction & Trading 16916 Rehab./Reconst./Upgrading of Del Pan Road (M. dela Industria to C.M. Recto) 05/20/09 NCR 9.600 120 C 0.461 0.133 0.300 - - - 89.40 *89.40%

V. Satisfactory

Flordes Construction & Trading 16916 Const./Rehab./Replacement/ Completion and Repair of A. Regidor Elem. School 05/20/09 NCR 2.481 120 O 0.326 0.240 0.150 0.030 0.065 0.050 86.10 -

Flordes Construction & Trading 16916 Rehabilitation of NCR/Bulacan Boundary-Bigte Ipo Dam Road 06/01/09 III 42.902 150 O 0.334 0.240 0.150 0.030 0.040 0.050 84.40 -

Flordes Construction & Trading 16916 Conc. of Brgy. Road, Mulawin F. Homes 05/20/08 III 1.334 70 C 0.370 0.200 0.300 - - - 87.00 *87.00% V. Satisfactory

Flordes Construction & Trading 16916 Conc. with Drainage Impvt. Along Juan Luna St. 05/16/08 NCR 4.744 120 C 0.370 0.146 0.300 - - - 81.60 83.94%

V. Satisfactory

Flordes Construction & Trading 16916 Conc./Reblocking of G. Tuazon St. 11/28/07 NCR 4.696 120 C 0.353 0.200 0.300 - - - 85.30 82.66% V. Satisfactory

Flordes Construction & Trading 16916 Const. of MPB, Brgy. Maharlika 11/26/08 III 2.381 75 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding

Flordes Construction & Trading 16916 Const. of Sch. Bldg. (9 CL) Carlos P. Garcia High School 02/22/08 NCR 7.192 120 C 0.288 0.300 0.300 - - - 88.80 *88.80%

V. Satisfactory

Flordes Construction & Trading 16916 Drainage Improvement with Concreting/Upgrading 11/14/08 NCR 2.303 90 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Outstanding

Flordes Construction & Trading 16916 Proposed Repair/Rehab. of Jose Vicencio Health Center 11/10/08 NCR 1.929 60 C 0.343 0.253 0.300 - - - 89.60 *89.60%

V. Satisfactory

Flordes Construction & Trading 16916 Proposed Repair/Rehab. of Roads & Alleys in Manila 08/14/07 NCR 1.435 60 C 0.270 0.257 0.300 - - - 82.70 *82.70%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page160

Page 169: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Flordes Construction & Trading 16916 Repair/Rehab. & Const. of Bambang-Bagumbayan-Maysantol-San Nicolas FMR 03/05/09 III 4.767 96 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

Flordes Construction & Trading 16916 Const./Replacement/Completion & Repair of A. Regidor E/S 09/09/09 NCR 2.482 120 C 0.451 0.133 0.300 - - - 88.40 86.79%

Satisfactory

Flordes Construction & Trading 16916 Rehab./Const./Upgrading of T. Mapua Street, Binondo/Sta. Cruz 09/09/09 NCR 7.681 120 C 0.422 0.133 0.300 - - - 85.50 *85.50%

Satisfactory

Flordes Construction & Trading 16916 Rehabilitation of Bocaue-San Jose Road 09/07/09 III 9.535 110 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory

Flordes Construction & Trading 16916 Rehab. of Sibul-Biak na Bato Road 08/08/09 III 4.758 90 C 0.469 0.133 0.300 - - - 90.20 *90.20% V. Satisfactory

Flordes Construction & Trading 16916 Rehab.of NCR/Bulacan Bdry.-Bigte Ipo Dam Road 09/07/09 III 42.907 150 C 0.441 0.133 0.300 - - - 87.40 85.60%

Satisfactory

Flordes Construction & Trading 16916 Concreting/Impvt. of Kayquit-Asis FMR 09/09/09 IVA 9.558 120 C 0.346 0.200 0.300 - - - 84.60 *84.60% Satisfactory

Flordes Construction & Trading 16916 Const./Rehab./Replacement/Completion & Repair of S/B at Canumay NHS (Batch 2) 03/02/10 NCR 4.559 120 C 0.386 0.191 0.300 - - - 87.70 87.70%

Satisfactory

Flordes Construction & Trading 16916 Rehab. of Dr. Jose Fabella Memorial Hospital 02/22/10 NCR 4.799 75 C 0.423 0.133 0.300 - - - 85.60 85.60%

Satisfactory

Flordes Construction & Trading 16916 Conc. of Visitacion-Kapanikian Barangay Road 02/19/10 II 48.240 380 O 0.326 0.300 0.150 0.030 0.045 0.033 88.40 -

Flordes Construction & Trading 16916 Const. of School Building, Bulacan Polytechnic College Campus 03/04/10 III 47.670 300 C 0.465 0.133 0.300 - - - 89.80 89.80%

V. Satisfactory

Floriane Construction and Supply 12261 Construction of Multi-Purpose Building, North Pob. 06/01/09 X 0.938 105 C 0.395 0.061 0.300 - - - 75.60 79.66%

Unsatisfactory

Floriane Construction and Supply 12261 Completion of MPB, Brgy. Maanas 05/20/08 X 0.755 120 C 0.338 0.100 0.300 - - - 73.80 *73.80% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page161

Page 170: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Floriane Construction and Supply 12261 Conc. of Multi-Purpose Pavement 08/26/08 X 0.936 120 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Floriane Construction and Supply 12261 Const. of MPB @ North Poblacion 03/09/09 X 0.938 105 O 0.358 0.240 0.101 0.030 0.035 0.050 81.40 -

Floriane Construction and Supply 12261 Const. of River Control at Mambayaan (Phase 2) 08/29/07 X 4.644 180 C 0.339 0.200 0.300 - - - 83.90 82.04%

V. Satisfactory

Floriane Construction and Supply 12261 Const./Impvt./Completion of MPB 11/26/07 X 0.324 210 C 0.358 0.300 0.300 - - - 95.80 *95.80% Oustanding

Floriane Construction and Supply 12261 Const./Rehab. of Roads, Kitambis-Mimbuwahan 11/24/08 X 0.939 120 C 0.207 0.300 0.300 - - - 80.70 *80.70%

V. Satisfactory

FM2 Trading & Enterprises 19044 Conc. of FMR, Brgy. Luna St. 03/05/08 I 0.960 45 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

FM2 Trading & Enterprises 19044 Const. of Drainage System @ Brgy. Caranglaan 11/27/08 I 0.767 30 C 0.306 0.221 0.300 - - - 82.70 *82.70%

V. Satisfactory

Fojas Builders Enterprises 31869 Const. of 2 CL Sch. Bldg., San Antonio E/S 11/10/08 IV-A 0.955 70 C 0.346 0.300 0.000 - - - 64.60 83.29% V. Satisfactory

Footprints Construction 16713 Const. of Pedestrian Overpass @ Palomoc Titay 08/23/08 IX 2.856 90 C 0.176 0.200 0.300 - - - 67.60 72.52%

Satisfactory

Footprints Construction 16713 Conc. of Farm to Market Rd., Manaol 03/03/10 X 0.978 160 O 0.325 0.300 0.150 0.022 0.038 0.033 86.80 -

Footprints Construction 16713 Const. of Road with Drainage, Vicmar Circumferential Road, Zone 7 02/22/10 X 3.735 120 C 0.367 0.200 0.300 - - - 86.70 86.70%

Satisfactory

Foretop Construction 32813 Construction of Boton River Control 05/19/09 IV-B 2.845 108 C 0.389 0.200 0.300 - - - 88.90 *88.90% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page162

Page 171: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Foretop Construction 32813 Concreting of Marinduque Circumferential Road (Dili-Bangbang Section) 05/18/09 IV-B 6.172 90 C 0.406 0.200 0.300 - - - 90.60 86.46%

Satisfactory

Fortstone Construction Enterprises 31668 Const. of 6 CL 2 Storey Bldg. at Mariano Peralta H/S 05/15/08 XI 3.727 120 C 0.252 0.200 0.000 - - - 45.20 70.68%

Satisfactory

Fortstone Construction Enterprises 31668 Const. of Nueva Villa Flood Control 11/23/08 XI 3.872 215 C 0.353 0.172 0.300 - - - 82.50 80.79% V. Satisfactory

Fortstone Construction Enterprises 31668 Construction of Water Supply at Brgy. Wawa 03/04/09 XI 1.887 120 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

Fortstone Construction Enterprises 31668 Rehab. of MPB (City Jail) 05/13/08 XII 0.960 70 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory

Fortstone Construction Enterprises 31668 Const./Rehab./ Repair of Multi-Purpose Bldg., Sultan Mastura 09/01/09 XII 1.421 45 C 0.417 0.133 0.300 - - - 85.00 87.38%

Satisfactory

Fortstone Construction Enterprises 31668 Const. of 2-CL Academic Building @ Biao P/S 09/04/09 XI 1.094 120 O 0.348 0.240 0.150 0.030 0.035 0.050 85.30 -

Fortstone Construction Enterprises 31668 Const. of 2-CL Academic Bldg. at Biao P/S 02/24/10 XI 1.094 120 C 0.424 0.133 0.300 - - - 85.70 85.42% Satisfactory

Fortunato T. Sanchez 407 Asphalt Overlay (Pier to City Hall) 08/28/07 XIII 4.729 90 C 0.275 0.200 0.300 - - - 77.50 78.58% Satisfactory

Fortunato T. Sanchez 407 Concreting of Road 11/24/08 XIII 5.770 180 C 0.330 0.200 0.300 - - - 83.00 82.72% V. Satisfactory

Foundation Specialists, Inc. 7437 Widening of R-10 Road Project Vitas Bridge and its approaches 03/11/09 URPO 158.286 480 O 0.349 0.300 0.000 0.030 0.060 0.050 78.90 -

Foundation Specialists, Inc. 7437 Widening of R-10 Road Project, Vitas Bridge and its approaches 03/05/10 URPO 165.623 690 C 0.477 0.200 0.300 - - - 97.70 86.42%

Satisfactory

Four Brothers Construction 31614 Const. of MPB, Brgy. West Buyagan 11/11/08 CAR 0.476 40 C 0.285 0.200 0.300 - - - 78.50 *78.50% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page163

Page 172: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Four Brothers Construction 31614 Construction of Pontino ES (Sto. Niño) 08/26/09 CAR 0.426 30 O 0.344 0.240 0.000 0.030 0.038 0.017 66.90 -

Four Brothers Corporation 31614 Contruction of Pontino ES Ambassador 03/01/10 CAR 0.426 45 C 0.397 0.200 0.000 - - - 59.70 64.74% Poor

Four J Construction 15104 Const. of Box Culvert @ Brgy. Dalig 08/30/07 IVA 0.956 60 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory

Four J Construction 15104 Const. of MPB @ UPS V Area I 08/15/07 NCR 0.476 60 C 0.340 0.200 0.300 - - - 84.00 83.30% V. Satisfactory

Four J Construction 15104 Impvt. of Cainta River 05/12/08 IV-A 3.836 90 C 0.339 0.269 0.300 - - - 90.80 85.52% V. Satisfactory

Four J Construction 15104 Widening of Quezon Avenue 02/21/08 NCR 21.722 90 O 0.376 0.240 0.100 0.018 0.042 0.100 87.60 -

Foz Designs, Builds and Supplies 32814 Const. of 1 unit Classroom Sch. Bldg. 08/21/08 V 0.482 60 C 0.246 0.200 0.300 - - - 74.60 *74.60% Satisfactory

Foz Designs, Builds and Supplies 32814 Const. of Sorsogon 2nd DEO 11/17/08 V 0.960 60 C 0.364 0.200 0.300 - - - 86.40 *86.40% V. Satisfactory

Framecon Builders 22482 Const. of Farm-to-Market Road at Brgy. Bagong Sikat 06/03/09 III 0.955 30 C 0.311 0.195 0.300 - - - 80.60 *80.60%

Unsatisfactory

Framecon Builders 22482 Completion of Multi-Purpose Building, San Luis Central School 03/03/09 III 2.574 120 C 0.440 0.133 0.300 - - - 87.30 *87.30%

Satisfactory

Framecon Builders 22482 Const. of Drainage Canal at Brgy. Mangino 11/24/08 III 0.475 30 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory

Framecon Builders 22482 Repair/Impvt. of Mallorca-Tabuating Road 02/21/07 III 1.853 75 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -

Framecon Builders 22492 Construction of 3-CL School Building, Diteki Elementary School 09/08/09 III 1.773 120 C 0.458 0.133 0.300 - - - 89.10 *89.10%

V. Satisfactory

Framecon Builders 22482 Concreting of GK Soledad Road, Brgy. Tabon 09/04/09 III 1.911 70 C 0.432 0.133 0.300 - - - 86.50 *86.50%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page164

Page 173: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Framecon Builders 22482 Conc. of Roads at Various Brgy. San Isidro 02/26/10 III 1.819 60 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory

Framecon Builders 22482 Rehab. of Farm to Market Road at Kalikid Sur 02/25/10 III 0.951 60 C 0.446 0.133 0.300 - - - 87.90 87.90%

Satisfactory

Franzcor Trading & Construction 18082 Impvt. of Blk. 18, Purok 6, Kenneth Road, Lupang Arenda, Brgy. Sta. Ana 05/18/09 IV-A 2.886 120 C 0.446 0.133 0.300 - - - 87.90 *87.90%

Satisfactory

Franzcor Trading & Construction 18082 Impvt. of Blk. 29, Purok 5, Lupang Arenda, Brgy. Sta. Ana 05/18/09 IV-A 2.885 120 C 0.446 0.133 0.300 - - - 87.90 *87.90%

Satisfactory

Franzcor Trading & Construction 18082 Completion of Napindan E/S MPB, Napindan E/S Brgy. Napindan 02/24/10 NCR 1.925 60 C 0.403 0.133 0.300 - - - 83.60 83.60%

Satisfactory

FRD Construction 10227 Const. of 1 Unit 1 CL Sch. Bldg. @ Malinao HS 03/16/09 VIII 0.496 75 C 0.430 0.200 0.000 - - - 63.00 68.74%

Poor

FRD Construction 10227 Const. of 1 Unit 1 CL School Bldg. @ Dao E/S 08/21/08 VIII 0.498 75 C 0.383 0.106 0.300 - - - 78.90 *78.90%

Satisfactory

FRD Construction 10227 Reconst. of Soom Bridge along Tagbilaran East Road 08/30/08 VII 13.241 390 C 0.237 0.300 0.300 - - - 83.70 81.06%

V. Satisfactory

FRD Construction 10227 Rehab./Impvt. of Laoang-Calomotan Rd. 09/05/07 VIII 9.315 150 C 0.318 0.300 0.300 - - - 91.80 87.18% V. Satisfactory

FRD Construction 10227 Rehab/Impv't of Liloan-Himay-angan-Libagon Road 03/05/09 VIII 18.692 360 O 0.351 0.249 0.150 0.030 0.042 0.050 87.20 -

FRD Construction 10227 Repair/Rehab. of Lilo-an-Sogod Bdry. Mahaplag Road 11/22/08 VIII 9.343 220 C 0.364 0.200 0.300 - - - 86.40 *86.40%

V. Satisfactory

FRD Construction 10227 Upgrading (Conc.) of Wright-Taft-Borongan Road 09/03/08 VIII 33.774 220 O 0.347 0.237 0.100 0.030 0.027 0.100 84.10 -

FRD Construction 10227 Upgrading (Conc.) of Wright-Taft-Borongan Road 03/14/09 VIII 33.775 340 O 0.276 0.300 0.150 0.030 0.047 0.033 83.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page165

Page 174: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

FRD Construction 10227 Rehab./Impvt. of Liloan-Himay-Angan-Libagon Road 09/08/09 VIII 18.692 360 C 0.438 0.133 0.300 - - - 87.10 88.60%

Satisfactory

FRD Construction 10227 Rehab. of Wright-Taft-Borongan Road with exceptions 09/16/09 VIII 34.207 280 O 0.325 0.240 0.150 0.030 0.045 0.050 84.00 -

FRD Construction 10227Upgrading (Conc.) of Wright-Taft-Borongan

Road, Km. 870+000-Km. 880+000 (w/ exceptions)

03/09/10 VIII 33.775 360 C 0.345 0.200 0.300 - - - 84.50 84.11% Satisfactory

Freden Construction 22665 Const. of Lined Canal 03/20/09 XII 1.864 117 C 0.445 0.200 0.300 - - - 94.50 *88.56% Satisfactory

Freden Construction 22665 Const. of Lined Drainage along Makar-Kiamba Road 09/05/07 XII 1.900 75 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

Freden Construction 22665 Const. of Makar Drainage Protecting Makar Port (Labangal Section) 09/03/08 XII 1.422 75 C 0.300 0.300 0.300 - - - 90.00 88.38%

V. Satisfactory

Freden Construction 22665Repair & Maintenance of National Roads &

Bridges Makar-Marbel Road (going to Makar) and Makar-Kiamba Road

03/20/09 XII 1.238 60 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory

Fullido's Construction and Enterprises 20347 Const. of 1 CL Sch. Bldg. (7m x 9m) Corella

H/S 09/02/08 VII 0.410 140 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding

FVCS Construction & Supply 32518 Repair/Maintenance of Panacan Revetment 08/12/08 IV-B 0.645 45 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

FVCS Construction & Supply 32518 Const. of MPB, Brgy. Poblacion I 03/02/10 IVB 1.318 90 O 0.306 0.300 0.150 0.030 0.035 0.033 85.40 -

G & P Builders, Incorporated 3960 Construction of CDO 3rd Bridge & Access Road Phase I, Kauswagan 09/06/07 X 35.267 450 C 0.295 0.300 0.300 - - - 89.50 80.47%

V. Satisfactory

G E S Construction 30299 Const. of MPB @ Brgy. 46 03/18/09 VIII 0.963 70 O 0.382 0.300 0.150 0.022 0.043 0.033 93.00 -

G. Uymatiao Jr. Construction 6663 Conc. of Brgy. Daro Road 11/23/07 VII 0.474 95 C 0.357 0.000 0.300 - - - 65.70 78.72% Satisfactory

G. Uymatiao Jr. Construction 6663 Const./Widening of Box Culvert 03/03/08 VII 1.382 110 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page166

Page 175: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

G. Uymatiao, Jr. Construction 6663 Const./Impvt. of Dayoyo Section (DNR) Km. 95.720-Km.96.880 05/29/09 VII 9.094 147 C 0.459 0.141 0.300 - - - 90.00 *90.00%

V. Satisfactory

G. Uymatiao, Jr. Construction 6663 Const./Impvt. of San Jose-Cantupa Section DNR (Km. 101.980-Km. 104.12235) 05/29/09 VII 18.384 292 C 0.371 0.200 0.300 - - - 87.10 83.14%

Satisfactory

G.C.I. Construction 11346 Concreting of Baao-Iriga City, San Nicolas, Baao Section 05/29/09 V 1.433 87 C 0.375 0.200 0.300 - - - 87.50 *87.50%

Satisfactory

G.C.I. Construction 11346 Road Upgrading of Libon-Bacolod-San Vicente-Marocmoc-Buga Road 05/28/09 V 19.230 134 O 0.326 0.240 0.150 0.030 0.040 0.050 83.60 -

G.C.I. Construction 11346 Conc. of Baras-Gigmoto Road (San Vicente Section) 08/25/07 V 9.628 210 O 0.362 0.231 0.100 0.030 0.030 0.100 85.30 -

G.C.I. Construction 11346 Conc. of Cagmanaba Road 08/22/08 V 1.911 120 C 0.301 0.279 0.300 - - - 88.00 *88.00% V. Satisfactory

G.C.I. Construction 11346 Conc. of Nabua-Balatan Road (Tapayas-Cabanban Sect.) 03/03/08 V 9.357 120 C 0.318 0.200 0.300 - - - 81.80 82.67%

V. Satisfactory

G.C.I. Construction 11346 Conc. of Roads at San Jose Road 08/22/08 V 1.911 120 C 0.274 0.300 0.300 - - - 87.40 *87.40% V. Satisfactory

G.C.I. Construction 11346 Conc. of San Isidro 08/19/08 V 9.454 105 C 0.319 0.218 0.300 - - - 83.70 *83.70% V. Satisfactory

G.C.I. Construction 11346 Const. of Buhi-Lidong Road 08/19/08 V 28.220 150 C 0.261 0.200 0.300 - - - 76.10 83.30% V. Satisfactory

G.C.I. Construction 11346 Const. of Road @ Tagbong-Binobong Road 11/25/08 V 4.777 120 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory

G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon to Brgy.

Calzada03/02/09 V 19.160 300 C 0.432 0.133 0.300 - - - 86.50 84.48%

Satisfactory

G.C.I. Construction 11346 Const. of San Vicente Drainage System 11/28/07 V 2.362 150 C 0.308 0.200 0.300 - - - 80.80 *80.80% V.Satisfactory

G.C.I. Construction 11346 Const. of San Vicente-Gutan-Lubak-Anguib Road,Phase V 02/25/09 II 20.259 330 O 0.267 0.300 0.150 0.030 0.035 0.050 83.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page167

Page 176: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

G.C.I. Construction 11346 Const./Rehab. of San Vicente-Gutan-Lubac-Angub Rd. Phase IV 08/25/08 II 48.192 360 C 0.342 0.201 0.300 - - - 84.30 83.46%

V. Satisfactory

G.C.I. Construction 11346 Const./Road Opening of San Vicente-Gutan-Luban-Aguib Road (P III) 08/25/08 II 28.095 370 C 0.289 0.228 0.300 - - - 81.70 75.76%

Satisfactory

G.C.I. Construction 11346 Construction of 2 Storey Multi-Purpose Building 03/09/09 V 0.945 120 C 0.431 0.200 0.300 - - - 93.10 *93.10%

V. Satisfactory

G.C.I. Construction 11346 Construction of Roads 03/12/09 V 3.821 120 C 0.438 0.200 0.300 - - - 93.80 *93.80% V.Satisfactory

G.C.I. Construction 11346 Impvt./Conc. of Goa-Tinambac Road 11/19/07 V 9.553 110 C 0.245 0.279 0.300 - - - 82.40 82.40% V. Satisfactory

G.C.I. Construction 11346Installation of Sheet Piles & Conc. of

Training Levee inc. Earthdike, Traversia Revetment

02/25/08 V 39.000 261 C 0.351 0.200 0.300 - - - 85.10 79.67% Satisfactory

G.C.I. Construction 11346 Libmanan-Cabusao Embankment (Poblacion Revetment) 08/26/08 V 10.523 270 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -

G.C.I. Construction 11346 Rehab./Impv't of Talongog-Busac River Control 03/06/09 V 19.269 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%

V. Satisfactory

G.C.I. Construction 11346

Rehab./Reconst. of Damaged National Road and Generated from Pavement Mgt. System (Highway Dev't & Mgt. HDM-4) Jct.

Bato-Baras Road

03/04/09 V 19.180 301 O 0.361 0.300 0.150 0.030 0.061 0.050 95.20 -

G.C.I. Construction 11346 Repair/Restoration of Damaged Dike Maipon R.C. 03/06/09 V 14.385 180 C 0.445 0.200 0.300 - - - 94.50 84.54%

Satisfactory

G.C.I. Construction 11346 Repair/Restoration of Damaged Rd. Pavement along Balogo-Nasisi 02/29/08 V 28.860 120 C 0.263 0.300 0.300 - - - 86.30 *86.30%

V. Satisfactory

G.C.I. Construction 11346 Road Conc. at Palestina Road 03/05/08 V 1.891 60 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory

G.C.I. Construction 11346 Const. of San Vicente-Gutan Lubak-Anguib Road, Phase V 09/09/09 II 20.642 415 C 0.426 0.030 0.300 - - - 75.60 80.16%

Unsatisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page168

Page 177: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

G.C.I. Construction 11346Rehab./Reconst./Upgrading of Damaged National Roads, Daang Maharlika, Km. 395+000-Km. 426+000 with exception

09/09/09 V 28.084 180 C 0.479 0.154 0.300 - - - 93.30 *93.30% V. Satisfactory

G.C.I. Construction 11346 Rehab./Reconst. of Damaged National Roads, Jct. Bato-Baras Road 09/05/09 V 19.180 390 C 0.386 0.200 0.300 - - - 88.60 92.56%

V. Satisfactory

G.C.I. Construction 11346 Rehab./Reconst. of Naga City Bdry,. Calabanga-Balongay Road 09/10/09 V 47.763 120 C 0.476 0.148 0.300 - - - 92.40 *92.40%

V. Satisfactory

G.C.I. Construction 11346 Rehabilitation of Danao-Pasacao Road 09/11/09 V 47.955 318 C 0.416 0.200 0.300 - - - 91.60 *91.60% V. Satisfactory

G.C.I. Construction 11346 Road Opening of Pararapo-Pulang Daga Road 09/09/09 V 19.107 100 C 0.400 - 0.500 - - - 90.00 *90.00%

V. Satisfactory

G.C.I. Construction 11346 Rehab./Dredging of Bato River Control 09/04/09 V 14.390 180 C 0.384 - 0.500 - - - 88.40 *88.40% Satisfactory

G.C.I. Construction 11346 Reconst. of Cabangan River Control, Ubaliw 09/02/09 V 19.269 90 C 0.375 - 0.500 - - - 87.50 *87.50%

Satisfactory

G.C.I. Construction 11346 Road Opening/Const. of Missing Links of Malinao-Buhi Road, (Buhi Side) 09/08/09 V 19.107 179 O 0.311 0.300 0.150 0.030 0.047 0.033 87.10 -

G.C.I. Construction 11346 Const. of Salvacion-Baybay, Zone 7 Road 09/10/09 V 3.061 120 C 0.362 0.200 0.300 - - - 86.20 *86.20% Satisfactory

G.C.I. Construction 11346 Road Upgrading of Libon-Bacolod-San Vicente-Marocmoc-Buga Road 09/02/09 V 19.230 134 C 0.424 0.154 0.300 - - - 87.80 85.20%

Satisfactory

G.C.I. Construction 11346Completion of Minaili Bridge and

Approaches along Panganiban-Bagamanoc Road

02/25/10 V 13.891 275 C 0.492 0.133 0.300 - - - 92.50 92.50% V. Satisfactory

G.C.I. Construction 11346 Quinali-Talisay River Flood Control Embankment & Channelization 02/26/10 V 38.400 417 O 0.360 0.300 0.105 0.030 0.050 0.033 87.80 -

G.C.I. Construction 11346 Road Upgrading (Gravel to Concrete) Gigmoto-Viga Road, Phase II 02/25/10 V 74.100 270 O 0.349 0.245 0.150 0.030 0.050 0.050 87.40 -

G.C.I. Construction 11346 Road Upgrading (Gravel to Concrete) Viga Panganiban-Bagamanoc Road 02/25/10 V 19.192 180 O 0.366 0.247 0.133 0.030 0.045 0.050 87.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page169

Page 178: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

G.C.I. Construction 11346 Road Upgrading (Gravel to Concrete) Baras-Gigmoto-Viga Road 02/25/10 V 75.850 343 C 0.424 0.133 0.300 - - - 85.70 85.70%

Satisfactory

G.C.I. Construction 11346 Quinali-Talisay River Flood Control Embankment & Channelization 02/26/10 V 17.285 220 O 0.320 0.300 0.120 0.030 0.050 0.033 85.30 -

G.D.L. Construction 22796 Rehab. of San Miguel-Sibul Road 09/08/09 III 19.043 120 C 0.414 0.133 0.300 - - - 84.70 *84.70% Satisfactory

G.D.L. Construction / Persan Construction, Inc. (JV) JV-07-165 Norzagaray-Bigte Road Including of

Replacement of Kay Uwak Bridge 06/01/09 III 29.494 180 C 0.270 0.200 0.300 - - - 77.00 84.02%Satisfactory

G.D.L. Construction/E.C. De Luna Constructio Corporation (JV) JV-07-094

Rehab./Reconst. of Damaged Paved National Road at Gen,. Alejo Santos

Highway, Plaridel-Bustos09/04/09 III 150.985 310 C 0.402 0.133 0.300 - - - 83.50 84.16%

Satisfactory

G.F. Falcis Construction & Supply 26147 Const. of Brgy. 9 River Control 05/21/08 VI 0.945 90 O 0.387 0.200 0.100 0.030 0.052 0.200 96.90 -

G.F. Rovero Merchandising 27268 Rehab./Construction of Flood Control Structure, Poblacion 06/05/09 VI 4.812 120 C 0.483 0.192 0.300 - - - 97.50 93.84%

V. Satisfactory

G.F. Rovero Merchandising 27268 Conc. of Altavas-Jamindan Road 08/26/07 VI 0.961 50 C 0.381 0.116 0.300 - - - 79.70 *79.70% Satisfactory

G.F. Rovero Merchandising 27268 Repair/Rehab. of Quarters/Office Building 11/25/07 VI 6.645 180 C 0.278 0.300 0.300 - - - 87.80 89.83% V. Satisfactory

G.F. Rovero Merchandising 27268 Impvt. of Access Road to Kalibo Airport 09/05/09 VI 8.032 244 O 0.378 0.300 0.150 0.030 0.025 0.033 91.60 -

G.F. Rovero Merchandising 27268 Impvt. of Access Road to Caticlan Port 09/06/09 VI 9.639 226 O 0.364 0.300 0.150 0.030 0.025 0.033 90.20 -

G.F. Rovero Merchandising 27268 Const./Rehab. of Multi-Purpose Bldg. at Brgy. Poblacion 02/28/10 VI 0.958 40 C 0.425 0.200 0.300 - - - 92.50 92.50%

V. Satisfactory

G.F. Rovero Merchandising 27268 Const. of Ibajay Public Market, Brgy. Poblacion 02/26/10 VI 4.821 120 O 0.359 0.300 0.150 0.015 0.032 0.050 90.60 -

G.F. Rovero Merchandising 27268 Impvt. of Access Road to Caticlan Port 02/27/10 VI 9.639 260 C 0.408 0.200 0.300 - - - 90.80 89.21% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page170

Page 179: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

G.G. Uy Construction 32319 Rehabilitation of Main Canal (Sta. 13+150-Sta. 16+600 9/10-14/07 I 12.410 150 C 0.250 0.300 0.300 - - - 85.00 84.84%

V.Satisfactory

G.O. Marron General Contractor 6844 Completion of MPB @ Balaoan 11/11/08 I 1.881 92 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

G.O. Marron General Contractor 6844 Conc. Paving of Sitio Nagbayugan Feeder Road 08/22/07 I 1.881 77 C 0.383 0.260 0.300 - - - 94.30 71.68%

Satisfactory

G.O. Marron General Contractor 6844 Const. of MPB, Brgy. Central East I 05/23/08 I 0.940 48 C 0.272 0.300 0.300 - - - 87.20 75.65% Satisfactory

G.O. Marron General Contractor 6844 Const./Rehab. of MPB 08/22/07 I 4.674 349 C 0.333 0.300 0.300 - - - 93.30 79.60% Satisfactory

G.O. Marron General Contractor 6844 Concrete Paving of Tallaoen-Nagrebcan-Sucoc Norte Road 02/26/10 I 0.974 60 C 0.404 0.133 0.300 - - - 83.70 83.70%

Satisfactory

G.R. Quirong Construction 9019 Const. of MPB at Brgy. Rizal 12/02/07 VIII 0.470 90 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory

G.V. Burton Builders 26804 Const. of Jct. National-Bitnong-Belance-NV Bdry. Rd. Oyao Section 06/03/09 II 9.644 180 C 0.398 0.133 0.300 - - - 83.10 *83.10%

Satisfactory

G.V. Burton Builders 21700 Const. of MPB (Phase I) @ Tidang Village 08/30/07 II 0.286 60 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

G-3 Construction 32869Const. of School Building, 2-Storey, 4-CL Mahabang Parang NHS, Brgy. Mahabang

Parang02/15/10 IVA 5.189 180 O 0.330 0.300 0.150 0.030 0.058 0.050 91.80 -

Gacutan Construction 10789 Alibadabad CPIP 10/1-5/07 II 2.560 180 C 0.272 0.159 0.300 - - - 73.10 73.10% Satisfactory

Gacutan Construction 10789 Conc. of Ilocos Norte-Abra Road 11/17/08 I 11.649 180 C 0.339 0.200 0.300 - - - 83.90 83.42% V. Satisfactory

Gacutan Construction 10789 Conc. of Tandang Sora St. 05/23/08 II 9.564 150 C 0.329 0.202 0.300 - - - 83.10 *83.10% V. Satisfactory

Galeno Construction, Inc. 3427 Completion of Bacolod South Kabankalan Road 06/01/09 VI 18.835 240 O 0.325 0.300 0.150 0.023 0.050 0.050 89.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page171

Page 180: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Galeno Construction, Inc. 3427 Completion of Camindangan Bridge along Candoni-Sipalay Road, Brgy. Camindangan 03/07/09 VI 11.954 306 C 0.389 0.200 0.300 - - - 88.90 86.62%

Satisfactory

Galeno Construction, Inc. 3427 Completion of Bacolod South Kabankalan Road 09/12/09 VI 18.844 301 O 0.325 0.300 0.150 0.023 0.055 0.050 90.30 -

Galeno Construction, Inc. 3427

Reblocking of Deteriorated Concrete Pavement along Bacolod North Road

(Manapla Section) Km. 36+800-Km. 40+500 with exception

09/14/09 VI 19.116 336 C 0.397 0.082 0.300 - - - 77.90 83.48% Satisfactory

Galeno Construction, Inc. 3427 Completion of Bacolod South Kabankalan Rd. 03/06/10 VI 18.705 314 C 0.338 0.200 0.300 - - - 83.80 87.55%

Satisfactory

Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre Highway Alae-

Kisolon Road 03/06/09 X 9.644 75 C 0.429 0.133 0.000 - - - 56.20 71.71% Poor

Gampik Construction & Development Inc. 8019 Impv't./Rehab./Asphalt Overlay of Initao-

Naawan Road Sect. 08/30/07 X 14.462 90 C 0.384 0.300 0.000 - - - 68.40 71.34% Satisfactory

Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road, Tuganay-

Sto. Niño Sect. 03/03/08 XI 9.984 180 C 0.307 0.300 0.300 - - - 90.70 85.18% V.Satisfactory

Gaver General Merchandising 24186 Construction of School Building at Aklan NHS for Arts & Trades 06/05/09 VI 1.360 75 C 0.468 0.107 0.300 - - - 87.50 *87.50%

Satisfactory

Gaver General Merchandising 24186 Rehab. of Multi-Purpose Pavement in Pastrana Park (Phase III) 11/25/07 VI 4.819 120 C 0.394 0.278 0.300 - - - 97.20 97.20%

Outstanding

GC Builders 14768 Concreting of Road, Brgy. Binaliw 09/15/09 VII 0.482 65 C 0.494 0.133 0.300 - - - 92.70 *92.70% V. Satisfactory

GC Builders 14768 Concreting of Road, Brgy. Lusaran 09/15/09 VII 0.675 65 C 0.489 0.133 0.300 - - - 92.20 *92.20% V. Satisfactory

GCI Construction 11346 Virac Airport Development Project 07/11/09 DOTC 25.232 150 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory

GCI Construction 11346 Repair/Rehab of LCPIS 06/04/07 V 11.652 90 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90 72.90% Satisfactory

GCI Construction 11346 Virac Airport Development Project (Extension Runway) 02/19/10 DOTC 17.257 150 C 0.469 0.200 0.300 - - - 96.90 96.90%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page172

Page 181: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

GCMG Construction 9743 Const. of Standard Modified School Bldg. Two (2) CL (7m x 18m) Portulin NHS 03/03/10 X 1.312 120 C 0.425 0.133 0.300 - - - 85.80 84.54%

Satisfactory

GEA Construction and Corporation 10163 Romblon Airport Development Project 04/27/09 DOTC 4.800 90 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory

GEA Construction Corporation 10163 Laguindingan Airport Development Project 06/25/09 DOTC 22.360 180 O 0.400 0.300 0.150 0.020 0.039 0.050 95.90 -

GEA Construction Corporation 10163 San Jose Airport Development Project 11/21/09 DOTC 3.359 120 C 0.470 0.200 0.300 - - - 97.00 97.00% Outstanding

GEA Construction Corporation 10163 Romblon Airport Development Project 11/27/09 DOTC 1.437 90 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding

GEA Construction Corporation 10163 Antique Dev't Project (Expansion of Terminal Building) 03/27/10 DOTC 1.916 120 C 0.459 0.200 0.300 - - - 95.90 95.90%

V.Satisfactory

GED Construction 13614 Const. of Secondary Sch. Bldg. @ Cato MNHS 03/06/08 I 0.485 40 C 0.273 0.200 0.300 - - - 77.30 * 77.30%

Satisfactory

Geed Construction 10823 Impvt. of Surigao-Davao Coastal Road along Cabanahan 11/24/08 XIII 12.464 100 C 0.320 0.200 0.300 - - - 82.00 77.08%

Satisfactory

Geety Realty & Dev. Corporation 30447 Const. of River Control (Revetment) Candulawan 03/08/08 VII 4.446 75 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Geety Realty & Development Corporation 30447 Construction of Colon Flood Control

Structures 06/01/09 VII 4.622 90 C 0.485 0.162 0.300 - - - 94.70 *94.70% V. Satisfactory

Geety Realty & Development Corporation 30447 Rehab., Reconst. of Tapal (Carcar)-

Zaragoza-Olango-Aloguinsan Road 06/01/09 VII 19.191 45 C 0.444 0.200 0.300 - - - 94.40 *94.40% V. Satisfactory

Geety Realty & Development Corporation 30447

Road Upgrading (Gravel to Concrete) Tapal (Carcar)-Zaragoza-Olango-

Alonguinsan Road06/01/09 VII 5.755 60 C 0.438 0.200 0.300 - - - 93.80 *93.80%

V. Satisfactory

Geety Realty & Development Corporation 30447 Rehabilitation of Canlumampao 10/24/07 VII 9.598 300 O 0.333 0.300 0.070 0.030 0.033 0.100 86.60 -

Gem Construction & Supply 29732 Const. of Brgy. Road @ Brgy. Manggas 11/24/07 IV-A 0.964 90 C 0.339 0.200 0.300 - - - 83.90 * 83.90% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page173

Page 182: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gemma Construction Supply 5044 Const. of Drainage Canal from Poblacion to San Pablo 05/19/08 XII 0.950 100 C 0.267 0.300 0.300 - - - 86.70 81.60%

V. Satisfactory

Gemma Construction Supply 5044 Const. of MPB (Phase I) 03/20/09 XII 4.767 120 C 0.416 0.133 0.300 - - - 84.90 83.43% Satisfactory

Gemma Construction Supply 5044 Const. of Sinawal Flood Control Protecting Makar-Tupi-Marbel Road 09/03/08 XII 1.390 75 C 0.305 0.300 0.300 - - - 90.50 88.22%

V. Satisfactory

Gemma Construction Supply 5044 Const./Renovation/Completion of DPWH Regional Office XII 08/29/08 XII 4.998 120 C 0.394 0.200 0.300 - - - 89.40 *89.40%

V. Satisfactory

Gemma Construction Supply 5044 Construction of Provincial Hospital 03/13/09 XII 1.917 85 C 0.467 0.133 0.300 - - - 90.00 *90.00% V. Satisfactory

Gemma Construction Supply 5044 Repair/Rehab. Along Dulawan-Marbel Road 08/27/08 XII 9.620 120 C 0.262 0.237 0.300 - - - 79.90 *79.90% Satisfactory

Gemma Construction Supply 5044Repair/Rehab. of Road along Marbel-Alah

Valley-Cotabato Road (Alah Highway Bdry. w/ Maguindanao)

03/12/09 XII 9.551 128 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory

Gemma Construction Supply 5044 Rerpair/Rehab. of Road along Kidapawan-Alah Jct. Road (kapingkong Isulan Section) 03/13/09 XII 9.544 129 C 0.393 0.133 0.300 - - - 82.60 *82.60%

Satisfactory

Gemma Construction Supply 5044 Road Upgrading, Dulawan-Marbel Road 03/13/09 XII 18.922 293 O 0.321 0.240 0.150 0.030 0.050 0.050 84.10 -

Gemma Construction Supply 5044 Widening/Conc. of Calean Bridge along Dulawan-Marbel Road 11/27/07 XII 9.497 209 C 0.369 0.200 0.300 - - - 86.90 86.90%

V.Satisfactory

Gemma Construction Supply, Inc. 5044 Road Upgrading (Gravel to Concrete) Dulawan-Marbel Road 09/08/09 XII 18.922 447 O 0.326 0.300 0.150 0.030 0.042 0.050 89.80 -

Gemma Construction Supply, Inc. 5044 Road Upgrading (Gravel to Paved) of Marbel-Makar Road 09/11/09 XII 8.561 154 C 0.427 0.200 0.300 - - - 92.70 89.28%

V. Satisfactory

Gemma Construction Supply, Inc. 5044 Completion of MPB @ Brgy. Kalanawi-1 09/08/09 XII 0.481 221 O 0.357 0.241 0.150 0.030 0.018 0.033 82.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page174

Page 183: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gemma Construction Supply, Inc. 5044Const. of Isulan Highway Junction Dukay-Bagumbayan Sen. Ninoy Aquino Road (D'

Lotilla Section)03/03/10 XII 14.139 175 O 0.373 0.240 0.150 0.030 0.050 0.033 87.60 -

Gemma Construction Supply, Inc. 5044 Road Upgrading (Gravel to Concrete) Dulawan-Marbel Road 03/04/10 XII 18.923 662 O 0.354 0.240 0.150 0.030 0.050 0.033 85.70 -

Gemma Construction Supply, Inc. 5044Const. of Isulan Highway Junction Dukay-Bagumbayan Sen. Ninoy Aquino Road (D'

Lotilla Section)03/03/10 XII 25.934 304 O 0.329 0.241 0.150 0.030 0.050 0.033 83.30 -

Gemma ConstructionSupply 5044 Completion of MPB at Brgy. Kalanawi-I 06/02/09 R-XII 0.481 221 O 0.300 0.269 0.150 0.030 0.041 0.050 84.00 -

Geneson Construction & Supply 13728 Completion of Kabaka/KMTC Multi-Purpose Building 02/26/09 NCR 1.928 76 C 0.456 0.109 0.300 - - - 86.50 *86.50%

Satisfactory

Geneson Construction & Supply 13728 Repair/Rehab. of Road and Drainage Improvement 11/20/08 NCR 2.373 75 C 0.335 0.300 0.300 - - - 93.50 *93.50%

Outstanding

Genetian Builders 18052 Conc. along Liloy-ZN-Ipil, ZSP Rd. (Phase III), Sta. 1999+490 to Sta. 2000+240 02/25/10 IX 14.348 130 C 0.350 0.154 0.300 - - - 80.40 82.32%

Satisfactory

Genetian Builders 18052 Conc. along Liloy-ZN-Ipil, ZSP (Phase II) Sta. 1998+720 - Sta. 1999+470 02/25/10 IX 14.348 140 C 0.285 0.200 0.300 - - - 78.50 75.08%

Unsatisfactory

Gerezsons Resources Corporation 20699 Const. of Road Opening Brgy. Milagros-Brgy. Badiangay 06/09/09 VIII 1.776 175 C 0.389 0.200 0.000 - - - 58.90 40.30%

Poor

Gerezsons Resources Corporation 20699 Const. of 1 CL Sch. Bldg. Tolosa NHS 12/05/08 VIII 0.519 120 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory

Gerezsons Resources Corporation 20699 Repair/Rehab. of Grouted Riprap @ Brgy. 39 03/16/09 VIII 0.964 95 C 0.437 0.200 0.000 - - - 63.70 *63.70%

Poor

Gerezsons Resources Corporation 20699 Repair/Rehab. of National Road along Jct. Taft-Arteche Rd. Sect. 03/16/09 VIII 4.755 90 C 0.454 0.200 0.300 - - - 95.40 *95.40%

V. Satisfactory

Gershli Construction & Supply 28480 Conc. of Roads, Brgy. Tanagan 03/04/09 IV-A 0.954 60 C 0.435 0.141 0.300 - - - 87.60 *87.60% Satisfactory

Gershli Construction & Supply 28480 Const. of FMR at Brgy. Santor 11/21/07 IV-A 1.926 90 C 0.321 0.200 0.300 - - - 82.10 *82.10% V . Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page175

Page 184: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gershli Construction & Supply 28480 Const. of MPB at Brgy. Wawa 08/28/08 IV-A 3.372 90 C 0.310 0.286 0.300 - - - 89.60 *89.60% V. Satisfactory

Gershli Construction & Supply 28480 Const. of Multi Purpose Building/Structure in Brgy. Bilaran 11/23/07 IV-A 0.479 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. Satisfactory

Gershli Construction & Supply 28480 Impvt. of MPB, Cuenca C/S 11/27/08 IV-A 0.289 60 C 0.345 0.277 0.300 - - - 92.20 *92.20% Outstanding

Gershli Construction & Supply 28480 Const. of Multi-Purpose Building at Brgy. Loma 09/05/09 IVA 1.910 90 C 0.447 0.133 0.300 - - - 88.00 *88.00%

Satisfactory

Gershli Construction & Supply 28480 Concreting of Road in Brgy. Malalay 02/25/10 IVA 0.490 45 C 0.432 0.200 0.300 - - - 93.20 93.20% V. Satisfactory

Gershli Construction & Supply 28480 Const./Rehab. of Road at San Pedro 02/26/10 IVA 0.399 30 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory

Gershli Construction & Supply 28480 Repair/Rehab. of Road, Sixto Castillo St. 03/03/10 IVA 1.928 60 C 0.454 0.133 0.300 - - - 88.70 88.70% Satisfactory

GES Construction 30299 Construction of Multi-Purpose Building @ Brgy. 46 06/10/09 VIII 0.963 70 C 0.302 0.133 0.300 - - - 73.50 87.15%

Satisfactory

GES Construction 30299 PICAS-San Vicente CIS, Phase 7, Contingency 10/6-10/08 PIO 531.923 30 C 0.349 0.219 0.300 - - - 86.80 86.80%

V.Satisfactory

GES Construction 30299 Taripa CIS 10/6-10/08 PIO 1.012 90 O 0.359 0.238 0.100 0.015 0.029 0.100 84.14 -

Gicar Construction 12624 Conc. of Line Canal along Surigao-Wharf Road km. 1122+270 to km. 1122+560 05/13/08 XIII 0.962 90 C 0.311 0.300 0.300 - - - 91.10 89.90%

V. Satisfactory

Gicar Construction 12624 Conc. of Line Canal with Slope Protection along Surigao-Agusan Road 08/23/08 XIII 1.927 90 C 0.388 0.166 0.300 - - - 85.40 84.38%

V. Satisfactory

Gicar Construction 12624 Const. of Kag-ayongan Bridge and Approaches Phase I 08/22/07 XIII 10.274 210 C 0.376 0.205 0.300 - - - 88.10 86.93%

V. Satisfactory

Gicar Construction 12624 Const. of Navarro Bridge & Approaches 08/21/08 XIII 8.029 180 C 0.363 0.176 0.300 - - - 83.90 79.64% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page176

Page 185: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gicar Construction 12624 Const./Widening of Dinagat-Loreto Road (Sto. Niño-Diegas Section) 11/20/08 XIII 14.424 240 C 0.358 0.300 0.000 - - - 65.80 70.60%

Satisfactory

Gicar Construction 12624 Impvt./Conc. of Lantay-Maraboc-Pangantucan Road 05/18/08 X 14.274 262 C 0.345 0.119 0.300 - - - 76.40 74.36%

Satisfactory

Gicar Construction 12624 Replacement of San Isidro Bridge 11/22/07 XIII 14.151 431 C 0.300 0.300 0.300 - - - 90.00 90.00% Outstanding

Gicar Construction 12624 Concreting of Surigao City-San Juan Coastal Rd. 09/06/09 XIII 28.595 315 C 0.431 0.148 0.300 - - - 87.90 88.88%

Satisfactory

Gicar Construction 12624 Reconst./Reblocking of Surigao City-San Juan Coastal Rd. 09/06/09 XIII 9.646 281 C 0.422 0.150 0.300 - - - 87.20 *87.20%

Satisfactory

Gicar Construction 12624Rehab./Reconst. Along Quezon-Mapawa-Capalayan-Espina-Navarro Rd., Arellano

Dist.09/06/09 XIII 21.144 225 C 0.434 0.133 0.300 - - - 86.70 *86.70%

Satisfactory

Gicar Construction 12624 Const./Conc. of Jct. Magsaysay-Cagdianao Rd. 09/05/09 XIII 24.071 240 O 0.373 0.300 0.051 0.030 0.056 0.017 82.70 -

Gicar Construction 12624 Const./Conc. of Junction Magsaysay-Cagdianao Rd. 02/24/10 XIII 24.071 270 C 0.433 0.133 0.300 - - - 86.60 84.65%

Satisfactory

Gilbert D. Lim "GDL" Enterprise & Services 25499 Conc. of Bolod-Bolod-Catmon Road 11/30/07 VIII 4.650 180 C 0.210 0.200 0.300 - - - 71.00 *71.00%

Satisfactory

Gind Construction and Enterprises 18679 Const. of Public Market Toilet & Market Office & Site Devlopment 06/01/09 I 8.514 230 C 0.457 0.133 0.300 - - - 89.00 *89.00%

Satisfactory

Gind Construction and Enterprises 18679 Const. of Bagani Gabor MPB 02/17/10 I 2.295 65 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory

GJD Construction & Supply 25866 Const. of 2 CL Sch. Bldg. @ Titay NHS Malagandis Annex 08/24/07 IX 0.871 100 C 0.332 0.230 0.300 - - - 86.20 68.91%

Fair

GJD Construction & Supply 25866 Const. of MPB @ Poblacion 11/22/08 IX 0.475 42 C 0.372 0.181 0.300 - - - 85.30 *85.30% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page177

Page 186: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

GJD Construction & Supply 25866 Const. of Pedestrian Overpass @ Tigbungabong 08/23/08 IX 2.859 90 C 0.175 0.300 0.300 - - - 77.50 65.14%

Fair

GJD Construction & Supply 25866 Const. of MPB (Regional Trial Court) 02/27/10 IX 0.944 75 C 0.334 0.200 0.300 - - - 83.40 83.40% Satisfactory

GJE Builders 18286 Construction of Multi-Purpose Building, Brgy. Masalasa 05/22/09 III 0.520 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%

Satisfactory

GJE Builders 18286 Conc. of Coral-San Francisco Road w/ Box Culvert 08/29/07 III 4.709 120 C 0.283 0.300 0.300 - - - 88.30 87.76%

V. Satisfactory

GJE Builders 18286 Conc. of Purok 5 Road 05/21/08 III 1.675 75 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory

GJE Builders 18286 Concreting of Road at Fairlane Subdivision, Brgy. San Vicente 02/26/09 III 2.821 90 C 0.422 0.196 0.300 - - - 91.80 *91.80%

V. Satisfactory

GJE Builders 18286 Const. of 1 CL Sch. Bldg. at San Juan de Valdez E/S 08/21/08 III 0.423 45 C 0.290 0.257 0.300 - - - 84.70 *84.70%

V. Satisfactory

GJE Builders 18286 Construction of 2-CL School Buidling at Balaoang H/S Annex 02/26/09 III 0.889 60 C 0.452 0.133 0.300 - - - 88.50 *88.50%

Satisfactory

GJE Builders 18286 Paving/Upgrading of Romulo Highway, Sta. Ignacia Section 08/29/07 III 2.737 30 C 0.318 0.291 0.300 - - - 90.90 *90.90%

Outstanding

GJE Builders 18286 Conc. of Brgy. Road @ Brgy. Dolores (Phase I) 02/24/10 III 0.454 75 C 0.440 0.200 0.300 - - - 94.00 94.00%

V. Satisfactory

GJE Builders 18286 Conc. Of Brgy. Road at Brgy. San Jacinto 02/24/10 III 0.936 60 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory

GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge 11/14/07 III 13.950 240 C 0.364 0.300 0.300 - - - 96.40 96.40% Outstanding

GNE Construction 21764 Const. of Modified 2 CL Sch. Bldg. E/S 03/03/08 IX 0.765 60 C 0.336 0.200 0.300 - - - 83.60 *83.60% V. Satisfactory

GNE Construction 21764 Const. of MPB, Poblacion 12/04/08 IX 0.935 90 C 0.373 0.147 0.300 - - - 82.00 *82.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page178

Page 187: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

GNGC Enterprises 29124Conc. of Armstrong Ave. & Conc. &

Drainage Impvt. of Sunset St. (Package II) @ Brgy. Moonwalk & Brgy. San Antonio

08/15/07 NCR 3.305 45 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory

GNGC Enterprises 29124 Const. of MPB at Goodwill, Brgy. BF Homes 02/17/10 NCR 3.816 75 C 0.470 0.133 0.300 - - - 90.30 90.30%

V.Satisfactory

Go Solid Builders, Inc. 32885 Const. of 2 CL Secondary Sch. Bldg. @ Tacloban City National High Sch. 11/25/08 VIII 0.949 75 C 0.352 0.200 0.300 - - - 85.20 *85.20%

V. Satisfactory

Gold Rich Construction & Trading (Formerly: Gold Rich Construction) 16489 Rehab./Reconst. of Damaged National

Roads along Kennon Road, Outlook Drive 06/03/09 CAR 19.010 88 C 0.449 0.200 0.300 - - - 94.90 *94.90% V. Satisfactory

Gold Rich Construction & Trading (Formerly: Gold Rich Construction) 16489

Conc. and Impvt. Project along Benguet (Impvt. along Baguio City limit to Sto.

Tomas Road)05/19/09 CAR 24.314 120 O 0.281 0.294 0.150 0.030 0.047 0.050 85.20 -

Gold Rich Construction & Trading (Formerly: Gold Rich Construction) 16489 Conc. and Impvt. Project along Benguet I

(Conc. along Itogon-Dalupirip Road) 05/19/09 CAR 15.838 120 O 0.283 0.300 0.150 0.022 0.042 0.050 84.70 -

Gold Rich Construction & Trading (Formerly: Gold Rich Construction) 16489 Rehab./Reconst. of Gurel-Kabayan-Buguias-

Abatan Road 08/25/09 CAR 51.361 330 O 0.391 0.300 0.076 0.015 0.037 0.017 83.60 -

Gold Rich Construction & Trading (Formerly: Gold Rich Construction) 16489

Conc. and Impvt. Project along Benguet (Impvt. along Baguio City limit to Sto.

Tomas Road)03/02/10 CAR 25.662 120 C 0.421 0.133 0.300 - - - 85.40 85.28%

Satisfactory

Gold Rich Construction & Trading (Formerly: Gold Rich Construction) 16489 Conc. and Impvt. Project along Benguet

(Conc. along Itogon-Dalupirip Road) 03/02/10 CAR 15.838 170 C 0.340 0.200 0.300 - - - 84.00 84.42% Satisfactory

Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Const. of Classrooms at City High School

Annex 08/28/08 CAR 7.531 120 C 0.390 0.130 0.300 - - - 82.00 *82.00% V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Const. of MPB @ Brgy. Gabriela Silang 08/28/08 CAR 1.909 90 C 0.396 0.195 0.300 - - - 89.10 *89.10%

V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehab./Impvt. of Ferguson Road 08/28/08 CAR 6.626 80 C 0.396 0.109 0.300 - - - 80.50 *80.50%

V. Satisfactory

Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehab./Impvt. of Kennon Drive, Kennon

Road 11/21/08 CAR 6.626 80 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page179

Page 188: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehab./Impvt. of Outlook Drive 08/28/08 CAR 6.626 80 C 0.391 0.107 0.300 - - - 79.80 *79.80%

Satisfactory

Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehabilitation along City Limit-Santo

Tomas Road 02/23/09 CAR 28.926 265 C 0.465 0.200 0.300 - - - 96.50 *96.50% Outstanding

Golden Ridge Enterprises 29946 Masao Port Expantion Project 9/16-19/08 PPA 91.102 420 C 27.982 30.000 30.000 - - - 86.61 86.61% V.Satisfactory

Golden Tech Construction 14820 Addalam River Irrigation Project 04/27/09 05/01/09 NIA 9.792 370 O 0.325 0.240 0.150 0.023 0.038 0.050 82.57 -

Golden Tech Construction 14820 Construction of Water Supply, Masaya Centro 08/27/09 II 1.186 90 C 0.430 0.130 0.300 - - - 86.00 *86.00%

Satisfactory

Goldfin Construction 21343 Const. Additional Floor and Repair/Repair of existing MPB (TESDA) 12/04/08 IX 4.718 315 C 0.385 0.257 0.300 - - - 94.20 81.57%

V. Satisfactory

Goldfin Construction 21343 Const. of 1 unit, 4 Storey, 20 CL Tisa II E/S Bldg. 12/04/08 VII 13.363 120 C 0.370 0.248 0.300 - - - 91.80 84.17%

V. Satisfactory

Goldfin Construction 21343 Const. of Camp Lapu-Lapu E/S 05/28/08 VII 2.938 50 C 0.362 0.300 0.300 - - - 96.20 85.77% V. Satisfactory

Goldfin Construction 21343 Const. of 4 Storey-8 Classroom Sch. Bldg. at Basak Community Elementary School 09/16/09 VII 5.220 120 O 0.379 0.300 0.150 0.030 0.029 0.025 91.30 -

Goldfin Construction 21343 Const. of 4 Storey-8 Classroom Sch. Bldg. at Basak Community Elementary School 03/08/10 VII 5.220 120 C 0.425 0.139 0.300 - - - 86.40 89.83%

V. Satisfactory

Goldrich Construction 16489 Masantol River Wharf (Phase 2) Improvement Project 7/1-4/08 PPA 16.879 120 O 0.362 0.240 0.100 0.015 0.035 0.067 81.84 -

Goldrich Construction 16489 Repair/Rehab. Multi-Purpose Building, San Jose St. 02/27/09 NCR 2.879 127 C 0.494 0.166 0.300 - - - 96.00 *96.00%

V.Satisfactory

Goldrich Construction & Trading (Formerly Gold Rich Construction) 16489 Rehab., Reconst. of Damaged National

Roads along Kennon Road, Loakan Road 09/10/09 CAR 19.279 88 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory

Goldrich Construction and Trading 16489 Const. of MPB @ Brgy. Gabriela Silang 03/05/08 CAR 1.909 90 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page180

Page 189: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Goldrich Construction and Trading 16489 Impvt. of Bontoc-Tinglayan Road (Package 2), km. 396+500-km. 398+400 05/24/08 CAR 12.407 118 C 0.338 0.200 0.300 - - - 83.80 78.52%

Satisfactory

Goldrich Construction and Trading 16489 Impvt. of Pico-Lamtang Road 11/12/07 CAR 5.742 100 C 0.330 0.292 0.300 - - - 92.20 92.20% Outstanding

Goldrich Construction and Trading (Formerly: Goldrich Const.) 16489 Rehab. of Kennon Road, Km. 242+966-Km.

243+066 and Km. 245+268-Km. 245+563 11/26/07 CAR 9.361 80 C 0.322 0.265 0.300 - - - 88.70 *88.70% V. Satisfactory

Goldrock Construction & Development Corp. 5389 Const. of Ilog-ilog Bridge, Rizal-

Panalingaan Road 05/27/08 IV-B 15.616 255 C 0.291 0.279 0.300 - - - 87.00 83.04% V. Satisfactory

Goldrock Construction & Development Corp. 5389 Rehab. of El Nido-Taytay Road (Brgy.

Mabini-Brgy. Sandoval Section) 08/14/08 IV-B 14.155 164 C 0.372 0.200 0.300 - - - 87.20 86.42% V. Satisfactory

Goldrock Construction & Development Corp. 5389 Rehab. of Taytay Road (Sitio Igang-Brgy.

Pamantolon Sect.) 08/14/08 IV-B 14.157 164 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory

Goldrock Construction & Development Corp. 5389 Rehab./Impv't of Quezon-Punta Baja Road,

150+000-Km. 168+000 03/03/09 IV-B 14.230 210 C 0.397 0.200 0.300 - - - 89.70 82.23% Satisfactory

Goldrock Construction & Development Corp. 5389 Concreting of Jct. Itabiak-San Vicente

Airport Road 09/07/09 IVB 47.452 257 O 0.391 0.288 0.150 0.030 0.033 0.033 92.50 -

Goldrock Construction & Development Corp. 5389 Conc. of Jct. Itabiak-San Vicente Airport

Road 03/04/10 IVB 47.452 228 C 0.438 0.200 0.300 - - - 93.80 90.29% V. Satisfactory

Gonzalo Construction 1826 Repair/Rehab. of Multi-Purpose Building (DBM) 06/04/09 CAR 9.637 270 C 0.451 0.146 0.300 - - - 89.70 87.25%

Satisfactory

Gonzalo Construction 1826Impvt. along Acop-Kapangan-Kibungan-Bakun Road, km 290+100 - Km. 294+700

(VS) 05/26/08 CAR 19.130 150 C 0.314 0.200 0.300 - - - 81.40 76.24%

Satisfactory

Gonzalo Construction 1826 Rehabilitation/Reconstruction of Damanged Road along Abra-Kalinga Road 02/25/09 CAR 14.328 200 O 0.159 0.000 0.114 0.000 0.025 0.000 29.80 -

Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) 03/06/08 CAR 9.637 210 O 0.364 0.300 0.100 0.030 0.021 0.100 91.50 -

Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) 05/29/08 CAR 9.637 210 O 0.337 0.289 0.030 0.030 0.056 0.067 80.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page181

Page 190: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gonzalo Construction 1826 Replacement/ Const. of Man-asok Bridge & Approaches 08/15/07 CAR 9.305 255 C 0.355 0.000 0.300 - - - 65.50 80.14%

V. Satisfactory

Gonzalodo Enterprises 30681 Rehabilitation of Various Barangay Roads 06/04/09 VII 3.742 95 C 0.392 0.133 0.300 - - - 82.50 *82.50% Satisfactory

Gonzalodo Enterprises 30681 Conc. of Bogo-Curva-Madellin-Daanbantayan Road, Antipolo Section 11/29/07 VII 7.600 112 C 0.309 0.200 0.300 - - - 80.90 *80.90%

V. Satisfactory

Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building 03/05/09 VII 0.470 60 C 0.402 0.200 0.300 - - - 90.20 *90.20%

V. Satisfactory

Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building 03/05/09 VII 0.460 60 C 0.450 0.133 0.300 - - - 88.30 *88.30%

Satisfactory

Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building @ Tabugon 03/06/09 VII 0.482 75 C 0.347 0.000 0.300 - - - 64.70 *64.70%

Poor

Gonzalodo Enterprises 30681 Impvt. of MPB 08/27/08 VII 1.885 75 C 0.349 0.200 0.300 - - - 84.90 72.09% Satisfactory

Gonzalodo Enterprises 30681 Impvt. of MPB, Lapu-lapu Central School 09/01/08 VII 0.921 60 C 0.314 0.200 0.300 - - - 81.40 *81.40% V. Satisfactory

Gonzalodo Enterprises 30681 Repair of Old Multi-Purpose Building, Brgy. Sitio Planta 09/01/09 VII 0.288 30 C 0.422 0.117 0.300 - - - 83.90 *83.90%

Satisfactory

Good Fortune International Incorporated 9246

Const. of Nabitasan River Control along Iloilo City, Dumangas Coastal Road and

Metro Iloilo Circumferential Road06/10/09 VI 8.910 267 C 0.442 0.200 0.300 - - - 94.20 *94.20%

V. Satisfactory

Good Fortune International Incorporated 9246 Concreting of Lemery - San Rafael Road 06/09/09 VI 28.639 419 O 0.373 0.300 0.150 0.023 0.045 0.050 94.10 -

Good Fortune International Incorporated 9246 Concreting of Lemery-San Rafael Road 09/08/09 VI 28.639 430 O 0.312 0.300 0.150 0.023 0.050 0.050 88.50 -

Good Fortune International, Inc. 9246 Rehabilitation of Sibud Main Drainage 8/10-18/09 NIA 5.428 381 C 0.432 0.200 0.300 - - - 93.22 *93.22% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page182

Page 191: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Good Fortune International, Incorporated 9246 Const. of Bayunan Bridge 03/12/09 VI 17.478 479 C 0.453 0.200 0.300 - - - 95.30 88.55%

Satisfactory

Good Fortune International, Incorporated 9246 Const. of Odol Bridge 03/05/08 VI 12.223 240 C 0.383 0.300 0.000 - - - 68.30 77.11%

Satisfactory

Good Fortune International, Incorporated 9246 Road Upgrading of San Rafael-Passi Rd. 03/04/10 VI 19.087 150 O 0.319 0.300 0.150 0.030 0.033 0.033 86.50 -

Good Fortune International, Incorporated 9246 Conc. of Tiwi-Talisay-Guintas Port Rd. 02/24/10 VI 19.289 180 O 0.351 0.237 0.150 0.020 0.037 0.050 84.50 -

Good Speed Construction & Services 20572 Asphalt Overlay at Brgy. Halang going to Brgy. Real 08/17/07 IV-A 1.921 15 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Goodspeed Construction & Services 29572 Const. of 2-New Classroom @ Los Baños NHS, (Batong Malake) 02/24/10 IVA 3.532 60 C 0.362 0.200 0.300 - - - 86.20 86.20%

Satisfactory

Goodvibe Builders, Inc. 32686 Widening of MNR, Urdaneta-Villasis Section 05/19/09 I 7.237 620 O 0.367 0.218 0.150 0.030 0.030 0.050 84.50 -

Goodvibe Builders, Inc. 32686 Conc. of FMR @ Nancayasan 03/07/08 I 0.475 40 C 0.223 0.300 0.300 - - - 82.30 *82.30% V. Satisfactory

Goodvibe Builders, Inc. 32686 Conc. of Farm-to-Market Road at San Pedro Apartado 03/04/10 I 0.482 60 C 0.324 0.200 0.300 - - - 82.40 82.40%

Satisfactory

Goodvibe Builders, Inc. 32686 Conc. of Farm-to-Market Road, Brgy. Canarvacanan 03/04/10 I 0.484 60 C 0.322 0.200 0.300 - - - 82.20 82.20%

Satisfactory

Gospa Construction 15353 Impvt./Rehab. of MPB 08/15/08 NCR 0.480 90 C 0.349 0.257 0.300 - - - 90.60 *90.60% Outstanding

Gowil Builders 18733 Const. of Flood Control and Drainage Facilities, Brgy. Punta Princesa 06/09/09 VII 0.944 45 C 0.417 0.000 0.300 - - - 71.70 *71.70%

Poor

Gowil Builders 18733 Conc. of FMR @ Brgy. Awihao 08/19/08 VII 0.953 60 C 0.324 0.175 0.300 - - - 79.90 81.46% V. Satisfactory

Gowil Builders 18733 Const. of MPB, Bry. Cabitoonan 08/19/08 VII 1.429 90 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page183

Page 192: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Gowil Builders 18733 Const./Completion of MPB (Covered Court) 03/12/09 VII 4.225 120 C 0.417 0.197 0.300 - - - 91.40 *91.40% V. Satisfactory

Gowil Builders 18733 Const./Completion of MPB (Covered Court) 03/12/09 VII 1.406 120 C 0.389 0.055 0.300 - - - 74.40 *74.40% Poor

Gowil Builders 18733 Const./Completion/Extension of Two (2) Storey Bldg at Luray II NHS 09/04/09 VII 1.980 120 C 0.417 0.133 0.000 - - - 55.00 *55.00%

Poor

GP Construction 18653 Const. of MPB 11/24/08 V 1.872 90 C 0.390 0.200 0.300 - - - 89.00 85.92% V. Satisfactory

GP Construction 18653 Const. of Spillway 08/31/07 V 0.378 90 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

Grace Const. Corp./Dipolog Top Const. Dev't. Corp (JV) JV-08-016 Dipolog Airport Development Project 09/02/09 DOTC 0.163 360 O 0.368 0.300 0.150 0.030 0.051 0.050 94.90 -

Grace Const. Corp./Dipolog Top Const. Dev't. Corp (JV) JV-08-016 Dipolog Airport Development Project 03/21/09 DOTC 163.779 360 O 0.352 0.300 0.150 0.030 0.051 0.050 93.30 -

Grace Construction Corp./Dipolog Top Const. Dev't Corp. JV-08-016

Dipolog Airport Dev't Project (Extension of Runway, Construction of Perimeter Fence

and Continuation of Shore Protection)03/11/10 DOTC 163.779 360 C 0.404 0.200 0.300 - - - 90.40 92.70%

V.Satisfactory

Grace Construction Corp./Dipolog Top Const. Dev't Corp. (Joint

Venture)JV-08-016

Dipolog Airport Development Project (Continuation of Extension of Runway,

Asphalt Overlay, Shore Protection, Construction of Fire Station Building,

Elevated Water Tank, Access Road and Box Culvert)

03/11/10 DOTC 86.640 180 O 0.336 0.300 0.150 0.030 0.051 0.050 91.70 -

Grace Construction Corporation 3771 Const. of Opao Bridge and Approaches, Brgy. Opao 06/09/09 IX 71.037 1,067 O 0.373 0.300 0.132 0.030 0.047 0.033 91.50 -

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Orienatl

Coastal Road (Manay-Boston) Manay-Caraga Section, Phase I

06/10/09 XI 192.466 898 O 0.344 0.300 0.150 0.030 0.056 0.033 91.30 -

Grace Construction Corporation 3771 Impvt./Repair of General Santos-Apopong-Marbel Road going to Cotabato 06/09/09 R-XII 18.891 90 C 0.436 0.200 0.300 - - - 93.60 89.76%

V. Satisfactory

Grace Construction Corporation 3771 Asphalt Overlay along Ozamis-Oroquieta Road 12/01/08 X 9.634 120 C 0.291 0.200 0.300 - - - 79.10 *79.10%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page184

Page 193: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Grace Construction Corporation 3771 Const. of Cagayan de Oro Third Bridge & Access Road Phase VI 03/06/08 X 72.905 450 O 0.365 0.251 0.050 0.030 0.045 0.067 80.80 -

Grace Construction Corporation 3771 Const. of Cagayan de Oro Third Bridge & Access Road Phase VI 05/13/08 X 72.905 450 O 0.365 0.300 0.100 0.030 0.035 0.100 93.00 -

Grace Construction Corporation 3771 Const. of Kipit II Bridge and Approaches 02/22/07 IX 69.136 470 O 0.293 0.193 0.100 0.024 0.037 0.100 74.70 -

Grace Construction Corporation 3771 Const. of Limpapa Bridge & Approaches 08/19/08 IX 60.097 360 O 0.226 0.240 0.100 0.030 0.047 0.100 74.30 -

Grace Construction Corporation 3771 Const. of Opao Bridge & Approaches 09/04/07 IX 71.415 360 O 0.361 0.203 0.100 0.030 0.035 0.100 82.90 -

Grace Construction Corporation 3771 Const. of Tagoloan Bridge & Approaches 11/26/07 X 38.345 450 O 0.340 0.300 0.100 0.030 0.045 0.100 91.50 -

Grace Construction Corporation 3771 Const. of Tagoloan Bridge & Approaches 03/07/08 X 38.345 450 O 0.353 0.162 0.100 0.030 0.035 0.100 78.00 -

Grace Construction Corporation 3771 Const. of Upper Makar Bridge I 12/06/07 XII 8.582 160 C 0.392 0.200 0.300 - - - 89.20 *89.20% V.Satisfactory

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay-Caraga Section, Phase I

03/05/08 XI 192.466 898 O 0.347 0.300 0.100 0.030 0.037 0.100 91.40 -

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay-Caraga Section, Phase I

05/28/08 XI 192.466 898 O 0.367 0.300 0.100 0.030 0.030 0.100 92.70 -

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay-Caraga Section, Phase I

11/25/08 XI 192.466 898 O 0.246 0.300 0.100 0.030 0.060 0.100 83.60 -

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay-Caraga Section, Phase II

08/29/08 XI 178.716 862 O 0.324 0.300 0.100 0.030 0.060 0.100 91.40 -

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay-Caraga Section, Phase II

03/10/09 XI 178.717 862 O 0.322 0.300 0.150 0.030 0.060 0.050 91.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page185

Page 194: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Grace Construction Corporation 3771Impvt./Conc. Paving of Dapitan City-Dakak

Road, along Dapitan City-Dakak Coastal Loop Road Phase II

09/03/08 IX 18.631 223 C 0.367 0.200 0.300 - - - 86.70 77.64% Satisfactory

Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-Dakak Road, Phase I 03/10/08 IX 48.030 340 O 0.400 0.300 0.100 0.018 0.051 0.100 96.90 -

Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-Dakak Road, Phase I 05/27/08 IX 48.038 340 O 0.329 0.229 0.100 0.030 0.038 0.100 82.60 -

Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-Dakak Road, Phase I 09/03/08 IX 48.038 340 O 0.360 0.270 0.100 0.030 0.042 0.100 90.20 -

Grace Construction Corporation 3771Impvt./Rehab. of Butuan-Cagayan de Oro-

Iligan Road, Salay-Dampil, Lagonglong Section, Looc

03/05/08 X 9.592 120 C 0.242 0.237 0.300 - - - 77.90 *77.90% Satisfactory

Grace Construction Corporation 3771 Impv't/Conc. Paving of Dapitan City-Dakak Road, Phase II 03/17/09 IX 47.488 702 O 0.337 0.277 0.150 0.030 0.035 0.050 87.90 -

Grace Construction Corporation 3771 Installation of Road Safety Devices along Dobleston-Butadon Road 03/12/09 X 9.943 60 C 0.419 0.133 0.300 - - - 85.20 *85.20%

Satisfactory

Grace Construction Corporation 3771 Rehab./Impvt. of Sayre Highway, PCC to Damulog Section (Selective Section) 08/22/08 X 18.538 120 C 0.383 0.200 0.300 - - - 88.30 81.10%

V. Satisfactory

Grace Construction Corporation 3771 Concreting of Iligan Circumferential Road 09/12/09 X 329.805 540 O 0.272 0.300 0.123 0.030 0.047 0.033 80.50 -

Grace Construction Corporation 3771 Const. of Lobog Parallel Bridge and Approaches (Phase IV) 09/15/09 X 52.566 180 O 0.353 0.240 0.100 0.030 0.037 0.033 79.30 -

Grace Construction Corporation 3771 Impv't. Conc. Paving of Dapitan City-Dakak Road, Phase II 03/08/10 IX 47.488 702 C 0.395 0.161 0.300 - - - 85.60 86.98%

Satisfactory

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay Caraga Section, Phase II

03/05/10 XI 178.716 862 C 0.377 0.200 0.300 - - - 87.70 89.86% V. Satisfactory

Grace Construction Corporation 3771Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Manay Caraga Section, Phase I

03/05/10 XI 192.464 898 C 0.373 0.200 0.300 - - - 87.30 88.77% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page186

Page 195: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Grace Construction Corporation 3771 Rehab./Impvt. of Cotabato-Davao Road (Panatan-Simuay Section) 02/23/10 XII 23.866 65 C 0.437 0.200 0.300 - - - 93.70 93.70%

V. Satisfactory

Grace Construction Corporation 3771 Rehab./Impvt. of Cotabato-Lanao Rd., (Sta. 1872+468-Sta. 1877+000) 02/23/10 XII 23.841 65 C 0.436 0.200 0.300 - - - 93.60 93.60%

V. Satisfactory

Grace Construction Corporation 3771

Const. of Upper Makar Bridge No.1 Phase IV (Completion of Abutment "A" and Const.

of 4 spans, 30 LM PSCG Superstructure) along Circumferential Rd.

03/10/10 XII 47.371 240 O 0.343 0.253 0.150 0.030 0.040 0.033 84.90 -

Grace Costruction Corp./Ulticon Builders, Inc. (J.V.) JV-05-061

Reconst. of Padada Br. Along Digos-Makar Rd. inc. Const. of Padada By Pass Bridge &

Approaches09/05/09 XI 227.509 1,094 C 0.498 0.133 0.300 - - - 93.10 89.36%

V. Satisfactory

Grace Llan Const. & General Mdse. 1847 Const. of 2 Storey 8 Cl Sch. Bldg. @ BNHS 05/23/08 IV-A 14.247 150 C 0.389 0.231 0.300 - - - 92.00 79.40% Satisfactory

Graia Const. & Supply (Formerly: Graia Const. & Supplies) 30826 Repair/Rehab. Maragondon-Magallanes

Road 03/10/09 IV-A 9.629 25 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory

Graia Construction Corporation (Formerly: Graia Const. Supply) 30856 Const. of Multi-Purpose Building at Cavite

State University 09/09/09 IVA 1.913 60 C 0.489 0.159 0.300 - - - 94.80 *94.80% V. Satisfactory

Granby Trading & Construction 27554 Conc. of Bayanan-Tiguihan Pola Port Access Road 02/24/09 IV-B 4.747 75 C 0.398 0.133 0.300 - - - 83.10 77.46%

Unsatisfactory

Grand Builders 6845 Conc. of Tubod-Ganassi Road 12/03/08 X 10.832 125 C 0.300 0.300 0.000 - - - 60.00 76.92% Satisfactory

Grand Builders 6845 Rehab. of Linamon-Zamboanga Road, Tubod Section 12/03/08 X 9.057 150 C 0.306 0.300 0.000 - - - 60.60 75.60%

Satisfactory

Grand Builders 6845Conc./Impvt. of Tubod-Ganassi Road (Pinpin Section) Sta. 1595+945-Sta.

1597+51509/14/09 X 18.054 150 C 0.353 0.155 0.300 - - - 80.80 83.14%

Satisfactory

Grand Builders 6845 Conc. of Iligan-Bukidnon Rd. Km. Sta. 1527+308 - Km. Sta. 1527+930 03/05/10 X 18.029 180 C 0.412 0.146 0.300 - - - 85.80 87.18%

Satisfactory

Great Lakes Enterprises 31429 Const. of Melgar Seawall 08/19/08 IV-B 4.775 90 C 0.267 0.200 0.300 - - - 76.70 81.14% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page187

Page 196: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Great Lakes Enterprises 31429 Conc. of Road at Brgy. Puting Tubig 02/16/10 IVB 1.242 70 C 0.386 0.149 0.300 - - - 83.50 83.50% Satisfactory

Greco Construction and Supply 21884 Rehab./Asphalting along MSDR West Service Road 08/13/08 NCR 4.825 20 C 0.270 0.300 0.300 - - - 87.00 *87.00%

V. Satisfactory

Green Horizon Landscapers & Developers, Inc. 18802

Impvt. (Conc. of Access Road @ Juction Pola Road Km 73+000 (leading to Pola

Port)09/03/09 IVB 35.603 240 O 0.337 0.288 0.150 0.030 0.051 0.050 90.60 -

Green Horizon Landscapers & Developers, Inc. 18802 Completion of Calapan South Road,

Tabtabong-Banti Section 09/05/09 IVB 38.059 238 O 0.359 0.240 0.150 0.030 0.042 0.050 87.10 -

Green Horizons Landscapers and Developers, Inc. 18802 Conc. of CNR San Teodoro-Puerto Galera

Road, Tamaraw Section 02/18/08 IV-B 19.165 210 C 0.363 0.300 0.300 - - - 96.30 91.02% Outstanding

Green Horizons Landscapers and Developers, Inc. 18802 Const. of MPB @ Sitio IV Agua 09/04/07 IV-B 1.899 133 C 0.351 0.200 0.300 - - - 85.10 85.10%

V. Satisfactory

Greenwall Construction 14457 Repair/Impvt./Rehab. of San Luis-Ma. Aurora-Catañeda Road 11/23/07 III 4.624 20 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

Greg Construction and Trading 19455 Const. of Classrooms at Dr. Arcadio NHS 03/04/08 NCR 4.770 90 C 0.253 0.200 0.300 - - - 75.30 78.31% Satisfactory

Greg Construction and Trading 19455 Const. of MPB at San Antonio Valley 8, Brgy. San Antonio 02/17/10 NCR 3.835 75 C 0.478 0.133 0.300 - - - 91.10 91.10%

V.Satisfactory

Greyrock Construction 9296 Reconst. of Zamboanga City-Labuan-Limpapa Road 03/02/09 IX 12.273 128 C 0.455 0.200 0.300 - - - 95.50 91.24%

V.Satisfactory

Greyrock Construction 9296 Road Upgrading (Gravel to Concrete) Zamboanga City-Labuan-Limpapa Road 09/01/09 IX 16.076 195 C 0.427 0.200 0.300 - - - 92.70 90.06%

V. Satisfactory

Guinhalinan Construction & Concrete Aggregates Supplies 28965 Completion of Baywalk 11/30/07 XIII 1.910 150 C 0.320 0.300 0.300 - - - 92.00 92.00%

Outstanding

Guinhalinan Construction & Concrete Aggregates Supplies 28965 Const. of Flood Control Structures along

Shoreline 05/23/08 XIII 1.920 60 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

Guinhalinan Construction & Concrete Aggregates Supplies 28965 Rehab. of Tabon-Labisma-Lawigan Road 05/23/08 XIII 3.745 90 C 0.332 0.200 0.300 - - - 83.20 84.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page188

Page 197: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

GVR Construction & Supply 31603 Const. of MPB (Atty. G.R. Banaag RCYDC) 09/05/07 XIII 0.959 60 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

H C M Construction Corporation 19382 Rehab. of MSR-Quirino Brgy. Manuyo to Brgy. Aldana 06/04/09 NCR 14.320 60 C 0.485 0.133 0.300 - - - 91.80 *91.80%

V. Satisfactory

H C M Construction Corporation 19382 Const. of Pres. Garcia Ave. (Sucat Road-Coastal Road), C-5 Ext. 09/18/09 NCR 19.290 240 O 0.325 0.274 0.150 0.030 0.070 0.050 89.90 -

H R B Construction 10528 Concrete Pedestrian Bridge, San Francisco 03/12/09 V 0.946 94 C 0.422 0.200 0.300 - - - 92.20 *92.00% V. Satisfactory

H R B Construction 10528 Const. of Multi-Purpose Building (Phase III) San Ramon Pilot H/S 03/10/09 V 0.473 90 C 0.457 0.133 0.300 - - - 89.00 *89.00%

Satisfactory

H R B Construction 10528 Opening of Salvacion-Del Rosario Road 03/03/08 V 4.703 90 C 0.267 0.300 0.300 - - - 86.70 79.20% Satisfactory

H.G. Lopez Construction 17691 Const. of Dagupan MPB 11/24/08 CAR 0.466 90 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory

H.G. Lopez Construction 17691 Const. of Road Leading to Christ the Redeemer, Brgy.1 (Lubrins Hts.) 11/11/08 I 1.099 60 O 0.328 0.238 0.100 0.022 0.018 0.100 80.60 -

H.G. Lopez Construction 17691 Const. of TESDA MPB 11/24/08 CAR 1.906 60 C 0.350 0.200 0.300 - - - 85.00 88.15% V. Satisfactory

H.G. Lopez Construction 17691 Construction of Road leading to Christ the Redeemer, Brgy. 1 (Lubrin Hts.) 02/24/09 I 1.099 88 C 0.409 0.172 0.300 - - - 88.10 83.60%

Satisfactory

H.G. Lopez Construction 17691 Construction of 2-CL School Building @ Ayaoan Elem. School 09/02/09 I 1.241 85 C 0.453 0.189 0.300 - - - 94.20 *94.20%

V. Satisfactory

H.L.J. Construction & Enterprises 18080Conc. of Dancalan-Candoni-Damutan Valley Road, Caningay Section, Brgy.

Caningay05/30/09 VI 16.235 280 O 0.380 0.268 0.150 0.023 0.045 0.033 89.90 -

H.L.J. Construction & Enterprises 18080 Conc. of Dancalan-Candoni-Damutan Valley Road, Tabu Section, Brgy. Tabu 05/30/09 VI 18.335 280 O 0.366 0.251 0.150 0.023 0.050 0.033 87.30 -

H.L.J. Construction & Enterprises 18080 Reconstruction of Bacolod South Kabankalan Road 06/01/09 VI 16.997 180 C 0.375 0.200 0.300 - - - 87.50 84.26%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page189

Page 198: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

H.L.J. Construction & Enterprises 18080 Completion of Road Cementing and Drainage Canal 03/03/08 VII 0.474 55 C 0.328 0.200 0.300 - - - 82.80 83.04%

V. Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Balasan-Carles Road, Guinticgan-Abong Sction 05/28/08 VI 15.755 405 C 0.226 0.285 0.300 - - - 81.10 85.80%

V. Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-Lapus, Fairways Sect.) 11/29/08 VI 17.915 240 O 0.259 0.253 0.100 0.015 0.016 0.067 71.00 -

H.L.J. Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-Lapus, Fairways Sect.) 03/15/09 VI 19.686 289 O 0.312 0.296 0.150 0.018 0.050 0.033 85.90 -

H.L.J. Construction & Enterprises 18080 Conc. of Datag-Kamulayan FMR 08/30/07 VII 1.267 90 C 0.291 0.300 0.300 - - - 89.10 *89.10% V. Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Iloilo-Capiz Road (New Route) 03/11/08 VI 18.190 270 C 0.348 0.300 0.300 - - - 94.80 91.04% Outstanding

H.L.J. Construction & Enterprises 18080 Conc. of Jct. Bearins along Tapi-Magballo Road (Bantayan Section) at Brgy. Bantayan 05/13/08 VI 4.743 120 C 0.247 0.300 0.000 - - - 54.70 71.32%

Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Jct. Bearins-Salong Tapi-Magballo Road (Magballo Section) at Brgy. Magballo 05/13/08 VI 4.662 120 C 0.268 0.300 0.000 - - - 56.80 72.16%

Satisfactory

H.L.J. Construction & Enterprises 18080Conc. Paving of National Road along

Dancalan-Candoni Road, km. 104+058 - km. 104+372, Brgy. Dancalan

03/07/09 VI 2.957 182 C 0.392 0.200 0.300 - - - 89.20 85.66% Satisfactory

H.L.J. Construction & Enterprises 18080Conc. Paving of National Road along

Dancalan-Candoni Road, km. 105+447 - km. 105+777, Brgy. Dancalan

03/07/09 VI 3.047 120 C 0.436 0.200 0.300 - - - 93.60 82.20% Satisfactory

H.L.J. Construction & Enterprises 18080 Const. of Sac-sac Road Lined Canal 11/26/07 VII 1.373 145 C 0.300 0.300 0.300 - - - 90.00 *90.00% Outstanding

H.L.J. Construction & Enterprises 18080 Const. of San Jose (Canaway) River Control Project 11/25/08 VII 4.666 110 C 0.330 0.200 0.300 - - - 83.00 79.88%

Satisfactory

H.L.J. Construction & Enterprises 18080Impvt. of Roads leading to the Twin

Springs Project, Brgy. Bunga to Brgy. Baslay Road

11/25/08 VII 9.311 145 O 0.323 0.236 0.100 0.030 0.027 0.067 78.30 -

H.L.J. Construction & Enterprises 18080 Reconst. of Bacolod South Kabankalan Road 03/03/09 VI 16.997 180 O 0.261 0.292 0.150 0.030 0.055 0.033 82.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page190

Page 199: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

H.L.J. Construction & Enterprises 18080Conc. of Dancalan-Candoni-Damutan Valley Road, Caningay Sect., Brgy.

Caningay09/17/09 VI 16.235 280 O 0.376 0.300 0.150 0.023 0.045 0.033 92.70 -

H.L.J. Construction & Enterprises 18080 Conc. of Dancalan-Candoni-Damutan Valley Road, Tabu Sect., Brgy. Tabu 09/17/09 VI 18.335 280 C 0.394 0.200 0.300 - - - 89.40 88.14%

Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Road, Capalla Avenue Barangay Poblacion 09/10/09 VI 0.959 60 C 0.490 0.067 0.300 - - - 85.70 *85.70%

Satisfactory

H.L.J. Construction & Enterprises 18080 Rehab./Recons./Upgrading of Dumaguete North Rd., Polo-Tugas Rd. Sect. 09/12/09 VII 23.022 210 O 0.372 0.240 0.150 0.030 0.037 0.033 86.20 -

H.L.J. Construction & Enterprises 18080

Rehab./Reconst./Upgrading of Damaged Paved Roads Digos-Makar Rd., Tagansule

Proper Section, Km. 1586+100-Km. 1587+000

09/03/09 XI 11.575 180 C 0.423 0.133 0.300 - - - 85.60 86.44% Satisfactory

H.L.J. Construction & Enterprises 18080Conc. of Dancalan-Candoni-Damutan Valley Rd., Caningay Section, Brgy.

Caningay03/08/10 VI 16.235 280 C 0.339 0.187 0.300 - - - 82.60 87.82%

Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Anilao-Banate Rd., Km. 250+660 - Km. 256+000 02/24/10 VI 5.788 120 C 0.415 0.193 0.300 - - - 90.80 86.66%

Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Tiwi-Talisay Rd., Buri Section Km. 274+173 - Km. 274+560 02/04/10 VI 4.823 120 C 0.374 0.190 0.300 - - - 86.40 86.40%

Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Rosario-Cansilayan Rd., Km. 280+300 - Km. 281+395.50 w/ exception 02/24/10 VI 6.753 130 C 0.406 0.200 0.300 - - - 90.60 83.58%

Satisfactory

H.L.J. Construction & Enterprises 18080 Conc. of Boracay Rd. (Lapus-Lapus, Fairways Section) 02/28/10 VI 19.686 452 C 0.374 0.200 0.300 - - - 87.40 82.03%

Satisfactory

H.L.J. Construction & Enterprises 18080 Rehab./Reconst./Upgrading of Dumaguete North Road, Polo-Tugas Road Section 03/01/10 VII 23.040 245 C 0.366 0.200 0.300 - - - 86.60 85.79%

Satisfactory

H.S. Oaminal Construction & Gen. Merchandising 10578 Completion of Dormitory Building I Phase I 12/2/09 DOST 5.829 155 C 0.446 0.191 0.300 - - - 93.70 93.70%

V. Satisfactory

H.S. Oaminal Construction & General Merchandise 10578 Completion of Dormitory Bldg. I Phase I 11/26/08 DOST 5.829 150 O 0.320 0.300 0.128 0.017 0.043 0.023 83.10 -

H.T.L. Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road 11/24/08 II 14.459 120 O 0.302 0.231 0.100 0.030 0.033 0.067 76.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page191

Page 200: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

H.T.L. Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road 03/14/09 II 14.459 120 C 0.415 0.200 0.300 - - - 91.50 82.38% Satisfactory

H.T.L. Construction 3962 Redecking of Ipil Bridge along Daang Maharlika 03/05/09 II 11.560 90 C 0.438 0.200 0.300 - - - 93.80 84.08%

Satisfactory

Haidee Construction - AL B. Construction (JV) JV-07-081

Impvt./Widening/Conc. of McArthur Highway (MNR) Package IV, Apalit-San

Simon-Minalin-Sto. Tomas Section03/10/09 III 64.127 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%

V. Satisfactory

Haidee Construction and Development Corp. 10365 Replacement of Dalaquitan Bridge &

Approaches, Package VI 03/10/09 III 82.045 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory

Haidee Construction and Development Corp. 10365

Impvt./Widening/Conc. of Manila North Road (MNR) Phase V, Meycauayan

(Bulacan) to Mabalacat (Pampanga), Pampanga Section, Completion of

Dalaquitan Bridge, CP VII

08/28/09 III 46.100 150 O 0.379 0.234 0.150 0.030 0.051 0.050 89.40 -

Haidee Construction and Development Corp. 10365

Impvt./Widening/Conc. of Manila North Road (MNR) Phase V, Meycauayan

(Bulacan) to Mabalacat (Pampanga), Pampanga Section, Completion of

Dalaquitan Bridge, Contract Package VII

02/22/10 III 46.389 150 C 0.447 0.200 0.300 - - - 94.70 91.52% V. Satisfactory

Haidee Construction and Development Corp./Al-B Const. (JV)

SL2-SN-00774 / JV-

06-078

Impvt./Widening of Mc Arthur Highway, Phase III (Package III), Replacement of

Labangan Bridge No. 703/06/08 III 115.799 330 C 0.385 0.300 0.300 - - - 98.50 *98.50%

Outstanding

Halrey Construction Inc. 3267 Rehab. of Muzon-Tungkong Mangga Road, City of San Jose del Monte 03/04/10 III 14.282 110 C 0.421 0.133 0.300 - - - 85.40 85.40%

Satisfactory

Halrey Construction, Inc. 2267 Rehab./Reconst. (Conc.) of Naic-Jct. Caylabne Road 03/11/09 IV-A 28.921 180 C 0.429 0.133 0.300 - - - 86.20 87.64%

Satisfactory

Halrey Construction, Inc. 2267 Const. (Conc.) of Marikina-Infanta Rd. P-II, Rizal Side 11/28/07 IV-A 43.396 280 C 0.347 0.200 0.300 - - - 84.70 84.70%

V.Satisfactory

Halrey Construction, Inc. 2267Impvt./Conc. Blocking of Katipunan Ave. & E. Rodriguez Jr. C-5 (Shuster St. to Ortigas

Ave.)08/22/08 NCR 14.314 150 C 0.329 0.300 0.300 - - - 92.90 95.48%

Outstanding

Halrey Construction, Inc. 2267 Rehab./Reconst. (Conc.) of Naic-Jct.-Caylabne Road 11/14/08 IV-A 28.922 180 O 0.328 0.300 0.100 0.030 0.028 0.100 88.60 -

Halrey Construction, Inc. 2267Rehab./Reconst. of Damaged paved along

Carlos P. Garcia Ave. (C-5) (Ortigas Avenue Broadcast City)

09/11/09 NCR 9.640 150 C 0.434 0.133 0.300 - - - 86.70 89.64% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page192

Page 201: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Halrey Construction, Inc. 2267Rehab./Reconst. of Damaged Paved/Conc. Blocking along G. Araneta (Aurora Blvd.-E.

Rodriguez Ave.) both sides09/11/09 NCR 9.595 161 C 0.432 0.133 0.300 - - - 86.50 *86.50%

Satisfactory

Halrey Construction, Inc. 2267 Rehab./Reconst./Upgrading of Damaged National Roads at San Juan-Laiya Road 03/02/10 IVA 46.279 150 C 0.322 0.300 0.150 0.030 0.051 0.050 90.30 -

Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329 CP-A: Const./Impvt. of Kapatagan-

Dobliston Jct. Road (Addendum) 12/01/07 KFAED 1,305.817 365 O 0.396 0.300 0.100 0.030 0.056 0.100 98.20 -

Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329 CP-A: Const./Impvt. of Kapatagan-

Dobliston Jct. Road (Addendum) 03/11/08 KFAED 202.745 365 O 0.341 0.300 0.100 0.030 0.060 0.100 93.10 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum & Aganan

River03/02/07 MFCP I 1,194.106 1,080 O 0.391 0.200 0.100 0.030 0.055 0.200 97.60 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum & Aganan

River09/02/07 MFCP I 1,194.106 1,080 O 0.400 0.300 0.100 0.030 0.047 0.100 97.70 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum & Aganan

River11/21/07 MFCP I 1,305.817 1,080 O 0.360 0.200 0.100 0.030 0.065 0.200 95.50 -

Hanjin Heavy Industries & Const. Co. Ltd.

SL2-SN-00646/FC-

03-010

IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum & Aganan

River03/13/08 MFCP I 1,305.817 1,080 O 0.355 0.200 0.100 0.030 0.070 0.200 95.50 -

Hanjin Heavy Industries & Construction Co. Ltd.

SL1-SN-004892

Help for Catubig Agricultural Advancement Project (HCAAP) 11/9-12/09 NIA 0.994 1,253 O 0.393 0.288 - 0.024 0.037 0.037 77.90 -

Hanjin Heavy Industries & Construction Co. Ltd.

SL2-SN-000445

Bohol Cicumferential Road Impv't. Project CP-1, Valencia-Tagbilaran-Calape Section 08/24/07 PJHL 1,000.084 1,052 C 0.382 0.300 0.300 - - - 98.20 97.60%

Outstanding

Hanjin Heavy Industries & Construction Co. Ltd.

SLN-SN-000452

Bohol Irrigation Project, Stage 2 (BHIP2-C-2) 9/1-5/08 BHIP 608.709 1,416 C 0.331 0.300 0.300 - - - 93.10 93.10%

Outstanding

Hanjin Heavy Industries & Construction Co., Ltd. FC-03-010 CP No.1 Const. of Jaro Floodway & Imprv't.

of Tigum & Aganan Rivers 03/03/10 MFCP1 1,979.449 1,920 O 0.335 0.265 0.150 0.030 0.056 0.050 88.60

Hanjin/Kurimoto JV SL2-SN-000452 Bohol Irrigation Project, Stage 2 1/28-2/1/08 NIA-IV 1561.392 1,352 C 0.380 0.300 0.300 - - - 98.00 98.00%

Outstanding

Hausland Construction 32378 Const. of MPB at Minuyan Proper Towerville E/S 08/22/07 III 1.422 75 C 0.232 0.300 0.300 - - - 83.20 *83.20%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page193

Page 202: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway Project-Package 2 05/07-11/07 BCDA-III 9,097.880 850 O 0.352 0.300 0.070 0.024 0.047 0.033 82.58 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway Project-Package 2 07/02-06/07 BCDA-III 9,097.880 850 O 0.357 0.300 0.070 0.030 0.042 0.000 79.90 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway Project-Package 2 09/03-07/07 BCDA-III 9,097.880 850 O 0.350 0.293 0.050 0.024 0.047 0.067 83.07 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway Project-Package 2 11/05-09/07 BCDA-III 9,097.880 850 O 0.354 0.300 0.070 0.030 0.060 0.033 84.70 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway Project-Package 2 01/08-12/07 BCDA-III 9,097.880 850 O 0.389 0.299 0.070 0.030 0.042 0.033 86.40 -

Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway Project-Package 2 03/05-09/07 BCDA-III 9,097.880 850 O 0.378 0.293 0.070 0.024 0.042 0.067 87.41 -

Hazama-Taisei-Nippon Steel (HTN JOINT VENTURE) FC-04-025

Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access

Roads and Interchange2/4-6/09 BCDA 596.889 327 O 0.385 0.297 0.050 0.030 0.061 0.067 88.95 -

Hazama-Taisei-Nippon Steel (HTN JOINT VENTURE) FC-04-025

Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access

Roads and Interchange12/3-5/08 JBIC 596.889 327 O 0.348 0.300 0.050 0.030 0.038 0.067 83.25 -

HB Construction 32855 Const./Rehab of Drainage System, Sitio, Payong, Area, Phase 2 03/02/09 NCR 0.712 30 C 0.437 0.116 0.300 - - - 85.30 *85.30%

Satisfactory

HCM Construction Corporation 19382 Const. of Slope Protection for the Zapote River Impv't Projects and its Tributaries 02/25/09 NCR 18.753 120 C 0.400 0.198 0.300 - - - 89.80 *89.80%

V.Satisfactory

Henry S. Oaminal Const. & General Merchandise 10578 Conc. of Jct. (LIR) Carmen-Sagbayan-

Bacane Road 08/29/08 VII 22.646 250 O 0.293 0.222 0.000 0.020 0.032 0.100 66.70 -

Henry S. Oaminal Construction and General Merchandise 10578 Completion of Dormitory bldg. Phase I 11/26/08 DOST 5.829 150 O 0.320 0.300 0.128 0.017 0.043 0.023 74.80 -

Henry S. Oaminal Construction and General Merchandise 10578 PSHS CVC Construction of 3-storey ACA

Bldg. 02/26/09 DOST 13.530 339 C 0.359 0.289 0.300 - - - 94.80 94.80% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page194

Page 203: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Henry S. Oaminal Construction and General Merchandise 10578

Conc. of Jct. Dat-an-Sierra Bullones-Carmen-Sagbayan-Bacane-Tubigon Rd.

(Intermittent Sect.)09/04/09 VII 61.899 300 O 0.348 0.240 0.150 0.030 0.042 0.050 86.00 -

Henry S. Oaminal Construction and General Merchandise 10578 Conc. of Jct. Dat-an, Carmen-Sierra

Bullones-Pilar Rd., Sierra Bullones-Pilar 09/04/09 VII 32.346 234 C 0.436 0.133 0.300 - - - 86.90 85.64% Satisfactory

Henry S. Oaminal Construction and General Merchandise 10578

Conc. of Jct. Dat-an-Sierra Bullones-Carmen-Sagbayan-Bacane-Tubigon Rd.

(Intermittent Sect.)02/23/10 VII 61.899 300 C 0.355 0.145 0.300 - - - 80.00 83.60%

Satisfactory

Herbana Builders and Supply 32523 Rehab. of Jct. Tawad-Balud Road 02/27/09 V 4.809 60 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory

Herbana Builders and Supply 32523 Construction of Sta. Cruz River Control 08/24/09 V 4.680 180 C 0.416 0.200 0.300 - - - 91.60 89.26% V. Satisfactory

Herbana Builders and Supply 32523Construction of PSTC, S&J Proportion

Bldg. Repair of Training Center & Improvement of Perimeter Fence

03/11/10 DOST 26.183 - C 0.47 0.20 0.00 - - - 67.00 67.00% Poor

Herbert Malmis General Merchandise & Contractor, Inc. 4593 Concrete Paving of Tagbilaran-Sikatuna

Road 05/13/08 VII 6.495 130 C 0.359 0.300 0.300 - - - 95.90 86.60% V. Satisfactory

Herefold Builders Construction and Supply 20789 Conc. of Road at Sinala-Gulibay 02/28/08 IV-A 3.059 90 C 0.324 0.189 0.300 - - - 81.30 *81.30%

V. Satisfactory

Herefold Builders Construction and Supply 20789 Impvt.of MPB 03/09/09 IV-A 0.099 45 C 0.417 0.200 0.300 - - - 91.70 87.36%

Satisfactory

HG III Construction & Dev't. Corp. 947 NBP Resettlement Project, Phase III 10/19/07 NHA 155.483 270 O 0.16 0.24 0.1 0.02 0.0175 0.1 63.75 -

HG III Construction and Dev't Corp. 947 Sct. Ranger Housing Project, Phase III 04/27/07 NHA 49.688 180 O 0.395 0.300 0.100 0.030 0.047 0.100 97.19 -

HGG Builders & Supply 17824 Construction of Ala Building II Phase II 03/10/10 DOST 27.272 280 C 0.494 0.20 0.30 - - - 99.40 97.18% Outstanding

HGG Builders and Supply 17824 Completion of Academic Building Phase III 09/11/08 DOST 13.127 240 C 0.374 0.299 0.300 - - - 97.32 97.32% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page195

Page 204: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

HGG Builders and Supply 17824 Completion of Dormitory bldg. Phase III 03/19/09 DOST 18.930 290 C 0.374 0.297 0.300 - - - 97.10 97.10% Outstanding

HGG Builders and Supply 17824 Conc. of Brgy. Road, Andaya Highway Jct. to Municipal Hall 08/30/07 V 0.926 120 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V. Satisfactory

HGG Builders and Supply 17824 Const. of Conc. Drainage Canal, Brgy. Bigajo Norte 11/24/08 V 0.946 120 C 0.396 0.200 0.300 - - - 89.60 *89.60%

V. Satisfactory

HGG Builders and Supply 17824 Const. of Public Market, Brgy. Barcelona 11/24/08 V 1.891 120 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory

HG-III Construction and Development Corporation (Formerly: Golden City

Engineering and Const.)8431 Upgrading of Pantabangan-Canili-Baler

Road, Cadaclan Section 05/29/09 III 46.840 134 C 0.183 0.200 0.300 - - - 68.30 77.72% Unsatisfactory

HG-III Construction and Dev't. Corp. 8431 Land Development of Scout Ranger Housing Project, Ph. 3 04/16/08 NHA 49.597 180 C 0.385 0.299 0.300 - - - 98.40 98.40%

Outstanding

Hibiscus Trading & Construction Services 28280 Concreting/Drainage System along Pelaez

St., Villa Ma. Clara 05/25/09 NCR 5.578 90 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory

High Strength Dev. Corporation 31976 Construction of Bantog-Balbaloto, FMR 05/22/09 III 1.879 79 O 0.294 0.300 0.150 0.020 0.030 0.050 84.40 -

High Strength Dev. Corporation 31976 Construction of MPB @ Brgy. San Francisco 09/02/09 III 1.418 129 C 0.499 0.133 0.300 - - - 93.20 *93.20%

V. Satisfactory

High Strength Dev. Corporation 31976 Const. of Bantog-Balbaloto FMR 09/02/09 III 1.879 94 C 0.450 0.133 0.300 - - - 88.30 85.96% Satisfactory

High Strength Dev. Corporation 31976 Const. of MPB (Cluster II), Brgy. Buenavista & Brgy. Binauganan 02/24/10 III 4.348 120 C 0.346 0.200 0.300 - - - 84.60 84.60%

Satisfactory

Hilmarc's Construction Corporation 2748 Rehab. of Rizal MPB, Sports Center (Phase II) 11/27/07 NCR 38.595 240 C 0.314 0.300 0.300 - - - 91.40 91.40%

Outstanding

Hi-point Construction Corporation 30744 Repair/Rehab. of Catarman-Mondragon Road along Catarman Bridge 03/06/09 VIII 9.600 180 C 0.244 0.200 0.300 - - - 74.40 77.07%

Unsatisfactory

Hi-Tone Construcction and Development Corporation 23385 Completion of Tokyo Bridge along

Catanduanes Circum. Road 09/05/09 V 14.379 330 C 0.441 0.200 0.300 - - - 94.10 93.86% V. Satisfactory

Hi-Tone Construcction and Development Corporation 23385 Construction of Dapdap Rockcauseway

Northern Side 09/08/09 V 47.515 240 C 0.416 0.200 0.300 - - - 91.60 *91.60% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page196

Page 205: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Hi-Tone Construcction and Development Corporation 23385 Desilting & Channelization of San Juan

River, 09/02/09 V 9.600 45 C 0.416 - 0.500 - - - 91.60 *91.60% V. Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone

Const. Supply)23385 Const. of MPB BUPC Admin. Center (Phase

II) 08/13/08 V 15.759 210 C 0.367 0.200 0.300 - - - 86.70 88.66% V. Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone

Const. Supply)23385 Const. of Sabang MPB 03/03/09 V 9.556 490 C 0.494 0.133 0.300 - - - 92.70 88.29%

Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone

Const. Supply)23385 Const./Widening of Washington Drive to

Lakandul Drive 08/15/08 V 9.550 130 C 0.372 0.101 0.300 - - - 77.30 *77.30% Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone

Const. Supply)23385 Dredging of Panganiran River 08/15/08 V 19.188 90 C 0.388 - 0.500 - - - 88.80 *88.80%

V. Satisfactory

Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone

Const. Supply)23385 Opening/Const. of Tagoytoy-Taladong

Road (Phase I) 11/11/08 V 14.249 120 C 0.363 0.262 0.300 - - - 92.50 91.84% Outstanding

Hi-Tone Construction and Development Corporation 23385 Corollary Works at Tagaytay Resettlement

Project 8/11-14/09 NHA 19.985 120 O 0.394 0.300 0.150 0.030 0.065 0.050 98.90 -

Hi-Tone Construction and Development Corporation 23385 Corollary Works at Tagaytay Resettlement

Project 10/26-29/09 NHA 19.985 120 O 0.390 0.300 0.128 0.030 0.056 0.033 93.70 -

Hi-Tone Construction and Development Corporation 23385 Widening/Regravelling of Binongaan Road

(Sitio Gui-ob Section) 08/27/09 IVB 19.297 180 C 0.325 0.012 0.300 - - - 63.70 *63.70%Poor

Hi-Tone Construction and Development Corporation 23385 Widening/Regravelling of Agtigbao Road

(Sitio Naabang Section) 08/27/09 IVB 19.297 180 C 0.302 0.012 0.300 - - - 61.40 *61.40%Poor

Hi-Tone Construction and Development Corporation 23385 Corollary Works at Tagaytay Resettlement

Project 04/27/10 NHA 19.977 120 C 0.50 0.20 0.30 - - - 100.00 97.78% Outstanding

Hi-Tone Construction and Development Corporation 23385 Dredging / Desilting of Buyuan River 02/22/10 V 19.232 120 C 0.450 - 0.500 - - - 95.00 95.00%

V. Satisfactory

Hi-Tone Construction and Development Corporation 23385 Dredging / Desilting of Buyuan River 02/22/10 V 19.232 120 C 0.425 - 0.500 - - - 92.50 92.50%

V. Satisfactory

Hi-Tone Construction and Development Corporation (Formerly:

Lo-Tone Construction & Supply)23385 Widening/Road Opening of Linao-Talisay

Road 02/22/10 IVB 19.296 180 C 0.490 0.196 0.300 - - - 98.60 98.60% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page197

Page 206: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Hi-Tri Development Corporation 1758 Concrete Paving of Biliran Circumferential Road (Bool-Patag Section) 06/04/09 VIII 23.968 220 O 0.340 0.239 0.150 0.030 0.037 0.033 82.90 -

Hi-Tri Development Corporation 1758 Construction of Dr. Damian Reyes Mem. Road (Missing Link) 05/19/09 IV-B 77.147 320 O 0.343 0.272 0.150 0.030 0.042 0.033 87.00 -

Hi-Tri Development Corporation 1758 Const.of Dr. Damian Reyes Mem. Rd. (Missing Link) 03/12/09 IV-B 77.147 320 O 0.384 0.255 0.150 0.030 0.035 0.050 90.40 -

Hi-Tri Development Corporation 1758 Impvt. of Masbate-Malinta & Masbate-Mobo Road 11/21/07 V 10.387 180 C 0.188 0.135 0.300 - - - 62.30 *62.30%

Fair

Hi-Tri Development Corporation 1758 Rehab./Impvt. Along Pili-Tigaon-Albay Bdry. Road, km. 472+080 to km. 480+000 11/20/07 V 4.680 60 C 0.221 0.300 0.300 - - - 82.10 *82.10%

V. Satisfactory

Hi-Tri Development Corporation 1758Const. of Dr. Damian Reyes Memorial Road

(Missing Link) Hinapulan-Tumagabok Section

08/24/09 IVB 48.221 240 O 0.386 0.293 0.150 0.030 0.042 0.033 93.40 -

Hi-Tri Development Corporation 1758 Const. of Dr. Damian Reyes Memorial Road (Missing Link) Hinapulan 08/24/09 IVB 77.147 320 O 0.348 0.296 0.145 0.030 0.042 0.033 89.40 -

Hi-Tri Development Corporation 1758 Concrete Paving of Biliran Circ. Road (Bool-Patag Section) 09/03/09 VIII 23.968 220 C 0.430 0.133 0.300 - - - 86.30 84.26%

Satisfactory

Hi-Tri Development Corporation 1758Const. of Dr. Damian Reyes Memorial Road

(Missing Link) Hinapulan-Tumagabok Section

02/25/10 IVB 48.221 240 C 0.484 0.200 0.300 - - - 98.40 95.40% V. Satisfactory

Hi-Tri Development Corporation 1758 Const. of Dr. Damian Reyes Memorial Road (Missing Link) 02/24/10 IVB 77.147 320 C 0.398 0.133 0.300 - - - 83.10 86.60%

Satisfactory

HLJ Construction & Enterprises 18080Impvt. of Roads leading to the Twin

Springs Project, Brgy. Bunga to Brgy. Baslay Road

03/13/09 VII 9.311 145 C 0.443 0.200 0.300 - - - 94.30 84.70%Satisfactory

Hoger Construction 24128 Repair/Rehab. of Jct. Buenavista-Lawaan Rd. 08/21/08 VIII 3.342 150 C 0.301 0.200 0.300 - - - 80.10 *80.10%

V. Satisfactory

Homefixmix Builders Center 29997 Construction of Multi-Purpose Building 05/27/09 I 1.880 120 C 0.494 0.142 0.300 - - - 93.60 86.46% Satisfactory

Homefixmix Builders Center 29997 Concreting of Bugbugcao Barangay Road 02/24/09 I 0.191 18 C 0.393 0.200 0.300 - - - 89.30 *89.30%V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page198

Page 207: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Homefixmix Builders Center 29997 Concreting of Pagdildilan Barangay Road, Brgy. Pagdildilan 02/24/09 I 0.099 25 C 0.446 0.133 0.300 - - - 87.90 *87.90%

Satisfactory

Homeworld Construction Corporation 14725 Rehab./Reconst. of Sum-ag-Abuanan Road 05/27/09 VI 31.087 564 C 0.397 0.186 0.300 - - - 88.30 89.83%

Satisfactory

Homeworld Construction Corporation 14725 Rehab./Recons. of Bacolod South Road 05/27/09 VI 19.095 185 O 0.371 0.240 0.150 0.030 0.055 0.050 89.60 -

Homeworld Construction Corporation 14725 Rehab./Reconst./Upgrading of Bacolod

South Road (San Enrique-Tibsok Section) 09/18/09 VI 19.095 185 C 0.395 0.133 0.300 - - - 82.80 86.88% Satisfactory

Homeworld Construction Corporation 14725 Conc. of Bacolod South Road (Brgy. 4

Section) 09/16/09 VI 7.750 121 C 0.440 0.124 0.300 - - - 86.40 85.44% Satisfactory

Homeworld Construction Corporation (Formerly: Homeworld

Engineering)14725 Asphalt Overlay of Existing Asphalt

Pavement along Bacolod North Rd. 03/11/10 VI 13.946 80 C 0.435 0.200 0.300 - - - 93.50 93.50% V. Satisfactory

Homeworld Engineering 14725Rehab./Reconst. of Damaged Paved Nat'l Roads Generated from PMS/HDM-4, Sum-

ag-Abuanan Road03/05/09 VI 31.087 471 O 0.266 0.281 0.150 0.030 0.060 0.050 83.70 -

Homeworld Engineering 14725Rehab./Reconst. of Damaged Paved Nat'l Roads Generated from PMS/HDM-4, Sum-

ag-Abunan Road05/17/08 VI 30.687 268 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -

Honexson Builders 22288 Package 2-A: Concreting of Road at Brgy. Panacan 03/10/10 XI 1.888 180 C 0.388 0.200 0.300 - - - 88.80 88.80%

Satisfactory

Honeyville Construction 32160 Impvt. of San Rafael-Mampirao-San Jose Road, (Pugay-Mampirao Section) 05/30/09 V 18.817 215 O 0.335 0.300 0.150 0.030 0.040 0.050 90.50 -

Honeyville Construction 32160 Impvt. of Goa-Digdigon-San Isidro Road, San Isidro Section 09/09/09 V 18.788 195 O 0.313 0.278 0.150 0.030 0.047 0.050 86.80 -

Hony Trading and Construction 26898 Completion of MPB at Brgy. Palatiw 09/10/09 NCR 1.433 80 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory

Hony Trading and Construction 26898Const., Rehab., Replacement, Completion & Repair of Elementary & Secondary Sch.

Bldg. at CP Teresa E/S03/05/08 NCR 2.384 90 C 0.376 0.183 0.300 - - - 85.90 *85.90%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page199

Page 208: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Horamabi Builders 24129 Improvement/Rehabilitation of Roman Expressway 05/21/09 III 39.329 90 O 0.348 0.300 0.150 0.030 0.037 0.050 91.50 -

Horamabi Builders 24129 Road Upgrading (Gravel to Paved) @ 5th Street, Mariveles 05/22/09 III 2.895 36 C 0.382 0.200 0.300 - - - 88.20 *88.20%

Satisfactory

Horamabi Builders 24129 Rehab/Reconstruction/Upgrading of Lamao Access Road 05/22/09 III 10.615 42 C 0.413 0.133 0.300 - - - 84.60 *84.60%

Satisfactory

Horamabi Builders 24129 Rehab/Reconst./Upgrading of Jct. Layac-Balanga-Mariveles Port Road 05/21/09 III 48.250 81 O 0.382 0.210 0.150 0.030 0.040 0.033 84.50 -

Horamabi Builders 24129 Asphalt Overlay of Jct. Layac-Balanga-Mariveles Port Road (Orion Section) 05/14/08 III 1.924 8 C 0.381 0.200 0.300 - - - 88.10 *88.10%

V. Satisfactory

Horamabi Builders 24129 Const. of One (1) CL School Building @ Balanga Integrated Sch. 05/14/08 III 0.422 28 C 0.313 0.200 0.300 - - - 81.30 *81.30%

V. Satisfactory

Horamabi Builders 24129 Const. of One (1) CL School Building @ Marina Bay E/S 05/14/08 III 0.472 34 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V. Satisfactory

Horamabi Builders 24129 Const. of Two (2) Classroom Sch. Bldg. @ E.C. Bernabe National HS 02/26/09 III 0.887 58 C 0.366 0.187 0.300 - - - 85.30 89.64%

V.Satisfactory

Horamabi Builders 24129 Rehab. of Sch. Bldg. at Pablo Roman High School 11/18/08 III 0.754 34 C 0.323 0.300 0.300 - - - 92.30 *92.30%

Outstanding

Horamabi Builders 24129 Repair & Rehab. of Gov. J.J. Linao Road, Balanga City to Bagac Section 08/14/08 III 9.446 16 C 0.273 0.205 0.300 - - - 77.80 *77.80%

Satisfactory

Horamabi Builders 24129 Impvt./Rehab. of Roman Expressway 08/29/09 III 39.564 90 C 0.434 0.200 0.300 - - - 93.40 92.26% V. Satisfactory

Horamabi Builders 24129 Rehab./Reconst./Upgrading of Jct. Layac-Balanga-Mariveles Port Road 08/28/09 III 48.250 81 C 0.469 0.133 0.300 - - - 90.20 86.78%

Satisfactory

Horomabi Builders 24129 Rehab. of Road at Brgy. Talisay 02/19/10 III 1.402 32 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory

Houserock Builders & Trading 18822 Const./Repair & Rehab. of Multi-Purpose Bldg., Calabash St., (Phase II) 05/20/09 NCR 1.919 75 C 0.366 0.200 0.300 - - - 86.60 *86.60%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page200

Page 209: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Houserock Builders and Trading 18822 Rehab./Impvt. Along A.H. Lacson Ave. 11/28/07 NCR 0.933 30 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

HPL General Construction 22289 Completion of DPWH-NVSDEO Bldg. 05/29/08 II 2.700 152 C 0.363 0.200 0.300 - - - 86.30 86.30% V. Satisfactory

HPL General Construction 22289 Const./Replacement of Camanauan Bridge, along Dugo-San Vicente Road (DVSR) 05/13/08 II 4.240 240 O 0.396 0.217 0.100 0.030 0.028 0.067 83.80 -

HPL General Construction 22289 Const./Replacement of Camanauan Bridge, along Dugo-San Vicente Road (DVSR) 02/25/09 II 4.240 313 C 0.479 0.200 0.000 - - - 67.90 74.26%

Poor

HRB Construction 10528 Land Development of Magarao Resettlement Project 7/13-15/09 NHA 5.558 110 O 0.381 0.300 0.099 0.023 0.040 0.050 89.24 -

HRB Construction 10528 Land Development of Magarao Resettlement Project 11/9-12/09 NHA 5.277 110 D 0.454 0.200 0.300 - - - 95.40 -

HRB Construction 10528 Const. of RCBC along Pili-Tigaon Road, Brgy. Mabalodbalod 03/01/10 V 4.723 90 O 0.354 0.240 0.150 0.015 0.050 0.050 85.90 -

HVC Sagittarius Commercial and Construction 12954 Const. of Multi-Purpose Building (Mini

Gymnasium), Brgy. Plaza, Centrala 06/05/09 R-XII 0.797 168 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding

HVC Sagittarius Commercial and Construction 12954 Concrete Reblocking of Cotabato to Marbel

Road 06/06/09 R-XII 5.297 91 C 0.434 0.200 0.300 - - - 93.40 *93.40% V. Satisfactory

HVC Sagittarius Commercial and Construction 12954 Conc. of Sarangani-Davao del Sur Coastal

Road, Kalatungan-Punsad Sect. 06/11/09 R-XII 9.429 247 C 0.406 0.182 0.300 - - - 88.80 88.86% Satisifactory

HVC Sagittarius Commercial and Construction 12954 Sarangani-Davao del Sur Coastal Road,

Punsad-Pangyan Section 06/11/09 R-XII 9.390 180 O 0.327 0.265 0.150 0.024 0.040 0.033 83.90 -

HVC Sagittarius Commercial and Construction 12954 Const. of MPB @ Brgy. Sinolon 08/29/08 XII 0.759 98 C 0.281 0.300 0.300 - - - 88.10 84.74%

V. Satisfactory

HVC Sagittarius Commercial and Construction 12954 Completion of Multi-Purpose Bldg. Brgy.

San Roque 09/11/09 XII 0.384 42 C 0.426 0.162 0.300 - - - 88.80 *88.80% Satisfactory

HVC Sagittarius Commercial and Construction 12954 Sarangani-Davao Del Sur Coastal Road,

Punsad-Pangyan Section 09/17/09 XII 9.440 180 O 0.266 0.290 0.150 0.010 0.033 0.033 78.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page201

Page 210: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

HVC Sagittarius Commercial and Construction 12954 Sarangani-Davao Del Sur Coastal Road,

Punsad-Pangyan Section 03/09/10 XII 9.440 180 C 0.427 0.142 0.300 - - - 86.90 83.39% Satisfactory

Hypro Construction and Development Corporation 32745 Const. of Mompong Flood Control 05/22/08 IV-B 4.825 70 C 0.284 0.300 0.300 - - - 88.40 *88.40%

V. Satisfactory

I & E Construction 10410Impvt./Rehab. of Padre Burgos-Pototanin

Jct. Road (Additional Safety Warning Device)

05/27/09 IV-A 9.995 45 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory

I & E Construction 10410Widening of Road at Old MSR Sta. Rosa Section, Laguna 1st District inc. RROW

acquisition06/01/09 IV-A 48.179 60 C 0.460 0.133 0.300 - - - 89.30 *89.30%

V. Satisfactory

I & E Construction 10410 Rehab./Reconst. of Road at Sta. Rosa-Ulat Tagaytay Road 06/01/09 IV-A 28.860 60 C 0.409 0.133 0.300 - - - 84.20 *84.20%

Satisfactory

I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. 03/03/08 IV-A 9.552 60 C 0.336 0.200 0.300 - - - 83.60 80.66% V. Satisfactory

I & E Construction 10410 Impvt. of Drainage along Maharlika Highway 11/17/08 VIII 3.779 120 C 0.379 0.200 0.300 - - - 87.90 87.00%

V. Satisfactory

I & E Construction 10410 Impvt./Conc. of Marikina-Infanta Road (marcos Hi-way) P-III 08/30/07 IV-A 14.354 180 C 0.347 0.200 0.300 - - - *84.70 84.70%

V. Satisfactory

I & E Construction 10410 Impvt./Rehab. of Dr. Damian Reyes Road-Boac Side (Phase I) 11/27/08 IV-B 14.239 85 C 0.299 0.200 0.300 - - - 79.90 *79.90%

Satisfactory

I & E Construction 10410 Impvt./Rehab. of Tanauan-Dagami-Burauen Road, San Miguel- Barugo Road 02/27/08 VIII 19.296 60 C 0.376 0.200 0.300 - - - 87.60 *87.60%

V. Satisfactory

I & E Construction 10410 Rehab./Impvt. of Old Road MSR , Brgy. San Antonio 11/20/08 IV-A 19.204 90 C 0.287 0.200 0.300 - - - 78.70 *78.70%

Satisfactory

I & E Construction 10410 Const./Repair/Impvt. of Farm-to-Market Road, Brgy. Tamlong 09/03/09 IVA 9.641 129 C 0.347 0.200 0.300 - - - 84.70 *84.70%

Satisfactory

I & E Construction 10410 Const./Repair/Improvement of Brgy. Del Carmen FMR 09/03/09 IVA 9.643 129 C 0.340 0.200 0.300 - - - 84.00 *84.00%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page202

Page 211: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

I & E Construction 10410 Impvt. of Manila East Road, Cardona-Pililla Section (with exception) 02/17/10 IVA 14.395 60 C 0.387 0.200 0.300 - - - 88.70 88.70%

Satisfactory

I & E Construction 10410Rehab/Repair of CSCFJ Road, Km. 51+880-

Km. 53+955 (w/ exception) Calamba Section

02/24/10 IVA 19.900 15 C 0.365 0.200 0.300 - - - 86.50 86.50% Satisfactory

I M B Construction 13259 Conc. Paving of Brgy. Catmon-Daan 12/06/07 VII 0.926 60 C 0.316 0.300 0.300 - - - 91.60 *91.60% Outstanding

I.D.A. Jr Builders & Construction Supply 32022 Const. of Drainage System @ Brgy. 69 & 14 03/18/09 VIII 0.964 60 C 0.471 0.200 0.300 - - - 97.10 *97.10%

Outstanding

I.F. Blanco's Construction 25350 Conc. of Lumangbayan-Pili Road 02/21/08 IV-B 9.410 140 C 0.361 0.300 0.300 - - - 96.10 87.64% V. Satisfactory

I.F. Blanco's Construction 25350 Conc. of Zone 1, Marfrancisco Road 11/19/08 IV-B 9.485 140 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

I.F. Blanco's Construction 25350 Const. of 1 CL Sch. Bldg. @ Sinampad P/S 08/22/08 IV-B 0.479 50 C 0.384 0.200 0.300 - - - 88.40 82.24% V. Satisfactory

I.F. Blanco's Construction 25350 Const. of Orconuma River Control (Gabion Type) 09/05/07 IV-B 4.714 40 C 0.287 0.257 0.300 - - - 84.40 *84.40%

V. Satisfactory

IBC International Builders Corporation 8576

Asphalt Paving along Iloilo-Capiz Road (New Route) Pototan Section Km. 21+619-

Km. 23+61906/11/09 VI 14.424 78 C 0.429 0.200 0.300 - - - 92.90 *92.90%

V. Satisfactory

IBC International Builders Corporation 8576 Asphalt Overlay along Bacolod North Road 03/03/09 VI 9.638 60 C 0.439 0.133 0.300 - - - 87.20 *87.20%

Satisfactory

IBC International Builders Corporation 8576 Asphalt Overlay along Mambusao-Imbug

Road, Km. 97+200-Km. 98+000 03/07/08 VI 9.941 100 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

IBC International Builders Corporation 8576 Asphalt Overlay at Iloilo-Capiz Road (New

Route) 11/17/08 VI 11.400 55 C 0.345 0.276 0.300 - - - 92.10 *92.10% Outstanding

IBC International Builders Corporation 8576 Asphalt Overlay of Barotac Nuevo-

Dumangas-Dacutan Coastal Road 08/30/07 VI 9.310 195 C 0.326 0.233 0.300 - - - 85.90 87.64% V. Satisfactory

IBC International Builders Corporation 8576 Conc. of Iloilo-Capiz Road (Old Route) 03/17/09 VI 28.319 374 C 0.434 0.200 0.300 - - - 93.40 82.78%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page203

Page 212: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

IBC International Builders Corporation 8576 Conc. of Mandurriao-Pacquiad Road 11/22/07 VI 4.811 210 C 0.315 0.300 0.300 - - - 91.50 91.50%

Outstanding

IBC International Builders Corporation 8576 Conc. of Oton-Pakiad Road 05/20/08 VI 9.176 300 C 0.343 0.066 0.300 - - - 70.90 74.98%

Satisfactory

IBC International Builders Corporation 8576 Const. of Banayan Bridge 02/22/07 VI 15.499 230 O 0.400 0.300 0.070 0.030 0.030 0.067 89.70 -

IBC International Builders Corporation 8576 Const. of Banayan Bridge 05/28/07 VI 15.499 230 O 0.400 0.300 0.030 0.030 0.033 0.067 86.00 -

IBC International Builders Corporation 8576 Const. of Banayan Bridge 08/23/07 VI 15.499 240 O 0.400 0.300 0.030 0.030 0.043 0.067 87.00 -

IBC International Builders Corporation 8576 Kalibo Airport Development Project 04/23/09 DOTC 48.088 300 O 0.386 0.273 0.150 0.030 0.057 0.050 94.60 -

IBC International Builders Corporation 8576 Preventive Maintenance, Asphalt Overlay

of Iloilo-Capiz Road 03/19/09 VI 14.430 40 C 0.379 0.194 0.300 - - - 87.30 *87.30% Satisfactory

IBC International Builders Corporation 8576 Repair/Rehab. along Iloilo-Capiz Road

(New Route), Leganes-Zarraga 03/19/09 VI 9.608 30 C 0.438 0.194 0.300 - - - 93.20 *93.20% V. Satisfactory

IBC International Builders Corporation 8576 Widening of Dungon Bridge IV, Iloilo-Jaro

Diversion Road 03/02/09 VI 14.389 436 O 0.303 0.240 0.150 0.030 0.055 0.033 81.10 -

IBC International Builders Corporation 8576 Rehab. of Bacolod-South Road, Dancalan

Section Brgy. Dancalan 09/17/09 VI 33.775 127 C 0.432 0.168 0.300 - - - 90.00 88.92% Satisfactory

IBC International Builders Corporation 8576

Asphalt Overlay on existing pavement along Bacolod North Road (E.B. Magalona

Section)09/14/09 VI 13.963 90 C 0.428 0.133 0.300 - - - 86.10 *86.10%

Satisfactory

IBC International Builders Corporation 8576 Widening of Dungon Bridge IV Iloilo - Jaro

Diversion Road 09/01/09 VI 14.388 530 C 0.482 0.133 0.300 - - - 91.50 85.26% Satisfactory

IBC International Builders Corporation 8576

Kalibo Airport Development Project (Rehabilitation/Repair of Old Passenger

Terminal Building, Power House and Fire Station Building

04/14/10 DOTC 3.814 120 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory

IBC International Builders Corporation 8576 Kalibo Airport Development Project

(Construction of Terminal Building) 04/15/10 DOTC 48.088 300 C 0.457 0.200 0.300 - - - 95.70 95.10% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page204

Page 213: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

IBC International Builders Corporation 8576 Kalibo Airport Development Project

(Expansion of Terminal Building) 04/15/10 DOTC 28.835 180 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory

IBC International Builders Corporation (Formerly: IBC Iloilo

Builders Corporation)8576 Repair/Rehab. of Tiolas-Sinugbuhan Rd.

Km. 59+516-Km. 74+021 with exception 02/23/10 VI 9.628 55 C 0.433 0.200 0.300 - - - 93.30 93.30% V. Satisfactory

IBC International Builders Corporation (Formerly: IBC Iloilo

Builders Corporation)8576 Road Upgrading/Conc. of Tiolas-

Sinugbuhan Rd. 02/23/10 VI 18.228 210 O 0.320 0.300 0.150 0.030 0.047 0.050 89.70 -

IBC International Builders Corporation (Formerly: IBC Iloilo

Builders Corporation)8576 Rehab./Reconst. of Farm to Market Rd. in

Brgy. Tabuc Suba 03/12/10 VI 9.629 294 C 0.375 0.150 0.300 - - - 82.50 82.50% Satisfactory

Icalina Builders and Construction Supply 26889 Const. of 3-CL (2-Storey Type) SB,

Mancanhon E/S 05/25/09 X 3.081 140 O 0.295 0.300 0.080 0.030 0.013 0.033 75.10 -

Icalina Builders and Construction Supply 26889 Const. of 3 CL 2 Storey Sch. Bldg.,

Macanhan E/S 03/02/09 X 3.167 120 O 0.305 0.180 0.150 0.030 0.020 0.033 71.80 -

Icalina Builders and Construction Supply 26889 Const. of Multi-Purpose Pavement Zone II 08/23/08 X 0.932 120 C 0.388 0.200 0.300 - - - 88.80 *88.80%

V. Satisfactory

Icalina Builders and Construction Supply 26889

Const. of Slope Protection along Misamis Oriental-Ma. Cristina Bdry. Road, Nunucan

Section05/22/08 X 4.234 110 C 0.309 0.200 0.300 - - - 80.90 82.34%

V. Satisfactory

Icalina Builders and Construction Supply 26889 Rehab./Impvt./Conc. of Tubod Ganassi

National Road 06/01/07 X 4.574 40 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding

Icalina Builders and Construction Supply 26889 Const. of 3-CL (2-Storey Type) SB,

Mancanhan E/S 09/01/09 X 3.047 140 C 0.483 0.200 0.300 - - - 98.30 80.91% Unsatisfactory

IKM Builders & Construction Supply 30252 Const. of 2 Storey Extension Bldg. (RHUI) 08/28/07 IV-A 4.812 150 C 0.292 0.255 0.300 - - - 84.70 *84.70% V. Satisfactory

IKM Builders & Construction Supply 30252Rehab./Reconst. of Damaged National Road, Batangas-Lobo Road, Dagatan-

Laurel Section11/25/08 IV-A 9.647 120 C 0.255 0.300 0.300 - - - 85.50 *85.50%

V. Satisfactory

Ilfreo Construction & Trading 22671 Rehab./Reconst./Upgrading of Gen. Luna St., 05/26/09 NCR 9.602 105 C 0.382 0.200 0.300 - - - 88.20 *88.20%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page205

Page 214: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ILG Enterprises 31985 Conc. of FMR Brgy. Cansuso to Sitio Calminue 02/28/09 IVA 0.956 60 C 0.450 0.133 0.300 - - - 88.30 *88.30%

Satisfactory

ILG Enterprises 31985 Conc. of Public Market Road and Parking along Brgy. Biñan 11/17/07 IV-A 0.955 30 C 0.375 0.200 0.300 - - - 87.50 *87.50%

V. Satisfactory

ILG Enterprises 31985 Const. of FMR at Sitio III (Balugbog) 08/20/08 IV-A 2.873 60 C 0.361 0.300 0.300 - - - 96.10 *96.10% Outstanding

ILG Enterprises 31985 Const./Rehab. of Drainage System along CSCF Jct. Paete Section 08/19/08 IV-A 2.434 80 C 0.320 0.300 0.300 - - - 92.00 85.10%

V. Satisfactory

ILG Enterprises 31985 Construction of Rural Health Unit 02/22/10 IVA 0.980 55 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory

IM Construction Corporation 20074 Rehabilitation of Roads including Drainage 05/27/09 NCR 9.504 120 C 0.402 0.200 0.300 - - - 90.20 *90.20% V. Satisfactory

IM Construction Corporation 20074 Conc. Blocking of Susano Road 11/20/07 NCR 2.873 60 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding

IM Construction Corporation 20074 Conc./Impvt. of Road along MH del Pilar St. 05/21/08 NCR 9.480 120 C 0.361 0.300 0.300 - - - 96.10 *96.10% Outstanding

IM Construction Corporation 20074 Const. of 3-Storey, 6-Classroom School Building, Gen T. De Leon E/S 03/03/09 NCR 11.416 150 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

IM Construction Corporation 20074 Const. of Pedestrian Overpass at IBP Road 08/15/08 NCR 2.866 120 C 0.277 0.300 0.300 - - - 87.70 *87.70% V. Satisfactory

IM Construction Corporation 20074 Impvt. of Roads with Drainage System along Dalagang Bukid St. 08/22/07 NCR 14.259 150 C 0.208 0.200 0.300 - - - 70.80 *70.80%

Satisfactory

IM Construction Corporation 20074 Impvt./Widening (Conc.) of Boni Serrano Ave., Marikina Side to Quezon City Side 05/19/08 NCR 13.637 150 C 0.364 0.300 0.300 - - - 96.40 91.33%

Outstanding

IM Construction Corporation 20074 Rehab./Impvt. of Kalayaan Ave. District II 05/14/08 NCR 9.545 60 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page206

Page 215: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

IM Construction Corporation 20074 Widening of North Avenue 11/22/08 NCR 8.605 90 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding

IM Construction Corporation 20074Rehab., Reconst. of Damaged Paved

(Concrete Blocking along EDSA, Quezon Ave. Annapolis, South Bound

09/11/09 NCR 9.951 161 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory

IM Construction Corporation 20074 Repair/Rehab. of Various Roads & Alleys in Brgy. Baritan 09/17/09 NCR 0.475 60 C 0.433 0.133 0.300 - - - 86.60 *86.60%

Satisfactory

IM Construction Corporation 20074 Conc. of Road of Fishermans Wharf, (Phase 2), Brgy. La Huerta 09/03/09 NCR 0.953 30 C 0.331 0.133 0.300 - - - 76.40 *76.40%

Unsatisfactory

IM Construction Corporation 20074 Completion of MPB (Package A) R. Medina Compound, Brgy. San Dionisio 09/03/09 NCR 0.997 60 O 0.305 0.203 0.150 0.030 0.023 0.025 73.60 -

IM Construction Corporation 20074 Rehabilitation of Sta. Rita-Camias Road 09/07/09 III 19.046 110 C 0.448 0.133 0.300 - - - 88.10 92.12% V. Satisfactory

IM Construction Corporation 20074 Rehab. of Old Cagayan Valley Road 09/08/09 III 13.348 80 O 0.378 0.240 0.150 0.030 0.056 0.033 88.70 -

IM Construction Corporation 20074 Const. of Batasan National High School 03/01/10 NCR 11.563 264 C 0.387 0.200 0.300 - - - 88.70 88.70% Satisfactory

IM Construction Corporation 20074 Rehab. of Old Cagayan Valley Road 03/04/10 III 13.348 80 C 0.412 0.200 0.300 - - - 91.20 89.70% V. Satisfactory

IM Construction Corporation 20074

Const./Conc. Of Sections of the Third Bulacan Circumferential Road Network Gen. Alejo Santos Highway to Junction

CVR Via San Rafael

03/04/10 III 47.643 210 O 0.346 0.300 0.150 0.023 0.040 0.033 89.20 -

INC Builders 25351 Construction of Multi-Purpose Building 02/23/09 III 0.478 44 C 0.338 0.200 0.300 - - - 83.80 *83.80% Satisfactory

Infra Builders & Sellers Phils. 9391Conc. of Basud-Tagaytay-Baligang-

Taladong-Comon-Inarado-Peñafrancia Road, Comon-Inarado Road Section

05/27/09 V 19.100 240 O 0.319 0.300 0.150 0.023 0.035 0.033 86.00 -

Interchain Builders 28734 Const. of FMR @ Brgy. Magallanes-Brgy. Pating 08/16/07 V 0.931 60 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page207

Page 216: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Interior-Philoworks Construction Joint Venture JV-06-026 Const./Impvt. of Libon-Marocmoc-Pantao

Road 05/28/09 RRNDP 22.890 566 O 0.363 0.300 0.137 0.030 0.045 0.050 92.50 -

Interior-Philworks Const. Joint Venture JV-06-026 Contract Package III, Libon-Marocmoc,

Pantao Road 03/07/09 RRNDP 212.890 566 O 0.374 0.300 0.137 0.030 0.056 0.050 94.70 -

Interior-Philworks Const. Joint Venture JV-04-014 CP1, Ligao-Pio Duran Setion, Arterial Road

Links Devt. (Phase V) 11/20/08 V 328.190 759 C 0.231 0.300 0.300 - - - 83.10 84.28% V. Satisfactory

Interior-Philworks Construction Joint Venture JV-06-036 Const./Impvt. of Libon-Marocmoc-Pantao

Road 02/28/10 RRNDP 223.130 616 C 0.460 0.133 0.300 - - - 89.30 91.88% V. Satisfactory

International Builders Corporation (IBC) 8576 Fort San Pedro Improvement Project 9/18-21/07 PPA 181.489 540 O 0.364 0.275 0.100 0.030 0.053 0.100 92.20 -

Ira Construction 33159 Construction of Drainage System, Brgy. Buhangin 05/27/09 III 0.936 90 C 0.482 0.200 0.300 - - - 98.20 *98.20%

Outstanding

IRA Construction 33159 Concreting of Road Sitio Setan, Calabuanan 03/03/09 III 0.934 75 C 0.425 0.133 0.300 - - - 85.80 *85.80%

Satisfactory

IRA Construction / ZF Construction (JV) JV-08-197 Concreting of Road from PCA to

Cabitukulan, Brgy. Reserva 09/08/09 III 9.441 150 C 0.431 0.133 0.300 - - - 86.40 *86.40% Satisfactory

Isaga Builders 8652 Const. of Sta. Marcela MPB 11/24/08 CAR 1.439 43 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory

Isaga Builders 8652 Proposed Rehab./Impvt. along Calanasan-Claveria Road, Magnas Section 02/27/09 CAR 9.272 416 O 0.282 0.287 0.150 0.030 0.043 0.033 82.50 -

Isaga Builders 8652 Rehab. of National Road along Abbut-Conner-Kabugao Road 11/20/08 CAR 9.344 240 O 0.341 0.240 0.100 0.008 0.040 0.100 72.90 -

Isaga Builders 8652 Rehab. of National Road along Abbut-Conner-Kabugao Road 02/28/09 CAR 9.344 359 O 0.370 0.296 0.150 0.030 0.055 0.050 95.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page208

Page 217: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Isaga Builders 8652 Repair/Rehab. of Calafug-Lipay-Masico FMR 08/21/08 CAR 0.470 60 C 0.373 0.275 0.300 - - - 94.80 93.36%

Outstanding

Isaga Builders 8652 Repair/Rehab. of Priority FMR (Municipal wide) 11/16/07 CAR 1.394 60 C 0.178 0.225 0.300 - - - 70.30 *70.30%

Satisfactory

Isaga Builders 8652Rehab. of National Road along Abbut-Conner-Kabugao Road (KO539+000 -

KO564+532)09/05/09 CAR 9.344 359 C 0.482 0.133 0.300 - - - 91.50 90.00%

V. Satisfactory

Isaga Builders 8652 Rehab. / Impvt. along of Calanasan-Claveria Road, Magnas Section 09/05/09 CAR 9.120 438 O 0.368 0.240 0.150 0.030 0.056 0.033 87.70 -

Isaga Builders 8652 Rehab. Of Abbut-Conner-Kabugao Rd., Calafug-Mabubua Section 02/21/10 CAR 7.290 326 O 0.346 0.227 0.150 0.030 0.045 0.033 83.10 -

Isaga Builders 8652 Rehab. / Impvt. along of Calanasan-Claveria Road, Magnas Section 02/19/10 CAR 9.120 541 O 0.275 0.300 0.150 0.030 0.035 0.033 82.30 -

ISH Construction 30407 Construction of 3-Storey, 15-Classroom School Building 06/08/09 NHA 18.108 150 O 0.391 0.300 0.150 0.015 0.000 0.050 90.60 -

ISH Construction 30407 Const. of Multi-Purpose Covered Court, Function Hall and Day Care Center 07/24/09 NHA 14.742 120 O 0.379 0.259 0.150 0.030 0.070 0.050 93.80 -

ISH Construction 30407 Const. of Multi-Purpose Covered Court, Function Hall and Day Care Center 07/24/09 NHA 14.741 120 O 0.397 0.300 0.137 0.030 0.038 0.050 95.20 -

ISH Construction Inc. 30407 Const. of one unit 3-Storey Elementary School Bldg., Pkg. 2 04/22/08 SLB 16.059 120 C 0.330 0.300 0.000 - - - 63.00 63.00%

Fair

ISH Construction Inc. 30407 Construction of one(1) unit 3-storey Elementary School Building, Package 2 10/22/07 NHA 16.059 120 O 0.22 0.25 0.05 0.015 0.017 0.067 61.90 -

ISH Construction Inc. 30407 Construction of Three-Storey School Building (12 Classrooms) 07/10/08 SLB 17.201 150 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -

ISH Construction Incorporated 30407 San Isidro Resettlement Project 03/2-4/2010 NHA 13.266 150 O 0.3787 0.3000 0.1058 0.03 0.05 0.05 91.45 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page209

Page 218: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ISH Construction, Inc. 30407Const. of Multi-Purpose Covered Court,

Functional Hall and Day Care Center Building

10/22/09 NHA 14.409 120 C 0.500 0.200 0.300 - - - 96.17 96.17% Outstanding

ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Elementary School Bldg. 09/16/08 SLB-LPO 18.839 196 C 0.298 0.293 0.300 - - - 89.10 89.10%

V.Satisfactory

Italian-Thai Development Public Co., Ltd. FC-05-009 CP IVA, Suyo-Cervantes Road, ARLDP,

Phase V, 09/03/09 PJHL 1.164.617 1,238 O 0.361 0.300 0.150 0.030 0.070 0.050 96.10 -

Italian-Thai Development Public Company Limited FC-03-043

CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't. Project

(Himayangan-Silago-Abuyog Road & Liloan-San Ricardo Road Project) Phase IV

08/29/07 PJHL 1,010.701 1,132 C 0.374 0.300 0.300 - - - 97.40 93.74% Outstanding

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of ARLDP,

Phase V 08/23/07 PJHL 1,164.620 1,181 O 0.381 0.300 0.100 0.030 0.070 0.100 98.10 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of ARLDP,

Phase V 02/23/08 PJHL 1,164.622 1,181 O 0.351 0.300 0.100 0.030 0.070 0.100 95.10 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of ARLDP,

Phase V 05/15/08 PJHL 1,164.622 1,181 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of ARLDP,

Phase V 08/14/08 PJHL 1,164.622 1,238 O 0.369 0.300 0.100 0.030 0.070 0.100 96.90 -

Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of ARLDP,

Phase V 11/14/08 PJHL 1,164.622 1,238 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -

ITP Construction Inc. 9392 Const. of 3-Storey 15-Classroom School Building 07/30/09 NHA 18.111 150 O 0.400 0.299 0.150 0.030 0.058 0.050 98.70 -

ITP Construction Inc. 9392 Const. of one (1) Three-Storey School Building 12/11/09 NHA 19.920 195 C 0.500 0.200 0.300 - - - 99.09 99.09%

Outstanding

ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building 02/10/08 NHA 18.300 197 C 0.400 0.300 0.300 100.00 100%

Outstanding

ITP Construction, Inc. 9392 Sct. Ranger Housing Project, Phase I 04/27/07 NHA 51.850 180 O 0.400 0.300 0.100 0.030 0.032 0.100 96.23 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page210

Page 219: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building 07/17/08 NHA 17.202 150 O 0.378 0.262 0.070 0.020 0.053 0.067 84.93 -

ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building 09/24/08 NHA 17.202 150 O 0.395 0.286 0.030 0.020 0.053 0.033 81.62 -

ITP Construction, Inc. 9392 Sct. Ranger Housing Village Project. Phase I 04/25/08 NCL 51.777 180 C 0.261 0.300 0.300 - - - 86.10 86.10%

V.Satisfactory

Ivahrick Contractors 13688 Const. of Flood Control 02/25/09 NCR 2.858 94 C 0.340 0.200 0.300 - - - 84.00 77.64% Unsatisfactory

Ivy Michelle Trading & Construction 24093Conc. of El Nido-Bataraza Road (Aboabo-

Bataraza Sect.), Marangas-Bonobono Section

02/29/08 IV-B 22.097 180 C 0.294 0.300 0.300 - - - 89.40 *89.40% V. Satisfactory

Ivy Michelle Trading & Construction 24093Conc. of El Nido-Bataraza Road (PPC-Narra-

Aboabo Sect.), San Isidro/Calategas Section

11/26/07 IV-B 23.990 210 C 0.185 0.293 0.300 - - - 77.80 84.52% V. Satisfactory

Ivy Michelle Trading & Construction 24093 Const. of Aramaywan-Berong-Puerto Princesa Road 11/11/08 IV-B 19.097 252 C 0.339 0.200 0.300 - - - 83.90 79.40%

Satisfactory

Ivy Michelle Trading & Construction 24093 Conc. of QuezonAramaywan Road (Tabon Section) 09/11/09 IVB 24.965 224 C 0.411 0.200 0.300 - - - 91.10 88.37%

Satisfactory

J & A Pimentel Construction 7953 Construction of Balibadon 4 Bridge, Balibadon 06/04/09 XIII 18.988 240 C 0.457 0.200 0.300 - - - 95.70 91.20%

V. Satisfactory

J & A Pimentel Construction 7953 Const. of Tandag Shoreline Protection Project (Ph. 2) 09/08/09 XIII 13.850 209 C 0.486 0.133 0.300 - - - 91.90 92.23%

V.Satisfactory

J & A Pimentel Construction 7953 Completion of MPB Brgy. Parang 03/02/10 XIII 0.920 90 C 0.473 0.133 0.300 - - - 90.60 90.60% V.Satisfactory

J & A Pimentel Construction 7953 Const. of Tandag Shore Protection 03/03/10 XIII 13.855 150 C 0.432 0.133 0.300 - - - 86.50 86.50% Satisfactory

J & A Pimentel Construction 7953 Const. of Multi-Purpose Bldg. 03/02/10 XIII 0.922 90 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory

J & A Pimentel Construction 7953 Completion of MPB Tago (Phase V) 11/26/08 XIII 9.231 240 C 0.319 0.200 0.300 - - - 81.90 80.75% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page211

Page 220: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J & A Pimentel Construction 7953 Completion of MPB Tandag (Phase V) 03/06/08 XIII 9.387 255 C 0.338 0.200 0.300 - - - 83.80 85.55% V. Satisfactory

J & A Pimentel Construction 7953 Conc. of Junction Cortes-Nurcia Section (SDCR) 03/11/09 XIII 19.280 150 C 0.361 0.200 0.300 - - - 86.10 79.92%

Unsatisfactory

J & A Pimentel Construction 7953 Const. of Bocawe Bridge & Approaches 11/27/07 XIII 11.180 237 C 0.266 0.200 0.300 - - - 76.60 80.20% V. Satisfactory

J & A Pimentel Construction 7953 Const. of Cagmino Bridge & Approaches 05/20/08 XIII 11.830 220 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding

J & A Pimentel Construction 7953 Construction of Tandag Shoreline Protection Project (Phase II) 03/12/09 XIII 13.851 150 O 0.375 0.240 0.150 0.030 0.035 0.050 88.00 -

J & A Pimentel Construction 7953 Impvt. of Bank Protection of Anibongan Bailey Bridge along SCDR 05/22/08 XIII 5.174 60 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

J & S Escuadra Construction & Supply 20077 Const. of 2 units CL @ Hagonoy NHS

Annex 05/16/08 XI 0.952 60 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory

J D E Construction 19173 Const. of Two (2) unit CL @ West City Central School 08/23/08 X 0.932 75 C 0.371 0.200 0.300 - - - 87.10 82.62%

V. Satisfactory

J D E Construction 19173 Impvt. of Waterways, Sapang Creek along ICBR 08/23/08 X 4.667 135 C 0.354 0.200 0.300 - - - 85.40 83.72%

V. Satisfactory

J L A Construction & Supplies 24503 Const. of MPB at Almendras E/S 11/19/08 XI 1.710 110 C 0.353 0.300 0.300 - - - 95.30 91.03% Outstanding

J L A Construction & Supplies 24503 Construction of Multi-Purpose Building, Brgy. Sibulan 03/07/09 XI 2.854 110 C 0.365 0.200 0.300 - - - 86.50 *86.50%

Satisfactory

J L V Construction and Supply 9953 Impvt./Rehab. of Road 03/05/09 IV-A 9.645 30 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory

J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project

9/29/08 10/03/08 NHA 45.895 240 O 0.336 0.291 0.000 0.030 0.042 0.033 73.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page212

Page 221: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project 12/8-12/08 NHA 44.812 313 O 0.315 0.287 0.000 0.030 0.042 0.067 74.10 74.10%

Satisfactory

J. C. Baac Construction Corporation 25974 Impvt./Rehab. of Balbalan-Pinukpuk Road 11/18/08 CAR 26.052 260 O 0.323 0.234 0.100 0.020 0.030 0.067 77.40 -

J. C. Baac Construction Corporation 25974 Impvt./Rehab. of Bontoc-Lubuagan-Tabuk Road (Gongon Sect.) 02/24/08 CAR 13.257 296 C 0.370 0.300 0.300 - - - 97.00 78.40%

Satisfactory

J. C. Baac Construction Corporation 25974Impvt./Widening/Conc. of Bontoc-Tabuk-

Tuguegarao Road, Phase II, Suyo-Tangadan Section

03/04/09 CAR 47.214 360 O 0.385 0.296 0.150 0.030 0.032 0.033 92.60 -

J. C. Baac Construction Corporation 25974 Impv't/Rehab Larion Alto-Cabbo-Baliuag Road (going to Callao Alternate Route) 02/27/09 II 19.143 230 O 0.328 0.300 0.116 0.030 0.550 0.033 135.70 -

J. C. Baac Construction Corporation 25974 Replacement/Const. of Langso Bridge 08/22/07 CAR 7.699 195 C 0.291 0.200 0.000 - - - 49.10 67.97% Fair

J. Cordon Construction & Supply 32982 Const. of 2-CL School Building, Leon National High School 09/10/09 VI 0.925 60 C 0.441 0.099 0.300 - - - 84.00 *84.00%

Satisfactory

J. Cordon Construction & Supply 32982 Repair of School Bldg. at Leon National High School 03/05/10 VI 1.440 90 O 0.296 0.300 0.150 0.015 0.027 0.033 82.10 -

J. Custorio Construction 16237 Const. of Catarman Bridge along Catarman-Laoang Road 05/26/09 VIII 9.419 150 O 0.360 0.240 0.150 0.030 0.050 0.033 86.30 -

J. Custorio Construction 16237Rehab./Reconst./Upgrading of Damaged Paved National Roads, along Catarman-

Calbayog Road05/26/09 VIII 9.425 120 O 0.331 0.233 0.150 0.030 0.050 0.033 82.70 -

J. Custorio Construction 16237 Impvt./Rehab. of Dagansa-Libjo Road 03/07/09 VIII 4.797 60 O 0.314 0.300 0.050 0.020 0.037 0.050 77.10 -

J. Custorio Construction 16237 Const. of Catarman Bridge along Catarman-Laoang Road 09/14/09 VIII 9.419 172 O 0.345 0.240 0.150 0.030 0.045 0.033 84.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page213

Page 222: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.B. Alarcon Enterprises 18849 Completion of Approaches and Revetment of Gen. Luna Bridge 02/22/08 IVA 3.105 75 C 0.340 0.200 0.300 - - - 84.00 87.42%

V. Satisfactory

J.C. Baac Construction Corporation 25974 Improvement/Rehabilitation of Balbalan-Pinukpuk Road 05/28/09 CAR 26.052 260 C 0.376 0.200 0.300 - - - 87.60 81.48%

Unsatisfactory

J.C. Baac Construction Corporation 25974 Impvt./Rehab. Larion Alto-Cabbo-Baliuag Road (Going to Callao alternate Route) 05/18/09 II 19.134 281 O 0.371 0.247 0.150 0.030 0.047 0.033 87.80 -

J.C. Baac Construction Corporation 25974 Impvt./Rehab. of Kalinga-Abra Road Km. 469+000-476+000 (with exception) 09/02/09 CAR 9.392 308 C 0.416 0.133 0.030 - - - 57.90 *84.90%

Satisfactory

J.C. Baac Construction Corporation 25974Impvt./Widening/Conc. of Bontoc-Tabuk-

Tuguegarao Road, Phase II, Suyo-Tangadan Section

02/23/10 CAR 47.214 437 C 0.438 0.140 0.300 - - - 87.80 90.68% V. Satisfactory

J.C. Baac Construction Corporation 25974Impvt./Rehab. of Larion Alto-Cabbo-Baliuag

Peñablanca Road (going to Callao Alternate Route)

02/16/10 II 19.131 346 C 0.365 0.200 0.300 - - - 86.50 86.80% Satisfactory

J.D. Legaspi Construction 9608Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Baganga Section, Phase II

06/09/09 XI 191.035 597 O 0.378 0.236 0.150 0.030 0.060 0.050 90.40 -

J.D. Legaspi Construction 9608 Baseco Linear/Community Park cum Revetment Wall 09/03/07 PRRC 139.778 365 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -

J.D. Legaspi Construction 9608 Construction of Solano-Quezon Road 03/12/09 II 62.893 540 O 0.365 0.300 0.150 0.030 0.055 0.050 95.00 -

J.D. Legaspi Construction 9608CP 7: Impvt./Conc. of Surigao Sur-Davao

Oriental Coastal Road (Manay-Boston) Baganga Section Phase II

11/25/08 XI 191.035 597 O 0.211 0.300 0.100 0.030 0.060 0.100 80.10 -

J.D. Legaspi Construction 9608Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road, (Manay-Boston) Baganga Section PhaseII, C P No. 7

09/06/09 XI 191.035 597 O 0.380 0.300 0.150 0.030 0.042 0.033 93.50 -

J.D. Legaspi Construction 9608

Rehab. of Daang Maharlika Highway, Package I, Section 4 (Allen-Malaga Section)

Km. 669+364.55-Km.674+560.55 with exceptions

03/04/10 VIII 120.582 175 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory

J.D. Legaspi Construction 9608 Const. of 616 L.M. Manukan Seawall 03/11/10 IX 47.732 300 O 0.323 0.300 0.150 0.010 0.042 0.050 87.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page214

Page 223: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.D. Legaspi Construction 9608CP-7: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-

Boston) Baganga Section, Phase II03/04/10 XI 191.766 597 C 0.351 0.200 0.300 - - - 85.10 86.03%

Satisfactory

J.D. Legaspi Construction / BHM Construction (JV) JV-08-152

Conc. of Bontoc-Tabuk-Tugegarao Road (Package BLT-13a), Tinglayan Boundary-

Lubuagan-Tabuk Section II, Km. 467+000 - Km.471+838, Cagaluan - Gaogao Section

09/02/09 CAR 79.615 294 O 0.370 0.240 0.150 0.030 0.056 0.033 87.90 -

J.D. Legaspi Construction / BHM Construction (JV) JV-08-152

Conc. of Bontoc-Tabuk-Tugegarao Road (Package BLT-13a), Tinglayan Boundary-

Lubuagan-Tabuk Section II, Km. 467+000 - Km.471+838, Cagaluan - Gaogao Section

02/22/10 CAR 82.410 378 O 0.351 0.265 0.150 0.030 0.035 0.033 86.40 -

J.D. Legaspi Construction / VUC Engineering (JV) JV-08-148

Conc. of Bontoc-Tabuk-Tugegarao Road (Package BLT-15a), Tinglayan Boundary-

Lubuagan-Tabuk Section II, Km. 475+719 - Km.483+500

02/22/10 CAR 175.945 427 O 0.301 0.300 0.149 0.030 0.035 0.033 84.80 -

J.D. Legazpi Construction 9608 Construction of Solano-Quezon Road 06/02/09 II 62.893 540 O 0.373 0.300 0.150 0.030 0.051 0.050 95.40 -

J.E. Arradaza Construction & Supply 25353 Const. of Duguan Communal Irrigation Project 10/23/07 NIA-II 2.338 150 C 0.326 0.300 0.300 - - - 92.60 92.60%

Outstanding

J.E. Arradaza Construction and Supply 33256 Const. of Drainage System, Nasipit Main

Road going to Family Park 09/18/09 VII 1.152 89 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory

J.G. & P Enterprises 5090 Const. of Pedestrian Foot Bridge along Gov. Drive (FCIE) 08/23/07 IV-A 3.823 100 C 0.302 0.200 0.300 - - - 80.20 *80.20%

V. Satisfactory

J.G. & P Enterprises 5090 Rehab. And Impvt. Along Kawit-Noveleta Diversion Road, Kawit Section 05/26/08 IV-A 10.345 12 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V. Satisfactory

J.G. Garcia Construction 21054 Construction of Multi-Purpos Bldg. @ Maasin E/S 11/27/08 I 0.772 35 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V. Satisfactory

J.G. Garcia Construction 21054 Opening/Rehab of Farm to Market Road at Two Brgys. 03/09/09 I 0.964 30 C 0.418 0.200 0.300 - - - 91.80 *91.80%

V. Satisfactory

J.G. Oranza Construction 33370 Construction of Multi-Purpose Building, Brgy. Poblacion 03/20/09 XII 0.847 60 C 0.475 0.200 0.300 - - - 97.50 *97.50%

Outstanding

J.G. Oranza Construction 33370 Const. of Multi-Purpose Building (Additional), Brgy. Poblacion 03/12/10 XII 1.412 60 C 0.483 0.144 0.300 - - - 92.70 92.70%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page215

Page 224: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I) 02/13/07 Sp. Bridges 174.420 569 O 0.352 0.180 0.030 0.030 0.065 0.067 72.40 -

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I) 08/26/07 Sp. Bridges 174.420 569 O 0.332 0.269 0.000 0.030 0.061 0.067 75.90 -

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I) 02/20/08 Sp. Bridges 174.420 569 O 0.344 0.240 0.100 0.030 0.061 0.067 84.20 -

J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I) 02/24/09 Sp. Bridges 177.680 1,002 O 0.396 0.289 0.000 0.030 0.055 0.033 80.30 -

J.H. Pajara Construction Corp. 1890CP 6, Restoration of Patapat Viaduct under the Arterial Road Links Dev. Project, Phase

V11/15/08 PJHL 187.597 395 O 0.379 0.300 0.100 0.030 0.070 0.100 97.90 -

J.H. Pajara Construction Corp. 1890

NAIA Expressway & its Related Road Projects Phase I Package-IVA Sales St.

Viaduct Ramp Structure (M & E Retaining Wall)

02/19/08 URPO 348.561 680 C 0.302 0.300 0.000 - - - 60.20 68.66% Fair

J.I. Etac Construction & Supply 32722 Reconst. of Daang Maharlika (SM) San Isidro-San Juan Section 11/28/08 VIII 9.606 210 C 0.343 0.200 0.300 - - - 84.30 68.76%

Fair

J.I. Etac Construction & Supply 32722 Repair of Salvacion E/S 03/07/09 VIII 0.254 90 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfacory

J.I. Etac Construction & Supply 32722 Repair/Rehab. of San Antonio Seawall 03/07/09 VIII 1.918 180 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfacory

J.M. Luciano Construction Inc. 2083Conc. of SDCR (Aras-asan-Marihatag

Subsection) along Cortes-Tandag-Marihatag Sect.

09/09/09 XIII 268.415 615 O 0.308 0.277 0.150 0.030 0.065 0.033 86.30 -

J.M. Luciano Construction Inc. (Formerly: J.M. Luciano Const.) 2083 Impvt./Conc. of SCDR Cortes-Tandag-

Marihatag Road, Tandag-Marihatag Section 11/28/08 XIII 77.202 480 C 0.318 0.300 0.300 - - - 91.80 90.12% Outstanding

J.M. Luciano Construction, Inc. 2083Conc. of Surigao-Davao Coastal Road

(Aras-asan-Marihatag Subsection) along cortes-Tandag-Marihatag Section

06/07/09 XIII 268.415 615 O 0.345 0.300 0.150 0.030 0.056 0.050 93.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page216

Page 225: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.M. Luciano Construction, Inc. 2083 Contract Package VII, Const./Impvt. of Prosperidad-Liaga Rd. 03/06/10 RRNDP 396.914 570 O 0.378 0.300 0.150 0.030 0.051 0.033 94.20 -

J.M. Luciano Construction, Inc. 2083Conc. of Surigao-Davao Coastal Rd. (Aras-asan-Marihatag Sub-Section) along Cortes-

Tandag-Marihatag Section03/03/10 XIII 268.415 615 O 0.297 0.300 0.150 0.030 0.051 0.050 87.80 -

J.M. Maligaya Construction & Construction Supply 15018 Conc. of Noveleta-Naic-Tagaytay Road 06/03/09 IV-A 28.880 150 C 0.440 0.133 0.300 - - - 87.30 88.32%

Satisfactory

J.M. Maligaya Construction & Construction Supply 15018 Rehab./Reconst. of Noveleta-Naic-Tagaytay

Road 06/03/09 IV-A 24.075 120 O 0.362 0.240 0.150 0.030 0.025 0.050 85.70 -

J.M. Maligaya Construction & Construction Supply 15018 Asphalt Overlay of Pob. 3 11/13/08 IV-A 0.285 20 C 0.270 0.300 0.300 - - - 87.00 *87.00%

V. Satisfactory

J.M. Maligaya Construction & Construction Supply 15018 Conc. of Noveleta-Naic-Tagaytay Road 03/10/09 IV-A 28.880 150 O 0.374 0.300 0.103 0.030 0.033 0.050 89.00 -

J.M. Maligaya Construction & Construction Supply 15018 Rehab./Reconst. of Noveleta-Naic-Tagaytay

Road 09/09/09 IVA 24.075 131 C 0.329 0.200 0.300 - - - 82.90 84.58% Satisfactory

J.M. Maligaya Construction & Construction Supply 15018 Asphalt Overlay at Brgy. Poblacion 3 02/25/10 IVA 0.495 10 C 0.417 0.200 0.300 - - - 91.70 91.70%

V. Satisfactory

J.M. Morales Construction & Supply (Formerly: J.M. Morales Const.) 15574 Impvt. of MPB 08/13/08 III 5.780 120 C 0.387 0.270 0.300 - - - 95.70 70.64%

Satisfactory

J.M. Morales Construction & Supply (Formerly: J.M. Morales Const.) 15574 Upgrading/Rehab. of Lubao Diversion

Road 08/13/08 III 4.777 60 C 0.369 0.183 0.300 - - - 85.20 *85.20% V. Satisfactory

J.N. Dela Torre Construction 24978 Const. of PPSR, Narra-Aboabo Road Balitien Bridge I & II Approach 11/27/07 IV-B 5.553 150 C 0.297 0.292 0.300 - - - 88.90 88.90%

V.Satisfactory

J.N. Dela Torre Construction 24978 Rehab./Regravelling of Highway-Panisiran FMR 03/02/10 IVB 0.949 90 C 0.353 0.200 0.300 - - - 85.30 85.30%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page217

Page 226: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.P. Aquino & Bros. (Engineers, Developers, Architects, Builders) 13231 Const. of 1 CL Sch. Bldg. at Bamban

Gabaldon Elem. Sch. 08/20/08 III 0.426 60 C 0.344 0.232 0.300 - - - 87.60 *87.60% V. Satisfactory

J.P. Aquino and Bros. (Engineers, Developers, Architects, Builders) 13231 Concreting of Getha Road (College of Holy

Spirit) 05/23/09 III 1.504 60 C 0.260 0.200 0.300 - - - 76.00 *76.00% Unsatisfactory

J.P. Aquino and Bros. (Engineers, Developers, Architects, Builders) 13231 Const. of 2 CL S.B. at Cristo Rey High

School 09/01/09 III 0.970 90 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory

J.Q.G. Construction 10530Const. of Additional Work Items

Contiguous to Traffic Management along Manila North Road (MNR) Package I

06/02/09 III 16.518 119 C 0.368 0.200 0.300 - - - 86.80 *86.80%Satisfactory

J.Q.G. Construction 10530 Conc. of Maluid-San Andres Road (Sitio Malinis) 08/22/08 III 1.660 75 C 0.293 0.210 0.300 - - - 80.30 *80.30%

V. Satisfactory

J.Q.G. Construction 10530 Conc. of San Isidro-Penal Colony-Jct. Yapang Road 05/22/08 IV-B 23.812 240 C 0.355 0.300 0.300 - - - 95.50 82.03%

V. Satisfactory

J.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S 08/29/07 III 1.091 75 C 0.313 0.300 0.300 - - - 91.30 81.99% V. Satisfactory

J.Q.G. Construction 10530Traffic Management along Manila North Road (MNR) Package I along MNR from

Meycauayan to Malolos05/21/08 III 46.677 188 C 0.337 0.300 0.300 - - - 93.70 93.70%

Outstanding

J.R.C.F. Construction 31641 Repair/Renovation of MPB at Brgy. Pinyahan 02/26/10 NCR 1.434 30 C 0.482 0.200 0.000 - - - 68.20 69.88%

Poor

J.S. General Contractor 15258 Const. of Flood Control Structures along Alulod Creek 06/03/09 IV-A 1.436 45 C 0.464 0.133 0.300 - - - 89.70 *89.70%

V. Satisfactory

J.S. General Contractor 15258 Const. of Canal Lining at Brgy. Limbon 06/03/09 IV-A 0.286 90 C 0.459 0.133 0.300 - - - 89.20 *89.20% V. Satisfactory

J.S. General Contractor 15258 Concreting of Tanza-Trece Martirez City-Indang Road 06/03/09 IV-A 9.630 120 O 0.368 0.240 0.150 0.030 0.025 0.050 86.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page218

Page 227: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.S. General Contractor 15258 Const. of Canal Lining at Brgy. Poblacion 2 06/03/09 IV-A 0.287 90 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory

J.S. General Contractor 15258 Const. of MPB, Brgy. 7 11/13/08 IV-A 0.476 90 C 0.356 0.267 0.300 - - - 92.30 *92.30% Outstanding

J.S. General Contractor 15258 Const. of Water Supply System @ Pantihan 1,2, & 3 05/22/08 IV-A 0.575 120 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

J.S. General Contractor 15258 Drainage Impvt. Along Banaba Cerca 11/26/07 IV-A 1.905 75 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory

J.S. General Contractor 15258 Rehab. of Sch. Bldg., Cavite State University Gabaldon Bldg. 05/22/08 IV-A 1.431 70 C 0.347 0.200 0.300 - - - 84.70 85.05%

V. Satisfactory

J.S. General Contractor 15258 Conc.of Tanza-Trece Martires City-Indang Road 09/09/09 IVA 9.630 120 C 0.323 0.200 0.300 - - - 82.30 84.70%

Satisfactory

J.S. General Contractor 15258 Completion of MPB at Brgy. Sabutan 02/26/10 IVA 0.396 60 C 0.455 0.200 0.300 - - - 95.50 95.503% V. Satisfactory

J.S. General Contractor 15258 Completion of Secondary School Building at Amadeo NHS 02/26/10 IVA 2.391 90 C 0.443 0.200 0.300 - - - 94.30 94.30%

V. Satisfactory

J.S. General Contractor 15258 Concreting of Brgy. Bagong Tubig Road 02/26/10 IVA 6.726 179 C 0.386 0.200 0.300 - - - 88.60 88.60% Satisfactory

J.S. Layson & Co., Inc. (Formerly: J.S. Layson Construction) 2653 Reconstruction of Nanga Bridge, Km.

25+500 along Iloilo-Antique Road 03/05/08 VI 19.050 395 C 0.361 0.200 0.300 - - - 86.10 77.22% Satisfactory

J.T. Gamolo Construction 15759Road/Upgrading (Gravel to Paved) of Jct. S.H. Manolo Fortich-Libona-Indahag Road

(Pob. Kihare Sect.)05/29/09 X 19.219 150 O 0.391 0.258 0.150 0.030 0.043 0.050 92.20 -

J.T. Gamolo Construction 15759 Const. of Multi-Purpose Building, Baclayon 05/27/09 X 1.409 120 C 0.404 0.133 0.300 - - - 83.70 *83.70% Satisfactory

J.T. Gamolo Construction 15759 Completion of MPB @ Poblacion 03/04/09 X 1.412 90 C 0.363 0.200 0.300 - - - 86.30 *86.30% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page219

Page 228: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.T. Gamolo Construction 15759 Const. of Sayre Nat'l Highway (Don Carlos Section) 08/24/07 X 14.008 210 C 0.244 0.300 0.300 - - - 84.40 83.89%

V. Satisfactory

J.T. Gamolo Construction 15759

CP A, Provision of Slope Protection, Const./Installation of Gabions & Const. of Retaining Wall along Sayre Highway Alae-

Kisolon Road

11/21/08 X 9.339 241 C 0.386 0.300 0.300 - - - 98.60 91.14% Outstanding

J.T. Gamolo Construction 15759Road/Upgrading (Gravel to Paved) of Jct. S.H. Manolo Fortich-Libona-Indahag Road

(Pob. Kihare Section)09/04/09 X 19.219 150 C 0.461 0.150 0.300 - - - 91.10 91.76%

V. Satisfactory

J.T. Gamolo Construction 15759 Const. of Multi-Purpose Bldg. 02/24/10 X 0.969 75 O 0.380 0.300 0.097 0.030 0.038 0.033 87.80 -

J.V. Lagon Construction Corporation 11561Rehab./Reconst./Upgrading of Damaged Paved National Road along Marbel-Makar

Road06/06/09 R-XII 14.317 224 O 0.318 0.254 0.150 0.012 0.055 0.017 80.60 -

J.V. Lagon Construction Corporation 11561Rehab./Reconst. of Damaged Roads

Dulawan-Marbel (Tacuromg-New Carmen Section)

06/02/09 R-XII 19.022 435 O 0.380 0.300 0.000 0.030 0.060 0.017 78.70 -

J.V. Loreto Const. & Dev't. Corp. 13120 Conc. of Villaba-Leyte Road, Leyte III 08/23/08 VIII 28.880 300 C 0.174 0.200 0.300 - - - 67.40 76.06% Satisfactory

J.V. Loreto Const. & Dev't. Corp. 13120 Construction of PMO-Tacloban Port Operation Bldg. 4/15-18/07 PPA 79.644 534 O 0.3999 0.299 0.03 0.03 0.0525 0.0667 87.81 -

J.V. Loreto Const. & Dev't. Corp. 13120 Rehab. Along Daang Maharlika Road 11/25/08 VIII 50.156 125 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding

J.V. Loreto Const. & Dev't. Corp. 13120 Rehab./Repair of Bernard Reed Bridge 12/05/07 VIII 9.404 128 C 0.381 0.023 0.300 - - - 70.40 *70.40% Satisfactory

J.V. Loreto Construction & Development Corp. 13120 Rehab./Reconst./Upgrading of Pawing-

Campetic Road 06/09/09 VIII 11.560 180 O 0.370 0.225 0.150 0.030 0.047 0.050 87.20 -

J.V. Loreto Construction & Development Corp. 13120 Rehab./Reconst./ Upgrading of Pawing-

Campetic Road 03/11/10 VIII 11.560 195 C 0.473 0.133 0.300 - - - 90.60 88.56% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page220

Page 229: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J.Y.M. Construction and Development Corporation (Formerly:

JYM Const. & Devt. Enterprises)9100

Rehab./Reconst. of Damaged Paved (Concrete Blocking along E. Rodriguez Sr.

Ave.) Araneta-Aurora Blvd.09/11/09 NCR 9.600 161 C 0.434 0.133 0.300 - - - 86.70 *86.70%

Satisfactory

Jadestress Builders 9753 Impvt. of Talobatib-Jose Panganiban Road, Brgy. Osmeña 06/04/09 V 9.390 200 C 0.360 0.200 0.300 - - - 86.00 86.48%

Satisfactory

Jadestress Builders 9753 Rehab./Impvt. of Inascan-Bubulusan Barangay Road 09/03/09 V 2.394 75 C 0.410 0.200 0.300 - - - 91.00 92.20%

V. Satisfactory

Jagon Builders 24748 Rehab./Reconst./Upgrading of P. Aquino St. 05/26/09 NCR 9.600 105 C 0.466 0.143 0.300 - - - 90.90 *90.90%

V. Satisfactory

Jagon Builders 24748 Completion of San Joaquin Elem. School 03/06/09 NCR 4.776 60 C 0.469 0.161 0.300 - - - 93.00 *93.00% V.Satisfactory

Jagon Builders 24748 Const. of Academic Classroom at Plainview E/S 11/27/07 NCR 1.702 75 C 0.345 0.300 0.300 - - - 94.50 *94.50%

Outstanding

Jagon Builders 24748 Const./Completion of MPB @ Eshudama Sub. 05/20/08 NCR 1.423 60 C 0.340 0.150 0.300 - - - 79.00 *79.00%

Satisfactory

Jagon Builders 24748Partial Completion of School Bldg. and

Const. of Sch. Facilities @ Garbriela Silang Annex I

11/20/08 NCR 7.510 150 C 0.315 0.288 0.300 - - - 90.30 76.65% Satisfactory

Jagon Builders 24748 Upgrading/Conc. of Road with Drainage Impvt. Along Lapu-lapu Ave. 08/22/07 NCR 9.495 120 C 0.342 0.200 0.300 - - - 84.20 *84.20%

V. Satisfactory

Jagon Builders 24748 Conc. of Roads along Zone 16 03/02/10 NCR 1.900 60 C 0.271 0.200 0.300 - - - 77.10 77.10% Unsatisfactory

Jag-Vail Construction & Supply 24055 Seal Widening/Conc. of Shoulder along Daang Maharlika, Oas Diversion Road 08/22/07 V 0.438 30 C 0.331 0.106 0.300 - - - 73.70 *73.70%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page221

Page 230: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jag-Vail Construction and Supply 24055 Gaba Port Development Project 06/06/09 DOTC 4.788 90 C 0.404 0.200 0.300 - - - 90.40 90.40% V. Satisfactory

Jaime B. Ching 4256 Const. and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.013 408 O 0.355 0.281 - 0.030 0.064 0.033 76.33 -

Jaime B. Ching Enterprises 4256 Construction and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.013 438 C 0.435 0.174 0.300 - - - 90.91 *90.91%

V. Satisfactory

Jaime B. Ching Enterprises 4256 Rehabilitation of Taloc Main Drainage 8/10-18/09 NIA 5.988 438 C 0.376 0.200 0.300 - - - 87.59 *87.59% Satisfactory

Jaime B. Ching Enterprises 4256 Rehab. of Bacolod South Road (Pilar-Marina Section) 05/28/09 VI 9.484 116 O 0.373 0.240 0.150 0.015 0.045 0.033 85.60 -

Jaime B. Ching Enterprises 4256 Completion of Guintubhan (Bagroy) Bridge along Binalbagan-Isabel Road 09/06/07 VI 19.164 361 O 0.389 0.240 0.100 0.030 0.045 0.067 87.10 -

Jaime B. Ching Enterprises 4256 Completion of Guintubhan (Bagroy) Bridge along Binalbagan-Isabel Road 11/30/07 VI 19.164 366 O 0.215 0.240 0.100 0.030 0.042 0.100 72.70 -

Jaime B. Ching Enterprises 4256 Const. (Conc.) of Marikina-Infanta Rd. P-II, Laguna Side 11/28/07 IV-A 48.422 300 C 0.384 0.200 0.300 - - - 88.40 89.72%

V. Satisfactory

Jaime B. Ching Enterprises 4256 Const. and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.013 408 O 0.355 0.281 - 0.030 0.064 0.033 76.33 -

Jaime B. Ching Enterprises 4256 Const. of Flood Control (Phase II), Brgy. Laurel 09/01/09 IVA 0.959 35 C 0.326 0.200 0.300 - - - 82.60 *82.60%

Satisfactory

Jaime B. Ching Enterprises 4256 Rehab. of Bacolod South Road (Pilar-Marina Section) 09/15/09 VI 9.574 136 C 0.367 0.133 0.300 - - - 80.00 83.36%

Satisfactory

Jaime B. Ching Enterprises 4256 Const. of MPB (Covered Court) at Pontevedra NHS, Phase I 03/10/10 VI 1.422 65 C 0.373 0.200 0.300 - - - 87.30 87.30%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page222

Page 231: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jakboa Builders 31563 Repair/Renovation of PTRI Main Building 06/09/09 DOST 2.964 85 C 0.414 0.200 0.000 - - - 61.40 *61.40% Poor

Jameetrix Construction 19176Conc. of Additional 2-lanes along Davao

City Diversion Road, Buhangin-Maa Section

12/04/07 XI 9.236 240 C 0.350 0.300 0.300 - - - 95.00 95.00% Outstanding

Jameetrix Construction 19176 Conc. of Road at Brgy. Magtuod, Matina-Biao Road 12/04/08 XI 9.435 90 C 0.350 0.300 0.300 - - - 95.00 *95.00%

Outstanding

Jameetrix Construction 19176 Completion of Two Storey Sch. Bldg. at Kabacan E/S, Brgy. Maa 09/17/09 XI 2.892 180 C 0.471 0.133 0.300 - - - 90.40 *90.40%

V. Satisfactory

Jan Sha Construction & Supply 19462 Rehabilitation of Mataoroc CIS, Taisan CIS & Tariric CIS 08/15/07 NIA-V 1.763 60 C 0.323 0.244 0.300 - - - 86.70 *86.70%

V.Satisfactory

Jann-Norris Construction and Supplies 31814 Const. of Banganan Flood Control 05/29/08 II 2.884 40 C 0.304 0.200 0.300 - - - 80.40 *80.40%

V. Satisfactory

Jann-Norris Construction and Supplies 31814 Rehab./Impvt. of Road protection along

Daang Maharlika, Bonfal-Solano Sect. 03/06/08 II 4.644 90 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory

Jann-Norris Construction and Supplies 31814 Const. of Bonfal Multi-Purpose Building 03/03/10 II 0.660 44 C 0.429 0.133 0.300 - - - 86.20 86.20%

Satisfactory

Japuz-Jansol Enterprises 22869 Completion of Two (2) Storey School Building, Camiguin National High School 05/31/09 X 1.891 95 C 0.389 0.186 0.300 - - - 87.50 *87.50%

Satisfactory

Japuz-Jansol Enterprises 22869 Concreting of Lagoon Road, Brgy. Benoni 05/31/09 X 1.887 199 C 0.440 0.102 0.300 - - - 84.20 *84.20% Satisfactory

Japuz-Jansol Enterprises 22869 Completion of Maac North Poblacion National Road 08/27/08 X 4.822 70 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

Japuz-Jansol Enterprises 22869 Const. of Agoho MPB 11/24/07 X 1.861 105 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page223

Page 232: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Japuz-Jansol Enterprises 22869 Const. of Soro-Soro MPB 03/07/09 X 2.383 130 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory

Japuz-Jansol Enterprises 22869 Const./Rehab. of MPB Catarman C/S 03/07/09 X 1.902 80 C 0.326 0.200 0.300 - - - 82.60 *82.60% Satisfactory

Japuz-Jansol Enterprises 22869 Const./Rehab. of San Roque-Mahinog NHA Water System 11/22/08 X 9.541 215 C 0.360 0.300 0.300 - - - 96.00 *96.00%

Outstanding

Japuz-Jansol Enterprises 22869 Construction of Teruvian Dam & Canal System 04/13-18/09 NIA 4.178 90 O 0.352 0.180 0.150 0.030 0.064 0.050 82.55 -

Japuz-Jansol Enterprises 22869 Construction of Multi-Purpose Building Mambajao-Phase IIB 09/05/09 X 5.240 130 C 0.410 0.200 0.300 - - - 91.00 *91.00%

V. Satisfactory

Japuz-Jansol Enterprises /Angel & Sam Construction & General Merchandise Joint Venture

SLI-SN-005401

Const./Completion of Multi-Purpose Building Phase II, Poblacion Mambajao 09/05/09 X 9.541 180 C 0.429 0.200 0.300 - - - 92.90 *92.90%

V. Satisfactory

Jargon Construction & Supply 23474 Road Upgrading (Gravel to Concrete) Falls Section 06/03/09 R-XII 10.414 291 C 0.371 0.190 0.300 - - - 86.10 88.86%

Satisifactory

Jargon Construction & Supply 23474 Conc. of Sarangani-Davao del Sur Coastal Road, Taluya-Gumasa Section 06/11/09 R-XII 14.145 220 C 0.361 0.195 0.300 - - - 85.60 88.78%

Satisifactory

Jargon Construction & Supply 23474 Completion of MPB at Brgy. Kernam (Brgy. Hall) 03/13/09 XII 0.480 100 C 0.375 0.200 0.300 - - - 87.50 85.61%

Satisfactory

Jargon Construction & Supply 23474 Completion of MPB, Brgy. Mapantig 11/27/08 XII 1.248 80 C 0.399 0.199 0.300 - - - 89.80 *89.80% V. Satisfactory

Jargon Construction & Supply 23474 Conc. of Sarangani-Davao del Sur Coastal Road, Punsad Section. 03/11/08 XII 5.658 180 C 0.392 0.300 0.000 - - - 69.20 70.94% Satisfactory

Jargon Construction & Supply 23474 Conc. of Sarangani-Davao del Sur Coastal Road, Taluya-Gumasa Section 12/03/08 XII 14.145 220 O 0.398 0.238 0.100 0.030 0.043 0.100 90.90 -

Jargon Construction & Supply 23474 Const. of 1 unit Sch. Bldg. at Kalawag II 08/29/07 XII 0.372 80 C 0.372 0.075 0.300 - - - 74.70 *74.70% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page224

Page 233: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jargon Construction & Supply 23474 Contruction of Multi-Purpose Building, Brgy. Talahik 03/15/09 XII 0.800 98 C 0.409 0.200 0.300 - - - 90.90 *90.90%

V. Satisfactory

Jargon Construction & Supply 23474 Molo Flood Control 05/28/08 XII 1.888 120 C 0.326 0.300 0.300 - - - 92.60 91.70% Oustanding

Jargon Construction & Supply 23474 Rehab. of Sarangani-Sultan Kudarat Coastal Road (Malisbong Section) 03/18/09 XII 4.746 110 C 0.398 0.200 0.300 - - - 89.80 84.10%

Satisfactory

Jargon Construction & Supply 23474 Road Upgrading, Falls Section. 03/13/09 XII 10.414 217 O 0.362 0.300 0.150 0.015 0.030 0.050 90.70 -

Jargon Construction & Supply 23474 Const. of Additional Building of DPWH Regional Office 09/12/09 XII 9.549 150 C 0.431 0.147 0.300 - - - 87.80 *87.80%

Satisfactory

Jargon Construction & Supply 23474 Sarangani-Davao del Sur Coastal Road, Bigwaay Section 09/17/09 XII 7.548 150 C 0.378 0.184 0.300 - - - 86.20 86.92%

Satisfactory

Jargon Construction & Supply 23474 Const. of 2-CL School Building at Maan NHS 03/06/10 XII 1.328 105 C 0.486 0.138 0.300 - - - 92.40 92.40%

V. Satisfactory

Jargon Construction & Supply 23474Road Upgrading of Isulan Hwy. Jct. Dukay-

Bagumbayan-Sen. Ninoy Aquino Road (Tayugo Section)

03/03/10 XII 13.257 155 O 0.374 0.243 0.150 0.030 0.050 0.033 88.00 -

Jargon Construction & Supply 23474Road Upgrading of Isulan Hwy. Jct. Dukay-

Bagumbayan-Sen. Ninoy Aquino Road (Sitio Katipunan Section)

03/03/10 XII 10.456 128 O 0.320 0.240 0.150 0.030 0.050 0.033 82.30 -

Jaro Builders and Construction Supply 25560 Concreting of Road @ Patas 02/23/09 IV-B 1.443 50 C 0.439 0.133 0.300 - - - 87.20 *87.20%

Satisfactory

Jasa Builders 31330 Const. of MPB @ Agno C/S 08/29/07 I 0.758 80 C 0.238 0.200 0.300 - - - 73.80 *73.80% Satisfactory

Jasa Builders 31330 Construction of Multi-Purpose Building at Alos 03/10/09 I 0.475 40 C 0.425 0.200 0.300 - - - 92.50 *92.50%

V. Satisfactory

Jasa Builders/Alcel Construction (JV) JV-07-071 Rehab./Reconst. of Damaged Paved Nat'l

Roads, Bani-Agno Road 11/28/08 I 18.998 180 C 0.247 0.109 0.300 - - - 65.60 78.17% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page225

Page 234: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jasmig Construction Supply 26069 Const. of Multi-Purpose Building at Brgy. Catandala 05/22/09 IV-A 4.824 90 C 0.452 0.200 0.300 - - - 95.20 *95.20%

V. Satisfactory

Jasmig Construction Supply 26069 Conc. of Road, Brgy. Dayap to Brgy. Butucan & Brgy. Bulihan to Brgy. Looc 08/22/08 IV-A 4.774 90 C 0.363 0.300 0.300 - - - 96.30 *96.30%

Outstanding

Jasmig Construction Supply 26069 Const. of MPB (PICPA Bldg.) 11/22/07 IV-A 0.474 60 C 0.371 0.200 0.300 - - - 87.10 * 87.10% V. Satisfactory

Jasmig Construction Supply 26069 Const. of Open Canal @ Brgy. Coliat 11/24/07 IV-A 0.964 90 C 0.312 0.200 0.300 - - - 81.20 *81.20% V.Satisfactory

Jasmig Construction Supply 26069 Impvt./Rehab. of Catandala Road and Dumantay-Mahacot Road 11/20/08 IV-A 9.648 28 C 0.319 0.300 0.300 - - - 91.90 *91.90%

Outstanding

Jasmig Construction Supply 26069 Impvt./Rehab. of Manila-Batangas Road 03/05/09 IV-A 9.648 30 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory

Jasmig Construction Supply 26069 Impvt./Rehab. of Road at Gulod Itaas 03/05/09 IV-A 9.648 30 C 0.477 0.194 0.300 - - - 97.10 *97.10% Outstanding

Jasmin Construction 9561 Rehabilitation of Quezon-Carangonhan Road 05/20/09 V 2.871 232 C 0.426 0.122 0.300 - - - 84.80 83.90%

Satisfactory

Jasmin Construction 9561 Const. of Bislig Seawall 09/05/09 V 1.681 150 C 0.397 0.188 0.300 - - - 88.50 *88.50% Satisfactory

Jaykris Enterprises 30906 Const. of Road at Lanote St. 11/24/07 IX 0.932 35 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Jaykris Enterprises 30906 Rehab. of Road (Installation of Street Light) 08/24/07 IX 0.275 25 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory

Jay-mar Builder 7900 Completion of Multi-Pupose Building (Phase 2) 02/24/09 NCR 1.906 60 C 0.371 0.169 0.300 - - - 84.00 *84.00%

Satisfactory

Jay-mar Builder 7900 Const. of Two (2) Storey Sch. Bldg., Tambo E/S, Brgy. Tambo 11/12/08 NCR 1.906 60 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-03-06) 07/02/07 NIA-II 4.919 210 C 0.360 0.200 0.000 0.020 0.060 0.200 84.00 84.15%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page226

Page 235: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-07-06) 07/02/07 NIA-II 4.684 210 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

JBGM Construction 19897Road Impv't along Cordon-Diffun-Maddela-

Aurora and its related Roads, Dumanisi-Pimentel Road

03/07/09 II 4.823 150 C 0.439 0.200 0.300 - - - 93.90 *93.90% V.Satisfactory

JBGM Construction 19897Conc./Impvt. along Cordon-Madella-Aurora Bdry. Rd. & its Related Roads (Aurora West-

Cajel Road) and its Related Roads09/03/09 II 19.300 119 C 0.438 0.200 0.300 - - - 93.80 94.58%

V. Satisfactory

JBRC Construction 26019 Impvt. of Bago-Manarang Road 11/19/08 I 1.896 64 C 0.394 0.295 0.300 - - - 98.90 *98.90% Outstanding

J-Bros Construction 27587 Land Development of Sto. Domingo Res. Project, Phase II 6/1-5/09 NHA 44.812 338 C 0.310 0.300 0.000 - - - 60.95 60.95%

Poor

J-Bros Construction 27587 Construction of 3-Storey 15-Classroom School Building 03/19/09 NHA 17.203 150 O 0.337 0.300 0.000 0.030 0.043 0.000 71.00 -

JCO Construction and Supply 32576 Const. of Bridge, Brgy. Kanluran 03/13/09 V 0.658 60 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Satisfactory

JCW Construction 32161 Const./Impvt. of Silago Terminal Bldg. Complex 08/29/07 VIII 0.469 90 C 0.389 0.200 0.300 - - - 88.90 *88.90%

V. Satisfactory

JD Construction 30134 Concreting of Lictin-Yocti-Palawig Road 05/20/09 V 3.829 162 C 0.432 0.133 0.300 - - - 86.50 *86.50% Satisfactory

JD Construction 30134 Construction of Drainage System @ Lanao 02/24/10 V 1.635 120 C 0.403 0.133 0.300 - - - 83.60 83.60% Satisfactory

JDC Builders - Branch 32048 Const. of Multi-Purpose Pavement at Brgy. Monte Alegre 08/25/08 VIII 0.473 60 C 0.345 0.200 0.300 - - - 84.50 *84.50%

V. Satisfactory

JDC Builders - Branch 32048Repair of Pagsangaan Flood Control

Structures along Palompon-Isabele-Merida-Ormoc Road Section

02/26/10 VIII 6.690 402 C 0.432 0.018 0.000 - - - 45.00 63.60% POOR

JDC Builders Branch 32048 Construction of Multi-Purpose Pavement, Brgy. Linao 03/10/09 VIII 0.473 60 C 0.422 0.106 0.300 - - - 82.80 *82.80%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page227

Page 236: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

JDC Builders Branch 32048Repair of Pagsangaan Flood Control

Structure along Palompon-Isabel-Merida-Ormoc Road Section

03/10/09 VIII 6.690 402 O 0.274 0.245 0.150 0.020 0.021 0.050 76.00 -

JDC Builders-Branch 32048 Construction of Multi-Purpose Pavement 05/30/09 VIII 0.948 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory

Jeada Construction 17869 Conc. of Sorsogon Diversion Road 08/13/07 V 5.988 120 C 0.222 0.200 0.300 - - - 72.20 *72.20% Satisfactory

Jecel Constructiion Supply 21956 Construction of Multi-Purpose Building @ Poblacion Padada 05/29/09 XI 0.951 75 O 0.351 0.300 0.150 0.030 0.038 0.033 90.20 -

Jecel Construction Supply 21956 Completion of Multi-Purpose Building at North San Juan 03/18/09 XI 0.510 60 C 0.437 0.133 0.300 - - - 87.00 *87.00%

Satisfactory

Jecel Construction Supply 21956 Const. of MPB @ San Miguel 05/16/08 XI 0.952 60 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Jecel Construction Supply 21956 Const. of MPB @ Upper Limonzo 11/20/08 XI 0.952 75 C 0.371 0.220 0.300 - - - 89.10 86.23% V. Satisfactory

Jecel Construction Supply 21956 Construction of Multi-Purpose Building @ Poblacion 09/05/09 XI 0.951 236 O 0.391 0.240 0.150 0.015 0.029 0.050 87.50 -

Jecel Construction Supply 21956 Const. of Multi-Purpose Building @ Poblacion 02/25/10 XI 0.951 236 C 0.470 0.133 0.300 - - - 90.30 89.29%

V. Satisfactory

Jeff Construction 14774 Const. of Naboongan Bridge, Approaches & Detour, Brgy. Daguit 06/04/09 V 15.665 726 C 0.433 0.133 0.300 - - - 86.60 86.33%

Satisfactory

Jeff Construction 14774 Conc. of Bagong Silang-Capalonga National Secondary Rd. 03/07/08 V 9.450 230 O 0.330 0.240 0.100 0.023 0.045 0.100 83.80 -

Jegma Construction and Development Corporation 14775

Impvt./Conc. of Bogo-Curva-Medellin-Daan Bantayan Road Sta. 125+600-Sta. 127+368;

Sta. 127+653.50-Sta. 128+30009/03/09 VII 19.163 130 C 0.431 0.200 0.300 - - - 93.10 *93.10%

V. Satisfactory

Jegma Construction and Development Corporation 14775

Impvt./Conc. of Bogo-Curva-Medellin-Daan Bantayan Road Sta. 106+800-Sta.

112+911.8009/03/09 VII 100.494 330 O 0.328 0.300 0.150 0.030 0.056 0.050 91.40 -

Jegma Construction and Development Corporation 14775

Impvt. of Cebu-Balamban-Transcentral Highway, Sta. 20+000-Sta. 30+000 (with

exception)09/02/09 VII 38.900 270 O 0.341 0.240 0.150 0.030 0.061 0.050 87.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page228

Page 237: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jegma Construction & Dev't. Corporation 14775 Conc. of Liloy, Zamboanga del Norte-Ipil

Zamboanga, Sibugay 11/21/08 IX 14.314 135 O 0.358 0.240 0.070 0.030 0.030 0.033 76.10

Jegma Construction & Dev't. Corporation 14775 Rehab./Reconst. of Damaged Paved Nat'l

Roads, Camp Lapu-lapu Road 12/04/08 VII 14.318 191 C 0.346 0.200 0.300 - - - 84.60 86.70% V. Satisfactory

Jegma Construction & Dev't. Corporation 14775 Repair/Rehab. of Natalio Bacalso Ave. 12/02/08 VII 9.950 45 C 0.292 0.210 0.300 - - - 80.20 *80.20%

V. Satisfactory

Jegma Construction and Development Corporation 14775 Rehab./Reconst./Upgrading of Damaged

National Roads, Camp Lapu-Lapu Road 06/10/09 VII 2.830 60 C 0.470 0.200 0.300 - - - 97.00 *97.00% Outstanding

Jegma Construction and Development Corporation 14775 Rehab./Reconst. of Bogo-Curva-Medellin-

Daan Bantayan-May Road 06/11/09 VII 39.563 205 C 0.452 0.200 0.300 - - - 95.20 *95.20% V. Satisfactory

Jegma Construction and Development Corporation 14775

Impvt./Conc. of Bogo-Curva-Medellin-Daan Bantayan Road, Sta. 106+800-Sta.

112+911.8006/11/09 VII 96.369 270 O 0.385 0.291 0.150 0.030 0.060 0.033 94.90 -

Jegma Construction and Development Corporation 14775

Impvt. of Cebu-Balamban Transcentral Highway, Sta. 20+000-Sta. 30+000 (with

exceptions) 06/11/09 VII 38.600 240 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 -

Jegma Construction and Development Corporation 14775 Improvement of Multi-Purpose Building,

Brgy. Mambaling 06/09/09 VII 0.949 50 C 0.500 0.167 0.300 - - - 96.70 78.99% Unsatisfactory

Jegma Construction and Development Corporation 14775 Conc. of Liloy Zamboanga Del Norte-Ipil,

Zamboanga Sibugay Road (Phase III) 03/05/09 IX 14.314 130 C 0.418 0.200 0.300 - - - 91.80 82.38% Satisfactory

Jegma Construction and Development Corporation 14775 Conc. of Titay-Ipil National Road,Kitabog

Section 03/05/09 IX 9.533 120 C 0.390 0.200 0.300 - - - 89.00 *89.00% Satisfactory

Jegma Construction and Development Corporation 14775 Improvement of Multi-Purpose Building 03/03/09 VII 0.949 50 O 0.319 0.173 0.150 0.020 0.019 0.033 71.40 -

Jejor's Construction Corporation 5143Rehab./Reconst. (Asphalt to Concrete) of Jct. S.H. Manolo Fortich Libona-Indahag

Road (Gango Section)05/30/09 X 19.217 150 O 0.369 0.300 0.150 0.030 0.043 0.050 94.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page229

Page 238: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jejor's Construction Corporation 5143 Repair/Rehab. of Camiguin Circumferential Road Selective of Concrete Pavement 05/31/09 X 4.797 241 C 0.304 0.102 0.300 - - - 70.60 74.38%

Poor

Jejor's Construction Corporation 5143 Rehab./Impvt. of Camiguin Circ. Road, Tangub Sect. 11/22/08 X 9.554 515 C 0.400 0.300 0.300 - - - 100.00 94.90%

Outstanding

Jejor's Construction Corporation 5143Rehab./Reconst. (Asphalt to Concrete) of Jct. S.H. Manolo Fortich Libona-Indahag

Rd., (Gango Section)09/04/09 X 19.217 180 O 0.388 0.254 0.150 0.030 0.047 0.033 90.20 -

Jejor's Construction Corporation 5143 Replacement of Hubangon Double Barrel Box Culvert to Hubangon Bridge II 03/01/10 X 9.516 180 C 0.447 0.133 0.300 - - - 88.00 88.00%

Satisfactory

Jejor's Construction/Allado Construction-JV JV-06-052 Proposed Reclamation of Back-up Area 11/13-16/07 PPA 31.729 222 O 35.156 25.758 0.070 0.030 0.040 0.100 84.91 -

Jela Construction 17092 Asphalting of Road at Sitio Kalangyawon, Napo 09/11/09 VII 4.836 102 O 0.314 0.266 0.150 0.030 0.040 0.050 85.00 -

Jela Construction 17092 Asphalting of Road at Sitio Kalangyawon, Napo 03/10/10 VII 4.836 102 C 0.398 0.127 0.300 - - - 82.50 84.00%

Satisfactory

Jelm Construction 33230 Completion of 1-CL SB, San Roque E/S 03/18/09 VIII 0.192 120 C 0.443 0.118 0.300 - - - 86.10 *86.10%Satisfactory

Jemak Construction & Supply 32056 Conc. of Eco-Tourism @ Brgy. Guisguis 11/13/07 IV-A 8.878 110 C 0.368 0.200 0.300 - - - 86.80 83.68% V. Satisfactory

Jemak Construction & Supply 32056 Conc. of Mauban-Sampaloc-Lucban-Tayabas Circ. Road, Phase IX 11/15/08 IV-A 33.748 360 C 0.303 0.300 0.300 - - - 90.30 *90.30%

Outstanding

Jemak Construction & Supply 32056 Const. of MPB at Callejon NHS 05/12/08 IV-A 1.341 60 C 0.392 0.227 0.300 - - - 91.90 83.99% V. Satisfactory

Jemak Construction & Supply 32056 Rehab./Impvt. of MSR-Jct. Tiaong-Dolores Road 08/12/08 IV-A 14.389 120 C 0.366 0.300 0.300 - - - 96.60 87.78%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page230

Page 239: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jemak Construction & Supply 32056Rehab./Reconst. and Conc. Paving of Catanauan-Buenavista National Road

(Phase II-Buenavista Sect.)08/14/08 IV-A 14.456 120 C 0.335 0.300 0.300 - - - 93.50 88.40%

V. Satisfactory

Jemak Construction and Supply 32056 Conc. of Gumaca-Pitogo-Mulanay-San Narciso Road 08/25/09 IVA 38.542 180 C 0.382 0.200 0.300 - - - 88.20 86.88%

Satisfactory

Jemak Construction and Supply 32056 Conc. of Tayabas-Mauban-Sampaloc-Lucban Road (Sampaloc-Lucban Section) 08/29/09 IVA 48.218 200 C 0.428 0.133 0.300 - - - 86.10 *86.10%

Satisfactory

Jenzab Construction & Design 30654 Completion of MPB 08/29/08 VII 0.883 60 C 0.282 0.200 0.300 - - - 78.20 *78.20% Satisfactory

Jenzab Construction & Design 30654 Completion of various MPB @ Catmon-daan 03/11/08 VII 1.326 60 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. Satisfactory

Jenzab Construction & Design 30654 Road Conc. At Brgy. Can-Ibuang 08/29/08 VII 1.328 60 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

Jenzab Construction & Design 30654 Const. of Multi-Purpose Building (Covered Gym), San Vicente 09/14/09 VII 1.769 90 C 0.450 0.200 0.300 - - - 95.00 *95.00%

V. Satisfactory

Jenzab Construction & Design 30654 Road Concreting at Barangay Poblacion 09/14/09 VII 1.764 75 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory

Jenzab Construction & Design 30654 Road Concreting at Barangay Sandayong Sur 09/14/09 VII 1.764 75 C 0.411 0.195 0.300 - - - 90.60 *90.60%

V. Satisfactory

Jepa Construction and Supplies 30375 Concreting of Road 02/25/09 III 0.628 60 C 0.322 0.200 0.300 - - - 82.20 *82.20% Satisfactory

Jepa Construction and Supplies 30375 Const. of One (1) CL Sch. Bldg. @ R.E. Cayetano MES, Brgy. Malaya BEPZ 11/18/08 III 0.485 34 C 0.297 0.087 0.300 - - - 68.40 *68.40%

Fair

Jepa Construction and Supplies 30375 Repair/Rehab. of Multi-Purpose Pavement 03/03/08 III 0.456 75 C 0.332 0.209 0.300 - - - 84.10 *84.10% V. Satisfactory

Jepa Construction and Supplies 30375 Const. of Drainage Canal, Barangay Sacrifice Valley 08/27/09 III 0.618 60 C 0.454 0.133 0.300 - - - 88.70 *88.70%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page231

Page 240: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jepa Construction and Supplies 30375 Const. of Water System at Jacoba Subdivision, Brgy. Tuyo 02/19/10 III 2.338 56 C 0.420 0.196 0.300 - - - 91.60 91.60%

V. Satisfactory

Jerber Trading and Construction 19713 Conct. of One (1) CL S/B at Magpapalayok E/S 11/24/08 III 0.468 45 C 0.317 0.200 0.300 - - - 81.70 *81.70%

V. Satisfactory

Jerber Trading and Construction 19713 Rehab. of Gapan-Peñafrancia-Fort Magsaysay Road 08/27/07 III 4.727 30 C 0.307 0.207 0.300 - - - 81.40 *81.40%

V. Satisfactory

Jerry R. Santiago Construction 18453 Bongabon-Rizal-Aurora Road 06/02/09 III 17.369 45 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory

Jerry R. Santiago Construction 18453 Const. of MPB at NEUST, Sumacab Campus 11/24/08 III 3.783 120 C 0.283 0.200 0.300 - - - 78.30 *78.30%

Satisfactory

Jerry S. Santiago Construction 18453 Const. of Multi-Purpose Bldg. at Nueva University of Science and Technology 09/05/09 III 7.283 150 C 0.464 0.133 0.300 - - - 89.70 85.64%

Satisfactory

Jessie Construction Services 29878 Const. of Atok MPB 08/14/08 CAR 0.480 35 C 0.351 0.147 0.300 - - - 79.80 79.80% Satisfactory

Jet Construction Supply 7063Rehab./Recons/Upgrading of Guimaras Circumferential Road, Tumanda-Cabano

Section06/03/09 VI 18.970 135 C 0.404 0.200 0.300 - - - 90.40 *90.40%

V. Satisfactory

Jetver Trading & Construction 25501 Construction of (1CL) School Building Upper Lapu-Lapu PS 06/02/09 IV-B 0.494 120 C 0.344 0.200 0.300 - - - 84.40 *84.40%

Satisfactory

Jetver Trading & Construction 25501 Rehab./Impv't of Caguisan Brgy. Stage 03/04/09 IV-B 0.470 90 C 0.481 0.092 0.300 - - - 87.30 *87.30% Satisfactory

Jetver Trading & Construction 25501 Const. of MPB @ Brgy. Poblacion 08/12/08 IV-B 0.479 120 C 0.359 0.200 0.300 - - - 85.90 82.89% V. Satisfactory

Jetver Trading & Construction 25501 Const. of Sch. Bldg., Tagusao NHS (1 CL) 11/11/08 IV-B 0.947 150 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

Jetver Trading & Construction 25501 Const. of Multi-Purpose Building, Brgy. Alfonso XIII 03/03/10 IVB 0.676 60 O 0.311 0.300 0.150 0.023 0.037 0.050 87.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page232

Page 241: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

JFAP Construction 21706 Improvement (Concreting) of Access Road to Ormoc Port 05/30/09 VIII 1.817 90 C 0.493 0.133 0.300 - - - 92.60 *92.60%

V. Satisfactory

JFAP Construction 21706Repair & Rehabilitation of Palo-Carigara-Ormoc Road, Km 984+753-Km 985+503 w/

exceptions03/10/09 VIII 4.819 150 C 0.355 0.191 0.300 - - - 84.60 *84.60%

Satisfactory

JFJ Construction 32107 Rehabilitation of Sibud Main Drainage 8/10-18/09 NIA 6.446 381 C 0.420 0.200 0.300 - - - 92.01 *92.01% V. Satisfactory

JGC Construction 29157 Const. of MPB, Sampaloc Site 2 Barangay B.F. Homes 06/02/09 NCR 3.815 75 C 0.473 0.133 0.300 - - - 90.60 *90.60%

V. Satisfactory

Jhall Marketing & Services 15760 Const. of MPB in Sto. Rosario 12/03/08 VI 1.369 90 C 0.279 0.300 0.300 - - - 87.90 86.36% V. Satisfactory

Jhall Marketing & Services 15760 Upgrading/Conc. of Capinang-San Dionisio Road 03/17/09 VI 9.545 180 C 0.390 0.187 0.300 - - - 87.70 86.02%

Satisfactory

JHI Construction & Supply 19317 Const. of MPB (Phase V) 11/28/07 I 0.948 50 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory

JHI Construction & Supply 19317 Impvt. of Viray-Depalo River Control Project 05/28/08 I 4.823 75 C 0.367 - 0.500 - - - 86.70 *86.70%

V. Satisfactory

JHI Construction and Supply 19317 Construction of 2CL @ Torres NHS (7x9) 08/27/09 I 0.972 65 C 0.407 0.200 0.300 - - - 90.70 *90.70% V. Satisfactory

JHJ Construction 3781 Const./Completion of DepEd Bldg. (Roof Deck Roofing) Phase I 08/31/07 VI 0.949 0 C 0.364 0.100 0.300 - - - 76.40 *76.4%

Satisfactory

JHJ Construction 3781 Conc. of Passi-San Enrique Rd., Km. 49+740-Km. 52+659.60 with exceptions 02/24/10 VI 24.945 240 O 0.391 0.240 0.150 0.010 0.033 0.050 87.40 -

Jim-Jake Const. & Supply 23377 Conc. of Legazpi Road 08/26/08 I 0.288 60 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Jirk Construction 29918 Const. of Cagayan River Control 05/17/07 II 9.469 240 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -

Jirk Construction 29918 Const. of Drainage Canal 11/11/08 II 1.412 90 C 0.211 0.200 0.300 - - - 71.10 *71.10% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page233

Page 242: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jits Construction Corp. 13232 Construction of 3-Storey 15-Classroom School Building 07/31/09 NHA 18.108 150 O 0.340 0.171 0.150 0.020 0.051 0.050 78.20 -

JJ & J Construction & General Supply 3023 Rehabilitation of Owak Isidro Communal

Irrigation System 10/24/07 NIA-VII 2.377 90 O 0.342 0.300 0.300 - - - 94.20 -

JJ & J Construction and General Supply 30231 Const. of MPB at Brgy. Bacayan 12/03/07 VII 0.479 50 C 0.300 0.000 0.300 - - - 60.00 *60.00%

Poor

JJ & J Construction and General Supply 30231 Const. of Triple Box Culvert 03/12/08 VII 2.874 60 C 0.337 0.200 0.300 - - - 83.70 *83.70%

V. Satisfactory

JJ & J Construction and General Supply 30231 Const./Conc. of 2 lanes Access Road to

New City Hall (Phase I) 03/09/08 VII 4.748 130 C 0.329 0.300 0.300 - - - 92.90 84.50% V. Satisfactory

JJ & J Construction and General Supply 30231 Const./Conc. of 4 lanes Access Road to

New Toledo City Hall 09/04/07 VII 4.748 105 O 0.312 0.300 0.030 0.030 0.035 0.067 77.40 -

JJ & J Construction and General Supply 30231 Repair/Rehabilitation of Road 03/03/09 VII 0.711 60 C 0.376 0.182 0.300 - - - 85.80 *85.80%

Satisfactory

JJ & J Construction and General Supply 30231 Repair/Rehabilitation of Road 03/03/09 VII 0.711 60 C 0.257 0.182 0.300 - - - 73.90 *73.90%

Poor

JJ & J Construction and General Supply 30231 Impvt .of Multi-Purpose Building, Brgy.

Carreta 09/16/09 VII 0.482 65 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding

JJA Construction and Supply 22676 Completion of Bulanao Flood Control 05/27/09 CAR 5.739 120 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory

JJA Construction and Supply 22676 Conc. of Calanan Jct.-Pinukpuk Jct. Road 08/21/07 CAR 4.599 150 C 0.341 0.013 0.300 - - - 65.40 81.24% V. Satisfactory

JJA Construction and Supply 22676 Const. of Dapasen Community Erosion Control 11/14/08 CAR 0.192 120 C 0.147 0.300 0.300 - - - 74.70 *74.70%

Satisfactory

JJA Construction and Supply 22676 Impvt./Conc. of Mapaway-Appas via Ipil Road 08/19/08 CAR 1.107 120 C 0.353 0.200 0.300 - - - 85.30 *85.30%

V. Satisfactory

JL Construction 31720 Impvt. of MPB and Drainage System 11/27/08 CAR 0.953 45 C 0.308 0.200 0.300 - - - 80.80 *80.80% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page234

Page 243: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

JLA Construction and Supplies 24503 Concreting/Improvement of Calinan-Baguio-Cadalian Road 05/25/09 XI 4.795 120 O 0.316 0.300 0.150 0.030 0.046 0.050 89.20 -

JLA Construction and Supplies 24503 Conc./Impvt. of Calinan-Baguio-Cadalian Road 09/02/09 XI 4.795 120 C 0.409 0.200 0.300 - - - 90.90 89.88%

V. Satisfactory

JLP Construction & Supply 26983 Academic Building 3 05/14-15/09 DOST 8.294 120 O 0.383 0.295 0.150 0.030 0.062 0.050 97.00 -

JLP Construction & Supply 26983 Girl's Dormitory 05/14-15/09 DOST 3.960 365 O 0.345 0.300 0.015 0.030 0.059 0.050 79.90 -

JLP Construction & Supply 26983 San Ildefonso Ilocos Sur (Girls Dormitory) 06/05/08 DOST 3.960 120 C 0.308 0.234 0.300 - - - 84.20 84.20% Satisfactory

JLP Construction & Supply 26983 Completion of Dormitory Building 03/2-3/10 DOST 23.192 425 C 0.4464 0.20 0.30 - - - 94.64 93.77% V. Satisfactory

JLP Construction & Supply 26983 Completion of Alaremil Building III 03/2-3/10 DOST 2.294 135 C 0.487 0.20 0.30 - - - 98.70 97.51% V. Satisfactory

JLP Construction & Supply (Formerly: JLP Construction) 26983 Rehab. of 4 Cl Sch.Bldg. (Gabaldon Type)

@ Solsona South E/S 08/15/07 I 2.842 67 C 0.345 0.300 0.300 - - - 94.50 86.73% V. Satisfactory

JLP Construction Supply 26983 San Ildefonso Ilocos Sur (Girls Dormitory) 06/05/08 DOST 3.960 120 C 0.308 0.234 0.300 - - - 84.20 84.20% V. Satisfactory

JLV Construction & Supply 9953 Const. of Taliba-Tejero FMR 11/21/08 IV-A 0.949 80 C 0.250 0.300 0.300 - - - 85.00 *85.00% V. Satisfactory

JLV Construction & Supply 9953 Const./Rehab. of Road 05/23/08 IV-A 0.284 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

JLV Construction & Supply 9953 Const./Rehab. of Road 05/23/08 IV-A 0.284 45 C 0.306 0.210 0.300 - - - 81.60 *81.60% V. Satisfactory

JLV Construction & Supply 9953 Impvt./Rehab. of Multi-Purpose Building @ Brgy. Pantay Matanda 08/29/07 IV-A 3.858 120 C 0.294 0.217 0.300 - - - 81.10 84.67%

V. Satisfactory

JLV Construction and Supply (Formerly: JLV Construction) 9953 Const. of Masaguitsit-Banalo NHS 7m & 9m

Academic Building 09/04/09 IVA 0.559 120 C 0.463 0.133 0.300 - - - 89.60 *89.60% V. Satisfactory

J-Marbel Construction and Supply 24268 Construction of Auditorium 03/19/09 DOST 13.961 169 O 0.350 0.293 0.062 0.030 0.053 0.033 82.05 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page235

Page 244: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J-Marbela Construction and Supply 24268 Land Development of Calabanga Resettlement Project 6/30/09 07/3/09 NHA 9.902 170 C 0.393 0.264 0.300 - - - 95.68 95.68%

V. Satisfactory

J-Marbela Construction and Supply 24268 Opening/Impvt. of San Roque-Carangonhan Brgy. Road 08/13/08 V 9.623 120 C 0.361 0.265 0.300 - - - 92.60 *92.60%

Outstanding

J-Marbela Construction and Supply 24268 Construction of Auditorium 9/17/09 DOST 13.961 169 C 0.4772 0.1956 0.300 - - - 97.28 97.28% Outstanding

JMLD Construction 22679 Conc. of Road at Zone 6, Grijalvo 11/14/07 V 0.279 60 C 0.353 0.200 0.300 - - - 85.30 *85.30% V.Satisfactory

JMT Construction 14186 Conc. of Dapa-Cancohoy del Carmen Road (Sta. Fe Sect.) 11/22/07 XIII 7.638 195 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V.Satisfactory

JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road 08/25/07 XIII 9.522 287 C 0.365 0.300 0.000 - - - 66.50 73.48% Satisfactory

JMT Construction 14186 Replacement of San Isidro Bridge (Phase II) 05/15/08 XIII 19.280 241 C 0.371 0.200 0.300 - - - 87.10 82.18% V.Satisfactory

JMT Construction 14186 Rd. Upgrading ( Gravel to Concrete) Surigao-San Juan Coastal Rd. 09/06/09 XIII 9.485 210 O 0.368 0.200 0.150 0.030 0.055 0.033 83.60 -

JMT Construction 14186 Const. of Water System, Brgy. Balite 03/01/10 XIII 0.943 120 C 0.462 0.133 0.300 - - - 89.50 89.50% V.Satisfactory

JMU Construction 6877 Const. of MPB (Gym Phase I) 08/11/08 II 4.822 120 C 0.260 0.200 0.300 - - - 76.00 76.00% Satisfactory

JMU Construction 6877 Const. of MPB (Muicipal Hall / Annex Bldg.) 02/27/08 II 0.482 60 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory

JMU Construction 6877 Construction of 1 CL Std. Sch. Building @ San Juan Integrated School 11/13/07 II 0.483 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%

V. Satisfactory

JMU Construction 6877 Construction of Multi-Purpose Building (Gym) 08/25/09 II 9.646 180 C 0.451 0.133 0.300 - - - 88.40 90.36%

V.Satisfactory

J'ner Cepada Construction 30212 Impvt. (Concreting) of Access Road to Maasin Port 05/27/09 VIII 1.833 120 O 0.400 0.240 0.150 0.030 0.047 0.050 91.70 -

J'ner Cepada Construction 30212 Construction of Multi-Purpose Building, Brgy. Anahawan 05/28/09 VIII 0.473 40 C 0.438 0.133 0.300 - - - 87.10 *87.10%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page236

Page 245: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

J'ner Cepada Construction 30212 Bolod-Bolod Communal Irrigation Project 7/13-17/09 NIA 6.636 210 C 0.460 0.120 0.300 - - - 87.98 *87.98% Satisfactory

J'ner Cepada Construction 30212 Badiangon-Tahusan Communal Irrigation System 7/13-17/09 NIA 1.654 120 C 0.443 0.120 0.300 - - - 86.25 *86.25%

Satisfactory

J'ner Cepada Construction 30212 Concreting Road, Sta. Sofia-Tangkaan Road 03/05/09 VIII 1.876 75 C 0.356 0.200 0.300 - - - 85.60 *85.60%

Satisfactory

J'ner Cepada Construction 30212 Const. of Libas MPB 05/26/08 VIII 0.995 90 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory

J'ner Cepada Construction 30212Repair/Impvt. of National Road along Ilag-

Liloan Section, Libagon-Liloan Road Section

08/29/08 VIII 4.761 180 C 0.346 0.242 0.300 - - - 88.80 *88.80% V. Satisfactory

J'ner Cepada Construction 30212 Impvt. (Concreting) of Access Road to Maasin Port 09/07/09 VIII 1.833 120 C 0.462 0.133 0.300 - - - 89.50 90.82%

V. Satisfactory

J'ner Cepada Construction 30212 Const. of 7m x 7m Sto. School Building @ Tabunok E/S 02/27/10 VIII 0.476 80 C 0.423 0.200 0.300 - - - 92.30 92.30%

V.Satisfactory

J'ner Cepada Construction 30212 Concreting of Poblacion Road 02/28/10 VIII 0.990 60 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory

Jobel Enterprises 19799 Completion of MPB (Phase 2), Brgy. Salac 02/28/09 IV-A 0.384 30 C 0.391 0.200 0.300 - - - 89.10 *89.10% V. Satisfactory

Jobel Enterprises 19799 Const. of Drainage System 08/21/07 IV-A 0.476 30 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Jobel Enterprises 19799 Const. of MPB 08/14/08 IV-A 0.477 60 C 0.270 0.226 0.300 - - - 79.60 *79.60% Satisfactory

Jobel Enterprises 19799 Const. of One (1) CL School Building @ Coralan E/S 11/17/07 IV-A 0.466 40 C 0.364 0.200 0.300 - - - 86.40 *86.40%

V. Satisfactory

Jobel Enterprises 19799 Impvt./Rehab. of Bridge Approaches, CSCF Jct. 11/19/08 IV-A 2.887 75 C 0.370 0.200 0.300 - - - 87.00 *87.00%

V. Satisfactory

Jobel Enterprises 19799Conc./Widening of Pagsawitan Intersection & other Related Activites along CSCF Jct.

Road, Brgy. Pagsawitan09/01/09 IVA 1.922 69 C 0.399 0.141 0.300 - - - 84.00 *84.00%

Satisfactory

Jocyn Construction 32401Repair and Rehab. of Tagbilaran North

Road (Talibon Section), km. 112+499-Km. 113+849 (with exceptions)

02/26/10 VII 9.253 30 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page237

Page 246: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

John Dee B. Bustamante Construction 30458 Conc. of Ipil-ipil St. 08/24/07 III 0.743 75 C 0.239 0.300 0.300 - - - 83.90 *83.90%

V. Satisfactory

John Dee B. Bustamante Construction 30458 Conct. of 2 CL School Bldg. Carmen T.

Valenzuela E/S 05/26/08 III 0.801 120 C 0.346 0.186 0.300 - - - 83.20 *83.20% V. Satisfactory

John Dee B. Bustamante Construction 30458 Const. of Drainage System along Burgos

Ext. (Gloria St. to Baclaran) 08/25/08 III 0.473 60 C 0.300 0.300 0.300 - - - 90.00 *90.00% V. Satisfactory

John Dee B. Bustamante Construction 30458 Construction of One (1) Unit Science CL,

Rizal, E/S 03/03/09 III 0.808 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory

John Dee B. Bustamante Construction 30458 Completion of Multi-Purpose Building,

Brgy. 02 09/08/09 III 0.476 45 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory

John Dee B. Bustamante Construction 30458 Conc. of Road in front of Baler Sports

Complex 02/27/10 III 0.932 60 C 0.483 0.133 0.300 - - - 91.60 91.60% V. Satisfactory

John Ray Developer & Supplies 20795 Conc. of Kidapawan-Magpet-Pangao-an Road, Mateo Section 11/26/07 XII 5.607 100 C 0.353 0.277 0.300 - - - 93.00 *93.00%

Outstanding

John Ray Developer & Supplies 20795Const. of Drainage Canal along Cotabato-

Davao Road (Central Marketing/Metro Bank Side)

08/27/07 XII 4.508 160 C 0.351 0.300 0.300 - - - 95.10 89.70% V. Satisfactory

Jojo Construction & Dev't. Corp. (Formerly: Jojo Const.) 13174 Const. (Road Opening) of FMR with

Drainage System @ Brgy. Ilayang Iyam 02/23/09 IV-A 1.148 40 C 0.483 0.117 0.300 - - - 90.00 *90.00% V. Satisfactory

Jojo Construction & Dev't. Corp. (Formerly: Jojo Const.) 13174 Impvt. of Flood Control &Drainage along

MSR-Tiaong Section 11/10/08 IV-A 2.381 120 C 0.394 0.200 0.300 - - - 89.40 86.16% V. Satisfactory

Jomar Builders & Supply 9138 Conc. of Municipal Streets, Brgy. 1, 2, 3, & 4 05/29/08 V 0.941 60 C 0.298 0.200 0.300 - - - 79.80 *79.80%

Satisfactory

Jomar Builders & Supply 9138 Rehab./Impvt. of DPWH Camarines Norte DEO 11/27/08 V 1.885 90 C 0.382 0.200 0.300 - - - 88.20 *88.20%

V. Satisfactory

Jomarcann General Construction 30599 Const. of Flood Control along Balili River, Km. 253+000 - Km. 255+000 03/03/08 CAR 9.623 205 C 0.230 0.200 0.300 - - - 73.00 *73.00%

Satisfactory

Jomarcann General Construction 30599 Construction of Farm-to-Market Road, Ambaracao Norte 02/25/09 I 1.924 60 C 0.279 0.200 0.300 - - - 77.90 *77.90%

Unsatisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page238

Page 247: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jomarcann General Construction 30599 Construction of Multi-Purpose Building 03/13/09 CAR 9.631 897 C 0.299 0.200 0.300 - - - 79.90 *79.90% Unsatisfactory

Jomarcann General Construction 30599Repair & Maintenance of Laoag-Sarrat-Piddig-Solsona Road, km. 493+000-km.

501+000, Sarrat Sect.08/21/08 I 4.646 60 C 0.344 0.200 0.300 - - - 84.40 75.73%

Satisfactory

Jomarcann General Construction 30599 Repair and Rehab. of DBM Secretary's Cottage 09/10/09 CAR 6.229 90 C 0.499 0.133 0.300 - - - 93.20 *93.20%

V. Satisfactory

Jomarcann General Construction 30599 Impvt. of Protection Works along Kennon Road, Km.215+500 - 215+850 (vs) 09/10/09 CAR 9.650 163 O 0.377 0.240 0.150 0.030 0.056 0.033 88.60 -

Jometron Engineering & Construction 23147 Concreting of San Vicente Farm-to-Market

Road 05/22/09 V 0.936 90 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory

Jometron Engineering & Construction 23147 Conc. of Donsol-Banuang Road 11/13/07 V 6.465 150 C 0.333 0.194 0.300 - - - 82.70 82.70%

V.Satisfactory

Joni Construction 26023 Construction of Brgy. Cagbonga-Brgy. Maypangdan, Brgy. Cagbonga 06/09/09 VIII 4.759 238 C 0.304 0.133 0.300 - - - 73.70 79.64%

Unsatisfactory

Joni Construction 26023 Completion of Boys Dormitory & Perimeter Fence 05/22/08 DOST 7.049 120 C 0.307 0.287 0.300 - - - 89.40 89.40%

V.Satisfactory

Joni Construction 26023 Completion of Boys Dormitory & Perimeter Fence 05/22/08 DOST 7.049 120 C

Joni Construction 26023 Const. of 1 CL Secondary Sch. Bldg. at Babatngon NHS 12/04/07 VIII 0.503 60 C 0.334 0.200 0.300 - - - 83.40 *83.40%

V. Satisfactory

Joni Construction 26023 Repair/Maintenance of Burayan Revetment 09/02/08 VIII 1.190 60 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory

Jorvivs Construction 6527 Const. of 2 Storey 6 CL Malaybalay City Central School 05/16/08 X 4.242 210 C 0.393 0.226 0.000 - - - 61.90 72.15%

Satisfactory

Joselle Construction 16243 Conc. of Brgy. 2 @ Osmeña Ave. 09/01/08 XIII 2.350 75 C 0.342 0.200 0.300 - - - 84.20 83.54% V. Satisfactory

Joselle Construction 16243 Concreting of Barangay Osmena-Magkiangkang Road 03/16/09 XIII 2.821 150 C 0.459 0.133 0.300 - - - 89.20 *89.20%

V.Satisfactory

Joselle Construction 16243 Const. of Multi-Purpose Building (Covered Court), Brgy. Bit-os 09/16/09 XIII 2.242 120 C 0.480 0.133 0.300 - - - 91.30 93.12%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page239

Page 248: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Joy Construction 14386 Const. of 1 unit 2 Cl at Port Holand E/S 08/22/07 IX 0.675 115 C 0.277 0.188 0.000 - - - 46.50 54.27% Poor

Joy Construction 14386 Impvt./Conc. of Isabela -Maluso National Road, Batungal Section 05/15/08 IX 7.590 80 C 0.233 0.300 0.300 - - - 83.30 79.22%

Satisfactory

Joy-Ann Construction and Supplies 23148 Const. of MPB at Aduana St. City Proper 11/17/08 VI 2.887 120 C 0.333 0.284 0.000 - - - 61.70 59.88% Poor

JQD Construction and General Services 18852 Const. of Maasin City MPB (Training

Center) 05/26/08 VIII 7.189 240 C 0.337 0.200 0.300 - - - 83.70 83.03% V. Satisfactory

JR Contractor 9638 Const. of Drainage System, 11/28/07 V 0.951 150 C 0.267 0.200 0.300 - - - 76.70 78.44% Satisfactory

JR Contractor 9638 Const./Rehab. of Water Supply 03/04/09 V 1.665 90 C 0.474 0.133 0.300 - - - 90.70 85.84% Satisfactory

JR Contractor 9638 Conc. of Batalay Bato Road leading to National Shrine 08/04/09 V 4.780 180 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

JR Contractor 9638 Const./Completion of 1-CL 7.0m x 9.0m Buyo Integrated School Bldg. 02/24/10 V 0.293 60 C 0.437 0.133 0.300 - - - 87.00 87.00%

Satisfactory

JRALD Construction and Trading 33079 Const. of School Building at Floridablanca Integrated School, San Antonio 08/24/09 III 0.573 60 C 0.457 0.133 0.300 - - - 89.00 87.04%

Satisfactory

JRALD Construction and Trading 33079 Const. of School Building Floridablanca Integrated School, San Antonio 05/19/09 III 0.573 60 O 0.384 0.225 0.150 0.030 0.023 0.050 86.20 -

Jrald Construction and Trading 33079 Slope Protection along Porac River 02/16/10 III 4.786 44 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory

JRPF Construction & Trading 31899 Const. of MPB @ Telabastagan E/S 11/19/07 III 0.836 40 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory

JRPF Construction & Trading 31899 Const. of Pandacaqui Resettlement E/S 11/19/07 III 1.901 62 O 0.243 0.252 0.100 0.023 0.038 0.100 76.00 *76.00% Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Argao-Moalboal Road, Intermittent Section 09/05/07 VII 9.601 160 C 0.338 0.300 0.300 - - - 93.80 *93.80%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page240

Page 249: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Bangad-Fort Magsaysay Road, Cabanatuan City & Sta. Rosa 11/22/07 III 19.143 90 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Lipa-Mataas na Kahoy Road, Lipa Section 09/28/07 IVA 14.458 120 C 0.289 0.208 0.300 - - - 79.70 83.54%

V. Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Natalio Bacalso Ave. Dalaguete-Boljo-on Section (Phase 2) 12/04/07 VII 9.600 182 C 0.231 0.300 0.300 - - - 83.10 *83.10%

V. Satisfactory

JSG Construction Company, Inc. 9350 Impvt./Rehab. of Roads at Brgy. San Isidro 11/20/07 IVA 19.280 30 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

JSG Construction Company, Inc. 9350Impvt./Rehab. of Tanauan-Dagami Road,

Cansamada - District IV Sect. with exceptions

02/27/08 VIII 19.296 60 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory

JSG Construction Company, Inc. 9350Rehab./Impvt. Along Calubian-San Isidro-

Tabango-Villaba-Palompon Road, Km. 1005+346 - Km. 1028+355with exceptions

03/01/08 VIII 19.288 30 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory

JSG Construction Company, Inc. 9350Rehab./Impvt. Along Lemon-Leyte-Biliran Road, Km. 0997+000 - Km. 1004+778 with

exceptions02/29/08 VIII 19.288 36 C 0.398 0.200 0.300 - - - 89.80 *89.80%

V. Satisfactory

JSG Construction Company, Inc. 9350Rehab./Impvt. Along St. Rosario-Villaba

Road, Km. 1003+370 - Km. 1014+196 with exceptions

03/01/08 VIII 19.288 30 C 0.391 0.200 0.300 - - - 89.10 *89.10% V. Satisfactory

JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads, Maasin-Malitbog Road 11/22/08 VIII 14.399 140 C 0.355 0.142 0.300 - - - 79.70 *79.70%

Satisfactory

JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads, Malitbog-Bontoc Road 11/22/08 VIII 14.394 140 C 0.376 0.125 0.300 - - - 80.10 *80.10%

V. Satisfactory

JTA Builders 1801 Const. of 2-CL 7.0m x 1.0 m Dulong E/S 09/09/09 X 1.033 60 O 0.379 0.191 0.150 0.030 0.043 0.033 82.60 -

JUF Construction 17987 Const. of Calbayog Diversion Road, Sta. 9+960-Sta. 10+960 03/10/09 VIII 19.089 240 C 0.496 0.196 0.300 - - - 99.20 *99.20%

Outstanding

JUF Construction 17987Rehab. of Damaged Portion of Cagmanipis Bridge along Maharlika Highway, Calbayog-

Allen Road Section05/15/08 VIII 4.820 90 C 0.314 0.200 0.300 - - - 81.40 *81.40%

V. Satisfactory

JUF Construction 17987Repair/Rehab. of Caglanipao Bridge, Daang

Maharlika, Calbayog-Allen Road, Brgy. Caglanipao Tinambacan District

11/29/07 VIII 9.645 60 C 0.369 0.100 0.300 - - - 76.90 *76.90% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page241

Page 250: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

JUF Construction 17987 Repair/Rehab. of Calbayog-Catarman Road (Km. 784+739 to Km. 809+270) 05/17/08 VIII 9.643 210 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Juldan Builders 22810 Conc. of San Leonardo-Peñaranda-Gen. Tinio Road 11/23/07 III 7.458 160 C 0.315 0.200 0.300 - - - 81.50 81.50%

V.Satisfactory

Juldan Builders 22810 Const. of MPB Army Reservist, Camp Tinio 02/26/10 III 0.983 45 C 0.490 0.133 0.300 - - - 92.30 92.30% V.Satisfactory

Julita Builders 13936 Impvt. of Multi-Purpose Building (Student Center), College of Fisheries 06/09/09 VIII 4.823 150 C 0.419 0.133 0.300 - - - 85.20 *85.20%

Satisfactory

Julita Builders 13936Conc. Paving of Critical Portion of National

Circ. Rd., Culaba-Caibiran Rd. (Maurang-Manlabang Rd. Sect.)

08/21/08 VIII 4.761 160 C 0.242 0.200 0.300 - - - 74.20 79.18% Satisfactory

Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) 05/21/08 VIII 1.928 90 C 0.396 0.200 0.300 - - - 89.60 *89.60%

V. Satisfactory

Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) 08/19/08 VIII 0.949 90 C 0.366 0.055 0.300 - - - 72.10 82.25%

V. Satisfactory

Julita Builders 13936 Road Conc. of Brgy. Poblacion to Brgy. Patoc 02/22/10 VIII 1.888 120 C 0.395 0.200 0.300 - - - 89.50 89.50%

V. Satisfactory

Juncynth Const. & General Services 18385 Concreting of San Roque-San Isidro Road 03/06/09 VIII 0.939 114 C 0.414 0.141 0.300 - - - 85.50 *85.50%Satisfactory

Juncynth Construction General Services 18385 Const. of MPB @ Brgy. Anahawan (Phase

I) 05/28/08 VIII 0.469 60 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

Junge Konstrukt 21275 Asphalting of Sunflower St., Brgy. Pasong Tamo 03/09/09 NCR 0.954 15 C 0.402 0.200 0.300 - - - 90.20 *90.20%

V.Satisfactory

Jupa Construction 23577 Construction of Water Supply, Brgy. Sangcol 05/29/09 VIII 2.373 90 C 0.400 0.133 0.300 - - - 83.30 *83.30%

Satisfactory

JUPA Construction 23577 Lipata CIS 7/6-10/09 NIA 2.406 120 C 0.409 0.120 0.300 - - - 82.94 *82.94% Satisfactory

JUPA Construction 23577 Kinabrahan CIS 7/6-10/09 NIA 1.160 90 C 0.401 0.120 0.300 - - - 82.13 *82.13% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page242

Page 251: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Jupa Construction 23577 Rehab./Impvt. of Brgy. Pagsanghan-Lawaan-Ginagdanan Farm-to-Market Road 03/06/10 VIII 9.619 179 C 0.428 0.133 0.300 - - - 86.10 86.10%

Satisfactory

JV Lagon Construction Corporation 11561Rehab./Reconst. of Damaged Roads

Dulawan Marbel (Tacurong-New Carmen Section)

03/13/09 XII 19.022 435 O 0.365 0.300 0.099 0.030 0.035 0.050 87.90 -

JV Lagon Construction Corporation 11561Rehab./Reconst./Upgrading of Damaged Paved National Road along Marbel-Makar

Road09/11/09 XII 14.309 224 O 0.350 0.300 0.000 0.010 0.014 0.000 67.40 -

JV Lagon Construction Corporation 11561 Conc. of Sarangani-Davao Del Sur Coastal Road (Pangyan-Dungon Sect.) 09/17/09 XII 9.424 239 C 0.212 0.200 0.000 - - - 41.20 65.26%

Poor

JV Lagon Construction Corporation 11561Sarangani-Davao Del Sur Coastal Road, Sapu Masla-Kapatan Section Malapatan-

Glan09/16/09 XII 7.010 90 O 0.350 0.000 0.000 0.010 0.015 0.000 37.50 -

JV Lagon Construction Corporation 11561 Rehab./Reconst. of Damaged Paved National Road along Marbel-Makar Road 03/05/10 XII 14.309 233 C 0.396 0.133 0.000 - - - 52.90 62.18%

POOR

JYP General Construction 32985 Repair/Rehab. of 3-Classrooms 05/22/09 CAR 0.237 35 C 0.376 0.200 0.300 - - - 87.60 *87.60% Satisfactory

JYP General Construction 32985 Concreting of FMR, Barangay Sebang 05/21/09 CAR 0.956 30 C 0.330 0.200 0.300 - - - 83.00 *83.00% Satisfactory

JYP General Construction 32985 Const./Rehab. of Pongo-Mangga Small Scale Mining FMR 11/12/08 CAR 0.312 26 C 0.218 0.200 0.300 - - - 71.80 *71.80%

Satisfactory

K.D.C.M. Construction 29023 Conc. of Abra-Kalinga Road (Cagaluan-Ableg Sect.) 05/19/08 CAR 8.952 245 C 0.377 0.200 0.300 - - - 87.70 88.00%

V. Satisfactory

K.D.C.M. Construction 29023 Const. of Flood Control Structures along Chico River from Calanan to Cabaruan 11/21/07 CAR 4.816 158 C 0.360 0.200 0.300 - - - 86.00 *86.00%

V. Satisfactory

Kajima Corporation FC-04-023Const. of Segment 3B-2, Subway (Tunnel)

Section at Cebu City, MCDP III, Cebu South Coastal Road

06/06/09 MCDP 1,367.069 1,247 O 0.357 0.300 0.150 0.030 0.070 0.050 95.70 -

Kajima Corporation FC-99-014 Masao River Impvt. & Const. of Urban Drainage System (S.A. No.5) 06/10/09 XIII 130.000 360 O 0.400 0.300 0.150 0.030 0.056 0.033 96.90 -

Kajima Corporation FC-04-023Const. of Segment 3B-2, Subway (Tunnel)

Section at Cebu City, MCDP III, Cebu South Coastal Road

03/13/10 MCDP 1,625.321 1,367 O 0.391 0.300 0.107 0.030 0.070 0.050 94.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page243

Page 252: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Kajima Corporation FC-99-014 Masao River Impvt. & Const. of Urban Drainage System (S.A. No. 5) 03/11/10 CARBDP 130.000 360 C 0.432 0.200 0.300 - - - 93.20 95.42%

V.Satisfactory

Kajima Corporation FC-04-023Const. of Cebu South Coastal Road

Project, Segment 3B-2, MCDP III, Subway Tunnel Section

03/12/08 CSCRP-MCDP 1,264.367 1,095 O 0.365 0.300 0.100 0.030 0.070 0.100 96.50 -

Kajima Corporation FC-04-023Const. of Cebu South Coastal Road

Project, Segment 3B-2, MCDP III, Subway Tunnel Section

06/05/07 MCDP III 1,264.367 1,095 O 0.358 0.300 0.100 0.030 0.065 0.100 95.30 -

Kajima Corporation FC-04-023Const. of Cebu South Coastal Road

Project, Segment 3B-2, MCDP III, Subway Tunnel Section

11/30/07 MCDP III 1,264.367 1,095 O 0.356 0.300 0.100 0.030 0.070 0.100 96.00 -

Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV FC-04-023 Subic-Clark-Tarlac Expressway Project-

Package 1 12/10-14/07 BCDA-III 13968.698 940 C 0.384 0.300 0.070 0.030 0.065 0.067 91.55 83.27% V.Satisfactory

Kalantas Construction & Development Corporation 23915 Conc. of Kinalablaban Bridge Approaches 08/23/08 XIII 17.074 285 C 0.217 0.200 0.300 - - - 71.70 72.78%

Satisfactory

Kalantas Construction & Development Corporation 23915 Conc. of San Jose Rd. (Bdry. Trento Rd.

Sect.) 09/11/09 XIII 19.137 232 C 0.433 0.131 0.300 - - - 86.40 88.17% Satisfactory

Kamagong Builders & Developers Corporation 1720 Rehab. of Kawit-Noveleta Diversion Road 08/27/08 IV-A 14.448 90 C 0.308 0.300 0.300 - - - 90.80 83.48%

V. Satisfactory

Kamagong Builders & Developers Corporation 1720

Impvt./Widening of Manila-Cavite Road (Kawit-Noveleta Diversion Road) inc.

RROW Acquisition, Brgy. Marulas Sect.03/03/10 IVA 41.894 415 O 0.353 0.300 0.042 0.030 0.055 0.033 81.30 -

Kamagong Builders & Developers Corporation 1720

Impvt./Widening of Manila-Cavite Road (Kawit-Noveleta Diversion Road) inc.

RROW Acquisition, Brgy. Batong Dalig Sect.

03/03/10 IVA 41.894 415 O 0.347 0.300 0.036 0.030 0.055 0.033 80.10 -

Kane Construction, Inc. 2888Impvt./Widening/Conc. of Bontoc-Tabuk-

Tuguegarao Rd., Phase V, Pingao-Tomiagan Section

03/04/09 CAR 47.225 300 O 0.317 0.273 0.150 0.030 0.048 0.050 86.80 -

Kane Construction, Inc. 2888

Impvt./Widening/Conc. of Bontok-Tabuk, Tuguegarao Road, Phase V, Pingao-

Tomitangan Section Km. 467+000-Km. 471+383 with exception

09/02/09 CAR 48.250 325 O 0.380 0.240 0.123 0.030 0.056 0.033 86.20 -

Karpa Builders and Trading 33003 Construction of Road, Camia Street, Barangay Mabuco 05/20/09 III 0.475 60 C 0.416 0.200 0.300 - - - 91.60 *91.60%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page244

Page 253: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Karpa Builders and Trading 33003 Const. of MPB Town Plaza 11/17/08 III 0.476 60 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory

Kasanga Construction 17024 Const. of MPB at Caagutayan 09/04/07 IV-B 0.666 82 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory

Kasanga Construction 17024 Const. of MPB at Panggalaan 08/19/08 IV-B 0.668 75 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory

Kawi Construction 25844 Completion of Lengey MPB (Phase IV) 02/29/08 CAR 2.389 102 C 0.336 0.200 0.000 - - - 53.60 67.11% Fair

Kawi Construction 25844 Completion of MPB Phase III 08/17/07 CAR 0.960 60 C 0.244 0.080 0.000 - - - 32.40 71.74% Satisfactory

KCS Construction & Supply 19641 Road Shouldering (Zone 2) 05/31/09 V 0.141 120 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory

KCS Construction & Supply 19641 Conc. of Cemetery Road, Brgy. Catabangan Proper 11/14/07 V 0.460 90 C 0.323 0.119 0.300 - - - 74.20 *74.20%

Satisfactory

KCS Construction & Supply 19641 Conc. of Road at Cabuyao Road 08/22/08 V 1.912 90 C 0.272 0.300 0.300 - - - 87.20 *87.20% V. Satisfactory

KCS Construction & Supply 19641 Const./Rehab./Repair of Multi-Purpose Buildings 09/02/09 V 0.479 30 C 0.407 0.195 0.300 - - - 90.20 *90.20%

V. Satisfactory

KCS Construction & Supply 19641 Impvt. of Lagonoy-Presentacion Road, Km. 499+491-Km.528+00 with exceptions 09/09/09 V 14.142 231 O 0.346 0.240 0.150 0.030 0.042 0.050 85.80 -

KCS Construction & Supply 19641Rehab./Reconst./Upgrading of Albay West Coast Road (Maonon-Basicao-La Medalla

Pioduran)09/03/09 V 14.425 120 C 0.434 0.133 0.300 - - - 86.70 84.48%

Satisfactory

Kent Construction 8655 Concreting of Road Brgy. Canlanipa 05/28/09 XIII 1.526 156 C 0.472 0.130 0.300 - - - 90.20 *90.20% V. Satisfactory

Kent Construction 8655 Conc. Paving of Dapa-Union Road (One Lane) 11/21/08 XIII 5.732 145 O 0.233 0.200 0.050 0.030 0.032 0.067 61.20 -

Kent Construction 8655 Conc. Paving of Dapa-Union Road (One Lane) 03/07/09 XIII 5.732 145 O 0.325 0.236 0.000 0.030 0.032 0.033 65.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page245

Page 254: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Kent Construction 8655 Const. of MPB (Phase 2) 11/21/08 XIII 0.480 125 C 0.374 0.200 0.000 - - - 57.40 71.82% Satisfactory

Kent Construction 8655 Completion of Multi-Purpose Bldg., Brgy. Washington 09/06/09 XIII 2.411 105 C 0.456 0.133 0.300 - - - 88.90 *88.90%

Satisfactory

Kent Construction 8655 Concreting of Marga-Capayahan Rd. 09/06/09 XIII 1.363 119 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory

Kent Construction 8655 Jct. Osmeña-Pilar Rd.,Maasin 09/03/09 XIII 5.787 381 C 0.461 0.200 0.300 - - - 96.10 78.52% Unsatisfactory

Kent Construction 8655 Conc. Paving of Dapa-Union Rd. (one Lane) 02/26/10 XIII 5.732 135 C 0.405 0.200 0.000 - - - 60.50 62.24% Poor

Kenwood Construction Enterprises 22186 Impvt./Rehab. of DPWH-Sub DEO 05/31/09 I 2.892 180 O 0.357 0.264 0.150 0.030 0.045 0.033 87.90 -

Kenwood Construction Enterprises 22186 Widening/Concreting of McArthur Highway (MNR) including Traffic Management 05/19/09 I 10.060 138 O 0.350 0.201 0.000 0.030 0.050 0.033 66.40 -

Kenwood Construction Enterprises 22186 Conc. of FMR at Brgy. Tarece 05/28/08 I 0.471 90 C 0.256 0.300 0.300 - - - 85.60 82.48% V. Satisfactory

Kenwood Construction Enterprises 22186 Const. of 12 Cl Building with CR 11/23/07 I 4.816 150 C 0.310 0.200 0.300 - - - 81.00 81.00% V.Satisfactory

Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Gym (Phase 1) 08/27/08 I 2.892 70 C 0.336 0.300 0.300 - - - 93.60 *93.60%

Outstanding

Kenwood Construction Enterprises 22186 Construction of Water System at Brgy. Leet 03/06/09 I 2.411 110 C 0.397 0.200 0.300 - - - 89.70 82.22%Satisfactory

Kenwood Construction Enterprises 22186 Rehab. of Acop-San Angel-Salvacion Road 08/26/08 I 9.637 100 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

Kenwood Construction Enterprises 22186 Widening/Concreting of McArthur Highway (MNR) including Traffic Management 03/05/09 I 10.060 138 O 0.303 0.300 0.150 0.030 0.055 0.050 88.80 -

Kenwood Construction Enterprises 22186 Improvement/Rehab. of DPWH Sub-DEO 08/27/09 I 2.893 180 C 0.404 0.190 0.300 - - - 89.40 88.35% Satisfactory

Kenwood Construction Enterprises 22168 Widening/Conc.g of McArthur Highway (MNR) including Traffic Mgt. 03/05/10 I 9.845 323 C 0.302 0.200 0.300 - - - 80.20 78.64%

Unsatisfactory

Kez Enterprises (Formerly: Agripo Construction) 25556 Completion of MPB at Sinayawan 02/24/10 X 0.971 75 C 0.474 0.143 0.300 - - - 91.70 91.70%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page246

Page 255: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

KEZ Enterprises (Formerly: I. Agripo Construction) 25556 Const. of Multi-Purpose Pavement, Purok

17-C, Poblacion 05/26/09 X 0.233 45 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding

KEZ Enterprises (Formerly: I. Agripo Construction) 25556 Const. of Multi-Purpose Building, Tugaya 05/26/09 X 0.935 90 C 0.451 0.139 0.300 - - - 89.00 *89.00%

V. Satisfactory

Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of MPB 08/21/08 X 0.913 60 C 0.264 0.300 0.300 - - - 86.40 82.55%

V. Satisfactory

KGD Builders 21960 Concreting of Road 03/20/09 XII 1.413 75 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory

KGD Builders 21960 Const. of 2-CL Lanton E/S 03/13/08 XII 0.796 90 C 0.384 0.178 0.300 - - - 86.20 *86.20% V. Satisfactory

KGD Builders 21960 Drilling and Const. of Deepwell (Rotary Drilling) 08/30/08 XII 1.124 112 C 0.385 0.200 0.300 - - - 88.50 85.98%

V. Satisfactory

Kilusang Magkaibigan M. P. Cooperative (KMMPC) 31666 Improvement of the Laoag City General

Hospital 03/03/09 I 0.944 45 C 0.354 0.200 0.300 - - - 85.40 *85.40%Satisfactory

Kilusang Magkaibigan M. P. Cooperative (KMMPC) 31666 Const. of DPWH Davao Oriental 1st District

Engineering Office Bldg. 09/11/09 XI 2.885 150 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Improvement of Highway Junction-Lantog

Bandera Road 06/08/09 XI 4.712 180 C 0.390 0.200 0.300 - - - 89.00 82.58% Satisfactory

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Improvement of Brgy. San Isidro-Brgy.

Mabini Farm-to-Market Road 06/08/09 XI 1.882 120 C 0.478 0.200 0.300 - - - 97.80 82.38% Satisfactory

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Conc. of Access Road (Jct. Agusan-Davao

Road) 08/30/07 XI 4.245 120 C 0.331 0.200 0.300 - - - 83.10 87.84% V.Satisfactory

Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Const. of Flood Control (Laoag River) Brgy.

34 02/23/10 I 4.820 96 C 0.409 0.133 0.300 - - - 84.20 84.20% Satisfactory

Kilusang Magkaibigan Multi-Purpose Cooperative (KMMPC) 31666 Renovation of Student Center-USC House 07/08/09 U.P. 0.262 10 C 0.409 0.182 0.300 - - - 89.07 *89.07%

V.Satisfactory

Kilusang Magkaibigan Multi-Purpose Cooperative (KMMPC) 31666 Renovation of E.B. Lopez Hall 07/08/09 U.P. 0.822 90 C 0.479 0.094 0.300 - - - 87.30 *87.30%

Satisfactory

Kilusang Magkaibigan Multi-Purpose Cooperative (KMMPC) 31666 Concreting of Montevista-Compostela-Mati

Road, Araibo Section 09/09/09 XI 1.915 90 C 0.422 0.200 0.300 - - - 92.20 90.16% V.Satisfactory

Kim Harold Trading Manufacturing and Const. 28019 Conc. of PPNR, Taytay El Nido Rd.

(Canduyog-Bato Section) 03/04/08 IV-B 14.097 165 O 0.338 0.240 0.100 0.030 0.056 0.067 83.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page247

Page 256: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL in Central Taytay Naional

High School 08/14/08 IV-B 0.369 173 C 0.384 0.200 0.300 - - - 88.40 *88.40% V.Satisfactory

Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL Roxas North Central Sch. 11/13/08 IV-B 0.376 210 C 0.379 0.200 0.300 - - - 87.90 *87.90%

V.Satisfactory

Kim Harold Trading Manufacturing and Const./Orani Builders & Suuply

(JV)28019 Conc. of PPNR, Taytay El Nido Rd.

(Canduyog-Bato Section) 05/19/08 IV-B 14.097 165 C 0.270 0.300 0.300 - - - 87.00 84.66% V.Satisfactory

Kim-Harold Trading, Manufacturing & Construction 28019 Repair and Rehab. of Concrete Open

Drainage, Brgy. New Barbacan 06/04/09 IV-B 0.094 24 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory

King Gaspar Construction 29984 Construction of Happy Hallow, Farm-to-Market Road 06/03/09 CAR 4.719 88 C 0.394 0.200 0.300 - - - 89.40 *89.40%

V. Satisfactory

King's Builders & Development Corp. 29199 Construction of Community Hospital 05/27/09 IV-B 2.842 150 C 0.405 0.200 0.300 - - - 90.50 84.69% Satisfactory

King's Builders & Development Corp. 29199Completion of Mindoro Or./Occ. East Coastal Road, Lambok-San Francisco

Section02/18/10 IVB 27.583 288 C 0.400 0.200 0.300 - - - 90.00 84.90%

Satisfactory

King's Builders & Development Corporation 29199 Const. of Hospital Building at Poblacion 08/21/08 IV-B 2.836 120 C 0.311 0.200 0.300 - - - 81.10 81.31%

V. Satisfactory

King's Builders & Development Corporation 29199 Const. of Line Canal at Brgy. Sta. Teresita 09/05/07 IV-B 0.941 40 C 0.279 0.229 0.300 - - - 80.80 77.26%

Satisfactory

King's Builders & Development Corporation 29199 Const. of Orcunoma River Control 05/14/08 IV-B 9.413 198 C 0.296 0.269 0.300 - - - 86.50 85.00%

V. Satisfactory

King's Builders & Devt. Corp. / Orient Star Const. (J.V.) 29199 Impvt./Repair of Orconuma Dike 11/12/07 IV-B 4.729 181 C 0.312 0.200 0.300 - - - 81.20 81.20%

V.Satisfactory

Kirskat Venture 32042Conc. of Jct. National Road, Mianay-Duyoc-

Calaan-Panitan Road Km. 93+365-Km. 96+644

06/08/09 VI 11.869 150 C 0.461 0.200 0.300 - - - 96.10 *96.10% Outstanding

Kirskat Venture 32042 Concreting of Maayon-Cuartero Junction, Iloilo-Capiz Road 06/08/09 VI 27.432 180 C 0.441 0.200 0.300 - - - 94.10 *94.10%

V. Satisfactory

Kirskat Venture 32042 Completion of Multi Purpose Gymnasium 06/18/08 DOST 61.723 150 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page248

Page 257: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Kirskat Venture 32042 Completion of PSHS WVC Gymnasium 08/21/08 DOST 8.544 173 C 0.392 0.300 0.300 - - - 99.16 99.16% Outstanding

Kirskat Venture 32042 Const. of Lupgupan Bridge along Iloilo-Capiz Road 12/02/08 VI 9.631 180 C 0.345 0.300 0.300 - - - 94.50 *94.50%

Outstanding

Kirskat Venture 32042 Const. of Maayon River Control 12/02/08 VI 3.197 255 C 0.373 0.200 0.300 - - - 87.30 *87.30% V.Satisfactory

Kirskat Venture 32042Const. of Panay River Control, Brgy. Punta Tabuc-Roxas City, Iloilo-Capiz Road (New

Route)12/02/08 VI 3.656 225 C 0.345 0.200 0.300 - - - 84.50 87.14%

V.Satisfactory

Kirskat Venture 32042 Const. of Side Slope Protection along Iloilo-Capiz (Old Route) 05/26/08 VI 4.815 180 C 0.288 0.200 0.300 - - - 78.80 86.00%

V.Satisfactory

Kirskat Venture 32042

Conc. of Tapaz-Jamindan-Altavas Rd., Agambulong Sect. Km. 85+094.3 - Km.

85+562.8 and Km. 85+614.8 - Km. 86+825.8 with exception

03/02/10 VI 29.332 330 C 0.450 0.146 0.300 - - - 89.60 89.60% V.Satisfactory

Kirskat Venture 32042 Const. of Pob. Tabuc, Mambusao River Control 03/02/10 VI 4.812 150 O 0.360 0.300 0.150 0.020 0.028 0.033 89.10 -

Kirskat Venture 32042 Const. of Jamindan River Control 03/02/10 VI 4.809 150 O 0.336 0.300 0.150 0.020 0.028 0.033 86.70 -

KJC Construction & Supply 33041Impvt./Widening of Bacolod -Murcia-D.S. Benedicto-San Carlos City Road (Wawa

Section)05/26/09 VI 4.520 104 C 0.383 0.200 0.300 - - - 88.30 86.98%

Satisfactory

KLDS Trading & Construction 28091 Const. of MP Building in the Municipality of General Trias 09/08/09 IVA 5.747 116 C 0.360 0.166 0.300 - - - 82.60 *82.60%

Satisfactory

KLDS Trading and Construction 28091 Const. of 2 Storey MPB 08/26/08 IV-A 0.478 60 C 0.375 0.257 0.300 - - - 93.20 *93.20% Outstanding

KLDS Trading and Construction 28091 Drainage Impvt. Along Brgy. Alulod 11/26/07 IV-A 5.281 150 C 0.357 0.200 0.300 - - - 85.70 *85.70% V.Satisfactory

KLDS Trading and Construction 28091 Rehab./Impvt. of Drainage Canal along Silang By-Pass Road 08/22/08 IV-A 0.803 45 C 0.360 0.300 0.300 - - - 96.00 85.32%

V.Satisfactory

Kobey Construction/B.E. Construction (JV) JV-06-065

Const. of Slope Protection of PalaypayBridge along Bugasong-

Valderrama Road05/30/08 VI 4.782 150 O 0.340 0.160 0.100 0.022 0.048 0.200 87.00 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page249

Page 258: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Koronadal V & E Builders and Construction Supply 22187

Rehab./Reconst. of Damaged Paved Road along Marbel-Makar Road Saravia-

Carpenter Hill Section06/06/09 R-XII 13.209 252 C 0.391 0.140 0.300 - - - 83.10 86.10%

Satisfactory

Koronadal V & E Builders and Construction Supply 22187 Construction of Multi-Purpose Building,

Brgy. Lapuz (Bo.6) 06/05/09 R-XII 0.795 98 C 0.331 0.194 0.300 - - - 82.50 *82.50% Satisfactory

Krys-Jon Construction 24624 Agno River Integrated Irrigation Project 7/13-18/09 NIA 4.067 90 C 0.392 0.200 0.300 - - - 89.18 *89.18% V. Satisfactory

Krys-Jon Construction 24624 Construction of Classroom/School Bldg. at NEUST, Sumacab Este 03/04/09 III 0.567 45 C 0.407 0.133 0.300 - - - 84.00 *84.00%

Satisfactory

KSS Hardware Consttruction and Supply 31239 Const. of Multi-Purpose Building at

Poblacion 03/13/09 XII 0.960 104 C 0.451 0.086 0.300 - - - 83.70 *83.70% Satisfactory

Kuntel Construction 10234 Rehab./Conc. of Himamaylan Road Section 02/29/08 VI 8.040 205 C 0.323 0.200 0.300 - - - 82.30 84.82% V. Satisfactory

Kuntel Construction 10234 Widening/Impvt. of Bacolod South Kabankalan Road (Bacolod City Sect.) 11/19/08 VI 7.874 210 C 0.299 0.200 0.300 - - - 79.90 77.18%

Satisfactory

Kuntel Construction 10234Rehab./Reconst./Upgrading of Bacolod North Road, Km. 1+904-Km. 4+293 with

exceptions09/12/09 VI 27.434 270 O 0.347 0.240 0.150 0.030 0.040 0.050 85.70 -

Kuntel Construction 10234Rehab./Reconst./Upgrading of Bacolod North Rd., Km. 1+904 to Km. 4+293 with

exceptions03/06/10 VI 27.434 275 C 0.394 0.200 0.300 - - - 89.40 87.18%

Satisfactory

KV Construction and Supply 17509 Const. of Sahing Flood Control along MWCR 11/21/08 IVB 12.012 130 C 0.240 0.200 0.300 - - - 74.00 75.92%

Satisfactory

KV Construction and Supply 17509 Rehab. of Galocan Bridge along Manila South Road, Malangad-Basud 11/13/07 V 11.441 280 C 0.400 0.154 0.300 - - - 85.40 *85.40%

V. Satisfactory

KVC Construction 28959 Conc. of Baguio-Bontoc- Mt. Data Road (Bun-ayan-Pakya Sect.) 11/14/08 CAR 9.783 180 C 0.234 0.200 0.000 - - - 43.40 54.58%

Poor

KVC Construction 28959 Conc. of Baguio-Itogon Road 03/12/09 CAR 14.308 195 C 0.370 0.192 0.300 - - - 86.20 80.26% Unsatisfactory

KVC Construction 28959 Impvt. Along Acop-Kapangan-Kibungan Road (km. 278+300 - km. 280+760) 11/16/07 CAR 6.704 82 C 0.347 0.000 0.300 - - - 64.70 64.70%

Fair

KVC Construction 28959 Rehab. Along Acop-Kapangan-Kibungan Road 05/26/08 CAR 9.565 150 C 0.368 0.200 0.300 - - - 86.80 80.08%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page250

Page 259: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

KVC Construction 28959 Rehab. Along Kennon Road 03/04/08 CAR 8.412 150 C 0.372 0.192 0.300 - - - 86.40 78.54% Satisfactory

KVC Construction 28959 Construction of Upper Mesh Footpath 08/26/09 CAR 0.230 30 C 0.460 0.133 0.300 - - - 89.30 *89.30% V. Satisfactory

KVCC Construction 27179 Rehab. of Brgy. Imelda-Brgy. Poblacion Road 03/18/09 VIII 1.906 101 C 0.394 0.194 0.300 - - - 88.80 85.08%

Satisfactory

Kyro Builders 19567 Rehab./Reconst. of Jct. Pinagpanaan-Rizal-Pantabangan Road 06/01/09 III 19.297 63 C 0.456 0.198 0.300 - - - 95.40 *95.40%

V. Satisfactory

Kyro Builders 19567 Concreting of Bantug-Sapang Cawayan FMR 06/01/09 III 4.709 60 C 0.328 0.185 0.300 - - - 81.30 82.08%

Satisfactory

Kyro Builders 19567 Conc. of Roads at Sta. Cruz 11/17/08 III 0.936 25 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding

Kyro Builders 19567 Road Upgrading (Rehab./Impvt) of Munoz-Lupao Road 09/04/09 III 14.467 40 C 0.473 0.133 0.300 - - - 90.60 *90.60%

V. Satisfactory

Kyro Builders 19567 Rehab./Reconst. Of San Jose-Lupao Road 03/01/10 III 28.087 90 C 0.381 0.200 0.300 - - - 88.10 88.10% Satisfactory

L & L Construction 15108 Conc. of Initao Road 08/30/07 X 0.960 45 C 0.325 0.300 0.000 - - - 62.50 *62.50% Fair

L & L Construction 15108 Const. of MPB, Brgy. Luyong Bonbon 03/07/08 X 0.964 75 C 0.388 0.226 0.300 - - - 91.40 *91.40% Outstanding

L & L Construction 15108 Conc. of Farm to Market Rd., Casulog Salay 03/02/10 X 0.992 130 O 0.335 0.240 0.150 0.023 0.043 0.033 82.40 -

L M D Construction 9410 Construction of Multi-Purpose Building at Dumalinao Pilot School 06/20/09 IX 4.595 180 O 0.380 0.240 0.150 0.020 0.042 0.050 88.20 -

L. Baltonado Construction & Development Corporation 25250 Conc. of Tabing-Kawayan-Sta.Rosa-Lawis-

Tabango Road 11/24/07 VIII 4.738 120 C 0.385 0.200 0.300 - - - 88.50 88.50% V.Satisfactory

L.A. Arizola Construction & Supply 31060 Conc. of Fatima-Malabog Road 12/04/07 XI 2.694 210 C 0.306 0.300 0.300 - - - 90.60 90.60% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page251

Page 260: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.A. Arizola Construction & Supply 31060 Conc. of Kidapawan Magnet-Pangaon-an Road inc. Marbel Bridge and Approaches 03/09/09 XII 9.485 90 O 0.328 0.240 0.150 0.030 0.035 0.033 81.60 -

L.A. Arizola Construction & Supply 31060 Conc. of Road @ Brgy. Maa 12/03/08 XI 9.441 90 C 0.346 0.300 0.300 - - - 94.60 *94.60% Outstanding

L.A. Arizola Construction & Supply 31060 Impvt./Conc. of Additional 2 lanes from Church of Later Day Saints up to Carmen 11/23/07 XI 4.129 150 C 0.277 0.300 0.300 - - - 87.70 87.70%

V. Satisfactory

L.A. Arizola Construction and Supply 31060 Conc. of Kidapawan-Magpet-Pangao-an Rd., (Km. 1625+680.86-Km.1625+977.30) 09/04/09 XII 4.007 65 C 0.462 0.200 0.300 - - - 96.20 *96.20%

V. Satisfactory

L.A. Clamor Construction 26413 Const. of 2 CL Sch. Bldg. at Canda NHS 11/12/07 IV-A 2.013 50 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory

L.A. Clamor Construction 26413 Const. of One Classroom Academic Building at Manuel Macasaet NHS 08/27/09 IVA 0.598 90 C 0.456 0.200 0.300 - - - 95.60 *95.60%

V. Satisfactory

L.A. Clamor Construction 26413 Const. of Multi-Purpose Building at Bukal Sur National High School 02/17/10 IVA 0.671 60 C 0.499 0.141 0.300 - - - 94.00 94.00%

V. Satisfactory

L.A. Clamor Construction 26413 Const. of Spillway at Kinatihan II 02/17/10 IVA 0.479 45 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory

L.A. Digao Construction 15371 Const. of Multi-Purpose Bldg. Brgy. Capayahan 05/28/09 XIII 1.685 118 C 0.448 0.133 0.300 - - - 88.10 *88.10%

Satisfactory

L.A. Digao Construction 15371 Conc. of Road, Brgy. Poblacion 03/01/10 XIII 0.942 90 C 0.491 0.133 0.300 - - - 92.40 92.40% V.Satisfactory

L.A. Digao Construction 15371 Const. of MPB Brgy. Capayahan 03/01/09 XIII 0.877 90 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory

L.A. Digao Construction 15371 Const. of MPB Brgy. Motorpool, Tubod 03/01/10 XIII 2.352 104 C 0.479 0.133 0.300 - - - 91.20 86.23% Satisfactory

L.C. Construction 7024 Construction/Rehabilitation/Repair of Multi-Purpose Building 06/05/09 IX 0.464 30 C 0.457 0.133 0.300 - - - 89.00 88.79%

Satisfactory

L.C. Construction 7024 Improvement of Access Road, Pagadian City Airport (Lumbia Sect.) 06/05/09 IX 15.346 195 O 0.375 0.238 0.150 0.020 0.042 0.050 87.50 -

L.C. Construction 7024 Const. of 1CL Modified Standard School Building 03/11/09 IX 0.476 40 C 0.462 0.175 0.300 - - - 93.70 *93.70%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page252

Page 261: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.C. Construction 7024 Const. of One (1) unit Modified Sch. Bldg., Lantian Elem. Sch. 11/29/08 IX 0.490 45 C 0.356 0.156 0.300 - - - 81.20 *81.20%

V. Satisfactory

L.C. Construction 7024 Construction/Rehabilitation/Repair of Multi-Purpose Bldg. 03/11/09 IX 0.464 30 O 0.395 0.240 0.150 0.020 0.032 0.050 88.70 -

L.C. Construction 7024 Rehab. of Cagayan de Oro Port Road 03/03/09 X 0.490 14 O 0.275 0.240 0.042 0.020 0.027 0.050 65.40 -

L.C. Construction 7024 Impvt. of Access Roads, Pagadian City Airport, (Lumbia Section) 09/11/09 IX 15.346 256 O 0.335 0.300 0.150 0.023 0.040 0.033 88.10 -

L.C. Construction 7024

Rehab./Reconst./Upgrading of Damaged Paved National Roads at Kolambugan

Section, Sta. 1569+000-Sta.1570+009 w/ exception

09/14/09 X 13.841 120 C 0.354 0.189 0.300 - - - 84.30 *84.30% Satisfactory

L.C. Construction 7024 Rehabilitation of Cagayan De Oro Port Road 09/01/09 X 13.864 197 C 0.442 0.200 0.000 - - - 64.20 64.92%

Poor

L.C. Construction 7024 Widening of Lanao-Pagadian-Zamboanga City Road, Tiguma-Lumbia Sect. (Phase II) 03/05/10 IX 18.675 210 O 0.291 0.287 0.150 0.030 0.047 0.050 85.50 -

L.C. Ting Construction 23666 Conc. of Butuan City-Pianing-Tandag Road 06/08/09 XIII 19.195 255 O 0.363 0.300 0.150 0.030 0.051 0.050 94.40 -

L.C. Ting Construction 23666 Rehab./Reconst. of Surigao City-San Juan Coastal Road 05/28/09 XIII 5.765 60 C 0.441 0.200 0.300 - - - 94.10 *94.10%

V. Satisfactory

L.C. Ting Construction 23666 Const. of Mat-I Bridge & Approaches 05/27/09 XIII 11.822 485 C 0.444 0.200 0.300 - - - 94.40 92.36% V. Satisfactory

L.C. Ting Construction 23666 Const. of Olave Bridge & Approaches, Brgy. Olave 05/27/09 XIII 18.338 560 C 0.405 0.200 0.300 - - - 90.50 85.16%

Satisfactory

L.C. Ting Construction 23666Conc. of Additional Lane along Iligan-Cagayan de Oro-Butuan City Libertad-

Bancasi Section12/05/07 XIII 9.466 150 C 0.297 0.300 0.300 - - - 89.70 79.20%

Satisfactory

L.C. Ting Construction 23666 Conc. of Lake Mainit Circumferential Road 03/03/09 XIII 9.618 195 C 0.379 0.200 0.300 - - - 87.90 84.36% Satisfactory

L.C. Ting Construction 23666 Const. of Damaged Flood Control Structure along Napaliran River 11/24/08 X 9.033 210 C 0.304 0.300 0.300 - - - 90.40 80.95%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page253

Page 262: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.C. Ting Construction 23666 Const. of Matho Bridge and Approaches 05/21/08 XIII 14.368 228 C 0.330 0.300 0.000 - - - 63.00 70.86% Satisfactory

L.C. Ting Construction 23666 Const. of MAT-I Bridge and Approaches 05/29/08 XIII 11.822 255 O 0.342 0.300 0.100 0.030 0.038 0.100 91.00 -

L.C. Ting Construction 23666 Const. of Olave Bridge and Approaches 12/04/08 XIII 18.338 275 O 0.314 0.284 0.050 0.030 0.038 0.100 81.60 -

L.C. Ting Construction 23666 Rehab. of Libertad Bridge along Butuan City-Misamis Oriental Rd. 12/05/07 XIII 10.856 195 C 0.323 0.300 0.300 - - - 92.30 91.16%

Outstanding

L.C. Ting Construction 23666Rehab./Reconst. Along Daang

Maharlika(Surigao-Agusan Rd.) Surigao City-Alegria Sect.

09/06/09 XIII 54.901 210 C 0.480 0.133 0.300 - - - 91.30 *91.30% V.Satisfactory

L.C. Ting Construction 23666 Rehab./Reconst. of Surigao-Agusan Rd., Jct. Bad-as-Sison Sect. 09/06/09 XIII 13.484 60 C 0.444 0.133 0.300 - - - 87.70 *87.70%

Satisfactory

L.C. Ting Construction 23666 Conc. of Butuan City-Pianing-Tandag Rd. 09/14/09 XIII 19.195 255 O 0.282 0.281 0.150 0.030 0.060 0.033 83.60 -

L.C. Ting Construction 23666

Rehab./Reconst. of Damaged Paved National Rds. Along Daang Maharlika Rd. (Agusan-Davao Rd.) Tabon-Tabon-El Rio

Section

02/23/10 XIII 45.220 327 C 0.461 0.133 0.300 - - - 89.40 89.40% V.Satisfactory

L.C. Ting Construction 23666 Conc. of Butuan City-Pianing-Tandag Rd. 03/08/10 XIII 19.195 255 C 0.426 0.133 0.300 - - - 85.90 87.76% Satisfactory

L.C. Ting Construction / Davao L.A. Parts & Hardware Corporation Joint

Venture JV-07-102

Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-Boston)

Manay Section03/05/10 XI 47.218 332 C 0.384 0.200 0.000 - - - 58.40 70.28%

POOR

L.C. Ting Construction / Davao L.A. Parts & Hardware Corporation Joint

VentureJV-07-102

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay

Section11/25/08 XI 47.225 166 O 0.272 0.298 0.100 0.030 0.055 0.067 82.20 -

L.C. Ting Construction / Davao L.A. Parts & Hardware Corporation Joint

VentureJV-07-102

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay

Section03/10/09 XI 47.218 303 O 0.303 0.300 0.021 0.030 0.055 0.033 74.20 -

L.D. Barcelona Construction and Supply 20963 Road Concreting at E.B. Magalona 11/24/08 VI 0.906 60 C 0.328 0.196 0.300 - - - 82.40 82.64%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page254

Page 263: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.G. Lasacar Construction 11960Const. /Impvt. of Mambajao-Catarman

Cross County Road (Phase 4), Mambajao-Catarman Sect.

05/31/09 X 9.483 230 O 0.310 0.236 0.150 0.010 0.022 0.033 76.10 -

L.G. Lasacar Construction 11960 Const. of Road, Sitio Maubog, Balbagon 03/07/09 X 0.949 65 C 0.401 0.133 0.300 - - - 83.40 *83.34% Satisfactory

L.G. Lasacar Construction 11960 Rehab./Conc. of Upper Tupsan Brgy. Road 11/24/07 X 0.920 85 C 0.353 0.300 0.300 - - - 95.30 *95.30% Outstanding

L.G. Lasacar Construction 11960 Const./Rehab. of Protection Works / Seawall, Looc Catarman 09/05/09 X 9.358 270 O 0.318 0.226 0.150 0.020 0.047 0.033 79.40 -

L.G. Lasacar Construction 11960Const./Impvt. of Mambajao-Catarman-

Cross County Road (Phase 4) Mambajao-Catarman Section

09/05/09 X 9.483 225 O 0.296 0.236 0.000 0.030 0.037 0.017 61.60 -

L.G. Lasacar Construction 11960 Impvt./Rehab. of Camiguin Circumferential Road Tangub Section 09/06/09 X 19.004 352 O 0.368 0.012 0.150 0.020 0.037 0.017 60.40 -

L.G. Lasacar Construction 11960 Const./Rehab. of Protection Works/Seawall, Looc, Catarman 03/01/10 X 9.358 280 C 0.481 0.200 0.300 - - - 98.10 86.88%

Satisfactory

L.G. Lasacar Construction 11960Const. of Std. Modified School Bldg. One

(1) Classroom (7m x 9m) Brgy. 18A Primary School

03/03/10 X 0.696 60 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory

L.L.A. Builders 15075 Const. of MPB 08/15/07 IV-A 1.154 110 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding

L.M.G. Construction 5719 Completion of MPB, Brgy. Signal Village 05/29/09 NCR 7.675 120 C 0.448 0.200 0.300 - - - 94.80 85.28% Satisfactory

L.M.G. Construction 5719 Construction of Multi-Purpose Building (Health Center) 06/01/09 III 2.171 75 C 0.471 0.200 0.300 - - - 97.10 *97.10%

Outstanding

L.M.G. Construction 5719 Daang Maharlika (LZ) 11/24/08 III 18.916 300 O 0.334 0.180 0.100 0.020 0.028 0.100 76.20 -

L.M.G. Construction 5719 Daang Maharlika (LZ), Sta. 98+700 to Sta. 101+800 w/ exception 03/04/09 III 18.916 300 C 0.423 0.200 0.300 - - - 92.30 82.64%

Satisfactory

L.M.G. Construction 5719Repair/Rehab./Impvt. of Roadways (Inst. of Road Traffic Safety Devices), SLMAC Road

(So. Dimotol-By PassRd..)11/23/07 III 4.624 25 C 0.224 0.200 0.300 - - - 72.40 *72.40%

Satisfactory

L.M.G. Construction 5719 Repair/Rehab./Impvt. of San Jose-Lupao Road 11/17/08 III 7.023 7 C 0.229 0.300 0.300 - - - 82.90 *82.90%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page255

Page 264: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.M.G. Construction 5719 Sarangani-Davao Del Sur Coastal Road-Glan Padidu-Glan Poblacion Section 09/16/09 XII 7.039 90 C 0.319 0.133 0.300 - - - 75.20 *75.20%

Unsatisfactory

L.N. Salvador Construction 16661 Improvement (Concreting) of Access Road, Calapan Airport Road 05/25/09 IV-B 0.979 45 C 0.411 0.200 0.300 - - - 91.10 *92.70%

V. Satisfactory

L.N. Salvador Construction 16661 Completion of MPB at Pola Central E/S 11/17/08 IV-B 4.803 180 C 0.361 0.200 0.300 - - - 86.10 85.12% V. Satisfactory

L.N. Salvador Construction 16661 Conc. of Road at Barangay San Jose 02/16/10 IVB 3.857 75 C 0.321 0.200 0.300 - - - 82.10 82.10% Satisfactory

L.P.O. Enterprises 20730Const. (Rehab., Replacement, Completion

and Repair) of Two (2) Storey (4) Classroom Sch. Bldg. at San Mateo E/S

11/30/07 IV-A 4.647 120 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Don Jose 11/20/07 IV-A 4.045 120 C 0.364 0.200 0.300 - - - 86.40 83.32% V. Satisfactory

L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Pedro Guevarra MNHS 11/18/08 IV-A 3.632 90 C 0.365 0.279 0.300 - - - 94.40 *94.40%

Outstanding

L.P.O. Enterprises 20730 Const. of MPB (Phase II) 02/28/09 IV-A 1.442 75 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory

L.P.O. Enterprises 20730 Completion of 2-Storey 4-Classroom School Building @ Bugarin E/S 08/25/09 IVA 2.984 60 C 0.476 0.133 0.300 - - - 90.90 *90.90%

V. Satisfactory

L.P.O. Enterprises 20730 Const. of Two (2) Storey, 2-L School Building Pedro Guevarra MHHS 09/01/09 IVA 2.310 84 C 0.467 0.128 0.300 - - - 89.50 *89.50%

V. Satisfactory

L.P.O. Enterprises 20730 Partial Const. of 2-Storey, 4-CL at Dr. Jose Tamayo MES 09/03/09 IVA 0.931 50 C 0.438 0.133 0.300 - - - 87.10 *87.10%

Satisfactory

L.P.O. Enterprises 20730 Const. of MPB (Phase III) 02/23/10 IVA 0.985 50 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory

L.P.O. Enterprises 20730 Construction of Road Brgy. Pinagbayanan 02/23/10 IVA 0.995 57 C 0.347 0.200 0.300 - - - 84.70 84.70% Satisfactory

L.R. De Guzman Construction 10264 Const. of MPB @ Brgy. Sto. Domingo 02/19/10 III 4.677 70 C 0.489 0.158 0.300 - - - 94.70 94.70% V. Satisfactory

L.R. Tiqui Builders, Inc. 13810 Rehab./Reconst./Upgrading along McArthur Highway 05/27/09 NCR 4.747 90 C 0.431 0.200 0.300 - - - 93.10 *93.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page256

Page 265: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.R. Tiqui Builders, Inc. 13810Asphalt Overlay of Daang Maharlika

(Poblacion Aritao-Darapirap Section and Darapidap-Gabut Section)

06/02/09 II 39.996 80 C 0.461 0.133 0.300 - - - 89.40 89.88% V.Satisfactory

L.R. Tiqui Builders, Inc. 13810Const. of Palilihan Bridge #1 inc.

approaches and Road-Right-Of-Way along Roman Expressway

05/21/09 III 90.179 240 O 0.369 0.297 0.150 0.030 0.056 0.050 95.20 -

L.R. Tiqui Builders, Inc. 13810

Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to Mabalacat,

Pampanga, Phase IV, Package I, Meycauayan-Marilao-Bocaue Section

05/30/09 III 188.051 270 C 0.416 0.200 0.300 - - - 91.60 94.60%V. Satisfactory

L.R. Tiqui Builders, Inc. 13810 Impvt./Rehab. of General Alejo Santos Highway including Niugan Bridge No. 3 06/03/09 III 62.066 210 O 0.333 0.300 0.150 0.030 0.055 0.050 91.80 -

L.R. Tiqui Builders, Inc. 13810

Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to Mabalacat, Pampanga, Phase IV, Package II, Balagtas-

Guiguinto Section

05/30/09 III 70.394 180 C 0.349 0.200 0.300 - - - 84.90 90.96%V. Satisfactory

L.R. Tiqui Builders, Inc. 13810Traffic Management along Manila North

Road from Meycauayan, Bulacan-Mabalacat, Pampanga (Package II)

06/02/09 III 138.317 269 O 0.315 0.300 0.150 0.030 0.060 0.050 90.50 -

L.R. Tiqui Builders, Inc. 13810NCR-Bulacan Boundary-Bigte-Ipo Dam

Road Including Replacement of Kay Tialo Bridge

06/01/09 III 47.641 210 C 0.331 0.200 0.300 - - - 83.10 89.34%V. Satisfactory

L.R. Tiqui Builders, Inc. 13810 Rehab/Reconst./Upgrading of Bocaue-San Jose Road 05/28/09 III 44.882 270 O 0.357 0.240 0.150 0.030 0.045 0.050 87.20 -

L.R. Tiqui Builders, Inc. 13810 Impvt./Rehab. of Norzagaray-Bigte Road, Bulacan 3rd Congressional District 06/03/09 III 57.822 180 O 0.249 0.300 0.150 0.030 0.055 0.050 83.40 -

L.R. Tiqui Builders, Inc. 13810 Road Impvt. and Repair of Evangelista St., and Mambog 06/04/09 IV-A 14.395 15 C 0.474 0.133 0.300 - - - 90.70 *90.70%

V. Satisfactory

L.R. Tiqui Builders, Inc. 13810Widening of Road (Biñan, Laguna to

Carmona, Cavite Boundary) Laguna 1st District inc. RROW acquisition

06/01/09 IV-A 48.159 60 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory

L.R. Tiqui Builders, Inc. 13810Construction of Palihan Bridge #1 inc.

Approaches and Road Right-of-Way along Roman Expressway

08/29/09 III 90.178 270 C 0.452 0.200 0.300 - - - 95.20 94.75% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page257

Page 266: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.R. Tiqui Builders, Inc. 13810

Impvt./Widening of McArthur Highway (MNR)-Phase V, Meycauayan (Bulacan) to Mabalacat (Pampanga)-Bocaue-Balgatas-

Guiguinto Sect.)-CP II

09/05/09 III 88.724 180 O 0.371 0.300 0.150 0.030 0.056 0.033 94.00 -

L.R. Tiqui Builders, Inc. 13810Impvt./Widening/Concreting of Manila North Road (MNR)-Phase V (Malolos-

Calumpit Section)-CP I09/05/09 III 110.823 240 O 0.361 0.300 0.150 0.030 0.056 0.033 93.00 -

L.R. Tiqui Builders, Inc. 13810 Impvt./Rehab. of General Alejo Santos Highway inc. Niugan Bridge No. 3 09/09/09 III 62.146 230 O 0.358 0.300 0.150 0.030 0.056 0.033 92.70 -

L.R. Tiqui Builders, Inc. 13810 Impvt./Rehab. of Norzagaray-Bigte Road 09/09/09 III 57.900 200 O 0.345 0.300 0.150 0.030 0.056 0.033 91.40 -

L.R. Tiqui Builders, Inc. 13810 Rehab. of Meycauayan-Camalig Road 09/09/09 III 19.044 169 C 0.467 0.133 0.300 - - - 90.00 *90.00% V.Satisfactory

L.R. Tiqui Builders, Inc. 13810 Rehab. of Bocaue-San Jose Road 09/07/09 III 1.905 73 O 0.379 0.240 0.150 0.030 0.042 0.033 87.40 -

L.R. Tiqui Builders, Inc. 13810 Rehab./Reconst./Upgrading at Bocaue-San Jose Road 09/05/09 III 44.882 270 O 0.352 0.240 0.150 0.030 0.042 0.033 84.70 -

L.R. Tiqui Builders, Inc. 13810Const./Widening of San Marcelino Bridge and Paredes Bridge Carmona-Dasmariñas

Section09/11/09 IVA 46.748 390 C 0.449 0.200 0.300 - - - 94.90 *94.90%

V. Satisfactory

L.R. Tiqui Builders, Inc. 13810 Impvt./Widening of Aguinaldo Highway and other related Road Phase 09/11/09 IVA 60.907 437 C 0.423 0.200 0.300 - - - 92.30 86.72%

Satisfactory

L.R. Tiqui Builders, Inc. 13810 Const. of MPB, Sacred Heart Subdivision, Brgy. Canumay 03/02/10 NCR 3.325 112 C 0.486 0.133 0.300 - - - 91.90 91.90%

V.Satisfactory

L.R. Tiqui Builders, Inc. 13810 Const. of Balagtas and North Food Exchange Interchange 02/22/10 III 106.054 388 O 0.399 0.300 0.150 0.030 0.047 0.033 95.90 -

L.R. Tiqui Builders, Inc. 13810 Const. of Palilihan Bridge and Approaches (Phase IV) 02/18/10 III 24.992 150 O 0.368 0.300 0.150 0.030 0.042 0.050 94.00 -

L.R. Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of Damaged Paved National Road at Pulilan-Calumpit

Rd.03/02/10 III 47.735 120 O 0.353 0.300 0.150 0.030 0.051 0.033 91.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page258

Page 267: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.R. Tiqui Builders, Inc. 13810 Asphalt overlay of Daang Maharlika 03/13/09 II 39.996 80 O 0.388 0.225 0.150 0.030 0.059 0.050 90.20 -

L.R. Tiqui Builders, Inc. 13810 Conc. of Goa-Digdigon-San Isidro Road 11/24/08 V 14.041 90 C 0.211 0.200 0.300 - - - 71.10 78.12% Satisfactory

L.R. Tiqui Builders, Inc. 13810Const. of Palilihan Bridge # 1 including

approaches and Road Right-of-Way along Roman Expressway

02/27/09 III 90.181 240 O 0.351 0.300 0.150 0.030 0.056 0.050 93.70 -

L.R. Tiqui Builders, Inc. 13810 Impv't. & Rehab. of Gen. Alejo Santos Highway 03/12/09 III 82.002 210 C 0.389 0.200 0.300 - - - 88.90 *88.90%

Satisfactory

L.R. Tiqui Builders, Inc. 13810Impvt. (Widening/Conc.) of Mc Arthur

Highway (MNR) Meycauayan to Mabalacat, Pampanga (Phase IV) Package 1

11/21/08 III 188.051 270 O 0.376 0.300 0.100 0.030 0.060 0.100 96.60 -

L.R. Tiqui Builders, Inc. 13810Impvt. (Widening/Conc.) of Mc Arthur

Highway (MNR) Meycauayan to Mabalacat, Pampanga (Phase IV) Package II

11/21/08 III 70.394 180 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -

L.R. Tiqui Builders, Inc. 13810Impvt. (Widening/Conc.) of Mc Arthur

Highway (MNR) Meycauayan to Mabalacat, Pampanga (Phase IV) Package II

03/06/09 III 70.394 180 O 0.366 0.300 0.150 0.030 0.047 0.050 94.30 -

L.R. Tiqui Builders, Inc. 13810 Impvt/Widening of Aguinaldo Highway and other related road Phase II 08/28/08 IV-A 60.022 360 O 0.336 0.240 0.100 0.024 0.028 0.100 82.80 -

L.R. Tiqui Builders, Inc. 13810 Impvt/Widening of Aguinaldo Highway and other related road Phase II 11/11/08 IV-A 60.022 360 O 0.274 0.300 0.100 0.030 0.028 0.100 83.20 -

L.R. Tiqui Builders, Inc. 13810 NCR/Bulacan Bdry.-Bigte-Ipo Dam Road inc. Replacement of Kay Tialo Bridge 11/26/08 III 47.641 210 O 0.358 0.300 0.100 0.030 0.048 0.100 93.60 -

L.R. Tiqui Builders, Inc. 13810 NCR/Bulacan Bdry.-Bigte-Ipo Dam Road inc. Replacement of Kay Tialo Bridge 03/10/09 III 47.641 210 O 0.366 0.300 0.150 0.030 0.038 0.050 93.40 -

L.R. Tiqui Builders, Inc. 13810Reconst. of Tullahan/Ugong Bridge, Gen.

T. de Leon (near NLEX) near Bdry. of Caloocan

03/13/09 NCR 27.065 665 C 0.383 0.200 0.300 - - - 88.30 85.40% Satisfactory

L.R. Tiqui Builders, Inc. 13810 Traffic Management along Manila North Road, MNR from Meycauayan, (Package 2) 03/09/09 TEAM 138.317 239 O 0.371 0.300 0.150 0.030 0.060 0.050 96.10 -

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Const .of Palilihan Bridge No. 1 and

Approaches 11/13/07 III 46.781 195 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page259

Page 268: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Const. (Conc.) of Marikina-Infanta Rd. P-III,

Laguna Side 11/28/07 IV-A 53.040 300 C 0.296 0.200 0.300 - - - 79.60 85.90% V. Satisfactory

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810

Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near NLEX) near Bdry. Of

Caloocan, Valenzuela, M.M.05/29/08 NCR 27.066 90 O 0.368 0.240 0.100 0.030 0.033 0.067 83.80 -

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Roads and Drainage Impvt. Along T.

Santiago St. 08/21/07 NCR 9.428 120 C 0.241 0.200 0.300 - - - 74.10 *74.10% Satisfactory

L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders) 13810

Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near NLEX) near Bdry. Of

Caloocan, Valenzuela, M.M.03/06/08 NCR 27.066 90 O 0.367 0.240 0.100 0.018 0.051 0.100 *87.60 -

L.S. Abelar Construction 31560 Const. of 2 CL School Bldg. @ Wakas Elem. Sch. 11/13/08 IV-A 1.083 60 C 0.359 0.250 0.300 - - - 90.90 *90.90%

Outstanding

L.S. Abelar Construction 31560 Const. of Footbridge @ Brgy. Tanauan 11/15/08 IV-A 0.237 60 C 0.276 0.300 0.300 - - - 87.60 *87.60% V.Satisfactory

L.S. Abelar Construction 31560 Impvt. of Drainage Canal 05/14/08 IV-A 0.096 10 C 0.250 0.200 0.300 - - - 75.00 * 75.00% Satisfactory

L.S. Visorde Construction & Trading 32026 Completion of MPB @ Brgy. Tignoan 08/16/07 IV-A 0.481 60 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory

L.S. Visorde Construction & Trading 32026 Const. of Brgy. Hall & Day Care Center (Part 2) at Brgy. 3 02/26/09 IVA 0.673 40 C 0.435 0.133 0.300 - - - 86.80 *86.80%

Satisfactory

L.S.D. Construction & Supplies 8980 Construction of Sports Center Building 05/23/09 III 23.631 118 C 0.408 0.200 0.300 - - - 90.80 89.33% V. Satisfactory

L.S.D. Construction & Supplies 8980 Asphalt Overlay of Manila North Road (Bamban & Capas Section) 05/22/08 III 9.489 30 C 0.296 0.295 0.300 - - - 89.10 *89.10%

V.Satisfactory

L.S.D. Construction & Supplies 8980 Conc. of San Miguel-Cadre Road 11/14/08 III 7.577 100 C 0.308 0.290 0.300 - - - 89.80 *89.80% V.Satisfactory

L.S.D. Construction & Supplies 8980 Conc. of Sta. Cruz Road 08/21/08 III 2.891 90 C 0.354 0.194 0.300 - - - 84.80 78.68% Satisfactory

L.S.D. Construction & Supplies 8980 Const. of 2 CL Sch. Bldg. @ Maliwalo H/S (Annex) 05/21/08 III 0.811 60 C 0.386 0.150 0.300 - - - 83.60 *83.60%

V.Satisfactory

L.S.D. Construction & Supplies 8980 Construction (Concreting) of Munoz-Lupao Road 03/02/09 III 46.812 150 C 0.332 0.200 0.300 - - - 83.20 *83.20%

Satisfactory

L.S.D. Construction & Supplies 8980 Construction/Rehab/Improvement of Bamban Poblacion Road 03/09/09 III 19.036 150 C 0.340 0.200 0.300 - - - 84.00 *84.00%

Satisfactory

L.S.D. Construction & Supplies/R.R. Ricafort Construction and Supplies

Joint Venture JV-08-241 Rehab/Reconst. and Improvement of

Concepcion-Lapaz Road 09/01/09 III 28.657 150 C 0.465 0.133 0.300 - - - 89.80 85.30% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page260

Page 269: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

L.V. Capule Construction 15578 Completion of Conc. of Road & Drainage @ Fausta 08/21/07 III 2.838 60 C 0.366 0.300 0.300 - - - 96.60 92.46%

Outstanding

LA Arizola Construction and Supply 31060 Conc. of Kidapawan-Magpet-Pangao-an Road, inc. Marbel Bridge and Approaches 05/29/09 R-XII 9.484 126 C 0.373 0.199 0.300 - - - 87.20 83.84%

Satisfactory

La Greta Construction 33080 Impvt.of MPB at Brgy. Progreso 08/15/08 IV-A 0.142 30 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding

LA Milagrosa Enterprises 17404 Conc. of Cabu-an Brgy. Road 08/28/07 X 1.850 145 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

LA Milagrosa Enterprises 17404 Rehab./Conc. of Balite Brgy. Road 11/24/07 X 0.755 95 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding

La Prueba Construction 9923 Construction of Flood Control and Drainage Facilities, Brgy. Tisa 06/09/09 VII 0.946 45 C 0.355 0.133 0.300 - - - 78.80 *78.80%

Unsatisfactory

La Prueba Construction 9923 Construction of Multi-Purpose Building at Brgy. Baliwagan 05/26/09 VII 4.766 120 C 0.302 0.133 0.300 - - - 73.50 61.88%

Poor

La Prueba Construction 9923 Construction of Footbridge 03/12/09 VII 2.958 120 O 0.400 0.000 0.150 0.020 0.016 0.017 60.30 -

La Prueba Construction 9923 Construction of Multi-Purpose Building (Phase II) 03/12/09 VII 4.766 120 O 0.353 0.000 0.150 0.020 0.013 0.033 56.90 -

La Prueba Construction 9923 Const. of Footbridge at Brgy. Capt. Claudio 09/04/09 VII 2.958 144 C 0.408 0.195 0.300 - - - 90.30 79.26% Unsatisfactory

Labb Construction 13524 Concreting of La Union, Candijay-Mabini Road (Sta. 166+670-Sta. 166+846) 06/05/09 VII 2.636 125 O 0.359 0.300 0.131 0.030 0.042 0.033 89.50 -

Labb Construction 13524 Const. of Bridge along Concepcion, Danao-Buenavista Carmen Road 06/06/09 VII 13.914 504 O 0.344 0.263 0.150 0.030 0.047 0.050 88.40 -

Labb Construction 13524 Completion of Multi-Purpose Building/Completion of Municipal Hall 06/05/09 VII 0.929 118 O 0.280 0.300 0.150 0.030 0.043 0.050 85.30 -

Labb Construction 13524 Conc. Paving of Jct. Dat-an, Carmen-Sierra Bullones-Pilar-Alicia Road 03/01/08 VII 9.113 175 C 0.382 0.200 0.300 - - - 88.20 74.82%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page261

Page 270: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Labb Construction 13524 Const. of Bridges along Concepcion, Danao-Buenavista, Carmen Road 03/05/09 VII 13.914 446 O 0.346 0.227 0.150 0.023 0.042 0.050 83.80 -

Labb Construction 13524 Const. of Bridges along Concepcion-Danao-Buenavista Carmen Road 11/19/08 VII 9.564 350 O 0.343 0.238 0.100 0.030 0.037 0.100 84.80 -

Labb Construction 13524 Impvt./Conc. Paving of Jct. LIR Loay-Loboc-Carmen Road 08/24/07 VII 8.760 140 C 0.317 0.300 0.300 - - - 91.70 88.16%

V. Satisfactory

Labb Construction 13524 Reconst. of Napo Bridge along Dauis-Panglao Road 05/13/08 VII 6.502 160 C 0.361 0.300 0.300 - - - 96.10 86.50%

V. Satisfactory

LABB Construction 13524 Concreting of La Union-Candijay-Mabini Rd. (sta. 166+670 Sta 166+840) 09/04/09 VII 2.636 130 C 0.432 0.192 0.300 - - - 92.40 90.66%

V. Satisfactory

LABB Construction 13524 Const. of Bridge along Concepcion-Danao-Buenavista-Carmen Rd. 09/09/09 VII 13.914 559 C 0.448 0.200 0.300 - - - 94.80 89.32%

V. Satisfactory

Labb Construction 13524 Completion of MPB/Completion of Municipal Hall 02/25/10 VII 0.929 240 C 0.400 0.133 0.300 - - - 83.30 84.70%

Satisfactory

Lady of Assumption Enterprises 25360 Const./Impvt. of Multi-Purpose Building at Tomas Oppus 05/26/09 VIII 1.876 240 C 0.437 0.133 0.300 - - - 87.00 84.93%

Satisfactory

Lady of Assumption Enterprises 25360 Const. of Lanao Brgy. Road 11/22/08 VIII 1.889 30 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory

Lady of Assumption Enterprises 25360 Const. of Maria Socorro Bridge 11/21/08 VIII 0.944 45 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

Lady of Assumption Enterprises 25360 Const. of Tomas Oppus MPB 08/29/08 VIII 2.823 307 C 0.378 0.200 0.300 - - - 87.80 87.17% V. Satisfactory

Lady of Assumption Enterprises 25360 Const./Impvt. of Canturing River Control 11/22/08 VIII 0.472 90 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory

Lady of Assumption Enterprises 25360 Rehab./Impvt. of Bato-Bontoc Road 11/30/07 VIII 3.781 247 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory

Lady of Assumption Enterprises 25360 Const./Impvt. of MPB at Poblacion Tomas Oppus 02/28/10 VIII 1.888 120 C 0.468 0.133 0.300 - - - 90.10 90.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page262

Page 271: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lakewood Construction Company 5294 Construction of Flood Control at Brgy. Sanito 09/04/09 IX 9.495 572 C 0.431 0.200 0.300 - - - 93.10 76.40%

Unsatisfactory

Lambayong Construction and Supply 20800 Rehabilitation of Manin Canal (Sta. 16+626-21+714) 9/10-14/07 NIA-I 12.594 150 C 0.250 0.300 0.300 - - - 85.00 84.87%

V.Satisfactory

Lanao Builder & Enterprises 15982 PSHS CVC Academic Bldg. 1 Dormitory Bldg. 1 Ph. 1 04/26/07 DOST 9.59 450 O 0.68 0.300 - - - - 98.00 -

Lanao Builder and Enterprises 15982Rehab./Reconst. of Damaged National

Road along Linamon-Zamboanga Road, Donggo-an Sect.

06/05/09 X 17.145 281 C 0.469 0.167 0.300 - - - 93.60 90.78% V. Satisfactory

Lanao Builder and Enterprises 15982 Conc. of Bacolod-Pagayawan-Munai-Tangkal Road 09/02/07 X 4.645 37 C 0.280 0.200 0.300 - - - 78.00 82.98%

V. Satisfactory

Lanao Builder and Enterprises 15982 Conc. of Bito Abaga National Road 11/30/07 X 9.551 89 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

Lanao Builder and Enterprises 15982 Conc. of Iligan-Bukidnon Road, Sta. Filomena-Bonbonon, Digkilaan-Rogongon 08/29/08 X 27.643 360 C 0.365 0.200 0.300 - - - 86.50 88.80%

V. Satisfactory

Lanao Builder and Enterprises 15982 Conc./Impvt. of Tubod-Ganassi Road 09/01/07 X 13.785 210 C 0.299 0.300 0.300 - - - 89.90 87.74% V. Satisfactory

Lanao Builder and Enterprises 15982 Impvt. of Iligan-Aurora Road (Raw-an-Magpaytao-Lanipao-Abaga Sect.) 11/30/07 X 9.386 73 C 0.387 0.300 0.300 - - - 98.70 90.60%

Outstanding

Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga Roads, Kauswagan Section 08/30/08 X 9.053 120 O 0.333 0.240 0.100 0.030 0.032 0.100 83.50 -

Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga Roads, Linamon Section 12/03/08 X 4.517 90 C 0.358 0.300 0.300 - - - 95.80 86.98%

V. Satisfactory

Lanao Builder and Enterprises 15982 Widening of Kapatagan Poblacion Road along Linamon-Zamboanga Road 09/11/09 X 7.429 152 C 0.471 0.133 0.300 - - - 90.40 88.60%

Satisfactory

Lanao Builders and Enterprises 15982 Completion of ACA Bldg. I (Phase 3) 11/26/08 DOST 11.364 270 O 0.382 0.300 0.000 0.030 0.063 0.050 82.50 -

Lanao Builders and Enterprises 15982 Completion of ACA Bldg., I Phase (Construction) 11/26/08 DOST 11.364 270 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page263

Page 272: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lanao Builders and Enterprises 15982 Completion of ACA Building I (Phase 3) 11/26/08 DOST 11.364 270 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -

Landmark Builders 7400 Completion of MPB (OPD, DOPH 03/06/08 XI 0.472 60 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding

Landmark Builders 7400 Completion of MPB @ Brgy. Matiao (GSP) 05/23/08 XI 1.132 90 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory

Landrock Construction 27541 Construction of Multi-Purpose Building, Litanville 06/08/09 R-XII 0.940 75 C 0.303 0.200 0.300 - - - 80.30 84.22%

Satisfactory

Langit Construction 23462 Construction of Two (2) Storey, Four (4) CL S/B @ Paliparan III E/S 08/23/07 IV-A 1.694 150 C 0.308 0.200 0.300 - - - 80.80 77.37%

Satisfactory

Lano Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga Roads, Kauswagan Section 09/14/09 X 90.053 258 C 0.322 0.200 0.300 - - - 82.20 82.98%

Satisfactory

Larsen-Dutcher Constractor 29172 Rehab. of Roads, Brgy. Viente Reales 11/19/07 NCR 1.884 60 C 0.278 0.200 0.300 - - - 77.80 *77.80% Satisfactory

Larsen-Dutcher Constractor 29172 Repair of MPB 08/21/07 NCR 0.470 60 C 0.315 0.200 0.300 - - - 81.50 *81.50% V. Satisfactory

Laser's Builder 11817 Rehab./Impvt. of Multi-Purpose Building, Various Barangay 05/25/09 NCR 0.708 45 C 0.490 0.133 0.300 - - - 92.30 *92.30%

V. Satisfactory

Laser's Builder 11817 Repair/Rehab. of School Bldg. At C. Ramon Magsaysay E/S 09/14/09 NCR 1.458 45 C 0.457 0.133 0.300 - - - 89.00 *89.00%

Satisfactory

Laser's Builder 11817 Completion of MPB at Brgy. South Triangle 02/26/10 NCR 3.822 108 C 0.382 0.200 0.300 - - - 88.20 88.20% Satisfactory

Laser's Builders 11817 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.956 60 C 0.361 0.200 0.300 - - - 86.10 *86.10%

Satisfactory

LaTorre Builders & Construction 29538 Construction of Seawall Poblacion 02/24/10 VIII 0.950 90 C 0.354 0.200 0.300 - - - 85.40 85.40% Satisfactory

LB Builders Center 14115 Conc. Paving of Calubian-San Isidro Road 11/23/07 VIII 2.844 120 C 0.365 0.200 0.300 - - - 86.50 86.50% V.Satisfactory

LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Cagnocot E/S 11/23/07 VIII 0.469 60 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page264

Page 273: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Villanueva E/S 11/23/07 VIII 0.469 60 C 0.299 0.200 0.300 - - - 79.90 *79.90% Satisfactory

Leadtek Construction Inc. 25978 Const. of Sinanguyan NHS 05/23/07 X 0.595 60 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -

Leadway Construction & Development Corp. (LCDC) 4378 Const. of MPB (Covered Court) 02/18/08 III 1.871 45 C 0.253 0.293 0.300 - - - 84.60 *84.60%

V. Satisfactory

Leadway Construction & Development Corp. (LCDC) 4378

Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan, Bulacan to Mabalacat, Pampanga, Phase IV Package VIII-Replacement of Tulaoc-Sto.Domingo

Bridge & Approaches

03/11/09 III 46.752 150 C 0.454 0.200 0.300 - - - 95.40 *95.40%V. Satisfactory

Leadway Construction & Development Corp. (LCDC) 4378

Impvt./Widening/Conc. of MNR-Phase V-Meycauayan, Bulacan to Mabalacat,

Pampanga-Completion of Tulaoc Bridge and Sto. Domingo Bridge and Approaches

(CP VI)

08/28/09 III 31.028 171 O 0.361 0.300 0.150 0.030 0.050 0.050 94.10 -

Leadway Construction & Development Corp. (LCDC) 4378

Const. of BASA Airbase Access Road (Floridablanca) leading to SCTEX

Interchange08/25/09 III 93.566 240 O 0.369 0.300 0.150 0.030 0.051 0.033 93.30 -

Leadway Construction & Development Corp. (LCDC) 4378

Const. of Access Road (West Lateral Dike) connecting to Hacienda-Dolores-Porac

(SCTEX) Interchange, Hacienda08/25/09 III 123.501 210 C 0.464 0.200 0.300 - - - 96.40 92.80%

V. Satisfactory

Lechi Construction 24196 Construction of Flood Control (Seawall) 06/06/09 VIII 2.833 120 O 0.356 0.240 0.150 0.022 0.037 0.033 83.80 -

Leda Construction Incoporated 12229 Rehab. of Roads along Palo-Carigara-Ormoc Road 09/01/09 VIII 18.891 150 C 0.388 0.200 0.300 - - - 88.80 86.04%

Satisfactory

Leda Construction Incoporated 12229Const. of Jaro-Dagami-Burauen-La Paz

Road Jaro-Dagami-Burauen-La Paz Road Sect.

09/01/09 VIII 18.890 150 C 0.472 0.140 0.300 - - - 91.20 85.50% Satisfactory

Leda Construction Incorporated 12229Rehab. of Roads along Palo-Carigara-

Ormoc Road, Palo-Carigara-Ormoc Road Section

06/05/09 VIII 18.891 150 O 0.347 0.240 0.150 0.030 0.042 0.033 84.20 -

Leda Construction Incorporated 12229 Const. of Jaro-Dagami-Burauen-La Paz Road, Jaro-Dagami-La Paz Road Section 06/05/09 VIII 18.890 150 O 0.322 0.240 0.150 0.030 0.042 0.033 81.70 -

Leda Construction Incorporated 12229Concrete Paving of Jct.(LIR), Buenavista,

Carmen-Danao-Getafe Rd. Poblacion Danao Sect.

09/09/09 VII 9.614 240 O 0.356 0.240 0.150 0.030 0.037 0.033 84.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page265

Page 274: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Leda Construction Incorporated 12229 Cons. of Concepcion, Danao-Buenavista, Carmen Rd.Danao & Dagohoy 09/09/09 VII 14.070 412 O 0.351 0.240 0.150 0.030 0.037 0.033 84.10 -

Leda Construction Incorporated 12229 Jct. (LIR) Buenavista-Carmen-Danao-Getafe Rd. 09/09/09 VII 12.184 450 O 0.344 0.240 0.150 0.030 0.037 0.033 83.40 -

Leda Construction Incorporated 12229Const. of Pontaas Bridge along

Buenavista, Carmen- Concepcion Danao Rd.

09/09/09 VII 18.773 488 O 0.346 0.300 0.043 0.030 0.037 0.033 78.90 -

Leda Construction Incorporated 12229Const. Of Pontaas Bridge along

Buenavista, Carmen- Concepcion Danao Rd.

02/27/10 VII 18.773 519 C 0.484 0.134 0.300 - - - 91.80 88.52% Satisfactory

Leda Construction Incorporated 12229Concrete Paving of Jct. (LIR) Buenavista-

Carmen-Danao-Getafe Road Poblacion Danao Section

02/27/10 VII 9.614 308 C 0.425 0.139 0.300 - - - 86.40 87.03% Satisfactory

Leda Construction Incorporated 12229 Const. Of Concepcion, Danao-Buenavista, Carmen Rd., Danao & Dagohoy 02/27/10 VII 14.070 555 O 0.348 0.249 0.150 0.030 0.040 0.050 86.70 -

Leda Construction Incorporated 12229 Impvt./Const. of Concepcion-Danao-Buenavista-Carmen Road 02/23/10 VII 19.036 240 C 0.449 0.087 0.300 - - - 83.60 84.14%

Satisfactory

Leda Construction Incorporated (Formerly: Leda Const.) 12229 Conc. of Jaro-Dagami-Burauen-La Paz

Road 08/20/08 VIII 18.890 150 C 0.284 0.199 0.300 - - - 78.30 83.04% V. Satisfactory

Leda Construction Incorporated (Formerly: Leda Const.) 12229 Conc. of Jaro-Dagami-Burauen-La Paz

Road, Jaro Section 11/20/07 VIII 12.280 150 C 0.317 0.200 0.300 - - - 81.70 83.92% V. Satisfactory

Leda Construction Incorporated (Formerly: Leda Const.) 12229 Conc. of Sta. Fe-Magtangtang to Francisco

Dagohoy Caves 11/29/08 VII 4.740 160 C 0.288 0.300 0.300 - - - 88.80 88.47% V. Satisfactory

Leda Construction Incorporated (Formerly: Leda Const.) 12229 Const. of Concepcion, Danao-Buenavista,

Carmen Road 03/05/09 VII 14.070 412 O 0.400 0.300 0.150 0.030 0.030 0.050 96.00 -

Leda Construction Incorporated (Formerly: Leda Const.) 12229

Construction of Pontaas Bridge along Buenavista, Carmen-Concepcion-Danao

Road03/05/09 VII 18.773 418 O 0.367 0.255 0.150 0.030 0.040 0.050 89.20 -

Leda Construction Incorporated (Formerly: Leda Const.) 12229 Rehab. of Palo-Carigara-Ormoc Road 03/16/09 VIII 18.889 150 C 0.316 0.154 0.300 - - - 77.00 82.10%

Satisfactory

Leda Construction Incorporated (Formerly: Leda Const.) 12229

Rehab./Impvt. of Palo-Carigara-Ormoc-Baybay-Maasin Road, Palo-Carigara-Ormoc-

Baybay-Maasin Road Section02/27/08 VIII 11.338 150 C 0.213 0.200 0.300 - - - 71.30 *71.30%

Satisfactory

Leda Construction Incorporated (Formerly: Leda Const.) 12229 Rehab./Impvt. of Seawall 03/04/09 VII 10.881 378 C 0.401 0.200 0.300 - - - 90.10 86.68%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page266

Page 275: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Leda Construction Incorporated (Formerly: Leda Construction) 12229

Const. of Pontaas Bridge along Buenavista, Carmen Concepcion, Danao

Rd.06/06/09 VII 18.773 444 O 0.351 0.300 0.150 0.030 0.045 0.033 90.90 -

Leda Construction Incorporated (Formerly: Leda Construction) 12229 Jct. (LIR) Buenavista-Carmen-Danao-Getafe

Road 06/06/09 VII 12.184 334 O 0.362 0.277 0.150 0.030 0.047 0.033 89.90 -

Leda Construction, Incorporated 12229 Road Reblocking Real St., Poblacion 02/22/10 VIII 0.944 75 C 0.379 0.200 0.300 - - - 87.90 87.90% Satisfactory

Legacy Construction 22465 Construction and Improvement of Punta Taytay Main Drainage 8/10-18/09 NIA 5.936 421 C 0.366 0.200 0.300 - - - 86.57 *86.57%

Satisfactory

Legacy Construction 22465 Const. and Improvement of Punta Taytay Main Drainage 3/16-21/09 NIA 5.936 408 O 0.344 0.192 0.150 0.030 0.057 0.050 82.29 -

Legacy Construction 22465 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 6.636 231 C 0.468 0.247 0.200 - - - 91.50 91.50%

V. Satisfactory

Legacy Construction 22465 Rehab./Recons./Upgrading of Dumaguete North Rd. (Calo Rd. Sec.) 09/12/09 VII 26.856 200 O 0.386 0.240 0.150 0.030 0.037 0.033 87.60 -

Legazpi Premium Development Corporation 20701 Opening/Construction of Taladong-

Caguiba Road (Phase II) 05/18/09 V 14.250 171 C 0.437 0.183 0.300 - - - 92.00 83.15% Satisfactory

Legazpi Premium Development Corporation 20701 Channelization of Lower Mabini River 08/20/07 V 13.377 90 C 0.389 - 0.500 - - - 88.90 *88.90%

V. Satisfactory

Legazpi Premium Development Corporation 20701 Completion of Tokyo Bridge and

Approaches 11/15/08 V 32.570 270 C 0.356 0.092 0.300 - - - 74.80 72.40% Satisfactory

Legazpi Premium Development Corporation 20701 Const. of Tilod Bridge Approaches &

Detour 11/14/08 V 15.684 270 C 0.388 0.235 0.300 - - - 92.30 86.84% V. Satisfactory

Legazpi Premium Development Corporation 20701 Dredging of Hicming River (Downstream) 08/12/08 V 19.177 210 C 0.375 - 0.500 - - - 87.50 89.72%

V. Satisfactory

Legazpi Premium Development Corporation 20701 Viga Pilot Bridge and Approaches along

Viga-Panganiban Road 09/05/09 V 17.346 820 C 0.476 0.172 0.300 - - - 94.80 83.39% Satisfactory

Legazpi Premium Development Corporation 20701 Const. of the Extension of Tabaco City

Public Market 02/22/10 V 11.568 159 O 0.380 0.240 0.150 0.030 0.040 0.050 89.00 -

Legazpi Premium Development Corporation 20701 Opening/ Impvt. of Sitio Tina-Sitio Nauasan

Rd. (Phase I) 02/27/10 VI 40.515 310 O 0.382 0.300 0.129 0.020 0.028 0.017 87.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page267

Page 276: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Legazpi Premium Development Corporation 20701 Widening/Imprv't. of Brgy. Luctoga- Brgy.

Manika Rd. 02/27/10 VI 36.660 340 C 0.388 0.175 0.300 - - - 86.30 86.30% Satisfactory

Legazpi Premium Development Corporation 20701 Widening/Imprv't. of Lupaan-Tigunhao rd.,

Sta. 6+140 - 7+800 02/26/10 VI 19.297 270 C 0.360 0.168 0.300 - - - 82.80 82.80% Satisfactory

Lehci Construction 24196 Const./Repair of 2-CL School Building, San Isidro E/S 06/09/09 VIII 1.249 90 C 0.491 0.184 0.300 - - - 97.50 *97.50%

Oustanding

Lehci Construction 24196 Conc. Paving of Tigbao-Sta. Fe-San Miguel Rd. 09/04/08 VIII 8.548 175 C 0.317 0.200 0.300 - - - 81.70 82.72%

V. Satisfactory

Lehci Construction 24196 Const. of MPB at Eastern Visayas State University, Phase III 12/07/07 VIII 3.374 150 C 0.370 0.100 0.300 - - - 77.00 *77.00%

Satisfactory

Lehci Construction 24196 Const. of Seawall at Cogon 12/04/07 VIII 0.962 90 C 0.376 0.200 0.300 - - - 87.60 *87.60% V.Satisfactory

Lehci Construction 24196 Repair/Rehab. of Mahayahay Creek 05/29/08 VIII 4.747 100 C 0.288 0.200 0.300 - - - 78.80 79.88% Satisfactory

Lehci Construction 24196 Impvt. (Conc.) of Access Road to Airport, Tacloban Airport Road 09/18/09 VIII 19.300 208 C 0.403 0.200 0.300 - - - 90.30 *90.30%

V. Satisfactory

Lehci Construction 24196 Construction of Flood Control (Seawall) 09/01/09 VIII 2.833 120 C 0.418 0.200 0.300 - - - 91.80 87.00% Satisfactory

Lehci Construction 24196 Const. of Riprap Seawall, Brgy. West Visoria 02/23/10 VIII 1.889 120 C 0.331 0.200 0.300 - - - 83.10 83.10%

Satisfactory

Lenvoisa Construction 216721

Financing and Development of the Fifty (50) Hectares Reserved Area for Socialized

Housing under a Joint Venture arrangement (Phase II)

09/26/07 NHA 154.223 270 O 0.382 0.300 0.100 0.024 0.042 0.100 94.80 -

Lenvoisa Construction, Incorporated 216721

Financing and Dev't. of the fifty(50) hectares reserved area for socialized

housing under joint venture arrangement, Phase II

01/11/08 NHA 154.223 270 O 0.39 0.3 0.1 0.03 0.06 0.1 98.00 -

Lenvoisa Construction, Incorporated 216721 NBP Resettlement Project, Phase II 09/26/07 NHA 154.223 270 O 0.382 0.3 0.1 0.024 0.042 0.1 94.80 -

Leo-J Construction Services 27248 Const. of Slope Protection along Maculcol River Downstream 08/16/08 III 4.753 90 C 0.373 0.120 0.300 - - - 79.30 *79.30%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page268

Page 277: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Leo-J Construction Services 27248Const./Rehab./Replacement/Completion and Repair of Elementary & Secondary

School Bldg., La Paz08/02/09 III 9.506 120 C 0.475 0.133 0.300 - - - 90.80 *90.80%

V. Satisfactory

Leymarc Construction 22094 Completion of Zamboanguita Shoreline Protection 12/26/07 VII 0.889 80 C 0.252 0.300 0.300 - - - 85.20 *85.20%

V. Satisfactory

Leymarc Construction 22094 Const. of Dumaguete Flood Control, Dumaguete North Road 11/26/08 VII 4.717 140 C 0.293 0.184 0.300 - - - 77.70 79.74%

Satisfactory

Leza Construction and Supply 25565 Const. of 1 CL School Bldg. @ Buenlag NHS 03/04/08 I 0.494 71 C 0.334 0.200 0.300 - - - 83.40 87.74%

V. Satisfactory

Leza Construction and Supply 25565 Const. of Drainage Canal System at Tuliao 11/26/08 I 4.822 120 O 0.267 0.200 0.100 0.020 0.028 0.133 74.80 -

Leza Construction and Supply 25565 Const. of MPB at Turac E/S 05/28/08 I 1.928 130 C 0.273 0.300 0.300 - - - 87.30 *87.30% V. Satisfactory

Leza Construction and Supply 25565 Construction of Drainage System at Tuliao 03/06/09 I 4.822 120 C 0.434 0.200 0.300 - - - 93.40 82.24%Satisfactory

Leza Construction and Supply 25565 Construction/Completion/Repair of 1 Classroom, Doyong Malabago E/S 03/06/09 I 0.482 150 C 0.438 0.180 0.300 - - - 91.80 *91.80%

V. Satisfactory

Leza Construction and Supply 25565Repair and Rehab. of Pagal Bridge along

Carmen Jct.-Bayambang-San Carlos-Manat Road

05/28/08 I 0.481 30 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding

Leza Construction and Supply 25563 Const. of MPB at Magtaking (Phase II) 03/01/10 I 1.526 150 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory

Leza Construction and Supply 25563 Const. of MPB Lilimasan (Phase II) 03/01/09 I 1.000 150 C 0.365 0.200 0.300 - - - 86.50 86.50% Satisfactory

Leza Construction and Supply 25563 Const. of MPB at Tandoc (Phase II) 03/01/10 I 1.526 150 C 0.364 0.200 0.300 - - - 86.40 86.40% Satisfactory

LGC Trucking and Construction 14464 Conc. of Talacogon-La Paz-Loreto-Veruela-Sta. Josefa Marbon Section 06/09/09 XIII 9.483 382 C 0.409 0.200 0.300 - - - 90.90 86.70%

Satisfactory

LGC Trucking and Construction 14464 Const. of Andanan Flood Control Phase II 05/24/08 XIII 9.374 120 O 0.350 0.200 0.100 0.030 0.043 0.200 92.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page269

Page 278: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

LGC Trucking and Construction 14464 Impvt. of Bank Protection of Mapaga RCDG Bridge 09/01/08 XIII 6.591 135 C 0.320 0.200 0.300 - - - 82.00 85.06%

V. Satisfactory

LGC Trucking and Construction 14464 Const. of Tolosa-BLISS Rd. Tolosa 09/01/09 XIII 0.999 60 C 0.462 0.133 0.300 - - - 89.50 *89.50% V.Satisfactory

LGC Trucking and Construction 14464 Const. of Maparasan Primary School, San Roque 09/11/09 XIII 0.668 90 C 0.454 0.140 0.300 - - - 89.40 *89.40%

V.Satisfactory

LGC Trucking and Construction 14464 Const. of MPB (SURSECO-1 Gym), Brgy. San Fernando 03/04/10 XIII 1.903 165 O 0.387 0.240 0.150 0.030 0.047 0.033 88.70 -

LGC Trucking and Construction 14464 Rehab./Const. of Manapa Footbridge 02/22/10 XIII 1.925 105 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory

LGC Trucking and Construction 14464Const. of Flood Control

Structures/Shoreline Protection, Guava Jct., Brgy. Poblacion

03/04/10 XIII 0.954 165 O 0.360 0.240 0.150 0.030 0.047 0.050 87.70 -

LGC Trucking and Construction 14464 Conc. of Purok 1, 2, 3, & 5 at Caramcam District 03/04/10 XIII 3.337 120 O 0.371 0.240 0.150 0.030 0.045 0.033 86.90 -

Liberty Builders and Development Corporation 7224 Restoration of the Burnt Bureau of

Immigration Main Bldg. 03/10/09 Sp. Bldgs 30.029 645 C 0.467 0.000 0.300 - - - 76.70 83.56% Satisfactory

Ligao Sto. Niño 9279 Rehabilitation of Canal Network (package 1) 08/15/07 NIA-V 10.323 150 O 0.283 0.200 0.100 0.018 0.033 0.200 83.40 -

Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao Resettlement

Project 12/18-21/07 NHA 9.974 150 O 0.299 0.262 0.1 0.03 0.019 0.1 81.00 -

Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao Resettlement

Project 6/18-20/08 V 9.969 150 C 0.330 0.300 0.300 - - - 93.00 93.00% V.Satisfactory

Likayan Construction 32714 Const. of 2-CL, Rooms-Sayapot PS 05/23/09 CAR 0.866 100 C 0.466 0.116 0.300 - - - 88.20 *88.20% Satisfactory

Lim General Contractor 8482 Rehab./Reconst. of Tablas Circumferential Road, Alcantara-Looc Section 05/22/09 IV-B 18.798 167 C 0.268 0.200 0.300 - - - 76.80 79.62%

Unsatisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page270

Page 279: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lim General Contractor 8482 Conc. of Buenavista-Cawayan Road (Cawayan Side) 08/25/08 V 28.798 120 C 0.336 0.239 0.300 - - - 87.50 77.54%

Satisfactory

Lim General Contractor 8482 Conc. of Masbate-Cataingan Road, Balatucan-Uson Sect. 05/20/08 V 9.498 60 C 0.288 0.200 0.300 - - - 78.80 77.72%

Satisfactory

Lim General Contractor 8482 Const. of Bagumbayan Bridge, Approaches, and Detour 08/22/08 V 15.940 210 C 0.241 0.200 0.300 - - - 74.10 76.20%

Satisfactory

Lim General Contractor 8482 Const. of Buyo Bridge, Approaches & Detour 11/20/07 V 19.200 270 C 0.199 0.123 0.300 - - - 62.20 70.87%

Satisfactory

Lim General Contractor 8482 Const. of Jct. Guinhayan-Malbog-Sta. Fe Road (leading to San Jose Island) 11/24/08 IV-B 18.798 180 C 0.317 0.200 0.300 - - - 81.70 83.86%

V. Satisfactory

Lim General Contractor 8482 Const. of San Fernando North Road, San Fernando Section 11/20/07 V 11.000 120 C 0.235 0.135 0.300 - - - 67.00 73.42%

Satisfactory

Lim General Contractor 8482 Const. of San Fernando South Road, Batuan Section 11/20/07 V 11.250 120 C 0.195 0.109 0.300 - - - 60.40 71.68%

Satisfactory

Lim General Contractor 8482Rehab./Reconst. of Damaged National

Road along San Fernando North Rd., San Jacinto Section

03/01/09 V 18.898 233 C 0.437 0.133 0.300 - - - 87.00 72.30% Poor

Lim General Contractor 8482 Rehab./Reconst. of Tablas Circ. Road, Alcantara-Looc Section 11/24/08 IV-B 18.798 167 O 0.307 0.240 0.100 0.030 0.038 0.100 81.50 -

Lim General Contractor 8482 Replacement of Damaged Bridge 05/19/08 V 14.100 231 C 0.342 0.200 0.300 - - - 84.20 78.26% Satisfactory

Lim General Contractor 8482 Conc. of Tablas Circ. Road, San Agustin-Calatrava Road (Dakit-Dakit Sect.) 08/27/09 IVB 19.298 177 O 0.374 0.300 0.150 0.030 0.047 0.033 93.40 -

Lim General Contractor 8482Conc. of Tablas Circ. Road, San Agustin-Calatrava Road (Can-Omiang-Cabulotan

Section)08/27/09 IVB 19.298 180 O 0.333 0.300 0.150 0.030 0.047 0.033 89.30 -

Lim General Contractor 8482 Conc. of Tablas Circ. Road, Alcantara-Looc Road (Tugdan Airport) 08/28/09 IVB 19.298 170 O 0.351 0.281 0.150 0.030 0.047 0.033 89.20 -

Lim General Contractor 8482 Conc. of Tablas Circ. Road, Calatrava-San Agustin Road (Salingsing Sect.) 08/27/09 IVB 19.298 150 O 0.319 0.300 0.150 0.030 0.047 0.033 87.90 -

Lim General Contractor 8482 Concreting of Masbate City-Cawayan Road Network 08/28/09 V 33.248 210 C 0.440 0.153 0.300 - - - 89.30 *89.30%

V. Satisfactory

Lim General Contractor 8482Conc. of Tablas Circumferential Road-San

Agustin-Calatrava Road (Dakit-Dakit Section)

02/22/10 IVB 19.298 177 C 0.454 0.133 0.300 - - - 88.70 91.52% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page271

Page 280: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lim General Contractor 8482 Conc. of Tablas Circumferential Road, Alcantara-Looc Road (Tugdan Airport) 02/23/10 IVB 19.298 170 C 0.385 0.200 0.300 - - - 88.50 88.92%

Satisfactory

Lim General Contractor 8482Conc. of Tablas Circumferential Road,

Calatrava-San Agustin Road (Salingsing Section)

02/22/10 IVB 19.298 150 C 0.448 0.133 0.300 - - - 88.10 87.98% Satisfactory

Limokun Builders & Supply 30997 Impvt./Rehab. of Porac-Guagua Road 05/14/08 III 4.771 60 C 0.355 0.115 0.300 - - - 77.00 *77.00% Satisfactory

Linear Construction Corporation 3575 NBP Resettlement Project, Phase IV 01/17/08 NHA 148.89 270 O 0.392 0.232 0.1 0.024 0.04 0.1 88.80 -

Linear Construction Corporation 3575 Construction of 1 unit 3-Storey, 15-Classroom School Building 01/12/10 NHA 21.655 249 O 0.392 0.300 0.000 0.030 0.050 0.050 82.20 -

Linear Construction Corporation 3575 Construction of 1 unit 3-Storey, 15-Classroom School Building 04/12/10 NHA 21.655 249 O 0.398 0.300 0.000 0.030 0.070 0.050 84.80 -

Liong-Co Construction & Construction Supply 28361 Completion of Miputak-Turno By Pass

Road with Drainage Components 03/18/09 IX 4.716 180 C 0.470 0.200 0.300 - - - 97.00 85.54% Satisfactory

Liong-Co Construction & Construction Supply 28361 Const. of MPB (Covered Court) at Sicayab

E/S 12/04/07 IX 2.268 180 C 0.392 0.200 0.300 - - - 89.20 89.20% V.Satisfactory

Lisa Construction 24134 Cabanatuan City-Carmen Road 06/02/09 III 28.570 120 O 0.391 0.206 0.150 0.020 0.030 0.050 84.70 -

Lisa Construction 24134 Rehab./Reconst & Impvt. of Cabanatuan City-Carmen Road 09/04/09 III 28.950 120 C 0.416 0.133 0.300 - - - 84.90 84.78%

Satisfactory

Liza Construction 24234

Regraveling/Completion of FMR in Brgy. Sta. Monica to San Eustacio La Purisima to Pantoc, Bibiclat & Santiago to Magsaysay

Road

03/02/09 III 46.812 150 C 0.344 0.200 0.300 - - - 84.40 *84.40%Satisfactory

LJPM Builders & Construction Supply 29981 Rehab./Impvt. of National Road along

Amaga-Liloan Road Section 08/29/08 VIII 3.735 180 O 0.378 0.242 0.070 0.020 0.032 0.067 80.90 -

LJPM Builders & Construction Supply 29981 Rehab./Impvt. of National Road along

Amaga-Liloan Road Section 11/21/08 VIII 3.735 180 O 0.380 0.240 0.100 0.020 0.037 0.100 87.70 -

LJPM Builders & Construction Supply 29981 Repair of Abuyog District Hospital 08/28/08 VIII 0.470 30 C 0.378 0.200 0.300 - - - 87.80 *87.80%

V. Satisfactory

LJPM Builders & Construction Supply 29981 Repair/Impv't of National Roads along

Amaga-Liloan Road Section 03/05/09 VIII 3.735 180 C 0.433 0.134 0.300 - - - 86.70 85.26%Satisfactory

Llaban Construction & Trucking 29504 Rehab./Impvt. of Cotabato 2nd Eng'g. District Office Building & Quarter 05/28/09 R-XII 3.313 120 C 0.410 0.200 0.300 - - - 91.00 89.18%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page272

Page 281: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Llaban Construction & Trucking 29504 Conc. of Dualing-New Panay-Midsayap Road, (Lawili-Arizona Section) 02/28/08 XII 9.523 120 C 0.355 0.119 0.300 - - - 77.40 77.70%

Satisfactory

Llaban Construction & Trucking 29504 Const. of 1 Cl Bldg., San Pedro E/S 08/22/07 XII 0.476 40 C 0.309 0.300 0.300 - - - 90.90 *90.90% Outstanding

Llaban Construction & Trucking 29504 Const. of MPB @ Brgy. Upper Glad 1 08/22/07 XII 0.286 30 C 0.369 0.300 0.300 - - - 96.90 *96.90% Outstanding

Llaban Construction & Trucking 29504 Concreting of Kidapawan-Ilomavis Tourist Road 09/05/09 XII 18.530 112 C 0.389 0.200 0.300 - - - 88.90 *88.90%

Satisfactory

Llaban Construction & Trucking 29504 Completion of Multi-Purpose Building @ Brgy. Poblacion 09/03/09 XII 0.956 75 C 0.441 0.133 0.300 - - - 87.40 *87.40%

Satisfactory

LLM Concrete Products 14235 Completion of MPB at Brgy. Magugpo West 11/29/08 XI 1.884 90 C 0.336 0.056 0.300 - - - 69.20 79.14% Satisfactory

LLM Concrete Products 14235 Const. of Matanao National High School 11/22/07 XI 0.865 60 C 0.324 0.200 0.300 - - - 82.40 *82.40% V. Satisfactory

LLM Concrete Products 14235 Const. of MPB @ Goma, Digos City realigned to Conc. of FMR 11/22/07 XI 0.944 45 C 0.320 0.200 0.300 - - - 82.00 *82.00%

V. Satisfactory

LLM Concrete Products 14235 Const. of MPB @ Poblacion 11/23/07 XI 1.885 120 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory

LLM Concrete Products 14235 Const. of Multi-Purpose Building 03/06/09 XI 0.951 75 C 0.461 0.142 0.300 - - - 90.30 *90.30% V. Satisfactory

LLM Concrete Products 14235 Const. of Slope Protection along Buclad-Poblacion-Asuncion Sect. 08/28/07 XI 3.845 150 C 0.265 0.200 0.300 - - - 76.50 *76.50%

Satisfactory

LLM Concrete Products 14235 Const./Rehab.of MPB @ Brgy. Ising 05/19/08 XI 2.453 150 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

LLM Concrete Products 14235 Const. of Multi-Purpose Building @ Tuban E/S 02/25/10 XI 0.494 45 C 0.436 0.133 0.300 - - - 86.90 86.90%

Satisfactory

LLM Concrete Products 14235 Completion of Multi-Purpose Building @ Purok Villa Paraiso, Brgy. Visayan Village 02/27/10 XI 0.489 60 C 0.399 0.133 0.300 - - - 83.20 83.20%

Satisfactory

LMD Construction 9410 Construction and Completion of Multi-Purpose Building 06/02/09 IX 3.861 180 C 0.492 0.133 0.300 - - - 92.50 88.79%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page273

Page 282: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

LMD Construction 9410 Const./Impvt. MPB (Municipal Hall) @ Poblacion San Miguel 03/07/08 IX 4.595 225 C 0.348 0.247 0.300 - - - 89.50 86.07%

V. Satisfactory

LMD Construction 9410 Impvt./Conc. Paving of Kagawasan-Pitogo Road (Kagawasan Section) 08/30/07 IX 4.595 100 C 0.353 0.300 0.300 - - - 95.30 71.36%

Satisfactory

LMD Construction 9410 Construction of Multi-Purpose Building at Dumalinao Pilot School 09/09/09 IX 4.595 180 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90 -

LMD Construction 9410 Const. of MPB @ Dumalinao Pilot School 03/03/10 IX 4.595 180 C 0.380 0.200 0.300 - - - 88.00 88.38% V.Satisfactory

LMD Construction 9410 Road Upgrading (Gravel to Concrete) Junction Aurora-Ozamis City Road 03/05/10 IX 20.466 224 O 0.262 0.291 0.150 0.030 0.047 0.050 83.00 -

Lo Tone Construction 23385 Land Dev't. of Anislag Resettlement Project, Phase II 6/16-18/08 NHA 39.894 224 C 0.356 0.300 0.000 - - - 65.60 65.60%

Fair

Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin. Center (Phase 1) 08/22/07 V 9.505 180 C 0.363 0.200 0.300 - - - 86.30 *86.30%

V. Satisfactory

Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin. Center (Phase II) 11/23/07 V 15.759 210 O 0.399 0.239 0.100 0.030 0.027 0.100 89.50 -

Lo Tone Construction & Supply 23385 Dredging of Bato River (Katipunan-Kilikilihan) 05/23/08 V 19.180 210 C 0.492 - 0.500 - - - 99.20 65.60%

Fair

Lo Tone Construction & Supply 23385 Impvt. of Pag-asa Drainage System 03/01/08 V 4.762 150 C 0.333 0.200 0.300 - - - 83.30 84.32% V. Satisfactory

Lo Tone Construction & Supply 23385 Land Development of Anislag Resettlement Project (Phase II) 12/4-7/07 NHA-V 39.895 150 O 0.326 0.261 0.050 0.023 0.028 0.033 72.10 -

Lo Tone Construction & Supply 23385 Land Development of Tagaytay Resettlement Project 3/26-28/08 NHA 49.924 150 O 0.376 0.249 0.1 0.018 0.033 0.1 87.60 -

Lo Tone Construction & Supply 23385 Rehab./Impv't. of Calayucay-Sula Road 08/23/07 V 3.840 90 C 0.385 0.272 0.300 - - - 95.70 *95.70% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page274

Page 283: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lo Tone Construction & Supply 23385 Rehab./Impvt. of Hinipaan-Cahan Road 08/13/08 V 19.260 240 C 0.390 0.293 0.300 - - - 98.30 *98.30% Outstanding

Lo Tone Construction & Supply 23385 Road Opening of Damacan-Cagbulacao Road 05/17/08 V 28.493 210 O 0.400 0.293 0.100 0.020 0.023 0.100 93.60 -

Lo Tone Construction & Supply 23385 Widening/Impvt. of Catanduanes Circ. Road (Codon Section) 02/27/08 V 14.375 240 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

Lo Tone Construction & Supply 23385 Widening/Impvt. of Catanduanes Circ. Road (Tibang-Puting Baybay Section) 02/28/08 V 28.495 270 C 0.393 0.293 0.300 - - - 98.60 90.14%

Outstanding

Long Island Builders & Construction 31730 Road Upgrading/Concreting of Lanao-Pagadian-Zamboanga City Road 05/30/09 IX 3.661 160 O 0.323 0.240 0.150 0.020 0.050 0.050 83.30 -

Long Island Builders & Construction 31730 Road Upgrading/Conc. of Lanao-Pagadian-Zamboanga City Road 09/04/09 IX 3.604 205 O 0.357 0.300 0.150 0.030 0.045 0.033 91.50 -

Long Island Builders & Construction 31730 Road Upgrading/Conc. of Lanao-Pagadian-Zamboanga City Road 02/26/10 IX 3.649 220 C 0.408 0.151 0.300 - - - 85.90 86.80%

Satisfactory

Longwide Builders 20196 Const. of Telaje Flood Control 06/03/09 XIII 4.565 195 O 0.333 0.275 0.150 0.030 0.023 0.050 86.10 -

Longwide Builders 20196 Const. of Public Market @ Brgy. Sumo-Sumo 08/29/08 XIII 0.549 60 C 0.362 0.200 0.300 - - - 86.20 *86.20%

V. Satisfactory

Longwide Builders 20196 Const. of Telaje Flood Control 09/08/09 XIII 4.565 195 C 0.396 0.185 0.300 - - - 88.10 88.22% Satisfactory

Lorenzo Construction & Development Corp. 4284 Impvt./Rehab. of Gapan-San Fernando-

Olongapo Road 09/05/09 III 42.155 180 O 0.224 0.300 0.150 0.030 0.050 0.033 78.70 -

Lorenzo Construction and Development Corporation 4284 Impvt./Rehab. of Gapan-San Fernando-

Olongapo Road 06/03/09 III 42.155 180 O 0.317 0.300 0.150 0.030 0.030 0.050 87.70 -

Lorgen Construction 20197 Conc./Impvt. of F.P. Felix Ave. (formerly Imelda Ave.) 11/29/07 IV-A 6.255 150 C 0.289 0.200 0.300 - - - 78.90 85.38%

V. Satisfactory

Lo-Tone Construction & Supply 23385 Road Opening of Damacan-Cagbulacao Road 05/19/09 V 28.493 240 C 0.475 0.195 0.300 - - - 97.00 94.96%

V. Satisfactory

Lotrim Construction 12273 Construction of DOST Caraga S & T Center 06/18/09 DOST 14.233 345 O 0.367 0.208 0.130 0.030 0.060 0.030 82.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page275

Page 284: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lotrim Construction 12273 Construction of DOST Caraga S&T Center 10/29/09 DOST 14.232 345 C 0.457 0.191 0.300 - - - 94.80 94.80% V. Satisfactory

Lotrim Construction Inc. 12273 Rehab. of MPB 08/29/07 XI 4.715 240 C 0.361 0.200 0.300 - - - 86.10 *86.10% V.Satisfactory

Lotrim Construction, Inc. 12273 Conc./Impvt. of Eden-Tagurano Road 02/23/10 XI 1.922 90 C 0.373 0.200 0.300 - - - 87.30 87.30% Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Six CL @ Maragusan NHS 03/04/08 XI 6.560 180 C 0.337 0.300 0.300 - - - 93.70 89.01%

V. Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Three (3) Storey DBM Regional

Office Bldg. 12/02/08 XIII 18.638 240 C 0.397 0.200 0.300 - - - 89.70 88.53% V. Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const./Impvt. of Drainage at J.P. Laurel St.

to Davao Beach Club 05/28/08 XI 4.717 150 C 0.344 0.200 0.300 - - - 84.40 86.74% V. Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Impvt./Conc. of Calinan-Bagiuo-Cadalian

Road 03/02/09 XI 18.801 210 C 0.352 0.200 0.300 - - - 85.20 84.54% Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab. of Davao-Cotabato Road

Kinuskusan Section 03/06/09 XI 19.279 210 C 0.378 0.200 0.300 - - - 87.80 82.52% Satisfactory

Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab./Impvt. of DPWH Davao del Sur 2nd

DEO Bldg. 03/05/09 XI 9.449 120 C 0.452 0.200 0.300 - - - 95.20 82.18% Satisfactory

Lotrim Construction, Incorporated (Formerly: Lotrim Const.) 12273

Rehab./Reconst./Upgrading of Damaged Paved National Roads at Daang Maharlika

(MN) Legaspi Section.09/16/09 XI 9.642 180 C 0.482 0.133 0.300 - - - 91.50 90.72%

V. Satisfactory

Lourel Design and Construction 17099Asphalt Overlay/Reblocking of Midsayap-Marbel Road, Km. Sta. 1779+000-Km. Sta. 1786+000, Dumadalig-New Iloilo Section

03/05/10 XII 9.649 110 O 0.306 0.300 0.150 0.023 0.050 0.033 86.20 -

Lourel Design and Construction 17099Asphalt Overlay/Reblocking of Marbel-Makar Rd., Km. Sta. 1701+000-Km. Sta.

1707+000, Sarawa - Bo. 6 Section03/05/10 XII 9.644 110 O 0.314 0.286 0.150 0.023 0.050 0.033 85.60 -

LSD Construction & Supplies / Wizard Trading & Construction Joint

Venture JV-08-238

Rehab./Reconst./Upgrading of Damaged Paved National Roads (Rehab./Reconst. of

Daang Maharlika Road)05/25/09 III 48.249 67 C 0.407 0.200 0.300 - - - 90.70 *90.70%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page276

Page 285: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

LSD Construction & Supplies/Wizard Trading & Construction (JV) JV-08-238 Rehab/Reconst./Upgrading of Daang

Maharlika Road 09/04/09 III 48.249 67 C 0.467 0.133 0.300 - - - 90.00 *90.00% V. Satisfactory

LSD Construction and Supplies / C.M. Dancel Construction and

Supply Joint Venture JV-08-315 Rehab./Reconst./Upgrading of Laoag-

Sarrat-Piddig-Solsona Road 02/24/10 I 134.537 330 O 0.258 0.273 0.055 0.030 0.051 0.033 70.00 -

LTS Builders and Construction Supply 33473 Const. of 2 CL School Building with toilet

(7mx18m) Policarpio Dano H/S 09/05/09 VII 1.132 90 O 0.400 0.240 0.150 0.030 0.037 0.033 89.00 -

Lucban Builders and Construction Supply Incorporated 31336 Const. of DPWH Building @ DPWH Quezon

1st DEO, Brgy. Abang 05/29/09 IV-A 4.148 150 O 0.360 0.240 0.150 0.030 0.023 0.033 83.60 -

Lucban Builders and Construction Supply Incorporated 31336 Completion of MPB @ Paaralang

Elementarya ng Lucban 08/16/07 IV-A 3.370 76 C 0.303 0.000 0.300 - - - 60.30 *60.30% Fair

Lucban Builders and Construction Supply Incorporated 31336 Const. of Daungan River Control 05/14/08 IV-A 3.371 60 C 0.320 0.200 0.300 - - - 82.00 81.82%

V. Satisfactory

Lucban Builders and Construction Supply Incorporated 31336 Const. of Multi-Purpose Bldg. @ Brgy.

Ibabang Palsabangon 02/22/10 IVA 1.254 40 C 0.453 0.200 0.300 - - - 95.30 95.30% V. Satisfactory

Lucban Builders and Construction Supply Incorporated 31336 Const. of Multi-Purpose Bldg. @ Brgy.

Nagsinamo (Phase II) 02/23/10 IVA 1.061 36 C 0.441 0.200 0.300 - - - 94.10 94.10% V. Satisfactory

Lucban Builders and Construction Supply, Incorporated 31336 Impvt. of DPWH Building @ DPWH Quezon

1st DEO Brgy. Abang 09/10/09 IVA 4.148 150 C 0.484 0.133 0.300 - - - 91.70 86.84% Satisfactory

Lucban Builders and Construction Supply, Incorporated 31336 Const. of Farm-to-Market at Brgy. Talipan 09/10/09 IVA 0.482 36 C 0.324 0.200 0.300 - - - 82.40 *82.40%

Satisfactory

Lucban Construction 4819 Const. of MPB @ Paaralang Sekondarya ng Lucban 02/26/09 IV-A 1.447 40 C 0.492 0.133 0.300 - - - 92.50 *92.50%

V. Satisfactory

Luck-Well Construction 17510 Paving of the Newly Constructed Back-up Area Project 04/20-23/10 PPA 47.305 300 O 0.3657 0.3000 0.1256 0.024 0.0600 0.0500 92.53 -

Lucky Armn's Construction & Enterprises 23434 Conc. of Shoulder at Picas San Jose DZR

Airport Road 06/08/07 VIII 1.898 50 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

Lug Square Construction 26623 Conc. of Nueva Vizcaya-Ifugao-Mt. Province Bdry. Rd. (Hingyon Section) 11/23/07 CAR 2.846 100 C 0.362 0.217 0.300 - - - 87.90 *87.90%

V. Satisfactory

Lug Square Construction 26623 Widening/Concreting along Banaue-Mayoyao Road (Tulaed Section) 03/06/09 CAR 1.888 348 C 0.339 0.157 0.000 - - - 49.60 62.26%

Poor

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page277

Page 286: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Lumel Glenn Construction 26817 Rehab. of Calapan South Road 11/19/08 IV-B 3.782 91 C 0.358 0.200 0.300 - - - 85.80 87.48% V. Satisfactory

LUYM Construction and Development Corporation 24098

Const. of San Jose St. Drainage System-Outfall 1 of the Drainage Facility of the Bohol Circ. Rd along C.P. Garcia Ave.

11/21/08 VII 14.038 252 C 0.307 0.189 0.300 - - - 79.60 77.86% Satisfactory

LVRO Construction & Supply 18116 Concreting of Barangay Road 03/14/09 XIII 1.924 95 C 0.430 0.200 0.300 - - - 93.00 *93.00% V. Satisfactory

LVRO Construction & Supply 18116 Rehab./Reconstruction of Damaged Paved along Dinagat-Loreto Road 03/04/09 XIII 7.086 225 O 0.368 0.240 0.150 0.030 0.035 0.050 87.30 -

LVRO Construction & Supply 18116 Repair/Rehab. along Dinagat-Loreto Road 03/04/09 XIII 9.649 190 O 0.372 0.282 0.082 0.030 0.035 0.033 83.40 -

LVRO Construction and Supply 18116 Const. of Aguntayan-Hilong-Hilong FMR 05/26/09 XIII 8.473 175 O 0.390 0.274 0.150 0.030 0.047 0.033 92.40 -

LVRO Construction and Supply 18116 Dredging/Rechanneling of Katugasan River 05/26/09 XIII 4.816 60 C 0.407 0.200 0.300 - - - 90.70 *90.70% V. Satisfactory

LVRO Construction and Supply 18116 Conc. of Bay-ang-Calamba Provincial Road 11/18/08 XIII 2.893 75 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory

LVRO Construction and Supply 18116 Conc. of Brgy. Sangay-Provincial Road 11/18/08 XIII 1.927 75 C 0.302 0.200 0.300 - - - 80.20 *80.20% V. Satisfactory

LVRO Construction and Supply 18116 Const. of Concepcion-Mt. Zion FMR 09/06/07 XIII 4.553 105 C 0.389 0.295 0.300 - - - 98.40 74.70% Satisfactory

LVRO Construction and Supply 18116 Const. of Culit Integrated School 05/12/08 XIII 0.486 75 C 0.390 0.200 0.300 - - - 89.00 *89.00% V. Satisfactory

LVRO Construction and Supply 18116 Const. of Jct. Bolod-Bolod-Albor Road (Albor-San Antonio Section) 05/17/08 XIII 6.620 238 C 0.321 0.200 0.300 - - - 82.10 *82.10%

V. Satisfactory

LVRO Construction and Supply 18116 Const./Rehab. of Cabadbaran River Dike 08/22/07 XIII 2.841 105 C 0.248 0.200 0.300 - - - 74.80 *74.80% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page278

Page 287: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

LVRO Construction and Supply 18116 Impvt./Conc. of New Public Market 11/20/07 XIII 0.950 45 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

LVRO Construction and Supply 18116 Reconst. of Quezon-Mapawa-Capalyan-Espina-Navarro Road-Arellano District 11/24/08 XIII 4.100 90 C 0.321 0.200 0.300 - - - 82.10 82.10%

V. Satisfactory

LVRO Construction and Supply 18116 Repair/Rehab. Along Dinagat-Loreto Road 11/19/08 XIII 9.649 160 O 0.307 0.168 0.100 0.023 0.038 0.100 73.60 -

LVRO Construction and Supply 18116 Surigao-Davao Coastal Road, Panhutungan Section 11/24/08 XIII 4.300 90 C 0.341 0.200 0.300 - - - 84.10 82.42%

V. Satisfactory

LVRO Construction and Supply 18116 Const./Rehab. of Aguntayan-Hilong-hilong FMR 09/01/09 XIII 8.473 150 C 0.408 0.165 0.300 - - - 87.30 90.36%

V.Satisfactory

LVRO Construction and Supply 18116 Rehab./Reconst. along Dinagat-Loreto Rd.(Dinagat Sect.) 09/01/09 XIII 7.086 267 C 0.458 0.162 0.300 - - - 92.00 90.50%

V.Satisfactory

LVRO Construction and Supply 18116 Const./Rehab. of Agutayan-Hilong-hilong Rd.(Phase II) 09/01/09 XIII 4.720 90 O 0.388 0.215 0.150 0.030 0.060 0.033 87.60 -

LVRO Construction and Supply 18116 Const. of School Bldg. @ La Union Integrated School 09/01/09 XIII 0.568 90 C 0.440 0.133 0.300 - - - 87.30 *87.30%

Satisfactory

LVRO Construction and Supply 18116Repair/Rehab. Along Dinagat-Loreto

Rd.(Km.0+000toKm.30+000, with excemptions)

09/04/09 XIII 9.649 228 C 0.466 0.133 0.300 - - - 89.90 83.06% Satisfactory

LVRO Construction and Supply 18116 Const. of Roads, Drainage & Embankment (Site Dev't. of Tubay Housing Projects) 02/22/10 XIII 6.682 120 C 0.460 0.133 0.300 - - - 89.30 89.30%

V.Satisfactory

LVRO Construction and Supply 18116 Const. of Seawall, Brgy. Ipil 03/01/10 XIII 2.351 116 C 0.454 0.133 0.300 - - - 88.70 84.86% Satisfactory

LXS Builders & Supplies 25172 Const. of Arenas NHS, Brgy. Ambayat 2nd 05/22/09 I 0.964 90 C 0.498 0.166 0.300 - - - 96.40 *96.40%

V.Satisfactory

LXS Builders & Supplies 25172 Const. of 1 CL School Bldg. @ Hermosa E/S 03/04/08 I 0.493 72 C 0.323 0.200 0.300 - - - 82.30 87.90%

V. Satisfactory

LXS Builders & Supplies 25172 Const. of Drainage System at Mariposa Creek 08/28/07 I 0.668 40 C 0.260 0.300 0.300 - - - 86.00 *86.00%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page279

Page 288: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M A M Construction & Trading 19915 Const. of One (1) CL at Sta. Cruz ES, Lubao West 08/24/09 III 0.479 60 C 0.412 0.133 0.300 - - - 84.50 *84.50%

Satisfactory

M A M Construction & Trading (Formerly: MAM Construction) 19915 Const. of St. Tomas NHS 11/10/08 III 0.901 80 C 0.309 0.300 0.300 - - - 90.90 *90.90%

Outstanding

M A M Construction & Trading (Formerly: MAM Construction) 19915 Repair and Rehab. of San Pablo ES 11/10/08 III 0.191 80 C 0.326 0.300 0.300 - - - 92.60 *92.60%

Outstanding

M M Construction 12012Rehab./Reconst. of Damaged National

Road KO 216+830 with exception, Poblacion Villaflores Section

06/03/09 II 14.468 200 C 0.400 0.200 0.300 - - - 90.00 89.28% V. Satisfactory

M M Construction 12012 Conc. of Bambang-Kasibu-Quezon-Solano Road (Labni Section) 03/10/09 II 14.225 120 C 0.406 0.200 0.300 - - - 90.60 86.64%

Satisfactory

M M Construction 12012Rehab./Reconst. of Damaged National Roads, Daang Maharlika, Poblacion

Villaflores Section11/28/08 II 14.468 200 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -

M M Construction 12012Rehab./Reconst. of Damaged National Roads, Daang Maharlika, Poblacion

Villaflores Section03/11/09 II 14.468 200 O 0.355 0.300 0.150 0.030 0.050 0.033 91.80 -

M M Construction 12012Rehab./Reconst./Upgrading of Damaged

Paved National Road along Daang Maharlika (Balete-Namamparan Section)

08/28/09 II 18.902 116 C 0.410 0.200 0.300 - - - 91.00 89.32% V. Satisfactory

M M Construction 12012 Const. of Farm-to-Market Road (Tire Path), Bliss Kirang 03/04/10 II 0.397 30 C 0.369 0.200 0.300 - - - 86.90 86.90%

Satisfactory

M N Revelo Construction 24789 Reconst. of Lanao-Pagadian-2Z Road, Lumbog Sect. Km. 1743+900 02/26/10 IX 4.035 123 O 0.275 0.285 0.150 0.020 0.047 0.050 82.70 -

M N Revelo Construction 24789Reconst. of Lanao-Pagadian-2Z Road, Diplahan Section, Km. 1739+200 - Km.

1798+90002/26/10 IX 3.514 203 O 0.291 0.300 0.150 0.020 0.028 0.017 80.60 -

M. Montesclaros Enterprises Inc. (Formerly: Monteclaros Enterprises) 6506

Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Maramag-Maradugao Rd. Sta. 1558+538 - Sta.

1576+850

02/25/10 X 7.400 90 C 0.446 0.133 0.300 - - - 87.90 85.50% Satisfactory

M. Montesclaros Enterprises, Inc. 6505

Road Upgrading/Gravel to Asphalt along Kibawe-Kadilingan Road (Sta. 1582+874-Sta. 1582+942.45 w/ exception) selective Sections, Kibawe-Kadilingan-Kalilangan

05/28/09 X 28.335 120 O 0.367 0.300 0.150 0.030 0.050 0.050 94.70 -

M. Montesclaros Enterprises, Inc. 6506

Rehab./Reconst./Upgrading of Damaged Paved National Roads along Maramag-

Maradugo Road, Sta. 1558+538-Sta.1576+850 selected sections

05/29/09 X 6.731 120 O 0.310 0.245 0.150 0.030 0.054 0.050 83.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page280

Page 289: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M. Montesclaros Enterprises, Inc. 6506 Const. of 135 L.M. Steel Bridge (Bridge Approaches) 05/28/09 X 22.665 240 O 0.306 0.260 0.150 0.030 0.040 0.050 83.60 -

M. Montesclaros Enterprises, Inc. 6506 Asphalt Overlay/Patching of Bituminous Pavement @ Sayre Highway 08/22/08 X 9.338 45 C 0.387 0.200 0.300 - - - 88.70 84.80%

V. Satisfactory

M. Montesclaros Enterprises, Inc. 6506 Conc. of Bukidnon-Davao Road (Dologon-Busco-Quezon Sect.) 08/21/08 X 67.179 315 C 0.360 0.200 0.300 - - - 86.00 86.00%

V. Satisfactory

M. Montesclaros Enterprises, Inc. 6506 Const. of 135 lm Steel Bridge (Bridge Approaches 03/03/09 X 22.665 271 O 0.360 0.240 0.150 0.030 0.045 0.050 87.50 -

M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao 02/22/07 X 9.375 180 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -

M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao 05/24/07 X 9.375 180 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -

M. Montesclaros Enterprises, Inc. 6506 Const. of Sayre National Highway 02/28/08 X 33.060 330 C 0.293 0.300 0.300 - - - 89.30 90.23% Outstanding

M. Montesclaros Enterprises, Inc. 6506 Patching/Asphalt Overlay along Bukidnon-Davao City Road, Camp I- Kiuntod Section 08/24/07 X 4.689 30 C 0.380 0.300 0.300 - - - 98.00 *98.00%

Outstanding

M. Montesclaros Enterprises, Inc. 6506 Repair/Rehab. of Proposed Development of DPWH Ver Overview Bldg. 11/21/07 X 9.375 215 C 0.399 0.300 0.300 - - - 99.90 93.85%

Outstanding

M. Montesclaros Enterprises, Inc. 6506Road Upgrading (Gravel to Concrete)

based on GTRSTB (HDM4 Analysis) along Kibawe-Kadingilan-Kalilangan Road

03/03/09 X 4.823 74 C 0.416 0.133 0.300 - - - 84.90 82.26% Satisfactory

M. Montesclaros Enterprises, Inc. 6506Road Upgrading (Gravel to Concrete) Jct.

SH Impasugong-Patulangan By-Pass Road (Patulangan Section)

03/03/09 X 18.991 270 C 0.393 0.133 0.300 - - - 82.60 85.90% Satisfactory

M. Montesclaros Enterprises, Inc. 6506

Road Upgrading (Gravel to Asphalt) along Kibawe-Kadilingan-Kalilangan Road Sta. 1582+874-Sta. 1582+942.45 w/ exception

Selective Sections

09/03/09 X 28.335 90 C 0.445 0.133 0.300 - - - 87.80 91.94% V. Satisfactory

M. Montesclaros Enterprises, Inc. 6506 Const. of 135 l.m. Steel Bridge (Bridge Approaches) 09/04/09 X 22.665 240 O 0.288 0.300 0.150 0.030 0.051 0.050 86.90 -

M.B. Ang Const. and Supply 25001Concreting of Caibiran,-Cabucgayan National Circumferential Road (Uson-

Gamay Section)03/13/09 VIII 3.725 160 C 0.303 0.035 0.300 - - - 63.80 76.46%

Unsatisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page281

Page 290: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M.B. Ang Construction and Supply 25001 Conc. of Caibiran-Cabucgayan National Circ. Road (Uson-Gamay Section) 11/18/08 VIII 3.725 160 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -

M.C. Torio Construction 10534 Alibadabad CPIP 10/1-5/07 NIA-II 2.193 120 C 0.300 0.296 0.300 - - - 89.60 85.47% V. Satisfactory

M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project 10/1-5/07 NIA-II 8.706 343 C 0.298 0.240 0.300 - - - 83.80 82.3%

V.Satisfactory

M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Poblacion 11/12/07 III 2.845 60 C 0.380 0.279 0.300 - - - 95.90 *95.90%

Outstanding

M.C.B. Zamora Construction & Supplies 32006 Impvt./Rehab. of Pathwalk along Porac

River 11/12/07 III 2.846 60 C 0.275 0.245 0.300 - - - 82.00 *82.00% V. Satisfactory

M.C.B. Zamora Construction & Supplies 32006 Rehab. of Pasbul-San Nicolas 2nd Road 08/13/08 III 4.743 90 C 0.361 0.224 0.300 - - - 88.50 *88.50%

V. Satisfactory

M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Barangay Matungao 02/15/10 IVB 0.891 90 O 0.302 0.300 0.150 0.030 0.023 0.033 83.80 -

M.E. Baning Construction 22682 Const. of MPB @ Brgy. Emmanuel 03/09/09 IV-A 0.482 60 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory

M.G Salazar Construction Corp. 4072 Construction of 3-Storey Girls Dormitory 02/24/10 DOST 30.959 285 C 0.458 0.20 0.30 - - - 95.80 91.75% V. Satisfactory

M.G. Cereno Construction 14979 Construction of Spillway 03/13/09 V 0.469 45 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory

M.G. Francisco Construction29831 Impvt. of School Building Calumpit C/S 03/03/10 III 0.494 8 C 0.453 0.133 0.300 - - - 88.60 88.60%

Satisfactory

M.G. Jacinto Construction 20617 Construction of Multi-Purpose Building @ Camasi H/S 05/18/09 II 1.925 230 C 0.478 0.133 0.300 - - - 91.10 *91.10%

V. Satisfactory

M.G. Jacinto Construction 20617 Const. of Multi-Purpose Building 02/16/10 II 1.911 120 C 0.451 0.107 0.300 - - - 85.80 85.80% Satisfactory

M.G. Salazar Const. Corp. 4072Rehab/Reconst./Upgrading of Daang Maharlika Road (Baliuag & Plaridel

Section)05/29/09 III 42.945 228 O 0.325 0.240 0.150 0.030 0.040 0.050 83.50 -

M.G. Salazar Const. Corp. 4072Rehab./Reconst./Upgrading at Daang Maharlika Road (Baliuag & Plaridel

Section)09/04/09 III 42.945 228 O 0.325 0.240 0.150 0.030 0.046 0.033 82.40 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page282

Page 291: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M.G. Salazar Construction 4072 Construction of Girls Dormitory Bldg. 05/28/09 DOST 30.572 285 O 0.352 0.260 0.150 0.030 0.048 0.050 89.00 -

M.G. Salazar Construction 4072 Site Development Project 05/28/09 DOST 0.972 101 O 0.360 0.251 0.100 0.024 0.058 0.033 82.60 -

M.G. Salazar Construction 4072 PSHS CVC Site Development Project 10/8/09 DOST 0.927 101 C 0.496 0.200 0.300 - - - 99.60 99.60% Outstanding

M.G. Samidan Construction 16779Impvt. of Baguio-Bontoc-Banaue Road,

Conc. of Mt. Data-Bontoc Road, Km. 352+980-Km. 355+621

08/14/08 CAR 18.506 206 C 0.348 0.100 0.300 - - - 74.80 81.58% V. Satisfactory

M.G. Samidan Construction 16779Impvt. of Benguet-Bontoc (Mr. Prov.)-

Tinglayan-Lubuagan (Kalinga) Road At-Ato-Circle Section

11/24/07 CAR 7.286 218 C 0.374 0.300 0.300 - - - 97.40 92.33% Outstanding

M.G. Samidan Construction 16779Widening/Conc. of Mt. Data-Bontoc Road, Lukib-Sadsadan Section, Km. 349+210 -

Km. 350+24305/23/08 CAR 13.139 144 C 0.369 0.200 0.300 - - - 86.90 80.96%

V. Satisfactory

M.G. Villamin Construction 22521 Const. of Flood Control Pilot Procject at Kinanliman River Control 09/10/09 IVA 4.820 140 C 0.387 0.200 0.300 - - - 88.70 87.02%

Satisfactory

M.G.G. Construction & Supply 31228 Const. of MPB (Hall) 11/11/08 III 1.233 45 C 0.375 0.200 0.300 - - - 87.50 *87.50% V.Satisfactory

M.H. Southern Construction 5841 Sarangani Davao del Sur Coastal Road, Cross Section 06/11/09 R-XII 7.457 150 O 0.297 0.249 0.150 0.024 0.045 0.050 81.50 -

M.H. Southern Construction 5841Conc. of Road and Reblocking, Marbel-

makar Road, Matin-ao Silway 8, (Km. 1662+800 - Km. 1663+740)

06/08/09 R-XII 14.167 195 O 0.301 0.300 0.000 0.030 0.055 0.033 71.90 -

M.H. Southern Construction 5841 Conc. of Road & Reblocking, Marbel-Makar Road, Matinao Silway 8 03/20/09 XII 14.169 180 O 0.346 0.300 0.150 0.030 0.040 0.050 91.60 -

M.H. Southern Construction 5841 Const. of Dungon Seawall 09/02/08 XII 4.653 150 C 0.261 0.288 0.000 - - - 54.90 75.90% Satisfactory

M.P Villegas Construction 16683 Completion of Boys Dormitory 03/2-3/10 DOST 14.969 345 C 0.4875 0.20 0.30 - - - 98.75 98.75% Outstanding

M.P. Villegas Construction 16683 Administration Building 06/05/08 DOST 6.975 171 C 0.351 0.275 0.300 - - - 92.60 92.60% V. Satisfactory

M.P. Villegas Construction 16683Construction of DOST Reg IV-A Food

Safety & Quality Assurance Laboratory Building

05/26/09 DOST 9.379 120 C 0.492 0.200 0.300 - - - 99.17 99.17% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page283

Page 292: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M.P. Villegas Construction 16683 Construction of DOST Reg IV-A Food Safety and Quality Assurance Lab. 5/26/09 DOST 9.379 180 C 0.491 0.200 0.300 - - - 99.10 99.10%

Outstanding

M.P. Villegas Construction 16683 Construction of DOST Reg IV-A Food Safety and Quality Assurance Lab. 10/15/09 DOST 6.018 180 C 0.4591 0.187 0.300 - - - 94.61 94.61%

V.Satisfactory

M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of FMR, Brgy. Sapaan to San Andres-

Labak 02/20/08 IV-A 0.383 60 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory

M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Const. of MPB, Gumaca MAPC MPCI 11/15/08 IV-A 0.946 30 C 0.181 0.300 0.300 - - - 78.10 *78.10%

Satisfactory

M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Const. of Multi-Purpose Building at Brgy.

Adia Bitaog 02/19/10 IVA 0.287 60 C 0.475 0.150 0.300 - - - 92.50 92.50% V. Satisfactory

M.R. Santiago Construction 27329 Rehab. of Camias-Sibut Road 11/15/07 III 5.709 90 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding

M.R. Vargas Construction 8215 M'lang Airport Development Project 03/13/09 DOTC 13.458 180 O 0.360 0.293 0.150 0.023 0.050 0.033 90.90 -

M.R.C. Bechaida Construction & Supply 32821 Conc. of Masagongsong Bridge

Approaches 11/18/08 VIII 1.867 140 O 0.370 0.232 0.100 0.015 0.037 0.100 85.40 -

M.R.C. Bechaida Construction & Supply 32821 Concreting of Masagongsong Bridge

Approaches 03/13/09 VIII 1.867 162 C 0.335 0.000 0.300 - - - 63.50 76.64%Unsatisfactory

M.R.C. Bechaida Construction & Supply 32821 Const. of 2-CL 7mx9m Sch. Bldg, Look

Primary School, Brgy. Look 09/03/09 VIII 0.725 66 C 0.409 0.159 0.300 - - - 86.80 *86.80% Satisfactory

M.S. Ramos Construction 31684 Const./Rehab. of FMR at Brgy. Ligas 05/19/08 III 0.380 15 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

M.S. Ramos Construction 31684 Impvt./Rehab of Mac Arthur Highway including drainage 11/19/07 NCR 9.425 120 C 0.300 0.200 0.300 - - - 80.00 85.40%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page284

Page 293: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M.S. Ramos Construction 31684 Impvt./Rehab. of Roads Brgy. Pulong Buhangin 08/29/08 III 2.857 80 C 0.353 0.200 0.300 - - - 85.30 85.30%

V. Satisfactory

M.S. Ramos Construction 31684 Rehab. of Rizal-Bulacan Boundary-Bigte Road 11/14/07 III 5.038 85 C 0.304 0.300 0.300 - - - 90.40 *90.40%

Outstanding

M.S. Ramos Construction 31684 Rehab./Impv't. of Sibul-Biak na Bato Road 03/11/09 III 47.623 210 C 0.360 0.200 0.300 - - - 86.00 *86.00% Satisfactory

M.S. Ramos Construction 31684Const./Impvt. of P. Antonio St. (Covered Walkway/Sidewalk/Curb & Gutter, Brgy.

Ugong09/10/09 NCR 5.254 90 O 0.398 0.225 0.150 0.020 0.035 0.050 87.80 -

M.S. Ramos Construction 31684 Repair/Rehab./Const. of MPB @ Brgy. 150, District II 09/08/09 NCR 0.480 60 C 0.420 0.133 0.300 - - - 85.30 *85.30%

Satisfactory

M.S. Ramos Construction 31684 Const. of School Building, Diosdado Macapagal HS (2-CL) 09/08/09 III 1.350 80 C 0.490 0.133 0.300 - - - 92.30 *92.30%

V. Satisfactory

M.S. Ramos Construction 31684Rehab./Impvt. of Drainage Canal along Gen. Alejo Santos Highway, Poblacion

Section, Km. 52+107-Km. 53+10709/04/09 III 4.774 30 C 0.425 0.133 0.300 - - - 85.80 *85.80%

Satisfactory

M.S. Ramos Construction 31684Rehab./Impvt. of Drainage Canal along Pulilan-Plaridel Diversion Road, Km.

41+100-Km.42+000 w/ exception09/04/09 III 4.774 45 C 0.417 0.133 0.300 - - - 85.00 84.58%

Satisfactory

M.S. Ramos Construction 31684Rehab./Impvt. of Drainage Canal along Bigaa-Plaridel Road via Bulacan and

Malolos Road (Panginay Section)09/04/09 III 4.773 30 C 0.405 0.133 0.300 - - - 83.80 *83.80%

Satisfactory

M.S. Ramos Construction 31684 Repair/Rehab. along OBR, Bulawen Section 02/19/10 III 9.458 20 C 0.408 0.200 0.300 - - - 90.80 90.80%

V. Satisfactory

M.S. Ramos Construction 31684 Const. of One (1) CL School Bldg. at BLISS Elem. School 02/26/10 IVA 0.396 45 C 0.461 0.200 0.300 - - - 96.10 96.10%

Outstanding

M.S. Ramos Construction 31684 Const. of Multi-Purpose Building, Angono Gen. Hospital 02/16/10 IVA 0.959 60 C 0.456 0.200 0.300 - - - 95.60 95.60%

V. Satisfactory

M.S.C. Construction / Persan Construction (JV)

SL2-SN-000820/JV-

07-158

Rehab./Impv't. of Gen. Alejo Santos Highway to CVR Junction via San Rafael

Road03/10/09 III 47.614 210 C 0.425 0.200 0.300 - - - 92.50 *92.50%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page285

Page 294: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M.S.D.L.R. Construction 32266 Const./Conc. of Rd. Zone 2, Sitio Camarahan, Brgy. Pagatpat 02/22/10 X 0.970 175 C 0.396 0.133 0.300 - - - 82.90 82.90%

Satisfactory

M.S.D.LR. Construction 32266 Widening of CDO-Airport Road 09/01/09 X 9.444 120 C 0.438 0.133 0.300 - - - 87.10 70.72% Poor

M.V. Caldo Engineering Construction and Supplies 16938 Const. / Rehab. / Replacement / Completion

and Repair of Plaridel E/S 08/14/08 NCR 0.959 75 C 0.327 0.300 0.300 92.70 *92.70% Outstanding

M.V. Caldo Engineering Construction and Supplies 16938 Const. of MPB, Brgy. 385 11/14/08 NCR 0.576 60 C 0.345 0.200 0.300 84.50 *84.50%

V. Satisfactory

M.V. Caldo Engineering Construction and Supplies 16938 Proposed Const./Repair/Rehab/of Multi-

Purpose Bldg., Brgy. 776 02/26/09 NCR 0.962 30 C 0.382 0.038 0.300 - - - 72.00 *72.00% Poor

M.V. Confirm Construction & Development Inc. 32469 Const. of Six (6) Cl @ Santor E/S 08/30/07 IVA 2.892 120 C 0.345 0.103 0.300 - - - 74.80 *74.80%

Satisfactory

M.V. Sabalburo Construction and Supply 32561 Construction of Sta. Catalina Seawall 06/02/09 I 4.754 110 C 0.445 0.133 0.300 - - - 87.80 *87.80%

Satisfactory

M.V. Sabalburo Construction and Supply 32561 Completion of Antero P. Hermosa E/S 11/16/07 I 0.388 48 C 0.365 0.300 0.300 - - - 96.50 *96.50%

Outstanding

M.V. Sabalburo Construction and Supply 32561 Repair of Cabusligan School Bldg.,

Cabusligan E/S 08/15/08 I 0.949 82 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

M.V. Sabalburo Construction and Supply 32561 Rehab./Reconst./Upgrading of Damaged

Paved National Road Narvacan Section 09/05/09 I 9.479 132 C 0.415 0.200 0.300 - - - 91.50 *91.50% V. Satisfactory

M.V. Sabalburo Construction and Supply 32561 Completion of MPB at Fuerte E/S 02/19/10 I 0.886 51 C 0.455 0.133 0.300 - - - 88.80 88.80

Satisfactory

M.V. Sabalburo Construction and Supply 32561 Const. of Drainage and Canal Around Plaza

Burgos 02/19/10 I 0.951 151 C 0.392 0.133 0.300 - - - 82.50 82.50% Satisfactory

M.Y Reyes Builders and Development Corp. 26386 Construction of Three-Storey 25-

Classroom School 12/10/09 NHA 18.112 150 C 0.4873 0.2000 0.3000 - - - 98.73 98.73% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page286

Page 295: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

M.Y. Reyes Builders & Development Corporation 26386 Const. of Multi-Purpose Covered Court 06/28/07 NHA 4.698 120 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -

M.Y. Reyes Builders & Development Corporation 26386 Construction of One Unit 3-Storey School

Building 05/21/08 NHA 17.198 150 O 0.353 0.300 0.100 0.020 0.018 0.100 89.00 -

M.Y. Reyes Builders & Dev't. Corporation 26386 Construction of a 3-storey School Building 03/06/08 NCL 17.363 187 C 0.397 0.300 0.300 - - - 99.7 99.70%

Outstanding

M.Y. Reyes Builders & Dev't. Corporation 26386 Construction of a 3-Storey School Building 08/06/08 NHA 17.198 150 C 0.400 0.300 0.300 - - - 100.00 100.00%

Outstanding

M2R Construction 13431 Construction of Multi-Purpose Building, Brgy. San Guillermo 05/23/09 III 1.139 90 C 0.393 0.200 0.300 - - - 89.30 *89.30%

V. Satisfactory

M2R Construction 13431 Rehab/Improvement of Paite-Maculcol Dike 05/26/09 III 9.515 60 C 0.418 0.133 0.300 - - - 85.10 *85.10%Satisfactory

M2R Construction 13431 Const. of Slope Protection East Dirita Bridge 05/26/08 III 4.753 90 C 0.284 0.158 0.300 - - - 74.20 *74.20%

Satisfactory

M2R Construction 13431 Genaro Magsaysay Bldg., Batonlapoc E/S 05/26/08 III 1.140 90 C 0.367 0.071 0.300 - - - 73.80 81.43% V. Satisfactory

M3A Construction 32123 Const. of Roads 11/25/08 V 4.776 120 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

M3A Construction 32123 Construction of Pili-Tinangis Road 03/12/09 V 14.186 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory

M3A Construction 32123 Road Concreting of Bagong Sirang 05/29/08 V 14.469 90 C 0.299 0.200 0.300 - - - 79.90 * 79.90% Satisfactory

Ma-an Construction Corp. 28751 Rehab./Impvt. of DPWH Leyte 2nd DEO 03/16/09 VIII 4.746 180 C 0.427 0.139 0.300 - - - 86.60 82.40%Satisfactory

Mabrak Construction 33340 Conc. of Nueva Vizcaya-Ifugao-Mt. Province Road 05/26/09 CAR 3.782 40 O 0.400 0.300 0.000 0.030 0.029 0.033 79.20 -

Mabrak Construction 33340 Const. of Dep-Ed Ifugao Division MPB (Phase III) 09/01/09 CAR 0.952 80 C 0.363 0.200 0.300 - - - 86.30 *86.30%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page287

Page 296: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mabrak Construction 33340 Conc. of Nueva Vizcaya-Ifugao-Mt. Province Road 02/25/10 CAR 3.782 167 C 0.431 0.133 0.300 - - - 86.40 82.08%

Satisfactory

Mac Builders 7249 Conc. of Calubian Jct., San Isidro-Tabango-Villaba-Palompon Road 06/02/09 VIII 55.351 330 O 0.364 0.240 0.150 0.030 0.035 0.050 86.90 -

MAC Builders 7249 Conc. of Calubian-San Isidro-Tabango-Villaba Road (Tabango-Tabing Sect.) 03/12/09 VIII 17.943 220 C 0.265 0.146 0.300 - - - 71.10 80.16%

Unsatisfactory

Mac Builders 7249Completion of Calaguise Steel Bridge,

along Sambulawan-Calaguise-Calubian Road

09/05/09 VIII 37.485 330 C 0.454 0.172 0.300 - - - 92.60 *92.60% V. Satisfactory

Mac Builders 7249 Concreting of Basey-Sohoton Road 08/31/09 VIII 28.495 230 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory

Mac Builders 7249Conc. of Calubian Jct. San Isidro-Tabango-

Villaba-Palompon Road Tabango-San Isidro

09/05/09 VIII 55.351 330 O 0.357 0.245 0.150 0.030 0.040 0.050 87.20 -

Mac Builders 7249 Rehab. (Conc.) of Cabungaan-Tabunok-Consuegra Road 09/05/09 VIII 14.052 180 O 0.340 0.245 0.150 0.030 0.040 0.050 85.50 -

Mac Builders 7249 Conc. of Calubian Jct. San Isidro-Tabango-Villaba Palompon Road 02/24/10 VIII 55.888 330 C 0.342 0.200 0.300 - - - 84.20 85.92%

Satisfactory

MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge (Completion) 09/05/07 VIII 58.313 360 O 0.372 0.300 0.030 0.022 0.055 0.033 81.20 -

MAC Builders / Ubas Construction (JV) JV-05-021 Impvt. of Allen-Malaga Section along

Maharlika Highway, Ferry Terminal-Allen 08/30/08 VIII 46.652 260 O 0.354 0.240 0.000 0.022 0.054 0.067 73.70 -

MAC Builders/B.M. Marketing (JV) JV-07-117 Guiuan Airport Development Project 10/07/09 DOTC 0.105 180 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding

Madyaw Construction & Dev. Corporation 29598 Completion of Philippine Normal University

Multi-Purpose Bldg. (Covered Court) 06/08/09 XIII 1.872 150 C 0.445 0.200 0.300 - - - 94.50 *94.50% V. Satisfactory

Madyaw Construction & Dev. Corporation 29598

Conc.of Talacogon-La Paz Road Section along Butuan City-Talacogon-La Paz-

Loreto Veruela-Sta. Josefa Road06/09/09 XIII 19.247 416 O 0.350 0.300 0.150 0.030 0.051 0.050 93.10 -

Madyaw Construction & Dev. Corporation 29598 Const./Impvt. of Water Supply System

(Hydrolic Ram Pump), Brgy. M.J. Santos 06/11/09 XIII 1.856 133 O 0.339 0.300 0.150 0.030 0.048 0.050 91.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page288

Page 297: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Madyaw Construction & Dev. Corporation 29598 Completion of Azpetia Bridge along NRJ-

Awa-Prosperidad-Lianga Road 03/16/09 XIII 6.724 180 C 0.376 0.200 0.300 - - - 87.60 84.96% Satisfactory

Madyaw Construction & Dev. Corporation 29598 Const./Imprv't. of Water Supply System,

Brgy. M.J. Santos 09/16/09 XIII 1.856 133 C 0.475 0.908 0.300 - - - 168.30 91.34% V.Satisfactory

Madyaw Construction & Dev. Corporation 29598

Conc. of La Paz-loreto Rd. Sect. along Butuan city-Talacogon-La Paz-Loreto-

Veruela-Sta. Josefa Rd.09/14/09 XIII 19.242 432 C 0.430 0.150 0.300 - - - 88.00 89.62%

V.Satisfactory

Madyaw Construction & Dev. Corporation 29598

Conc. of Talacogon-La Paz Rd. Sect. along Butuan City-Talacogon-la Paz-Veruela-Sta.

Josefa Rd.09/14/09 XIII 19.247 320 C 0.395 0.135 0.300 - - - 83.00 88.55%

Satisfactory

Madyaw Construction & Dev't. Corp. 29598 Completion of San Luis Footbridge, Old Poblacion 12/01/08 XIII 5.722 210 O 0.324 0.300 0.100 0.030 0.032 0.100 88.60 -

Madyaw Construction & Dev't. Corp. 29598 Conc. of Bayugan-San Luis-Talacogon Circ. Road 09/03/08 XIII 9.456 195 C 0.310 0.046 0.300 - - - 65.60 70.82%

Satisfactory

Madyaw Construction & Dev't. Corp. 29598 Const. of Phil. Normal University MPB 05/24/08 XIII 2.353 75 C 0.322 0.200 0.300 - - - 82.20 86.77% V. Satisfactory

Madyaw Construction & Dev't. Corp. 29598 Const. of San-Isidro-Hinimbangan FMR 11/20/07 XIII 19.235 300 C 0.293 0.300 0.300 - - - 89.30 89.30% V. Satisfactory

Madyaw Construction & Dev't. Corporation 29598 Conc. of Manapa Provincial Rd. 02/23/10 XIII 28.879 300 O 0.379 0.239 0.150 0.030 0.045 0.033 87.60 -

Maer Summit Konstruck Co. 25262 Conc. of Mapantad-Licop Road 05/23/08 XI 0.943 90 C 0.350 0.200 0.300 - - - 85.00 87.16% V. Satisfactory

Maer Summit Konstruck Co. 25262 Conc. of Poblacion Road at Brgy. Central 03/06/08 XI 0.943 90 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding

Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road (Checote-Monserat Sect.) 11/27/08 XI 19.283 120 C 0.092 0.200 0.300 - - - 59.20 79.36%

Satisfactory

Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road (Lilisan Sect.) 03/11/09 XI 19.282 148 C 0.335 0.145 0.300 - - - 78.00 84.66%

Satisfactory

Maer Summit Konstruck Co. 25262 Conc. of Tua-tua Road 05/23/08 XI 1.415 90 C 0.359 0.200 0.300 - - - 85.90 87.46% V. Satisfactory

Maer Summit Konstruck Co. 25262 Impvt. of Davao Oriental-Surigao Sur Coastal Road (Banaybanay Section) 11/27/07 XI 10.324 120 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page289

Page 298: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Maer Summit Konstruck Co. 25262 Impvt. of Lanca-Luban Road 08/26/08 XI 2.830 90 C 0.217 0.200 0.300 - - - 71.70 *71.70% Satisfactory

Maer Summit Konstruck Co. 25262 Impvt. of Lavigan-Impog Road 08/26/08 XI 1.884 90 C 0.279 0.200 0.300 - - - 77.90 *77.90% Satisfactory

Maer Summit Konstruck Co. 25262 Impvt. of Manikling-Lavugan Road (Lavigan-Talisay Sect.) 08/31/07 XI 14.464 150 C 0.347 0.200 0.300 - - - 84.70 82.12%

V. Satisfactory

Maer Summit Konstruck Co. 25262 Rehab. of Davao or.-Surigao Coastal Road, Banaybanay-Mati Section (Phase I) 05/23/08 XI 19.289 180 C 0.329 0.200 0.300 - - - 82.90 *82.90%

V. Satisfactory

Maer Summit Konstrukt Co. 25262 Construction of Multi-Purpose Building 06/05/09 XI 4.723 230 O 0.387 0.266 0.150 0.030 0.043 0.033 90.90 -

Maer Summit Konstrukt Co. 25262 Road Upgrading of Tibanban-Lavigan Road 06/03/09 XI 48.233 150 C 0.446 0.149 0.300 - - - 89.50 *89.50% V. Satisfactory

Maer Summit Konstrukt Co. 25262 Const. of Multi-Purpose Building A (10m x 18m Covered Court) with Stage 09/14/09 XI 4.723 230 C 0.414 0.133 0.300 - - - 84.70 89.04%

V. Satisfactory

Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262

Impvt./Rehab. of Agusan-Davao Road, Km. 1469+000 to Km. 1482+000 with exception

Panabo-Carmen Section02/27/10 XI 19.093 60 C 0.487 0.133 0.300 - - - 92.00 92.00%

V. Satisfactory

Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262 Completion of Multi-Purpose Building,

Batobato 03/02/10 XI 2.055 90 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory

Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262 Const. of Gavino Dawang E/S (Package:

SB-09) 03/02/10 XI 1.061 90 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory

Maer Summit Kontrukt Co. 25262 Road Upgrading of Tiban-Lavigan Road, Tamban-Lilisan Sect. 09/14/09 XI 9.640 100 C 0.402 0.133 0.300 - - - 83.50 *83.50%

Satisfactory

Mafil Enterprises 27226 Provision of Line Canal along Jct. Dologon-Busco-Quezon Road Buni-Buni Section 08/24/07 X 0.278 30 C 0.356 0.200 0.300 - - - 85.60 *85.60%

V. Satisfactory

Maghuyop Construction 21641 Const. of 1-CL Datag E/S 06/09/09 VII 0.459 120 C 0.491 0.182 0.300 - - - 97.30 93.24% V. Satisfactory

Maghuyop Construction 21641 Completion of Multi-Purpose Building, CVSCAFT, Tagbilaran City Campus 03/04/09 VII 0.915 115 C 0.497 0.138 0.300 - - - 93.50 *93.50%

V. Satisfactory

Maghuyop Construction 21641 Conc. of FMR 05/13/08 VII 1.925 120 C 0.343 0.300 0.300 - - - 94.30 86.98% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page290

Page 299: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Maghuyop Construction 21641 Concreting of Multi-Purpose Pavement Tagbuane 03/03/09 VII 0.137 110 C 0.416 0.200 0.300 - - - 91.60 *91.60%

V. Satisfactory

Maghuyop Construction 21641 Concreting of Road 08/28/08 VII 2.784 120 C 0.345 0.222 0.300 - - - 86.70 83.88% V. Satisfactory

Maghuyop Construction 21641 Const. of 2 CL Sch. Bldg. w/o CR Guinacot H/S 08/29/08 VII 0.853 90 C 0.352 0.256 0.300 - - - 90.80 88.98%

V. Satisfactory

Maghuyop Construction 21641 Construction of Multi-Purpose Pavement, Basac Dacu 03/03/09 VII 0.137 110 C 0.450 0.133 0.300 - - - 88.30 *88.30%

Satisfactory

Maghuyop Construction 21641 Reconstruction of Balilihan Central Elementary School 03/03/09 VII 3.525 180 C 0.494 0.181 0.300 - - - 97.50 96.31%

Outstanding

Maghuyop Construction 21641 Renovation of Multi Purpose Pavement 11/20/07 VII 0.093 90 C 0.364 0.000 0.300 - - - 66.40 *66.40% Fair

Maghuyop Construction 21641 Const. of MPB Cogon Norte 02/24/10 VII 2.019 120 C 0.473 0.112 0.300 - - - 88.50 93.47% V. Satisfactory

Magna Rich Trading & Construction 29108 Const. of FMR Brgy. San Antonio 11/19/08 IV-A 0.955 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Makapa Corporation 30029 Const. of Sampaloc Seawall @ Sitio Little Mahingan 05/13/08 V 3.803 104 C 0.400 0.000 0.300 - - - 70.00 78.50%

Satisfactory

Makapa Corporation 30029 Const./Impvt. of Cawayan River Control 08/13/07 V 9.452 120 C 0.365 0.195 0.300 - - - 86.00 84.14% V. Satisfactory

Makapa Corporation 30029 Rehab./Retrofitting of Cawayan Bridge along Maharlika Highway 11/19/08 V 19.016 210 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Makapa Corporation 30029 Repair/Rehab. of Cawayan River Control 02/18/08 V 9.497 150 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory

Makati Development Corporation 2313 Const. of 10th & 11th Aveneus of Bonifacio Triangle Project 06/14/07 BCDA 52.800 120 c.d. O 0.316 0.300 0.100 0.020 0.047 0.100 88.28 -

Makati Development Corporation 2313 Const. of 10th and 11th Avenues of Bonifacio Triangle 09/24/07 BCDA 52.800 120 O 0.377 0.275 0.070 0.023 0.045 0.100 88.94 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page291

Page 300: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Makati Development Corporation 2313 Const. of 34.5 KVA UPDS along 26th St., 32nd St. & McKinley Parkway, Phase 3 09/21/07 BCDA 12.084 163 O 0.400 0.300 0.100 0.020 0.045 0.067 93.17 -

Mak-Jay Construction 19057 Concreting of Paykek-Kapangan Road 08/26/09 CAR 0.424 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory

Mak-Well Enterprises 25003 Const./Repair/Rehab. of MPB at Brgy. Tadlac 11/20/08 IV-A 2.880 35 C 0.316 0.200 0.300 - - - 81.60 *81.60%

V. Satisfactory

MAM Construction & Trading (Formerly: MAM Construction) 19915 Conc./Upgrading of Angeles-Porac-

Dinalupihan Road 11/12/07 III 5.689 72 C 0.282 0.272 0.300 - - - 85.40 *85.40% V. Satisfactory

MAM Construction & Trading (Formerly: MAM Construction) 19915 Const. of 2CL Sch. Bldg. at Sta. Rita E/S 08/13/08 III 0.765 88 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

MAM Construction & Trading (Formerly: MAM Construction) 19915 Const. of Elem. School Bldg. at Sta. Cruz

ES 11/10/08 III 0.786 80 C 0.383 0.276 0.300 - - - 95.90 *95.90% Outstanding

MAM Construction & Trading (Formerly: MAM Construction) 19915 Repair and Rehab. of San Pedro ES 11/10/08 III 0.384 80 C 0.338 0.300 0.300 - - - 93.80 *93.80%

Outstanding

Mamsar Construction and Industrial Corporation 15885

Rehab./Reconst./Upgrading of Damaged Paved National Roads at Poblacion

Section, Sta. 1524+000-Sta. 1526+000 w/ exception

09/14/09 X 18.467 150 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory

Mamsar Construction and Industrial Corporation 15885

Const. of Shore Protection including RC Pier /Wharf and Reclamation Area, DPWH,

RES03/09/10 XI 106.212 400 O 0.328 0.300 0.150 0.030 0.045 0.033 88.60 -

Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &

Approaches 12/05/07 X 16.484 298 C 0.380 0.300 0.300 - - - 98.00 86.64% V. Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885

Completion of Mandulog Bridge I along Ma. Cristina-Misamis Oriental Rd., Brgy. San

Roque-Hinaplanon09/01/07 X 13.667 315 C 0.317 0.300 0.300 - - - 91.70 94.08%

Outstanding

Mamsar Enterprises Agro-Industrial Corporation 15885 Const. of Mambu-ao Bridge & Approaches 08/25/08 X 22.223 395 C 0.353 0.293 0.300 - - - 94.60 89.66%

V. Satisfactory

Mamsar Enterprises Agro-Industrial Corporation 15885 Const./Impvt. of Water Supply Projects 11/25/08 XIII 10.392 180 C 0.311 0.200 0.300 - - - 81.10 87.28%

V. Satisfactory

Maningo Enterprises 13330 Concreting of Road, 11th Street, Doña Rosario Village, Barangay Labogon 06/05/09 VII 2.033 75 C 0.360 0.200 0.300 - - - 86.00 *86.00%

Satisfactory

Maningo Enterprises 13330 Const. of 2 Storey 6 CL E/S Bldg. 08/28/08 VII 4.767 100 C 0.227 0.200 0.300 - - - 72.70 *72.70% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page292

Page 301: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Manuel A. Dela Torre Jr. Builders 31024 Conc. of Fatima V 11/26/08 III 0.949 55 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding

Manuel A. Dela Torre, Jr. Builders 31024 Const. of Farm-to-Market Road at Sapang Pahalang 09/08/09 III 4.758 90 C 0.448 0.133 0.300 - - - 88.10 85.70%

Satisfactory

Map Alviola Construction 31951 Construction of Flood Control and Drainage Facilities 06/09/09 VII 0.946 45 C 0.431 0.133 0.300 - - - 86.40 *86.40%

Satisfactory

Map Alviola Construction 31951 Const. of Flood Control (Seawall) 08/25/08 VII 0.943 45 C 0.327 0.200 0.300 - - - 82.70 *82.70% V. Satisfactory

Map Alviola Construction 31951 Const. of Water System 05/26/08 VII 0.165 40 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory

Marbel Dynamic Builders 6150 Const. of Koronadal NCHS Annex, Bacongco Campus 03/14/09 XII 1.734 126 C 0.449 0.133 0.300 - - - 88.20 82.53%

Satisfactory

Marbel Dynamic Builders 6150 Impvt. of MPB at Poblacion 11/29/07 XII 0.961 123 C 0.275 0.200 0.300 - - - 77.50 *77.50% Satisfactory

Marcbilt Construction, Inc. 21844Conc. of Bontoc-Tabuk-Tuguegarao Road,

Bontoc-Tinglayan Boundary, Section I Ampawilen to Malanas Section

05/23/09 CAR 131.136 450 O 0.270 0.300 0.150 0.030 0.045 0.050 84.50 -

Marcbilt Construction, Inc. 21844 Road Upgrading (Gravel to Paved) MWCR, (San Francisco Section) 05/29/09 IV-B 28.659 150 O 0.303 0.300 0.150 0.030 0.035 0.050 86.80 -

Marcbilt Construction, Inc. 21844Road Upgrading (Gravel to Paved) MWCR, Sablayan-Sta. Cruz (Buenavista-Sto. Nino

Section)05/29/09 IV-B 19.112 140 O 0.305 0.290 0.150 0.030 0.025 0.050 85.00 -

Marcbilt Construction, Inc. 21844 Rehab./Reconst. (Conc.) of Dasmariñas-Carmona Road 11/12/08 IV-A 28.920 180 O 0.341 0.202 0.100 0.030 0.037 0.100 81.00 -

Marcbilt Construction, Inc. 21844 Rehab./Reconstruction of Carmona Diversion Road 09/08/09 IVA 23.957 109 C 0.438 0.200 0.300 - - - 93.80 90.20%

V. Satisfactory

Marcbilt Construction, Inc. 21844

Road Upgrading (gravel to paved), MWCR, Sablayan-Sta. Cruz (Buenavista-Sto. Nino

Section) KO 322+594- KO 323+465.65 to KO 323+622-KO 324+472

08/31/09 IVB 19.300 140 O 0.351 0.292 0.150 0.030 0.042 0.033 89.80 -

Marcbilt Construction, Inc. 21844Road Upgrading (gravel to paved), MWCR, (San Francisco Section) KO 332+300- KO

334+75508/30/09 IVB 28.659 165 O 0.337 0.300 0.150 0.030 0.042 0.033 89.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page293

Page 302: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Marcbilt Construction, Inc. 21844

Conc. of Bontoc-Tabuk-Tuguegarao Road, Bontoc, Tinglayan Bdry., Sect. I, Ampawilen to Malanas Section,

Km.411+140 - Km.416+055 (with exception)

08/29/09 CAR 131.136 425 O 0.358 0.240 0.150 0.030 0.056 0.033 86.70 -

Marcbilt Construction, Inc. 21844Road Upgrading of San Francisco Section (Gravel to Paved) MWCR (San Francisco

Section) KO 332+300 - KO 334+75502/20/10 IVB 28.950 193 C 0.363 0.200 0.300 - - - 86.30 87.32%

Satisfactory

Marcbilt Constructions, Inc. 21844 Rehab./Reconst. (Conc.) of Dasmariñas-Carmona Road 03/11/09 IV-A 28.917 190 C 0.454 0.133 0.300 - - - 88.70 84.08%

Satisfactory

Marcons Builder 8044 Const. of DPWH Building CAR (Phase IV) 05/29/08 CAR 8.553 150 O 0.363 0.240 0.100 0.030 0.051 0.100 88.40 -

Marcons Builder 8044 Const. of DPWH Regional Office Building (Phase V) 08/29/08 CAR 24.059 360 O 0.376 0.300 0.100 0.030 0.047 0.100 95.30 -

Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V 03/13/09 CAR 24.058 360 O 0.361 0.276 0.150 0.030 0.056 0.033 90.60 -

Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road 08/15/08 CAR 12.707 180 C 0.318 0.100 0.000 - - - 41.80 58.56% Poor

Marcons Builder 8044 Rehab./Impvt./Const. of DPWH Building (Phase III) 08/31/07 CAR 14.475 300 C 0.357 0.267 0.300 - - - 92.40 92.05%

Outstanding

Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V 03/04/10 CAR 24.058 395 C 0.481 0.133 0.300 - - - 91.40 92.48%

V. Satisfactory

Marcphil Construction 10949 Conc. of Port Road, Proper Bansud 09/05/07 IV-B 1.889 56 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

Marcphil Construction 10949 Concreting of San Aquilino-Baroc Road 02/26/09 IV-B 0.951 50 C 0.432 0.133 0.300 - - - 86.50 *86.50% Satisfactory

Marcris Enterprises 32820Repair and Rehab. of Ilang Bridge along

Carmen Jct.-Bayambang San Carlos-Manat Road

05/28/08 I 0.963 45 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding

Marcus Construction 12601 Conc. of Midsayap-Makar Road, Salunayan-Tumbras Section 11/22/07 XII 19.109 140 C 0.368 0.300 0.300 - - - 96.80 *96.80%

Outstanding

Marcus Construction 12601 Const. of Drainage Canal from Buluan Bridge II to Libungan River, Phase I, II & III 02/28/08 XII 14.285 175 C 0.300 0.300 0.300 - - - 90.00 *90.00%

V.Satisfactory

Marcus Construction 12601 Proposed Conc. of Liloy-Siocon Road, Imelda-San Roque-Gutalac Sect. 03/09/09 IX 19.128 225 C 0.459 0.155 0.300 - - - 91.40 84.05%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page294

Page 303: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Marcus Construction 12601Repair/Maintenance of Libungan Flood Control (Slope Protection Upstream of

Approach "B" of Libungan Bridge) Phase II11/19/08 XII 1.315 40 C 0.325 0.300 0.300 - - - 92.50 *92.50%

Outstanding

Marcus Construction 12601Repair/Rehab./Impv't. of Damaged Road

Section along Davao-Cotabato Road, Pikit-Midsayap Section

03/04/09 XII 9.435 125 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding

Marcus Construction 12601Rehab./Impvt. of Bukidnon-Cotabato National Road (Tambad Sect.), Brgy.

Tambad09/03/09 XII 57.136 289 O 0.368 0.300 0.150 0.030 0.033 0.033 91.40 -

Marcus Construction 12601Const. of Slope Protection Works along

Dualing-New Panay-Midsayap Road (Arizona Section)

09/04/09 XII 9.407 206 O 0.400 0.240 0.150 0.010 0.042 0.033 87.50 -

Marcus Construction 12601 Const. of Multi-Purpose Building at Midsayap Pilot Elementary School 02/26/10 XII 6.096 130 C 0.449 0.188 0.300 - - - 93.70 93.70%

V. Satisfactory

Marcus Construction 12601 Concrete Re-blocking along Davao-Cotabato Road 02/27/10 XII 6.378 110 C 0.407 0.133 0.300 - - - 84.00 84.00%

Satisfactory

Mardeb Construction & Development 6715 Construction of Manili Bridge 03/01/10 II 13.889 330 O 0.377 0.300 0.150 0.030 0.050 0.033 94.00 -

Mar-Deb Construction & Development 6715 Cagayan River Basin Protection Works,

Macate Section 11/23/07 II 19.269 210 C 0.259 0.300 0.300 - - - 85.90 *85.90% V. Satisfactory

Mar-Deb Construction & Development 6715 Completion of Turod-Banquero Concrete

Overflow Bridge PhaseIII 08/14/08 II 9.879 300 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -

Mar-Deb Construction & Development 6715 Conc. of Cauayan-Cabatuan National Road,

Cabatuan Section 02/28/08 II 9.412 190 C 0.342 0.200 0.300 - - - 84.20 87.02% V. Satisfactory

Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan Road

(Cabatuan Sect.) 03/04/09 II 9.563 150 C 0.439 0.200 0.300 - - - 93.90 91.68% V.Satisfactory

Mar-deb Construction & Development 6715 Conc. of Jct. Ipil-Quirino Bdry. Road 11/24/08 II 27.182 330 C 0.354 0.200 0.300 - - - 85.40 87.38%

V. Satisfactory

Mar-deb Construction & Development 6715 Const. of Bintacan Bridge & Approaches 05/21/07 II 24.964 270 O 0.382 0.300 0.030 0.030 0.019 0.033 79.40 -

Mar-deb Construction & Development 6715 Construction of Bintacan Bridge &

Approaches 11/19/08 II 24.964 446 C 0.393 0.300 0.000 - - - 69.30 77.32% Satisfactory

Mar-deb Construction & Development 6715 Impvt./Rehab. of Cauayan-Cabatuan Road 05/22/08 II 9.559 250 C 0.292 0.200 0.300 - - - 79.20 82.44%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page295

Page 304: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mar-deb Construction & Development 6715 Impvt./Rehab. of Daang Maharlika Road

(Widening) 11/14/07 II 4.778 160 C 0.298 0.300 0.300 - - - 89.80 88.90% V. Satisfactory

Mar-deb Construction & Development 6715 Reblocking of Concrete Pavement along

Santiago-Tuguegarao Rd. 05/23/08 II 4.741 330 C 0.328 0.200 0.300 - - - 82.80 *82.80% V. Satisfactory

Mar-deb Construction & Development 6715 Repair/Rehab.of Pigalo Bridge (Phase III) 05/23/08 II 4.790 255 C 0.319 0.200 0.300 - - - 81.90 84.12%

V. Satisfactory

Mar-deb Construction & Development 6715 Widening of Cauayan-Cabatuan Road

(Luna Section) 03/04/09 II 3.344 120 C 0.442 0.200 0.300 - - - 94.20 92.04% V.Satisfactory

Mar-Deb Construction & Development 6715

Rehab./Reconst./Upgrading of Damaged Paved National Roads w/ Widening, Daang

Maharlika KO 368+056-KO366+75608/26/09 II 13.387 132 C 0.439 0.200 0.300 - - - 93.90 *93.90%

V. Satisfactory

Mar-Deb Construction & Development 6715 Const. of 2-CLSB, Cauayan National H/S

Ext. Research Minante I 08/26/09 II 0.920 90 C 0.447 0.153 0.300 - - - 90.00 *90.00% V. Satisfactory

Mar-deb Construction & Development 6715 Const. of Dioton Bridge Bank Protection 02/24/10 II 0.950 90 C 0.427 0.133 0.300 - - - 86.00 86.00%

Satisfactory

Mar-deb Construction & Development 6715 Completion of Multi-Purpose Building at

Carabbatan Chica 02/24/10 II 0.143 40 C 0.395 0.162 0.300 - - - 85.70 85.70% Satisfactory

Mar-Deb Construction & Development 6715 Rehab/Reconst. Of Santiago-Tuguegarao

Road 05/26/09 II 11.473 237 C 0.454 0.200 0.300 - - - 95.40 93.03% V. Satisfactory

Mar-Deb Construction & Development 6715 Completion of Turod-Banquero Concrete

Overflow Bridge Phase III 05/26/09 II 9.879 535 C 0.457 0.200 0.300 - - - 95.70 84.96% Satisfactory

Margarita Construction 20201 Asphalt Overlay @ Brgy. Sucol 08/17/07 IV-A 0.480 3 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

Margarita Construction 20201 Rehab. of Norzagaray-Bigte Road 11/14/07 III 5.709 80 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory

Margarita Construction 20201 Rehab. of Sta. Maria-By Pass Road 09/07/09 III 4.757 100 O 0.357 0.240 0.150 0.030 0.042 0.033 85.20 -

Marier Construction & Supply 22878 Const. of One Unit 2 CL Sch. Bldg. at Siare Jhon HRN NHS 03/12/08 IX 0.948 150 C 0.335 0.287 0.300 - - - 92.20 *92.20%

Outstanding

Marigold Development Corporation 4707 Construction of Multi-Purpose Building @ Brgy. Baesa 08/23/07 NCR 1.145 60 C 0.319 0.202 0.300 - - - 82.10 *82.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page296

Page 305: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Marilag Construction 22813 Const. of Multi-Purpose Bldg., (Senior Citizen) 08/23/07 IV-A 0.478 40 C 0.380 0.200 0.300 - - - 88.00 *88.00%

V. Satisfactory

Marknest Construction 16818 Const. of MPB @ Bo. Obrero E/S 05/16/08 NCR 4.755 120 C 0.387 0.174 0.300 - - - 86.10 *86.10% V. Satisfactory

Marknest Construction and Builders (Formerly: Marknest Construction) 16818 Rehab/Reconst/Upgrading of Drainage

along GSO Road 08/25/09 III 9.520 115 C 0.402 0.133 0.300 - - - 83.50 *83.50% Satisfactory

Marknest Construction and Trading (Formerly: Marknest Const.) 16818 Road Upgrading of Mt. Arayat Park Road 05/19/09 III 11.429 90 O 0.356 0.300 0.150 0.020 0.033 0.050 90.90 -

Marknest Construction and Trading (Formerly: Marknest Construction) 16818 Const. of MPB at Nueva Victoria 11/11/08 III 0.952 25 C 0.315 0.200 0.300 - - - 81.50 *81.50%

V. Satisfactory

Marknest Construction and Trading (Formerly: Marknest Construction) 16818 Road Upgrading of Mt. Arayat National

Park Road 02/15/10 III 11.429 90 C 0.460 0.200 0.300 - - - 96.00 92.94% V. Satisfactory

Marknest Construction and Trading (Formerly: Marknest Construction) 16818 Const. of Gerry Rodriguez High School

Divisoria 02/15/10 III 7.517 120 C 0.485 0.200 0.300 - - - 98.50 88.98% Satisfactory

Marquin Construction 13332 Conc. of Roads at Brgy. Cogon 08/29/08 VII 0.882 45 C 0.314 0.184 0.300 - - - 79.80 *79.80% Satisfactory

Marquin Construction 13332 Const. of 3 CL SB @ Guinsay NHS 12/03/08 VII 1.825 70 C 0.310 0.262 0.300 - - - 87.20 75.37% Satisfactory

Marquin Construction 13332 Const. Rehab. of SB at Ramon Durano Sr. Science & Tech. 05/27/08 VII 0.894 70 C 0.361 0.300 0.300 - - - 96.10 *96.10%

Outstanding

Marquin Construction 13332 Construction of MPB Maslog E/S 03/10/09 VII 0.902 70 C 0.335 0.200 0.300 - - - 83.50 *83.50% Satisfactory

Marquin Construction 13332 Road Concreting of Brgy. Bili 03/10/09 VII 0.454 70 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory

Marquin Construction 13332 Road Concreting of Brgy. Tabunan-Brgy. Managase 03/10/09 VII 0.454 70 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V. Satisfactory

Marquin Construction 13332 Const. of 2-CL SB on top of the existing SB at Compostela NHS 09/14/09 VII 2.234 120 O 0.383 0.240 0.150 0.030 0.035 0.025 86.30 -

Marquin Construction 13332 Construction of 2-CL SB at Mohon NHS 09/14/09 VII 1.212 120 O 0.332 0.240 0.150 0.030 0.035 0.025 81.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page297

Page 306: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Marquin Construction 13332 Const. of 2-CL SB on top of the existing SB at Compostela NHS 03/09/10 VII 2.234 120 C 0.476 0.097 0.300 - - - 87.30 86.60%

Satisfactory

Marquin Construction 13332 Const. of 2-CL SB at Mohon NHS 03/09/10 VII 1.212 120 C 0.481 0.102 0.300 - - - 88.30 83.33% Satisfactory

Martha Construction Supply & General Merchandise 25827 Repair of Unpaved Shoulder 08/15/07 II 0.418 60 C 0.326 0.200 0.300 - - - 82.60 *82.60%

V. Satisfactory

Mar-vel Construction 23722 Conc. of Drainage System along MSR Daang Maharlika Road 02/23/08 IV-A 0.960 30 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V. Satisfactory

Mar-vel Construction 23722 Conc. of Road @ Brgy. Real 08/17/07 IV-A 0.289 30 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory

Mar-vel Construction 23722 Conc. of Road @ Brgy. Uno going to Brgy. Rizal 11/19/07 IV-A 4.801 60 C 0.298 0.200 0.300 - - - 79.80 *79.80%

Satisfactory

Mar-vel Construction 23722 Const. of Flood Control System/Riprapping @ Brgy. Estrella 11/20/08 IV-A 2.880 60 C 0.225 0.300 0.300 - - - 82.50 *82.50%

V. Satisfactory

Mar-vel Construction 23722 Const. of MPB @ Brgy. Puypuy 08/17/07 IV-A 0.480 30 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Mar-vel Construction 23722 Const. of Roads at Brgy. Bucal 08/14/08 IV-A 0.334 15 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory

Mar-vel Construction 23722 Impvt./Rehab. of Flood Control 08/21/08 IV-A 0.959 45 C 0.176 0.300 0.300 - - - 77.60 76.22% Satisfactory

Mar-Vel Construction & Supply 23722 Const./Impvt. of Water Supply Project in Waterless Municipality of Langgam 06/01/09 IV-A 2.316 133 C 0.417 0.133 0.300 - - - 85.00 85.48%

Satisfactory

Mar-vel Construction & Supply 23722 Const. of MPB at Ospital ng Biñan 03/02/09 IV-A 4.801 55 C 0.492 0.185 0.300 - - - 97.70 *97.70% Outstanding

Mar-vel Construction & Supply 23722 Const./Impvt. of Water Supply Projects in Waterless Municipality at Langgam 03/02/09 IV-A 2.316 133 O 0.400 0.200 0.150 0.030 0.028 0.050 85.80 *85.80%

Satisfactory

Mar-vel Construction & Supply 23722 Const. of MPB at Brgy. San Cristobal 02/24/10 IVA 2.887 40 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page298

Page 307: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mar-vel Construction and Supply 23722 Const. (Opening/Conc.) Bucal By Pass Road 09/02/09 IVA 28.890 120 C 0.376 0.200 0.300 - - - 87.60 *87.60%

Satisfactory

Mar-Vel Construction and Supply (Formerly: mar-Vel Const.) 23722

Repair/Maint. Asphalt Overlay of Daang Maharlika Road, Km. 132+500-Km.135+000

with exception05/26/09 III 14.103 10 C 0.348 0.200 0.300 - - - 84.80 *84.80%

Satisfactory

Mash Construction 20806 Const. of MPB at Brgy. Mabini 11/24/07 IV-A 1.444 120 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

Masulot Construction 10716

Const. (Opening) of Missing Links at Tubalan-Pangian-Pinalpalan-Alabel Road, Malita-Jose Abad Santos Road, Tubalan

Section

05/28/09 XI 19.089 115 O 0.400 0.300 0.150 0.022 0.028 0.033 93.30 -

Masulot Construction 10716 Road Upgrading of Mati-Maragusan Road (Buso-Taguibo Section) 06/05/09 XI 15.429 100 O 0.315 0.300 0.150 0.030 0.037 0.033 86.50 -

Masulot Construction 10716 Road Upgrading of Mati-Maragusan Road (Don Martin Marundan-Menzi Section) 06/05/09 XI 19.289 120 O 0.313 0.300 0.150 0.030 0.037 0.033 86.30 -

Masulot Construction 10716Rehab./Recons./Upgrading of Digos-Makar

Road, Kiblagon-Tagansule Section, Km. 1584+000-Km. 1584+750

05/28/09 XI 9.649 180 O 0.363 0.237 0.150 0.030 0.037 0.033 85.00 -

Masulot Construction 10716 Const. of Kidapawan-Magpet-Pangao-an Road, Mateo-Gubatan Section 06/01/09 R-XII 30.528 250 O 0.292 0.300 0.000 0.024 0.050 0.033 69.90 -

Masulot Construction 10716 Const. of Sabang Bridge along Arakan-Anapolon-Napaliko-Katipunan Road 05/30/09 R-XII 9.218 150 O 0.308 0.300 0.000 0.018 0.035 0.033 69.40 -

Masulot Construction 10716

Const. of Sabang Bridge along Arakan-Analopon-Napaliko-Katipunan Road (Steel

Truss Component to be supplied by others)

09/05/09 XII 9.217 150 O 0.336 0.300 0.000 0.010 0.028 0.033 70.70 -

Masulot Construction 10716 Const. of Kidapawan-Magpet-Pangao-An Road, Mateo-Gubatan Sect.) 09/05/09 XII 30.527 250 O 0.307 0.290 0.000 0.010 0.033 0.033 67.30 -

Masulot Construction 10716

Const. (Opening) of Missing Links of Tubalan-Pangian-Pinalpalan-Alabel Road

Malita, Jose Abad Santos Rd., Tubalan Section

09/03/09 XI 19.089 115 C 0.467 0.193 0.300 - - - 96.00 94.38% V. Satisfactory

Masulot Construction 10716 Road Upgrading of Mati-Maragusan Road (Buso-Taguibo Sect.) 09/14/09 XI 15.429 100 C 0.453 0.152 0.300 - - - 90.50 88.10%

Satisfactory

Masulot Construction 10716

Rehab./Reconst./Upgrading of Damaged Paved National Road, Digos-Makar Road-Baluyan-Sarangani Prov. Boundary Sect.

Km. 1590+000-Km. 1591+650

09/03/09 XI 19.291 210 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page299

Page 308: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Masulot Construction 10716 Road Upgrading of Mati-Maragusan Road (Don Martin Marundan-Menzi Section) 09/14/09 XI 19.289 120 C 0.440 0.142 0.300 - - - 88.20 87.06%

Satisfactory

Masulot Construction 10716

Rehab./Reconst.Upgrading of Damaged Paved Nat'l Road Digos-Makar Road

Kiblagon Section Km.1584+000-Km.1584+750

09/03/09 XI 9.649 180 C 0.439 0.133 0.300 - - - 87.20 85.88% Satisfactory

Maverick & Wee Eng Joint VentureSL1-SN-

005102/JV-07-105

Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay Boston) Banganga-

Cateel Section06/09/09 XI 191.222 597 O 0.368 0.255 0.150 0.030 0.060 0.050 91.30 -

Maverick & Wee Eng Joint Venture JV-07-105CP 8: Impvt./Conc. of Surigao Sur-Davao

Oriental Coastal Road (Manay-Boston) Baganga-Cateel Section

11/25/08 XI 191.290 597 O 0.381 0.240 0.100 0.030 0.060 0.100 91.10 -

Maverick Builders 14466 Impv't/Conc. of Compostela-Cateel Road 11/29/07 XI 66.371 369 C 0.365 0.300 0.300 - - - 96.50 97.10% Outstanding

Maverick Builders Incorporated 14460Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental Coastal Road,

Badas-Baso Section06/05/09 XI 48.132 161 O 0.381 0.300 0.150 0.030 0.051 0.033 94.50 -

Maverick Builders Incorporated 14460Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental Coastal Road,

(Dawan-Tagamot Section)06/05/09 XI 71.995 210 O 0.380 0.300 0.150 0.030 0.047 0.033 94.00 -

Maverick Builders Incorporated 14466Rehab./Recons./Upgrading of Damaged

Paved National Roads, for Package 1-A: a) Matina-Harana Section

06/11/09 XI 19.284 210 O 0.360 0.300 0.150 0.030 0.051 0.033 92.40 -

Maverick Builders Incorporated 31666 Concreting of Compostela-Cateel Road 06/08/09 XI 67.990 590 O 0.341 0.236 0.150 0.030 0.042 0.050 84.90 -

Maverick Builders Incorporated (Formerly: Maverick Builders) 14466 Rehab. of Davao-Or.-Surigao Coastal Road

Banaybanay-Mati Section (Phase II) 05/23/08 XI 19.290 180 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory

Maverick Builders, Incorporated 14460Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental Coastal Road,

Badas-Baso Section09/11/09 XI 48.132 164 C 0.450 0.133 0.300 - - - 88.30 92.98%

V. Satisfactory

Maverick Builders, Incorporated 14466Rehab./Reconst./Upgrading of Damaged Paved National Road @ Manatina-Harana

Section 09/11/09 XI 19.284 210 C 0.434 0.200 0.300 - - - 93.40 92.80%

V. Satisfactory

Maverick Builders, Incorporated 14466 Road Upgrading at Fatima-Malabog Road 09/16/09 XI 13.486 112 C 0.420 0.200 0.300 - - - 92.00 *92.00% V. Satisfactory

Maverick Builders, Incorporated 14466 Concreting of Compostela-Cateel Road 09/12/09 XI 69.384 590 O 0.265 0.300 0.150 0.030 0.047 0.033 82.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page300

Page 309: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Maverick Builders, Incorporated 14460Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental Coastal Road

(Dawan-Tagamot Section)03/02/10 XI 71.995 225 C 0.343 0.200 0.300 - - - 84.30 90.12%

V. Satisfactory

Maverick Builders, Incorporated 14466 Conc. of Compostela-Cateel Road 03/03/10 XI 69.384 590 C 0.347 0.200 0.300 - - - 84.70 83.75% Satisfactory

Maverick Builders, Incorporated (Formerly: Maverick Builders) 14466 Conc. of Compostela-Cateel Road 03/09/09 XI 67.990 590 O 0.266 0.300 0.150 0.030 0.032 0.050 82.80 -

Maverick Builders, Incorporated (Formerly: Maverick Builders) 14466

Rehab./Impv't. of Manay-Mati Sect. along Surigao Sur-Davao Oriental Coastal Road,

Badas-Baso Section03/11/09 XI 48.132 161 O 0.388 0.300 0.150 0.030 0.059 0.050 97.70 -

Maxnell Enterprises 7170 Completion of Public Market @ Brgy. San Pedro 09/02/09 VI 0.964 45 C 0.480 0.133 0.300 - - - 91.30 *91.30%

V. Satisfactory

Maxnell Enterprises 7170 Const. of 2 CL Building at Lacaron Elementary School 02/25/10 VI 1.140 90 C 0.424 0.164 0.300 - - - 88.80 88.80%

Satisfactory

Mayhaligue Construction and Supply 29586 Bagabag Airport Dev't Project (Repair/Rehabilitation of Terminal Building) 03/03/10 DOTC 4.802 120 C 0.463 0.200 0.300 - - - 96.30 96.30%

Outstanding

Mayhaligue Construction and Supply/B. Vicencio Const. (Joint

Venture)JV-08-023

Bagabag Airport Dev't Project (Completion of Concreting of Runway, Concreting of

Apron and Taxiway,Concreting of Vehicular Parking Area and Access Road

03/03/10 DOTC 72.214 300 C 0.432 0.200 0.300 - - - 93.20 93.20% V.Satisfactory

Mayhaligue Cosntruction & Supply 29586 Const. of Dapdap MPB 05/27/08 II 0.470 40 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

Mayokins Construction 31486 Construction of Covered Walkway along Access Road 01/24/08 PUP 2.565 74 C 0.400 0.284 0.300 - - - 98.40 98.40%

Outstanding

MBB Construction 11363 Ilocos Sur 2nd District Engineering Office Building 05/29/09 I 14.140 413 C 0.460 0.091 0.300 - - - 85.10 70.26%

Poor

MBB Construction 11363 MNR, Candon-Santiago Section 05/30/09 I 18.920 200 C 0.426 0.068 0.300 - - - 79.40 66.74% Poor

MBB Construction 11363 Rehab./Reconst. of Damaged National Road, Candon-Salcedo Road 05/30/09 I 18.989 300 C 0.258 0.073 0.300 - - - 63.10 63.96%

Poor

MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. 08/13/08 I 14.140 365 O 0.261 0.240 0.100 0.030 0.037 0.100 76.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page301

Page 310: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. 11/12/08 I 14.140 365 O 0.251 0.115 0.030 0.022 0.025 0.067 51.00 -

MBB Construction 11363 Const. of MPB 11/16/07 I 9.460 245 C 0.298 0.250 0.300 - - - 84.80 70.80% Satisfactory

MBB Construction 11363 Const. of Santa Seawall 08/14/08 I 19.211 210 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory

MBB Construction 11363 Impv't. of Vigan-Sta. Catalina Road 02/26/08 I 19.298 180 C 0.315 0.200 0.300 - - - 81.50 83.39% V. Satisfactory

MBB Construction 11363 MNR, Candon-Santiago Section 11/12/08 I 18.920 200 O 0.338 0.034 0.100 0.022 0.022 0.067 58.30 -

MBB Construction 11363 Rehab. of Conc. Pavement along MNR, Candon Section 05/14/08 I 9.449 120 C 0.221 0.300 0.300 - - - 82.10 83.66%

V. Satisfactory

MBB Construction 11363 Rehab./Reconst. of Vigan Airport Road 11/13/08 I 19.014 180 C 0.037 0.200 0.300 - - - 53.70 83.52% V. Satisfactory

MBB Construction 11363 Sta. Maria- Burgos Road 02/27/09 I 1.698 124 C 0.339 0.200 0.000 - - - 53.90 65.54%Poor

MBB Construction 11363 Rehabilitation/Reconstruction of Quirino-Pandan Road 09/07/09 I 9.510 148 C 0.397 0.200 0.300 - - - 89.70 *89.70%

V. Satisfactory

MBB Construction 11363 Bagar-San Agustin-Poblacion Road 02/17/10 I 21.921 230 O 0.272 0.300 0.150 0.030 0.047 0.033 83.20 -

MBD General Const./Duragold Trading & Const. (JV) JV-05-014 Const. of Sagayon Bridge & Approaches 05/29/08 X 23.811 330 C 0.396 0.300 0.300 - - - 99.60 89.88%

V. Satisfactory

MBD General Construction 9991 Concreting of Oroquieta-Calamba Mt. Road 06/08/09 X 7.146 120 O 0.292 0.300 0.000 0.010 0.011 0.000 61.30 -

MBD General Construction 9991 Concreting of Calamba-Baliangao Road 06/08/09 X 16.180 180 O 0.256 0.200 0.000 0.010 0.011 0.000 47.70 -

MBD General Construction 9991 Conc. of Calamba-Baliangao Road 11/29/08 X 16.180 180 O 0.312 0.000 0.050 0.023 0.035 0.100 52.00 -

MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road 11/29/08 X 7.146 120 O 0.258 0.085 0.100 0.023 0.025 0.100 59.10 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page302

Page 311: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road 03/18/09 X 7.146 219 O 0.313 0.240 0.000 0.030 0.045 0.000 62.80 -

MBD General Construction 9991 Const. of Dalacon Bridge & Approaches along Oroquieta-Calamba Mt. Rd. 05/23/08 X 15.545 300 C 0.279 0.138 0.300 - - - 71.70 81.30%

V. Satisfactory

MBD General Construction 9991Rehab./Upgrading od Jimenez Port Road

and Concr. of Shoulders inc. Const. of Drainage Canal along Jimenez Old Route

09/15/09 X 13.349 150 O 0.392 0.252 0.150 0.020 0.051 0.033 89.80 -

MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road 09/15/09 X 7.146 120 O 0.253 0.244 0.000 0.030 0.028 0.033 58.80 -

MBD General Construction 9991Rd. Upgrading (Gravel to Paved) Based on Gravel Rd. Strategies Calamba-Baliangao

Rd. Km. 1792+853 - Km. 1793+62003/08/10 X 9.485 120 C 0.471 0.133 0.000 - - - 60.40 60.40%

Poor

MBD General Construction 9991 Conc. of Oroquiteta-Calamba Mt. Rd. 03/08/10 X 7.600 246 C 0.438 0.133 0.000 - - - 57.10 59.14% Poor

MBD/LABB Joint Venture JV-08-259Conc. of JCT TER, Jagna-Sierra Bullones

Rd. Km. 76.526-Km.77.681;Km77.9163-Km.78.94995&Km.79.19182-Km.81.500

09/04/09 VII 88.829 270 O 0.351 0.255 0.150 0.030 0.042 0.033 86.10 -

MBD/LABB Joint Venture JV-08-259 Conc. of Jct. TER, Jagna-Sierra Bullones Road 02/23/10 VII 90.445 270 C 0.433 0.133 0.300 - - - 86.60 86.69%

Satisfactory

MC Angel Construction 28545 Conc. of Road, Brgy. Macasndig 02/22/10 X 2.332 119 C 0.370 0.193 0.300 - - - 86.30 86.30% Satisfactory

MC Torio Construction 10534 Construction of Canal and Canal Structures (LMC-ARIP-01-06) 07/03/07 NIA-II 4.070 210 C 0.400 0.300 - - - - 70.00 *70.00%

Fair

MCB Construction & Supply 12128 Const. of Water System @ Brgy. Doyong Nagsaing & Ambuetel 11/26/08 I 4.820 90 C 0.380 0.200 0.300 - - - 88.00 *88.00%

V. Satisfactory

MCB Construction and Supply 12128 Repair of Bridge along Guimba-Cuyapo (Nueva Ecija)-Tarlac Road, Brgy. San Jose 09/03/09 III 4.330 177 C 0.487 0.133 0.300 - - - 92.00 *92.00%

V. Satisfactory

MCGR Engineering Services 22202 Repair/Rehab. of Leyte-Samar Road, Cabalawan to Tagpuro Road Section 06/10/09 VIII 9.635 141 C 0.486 0.133 0.300 - - - 91.90 *91.90%

V. Satisfactory

MCGR Engineering Services 22202 Construction of Multi-Purpose Building, Brgy. 44 06/10/09 VIII 0.963 70 C 0.411 0.133 0.300 - - - 84.40 *84.40%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page303

Page 312: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

MCGR Engineering Services 22202 Concreting of Various Roads 12/05/07 VIII 0.965 125 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory

MCGR Engineering Services 22202 Const. of Drainage System, Brgy. 43 & 43A 03/09/09 VIII 0.964 60 C 0.473 0.200 0.300 - - - 97.30 *97.30% Outstanding

MCGR Engineering Services 22202 Repair/Rehab. of Rizal Avenue Extension 09/04/08 VIII 2.846 90 C 0.283 0.200 0.300 - - - 78.30 84.48% V. Satisfactory

ME3 Construction 31364 Asphalting of Daang Maharlika (Surigao-Agusan Road Section) 09/06/07 XIII 4.813 45 C 0.384 0.205 0.300 - - - 88.90 *88.90%

V. Satisfactory

ME3 Construction 31364 Impvt./Rehab. of Butuan-Malaybalay Road 08/21/07 XIII 4.804 45 C 0.280 0.300 0.300 - - - 88.00 *88.00% V. Satisfactory

Meditech Trade & Development 16545Const./Rehab. of Multi-Purpose Pavement along McArthur Highway, Mabini, Gacutan

and Plaza del Rosario St.11/13/07 III 2.809 120 C 0.346 0.200 0.300 - - - 84.60 *84.60%

V. Satisfactory

Meditech Trade & Development 16545 Impvt. Along Ipil-Quirino Bdry. Road, Jones-San Agustin 03/03/08 II 9.590 90 C 0.335 0.300 0.300 - - - 93.50 *93.50%

Outstanding

Meditech Trade & Development 16545 Impvt. of Macalelon-Gen Luna Road 08/13/08 IV-A 19.282 50 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding

Meditech Trade & Development 16545 Impvt. of Quezon-Guimba Road, Manacsac Section 11/21/07 III 14.044 15 C 0.293 0.200 0.300 - - - 79.30 *79.30%

Satisfactory

Meditech Trade & Development 16545 Impvt./Rehab. Along Gamu-Roxas Road 02/27/08 II 9.566 60 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory

Meditech Trade & Development 16545 Reblocking/Impvt. of Roman Expressway, Batangas II Section 11/19/08 III 18.899 50 C 0.387 0.277 0.300 - - - 96.40 *96.40%

Outstanding

Meditech Trade & Development 16545Regravelling/Asphalt

Overlay/Rehabilitation/Impv't along Daang Maharlika

03/05/09 II 19.238 120 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding

Meditech Trade & Development 16545Rehab. of Catanauan-Lopez Road

(Additional Safety Warning Device) km. 252+000 - km. 255+000

02/19/08 III 4.820 22 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory

Meditech Trade & Development 16545 Repair/Rehab. of Road leading to Mt. Samat Shrine 08/14/08 IV-A 9.254 28 C 0.279 0.300 0.300 - - - 87.90 *87.90%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page304

Page 313: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mega Builders Corporation (Formerly: Gem Const. & Supply) 29732 Repair/Rehab. of Multi-Purpose/Academic

Bldg., Batangas State University 05/21/08 IV-A 1.319 90 O 0.357 0.278 0.100 0.030 0.031 0.100 89.60 -

Mega M Builders 20515 Conc. of Line Canal, Brgy. Sta. Ana 11/17/08 IV-A 4.823 50 C 0.257 0.300 0.300 - - - 85.70 *85.70% V.Satisfactory

Mega M Builders 20515 Const./Rehab. of Road, Brgy. Sta. Ana 11/17/08 IV-A 4.823 40 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding

Mega M Builders 20515 Impvt. of FMR at Brgy. San Gregorio 02/26/08 IV-A 0.335 27 C 0.333 0.200 0.300 - - - 83.30 *83.30% V.Satisfactory

Megashine Builders Corporation (Formerly: Gem Const. & Supply) 29732 Repair/Rehab. of Multi-Purpose/Academic

Bldg., Batangas State University 08/27/08 IV-A 1.319 90 C 0.361 0.246 0.300 - - - 90.70 89.93% V. Satisfactory

Megila Const. & Development Supply 19262 Completion of Catalunan Pequeno E/S 03/11/08 XI 0.471 60 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory

Megila Construction and Development Supply 19262 Const. of MPB @ Leon Garcia NHS 09/04/08 XI 1.406 134 C 0.348 0.300 0.300 - - - 94.80 87.10%

V. Satisfactory

Megila Construction and Development Supply 19262 PSHS SMC Perimeter Fence 07/08/08 DOST 975.931 76 C 0.371 0.300 0.000 - - - 67.10 67.10%

Fair

Megila Construction Development and Supply 19262 PSHS SMC Perimeter Fence 07/08/08 DOST 0.975 76 C 0.371 0.300 0.000 - - - 67.10 67.10%

Poor

Mel-Jean Construction Corporation 16344 Rehab./Reconst./Upgrading of Damaged National Roads at Rosario-San Juan Road 05/28/09 IV-A 10.612 120 C 0.456 0.133 0.300 - - - 88.90 *88.90%

V. Satisfactory

Mel-Jean Construction Corporation 16344 Conc. & Const. of Bridge at So. Matuod-Inilahan Road 08/22/08 IV-A 9.638 180 C 0.336 0.200 0.300 - - - 83.60 76.40%

Satisfactory

Mel-Jean Construction Corporation 16344 Impvt./Upgrading of Sablayan-Penal Colony Road, Tabtaban Section 03/01/09 IV-B 9.630 144 C 0.434 0.082 0.300 - - - 81.60 78.42%

Unsatisfactory

Mel-Jean Construction Corporation 16344 Rehab. of Rosario-San Juan Road 08/28/07 IV-A 9.618 180 C 0.279 0.200 0.300 - - - 77.90 80.84% V. Satisfactory

Mel-Jean Construction Corporation 16344Rehab./Reconst. of Damaged National Roads, Batangas-Lobo Road, Bacao

Section03/06/09 IV-A 19.298 150 C 0.473 0.133 0.300 - - - 90.60 87.90%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page305

Page 314: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mel-Jean Construction Corporation 16344 Const. of Multi-Purpose Building at Brgy. Balintawak 03/01/10 IVA 2.411 90 C 0.438 0.200 0.300 - - - 93.80 93.80%

V. Satisfactory

Mel-Jean Construction Corporation (Formerly: Mel-Jean Enterprises) 16344 Repair/ Rehab. of FMR at Brgy. San

Sebastian 09/01/09 IVA 0.289 210 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory

Melrobe Builders & Const. Supplies 29752 Const. of MPB @ Brgy. Pintatagan 05/23/08 XI 1.416 90 C 0.308 0.200 0.300 - - - 80.80 88.50% V. Satisfactory

Melrobe Builders & Const. Supplies 29752 Const. of MPB CES and Sigaboy AVHS, Brgy. Poblacion Sigaboy 11/27/08 XI 1.813 120 C 0.368 0.100 0.300 - - - 76.80 79.04%

Satisfactory

Melrobe Builders & Const. Supplies 29752 Const. of MPB CES under Package 1A, Brgy. Central 03/11/09 XI 2.143 183 C 0.478 0.200 0.300 - - - 97.80 78.13%

Unsatisfactory

Melrobe Builders & Construction Supplies 29752 Const. of Multi-Purpose Building Covered

Court) Brgy. Cabadiangan 06/10/09 XI 2.362 90 O 0.371 0.300 0.150 0.030 0.047 0.033 93.10 -

Melrobe Builders & Construction Supplies 29752 Construction of Water System @ Brgy. San

Pedro 06/08/09 XI 0.944 180 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory

Melrobe Builders & Construction Supplies 29752 Construction of Multi-Purpose Building

(Covered Court) Brgy. Cabadiangan 03/02/10 XI 2.362 90 C 0.471 0.133 0.300 - - - 90.40 92.29% V. Satisfactory

Mel's Construction and Concrete Products 32212 Rehab. of Gonzalo St. 11/21/07 CAR 0.273 90 C 0.295 0.200 0.300 - - - 79.50 *79.50%

Satisfactory

Meltech Construction 14551 Const. of Two (2) Storey, 2 CL Sch. Bldg. 11/19/07 III 1.896 55 C 0.287 0.200 0.300 - - - 78.70 *78.70% Satisfactory

Menjer Construction 22815 Construction of Perimeter Fence 11/26/08 DOST 8.853 180 O 0.349 0.242 0.150 0.018 0.025 0.033 81.70 -

Menjer Construction 22815 Construction of Perimeter Fence 11/26/08 DOST 8.853 180 O 0.349 0.242 0.150 0.018 0.025 0.033 74.10 -

MEP Construction 18759 Continuation of MPB 03/03/10 CAR 3.801 90 C 0.500 0.143 0.300 - - - 94.30 94.30% V. Satisfactory

Mercado Concrete Products 4898 Asphalting of Road @ Brgy. Ermita 09/06/07 VII 1.156 6 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page306

Page 315: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mercedita Benasas General Mdse. 31745 Conc. of Sablayan-Sta. Cruz Road, Cabacungan-Pag-asa Section 08/26/08 IV-B 9.554 120 C 0.358 0.200 0.300 - - - 85.80 63.42%

Fair

Mesgo Construction 30677 Repair of MPB 12/03/07 VII 0.479 50 C 0.229 0.300 0.300 - - - 82.90 *82.90% V. Satisfactory

Messagon Engineering Builders 13749 Covered Pathwalk & Repair of Comfort Rooms 07/09/09 U.P. 1.349 115 C 0.399 0.194 0.300 - - - 89.30 *89.30%

V. Satisfactory

Meta Construction 28882 Construction of Multi-Purpose Building, Dammang East 05/27/09 II 0.458 150 C 0.443 0.200 0.300 - - - 94.30 82.47%

Satisfactory

Meta Construction 28882 Construction of Multi-Purpose Building 03/05/09 II 0.458 80 O 0.240 0.300 0.150 0.023 0.028 0.033 77.40 -

Meta Construction 28882 Repair/Rehab. of Lined Canal along Jct. Ipil-Quirino Bdry. Road 11/15/07 II 0.501 90 C 0.267 0.300 0.300 - - - 86.70 *86.70%

V. Satisfactory

Meta Construction 28882 Const. of 2-CL School Building, Kakilingan E/S 08/27/09 II 0.875 90 C 0.446 0.167 0.300 - - - 91.30 *91.30%

V. Satisfactory

Meta Construction 28882 Const. of Flood Control Project, Brgy. I RC 03/01/10 II 4.812 90 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory

Meta Construction 28882 Const./Comp./Repair of Multi-Purpose Building 03/01/10 II 0.840 150 C 0.421 0.133 0.300 - - - 85.40 85.40%

Satisfactory

Meta Construction 28882 Const./Comp./Repair of Multi-Purpose Building San Isidro 03/01/10 II 0.592 150 C 0.413 0.133 0.300 - - - 84.60 84.60%

Satisfactory

Meta Construction 28882 Const./Comp. of Multi-Purpose Bldg. 03/01/10 II 0.477 150 C 0.399 0.133 0.300 - - - 83.20 83.20% Satisfactory

Metrics Construction and Trading 18223 Rehab./Reconst. of Damaged Paved (Concrete Blocking along 15th Avenue) 05/25/09 NCR 1.913 35 C 0.470 0.133 0.300 - - - 90.30 *90.30%

V. Satisfactory

Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. 08/17/07 NCR 4.789 14 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory

Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. @ San Vicente E/S 11/18/08 NCR 3.829 75 C 0.276 0.200 0.300 - - - 77.60 *77.60%

Satisfactory

Metrics Construction and Trading 18223 Repair/Rehab./Const. of MPB, Domus Mariae 09/02/09 NCR 1.445 45 C 0.437 0.133 0.300 - - - 87.00 *87.00%

Satisfactory

MF Construction 22192 Const.of DPWH Siquijor District Engineering Office Building inc. Quarters 09/07/09 VII 2.892 189 O 0.373 0.240 0.150 0.030 0.037 0.033 86.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page307

Page 316: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

MF Construction 22192 Const.of DPWH Siquijor District Engineering Office Building inc. Quarters 03/06/10 VII 2.892 209 C 0.489 0.112 0.300 - - - 90.10 87.44%

Satisfactory

MGBJ Rising Construction & Land Developer 18656 Asphalt Overlay/Upgrading of Digos-

Markar-Buayan Road 03/19/09 XII 9.433 120 C 0.478 0.200 0.300 - - - 97.80 *97.80% Outstanding

MGBJ Rising Construction & Land Developer 18656 Conc. of Road Network at PNP Office 12

Command 09/05/07 XII 2.376 75 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

MGDJ Construction 29352 Const. of MPB @ Brgy. Quezon 11/24/07 IV-A 1.444 120 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory

MGDJ Construction 29352 Const. of MPB @ Brgy. Rizal 08/28/07 IV-A 1.433 90 C 0.361 0.203 0.300 - - - 86.40 *86.40% V. Satisfactory

MGDJ Construction 29352 Impvt. of MPB, Tanauan School of Fisheries 11/27/08 IV-A 0.192 60 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

MGDJ Construction 29352 Rehab. of Batangas-Lobo Road (Revetment) 05/21/08 IV-A 0.964 90 C 0.257 0.296 0.300 - - - 85.30 86.68%

V. Satisfactory

MGDJ Construction 29352 Const. of Roads @ Brgy. Poblacion 2 09/01/09 IVA 0.292 120 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory

MGSR Construction 33446 Const. of Multi-Purpose Pavement, Purok 2, Bulanao 05/27/09 CAR 0.281 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%

Satisfactory

MH Southern Construction 5841 Sarangani-Davao Del Sur Coastal Road, Cross Section 09/17/09 XII 7.517 150 C 0.375 0.190 0.300 - - - 86.50 83.50%

Satisfactory

Midnorth Luzon Construction and Development Corporation 31783 Completion of Pospos Pathway, Caluttit 05/23/09 CAR 0.240 155 C 0.483 0.200 0.300 - - - 98.30 *98.30%

Outstanding

Miggs Construction and Supply 17993 Repair of 6CL at Sasmuan Elementary School 08/24/09 III 0.956 60 C 0.477 0.133 0.300 - - - 91.00 *91.00%

V. Satisfactory

Miggs Construction and Supply 17993 Const. of Line Canal @ San Nicolas 02/17/10 III 2.869 60 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory

Milestone 888 Construction, Inc. 31224 Conc. of Domingo Municipal St. 08/25/08 II 0.472 90 C 0.293 0.218 0.300 - - - 81.10 76.18% Satisfactory

Min Construction 14656Const. of Liloy-Siocon Road inc. RCBC

Dansalan-Labason Poblacion ByPass Road (Km. 1983+390-Km. 1984+360)

06/01/09 IX 19.130 309 C 0.486 0.133 0.300 - - - 91.90 85.48% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page308

Page 317: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Min Construction 14656 Conc. of Liloy-Siocon Road, Kipit-Gutalac Section, Kipit, Labason and La-Libertad 06/01/09 IX 19.125 372 C 0.430 0.133 0.300 - - - 86.30 83.18%

Satisfactory

Min Construction 14656 Conc. of Liloy-Siocon Road (Labason Proper-Osukan Section) 11/25/08 IX 19.130 172 C 0.375 0.191 0.300 - - - 86.60 84.74%

V. Satisfactory

Min Construction 14656 Conc. of Liloy-Siocon Road with RCBC, Patawag Section 11/25/08 IX 11.456 145 C 0.357 0.137 0.300 - - - 79.40 82.40%

V. Satisfactory

Min Construction 14656 Const. of Tribal Hall at Poblacion 11/27/07 IX 0.943 70 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory

Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road (Phase III) Guintolan-Lutiman Section 03/04/09 IX 33.460 359 C 0.434 0.200 0.300 - - - 93.40 83.14%

Satisfactory

Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road, Lutiman Section 03/04/09 IX 17.001 230 C 0.453 0.171 0.300 - - - 92.40 93.18%

V.Satisfactory

Min Construction 14656 Impvt./Conc. Paving of Siocon-Sirawai Road, Brilliantes-Pangian Section 05/20/08 IX 23.971 240 C 0.320 0.119 0.300 - - - 73.90 81.16%

V. Satisfactory

Min Construction 14656 Proposed Conc. of Liloy, Zamboanga del Norte-Ipil,Phase II 03/04/09 IX 14.309 180 C 0.427 0.147 0.300 - - - 87.40 83.02%

Satisfactory

Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) 08/28/08 IX 19.125 168 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -

Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) 11/25/08 IX 19.125 213 O 0.327 0.239 0.100 0.030 0.025 0.067 78.80 -

Mindanao Rock 23479 Ozamis Airport Development Project 09/03/09 DOTC 45.829 150 O 0.356 0.300 0.150 0.020 0.026 0.050 90.20 -

Mindanao Rock 23479 Const. of Ozamis City Coastal By-Pass Road 06/09/09 X 42.951 240 O 0.309 0.258 0.150 0.020 0.043 0.050 83.00 -

Mindanao Rock 23479 Conc. of Casul Road, Casul 03/18/09 X 2.306 145 C 0.378 0.200 0.300 - - - 87.80 *87.80% Satisfactory

Mindanao Rock 23479 Const. of Migpangi Road (Extension) 03/12/08 X 1.048 140 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page309

Page 318: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mindanao Rock 23479 Impvt. of Ozamis-Oroquieta Road, Lapasan-Clarin-Tudela Section 03/16/09 X 2.892 310 C 0.388 0.200 0.000 - - - 58.80 73.14%

Poor

Mindanao Rock 23479 Rehab. of Slip Section along CDO-Airport Road 11/28/08 X 7.473 90 C 0.334 0.300 0.300 - - - 93.40 89.32%

V. Satisfactory

Mindanao Rock 23479 Const. of Ozamis City Coastal By Pass Road 09/16/09 X 42.950 240 O 0.308 0.257 0.150 0.030 0.051 0.033 82.90 -

Mindanao Rock 23479 Impvt. of Gurel-Bokod-Kabayan Road Km. 318+00-Km. 330+000 (Selected Portion) 08/25/09 CAR 9.628 150 C 0.395 0.133 0.300 - - - 82.80 *82.80%

Satisfactory

Mindanao Rock 23479

Ozamis Airport Dev't Project (Asphalt Overlay of Runway, Shoulder Grade Correction and Construction of CHB

Fence)

03/12/10 DOTC 45.829 150 C 0.449 0.200 0.300 - - - 94.90 92.10% V.Satisfactory

Mindanao Rock 23479

Ozamis Airport Dev't Project (Asphalt Overlay of Runway, Construction of ATO Administration Building and Improvement

of Terminal Building)

03/12/10 DOTC 30.320 120 C 0.457 0.198 0.300 - - - 95.50 95.50% V.Satisfactory

Mindanao Rock 23479 Maasin Dev't Project (Upgrading of Apron and Taxiway) 03/19/10 DOTC 40.424 180 C 0.438 0.200 0.300 - - - 93.80 93.80%

V.Satisfactory

Mindanao Rock 23479 Const. of Ozamiz City Coastal Bypass Rd. 03/06/10 X 42.950 240 C 0.482 0.133 0.300 - - - 91.50 86.37% Satisfactory

Mindanao Rock 23479Const. of Two(2) Unit Classroom Ignacio

Tan Memorial Integrated School Bagumbang

03/06/10 X 0.954 90 C 0.416 0.133 0.300 - - - 84.90 84.90% Satisfactory

Minrock Multi-Builders 15845 Conc. of Road at Bishop Smith Ave., Rosary Heights 11 11/20/07 XII 0.940 24 C 0.307 0.200 0.300 - - - 80.70 *80.70%

V. Satisfactory

Minrock Multi-Builders 15845 Const. of MPB @ Kimpo E/S, Rosary Heights 13 02/26/08 XII 1.896 65 C 0.362 0.181 0.300 - - - 84.30 79.05%

Satisfactory

Miracle Builders 28502Impvt./Rehab. of Daang Maharlika along Calbayog-Allen Road, km. 723+700 - km.

729+700 with exceptions03/09/08 VIII 4.823 120 C 0.361 0.200 0.300 - - - 86.10 *86.10%

V. Satisfactory

Miracle Builders 28502 Rehab. of Road @ Patiis Brgy. Malanday 08/30/07 IV-A 1.922 60 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory

Miracle Builders 28502 Conc. with Drainage System & Pathway along #52 Imperial St. Brgy. E. Rodriguez 02/26/10 NCR 0.483 30 C 0.462 0.133 0.300 - - - 89.50 89.50%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page310

Page 319: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mivico Builders and Developers 20551 Rehab./Reconst./Upgrading of Daang Maharlika Road 05/26/09 III 19.291 52 C 0.476 0.200 0.300 - - - 97.60 *97.60%

Outstanding

Mivico Builders and Developers 20551 Asphalt Overlay at Brgy. Mabini 02/26/10 III 1.479 30 C 0.456 0.133 0.300 - - - 88.90 88.90% Satisfactory

Mivico Builders and Developers / A.M.P. Construction (JV) JV-08-134 Improvement of Pentor-Balsik River

Control (Sta. Isabel Section) 05/20/09 III 9.602 150 C 0.339 0.200 0.300 - - - 83.90 *83.90%Satisfactory

MJB Corporation 18862 Conc. of Roads, GSIS Ave., Brgy. Bagong Nayon 02/15/10 IVA 1.928 120 C 0.456 0.200 0.300 - - - 95.60 95.60%

V. Satisfactory

MJP Construction & Development Corporation 30251 Regravelling of Daang Pare Road, Brgy.

San Jose 08/26/09 IVA 4.797 169 C 0.452 0.200 0.300 - - - 95.20 90.40% V. Satisfactory

MJT Builders 24202 Conc. of Road, Lagao-Conel Road, Brgy. Lagao 03/11/10 XII 1.410 60 C 0.358 0.200 0.300 - - - 85.80 85.80%

Satisfactory

MKM Marketing 15586 Impvt. of Viray-Depalo River Control Project 05/28/08 I 2.893 60 C 0.367 - 0.500 - - - 86.70 *86.70%

V.Satisfactory

MM Construction 12012

Rehab./Reconst./Upgrading of Damaged paved National Road Generated from PMS

(HDM-4) DM KO219+000-KO220+410 Baliling-Balite Section

09/01/09 II 14.473 120 C 0.404 0.200 0.300 - - - 90.40 90.82% V. Satisfactory

MN Revelo Construction 24789Impvt./Conc. Paving of Usugan Bridge

Approach along Zamboanga City-Pagadian-Misamis Occidental Road

03/06/08 IX 1.858 60 C 0.268 0.205 0.300 - - - 77.30 85.10% V. Satisfactory

Molina's General Builder 14845 Const. of FMR Brgy. Pook-Linga Road 08/21/07 IV-A 0.477 30 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory

Molte Aries Construction & Industries 3684 Road Upgrading of San Fernando-Bagulin

Road 05/28/09 I 14.114 400 O 0.300 0.260 0.150 0.030 0.035 0.033 80.80 -

Molte Aries Construction & Industries 3684 Impvt. (Conc.) of San Fernando-Bagulin

Road (Francisco L. Ortega Highway) 05/23/08 I 26.453 420 C 0.296 0.300 0.300 - - - 89.60 80.26% V. Satisfactory

Molte Aries Construction & Industries 3684 Upgrading (Conc. Paving) of San Fernando

By-Pass Road Extension 08/22/08 I 18.821 90 C 0.307 0.200 0.300 - - - 80.70 83.76% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page311

Page 320: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Molte Aries Construction & Industries 3684 Road Upgrading of San Fernando-Bagulin

Road 09/02/09 I 14.114 400 O 0.353 0.300 0.150 0.030 0.060 0.033 92.60 -

Molte Aries Construction & Industries 3684 Road Upgrading of San Fernando-Bagulin

Road 02/26/10 I 14.114 400 C 0.361 0.133 0.300 - - - 79.40 83.78% Satisfactory

Moment Diagram Builders 33908 Completion of MPB at Quezon Hill Proper Brgy 03/04/10 CAR 1.419 80 C 0.404 0.133 0.300 - - - 83.70 83.70%

Satisfactory

Monolithic Const. & Concrete Products, Inc. 5733

Construction of Diversion Work including Supply, Delivery, Installation and

Comissioning of Rubber Dam (Cabilogan-San Juan CIP)

07/09/07 NIA 46.981 300 C 0.390 0.180 0.300 - - - 87.00 *87.00% V.Satisfactory

Monolithic Const. & Concrete Products, Inc. 5733

Construction of Diversion Work including Supply, Delivery, Installation and

Comissioning of Rubber Dam (South Quinale CIS)

07/09/07 NIA 68.027 300 C 0.389 0.200 0.070 0.030 0.047 0.067 80.30 80.30% V.Satisfactory

Monolithic Const. & Concrete Products, Inc. 5733 South Quinale Communal Irrigation System 08/14/07 NIA-V 68.027 442 C 0.375 0.263 0.300 - - - 93.80 85.71%

V.Satisfactory

Monolithic Construction & Concrete Product, Inc. 5733

Rehab./Reconst./Upgrading of Marinduque Circumferential Road, Sibucao, Dili-

Bangbang08/24-25/09 IVB 23.208 160 C 0.430 0.200 0.300 - - - 93.00 *93.00%

V. Satisfactory

Monolithic Construction & Concrete Product, Inc. 5733 Rehab./Conc. of Marinduque

Circumferential Road (Intermittent Section) 08/25/09 IVB 82.951 360 O 0.370 0.282 0.150 0.030 0.051 0.033 91.60 -

Monolithic Construction & Concrete Product, Inc. 5733 Rehab./Conc. of Dr. Damian Reyes Road

(Boac Side) 08/24/09 IVB 64.662 280 C 0.450 0.168 0.300 - - - 91.80 89.97% V. Satisfactory

Monolithic Construction & Concrete Products Inc. 5733 Rehab. of Odiongan Bridge along Cateel-

Compostela Section 03/03/10 XI 52.910 240 C 0.358 0.200 0.300 - - - 85.80 86.70% Satisfactory

Monolithic Construction & Concrete Products, Inc. 5733

Rehab./Conc. of Marinduque Circumferential Road (Intermittent Section)

05/19/09 IV-B 82.951 360 O 0.353 0.300 0.150 0.030 0.033 0.050 91.60 -

Monolithic Construction & Concrete Products, Inc. 5733 Rehabilitation of Odiongan Bridge along

Cateel-Compostela Section 06/08/09 XI 52.910 240 O 0.370 0.237 0.150 0.030 0.042 0.050 87.90 -

Monolithic Construction & Concrete Products, Inc. 5733

Impv't/Conc.Paving of Jct. Baliguian to Siocon Road, Jct. Baliguian-Nonoyan-Sta.

Maria Section03/07/09 IX 48.006 380 O 0.386 0.263 0.099 0.030 0.037 0.033 84.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page312

Page 321: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Monolithic Construction & Concrete Products, Inc. 5733 Rehab./Conc. of Marinduque Circ. Rd.

(Intermittent Section) 03/11/09 IV-B 82.951 360 O 0.296 0.272 0.150 0.030 0.025 0.050 82.30 -

Monolithic Construction & Concrete Products, Inc. 5733 Rehab. of Odiongan Bridge along Cateel-

Compostela Sect. 09/11/09 XI 52.910 240 O 0.376 0.240 0.150 0.030 0.038 0.033 86.70 -

Monolithic Construction & Concrete Products, Inc. 5733 Rehab./Conc. Of Marinduque

Circumferential Road (Intermittent Section) 02/24/10 IVB 82.951 360 C 0.396 0.200 0.300 - - - 89.60 88.94% Satisfactory

Monolithic Construction and Concrete Products, Inc. 5733 Talibon Small Reservoir Irrigation Project 9/29/08

10/3/08 NIA 49.099 390 O 0.367 0.175 0.100 0.030 0.042 0.200 91.40 -

Montano Construction & Development Corp. 19473 Construction of De Venta Perla Bridge &

Approaches (Phase II) 06/08/09 IX 27.869 263 O 0.390 0.240 0.150 0.030 0.042 0.050 90.20 -

Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes Road

(Lebagon Section) 05/26/08 IX 16.712 120 O 0.352 0.300 0.100 0.030 0.043 0.100 92.50 -

Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes Road

(Lebagon Section) 03/16/09 IX 16.712 299 C 0.478 0.200 0.300 - - - 97.80 91.02% V. Satisfactory

Montaño Construction & Development Corporation 19473

Const. of De Venta Perla Bridge & App. (Phase I) along Dipolog-Sergio Osmeña-

Pagadian City Road 12/01/08 IX 28.395 528 C 0.321 0.300 0.300 - - - 92.10 *92.10%

Outstanding

Montaño Construction & Development Corporation 19473

Impvt./Conc. Paving of Dipolog-Punta-Dansullan Sergio Osmeña Nat'l Road

(Macleodes-Dilawa Sect.)09/04/07 IX 18.788 155 C 0.374 0.300 0.300 - - - 97.40 *97.40%

Outstanding

Montaño Construction & Development Corporation 19473

Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-Sergio Osmeña,

Zambo. Norte-Sur Bdry., Km. 1878+939-Km. 1879+689, De Venta Perla Section

09/14/09 IX 14.030 130 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory

Montaño Construction & Development Corporation 19473

Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-Sergio Osmeña,

Zambo. Norte-Sur Bdry., Km. 1869+888-Km. 1870+888, Dilawa Section

09/14/09 IX 18.564 159 C 0.474 0.200 0.300 - - - 97.40 91.34% V. Satisfactory

Monte Construction & Supply 19474 Const. of Calitlitan MPB 11/23/07 II 0.284 44 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory

Monte Construction & Supply 19474Rehab. of Maddiangat Bridge Piers and

Bank Protection, along Bambang-Kasibu-Quezon-Solano Road

06/02/07 II 4.765 76 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page313

Page 322: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Monte Construction & Supply 19474Rehab. of Papaya-Malabing-Wangal-

Binugawan-Tadji-Runruno Road (Kinalabasa Section)

05/28/08 II 1.755 56 C 0.321 0.200 0.300 - - - 82.10 *82.10% V. Satisfactory

Monthphil Construction Corporation 24285 Const. of MPB (SK Building) @ Brgy. San Nicolas 03/09/10 IX 0.945 80 C 0.359 0.200 0.300 - - - 85.90 85.90%

Satisfactory

Montphil Construction Corporation 24285 Concreting of Sta. Filomena Road going to Baybay Galas 06/10/09 IX 9.538 180 C 0.490 0.133 0.300 - - - 92.30 *92.30%

V. Satisfactory

Montphil Construction Corporation 24285Conc. of Marleodes-Dilawa Section along Dipolog Punta-Dansullan Sergio Osmeña

National Road12/05/07 IX 3.806 115 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

Montphil Construction Corporation 24285 Const. of One (1) Unit 1 CL Modified Sch. Bldg. @ San Pedro E/S 12/02/08 IX 0.433 60 C 0.383 0.200 0.300 - - - 88.30 *88.30%

V. Satisfactory

Montphil Construction Corporation 24285 Const./Completion of Multi-Purpose Building, Del Pilar 03/17/09 IX 0.945 100 C 0.383 0.200 0.300 - - - 88.30 *88.30%

Satisfactory

Montphil Construction Corporation 24285Impvt./Conc. Paving of Dipolog-Punta-Dansullan-Sergio Osmeña Nat'l Road

(Brgy. Dansullan-Macleodes Sect.)12/02/08 IX 2.788 90 C 0.366 0.163 0.300 - - - 82.90 83.08%

V. Satisfactory

Morning Steel Construction 30698 Construction of Dipaculao-Ma. Aurora Road, Brgy. Mucdol-Maligaya Section 03/03/09 III 4.769 120 C 0.406 0.133 0.300 - - - 83.90 *83.90%

Satisfactory

Morning Steel Construction 30698 Impvt./Conc. of Baler-Casiguran Road, Dibutunan-Ditale Section 05/26/08 III 4.660 120 C 0.325 0.200 0.300 - - - 82.50 84.39%

V. Satisfactory

Morning Steel Construction 30698 Rehab./Improvement of Debucao-Diome FTMR 09/08/09 III 4.717 150 O 0.359 0.228 0.150 0.030 0.050 0.033 85.00 -

Morning Steel Construction 30698 Impvt. of Dipaculao-Maria Aurora Road 02/27/10 III 9.443 180 C 0.441 0.133 0.300 - - - 87.40 88.36% Satisfactory

Mountaineers Engineering & Const. Services 6154 Completion of DPWH Resthouse (Rehab. of

DPWH Field Office) 03/10/09 CAR 8.196 170 C 0.485 0.200 0.300 - - - 98.50 81.00% Unsatisfactory

Mountaineers Engineering & Const. Services 6154 Const. of Benguet NHS-Lubas Extension 08/12/08 CAR 3.606 190 C 0.344 0.129 0.300 - - - 77.30 81.26%

V. Satisfactory

Mountaineers Engineering & Construction Services 6154 Const. of 2-Storey, 4-CL Benguet NHS-

Beckel Annex 05/20/09 CAR 4.429 277 O 0.371 0.229 0.150 0.030 0.035 0.050 86.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page314

Page 323: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Mountaineers Engineering & Construction Services 6154 Const. of 2-Storey, 4-CL Benguet NHS-

Beckel Annex 03/01/10 CAR 4.429 277 C 0.431 0.155 0.300 - - - 88.60 87.13% Satisfactory

MP Villegas Construction 16683 Administration Bldg. 06/05/08 DOST 6.975 171 C 0.351 0.275 0.300 - - - 92.60 92.60% Outstanding

MR. Santiago Constraction 27239 Rehabilitation of Lateral G Canal (Sta. 2+380-6+637) 9/10-14/07 NIA-I 5.617 110 C 0.250 0.300 0.300 - - - 85.00 85.19%

V.Satisfactory

MRB Construction and Supply 17701 Jagna Port Expansion Project 1/20-23/09 PPA 55.085 360 C 0.400 0.300 0.300 - - - 98.78 98.78% Outstanding

MRJR Construction & Trading 28265 Asphalt Overlay with squaring and Patching of Road at Brgy. Talon 2 06/04/09 NCR 0.963 14 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V.Satisfactory

MRJR Construction & Trading 28265 Const./Rehab. of River Strainer at Las Piñas & Zapote River 02/18/10 NCR 2.003 92 C 0.487 0.133 0.300 - - - 92.00 92.00%

V.Satisfactory

MRJR Construction & Trading 28265 Const. of MPB & Facilities (Waste Management), Brgy. Zapote 02/18/10 NCR 0.990 45 C 0.393 0.133 0.300 - - - 82.60 82.60%

Satisfactory

MRP Merchandising 13656 Const. of MPB at Zone II Brgy. Tara 11/14/07 V 0.281 90 C 0.352 0.184 0.300 - - - 83.60 *83.60% V. Satisfactory

MRRM Trading & Construction / Precious Construction (JV) JV-08-094 Impvt. of Farm-to-Market Road, Quinfermin-

Bagbuga-San Jose Road 05/29/09 I 9.630 133 C 0.423 0.133 0.300 - - - 85.60 85.84% Satisfactory

MRRM Trading & Construction / Precious Construction Joint Venture JV-08-094 Impvt. of Farm-to-Market Road, Quinfermin-

Bugbuga-San Jose Road 02/17/10 I 9.630 133 C 0.355 0.065 0.300 - - - 72.00 80.40% Unsatisfactory

MSB Construction & Trading 33019 Agno River Integrated Irrigation Project 7/13-18/09 NIA 8.513 60 C 0.476 0.181 0.300 - - - 95.61 *95.61% V. Satisfactory

MSF Construction 25307 Construction of Binaratan Elementary School Building 06/05/09 I 0.904 38 C 0.489 0.133 0.000 - - - 62.20 *62.20%

Poor

MSF Construction 25307 Impvt./Rehab. of Farm to Market Road @ Brgy. Suba & Monte 11/21/07 I 0.940 45 C 0.325 0.300 0.300 - - - 92.50 *92.50%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page315

Page 324: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Muaña Construction 9354 Const. of 1 unit, 4 Storey, 20 CL Mambaling E/S Bldg. 12/04/08 VII 13.360 120 C 0.370 0.216 0.000 - - - 58.60 72.18%

Satisfactory

Muaña Construction and Development Corp. 9354 Construction of Multi-Purpose Building,

Brgy. Labangon and Calamba 06/08/09 VII 1.885 60 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory

Mulana Construction 30708 Construction of School Building Cawag P/S 09/10/09 VII 0.580 165 O 0.400 0.155 0.150 0.030 0.037 0.033 80.50

Mulana Construction 30708 Const. of School Building Cawag P/S 02/26/10 VII 0.580 165 C 0.442 0.133 0.300 - - - 87.50 82.60% Satisfactory

Mulaña Construction 30708 Completion of Water Supply System at Sitio Magdagook, Brgy. 3, Kalangahan 05/26/09 VII 4.771 90 C 0.500 0.133 0.300 - - - 93.30 *93.30%

V. Satisfactory

Mulaña Construction 30708 Conc. of Toledo-Tabuelan-San Remegio Road (Antonio Y De Pio Highway) 11/29/07 VII 7.606 119 C 0.323 0.169 0.300 - - - 79.20 *79.20%

Satisfactory

Must Enterprises 13336 Const./Conc. of Cotabato Airport at Awang 05/26/09 R-XII 19.058 138 O 0.342 0.300 0.150 0.030 0.055 0.033 91.00 -

Must Enterprises 13336Const. of Slope Protection Works along

Dualing-New Panay-Midsayap Road, Arizona Section

11/20/08 XII 3.303 95 C 0.377 0.200 0.300 - - - 87.70 87.28% V.Satisfactory

Must Enterprises 13336 Impvt./Regravelling of Marbel-Midsayap Road 03/16/09 XII 9.642 65 C 0.372 0.133 0.300 - - - 80.50 *80.50%

Unsatisfactory

Must Enterprises 13336 Const./Concreting of Cotabato Airport @ Awang 09/01/09 XII 19.059 138 C 0.445 0.200 0.300 - - - 94.50 92.40%

V. Satisfactory

Must Enterprises 13336 Regravelling of Road at Rosay Heights 11 02/24/10 XII 0.940 18 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory

MV Confirm Construction & Development, Inc. 32469 Const. of MPB 05/28/08 IV-A 3.858 150 C 0.364 0.256 0.300 - - - 92.00 84.65%

V. Satisfactory

MWJ Construction 14882 Rehab./Const./Upgrading of Damaged Pavement, Caibaan Road 06/10/09 VIII 9.640 90 C 0.418 0.133 0.300 - - - 85.10 *85.10%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page316

Page 325: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

MWJ Construction 14882 Conc. of La Paz, Javier-Bito Road 08/20/08 VIII 9.445 120 C 0.325 0.173 0.300 - - - 79.80 83.58% V. Satisfactory

MWJ Construction 14882 Const. of Guingauan Flood Control 05/21/08 VIII 0.960 90 C 0.347 0.200 0.300 - - - 84.70 88.18% V. Satisfactory

MWJ Construction 14882 Road Concreting at Brgy. San Isidro 08/23/07 VIII 0.188 30 C 0.370 0.200 0.300 - - - 87.00 *87.00% V. Satisfactory

MWJ Construction 14882 Upgrading of Tigbao-Pulak-Sta. Fe Road 09/18/09 VIII 5.780 100 C 0.450 0.144 0.300 - - - 89.40 88.50% Satisfactory

MWJ Construction 14882 Construction of Burauen-Mahagnao Road 09/02/09 VIII 12.275 120 C 0.422 0.200 0.300 - - - 92.20 84.88% Satisfactory

MWJ Construction 14882 Conc. of Burauen-Albuera Road 02/22/10 VIII 9.447 150 C 0.402 0.200 0.300 - - - 90.20 92.20% V. Satisfactory

MY Builders and Construction 22687 Const. of Multi-Purpose Bldg., @ Canaoay Community School 08/22/07 I 0.939 68 C 0.303 0.200 0.300 - - - 80.30 *80.30%

V. Satisfactory

N & N Construction Corporation 30716 Impvt. of Catbalogan Drainage inc. Estero & Portion of Antiao River 05/13/08 VIII 8.822 310 O 0.335 0.160 0.100 0.020 0.040 0.200 85.50 -

N.A. Ibarra Construction (Formerly: Diocletian's Const.) 24742 Road Concreting, Brgy. Baracbac 02/28/09 I 0.855 18 C 0.367 0.200 0.300 - - - 86.70 *86.70%

Satisfactory

N.B. Avila Construction 13751 Conc. of Brgy. Pob. 4 Brgy. Road 03/10/09 IV-A 0.381 25 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory

N.B. Avila Construction 13751 Const. of Macanda Bridge, Brgy. Kaytapos 11/13/08 IV-A 0.477 60 C 0.258 0.300 0.300 - - - 85.80 *85.80% V. Satisfactory

N.B. Avila Construction 13751 Const. of MPB 11/14/08 IV-A 1.236 90 C 0.370 0.263 0.300 - - - 93.30 *93.30% Outstanding

N.B. Avila Construction 13751 Const. of Secondary Sch. Bldg., Malabang NHS 08/22/08 IV-A 1.283 120 C 0.338 0.250 0.300 - - - 88.80 *88.80%

V. Satisfactory

N.B. Avila Construction 13751 Riprapping of Kay Alaman River @ Brgy. Gomez-Zamora 05/22/08 IV-A 0.855 60 C 0.333 0.200 0.300 - - - 83.30 *83.30%

V. Satisfactory

N.B. Avila Construction 13751 Conc. of Dasmariñas-Trece Martirez City-Naic Road 09/09/09 IVA 4.775 90 C 0.450 0.200 0.300 - - - 95.00 89.42%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page317

Page 326: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

N.B. Avila Construction 13751 Conc. of Brgy. Biga I FMR 02/25/10 IVA 0.495 90 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory

N.B. Avila Construction 13751 Const. of MPB at Mataas na Burol 02/26/10 IVA 0.495 60 C 0.439 0.200 0.300 - - - 93.90 93.90% V. Satisfactory

N.B. Garcia Construction 30983 Const. of 2 CL S/B Victoria NHS, Selina Annex 02/23/08 IV-B 0.980 75 C 0.302 0.200 0.300 - - - 80.20 81.74%

V. Satisfactory

N.B. Garcia Construction 30983 Const. of San Jose National High School 08/27/08 IV-B 0.952 60 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory

N.B. Garcia Construction/ F.A. Torres Construction (JV) JV-08-288

Road Upgrading (Gravel to Paved) MWCR, Rizal-Calintaan (San Pedro-Mangat

Section)05/29/09 IV-B 9.565 90 O 0.281 0.300 0.150 0.030 0.033 0.050 84.40 -

N.B. Garcia Construction/ F.A. Torres Construction (JV) JV-08-288

Road Upgrading (gravel to paved), MWCR, Rizal-Calintaan (San Pedro-Mangat Section) KO 256+028- KO 256+733

08/31/09 IVB 9.646 164 O 0.345 0.298 0.150 0.030 0.037 0.033 89.30 -

N.B. Salbo Construction 6091 Const. of MPB @ Cristino M. Paragas E/S 08/20/08 IX 2.341 60 C 0.306 0.300 0.300 - - - 90.60 60.64% Fair

N.B. Salbo Construction 6091 Const. of Poblacion El Salvador Flood Control 11/28/07 X 9.462 180 C 0.384 0.300 0.000 - - - 68.40 73.44%

Satisfactory

N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control 05/30/07 X 9.462 180 O 0.281 0.200 0.050 0.030 0.037 0.200 79.80 -

N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control 08/30/07 X 9.462 180 O 0.337 0.200 0.000 0.030 0.038 0.133 73.80 -

N.B. Salbo Construction 6091Rehab. / Reconst. of Damaged Road

Sections along Linamon-Zamboanga Road (Taguitic Section)

11/28/08 X 19.212 455 O 0.251 0.300 0.100 0.024 0.045 0.100 82.00 -

N.B. Salbo Construction 6091Road Upgrading (Gravel to Concrete) based on GTRSTB, Gingoog-Claveria-

Villanueva Road03/11/09 X 19.293 165 O 0.347 0.233 0.150 0.030 0.050 0.033 84.30 -

N.B. Salbo Construction 6091Rehab./Reconst. of Damaged National

Road along Linamon-Zamboanga (Taguitic Section) Km. 1622+080.40-Km. 1622+543.45

09/11/09 X 19.212 455 C 0.453 0.133 0.300 - - - 88.60 85.54% Satisfactory

N.B. Salbo Construction 6091 Road Upgrading (Gravel to Concrete) Gingoog-Claveria-Villanueva Road 09/10/09 X 19.293 165 C 0.378 0.133 0.300 - - - 81.10 83.02%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page318

Page 327: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

N.B. Salbo Construction 6091 Const. of 2-CL (7m x 18m) Lugait NHS 03/10/10 X 1.249 60 C 0.409 0.143 0.000 - - - 55.20 55.20% Poor

N.B. Salbo Construction 6091 Completion of 4-CL @ Malapatan CES 03/09/10 XII 1.061 120 C 0.423 0.176 0.300 - - - 89.90 89.90% V. Satisfactory

N.F. Yamat Construction 5401 Repair of School Building, PNHS Annex, Brgy. Don Galo 02/24/09 NCR 0.948 75 C 0.321 0.160 0.300 - - - 78.10 *78.10%

Unsatisfactory

N.K. Enterprise 29292 Rehab./Imprv't. of Various Brgy. Rds. At Villafont & Imparayan 02/25/10 VI 18.922 210 O 0.338 0.263 0.150 0.020 0.030 0.033 83.40 -

N.M.E. Construction 22984 Completion of MPB @ Brgy. 589 05/13/08 NCR 1.443 45 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding

N.M.E. Construction 22984 Improvement of Fire Exit in Front of Ferry Terminal 10/09/08 PUP 529.175 45 C 0.341 0.291 0.300 - - - 93.20 93.20%

V. Satisfactory

N.M.E. Construction 22984 Proposed Const. of MPB at Brgy. 838 08/14/07 NCR 0.767 30 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory

N.M.E. Construction 22984 Proposed Rehab. of Syquia St. District VI 11/14/07 NCR 9.584 120 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory

N.M.E. Construction 22984 Proposed Repair/Rehab. of Roads & Alleys and vicinities @ Brgy. 818 11/10/08 NCR 0.962 30 C 0.279 0.200 0.300 - - - 77.90 *77.90%

Satisfactory

N.M.E. Construction 22984 Repair/Rehab. Along Railroad Street (Phase II) 08/13/08 NCR 2.881 20 C 0.181 0.300 0.300 - - - 78.10 *78.10%

Satisfactory

N.M.E. Construction 22984 Repair/Rehab. of MPB at Brgy. 889 08/14/07 NCR 1.419 105 C 0.323 0.200 0.300 - - - 82.30 87.20% V. Satisfactory

N.M.E. Construction 22984 Rehab./Reconst./Upgrading of Damaged Paved National Road, Finance Road 09/02/09 NCR 9.640 30 C 0.390 0.133 0.300 - - - 82.30 *82.30%

Satisfactory

N.M.E. Construction 22984 Proposed Repair/Rehab. of Roads & drainage at Brgy. 605 02/16/10 NCR 1.927 60 C 0.499 0.133 0.300 - - - 93.20 93.20%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page319

Page 328: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

N.M.E. Construction 22984 Renovation of Hostel Main Lobby and Addition of Waiting Lounge 07/22/08 PUP 2.296 65 C 0.385 0.300 0.300 - - - 98.50 98.50%

Outstanding

N.S. Gambito Construction Services 31640 Concreting of Aritao-Quirino Road, Bitnong Section 06/04/09 II 9.650 104 O 0.328 0.240 0.150 0.030 0.051 0.050 84.90 -

N.S. Gambito Construction Services 31604 Conc. of Aritao-Quirino Road, Bitnong Section 03/04/10 II 9.650 104 C 0.420 0.133 0.300 - - - 85.30 85.06%

Satisfactory

N.T. Tulabut Construction and Supply 15846 Const. of MPB 05/13/08 III 1.902 45 C 0.379 0.200 0.300 - - - 87.90 *87.90%

V.Staisfactory

N.T. Tulabut Construction and Supply 15846

Const. of MPB @ Brgy. San Vicente, Pilot Sch. For Phil. Craftsment, Bulaon

Resettlement11/11/08 III 3.611 50 C 0.257 0.200 0.300 - - - 75.70 *75.70%

Satisfactory

N.T. Tulabut Construction and Supply 15846 Const. of Calulut Multi-Purpose Building 08/24/09 III 1.902 30 C 0.490 0.133 0.300 - - - 92.30 *92.30%

V. Satisfactory

N.V. Balbuena Const. 12055Repair and Rehab of Jct. Layac-Balanga-Mariveles Port Road (Mabatang Section)

Phase II05/20/09 III 0.475 30 C 0.454 0.146 0.300 - - - 90.00 *90.00%

V. Satisfactory

N.V. Balbuena Construction 12055 Const. of One (1) Classroom School Marina Bay E/S 11/19/08 III 0.438 34 C 0.350 0.240 0.300 - - - 89.00 *89.00%

V.Staisfactory

N.V. Balbuena Construction 12055 Repair of Gapan-San Fernando-Olongapo Road 03/03/08 III 0.961 60 C 0.348 0.200 0.300 - - - 84.80 *84.80%

V.Staisfactory

N.V. Balbuena Construction 12055Repair/Rehabilitation of Junction-Layac-Balanga-Mariveles Port Road (Mabatang

Section)02/24/09 III 0.474 30 C 0.354 0.200 0.300 - - - 85.40 *85.40%

Satisfactory

N.V. Balbuena Construction 12055Const. of One (1) Classroom School

Building at Lamao National High School, Brgy. Lamao

08/28/09 III 0.513 32 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory

N.V. Balbuena Construction 12055 Completion of Lined Canal, Brgy. San Pablo 08/27/09 III 0.475 60 C 0.417 0.133 0.300 - - - 85.00 *85.00%

Satisfactory

N.V. Balbuena Construction 12055 Construction of Box Culvert, Brgy. Cataning 08/27/09 III 0.809 75 C 0.396 0.133 0.300 - - - 82.90 *82.90%

Satisfactory

N-22 Construction & Trading 25254 Const. of Drainage Canal at San Vicente 11/11/08 III 0.477 30 C 0.350 0.200 0.300 - - - 85.00 *85.00% V.Staisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page320

Page 329: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

N-22 Construction & Trading 25254 Const./Conc./Repair/Completion of San Nicolas Brgy. Road 08/11/08 III 0.474 25 C 0.321 0.200 0.300 - - - 82.10 *82.10%

V.Staisfactory

N-22 Construction & Trading 25254 Const./Conc./Repair/Completion of Sapa Brgy. Road 11/19/07 III 2.567 30 C 0.346 0.300 0.300 - - - 94.60 *94.60%

Outstanding

N-22 Construction and Trading 25254 Construction of FMR at Brgy. Dela Paz 05/18/09 III 0.955 30 C 0.365 0.200 0.300 - - - 86.50 *86.50% Satisfactory

Naga E.S. Construction and Supply 6593 Construction of Road, Hanawan-Sta. Cruz-Villa Florida Road 06/03/09 V 14.201 179 C 0.435 0.193 0.300 - - - 92.80 *92.80%

V. Satisfactory

Naga E.S. Construction and Supply 6593 Conc. of La Purisima Nuevo Road 03/12/09 V 5.617 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory

Naga E.S. Construction and Supply 6593 Road Concreting at Camanaba Road 08/22/08 V 1.891 60 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory

Nale Construction 18552 Const. of Elementary Sch. Bldgs. At Pio Macahig ME/S 08/23/08 VII 0.750 100 C 0.319 0.254 0.300 - - - 87.30 87.09%

V.Satisfactory

Nale Construction 18552 Rehab./Recons. of Dipolog-Sindangan-Liloy Road, Dohinob Cemetary Sect. 09/17/09 IX 3.778 80 C 0.437 0.200 0.300 - - - 93.70 90.40%

V. Satisfactory

Nascon Builders 14786 Const. of Multi-Purpose Building, Brgy. CP Garcia 06/02/09 X 1.060 75 O 0.374 0.276 0.110 0.030 0.019 0.033 84.20 -

Nascon Builders 14786 Conc. of FMR, Calangahan 03/12/09 X 0.962 45 C 0.376 0.200 0.300 - - - 87.60 *87.60% Satisfactory

Nascon Builders 14786 Impvt. of MPB 03/11/09 X 1.085 60 C 0.423 0.133 0.300 - - - 85.60 *85.60% Satisfactory

Nascon Builders 14786 Completion/Const./Rehab. of MPB 03/10/10 X 4.821 100 C 0.500 0.133 0.300 - - - 93.30 93.30% V.Satisfactory

Nascon Builders 14786 Const. of MPB Brgy. C.P. Garcia 03/10/10 X 1.060 75 C 0.444 0.133 0.300 - - - 87.70 85.60% Satisfactory

NBL Construction 30396 Const. of Brgy. Calamias-San Francisco FMR 05/22/09 IV-A 1.928 60 C 0.416 - 0.500 - - - 91.60 *91.60%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page321

Page 330: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

NBL Construction 30396Rehab./Reconst. of Bauan-Mabini Road, Widening/Conc. of Bauan-Mabini Circ.

Road, Mainit Section, Phase I05/22/09 IV-A 19.295 70 C 0.447 0.133 0.300 - - - 88.00 *88.00%

Satisfactory

NBL Construction 30396 Asphalt Overlay of Bauan-Mabini Road, Bagalangit Solo Sect. 08/25/08 IV-A 9.996 20 C 0.284 0.300 0.300 - - - 88.40 *88.40%

V. Satisfactory

NBL Construction 30396 Conc. of Palico-Cadre Road 11/18/08 IV-A 7.497 75 C 0.308 0.290 0.300 - - - 89.80 *89.80% V. Satisfactory

NBL Construction 30396 Conc./Const./Rehab. of Bauan-Mabini Circ. Road, Malimotoc I Section 03/05/09 IV-A 19.295 180 C 0.450 0.133 0.300 - - - 88.30 86.44%

Satisfactory

NBL Construction 30396 Const. of Bauan-Mabini Circ. Road 11/21/08 IV-A 11.571 120 C 0.326 0.300 0.300 - - - 92.60 *92.60% Outstanding

NBL Construction 30396 Const. of Gasang Seawall, Phase II 02/28/08 IV-A 3.134 30 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Satisfactory

NBL Construction 30396 Widening/Conc. of BauanMabini Circ. Road, San Teodoro-Mainit Section, Phase I 11/21/08 IV-A 19.289 120 C 0.304 0.300 0.300 - - - 90.40 *90.40%

Outstanding

NBL Construction 30396 Const. of Covered Line Canal along National Highway, Brgy. San Francisco 02/27/10 IVA 9.645 90 C 0.452 0.133 0.300 - - - 88.50 88.50%

Satisfactory

NBL Construction 30396 Const. of Brgy. Balanga Flood Control 02/24/10 IVA 5.350 30 C 0.366 0.200 0.300 - - - 86.60 86.60% Satisfactory

NBL Construction / OP Reyes Builders & Supply (JV) JV-08-239 Rehab./Reconst./Upgrading of Tagaytay-

Nasugbu Road (Wawa Sect.) 09/05/09 IVA 9.858 90 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory

Nes-san Builders 25142 Concreting of Road @ Avocado St., Brgy. San Francisco 02/25/09 III 0.475 15 C 0.221 0.133 0.300 - - - 65.40 *65.40%

Poor

Nes-San Builders 25142 Constn. of Drainage System Along Don Juico & Don Meliton Aves. 09/23/08 III 9.770 230 O 0.349 0.300 0.300 - - - 94.91 93.38%

Outstanding

Nes-san Builders 25142 Construction of Multi-Purpose Building @ Brgy. Duquit 02/25/09 III 0.525 30 C 0.440 0.133 0.300 - - - 87.30 *87.30%

Satisfactory

Nes-san Builders 25142 Completion of two (2) CL Bldg. @ Mawaque Resett. E/S @ Brgy. Mawaque 08/26/09 III 0.390 30 C 0.456 0.133 0.300 - - - 88.90 *88.90%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page322

Page 331: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Nes-san Builders 25142 Repair of Ten (10) CL Bldg at Camachilles H/S 08/26/09 III 0.509 45 C 0.438 0.133 0.300 - - - 87.10 *87.10%

Satisfactory

Nes-san Builders 25142 Construction of one (1) CL Bldg. @ Navaling E/S 08/26/09 III 0.487 30 C 0.424 0.133 0.300 - - - 85.70 *85.70%

Satisfactory

Nes-san Builders 25142 Const. of MPB Tinajero H/S Annex, Sta. Lucia Resettlement Center 02/23/10 III 3.810 60 C 0.499 0.133 0.300 - - - 93.20 93.20%

V. Satisfactory

New Arcond Builders Inc. 9614 Const. of UP National Institute of Physics Bldg. 08/22/08 NCR 4.716 120 C 0.353 0.200 0.300 - - - 85.30 84.74%

V.Statisfactory

New Arcond Builders Inc. 9614 Impvt./Conc. Blocking along C.P. Garcia St. 11/18/08 NCR 14.234 150 C 0.357 0.300 0.300 - - - 95.70 92.25% Outstanding

New Arcond Builders Incorporated (Formerly: Arcond Builders) 9614

Rehabilitation/Reconstruction of Damaged Paved (Concrete Blocking along J.P. Rizal

St.)05/25/09 NCR 2.877 45 C 0.450 0.133 0.300 - - - 88.30 *88.30%

Satisfactory

New Big Four J Construction Inc. 15104 Completion of Silverio School (Phase 2) 02/24/09 NCR 2.385 60 C 0.405 0.200 0.300 - - - 90.50 *90.50%

V.Satisfactory

New Big Four J Construction Inc. 15104 Concreting of Roads, Sta. Lucia (Y), Zaragoza to Santiago 03/03/09 III 0.946 25 C 0.370 0.190 0.300 - - - 86.00 *86.00%

Satisfactory

New Big Four J Construction Inc. (Formerly: Four J Construction) 15104 Widening of Quezon Avenue 08/27/08 NCR 21.719 165 C 0.361 0.200 0.300 - - - 86.10 88.26%

V.Satisfactory

New Big Four J Construction, Inc. 15104 Concreting of Roads at Sta. Cruz 05/26/09 III 1.136 30 C 0.341 0.200 0.300 - - - 84.10 *84.10% Satisfactory

New Big Four J Construction, Inc. 15104Rehab./Reconst./Upgrading of Damaged

National Roads along Calamba-Sta. Cruz-Famy Jct. Road

05/30/09 IV-A 28.939 120 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory

New Big Four J Construction, Inc. 15104 Construction of Multi-Purpose Building 05/18/09 IV-A 19.248 180 C 0.471 0.133 0.300 - - - 90.40 *90.40% V. Satisfactory

New Big Four J Construction, Inc. 15104Widening of Road at Old MSR Biñan

Section, Laguna 1st District inc. RROW acquisition

06/01/09 IV-A 48.178 60 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory

New Big Four J Construction, Inc. 15104 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 05/18/09 IV-A 19.209 180 O 0.389 0.240 0.150 0.020 0.030 0.050 87.90 -

New Big Four J Construction, Inc. (Formerly: Four J Construction) 15104 Repair/Maintenance (Conc. Reblocking)

along M.H. Del Pilar St. Brgy. Tugatog 03/03/10 NCR 1.448 45 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page323

Page 332: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

New Kanlaon Const., Inc/Markbilt Const./JV 896 Water Impounding/Earth Dam with Spillway

(Dauin Dam) 06/25/07 NIA 158.868 540 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 -

New Kanlaon Construction inc./ JE Manalo & CO., Inc. (JV) 896

Southern Philippines Irrigation Sector Project SPISP(Construction of Binalawan

Concrete Buttress Dam & Appurtenant Facilities)

06/12/10 NIA 167.797 378 O 0.382 0.211 0.00 0.030 0.033 0.017 67.30 -

New Kanlaon Construction, Inc. 896 Concreting of Barotac Nuevo-Dumangas-Dacutan Wharf Road 06/11/09 VI 17.611 99 O 0.357 0.240 0.150 0.015 0.040 0.050 85.20 -

New Kanlaon Construction, Inc. 896

Upgrading of Guimaras Circ. Road, Salvacion-Lucmayan Section, Nueva Valencia, Guimaras, Km.84+000-Km.

89+000 with exception

09/01/09 VI 18.988 135 C 0.443 0.133 0.300 - - - 87.60 *87.60% Satisfactory

New Kanlaon Construction, Inc. 896 Conc. of Barotac Nuevo-Dumangas-Dacutan Wharf Road 09/10/09 VI 17.611 115 C 0.403 0.147 0.300 - - - 85.00 85.12%

Satisfactory

New Kanlaon Construction, Inc. 896 Site Dev't and Construction of 2-Units 2-Storey School Building 07/31/07 PRRC 25.777 210 O 0.378 0.29 0 0.03 0.062 0.1 86.00 -

New Mindoreños Lumber, Hardware and General Merchandise 31745

Road Upgrading (gravel to paved) MWCR, Sablayan-Sta. Cruz (Pag-asa-Amnay Section) KO 352+647-KO 354+004.5

08/30/09 IVB 19.158 179 O 0.365 0.296 0.150 0.030 0.042 0.033 91.60 -

New Mindoreños Lumber, Hardware and General Merchandise 31745

Road Upgrading (gravel to paved) MWCR, Sablayan-Sta. Cruz (San Vicente-

Cabacungan Section) KO 329+363-KO 330+921

08/30/09 IVB 19.175 182 O 0.350 0.300 0.150 0.030 0.042 0.033 90.50 -

New Mindoreños Lumber, Hardware and General Merchandise 31745

Road Upgrading (gravel to paved) MWCR, Sta. Cruz-Mamburao (Casoy-Balansay

Section) KO 399+495-KO 400+87209/01/09 IVB 19.292 185 O 0.348 0.300 0.150 0.030 0.042 0.033 90.30 -

New Mindoreños Lumber, Hardware and General Merchandise 31745

Road Upgrading (gravel to paved) MWCR, Sta. Cruz-Mamburao (Pagbahan-Talabaan

Section) KO 389+704-KO 391+15708/30/09 IVB 14.471 191 O 0.368 0.300 0.101 0.022 0.042 0.033 86.60 -

New Mindorenos Lumber, Hardware and General Merchandise 31745

Road Upgrading (Gravel to Paved) MWCR, Sablayan-Sta. Cruz (San Vicente-

Cabacungan Section)05/29/09 IV-B 19.176 140 O 0.351 0.300 0.150 0.030 0.037 0.033 90.10 -

New Mindorenos Lumber, Hardware and General Merchandise 31745

Road Upgrading (Gravel to Paved) MWCR, Sablayan-Sta. Cruz (Pag-asa Amnay

Section)05/29/09 IV-B 19.158 140 O 0.354 0.300 0.115 0.030 0.035 0.033 86.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page324

Page 333: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

New Mindorenos Lumber, Hardware and General Merchandise 31745

Road Upgrading (Gravel to Paved) MWCR, Sta. Cruz-Mamburao (Casoy-Balansay

Section)05/30/09 IV-B 19.188 140 O 0.308 0.300 0.070 0.030 0.030 0.033 77.10 -

New Mindoreños Lumber, Hardware and General Merchandise 31745

Road Upgrading (Gravel to Paved) MWCR Sta. Cruz-Mamburao (Pagbahan-Talabaan

Sect) KO 389+704-KO 391+157 w/ exception02/20/10 IVB 14.471 236 C 0.431 0.133 0.300 - - - 86.40 85.26%

Satisfactory

New Mindoreños Lumber, Hardware and General Merchandise (Formerly:

Mercedita Benasas General Merchandise)

31745 Const. of Banus Bridge with Detour Bridge 11/21/08 IV-B 9.554 195 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory

New Mindoreños Lumber, Hardware and General Merchandise (Formerly:

Mercedita Benasas General Merchandise)

31745 Const. of Casague MPB 11/21/08 IV-B 0.864 45 O 0.329 0.240 0.100 0.030 0.027 0.100 82.60 -

New Mindoreños Lumber, Hardware and General Merchandise (Formerly:

Mercedita Benasas General Merchandise)

31745 Const. of Seawall at Poblacion I & II Brgy. Mulawin 08/26/08 IV-B 4.807 90 C 0.322 0.200 0.300 - - - 82.20 82.20%

V.Satisfactory

New Mindoreños Lumber, Hardware and General Merchandise (Formerly:

Mercedita Benasas General Merchandise)

31745 Construction of Casague Multi-Purpose Building 02/28/09 IV-B 0.864 45 C 0.494 0.091 0.300 - - - 88.50 *84.37%

Satisfactory

New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Const. of MPB (Annex) 02/22/08 IV-A 0.475 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%

V.Satisfactory

New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Impvt. of FMR at Brgy. Banca-Banca 02/26/08 IV-A 0.480 25 C 0.347 0.200 0.300 - - - 84.70 *84.70%

V.Satisfactory

New Rich General Contractor Services Contractor Services &

Trading Company, Inc.27629 Const. of Multi-Purpose Building, Brgy.

Poblacion V 02/23/10 IVA 0.493 40 C 0.445 0.200 0.300 - - - 94.50 94.5% V. Satisfactory

New San Fabian Builders & Supplies 16348 Const. of 2 CL Sch. Bldg., Galintuja P/S 11/26/08 III 0.954 90 C 0.364 0.265 0.300 - - - 92.90 *92.90% Outstanding

New San Fabian Builders & Supplies 16348 Construction of Multi-Purpose Bldg., Aurora Nat'l Science High School 03/03/09 III 2.133 120 C 0.451 0.133 0.300 - - - 88.40 *88.40%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page325

Page 334: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

New TBP Construction & Development Corp. 29155 Const. of Cross Drainage Structures along

MNR 11/25/08 I 4.417 120 O 0.344 0.120 0.100 0.020 0.042 0.133 75.90 -

New TBP Construction & Development Corporation 29155 Construction of Cross Drainage Structures

along MNR 08/25/09 I 4.417 337 O 0.358 0.265 0.150 0.030 0.045 0.033 88.10 -

Newadis Construction 23806Road Upgrading (Gravel to Paved) MWCR,

Calintaan-Sablayan (Bulangcog-Iriron Section)

05/30/09 IV-B 9.573 90 O 0.314 0.300 0.150 0.030 0.042 0.050 88.60 -

Newadis Construction 23806 Completion of the Conc. of Magsaysay-San Jose Road 09/10/07 IV-B 9.619 120 C 0.294 0.300 0.300 - - - 89.40 81.66%

V. Satisfactory

Newadis Construction 23806 Const. of 2 CL Abra de Ilog NHS 08/26/08 IV-B 0.954 50 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory

Newadis Construction 23806 Construction of Mamburao Seawall, Barangay 7 02/28/09 IV-B 2.683 120 C 0.433 0.069 0.300 - - - 80.20 *84.34%

Satisfactory

Newadis Construction 23806Road Upgrading (gravel to paved), MWCR,

Calintaan-Sablayan (Bulangcog-Iriron Section) KO 276+468- KO 277+141

08/31/09 IVB 9.650 192 O 0.344 0.294 0.150 0.030 0.037 0.033 88.80 -

Newadis Construction 23806 Const. of 2 CL School Building, Claudio Salgado Elementary School 02/20/10 IVB 1.368 90 C 0.468 0.133 0.300 - - - 90.10 90.10%

V. Satisfactory

NewBig Four J Construction, Inc. 15104 Const. of Municipal Hospital Building 03/01/10 IVA 33.705 210 O 0.337 0.300 0.150 0.030 0.050 0.033 90.00 -

NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) 05/24/08 V 23.780 210 O 0.367 0.240 0.100 0.030 0.023 0.100 86.00 -

NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) 03/02/09 V 23.780 487 O 0.335 0.239 0.150 0.030 0.061 0.050 86.50 -

NFH Construction & Supply 16055 Const. of Daguit 2 Bridge 05/30/08 V 19.650 240 O 0.339 0.300 0.070 0.020 0.023 0.067 81.90 -

NFH Construction & Supply 16055 Const. of Daguit 2 Bridge 08/28/08 V 19.650 330 O 0.342 0.300 0.070 0.030 0.028 0.067 83.70 -

NFH Construction & Supply 16055 Const. of Daguit 2 Bridge 03/13/09 V 19.650 714 O 0.341 0.240 0.000 0.030 0.056 0.050 71.70 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page326

Page 335: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

NFH Construction & Supply 16055 Const. of Nagas Bridge & Approaches 02/25/08 V 15.512 270 C 0.353 0.200 0.300 - - - 85.30 77.83% Satisfactory

NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) 09/03/09 V 23.780 487 C 0.388 0.200 0.300 - - - 88.80 87.27%

Satisfactory

NFH Construction & Supply 16055 Road Upgrading of Ligao-Pioduran Road 09/02/09 V 19.184 134 C 0.458 0.141 0.300 - - - 89.90 82.46% Satisfactory

NFH Construction & Supply (Formerly: NFH Gravel and Sand) 16055 Construction of Daguit 2 Bridge 06/04/09 V 19.650 736 C 0.487 0.133 0.300 - - - 92.00 84.26%

Satisfactory

NFH Construction & Supply (Formerly: NFH Gravel and Sand) 16055 Rehab./Reconst. of Damaged National

Road, Lakandula Drive 05/27/09 V 32.610 120 O 0.343 0.240 0.150 0.023 0.035 0.050 84.10 -

Nirvana Construction and Supplies 18691 Const. of 3 CL at Colon NHS (Ireneo Lopez Annex) 09/02/08 XII 1.301 90 C 0.305 0.248 0.000 - - - 55.30 *55.30%

Poor

Nirvana Construction and Supplies 18691 Const. of MPB, Brgy. Zone 4 03/14/09 XII 1.429 161 C 0.472 0.133 0.300 - - - 90.50 84.97% Satisfactory

Nirvana Construction and Supplies 18691 Impvt. of Lake Sebu-Maitum Road Phase I, Brgy. Takunel 05/23/08 XII 14.463 252 C 0.282 0.300 0.000 - - - 58.20 71.34%

Satisfactory

Nirvana Construction and Supplies 18691 Const. of 2-CL School Building at Basag NHS 03/06/10 XII 1.321 105 C 0.482 0.141 0.300 - - - 92.30 92.30%

V. Satisfactory

Nishimatsu Construction Company Limited

SLN-SN-000579/FC-

02-036

KAMANAVA Area Flood Control & Drainage System Improvement Project 08/29/08 NIA 3,441.588 1,914 C 0.332 0.300 0.300 - - - 93.20 92.01%

Outstanding

NMJ Construction & Trading 31017 Const./Impvt. of FMR 11/24/07 IX 0.465 25 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfctory

NMJ Construction & Trading 31017 Const./Impvt. of FMR, Canacan-Sininan 08/24/07 IX 0.464 40 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfctory

Norm Construction 13754 Repair/Rehab. of Brgy. Road @ Pisong A (Sta. 0+000-Sta. 0+480) Maria, Siquijor 06/02/09 VII 0.962 120 C 0.430 0.133 0.300 - - - 86.30 *86.30%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page327

Page 336: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Norm Construction 13754 Completion of Multi-Purpose Building 03/10/09 VII 0.459 120 C 0.442 0.133 0.300 - - - 87.50 *87.50%Satisfactory

Norm Construction 13754 Rehab. & Improvement of Municipal Roads 03/13/09 VII 1.431 30 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory

Norm Construction 13754 Conc. of Luyang-Poo-Lazi National Rd. (Km.17.620-Km.17.810) 09/07/09 VII 2.891 128 C 0.379 0.142 0.300 - - - 82.10 83.12%

Satisfactory

Norm Construction 13754 Conc. of Road Brgy. Poblacion DOS 12/01/08 VII 0.933 30 C 0.350 0.300 0.300 - - - 95.00 *95.00% Outstanding

Norsam Builders & Construction Supply 21184 Macagtas IS 7/6-10/09 NIA 4.559 240 O 0.363 0.240 0.150 0.030 0.063 0.050 89.61 -

Norsam Builders & Construction Supply 2184 IRAWAHAN CIS 7/6-10/09 NIA 1.910 180 C 0.468 0.160 0.300 - - - 92.84 *92.84%

V. Satisfactory

Norsam Builders & Construction Supply 2184 San Miguel CIS 7/6-10/09 NIA 4.005 150 O 0.365 0.240 0.150 0.030 0.063 0.050 89.77 -

Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg., Bantayan Elem.

Sch. 11/22/07 VIII 0.239 90 C 0.323 0.100 0.300 - - - 72.30 *72.30% Satisfactory

Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg., Pambujan

Elem. Sch. 11/22/07 VIII 0.655 90 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory

Northern / DMJ Construction (JV) JV-08-115 Construction of Baler-Casiguan Road CP3 03/06/09 III 505.307 450 O 0.394 0.300 0.150 0.030 0.033 0.033 94.00 -

Northern / Z M Construction (JV) JV-08-275Const. (Road Opening) of Lubao By-Pass

Road of San Fernando-Olongapo Road inc. RROW

05/19/09 III 135.396 180 O 0.318 0.272 0.150 0.030 0.051 0.050 87.10 -

Northern / ZM Construction (JV) JV-07-148

Tarlac-Nueva Ecija-Dingalan Port Road, Sta. Rosa-Jct. Fort Magsaysay Road (Phase 2) & Gabaldon-Dingalan Road

(Phase 3)

03/04/09 III 238.983 300 O 0.367 0.300 0.150 0.030 0.032 0.050 92.90 -

Northern Builders 8789Concrete Paving/Impvt. of Jct. National Road, Bitnong-Belance, Nueva Vizcaya

Boundary Road06/01/09 II 125.420 540 O 0.347 0.300 0.150 0.030 0.051 0.050 92.80 -

Northern Builders 8789 Rehab./Reconst./Upgrading of Tarlac-Maliwalo Road 05/26/09 III 13.822 60 C 0.474 0.200 0.300 - - - 97.40 *97.40%

Outstanding

Northern Builders 8789Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Jct. Fort Magsaysay-Laur Section)

Contract Package 305/30/09 III 299.894 360 O 0.337 0.300 0.150 0.030 0.042 0.050 90.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page328

Page 337: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Northern Builders 8789Rehab./Reconst./Upgrading of Arayat-

Magalang-Mabalacat Road, Km. 108+300 to Km. 111+500 (with exception)

06/04/09 III 37.804 52 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory

Northern Builders 8789 Construction of Togbongon River Control 05/28/09 XIII 9.585 149 C 0.384 0.186 0.300 - - - 87.00 86.58% Satisfactory

Northern Builders 8789 Asphalt Overlay along Manila North Road 02/27/09 III 9.743 30 C 0.431 0.195 0.300 - - - 92.60 *92.60%V. Satisfactory

Northern Builders 8789 Asphalt overlay of Daang Maharlika 03/13/09 II 38.996 85 C 0.470 0.200 0.300 - - - 97.00 *97.00% Outstanding

Northern Builders 8789 Baliuag Boundary, Candaba Road 02/24/09 III 33.886 144 C 0.430 0.181 0.300 - - - 91.10 *91.10%V. Satisfactory

Northern Builders 8789Concrete Paving/Impv't of Jct. National Road, Bitnong-Belance, Nueva Vizcaya

Bdry. Road03/10/09 II 125.412 540 O 0.354 0.300 0.150 0.030 0.045 0.050 92.90 -

Northern Builders 8789 Const. (Widening) of Calamba Bridge 02/23/08 IVA 63.341 380 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding

Northern Builders 8789 Construction of Togbongon River Control 03/10/09 XIII 9.585 149 O 0.300 0.300 0.150 0.030 0.033 0.050 86.30 -

Northern Builders 8789 Impvt./Widening of Manila North Road, Phase III 02/20/08 III 93.589 213 C 0.295 0.300 0.300 - - - 89.50 82.66%

V. Satisfactory

Northern Builders 8789Impvt./Widening/Conc. of McArthur

Highway (MNR) Tarlac Section Phase IV, Package II, Tarlac City Section

02/27/09 III 118.472 240 C 0.441 0.200 0.300 - - - 94.10 *94.10%V. Satisfactory

Northern Builders 8789 Rehab. of San Marcelino-San Narciso Rd. 11/14/08 III 47.529 60 C 0.326 0.300 0.300 - - - 92.60 *92.60% Outstanding

Northern Builders 8789 Rehab./Impvt. of MNR & Camp Dau Road 05/19/08 III 14.197 15 C 0.314 0.205 0.300 - - - 81.90 *81.60% V. Satisfactory

Northern Builders 8789 Repair of Angeles-Dinalupihan Road 11/12/08 III 6.591 70 C 0.317 0.200 0.300 - - - 81.70 *81.70% V. Satisfactory

Northern Builders 8789 Repair/Rehab. Along Romulo Highway 08/21/08 III 9.320 30 C 0.378 0.205 0.300 - - - 88.30 *88.30% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page329

Page 338: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Northern Builders 8789 San Vicente-Apalit Road 02/24/09 III 31.463 140 C 0.452 0.192 0.300 - - - 94.40 *94.40%V. Satisfactory

Northern Builders 8789Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Jct. Fort Magsaysay-Laur Section)

CP 309/07/09 III 299.894 360 O 0.379 0.300 0.150 0.030 0.050 0.033 94.20 -

Northern Builders 8789Widening/Conc. of Bontoc-Banaue Road,

Talubin-Samoki Section Bontoc, Km. 376+911-Km.385+000 (intermittent Section)

08/30/09 CAR 120.619 450 O 0.365 0.240 0.087 0.030 0.056 0.017 79.50 -

Northern Builders 8789Concrete Paving/Impvt. of Jct. National Road, Bitnong-Belance, Nueva Vizcaya

Boundary Road03/04/10 II 125.420 330 C 0.395 0.200 0.300 - - - 89.50 91.51%

V. Satisfactory

Northern Builders 8789Const. of Tarlac-Nueva Ecija-Dingalan

Road (Jct. Fort Magsaysay-Laur Section), CP3

02/23/10 III 306.881 360 C 0.392 0.200 0.300 - - - 89.20 90.68% V. Satisfactory

Northern Builders 8789 Rehab./Reconst. Of Sicsican-Licab Road, Sta. 0+000-Sta. 18+620 03/01/10 III 287.016 210 C 0.372 0.200 0.300 - - - 87.20 88.04%

Satisfactory

Northern Builders / Ferdstar Builders Contractors (JV) JV-07-118 Rehab/Reconst. of Tulaoc-Sto. Domingo

Road, Mexico Section 02/24/09 III 96.425 300 O 0.337 0.281 0.150 0.030 0.047 0.050 89.50 -

Northern Builders / R.A. Pahati Gravel & Sand (JV) JV-08-008

Rehab./Impvt./Widening of Tarlac-Nueva Ecija-Dingalan Port Road (Jct. Fort Magsaysay-Laur Road Section) CP I

05/30/09 III 223.074 300 C 0.355 0.200 0.300 - - - 85.50 90.72% V. Satisfactory

Northern Builders / R.A. Pahati Gravel & Sand (JV) JV-08-008

Rehab/Impvt./Widening of Tarlac-Nueva Ecija-Dingalan Port Road, Phase I, Fort

Magsaysay-Laur Road Section03/04/09 III 223.075 300 O 0.388 0.300 0.150 0.022 0.032 0.050 94.20 -

Northern Builders / ZM Const. (JV) JV-07-685 Impvt./Upgrading/Widening of Jct. Layac-Balanga-Mariveles Port Rd. 03/27/09 III 107.887 300 C 0.464 0.200 0.300 - - - 96.40 94.84%

V. Satisfactory

Northern Builders/DMJ Construction & Supply (JV) JV-06-076

Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Tarlac City-Sta. Rosa-Fort

Magsaysay-Palayan City-Laur-Gabaldon Road, Section 4, Sta. Rosa Fort Magsaysay

02/27/08 III 128.482 240 C 0.345 0.300 0.300 - - - 94.50 91.92% Outstanding

Northern Builders/Ferdstar Builders Contractor Joint Venture JV-07-143

Completion/Continuation of Unfinished On-going Bridge: Anao Bridge along San Jose

Malino-Anao Road05/18/09 III 18.988 60 O 0.307 0.300 0.150 0.030 0.042 0.050 87.90 -

Northern Builders/Ferdstar Builders Contractor Joint Venture JV-07-118 Rehab./Reconst. of Tulaoc Sto. Domingo

Road, Mexico Sect. 05/18/09 III 96.425 300 O 0.298 0.300 0.150 0.030 0.037 0.050 86.50 -

Northern Builders/Ferdstar Builders Contractor Joint Venture JV-07-143

Completion/Continuation of Unfinished On-Going Bridge: Anao Bridge along San Jose

Malino-Anao Road02/16/10 III 18.989 76 C 0.457 0.200 0.300 - - - 95.70 91.02%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page330

Page 339: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Northern Builders/Ferdstar Builders Contractor Joint Venture JV-07-118 Rehab./Reconst. Of Tulaoc Sto. Domingo

Rd., Mexico Section 02/16/10 III 96.425 300 C 0.402 0.200 0.300 - - - 90.20 88.88% Satisfactory

Northern Builders/New Big Four J Const. Inc. (Joint Venture) JV-08-207

Imprv't/Conc./widening of Panglao center Spur Rd. Sta. 3+120-to Sta.3=500;

Sta.3+700-Sta.5+200;Sta.5+540-Sta.6+20009/03/09 VII 110.999 300 O 0.383 0.240 0.150 0.030 0.037 0.050 89.00 -

Northern Builders/New Big Four J Const. Inc. (Joint Venture) JV-08-207

Imprv't./Conc. of Jct.(TER),Jagna-Sierra Bullones Rd. Km.86.283-

Km86.800;Km.87.020-Km.87.380;Km87.540-Km.89.64550;Km.94.380-Km.95.680

09/04/09 VII 87.718 270 O 0.329 0.240 0.150 0.030 0.037 0.050 83.60 -

Northern Builders/New Big Four J Construction Inc. Joint Venture JV-08-207

Impvt./Conc./Widening of Panglao Center Spur Road, Sta. 3+120-Sta.3+500, Sta.

3+700-Sta. 5+200, Sta. 5+540-Sta. 6+20006/10/09 VII 110.999 300 O 0.358 0.300 0.150 0.030 0.047 0.050 93.50 -

Northern Cotabato Construction and Supply 15515 Conc. of Banisilan-Guiling-Alamada-

Libungan Road (Camansi-Nicaan Section) 02/28/08 XII 4.785 74 C 0.357 0.200 0.300 - - - 85.70 81.86% V. Satisfactory

Northern/DMJ Construction Joint Venture JV-08-115 Construction of Baler-Casiguran Road

(Contract Package 3) 05/28/09 III 505.307 450 O 0.337 0.300 0.150 0.030 0.037 0.033 88.70 -

Northern/ZM Construction Joint Venture JV-07-148

Tarlac-Nueva Ecija-Dingalan Port Road, Sta. Rosa-Jct. Fort Magsaysay Road

(Phase 2) and Gabaldon-Dingalan Road (Phase 3)

05/30/09 III 241.076 360 C 0.429 0.200 0.300 - - - 92.90 92.90% V. Satisfactory

Northern/ZM Construction Joint Venture JV-08-275

Const. of (Road Opening) of Lubao-By Pass Road of San Fernando-Olongapo

Road inc. RROW08/25/09 III 135.396 180 O 0.336 0.300 0.150 0.030 0.051 0.033 90.00 -

Novanne Ventures Construction 22107 Cont. of MPB at Brgy. Singcang 09/03/07 VI 2.794 180 C 0.396 0.124 0.300 - - - 82.00 85.57% V. Satisfactory

Nukaza Trading and Construction 32067 Impvt. of Road with Lined Canal at Summitville Subd., Putatan Itaas 11/14/08 NCR 2.379 60 C 0.303 0.236 0.300 - - - 83.90 *83.90%

V. Satisfactory

Nukaza Trading and Construction Services 32067 Const./Rehab./Completion of Flood Control

Project at Brgy. Cupang 02/18/10 NCR 2.381 101 O 0.342 0.240 0.150 0.030 0.029 0.033 82.40 -

NY Construction and Supply 30388 Construction and Supply for the Catbalogan Port Rehabilitation Project 04/20-23/10 PPA 35.835 150 O 0.3960 0.3000 0.1500 0.0300 0.0700 0.0500 99.60 -

O.G. Santos Construction 2050 Conc. of Aurora-Dipolog City Road, Josefina Section 05/23/08 IX 13.353 210 C 0.251 0.201 0.300 - - - 75.20 74.87%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page331

Page 340: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

O.G. Santos Construction 2050 Conc. of Mahayag-Dumingag Road Kaangayan Section 03/12/09 IX 4.645 166 C 0.467 0.150 0.300 - - - 91.70 *91.70%

V. Satisfactory

O.G. Santos Construction 2050Const. of Line Ext. Canal & Spillway at Various sections of Newly completed Rehab. of Malalag-Malita-JAS Road

05/15/08 XI 2.878 95 C 0.274 0.300 0.300 - - - 87.40 87.34% V. Satisfactory

O.G. Santos Construction 2050Impvt./Conc. of By-Pass Road connecting Panabo Wharf Road and Panabo Coastal

Road11/30/08 XI 13.203 180 C 0.302 0.200 0.300 - - - 80.20 76.94%

Satisfactory

O.G. Santos Construction 2050

Road Upgrading (Gravel to Paved) Manaman-Ticulon-Lagumit-Little Baguio Road App. "A", Kinangan Bridge, Malita

Km. 1655+605-Km.1656+355

09/04/09 XI 14.465 120 C 0.430 0.133 0.000 - - - 56.30 *56.30% Poor

O.G. Santos Construction 2050 Completion of MPB for Package 1 at Duterte NHS, Brgy. Talomo 03/10/10 XI 2.841 180 C 0.492 0.133 0.300 - - - 92.50 92.50%

V. Satisfactory

O.L. De Leon Construction 16194 Conc. of Bagong Silang-Capalonga Road 11/27/08 V 14.188 150 C 0.370 0.200 0.300 - - - 87.00 88.62% V. Satisfactory

O.L. De Leon Construction 16194 Conc. of Talobatib-Jose Pang. Road 05/30/08 V 1.881 90 C 0.234 0.200 0.300 - - - 73.40 80.12% V. Satisfactory

O.R. Sarmiento Construction 1411 Conc. of Danao-Getafe Road 08/30/08 VII 9.472 210 C 0.256 0.300 0.300 - - - 85.60 87.92% V. Satisfactory

O.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-Sierra-Bullones Road 03/01/08 VII 81.102 300 O 0.387 0.169 0.070 0.030 0.056 0.100 81.20 -

O.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-Sierra-Bullones Road 08/29/08 VII 81.102 300 O 0.337 0.223 0.000 0.030 0.059 0.100 74.90 -

O.R. Sarmiento Construction 1411 Const. of Spillway - Phase I, Talibon Small Reservoir Irrigation Project 06/27/07 NIA-II 8.708 280 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 86.50%

V. Satisfactory

O.R. Sarmiento Construction 1411Const./Impv't (Concrete Paving) of

Concepcion, Danao-Buenavista-Carmen Road

03/05/09 VII 9.592 620 C 0.429 0.144 0.300 - - - 87.30 88.56%Satisfactory

O.R. Sarmiento Construction 1411 Talibon Small Reservoir Irrigation Project 9/29/08 10/3/08 NIA 11.574 343 O 0.350 0.157 0.100 0.030 0.047 0.200 88.40 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page332

Page 341: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

O.R. Sarmiento Construction 1411Rehab. of Daang Maharlika Highway,

Package I, Section 2 (Allen-Malaga Road Section) Km. 63+359.55-Km. 667+644.55

03/04/10 VIII 99.950 180 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding

O.R. Sarmiento Construction 1411

Rehab. of Daang Maharlika Highway Package I, Section 5 (Allen-Malaga Road Section) Km. 674+560.55-Km. 660+366.55

w/ exceptions

03/11/10 VIII 120.574 210 C 0.419 0.133 0.300 - - - 85.20 85.20% Satisfactory

Ocean Construction Services 32220 Const. of Lamo High School, 2 Storey School Building, Lamo 03/04/10 II 0.645 60 C 0.405 0.133 0.300 - - - 83.80 83.80%

Satisfactory

O'hara Construction & Aggregates 33173 Const. of Pinsao Proper, Farm-to-Market Road 06/03/09 CAR 4.725 112 C 0.375 0.200 0.300 - - - 87.50 *87.50%

Satisfactory

O'hara Construction & Aggregates 33173 Proposed One Storey Two Class room 7x7 (modified) Mamuyod E/S 08/26/09 CAR 1.025 82 O 0.344 0.240 0.118 0.030 0.043 0.033 80.80 -

O'hara Construction & Aggregates 33173 Proposed One Storey Two Class room 7x7 (modified) Mamuyod E/S 03/01/10 CAR 1.025 82 C 0.401 0.179 0.300 - - - 88.00 82.96%

Satisfactory

OIC Construction & Supply 23727 Road Conc. @ Brgy. San Juan, Alitagtag and Brgy. San Isidro 11/27/08 IV-A 0.291 45 C 0.277 0.300 0.300 - - - 87.70 *87.70%

V. Satisfactory

OIC Construction & Supply 23727 Waterworks Project (Level I) 05/28/08 IV-A 2.468 120 C 0.389 0.200 0.300 - - - 88.90 86.50% V. Satisfactory

Olin Development Engineering and Construction 26271 Concreting of Purok Repolyo Road, Brgy.

Golden Ribbon 06/10/09 XIII 0.911 45 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory

Omengan Construction and Development Corporation 5119

Impv't./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase III, Dao Bridge-

Cobaet Bridge05/28/09 CAR 48.191 300 C 0.352 0.200 0.300 - - - 85.20 88.56%

Satisfactory

Omengan Construction and Development Corporation 5119 Conc. along Kabugao-Pudtol-Luna Road,

Mataguisi Section 06/01/09 CAR 18.868 277 O 0.322 0.300 0.150 0.030 0.050 0.033 88.50 -

Omengan Construction and Development Corporation 5119 Const. of Saltan Bridge & Approaches 05/23/07 CAR 76.227 345 O 0.341 0.300 0.100 0.030 0.040 0.100 91.10 -

Omengan Construction and Development Corporation 5119

Improvement/Widening/Concreting of Bontoc-Tabuk-Tuguegarao Road, Phase 1,

Cobaet Bridge-Gonogon Bridge03/03/09 CAR 47.239 300 C 0.436 0.200 0.300 - - - 93.60 *93.60%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page333

Page 342: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Omengan Construction and Development Corporation 5119

Improvement/Widening/Concreting of Bontoc-Tabuk-Tuguegarao Road, Phase III,

Dao Bridge-Cobaet Bridge03/03/09 CAR 47.241 300 O 0.362 0.288 0.150 0.030 0.045 0.033 90.80 -

Omengan Construction and Development Corporation 5119

Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase VI, Mamaga Bridge-Basao Bridge, Km. 420+970-

Km.429+940

11/20/08 CAR 83.149 365 O 0.331 0.240 0.100 0.030 0.045 0.067 81.30 -

Omengan Construction and Development Corporation 5119

Impvt./Widening/Conc. Of Bontoc-Tabuk-Tuguegarao Road, Phase VI, Mamaga Bridge-Basao Bridge, Km. 420+970-

Km.429+940

03/04/09 CAR 83.149 365 O 0.376 0.300 0.150 0.030 0.045 0.033 93.40 -

Omengan Construction and Development Corporation 5119

Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Tinglayan Bdry.-

Lubuagan-Tabuk Sect. II Km. 472+500-Km.495+500

11/23/07 CAR 14.465 84 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding

Omengan Construction and Development Corporation 5119 Upgrading & Conc. of Tuguegarao-Tabuk-

Tinglayan Road, Pingaan-Dalimuno Section 08/21/07 CAR 14.329 150 C 0.266 0.016 0.300 - - - 58.20 72.90% Satisfactory

Omengan Construction and Development Corporation 5119 Conc. along Kabugao-Pudtol-Luna Road,

Matuguise Section 09/05/09 CAR 18.868 277 O 0.365 0.240 0.150 0.030 0.056 0.033 87.40 -

Omengan Construction and Development Corporation 5119

Widening/ Conc. of Mt. Data-Bontoc Road Aw-awigan, Mabaay to Capitin Section, Bauko and Sangan Km. 356+968-Km.

364+100

08/28/09 CAR 91.620 432 O 0.369 0.192 0.133 0.023 0.042 0.033 79.20 -

Omengan Construction and Development Corporation 5119

Widening / Conc. of Mt. Data-Bontoc Road Sabangan Bridge, Poblacion to Malitep

Bridge Section Balili Section, Km. 374+233-Km 380+227

08/28/09 CAR 91.443 430 O 0.361 0.240 0.053 0.023 0.042 0.017 73.60 -

Omengan Construction and Development Corporation 5119 Conc. along Kabugao-Pudtol-Luna Road,

Matuguise Section 02/18/10 CAR 19.104 307 C 0.433 0.133 0.300 - - - 86.60 87.41% Satisfactory

Omnicon Builders 22816 Const. of 2 Cl Sch. Bldg. @ Pinagturilan NHS 09/10/07 IV-B 1.339 90 C 0.257 0.300 0.300 - - - 85.70 70.51%

Satisfactory

Omnicon Builders 22816 Completion of 2-Storey, 2-CL Academic School Building at Bacoor Poblacion E/S 03/01/10 IVA 0.701 42 C 0.398 0.200 0.300 - - - 89.80 89.80%

V. Satisfactory

On Top Construction 32696 Const. of Salingao Flood Control 05/26/08 CAR 0.238 25 C 0.355 0.200 0.300 - - - 85.50 *85.50% V.Satisfactory

On Top Construction 32696 Const./Conc. of Singi FMR 11/13/08 CAR 0.238 28 C 0.317 0.200 0.300 - - - 81.70 *81.70% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page334

Page 343: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

OP Reyes Builders & Supply 32271 Conc. of Road in Brgy. Malaruhatan 08/23/07 IVA 0.470 60 C 0.292 0.216 0.300 - - - 80.80 *80.80% V. Satisfactory

OP Reyes Builders & Supply 32271 Const. of Flood Control System in Brgy. 2 02/24/10 IVA 0.490 45 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory

Open Builders and Supply 33342Const./Rehab./Replacement/Completion

and Repair of Elem. & Secondary S/B projects @ Cababto-an E/S

05/29/09 VIII 0.511 120 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory

Open Builders and Supply 33342Const./Rehab./Replacement/Completion

and Repair of Elem. & Secondary S/B Projects, La Perla NHS, Rawis NHS Annex

05/29/09 VIII 0.511 120 C 0.398 0.133 0.300 - - - 83.10 *83.10% Satisfactory

Open Builders and Supply 33342Repair/Rehab. of Cadat-Olan Bridge

Approach A along Catarman (Bdry.) Rawis Rd.

03/04/09 VIII 0.603 60 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory

OQC Construction 22690 Addalam River Irrigation Project 04/27/09 05/01/09 NIA 2.827 178 O 0.358 0.240 0.150 0.023 0.038 0.033 84.23 -

OQC Construction 22690 Const of San Vicente FMR 11/15/07 II 2.863 120 C 0.236 0.239 0.300 - - - 77.50 77.50% Satisfactory

OQC Construction 22690 Const. of MPB @ Brgy. 9 02/22/08 II 1.924 250 C 0.388 0.200 0.300 - - - 88.80 81.87% V. Satisfactory

OQC Construction 22690 Const. of MPB @ I.S.U. 11/16/07 II 1.895 150 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory

Orani Builders Supply 5349 Asphalt Overlay of Tabacan-Poblacion Road 05/20/09 III 16.268 120 O 0.400 0.200 0.150 0.023 0.025 0.050 84.80 -

Orani Builders Supply 5349 Widening of Gapan-San Fernando-Olongapo Road 05/20/09 III 28.516 120 O 0.350 0.209 0.150 0.030 0.040 0.050 82.90 -

Orani Builders Supply 5349 Concreting of Mabatang-Vicinal Road 05/20/09 III 7.643 120 O 0.314 0.233 0.150 0.030 0.037 0.050 81.40 -

Orani Builders Supply 5349 Const. of MPB @ Brgy. Camachile 11/12/07 III 0.660 42 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory

Orani Builders Supply 5349 Impvt. of Pentor-Balsik River Control, Sta. Isabel Section 11/17/08 III 4.767 120 C 0.264 0.300 0.300 - - - 86.40 *86.40%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page335

Page 344: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Orani Builders Supply 5349 Asphalt Overlay of Tabacan-Poblacion Road 08/27/09 III 16.268 120 C 0.466 0.133 0.300 - - - 89.90 86.84%

Satisfactory

Orani Builders Supply 5349 Widening of Gapan-San Fernando-Olongapo Road 08/27/09 III 28.516 120 C 0.408 0.133 0.300 - - - 84.10 83.38%

Satisfactory

Orani Builders Supply 5349 Concreting of Mabatang-Vicinal Road 08/27/09 III 7.643 120 C 0.427 0.133 0.300 - - - 86.00 83.24% Satisfactory

Orient Star Const./Lumel Glenn Const. (JV) JV-09-001

Completion of Mindoro Oriental/Occidental East Coastal Road, Nasucob-Campasaan

Sect.09/04/09 IVB 14.281 200 O 0.336 0.300 0.150 0.022 0.020 0.033 86.10 -

Orient Star Construction 7183 Const./Impvt. of Paclasan Seawall 11/19/08 IV-B 1.881 70 C 0.320 0.200 0.300 - - - 82.00 *82.00% V.Satisfactory

Orient Star Construction 7183 Rehab. of CSR Bansud Section 09/05/07 IV-B 4.710 90 C 0.301 0.300 0.300 - - - 90.10 *90.10% Outstanding

Orient Star Construction 7183 Repair/Maintenance of Cagancan River Control 11/19/08 IV-B 1.887 60 C 0.336 0.200 0.300 - - - 83.60 *83.60%

V.Satisfactory

Oriental Sales Center & Contractor 3816Conc. of Abra-Cervantes Road (km.

431+589 to Km. 432+185), Lagangilang Section

02/19/08 CAR 4.730 40 C 0.293 0.186 0.300 - - - 77.90 51.14% Poor

Oriental Sales Center & Contractor 3816 Const. of Bridge (Phase I) 05/21/07 I 0.958 35 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -

Oriental Sales Center & Contractor 3816Repair/Maint. of National Roads (Package),

Abra-Ilocos Sur Road and Abra-Kalinga Road

11/25/08 CAR 9.521 21 C 0.228 0.190 0.300 - - - 71.80 *71.80% Satisfactory

Oriental Sales Center & Contractor/Pangasinan New Wilson

Lumber & Construction (JV) JV-07-149 Const. of San Vicente-Pugo Bridge (Phase

I) 08/27/09 I 24.107 365 C 0.451 0.200 0.300 - - - 95.10 88.02% Satisfactory

Orientech Construction & Development Corporation 8874 Const./Widening & Conc. of Dinagat-Loreto

Road (Sta. Cruz-Wilson Road) 05/17/08 XIII 14.472 270 C 0.350 0.200 0.000 - - - 55.00 64.00% Fair

Orientech Construction & Development Corporation 8874 Construction of Multi-Purpose Bldg.(Phase

II) 09/04/09 XIII 14.470 210 O 0.386 0.240 0.150 0.030 0.043 0.033 88.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page336

Page 345: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Orzan Builders Enterprises 13382 Repair of Two CL Sch. Bldg. Pto. Diaz Central School 11/14/07 V 0.288 90 C 0.298 0.220 0.300 - - - 81.80 *81.80%

V. Satisfactory

Oscan Builder 31158 Completion of MPB, Old Lukban E/S, Magsaysay Ave. 11/26/08 CAR 0.953 44 C 0.368 0.200 0.300 - - - 86.80 *86.80%

V. Satisfactory

Oscan Builder 31158 Repair/Rehab. of Secondary Sch. Bldg. BCNHS-Main 03/05/08 CAR 4.772 132 C 0.360 0.300 0.300 - - - 96.00 89.28%

V. Satisfactory

P & V Construction & Sales 6533 Rehab. and Imprvt. of Concrete Revetment Pinulot Creek, Brgy. Pinulot 08/27/09 III 0.511 60 C 0.417 0.133 0.300 - - - 85.00 *85.00%

Satisfactory

P. C. Panopio Construction and Trading 32824 Repair/Rehab. of Slope Protection of Flood

Control along Camachile River 08/18/08 III 1.402 60 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory

P. L. Sebastian Construction 1076 Rehab./Reconst./Upgrading of Tagum-Panabo Circumferential Road 09/07/09 XI 96.181 200 O 0.389 0.241 0.150 0.030 0.051 0.050 91.10 -

P. Obial Construction 16784 Completion of Multi-Purpose Building in Mandaue City Central School 06/05/09 VII 2.352 111 C 0.500 0.149 0.300 - - - 94.90 *94.90%

V. Satisfactory

P.B. Grey Construction 13383Const. (Rehab., Replacement, Completion

and Repair) of Two (2) Storey (6) Classroom Sch. Bldg. at San Rafael E/S

11/30/07 IVA 6.934 150 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory

P.B. Grey Construction 13383 Rehab. of Road @ Litex Village 08/30/07 IVA 1.303 60 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory

P.B. Grey Construction 13383 Rehab. of Road @ Sitio San Roque 05/14/08 IVA 1.434 60 C 0.363 0.300 0.300 - - - 96.30 *96.30% Outstanding

P.B. Grey Construction 13383 Rehab./Impvt. of Angono Diversion Road 03/12/09 IVA 9.602 180 C 0.461 0.133 0.300 - - - 89.40 82.98% Satisfactory

P.B. Grey Construction 13383 Riprapping of Teresa River, Brgy. Dalig 03/03/09 IVA 0.959 30 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding

P.B. Grey Construction 13383 Repair of Two (2) Four (4) CL Sch. Bldg. @ Manggahan National High School 08/24/09 IVA 2.880 60 C 0.457 0.200 0.300 - - - 95.70 *95.70%

V. Satisfactory 07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page337

Page 346: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

P.B. Grey Construction 13383 Riprapping of a portion of Teresa Rvier Brgy. Dalig 08/25/09 IVA 0.479 30 C 0.478 0.133 0.300 - - - 91.10 *91.10%

V. Satisfactory

P.B. Grey Construction 13383 Riprapping of Teresa River, Brgy. Dalig 02/17/10 IVA 0.493 30 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory

P.B. Obial Construction 16784 Rehab./Const. of Dipolog-Sindangan-Liloy Road Magsaysay Section 06/01/09 IX 3.292 90 O 0.394 0.240 0.085 0.030 0.047 0.033 82.90 -

P.B. Obial Construction 16784 Const. of 1 unit, 4 Storey, 20 CL Bulacao H/S Bldg. 12/04/08 VII 13.356 120 C 0.341 0.272 0.300 - - - 91.30 80.66%

V. Satisfactory

P.B. Obial Construction 16784 Const. of Flood Control and Drainage System, Brgy. Mabolo 09/16/09 VII 0.964 50 C 0.422 0.133 0.300 - - - 85.50 *85. 50%

Satisfactory

P.B. Obial Construction 16784 Const. of Line Canal with Cover, Arlington Pond Ext., Sitio San Roque, Sambag II 03/08/10 VII 0.586 85 C 0.498 0.067 0.300 - - - 86.50 86. 50%

Satisfactory

P.B. Obial Construction 16784 Rehab./Reconst. of Dipolog-Sindangan-Liloy Road (Magsaysay Section) 03/11/10 IX 3.377 151 C 0.352 0.200 0.300 - - - 85.20 83.82%

Satisfactory

P.B. Obial Construction 16784 Conc. along Liloy, ZN-Ipil, ZS (Phase IV) Sta. 2000+260 - Sta. 2001+010 02/25/10 IX 14.335 130 O 0.306 0.287 0.150 0.020 0.028 0.033 82.40 -

P.E.R.R.C. Construction & Development Corp. 23869 Const. of Sch. Bldg. At Hapay Na Mangga 03/12/09 IVA 6.222 178 C 0.384 0.200 0.300 - - - 88.40 *88.40%

Satisfactory

P.J. Cruz Construction and Trading 14223 Completion of Multi-Purpose Building, Phase 15, Brgy. Gulod 03/09/09 NCR 1.632 90 C 0.406 0.200 0.300 - - - 90.60 *90.60%

V.Satisfactory

P.J. Cruz Construction and Trading (Formerly: P.J. Cruz Const.) 14223 Completion of School Bldg. at Rosa

Susano-Novaliches E/S 09/14/09 NCR 11.463 152 O 0.343 0.227 0.150 0.020 0.047 0.033 82.00 -

P.J. San Pedro Construction and Supply 14994 Concreting/Impvt. of Bayabas-Eden Road 05/25/09 XI 7.477 150 C 0.440 0.200 0.300 - - - 94.00 *94.00%

V.Satisfactory

P.J. San Pedro Construction and Supply 14994 Construction of Multi-Purpose Building @

Brgy. Bato 05/25/09 XI 2.265 180 C 0.454 0.200 0.300 - - - 95.40 91.26% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page338

Page 347: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

P.J. San Pedro Construction and Supply 14994 Completion of Multi Purpose Gymnasium 07/08/09 DOST 10.426 226 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -

P.J. San Pedro Construction and Supply 14994 Completion of PSHS SMC Multi Purpose

Gymnasium 11/19/08 DOST 10.692 298 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding

P.J. San Pedro Construction and Supply 14994 Completion of PSHS SMC Multi Purpose

Gynasium 11/19/08 DOST 10.692 298 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding

P.J. San Pedro Construction and Supply 14994 Completion of School Bldg., 3-Storey, 12

CL @ Bangoy NHS 09/03/08 XI 9.633 225 C 0.383 0.300 0.300 - - - 98.30 91.86% Outstanding

P.J. San Pedro Construction and Supply 14994 Conc. of Road at Catalunan Pequeño

(Project C) Mintal-Cawa-cawa Road 12/03/08 XI 2.032 110 C 0.370 0.300 0.300 - - - 97.00 *97.00% Outstanding

P.J. San Pedro Construction and Supply 14994 Const. of Water Works System, Brgy.

Tamugan (Lower Patag), Marilog District 08/19/08 XI 4.710 120 C 0.260 0.300 0.300 - - - 86.00 86.54% V.Satisfactory

P.J. San Pedro Construction and Supply 14996 Construction of Multi-Purpose Building,

Brgy. Bato 03/02/09 XI 2.265 180 O 0.334 0.300 0.150 0.030 0.038 0.033 88.50 -

P.J. San Pedro Construction and Supply 14994 Impvt. of Drainage along Agusan-Davao

Road 03/11/08 XI 1.867 90 C 0.318 0.300 0.300 - - - 91.80 *91.80% Outstanding

P.J. San Pedro Construction and Supply 14994 Impvt./ Rehab. of Fatima-Malabog Road 09/16/09 XI 9.451 150 C 0.417 0.200 0.300 - - - 91.70 *91.70%

V. Satisfactory

P.L. Sebastian Construction 1076Impvt./Conc. of Kapalong-Talaingod-

Valencia, Bukidnon Road, Brgy. Tiburcia -Brgy. Sto. Nino Section

06/03/09 XI 226.942 600 O 0.373 0.300 0.150 0.030 0.047 0.050 95.00 -

P.L. Sebastian Construction 1076Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay Boston) Cateel-Boston Section

06/09/09 XI 197.331 615 O 0.378 0.279 0.150 0.030 0.060 0.050 94.70 -

P.L. Sebastian Construction 1076 Rehab./Recons/Upgrading of Carmen-Dapecol Compound Road 06/01/09 XI 67.346 180 O 0.356 0.278 0.150 0.030 0.047 0.050 91.10 -

P.L. Sebastian Construction 1076 Rehab./Recons/Upgrading of Tagum-Panabo Circumferential Road 06/01/09 XI 96.181 200 O 0.400 0.197 0.120 0.030 0.042 0.033 82.20 -

P.L. Sebastian Construction 1076 Contract Package C, Malabang- Sultan Gumander Road 09/04/08 KFAED 793.246 1,817 C 0.373 0.300 0.300 - - - 97.30 89.66%

V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page339

Page 348: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

P.L. Sebastian Construction 1076 Baobo River Irrigation Project 10/21-24/08 NIA 224.599 631 O 0.368 0.162 0.070 0.030 0.042 0.200 87.17 -

P.L. Sebastian Construction 1076CP9: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal Road, (Manay-

Boston) Cateel-Boston Section)11/25/08 XI 197.331 615 O 0.393 0.271 0.100 0.030 0.065 0.100 95.90 -

P.L. Sebastian Construction 1076Impv't/Conc. of Kapalong-Talaingod-

Valencia Bukidnon Road, Brgy. Tiburcia to Brgy. Sto. Nino Sect.

03/14/09 XI 226.943 600 O 0.375 0.300 0.150 0.030 0.060 0.050 96.50 -

P.L. Sebastian Construction 1076CP-9: Imprvt./ Concreting of Surigao-Davao

Oriental Coastal Road, (Manay-Boston) Cateel-Boston Section

09/11/09 XI 197.331 615 O 0.374 0.300 0.150 0.030 0.054 0.050 95.80 -

P.L. Sebastian Construction 1076 Rehab./Reconst./Upgrading of Carmen-Dapecol Compound Road 09/07/09 XI 67.347 180 O 0.347 0.300 0.150 0.030 0.047 0.050 92.40 -

P.L. Sebastian Construction 1076CP-9: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road, (Manay-Boston)

Cateel-Boston Section03/04/10 XI 197.681 615 C 0.372 0.200 0.300 - - - 87.20 90.86%

V. Satisfactory

P.L. Sebastian Construction 1076CP-2: Impvt/Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Tiburcia to

Brgy. Sto. Niño Section02/26/10 XI 227.343 600 C 0.364 0.200 0.300 - - - 86.40 89.96%

V. Satisfactory

P.S. Labasbas Construction 6302 Bunacan CIP 06/1-6/09 NIA 2.125 150 C 0.447 0.120 0.300 - - - 86.68 *86.68% Satisfactory

P.S. Labasbas Construction 6302 Bunacan CIP 06/1-6/09 NIA 0.840 150 C 0.441 0.120 0.300 - - - 86.05 *86.05% Satisfactory

P.T. Diamond Merchandise & Construction 15451

Completion/Continuation of Unfinished/On-going Bridge, Sapilang along Manila North

Road08/15/08 I 3.542 300 C 0.329 0.200 0.300 - - - 82.90 *82.90%

Satisfactory

P.T. Diamond Merchandise & Construction 15451 Replacement of Sapilang Bridge along

MNR 02/26/08 I 12.993 378 C 0.379 0.200 0.000 - - - 57.90 73.40% Satisfactory

P.V.B. Construction and Trading 13269 Conc. of FMR @ Brgy. Mining 11/12/08 III 0.912 30 C 0.352 0.218 0.300 - - - 87.00 *87.00% Satisfactory

Pablo S. Labasbas Construction 6302 Construction of Gandara-Matuguinao Road 06/02/09 VIII 24.120 240 C 0.350 0.133 0.300 - - - 78.30 82.38% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page340

Page 349: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pablo S. Labasbas Construction 6302 Const. of 1-Unit, 2-CL S/B (7mx18m), Homonhon NHS (Sulangan Annex) 06/08/09 VIII 1.431 95 C 0.394 0.133 0.000 - - - 52.70 -

Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg., Guiuan National High School 03/17/09 VIII 1.068 95 C 0.423 0.200 0.300 - - - 92.30 *92.30%

V. Satisfactory

Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg., Maypangdan National High School 03/16/09 VIII 1.069 101 C 0.420 0.200 0.300 - - - 92.00 *92.00%

V. Satisfactory

Pablo S. Labasbas Construction 6302 Const. of Gandara-Matuguinao Road 03/10/09 VIII 24.121 240 O 0.351 0.240 0.150 0.030 0.047 0.033 85.10 -

Pablo S. Labasbas Construction 6302 Const. of Sta. Maria Bridge 08/29/08 IVB 13.507 240 C 0.328 0.200 0.300 - - - 82.80 82.20% V. Satisfactory

Pablo S. Labasbas Construction 6302 Rehab./Impvt. Along Tablas Circumferential Road 09/08/07 IVB 9.643 70 C 0.315 0.234 0.300 - - - 84.90 70.92%

Satisfactory

Pablo S. Labasbas Construction 6302 Const./Impv't. of Pagsangahan Barangay Road 02/23/10 IVB 0.250 52 C 0.334 0.200 0.300 - - - 83.40 83.40%

Satisfactory

Pablo S. Labasbas Construction 6302 Const. of 1-Unit, 1-CL SB (7m x 9m) at Tabo Elementary School 03/08/10 VIII 0.522 125 C 0.389 0.133 0.300 - - - 82.20 82.20%

Satisfactory

Pacer Construction & Development Corporation 4839 Repair/Rehabilitation of Roadway, Brgy.

110 06/10/09 VIII 2.890 100 C 0.347 0.200 0.300 - - - 84.70 *84.70% Satisfactory

Pacer Construction & Development Corporation 4839 Conc. of Calubian Jct.-San Isidro-Tabango

Road 11/24/07 VIII 4.737 150 C 0.301 0.201 0.300 - - - 80.20 *80.20% V. Satisfactory

Pacer Construction & Development Corporation 4839 Const. of Alawihaw Bridge & Approaches 08/24/07 VIII 6.407 180 C 0.394 0.200 0.300 - - - 89.40 85.20%

V. Satisfactory

Pacer Construction & Development Corporation 4839 Const. of MPB, Brgy. 83-C, 60 & 107 12/07/07 VIII 0.678 90 C 0.364 0.100 0.300 - - - 76.40 80.11%

V. Satisfactory

Pacer Construction & Development Corporation 4839 Rehab./Impvt. of Cabungaan-Tabunok-

Consuega Road 08/22/08 VIII 7.115 180 C 0.350 0.200 0.300 - - - 85.00 80.86% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page341

Page 350: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pacific Star Erectors 14224 Construction of Shalom E/S 06/01/09 CAR 0.459 90 C 0.486 0.147 0.300 - - - 93.30 *93.30% V. Satisfactory

Pacific Star Erectors 14224 Const. of Apayao State College MPB (Phase IV) 05/30/09 CAR 4.717 180 O 0.343 0.292 0.150 0.030 0.029 0.033 87.70 -

Pacific Star Erectors 14224 Const. of Apayao State Multi-Purpose Building 05/30/09 CAR 2.370 151 C 0.444 0.181 0.300 - - - 92.50 82.21%

Satisfactory

Pacific Star Erectors 14224 Construction of DPWH Regional Office Building, Phase VI 05/19/09 II 9.647 145 O 0.365 0.300 0.150 0.030 0.051 0.033 92.90 -

Pacific Star Erectors 14224 Const. of Apayao State College 05/16/08 CAR 1.854 210 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory

Pacific Star Erectors 14224 Const. of DPWH Regional Office Bldg. (Phase IV) 11/15/08 II 26.973 240 C 0.384 0.300 0.300 - - - 98.40 93.46%

Outstanding

Pacific Star Erectors 14224 Const. of Poblacion-Bulo-Waga FMR 11/19/07 CAR 0.919 120 C 0.190 0.300 0.300 - - - 79.00 81.85% V. Satisfactory

Pacific Star Erectors 14224 Const. of San Carlos Bridge & Approaches 05/17/08 II 10.903 282 C 0.360 0.300 0.000 - - - 66.00 76.32% Satisfactory

Pacific Star Erectors 14224 Const./Road Impvt. of Calanasan-Ilocos Norte Road, Parina Section 05/14/08 CAR 13.827 360 O 0.355 0.300 0.070 0.030 0.037 0.100 89.20 -

Pacific Star Erectors 14224 Construction of Apayao State College Multi-Purpose Building 02/28/09 CAR 2.324 150 O 0.391 0.300 0.150 0.030 0.045 0.033 94.90 -

Pacific Star Erectors 14224 Construction of Pudtol MPB (Gymnasium) Phase IV 02/27/09 CAR 6.613 210 O 0.327 0.300 0.150 0.022 0.041 0.033 87.30 -

Pacific Star Erectors 14224 Constrution/Improvement of Calanasan - Ilocos Norte Road, Parina Section 02/26/09 CAR 13.826 620 C 0.436 0.200 0.300 - - - 93.60 90.96%

V.Satisfactory

Pacific Star Erectors 14224 Proposed Const. of Pudtol MPB (Gymnasium) 02/21/08 CAR 1.427 90 C 0.215 0.300 0.300 - - - 81.50 *81.50%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page342

Page 351: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pacific Star Erectors 14224 Construction of DPWH Regional Office Building, Phase VI 08/24/09 II 9.648 145 C 0.481 0.133 0.300 - - - 91.40 92.45%

V. Satisfactory

Pacific Star Erectors 14224 Const. of District Engineer's Lounge and DPWH Canteen, Regional Center 02/21/10 II 5.940 75 C 0.456 0.200 0.300 - - - 95.60 95.60%

V. Satisfactory

Pacific Stars Erectors 14224 Construction of Pudtol MPB (Gymnasium) 09/04/09 CAR 6.613 266 O 0.396 0.240 0.150 0.030 0.056 0.033 90.50 -

Pacific Stars Erectors 14225 Construction of Apayao State College MPB (Phase IV) 09/04/09 CAR 4.712 199 O 0.393 0.240 0.150 0.030 0.056 0.033 90.20 -

Pacific Stars Erectors 14224 Construction of Apayao State College MPB (Phase IV) 02/21/10 CAR 4.712 199 C 0.423 0.184 0.300 - - - 90.70 89.48%

V. Satisfactory

Pacific Stars Erectors 14224 Construction of Pudtol MPB (Gymnasium) 02/18/10 CAR 6.906 266 C 0.422 0.185 0.300 - - - 90.70 89.44% V. Satisfactory

Pacific Stars Erectors 14224Road Upgrading (Gravel to Concrete) of Abbut-Conner-Kabugao Road, Ili Section

(Phase I)02/20/10 CAR 7.463 330 C 0.408 0.133 0.300 - - - 84.10 84.10%

Satisfactory

Pader Construction and Supply 20213 Const. of 2-CL SB at Eliseo ES Brgy. Nalin 05/28/09 R-XII 1.047 70 C 0.449 0.200 0.300 - - - 94.90 91.54% V. Satisfactory

Pader Construction and Supply 20213 Conc. of Dualing-Baliki-Silik Road (Dualing Section) 02/28/08 XII 4.789 74 C 0.375 0.119 0.300 - - - 79.40 78.02%

Satisfactory

Pader Construction and Supply 20213 Const. of Water System @ Brgy. Upper Baguer 08/23/07 XII 0.370 45 C 0.325 0.246 0.300 - - - 87.10 *87.10%

V. Satisfactory

Pader Construction and Supply 20213 Construction of 2 CL SB at Eliseo E/S 03/04/09 XII 1.047 70 O 0.353 0.300 0.150 0.030 0.035 0.033 90.10 -

Pader Construction and Supply 20213 Const. of Multi-Purpose Building (Covered Court) @ Brgy. Liliongan 09/03/09 XII 3.795 110 C 0.395 0.133 0.300 - - - 82.80 *82.80%

Satisfactory

Pader Construction and Supply 20213 Const. of Multi-Purpose Building at Brgy. Demapaco 02/26/10 XII 2.940 110 C 0.375 0.200 0.300 - - - 87.50 87.50%

Satisfactory

Pader Construction and Supply 20213 Concrete Re-blocking along Davao-Cotabato Road 02/27/10 XII 2.822 89 C 0.429 0.133 0.300 - - - 86.20 86.20%

Satisfactory

Pagadian Aggregates & Marketing 14886 Conc. of Brgy. Road, Opol 09/05/08 X 1.445 60 C 0.389 0.200 0.300 - - - 88.90 *89.90% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page343

Page 352: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pagadian Aggregates & Marketing 14886 Conc. of Kimaya-Solana By-Pass Road 03/11/09 X 4.820 145 C 0.400 0.200 0.000 - - - 60.00 70.38% Poor

Pagadian Aggregates & Marketing 14886 Conc. of Nat'l Roads Lourmah-Poblacion Section 03/06/08 IX 1.858 60 C 0.342 0.200 0.300 - - - 84.20 82.22%

V. Satisfactory

Pagadian Aggregates & Marketing 14886 Rehab. of Carmen-Patag-Bulua Road 03/02/09 X 9.410 143 C 0.395 0.133 0.300 - - - 82.80 83.58% Satisfactory

Palmares General Merchandise 24657 Completion of MPB at Brgy. Allah 06/02/09 R-XII 0.288 40 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory

Palmares General Merchandise 24657 Completion of MPB at Brgy. Magsaysay 11/27/08 XII 0.480 75 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory

Palmares General Merchandise 24657 Const. of MPB @ Brgy. Kenram (Health Center) 11/27/08 XII 0.240 40 C 0.366 0.200 0.300 - - - 86.60 *86.60%

V. Satisfactory

Palmares General Merchandise 24657 Const. of Multi-Purpose Building, Brgy. Ilian 03/13/09 XII 0.962 110 C 0.401 0.200 0.300 - - - 90.10 *90.10%

V. Satisfactory

Palmares General Merchandise 24657 Impvt. of Road from Koronadal City to Carpenter Hill 11/29/07 XII 4.819 183 C 0.357 0.300 0.300 - - - 95.70 84.84%

V. Satisfactory

Palmares General Merchandise 24657 Widening/Conc. of Dulawan-Marbel Road (Kalandangan Sect.) 11/27/07 XII 9.450 235 C 0.335 0.289 0.300 - - - 92.40 *92.40%

Outstanding

Palmares General Merchandise 24657 Const. of One (1) Unit One (1) Unit CL Academic SIB @ Don J. Buencamino MPS 09/09/09 XII 0.551 75 C 0.388 0.200 0.300 - - - 88.80 *88.80%

Satisfactory

Panay East Coast Construction and Supply 26469 Reblocking of Pototan-Bangga Polot-An

Road 03/18/09 VI 4.255 105 C 0.408 0.200 0.300 - - - 90.80 87.56% Satisfactory

Panay East Coast Construction and Supply 26469 Const. of Multi-Purpose Bldg. at Brgy.

Lapayon 03/05/10 VI 0.384 60 C 0.323 0.200 0.300 - - - 82.30 82.30% Satisfactory

Panay East Coast Construction and Supply 26469 Impvt. of Drainage System, Brgy.

Poblacion (along Plaza) 03/05/10 VI 0.481 60 O 0.347 0.300 0.044 0.010 0.023 0.033 75.70 -

Pangasinan New Wilson Lumber & Construction 8313 Const. of Drainage System, Sto. Niño St.,

Brgy. Poblacion 03/03/10 I 1.927 40 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page344

Page 353: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pangasinan New Wilson Lumber and Construction 8313 Conc. of Palapad-Torres Road, Brgy.

Palapad 11/27/08 I 0.945 40 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satistfactory

Pangasinan New Wilson Lumber and Construction 8313 Const./Opening of Lipi Norte-Pao Road

(Phase II) 08/28/08 I 1.919 40 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satistfactory

Paradox Construction 18557 Construction of Farm-to-Market Road 08/30/07 I 0.477 45 C 0.272 0.300 0.300 - - - 87.20 *87.20% V. Satisfactory

Parojinog & Sons Construction Company 32765 Const. of MPB 05/23/08 X 1.412 90 C 0.393 0.200 0.300 - - - 89.30 *89.30%

V. Satisfactory

Parojinog & Sons Construction Company 32765 Const. of MPB 12/01/08 X 2.384 60 C 0.250 0.200 0.300 - - - 75.00 *75.00%

Satisfactory

Partido Construction and Supply 20631Impvt. of Junction Digdigon (GOA)-

Tinambac Road, (Balaynan-Tierra Nevada Sect.)

05/31/09 V 21.358 150 O 0.303 0.300 0.150 0.030 0.055 0.050 88.80 -

Partido Construction and Supply 20631 Conc. of Bagong Silang Capalonga Road, Katabangan Sect. 06/04/09 V 6.021 180 O 0.366 0.240 0.150 0.030 0.050 0.050 88.60 -

Partido Construction and Supply 20631 Completion of Gubat-Tinawagan-Libod Road 03/10/09 V 9.361 120 C 0.455 0.133 0.300 - - - 88.80 84.18%

Satisfactory

Partido Construction and Supply 20631 Conc. of Bagong Silang-Capalonga Road, Dolores Section 11/27/08 V 11.978 195 C 0.356 0.290 0.300 - - - 94.60 89.80%

V. Satisfactory

Partido Construction and Supply 20631 Conc.of Goa-Tinambac Road, Payatan-Tupi-Tierra Nevaion 03/10/09 V 4.704 165 O 0.388 0.240 0.150 0.030 0.056 0.050 91.40 -

Partido Construction and Supply 20631 Const. of 1 CL Sch. Bldg at Sibaguan Agro Industrial NHS 11/19/07 V 0.518 90 C 0.372 0.203 0.300 - - - 87.50 *87.50%

V. Satisfactory

Partido Construction and Supply 20631 Const. of Drainage along Baao-Iriga-Nabua Road 08/19/08 V 4.681 120 C 0.362 0.200 0.300 - - - 86.20 78.88%

Satisfactory

Partido Construction and Supply 20631 Const. of Igbac-San Pedro Road 03/03/08 V 6.924 120 C 0.202 0.200 0.300 - - - 70.20 71.88% Satisfactory

Partido Construction and Supply 20631 Construction of Multi-Purpose Building Phase II 03/10/09 V 0.935 60 C 0.484 0.133 0.300 - - - 91.70 *91.70%

V. Satisfactory

Partido Construction and Supply 20631Impv't./Conc. of Binalay-Tamban Road, Olag-Pequeño-Sitio-Malibtong-Antipolo

Section03/04/08 V 9.553 90 C 0.223 0.200 0.300 - - - 72.30 79.83%

Satisfactory 07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page345

Page 354: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Partido Construction and Supply 20631 Repair/Rehab. of Scoured Embankment along Daang Maharlika 03/13/09 V 9.350 180 C 0.499 0.133 0.300 - - - 93.20 *93.20%

V. Satisfactory

Partido Construction and Supply 20631Conc. of Goa-Tinambac Road (Payatan-

Lupi-Tierra Nevada Section) Km. 500+045-Km.503+994.5 w/ exceptions

09/09/09 V 4.704 165 C 0.415 0.200 0.300 - - - 91.50 91.44% V. Satisfactory

Partido Construction and Supply 20631 Impvt. of Jct. Digdigon (GOA)-Tinambac Road, (Balaynan-Tierra Nevada Section) 09/09/09 V 21.358 175 O 0.318 0.300 0.150 0.030 0.051 0.050 89.90 -

Partido Construction and Supply 20631 Concreting of Bagong Silang-Capalonga Road, Katabangan Section 09/12/09 V 6.441 180 C 0.394 0.200 0.300 - - - 89.40 88.92%

Satisfactory

Partido Construction and Supply 20631 Impvt. of Jct. Digdigon (GOA)-Tinambac Road, Balaynan-Tierra Nevada Section) 03/01/10 V 21.358 175 C 0.400 0.133 0.300 - - `- 83.30 86.93%

Satisfactory

Patricia Builders 28745 Const. of Road, Brgy. San Francisco-Calihan 11/17/08 IV-A 4.824 40 C 0.269 0.300 0.300 - - - 86.90 *86.90%

V. Satisfactory

Patricia Builders 28745Implementation of Priority Projects in the

3rd District of Laguna (Brgy. Sta. Veronica-San Bartolome to San Benito

11/28/07 IV-A 4.824 60 C 0.343 0.262 0.300 - - - 90.50 *90.50% Outstanding

Patrick Construction 27780 Rehab./Conc. of Casili Brgy. Road 11/11/08 II 0.943 120 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory

Patrila Builders Inc, 26628 Const. of Cuartero Bridge Phase III 03/07/08 VI 9.960 240 C 0.340 0.300 0.000 - - - 64.00 81.46% V. Satisfactory

Patrila Builders, Inc. 26628 Upgrading/Concreting of Ajuy-Concepcion Road 06/09/09 VI 9.233 240 O 0.373 0.300 0.150 0.030 0.050 0.050 95.30 -

Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Road 03/17/09 VI 8.394 180 O 0.362 0.300 0.150 0.030 0.055 0.050 94.70 -

Patrila Builders, Inc. 26628 Concreting of Dueñas Diversion Road 09/09/09 VI 12.539 90 C 0.420 0.200 0.300 - - - 92.00 89.90% V. Satisfactory

Patrila Builders, Inc. 26658 Upgrading/Conc. of Ajuy-Concepcion Road 09/08/09 VI 9.233 240 O 0.322 0.286 0.000 0.030 0.050 0.050 73.80 -

Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Rd. 03/04/10 VI 9.233 324 C 0.458 0.200 0.300 - - - 95.80 91.08% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page346

Page 355: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Paula Mae Buhong Construction 26128 Conc. of Jct. Alfonso Lista-Mt. Province Bdry. Road 11/25/07 CAR 8.297 175 C 0.349 0.287 0.300 - - - 93.60 65.22%

Fair

Paula Mae Buhong Construction 26128 Const. of Municipal Health Center 11/15/08 CAR 1.911 170 C 0.295 0.111 0.300 - - - 70.60 80.72% V. Satisfactory

Paula Mae Buhong Construction 26128 Construction of Ujah E/S 08/31/09 CAR 0.511 60 C 0.437 0.132 0.300 - - - 86.90 *86.90% Satisfactory

Paula Mae Buhong Construction 26128 Widening/Concreting of Banaue-Hungduan-Tinoc-Benguet Bdry. Rd., Hwang Section 02/25/10 CAR 4.739 349 O 0.356 0.240 0.150 0.030 0.030 0.033 83.90 -

Paula Mae Buhong Construction/PBO Construction (JV) JV-07-152 Widening/Conc. of Banaue-Bontoc Road

(Halsema Highway) 03/06/09 CAR 48.192 300 C 0.444 0.200 0.300 - - - 94.40 84.68% Satisfactory

PBO Construction 18403Impv't./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV, Lubuagan-

Cagaluan Sect. 05/23/09 CAR 47.185 300 C 0.381 0.200 0.300 - - - 88.10 84.02%

Satisfactory

PBO Construction 18403 Const. of Bulanao Flood Control 08/19/08 CAR 9.500 180 C 0.330 0.200 0.300 - - - 83.00 88.64% V. Satisfactory

PBO Construction 18403 Const. of Sta. Maria-Paracelis Road, Phase II (Pinto-Caragasan Paraceln Section) 11/25/07 CAR 13.344 240 C 0.329 0.263 0.300 - - - 89.20 *89.20%

V. Satisfactory

PBO Construction 18403 Const. of Tammang Bridge (Partial Completion) 11/19/07 CAR 19.315 270 C 0.373 0.300 0.300 - - - 97.30 92.30%

Outstanding

PBO Construction 18403Impvt./Rehab. of Bontoc-Lubuagan-Tabuk Rd., Mananggol, Lubuagan-Wales Brook,

Tinglayan11/21/08 CAR 14.190 270 C 0.235 0.300 0.000 - - - 53.50 69.85%

Fair

PBO Construction 18403Impvt./Widening/Conc. of Bontoc-Tabuk-

Tuguegarao Road, Phase IV, Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section

11/19/08 CAR 47.185 300 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -

PBO Construction 18403Impvt./Widening/Conc. of Bontoc-Tabuk-

Tuguegarao Road, Phase IV, Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section

03/04/09 CAR 47.185 300 O 0.255 0.285 0.150 0.030 0.041 0.050 81.10 -

PBO Construction 18403Repair/Rehab. of Romualdez-Santor-

Calaocan-San Pascual Section, Babalag-Kinama-San Francisco Section

03/02/09 CAR 9.537 181 C 0.406 0.133 0.300 - - - 83.90 78.02% Unsatisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page347

Page 356: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

PBO Construction 18403Widening/Concreting of Mayoyao-

Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)

03/06/09 CAR 68.468 420 O 0.296 0.136 0.150 0.022 0.032 0.017 65.30 -

PBO Construction 18403Widening/Concreting of Mayoyao-

Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)

02/24/10 CAR 68.441 473 O 0.348 0.240 0.144 0.030 0.045 0.033 84.00 -

PBO Construction / Wilper Construction, Inc. (JV) JV-08-177

Conc. of Bontoc-Tabuk-Tugegarao Road (Package BLT-12), Tinglayan Boundary-

Lubuagan-Tabuk Section II, Km. 461+000 - Km.467+000, Dinacan-Cagaluan Sect.

02/22/10 CAR 126.378 441 O 0.304 0.284 0.150 0.030 0.035 0.033 83.60 -

Pearly Construction 5953 Const. of Multi-Purpose Bldg. at Brgy. Calumangan 03/10/10 VI 0.953 70 C 0.413 0.186 0.300 - - - 89.90 89.90%

V. Satisfactory

Pentagon Industrial Development & Construction Company, Inc. 12796

Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to Mabalacat, Pampanga, Phase IV, Package III, Malolos-

Calumpit Section

05/29/09 III 53.990 180 C 0.427 0.200 0.300 - - - 92.70 90.54%V. Satisfactory

Pentagon Industrial Development & Construction Company, Incorporated 12796 Riprapping of Sapangbalen Creek 05/19/08 III 0.941 30 C 0.167 0.300 0.300 - - - 76.70 60.86%

Fair

Pentagon Industrial Development & Construction Company, Incorporated 12796

Impvt./Widening of McArthur Highway (MNR)-Phase V, Meycauayan (Bulacan) to

Mabalacat (Pampanga)-(Meycauayan-Marilao Section)-CP III

09/09/09 III 47.235 150 O 0.376 0.300 0.150 0.030 0.042 0.033 93.10 -

Performance Builders & Dev't. Corp. 5303 Const. of Tan-Agan Bridge II 02/26/08 IV-B 21.239 270 C 0.319 0.200 0.300 - - - 81.90 80.13% V.Satisfactory

Persan Construction Inc. 2852Repair and Rehab. of Cavite-Batangas

Road Km. 23+000-Km. 24+000 with exception

03/01/10 IVA 9.974 51 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory

Persan Construction Inc. 2852 Conc. and Const. of Slope Protection of Pintong Bukawe FMR 02/18/10 IVA 19.230 120 O 0.333 0.300 0.150 0.030 0.050 0.033 89.60 -

Persan Construction Inc. 2852Const./Conc. of Sect. Of the Third Bulacan Circum. Rd. Network Daang Maharlika-DRT Via San Ildefonso Rd. (San Ildefonso Sect.)

03/04/10 III 47.642 210 O 0.367 0.300 0.150 0.030 0.047 0.050 94.40 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page348

Page 357: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Persan Construction Inc. 2852

Const./Conc. Of Sects. Of the Third Bulacan Circum. Rd. Network CVR-San Miguel-DRT-Angat Gen. Alejo Santos

Highway (Akle to DRT Sect.)

03/04/10 III 47.642 210 O 0.338 0.296 0.150 0.030 0.042 0.050 90.60 -

Persan Construction, Inc. 2852 Impvt./Rehab. of Daang Maharlika Road, Bulacan 3rd Congressional District 06/04/09 III 77.094 150 O 0.364 0.300 0.150 0.030 0.050 0.050 94.40 -

Persan Construction, Inc. 2852 Rehabilitation of Sibul-Biak Na Bato Road 06/01/09 III 14.299 110 O 0.372 0.239 0.150 0.030 0.051 0.050 89.20 -

Persan Construction, Inc. 2852 Rehab. of Farm-to-Market Road, Brgy. Pintong Bukawe 06/05/09 IV-A 18.711 150 C 0.458 0.066 0.300 - - - 82.40 87.80%

Satisfactory

Persan Construction, Inc. 2852 CVR-Junction-San Miguel-DRT-Angat-Gen.Alejo Santos Highway 03/11/09 III 47.605 210 C 0.439 0.200 0.300 - - - 93.90 *93.90%

V.Satisfactory

Persan Construction, Inc. 2852 Impvt. & Rehab. of Daang Maharlika Road, San Rafael-San Ildefonso Section 03/12/09 III 95.473 120 C 0.446 0.200 0.300 - - - 94.60 93.34%

V.Satisfactory

Persan Construction, Inc. 2852 Impvt. (Conc. Paving) along Carmen-Sagbayan-Bacane Nat'l Road 11/22/07 VII 14.256 225 C 0.343 0.170 0.000 - - - 51.30 57.93%

Poor

Persan Construction, Inc. 2852Impvt. (Conc. Paving) of Jct. Dat-an

Carmen-Sagbayan-Sierra Bullones, Pilar-Alicia Road

02/28/08 VII 30.557 210 C 0.341 0.200 0.300 - - - 84.10 82.42% V. Satisfactory

Persan Construction, Inc. 2852 Impvt. And Rehab. of Daang Maharlika Road, San Rafael-San Ildefonso Section 11/21/08 III 95.473 120 O 0.370 0.300 0.100 0.018 0.037 0.100 92.50 -

Persan Construction, Inc. 2852 Impv't/Conc. of Kapalong-Talaingod Road 03/14/09 XI 53.764 625 C 0.468 0.200 0.300 - - - 96.80 91.67% V. Satisfactory

Persan Construction, Inc. 2852 Rehab. of Daang Maharlika Road, San Rafael-San Ildefonso 11/15/07 III 16.496 70 C 0.310 0.300 0.300 - - - 91.00 *91.00%

Outstanding

Persan Construction, Inc. 2852 Rehab. of FMR, Brgy. Pintong Bukawe 03/14/09 IV-A 18.711 150 O 0.375 0.276 0.150 0.030 0.033 0.050 91.40 -

Persan Construction, Inc. 2852 Repair/Rehab. of Cavite-Batangas Road, Sampaloc Section 11/10/08 IV-A 9.904 15 C 0.211 0.300 0.300 - - - 81.10 *81.10%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page349

Page 358: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Persan Construction, Inc. 2852 Upgrading/Conc. With Drainage Impvt. P. Aquino St. 11/21/08 NCR 11.515 135 C 0.356 0.200 0.300 - - - 85.60 80.26%

V. Satisfactory

Persan Construction, Inc. 2852 Improvement of Pintong-Bukawe Road 08/24/09 IVA 19.232 180 O 0.341 0.285 0.150 0.030 0.043 0.050 89.90 -

Persan Construction, Inc. 2852 Widening of Carmona Bridge (Phase I) inc. approaches 03/03/10 IVA 60.454 529 O 0.393 0.300 0.150 0.030 0.050 0.033 95.60 -

Persan Construction, Inc. 2852 Impvt./Rehab. of Daang Maharlika Road 09/08/09 III 77.099 150 O 0.362 0.300 0.150 0.030 0.051 0.033 92.60 -

Persan Construction, Inc. 2852 Rehab. of Sibul-Biak na Bato Road 09/08/09 III 14.299 110 C 0.477 0.133 0.300 - - - 91.00 89.92% V. Satisfactory

Persan Construction, Inc. / Ulticon Builders, Inc. (JV) JV-07-108

Impv't/Conc. of Kapalong-Talaingod Bdry. Valencia Bukidnon Road, Sitio Napisulan

to Highway Bdry.03/14/09 XI 738.154 780 O 0.399 0.300 0.150 0.022 0.055 0.050 97.60 -

Persan Construction/Ulticon Builders, Inc. (JV) JV-07-108

Impvt./Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road (Sitio Napisulan to Highway Boundary, Valencia Section)

06/03/09 XI 738.153 780 O 0.394 0.300 0.150 0.030 0.042 0.050 96.60 -

Peter G. Chua Builders 25367 Concreting/Improvement of France St., Brgy. Don Bosco 06/02/09 NCR 6.231 89 C 0.490 0.133 0.200 - - - 82.30 *92.30%

V. Satisfactory

Peter G. Chua Builders 25367 Conc. of Gil Puyat Ave. 11/15/07 NCR 4.768 40 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding

Peter G. Chua Builders 25367 Const. of Bridge at Pamplona 3 11/13/07 NCR 4.609 75 C 0.319 0.200 0.300 - - - 81.90 79.08% Satisfactory

Peter G. Chua Builders 25367 Const. of MPB, Phase II @ Pulanglupa I 08/11/08 NCR 1.048 60 C 0.373 0.200 0.300 - - - 87.30 84.36%

V. Satisfactory

Peter G. Chua Builders 25367 Const./Completion of San Agustin Elem. Sch. 08/12/08 NCR 0.761 60 C 0.378 0.300 0.300 - - - 97.80 95.42%

Outstanding

Peter G. Chua Builders 25367 Const. of MPB, Sunvalley E/S, Brgy. Sun Valley 02/17/10 NCR 3.834 70 C 0.488 0.133 0.300 - - - 92.10 92.10%

V.Satisfactory

Petrina Construction & General Merchandise (Formerly: Petrina

Grocers Marketing)29695 Const. of Multi-Purpose Bldg. Bantuanon 02/24/10 X 0.971 75 C 0.398 0.133 0.300 - - - 83.10 83.10%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page350

Page 359: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS 08/21/07 X 1.394 75 C 0.357 0.200 0.300 - - - 85.70 83.53% V. Satisfactory

PGO Construction 15153Rehab./Reblocking along Bacolod Road

North Victorias Section Km. 35+901.5-Km. 37+000 with exception

05/26/09 VI 9.231 220 C 0.375 0.200 0.300 - - - 87.50 86.27% Satisfactory

PGO Construction 15153 Rehab./Reblocking of Deteriorated Conc. Pavement along Bacolod North Road 11/24/08 VI 9.231 220 O 0.343 0.225 0.100 0.022 0.048 0.067 80.50 -

PGO Construction 15153 Rehab./Reblocking of Deteriorated Conc. Pavement along Bacolod North Road 03/10/09 VI 9.231 220 O 0.331 0.300 0.150 0.030 0.060 0.033 90.40 -

Phil Manna Construction & Supply 10320 Const. of 1 CL Sch. Bldg. @ Taculod E/S Annex 11/15/07 V 0.459 90 C 0.319 0.300 0.300 - - - 91.90 *91.90%

Outstanding

Philippine Chemsteel Industries, Inc. 16965 Impvt. of Tayabas-Mainit Road, Km. 148+000-Km. 168+210 with exception 02/22/10 IVA 19.297 40 C 0.467 0.200 0.300 - - - 96.70 96.70%

Outstanding

Philippine Chemsteel Industries, Inc. 16965 Impvt. of Tayabas-Mainit-Mauban Road, Km. 155+000-Km. 166+000 with exception 02/22/10 IVA 14.297 40 C 0.467 0.200 0.300 - - - 96.70 96.70%

Outstanding

Philippine Chemsteel Industries, Inc. 16965

Rehab./Repair (with Traffic Safety Devices) along Famy-Real Road & Lucena-Tayabas-Lucban Road, Km. 122+000-Km. 130+000 & Km. 140+000-Km. 143+000, with exception

02/22/10 IVA 14.474 40 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory

Philippine Chemsteel Industries, Inc. 16965Impvt. of Famy-Real-Infanta-Dalahican Port

Road, Km. 093+000-Km. 114+000, with exception

02/23/10 IVA 19.297 40 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory

Philippine Chemsteel Industries, Inc. 16965Impvt. of Famy-Real-Infanta-Dalahican Port

Road, Km. 114+000-Km. 149+000, with exception

02/23/10 IVA 9.645 30 C 0.383 0.200 0.300 - - - 88.30 88.30% Satisfactory

Philippines Chemsteel Industries, Inc. 16965 Const. of Multi-Purpose Pavement @

Ringgit St. Kabute 08/12/08 IVA 0.308 150 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding

Philippines Chemsteel Industries, Inc. 16965 Rehab./Impvt. of Andalucia St. 11/28/07 NCR 0.933 30 C 0.314 0.300 0.300 - - - 91.40 *91.40%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page351

Page 360: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Philippines Chemsteel Industries, Inc. 16965 Roads on Various Brgys. 03/13/09 IVA 3.927 150 C 0.492 0.133 0.300 - - - 92.50 *92.50%

V. Satisfactory

Philworks Construction and Supply 32103 Road Opening/Upgrading of Uson-Tampuhan-Mambayawas, Awayan 06/01/09 V 9.458 134 C 0.375 0.200 0.300 - - - 87.50 88.46%

Satisfactory

Philworks Construction and Supply 32103 Const. of Cabotonan Bridge and Approaches (Phase 1) 08/28/07 V 17.749 344 C 0.384 0.232 0.300 - - - 91.60 82.87%

V. Satisfactory

Philworks Construction and Supply 32103 Const. of Mabolo Flood Control 08/22/08 V 9.460 120 C 0.317 0.300 0.300 - - - 91.70 *91.70% Outstanding

Philworks Construction and Supply 32103 Const. of Tula-tula Bridge & Detour 05/12/08 V 8.523 467 C 0.327 0.225 0.300 - - - 85.20 *85.20% V. Satisfactory

Philworks Construction and Supply 32103 Impv't./Rehab./Reblocking of Andaya Highway 08/25/08 V 23.880 180 C 0.299 0.300 0.300 - - - 89.90 85.04%

V. Satisfactory

Philworks Construction and Supply 32103 Reconst./Replacement of Damaged Bridge, Traversia Bridge 1 02/24/08 V 23.269 240 C 0.355 0.200 0.300 - - - 85.50 84.87%

V. Satisfactory

Philworks Construction and Supply 32103 Const. of Revetment along Libmanan Public Market 03/03/10 V 9.458 120 C 0.438 0.133 0.300 - - - 87.10 87.10%

Satisfactory

Phranaret Construction 16878Widening/Conc. of Banaue-Hungduan-Tinoc-Benguet Bdry. Road, Bokiawan

Section02/27/08 CAR 1.906 72 C 0.321 0.213 0.300 - - - 83.40 90.84%

Outstanding

Phranaret Construction 16878 Widening / concreting along Banaue-Hungduan-Benguet Boundary Road 08/31/09 CAR 7.645 260 C 0.458 0.133 0.300 - - - 89.10 89.28%

V. Satisfactory

PIBS Trading & Construction 14734 Rehab. of DPWH - Lanao del Norte DEO Bldg. & Emloyees' Quarteer 03/12/09 X 2.814 181 C 0.437 0.133 0.300 - - - 87.00 84.62%

Satisfactory

Pibs Trading and Construction 14734Rehab./Reconst./Upgrading of Kiwalan

Section, Sta. 15717+180-Sta. 1518+108 with exception

06/04/09 X 9.114 90 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page352

Page 361: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pibs Trading and Construction 14734Rehab./Impvt. of DPWH Bldg. Lanao del Norte 1st District Engineering Office and

Employees Quarter06/05/09 X 3.733 180 O 0.376 0.273 0.150 0.030 0.005 0.033 86.70 -

Pietras Builders Inc. 26738Slope Protection & Reblocking of

Sabulawan-Calaguise-Colubian Road Section

08/25/07 VIII 2.340 70 C 0.399 0.200 0.300 - - - 89.90 *89.90% V.Satisfactory

Pins Construction 13630 Const./Rehab./Repair of Multi-Purpose Building 06/03/09 IX 0.460 30 C 0.437 0.133 0.300 - - - 87.00 *87.00%

Satisfactory

Pins Construction 13630 Repair of Farm to Market Road, Poblacion-Tambo 11/26/08 X 0.192 30 C 0.288 0.254 0.300 - - - 84.20 *84.20%

V. Satisfactory

Pins Construction 13630 Const. of Multi-Purpose Building, DepEd Division 09/02/09 X 0.937 85 C 0.304 0.200 0.300 - - - 80.40 82.22%

Satisfactory

Pirra Construction Enterprises 10545 Const. of ACA Bldg. I & Dormitory Bldg. 04/16/09 DOST 24.290 180 O 0.356 0.271 0.150 0.030 0.044 0.050 90.10 -

PJ Construction & Supply 32305 Const. of MPB Btgy. Panacan 2 02/29/08 IVB 0.474 60 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding

PJ Construction & Supply 32305 Impvt./Regravelling of Pulot Center FMR 03/02/10 IVB 0.950 90 C 0.392 0.133 0.300 - - - 82.50 82.50% Satisfactory

PJ San Pedro Const. And Supply 14994 Completion of Multi-Purpose Gymnasium 07/08/08 DOST 10.426 226 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -

PJ San Pedro Construction andSupply 14994 Tiling Works and Exterior & Interior

Painting of Central Administration Building 07/08/09 U.P. 5.768 195 O 0.366 0.165 0.100 0.030 0.044 0.100 80.50 -

PJ San Pedro Construction andSupply 14994 Tiling Works and Exterior & Interior

Painting of Central Administration Building 7/8/2009 U.P. 5.768 195 C 0.471 0.173 0.300 - - - 94.40 94.4% V. Satisfactory

Plano Builders 16409 Proposed Construction of the College of Arts and Communication (CAC) Buildings 01/20-22/2010 UP -

Baguio 19.500 240 C 0.408 0.115 0.300 - - - 82.30 82.30% Satisfactory

Plano Builders 16409 Rehabiltation of Shaded Walk and Construction of Guard Post 01/20-22/2010 UP -

Baguio 0.760 30 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page353

Page 362: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

PLD Construction 1859Const. of Main Building, Cebu State

College of Science & Tecnology (CSCST) Bitoon Campus

03/13/09 VII 19.084 160 O 0.366 0.300 0.150 0.030 0.057 0.050 95.30 -

PLD Construction 1859 Const. of Pedestrian Overpass 12/05/08 VII 2.986 90 C 0.374 0.281 0.300 - - - 95.50 91.36% Outstanding

PLD Construction 1859 Opening/Conc. of Cebu-Toledo Wharf Road, Linao-Talisay-Minglanilla 08/20/08 VII 18.693 160 O 0.281 0.217 0.100 0.023 0.022 0.100 74.30 -

PLD Construction 1859Const. of Main Bldg., Cebu State College of

Scince & Technology (CSCST), Bitoon Campus

09/08/09 VII 19.083 239 C 0.479 0.200 0.300 - - - 97.90 86.84% Satisfactory

PLD Construction 1859 Asphalting of Road leading to Sitio Inayagan & Mahayahay, Tuyom 09/11/09 VII 4.822 45 C 0.339 0.200 0.300 - - - 83.90 *83.90%

Satisfactory

Polymer-Vic Const. 6157 Asphalt Overlay of Bataan Technological Park Inc. Road 05/20/09 III 19.030 90 O 0.396 0.200 0.150 0.030 0.025 0.050 85.10 -

Polymer-vic Construction 6157 Const. of Concrete Revetment @ Brgy. Pagalanggang 05/12/08 III 0.855 60 C 0.200 0.300 0.300 - - - 80.00 *80.00%

Satisfactory

Polymer-vic Construction 6157 Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo Road (Phase I) 02/24/09 III 4.794 30 C 0.440 0.200 0.300 - - - 94.00 92.14%

V.Satisfactory

Polymer-vic Construction 6157 Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo Road (Phase II) 02/24/09 III 4.794 30 C 0.366 0.200 0.300 - - - 86.60 91.16%

V.Satisfactory

Polymer-vic Construction 6157 Repair and Rehab. Along Roman Expressway (Phase I) 11/17/08 III 9.950 60 C 0.346 0.300 0.300 - - - 94.60 *94.60%

Outstanding

Polymer-vic Construction 6157 Asphalt Overlay of Bataan Technological Park Inc. Road 02/18/10 III 19.030 90 C 0.375 0.200 0.300 - - - 87.50 86.06%

Satisfactory

Pon Construction and Trading 33667 Impvt. of Pentor-Balsik River Control (Daang Bago Section) 02/18/10 III 4.728 120 O 0.367 0.220 0.150 0.020 0.038 0.050 84.50 -

Postema Construction & Development 15283 Conc. of Brgy Road going to Bulihan

Cemetery, Brgy. Old Bulihan 11/12/08 IV-A 1.901 60 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory

Postema Construction & Development 15283 Conc. of FMR @ Sitio Payad, Brgy. Pulong

Bunga 05/22/08 IV-A 0.390 45 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page354

Page 363: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Postema Construction & Development 15283 Widening of Tejero Bridge Phase IV 08/27/08 IV-A 8.664 130 C 0.320 0.300 0.300 - - - 92.00 87.56%

V. Satisfactory

Postema Construction & Development 15283 Riprapping of Mabulo River at Brgy.

Mabulo 09/09/09 IVA 0.381 60 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory

PPG Construction Corp. 20457 Const. of MPB at Cuenca (Const. of One Storey Municipal Agriculturist Building) 03/03/10 IVA 0.999 90 C 0.468 0.133 0.300 - - - 90.10 90.10%

V. Satisfactory

PPG Construction Corporation 20457 Const. of Multi-Purpose Building 05/20/09 IV-A 0.963 60 C 0.460 0.133 0.300 - - - 89.30 *89.30% V. Satisfactory

PRB Builders 26274 Construction/Rehabilitation of Road at San Miguel 02/26/10 IVA 0.399 30 C 0.463 0.133 0.300 - - - 89.60 89.60%

V. Satisfactory

PRC Construction 16631 Addalam River Irrigation Project 2/13-15/08 NIA 2.607 209 C 0.300 0.240 0.300 84.000 *84.00% V. Satisfactory

PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-02-06) 07/02/07 NIA-II 4.804 210 C 0.389 0.200 0.000 0.015 0.028 0.200 83.19 83.19%

V.Satisfactory

PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-05-06) 07/03/07 NIA-II 3.008 180 C 0.400 0.300 0.000 - - - 70.00 70.00%

Fair

PRC Construction 16631 Lapogan Communal Pump Irrigation Project 10/1-5/07 NIA-II 5.541 407 C 0.261 0.240 0.300 - - - 80.10 80.80%

Satisfactory

Precious Construction 32995 Improvement of Farm-to-Market Road, Quinfermin-Bugbuga-San Jose Road 02/26/09 I 9.630 133 O 0.315 0.300 0.150 0.020 0.025 0.050 86.00 -

Presli Deles Construction 22694 Const. One (1) unit CL modified std. Sch. Bldg., Brgy. Upper Laperian 11/29/08 IX 0.487 45 C 0.371 0.193 0.300 - - - 86.40 *86.40%

V. Satisfactory

Presli Deles Construction 22694 Const. of Two (2) Classroom School Bldg., Dulop NHS, Bag-ong Valencia Extension 03/06/10 IX 1.138 65 C 0.418 0.200 0.300 - - - 91.80 91.80%

V.Satisfactory

Prime Edge Construction & Concrete Products 7902 Concreting of Road at Camp 7 Brgy. 11/27/07 CAR 0.961 60 C 0.349 0.200 0.300 - - - 84.90 *84.90%

V. Satisfactory

Prime Mate Builders 32687 Const. of 2-Storey, 4-CL Balili E/S (Phase I) 05/20/09 CAR 4.163 268 O 0.348 0.275 0.150 0.030 0.029 0.050 88.20 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page355

Page 364: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Prime Mate Builders 32687 Const. of 2-Storey, 4-CL Balili E/S (Phase I), Balili 03/01/10 CAR 4.163 268 C 0.478 0.133 0.300 - - - 91.10 89.07%

V. Satisfactory

Prismodial Construction Co. 28345 Construction of 3-Storey, 15-Classroom School Building 09/03/09 NHA 18.107 150 O 0.360 0.276 0.000 0.030 0.055 0.000 63.60 -

Prodel Construction and Development Corporation 10839 Const. of School Bldg. @ Malabobo E/S 03/05/08 I 0.864 45 C 0.352 0.200 0.300 - - - 85.20 *85.20%

V. Satisfactory

Progressive Design and Construction 11826 Cocreting of Farm-to-Market Road, Brgy.

Parada-Brgy. Paras 02/28/09 I 0.951 27 C 0.408 0.133 0.300 - - - 84.10 *84.10%Satisfactory

Progressive Design and Construction 11826 Const. and Completion of School Building -

Napo Elem. School 09/07/09 I 0.952 150 C 0.482 0.157 0.300 - - - 93.90 *93.90% V. Satisfactory

Progressive Design and Construction 11826 Const. of School Building at Laoingen E/S 02/19/10 I 1.239 60 C 0.450 0.133 0.300 - - - 88.30 88.30%

Satisfactory

P-Square Contracting Services 17963 Const. of Brgy. Roads at Munting Tubig 08/28/08 IVA 0.193 90 C 0.364 0.200 0.300 - - - 86.40 79.80% Satisfactory

P-Square Contracting Services 17963 Const. of Brgy. Roads at Pangao 08/28/08 IVA 0.193 90 C 0.376 0.200 0.300 - - - 87.60 85.32% V. Satisfactory

Pulsar Construction 24422 Upgrading of Abbut-Conner-Kabugao Road 05/30/09 CAR 13.990 330 O 0.388 0.242 0.110 0.030 0.040 0.050 86.00 -

Pulsar Construction 24422Rehab./Reconst./Upgrading of Damaged Paved National Roads Cagayan-Apayao

Road, Sampaguita-Solano Section,05/18/09 II 19.289 120 O 0.379 0.240 0.150 0.030 0.056 0.050 90.50 -

Pulsar Construction 24422 Concrete Paving along JLLGR, San Pedro Section 05/21/09 II 19.290 240 C 0.486 0.133 0.300 - - - 91.90 88.12%

Satisfactory

Pulsar Construction 24422 Addalam River Irrigation Project 04/27/09 05/01/09 NIA 7.952 227 O 0.330 0.259 0.150 0.023 0.038 0.033 83.30 -

Pulsar Construction 24422 Completion of Abbag Bridge & Approaches 11/26/08 II 24.514 330 C 0.320 0.200 0.300 - - - 82.00 *82.00% V.Satisfactory

Pulsar Construction 24422 Conc. Paving of Jct. Logac-Lasam-Gagabutan Road 11/28/07 II 8.674 190 C 0.350 0.283 0.300 - - - 93.30 93.30%

Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page356

Page 365: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pulsar Construction 24422 Concrete Paving along JLLGR, San Pedro Section 02/23/09 II 19.291 240 O 0.328 0.300 0.150 0.023 0.040 0.050 89.10 -

Pulsar Construction 24422Rehab. of Pinacanauan Bridge's

Approaches & Extension of River Bank Protection & Dredging works Phase IV

11/17/07 II 9.524 125 C 0.296 0.300 0.300 - - - 89.60 *89.60% V.Satisfactory

Pulsar Construction 24422Rehab. of Pinacanauan Bridge's

Approaches & Extension of River Bank Protection Works Phase III

11/17/07 II 4.598 120 C 0.267 0.300 0.300 - - - 86.70 *86.70% V.Satisfactory

Pulsar Construction 24422 Upgrading of Abbut-Corner-Kabungao Road 02/28/09 CAR 13.991 428 O 0.400 0.300 0.150 0.030 0.037 0.033 95.00 -

Pulsar Construction 24422Rehab./Reconst./Upgrading of Damaged Paved Roads Apayao Rd., Sampaguita-Solano Section, KO499+500-KO501+100

09/10/09 II 19.423 145 C 0.446 0.133 0.300 - - - 87.90 89.46% V. Satisfactory

Pulsar Construction 24422 Upgrading of Abbut-Conner-Kabugao Road 09/05/09 CAR 13.991 428 O 0.382 0.240 0.046 0.030 0.056 0.017 77.10 -

Pulsar Construction 24422 Upgrading of Abbut-Conner-Kabugao Road 02/21/10 CAR 13.991 502 C 0.414 0.200 0.300 - - - 91.40 88.18% Satisfactory

Pulsar Construction 24422Road Upgrading (Gravel to Concrete) of

Abbut-Conner-Kabugao Road, Mayogyog Section

02/21/10 CAR 17.997 377 O 0.357 0.240 0.150 0.030 0.050 0.033 86.00 -

Pulsar Construction 24422 Cagayan River Flood Control Project (Enrile Section) 02/21/10 II 22.193 210 O 0.350 0.300 0.150 0.030 0.057 0.050 93.70 -

Pulsar Construction 24422 Construction of River Control Project 02/15/10 II 4.822 75 O 0.338 0.300 0.150 0.030 0.056 0.050 92.40 -

Pulsar Construction 24422 Const. of Lucban Flood Control Project, Phase 2 02/17/10 II 6.754 238 C 0.426 0.133 0.300 - - - 85.90 85.90%

Satisfactory

Pyramid Consolidated Builders & Gen. Merchandise 15599

Const. of Two (2) Classroom Modified Standard (7.0m x 9.0m) School Building

Mahayag NHS06/04/09 IX 0.949 90 C 0.420 0.133 0.300 - - - 85.30 85.51%

Satisfactory

Pyramid Consolidated Builders & Gen. Merchandise 15599 Concreting of Roads, Brgy. Nazareth 05/25/09 X 1.869 90 C 0.447 0.146 0.300 - - - 89.30 *89.30%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page357

Page 366: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Pyramid Consolidated Builders & Gen. Merchandise 15599 Const. DPWH Misamis Oriental 2nd DEO

Bldg. 03/10/09 X 5.785 120 C 0.479 0.133 0.300 - - - 91.20 *91.20% V.Satisfactory

Pyramid Consolidated Builders & Gen. Merchandise 15599 Const. of 2-Cl Modified Standard School

Buildin Mahayag NHS 03/12/09 IX 0.949 90 O 0.349 0.247 0.150 0.030 0.030 0.050 85.60 -

Pyramid Consolidated Builders & Gen. Merchandise 15599 Const. of Seawall, San Alonzo, Balingoan 03/03/10 X 0.447 119 O 0.329 0.240 0.150 0.030 0.047 0.050 84.60 -

QM Builders 30743 Road Upgrading (Gravel to Concrete), Cebu-Toledo Wharf Road 06/03/09 VII 19.308 40 C 0.489 0.195 0.300 - - - 98.40 *98.40%

Outstanding

QM Builders 30743Road Rehab./Reconst./Upgrading along

Sibonga-Dumanjug Road, Balagytiki Section

05/29/09 VII 14.037 75 O 0.392 0.300 0.150 0.030 0.050 0.050 97.20 -

QM Builders 30743Const. of Roadway Realignment /Widening of Cebu-Balamban-Transcentral Road Km.

37+910-Km. 37+960, Sitio Kurus-Kurus05/26/09 VII 9.524 120 O 0.400 - 0.200 0.050 0.071 0.250 97.10 -

QM Builders 30743 Rehab., Reconst. of Cebu-Toledo Wharf Road 06/01/09 VII 19.321 45 C 0.483 0.186 0.300 - - - 96.90 *96.90%

Outstanding

QM Builders 30743 Road Upgrading (Gravel to Paved) along Sibonga-Dumanjug Road 05/29/09 VII 18.718 75 O 0.377 0.300 0.150 0.030 0.050 0.050 95.70 -

QM Builders 30743Reconst. of Toledo-Pinamungahan-

Aloguinsan-Mantalongon Road Km. 86+000-Km. 87+803.2, Barili Section

05/27/09 VII 19.071 140 C 0.455 0.200 0.300 - - - 95.50 *95.50% V. Satisfactory

QM Builders 30743 Asphalt Overlay of Santander-Barili-Toledo Road, Camboang Section 08/22/08 VII 3.294 10 C 0.260 0.300 0.300 - - - 86.00 *86.00%

V.Satisfactory

QM Builders 30743 Asphalting of Sibonga-Dumanjug Road, Brgy. Bulak Proper Section 12/01/08 VII 1.859 20 C 0.311 0.220 0.300 - - - 83.10 *83.10%

V.Satisfactory

QM Builders 30743 Const. of Flood Control (Water Breaker, Seawall, Shore Protection) 03/03/09 VII 1.903 30 C 0.383 0.147 0.300 - - - 83.00 *83.00%

Satisfactory

QM Builders 30743 Const. of Flood Control Structure 03/08/08 VII 3.555 55 C 0.375 0.200 0.300 - - - 87.50 *87.50% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page358

Page 367: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

QM Builders 30743 Const. of Pakigne Flood Control 08/25/08 VII 2.862 60 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory

QM Builders 30743Preventive Maint./Impv't. of Sibonga-

Dumanjug National Road Tubod-Dugo-an, Balagytiki Section

03/13/09 VII 9.979 30 C 0.374 0.200 0.300 - - - 87.40 *87.40% Satisfactory

QM Builders 30743 Rehab. & Repair of Brgy. Road @ Brgy. Manlapay 03/07/08 VII 0.930 30 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V.Satisfactory

QM Builders 30743 Rehab./Reconstruction of Cebu-Toledo Wharf Road 03/16/09 VII 21.217 150 O 0.372 0.300 0.000 0.022 0.027 0.050 77.10 -

QM Builders 30743 Repair/Rehab. of Road at Perrelos 03/16/09 VII 1.841 60 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory

QM Builders 30743 Repair/Rehab. of Tangke Drainage 12/02/08 VII 0.918 30 C 0.324 0.200 0.300 - - - 82.40 *82.40% V.Satisfactory

QM Builders 30743 Repair/Rehab./Conc. of Trocio St. Brgy. Poblacion 11/28/08 VII 5.158 90 C 0.367 0.200 0.300 - - - 86.70 *86.70%

V.Satisfactory

QM Builders 30743 Repair/Rehab./Impvt. of Simala-Lindogon Brgy. Road 05/26/08 VII 9.478 45 C 0.324 0.300 0.300 - - - 92.40 *92.40%

Outstanding

QM Builders 30743

Const. of Roadway Realignment/Widening of Cebu-Balamban-Transcentral Road (Km

37+910-Km 37+960, Sitio Kurus-Kurus, Brgy. Bayong

09/04/09 VII 9.524 120 C 0.458 - 0.500 - - - 95.80 96.58% Outstanding

QM Builders 30743 Rehab,/Reconst./Upgrading along Sibonga-Dumanjug Road, Balagytiki Section 09/08/09 VII 14.038 75 C 0.458 0.191 0.300 - - - 94.90 96.28%

Outstanding

QM Builders 30743 Road Upgrading (Gravel to Paved) along Sibonga-Dumanjug Road 09/08/09 VII 18.718 75 C 0.470 0.182 0.300 - - - 95.20 95.20%

V. Satisfactory

QM Builders 30743 Repair/Rehab. of Brgy. Upper Tunghaan to Sitio Maria Respondo FMR 09/10/09 VII 14.410 120 O 0.341 0.240 0.150 0.030 0.040 0.050 85.10 -

QM Builders 30743 Imprv't.(Conc.) of Access Rd., Bais Port Access Rd. 09/12/09 VII 19.168 200 O 0.252 0.300 0.150 0.030 0.047 0.050 82.90 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page359

Page 368: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

QM Builders 30743 Rehab. of Natalio Bacalso Ave., Km. 48.852-Km.50.360 Carcar-Sibonga Sect. (Phase II) 03/10/10 VII 9.454 105 C 0.441 0.112 0.300 - - - 85.30 86.98%

Satisfactory

QM Builders 30743 Repair/Rehab. of Brgy. Upper Tunghaan to Sitio Maria Respondo FMR 03/10/10 VII 14.413 150 C 0.311 0.200 0.300 - - - 81.10 83.50%

Satisfactory

QM Builders 30743 Rehab./Reconst. of Cebu-Toledo Wharf Road 03/10/10 VII 21.217 301 C 0.485 0.133 0.300 - - - 91.80 82.98%

Satisfactory

Quezon Victory and Gen. Contractor 6631 Const. of Sta. Cruz Diversion Dam for Sta. Sta Cruz RIS 3/3-7/08 NIA 78.176 365 C 0.349 0.22 0.300 - - - 86.33 86.33%

V. Satisfactory

Quezon Victory General Contractor 6631

Installation of New Traffic Signs/Application Markings/Other Road Safety Devices & Lighting Impvts. Along MSR, Daang Maharlika, Pagbilao Section

05/28/09 IV-A 4.997 30 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory

Quezon Victory General Contractor 6631 Rehab./Reconst. of Tiaong-San Antonio Road 05/25/09 IV-A 9.590 139 O 0.384 0.240 0.150 0.030 0.025 0.050 87.90 -

Quezon Victory General Contractor 6631 Concreting of Gumaca-Pitogo-Mulanay-San Narciso Road 05/26/09 IV-A 14.473 146 O 0.393 0.240 0.150 0.020 0.025 0.050 87.80 -

Quezon Victory General Contractor 6631 Const./Conc. of Candelaria-By-Pass Road inc. RROW at Brgy. Mangilag Sur 05/25/09 IV-A 17.658 99 O 0.358 0.240 0.150 0.030 0.025 0.050 85.30 -

Quezon Victory General Contractor 6631 Conc. of MSR, Jct. Lopez-Hondagua Port Road 08/22/07 IVA 3.366 60 C 0.263 0.222 0.300 - - - 78.50 *78.50%

Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB 08/14/07 IV-A 1.460 60 C 0.315 0.200 0.300 - - - 81.50 *81.50% V. Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB @ Brgy. Peñafrancia 11/15/08 IV-A 0.333 100 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB @ Infanta E/S 11/16/07 IV-A 1.925 40 C 0.358 0.200 0.300 - - - 85.80 73.27% Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB, Brgy. Abo, Nagcarlan 11/17/08 IV-A 1.337 60 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page360

Page 369: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

Quezon Victory General Contractor 6631 Maintenance, Rehab. & Impvt. of National Arterial Road along Maharlika Highway 11/20/07 IV-A 9.969 45 C 0.357 0.200 0.300 - - - 85.70 *85.70%

V. Satisfactory

Quezon Victory General Contractor 6631 Rehab./Impvt. of Quezon-Batangas Road 08/12/08 IV-A 5.746 86 C 0.363 0.300 0.300 - - - 96.30 88.56% V. Satisfactory

Quezon Victory General Contractor 6631 Const. of 1 CL School Building at Brgy. Calwit E/S 08/25/09 IVA 0.524 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%

V. Satisfactory

Quezon Victory General Contractor 6631 Rehab./Reconst. of Gumaca-Pitogo-Mulanay-San Narciso Road 08/24/09 IVA 14.474 120 C 0.397 0.200 0.300 - - - 89.70 88.56%

Satisfactory

Quezon Victory General Contractor 6631 Rehab./Reconst.. of Tiaong - San Antonio Road 08/27/09 IVA 9.590 139 C 0.392 0.200 0.300 - - - 89.20 88.42%

Satisfactory

Quezon Victory General Contractor 6631 Const./Conc. of Candelaria By-Pass Road inc. RROW @ Brgy. Mangilag Sur 08/27/09 IVA 17.658 99 C 0.361 0.200 0.300 - - - 86.10 85.62%

Satisfactory

Quezon Victory General Contractor 6631 Const. of MPB (Covered Court) @ Tayabas East Central School 02/22/10 IVA 2.412 40 C 0.435 0.200 0.300 - - - 93.50 93.50%

V. Satisfactory

Quirante Construction 32827 Construction of Multi-Purpose Building, Poblacion (Fence) 06/01/09 VII 0.464 120 C 0.426 0.198 0.300 - - - 92.40 86.31%

Satisfactory

Quirante Construction 32827 Construction of Multi-Purpose Building in Tabunoc (Fire Station) 06/01/09 VII 0.468 120 C 0.472 0.133 0.300 - - - 90.50 85.53%

Satisfactory

Quirante Construction 32827 Construction of Multi-Purpose Building, Poblacion (SWAT) 06/01/09 VII 0.922 120 C 0.454 0.133 0.300 - - - 88.70 84.71%

Satisfactory

Quirante Construction 32827 Const. of 1 CL Sch. Bldg. @ Balud NHS 08/25/08 VII 0.482 87 C 0.341 0.248 0.300 - - - 88.90 *88.90% V. Satisfactory

Quirante Construction 32827 Const. of Ocaña Flood Control Structures 03/10/10 VII 4.760 60 C 0.390 0.133 0.300 - - - 82.30 85.42% Satisfactory

R A Ignacio Construction 29977 Const./Rehab. of MPB 02/29/08 NCR 0.942 75 C 0.302 0.200 0.300 - - - 80.20 *80.20% V.Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page361

Page 370: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R C S Construction 12458Repair/Rehab. of One (1) Classroom

School Building @ M.P. Cuaderno Sr., ES, Brgy. Sibacan

08/28/09 III 0.490 53 O 0.384 0.240 0.150 0.020 0.037 0.033 86.40 -

R C S Construction 12458 Construction of Multi-Purpose Bldg. @ Mt. View ES Polaries 02/25/09 III 0.470 28 C 0.479 0.200 0.300 - - - 97.90 *97.90%

Outstanding

R C S Construction 12458 Rehabilitation of Drainage Facility at Brgy. Wakas 02/25/09 III 0.231 28 C 0.416 0.200 0.300 - - - 91.60 *91.60%

V.Satisfactory

R C S Construction 12458 Rehab. of Flood Control Canal @ Brgy. Tenejero 02/19/10 III 0.747 28 C 0.466 0.163 0.300 - - - 92.90 92.90%

V. Satisfactory

R L K Construction and Builders 32194 Conc. of Road in Carmen West 08/26/08 I 1.925 60 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory

R N V Construction 12570 Rehab./Impvt. of Romblon Engineering District Office 05/21/09 IV-B 4.692 146 C 0.442 0.200 0.300 - - - 94.20 88.25%

Satisfactory

R N V Construction 12570 Conc. of Dapawan-Torrel Road 08/29/08 IV-B 4.693 80 C 0.358 0.200 0.300 - - - 85.80 *85.80% V.Satisfactory

R N V Construction 12570 Rehab./Impvt. of Romblon DEO 11/24/08 IV-B 4.693 146 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -

R N V Construction 12570 Repair/Rehab. of Odiongan North Central E/S 02/26/08 IV-B 0.478 26 C 0.370 0.300 0.300 - - - 97.00 *97.00%

Outstanding

R N V Construction 12570 Const./Imprv't of Brgy. Poblacion Line Canal-San Andres 02/22/10 IVB 1.466 100 O 0.274 0.300 0.150 0.030 0.048 0.033 83.50 -

R. Agullo Construction & Enterprises 11109 Const. of Health Center @ Brgy. Can-Uguib 08/30/07 VIII 0.233 25 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding

R. Agullo Construction & Enterprises 11109 Const. of MPB @ Brgy. Sto. Rosario (Phase III) 03/03/08 VIII 0.282 45 C 0.311 0.200 0.300 - - - 81.10 *81.10%

V. Satisfactory

R. Agullo Construction & Enterprises 11109 Const. of Sta. Margarita NHS Bldg. 08/27/08 VIII 0.508 60 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory

R. D. Interior Jr. Const./Brostan Const. Dev't (JV) JV-08-002 Pagadian Airport Development Project 03/23/09 DOTC 174.361 360 O 0.377 0.300 0.150 0.030 0.056 0.050 96.30 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page362

Page 371: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R. D. Policarpio Co., Inc. 4414 Tacloban Airport Development Project 10/08/09 DOTC 0.126 180 O 0.365 0.300 0.040 0.030 0.042 0.050 82.70 -

R. K. Engineering & Construction 12534Conc. of Critical Section along National

Circumferential (Salawad-Pawikan- Baso Section)

08/24/07 VIII 4.755 130 C 0.291 0.300 0.300 - - - 89.10 88.20% V.Satisfactory

R. K. Engineering & Construction 12534 Const. of Esperanza Drainage 08/28/08 VIII 0.095 90 C 0.320 0.200 0.300 - - - 82.00 76.18% Satisfactory

R. R. Encabo Constructors and Traders 14716 LTO-LETAS Office Building Project 10/29/09 DOTC 24.864 300 C 0.455 0.200 0.300 - - - 95.50 95.50%

V. Satisfactory

R. R. Encabo Constructors and Traders 14716 Punta- Santa Ana URA Project, URA-MLA-

02A 728 Housing Project 10/05/07 PRRC 218.4 363 O 0.33 0.3 0.1 0.03 0.05 0.1 91.34 -

R. Semilla Construction and Marketing 9263 Rehab./Impvt. of DPWH Davao del Sur 1st

DEO inc. Employees Quarters 03/07/09 XI 7.700 24 C 0.476 0.200 0.300 - - - 97.60 92.07% V. Satisfactory

R. Semilla Construction and Marketing 9263 Impvt./Widening of Cainta-Kaytickling-

Atnipolo-Teresa Road 08/26/09 IVA 4.806 120 C 0.360 0.200 0.300 - - - 86.00 86.54% Satisfactory

R. V. Construction 6110 Ozamis Airport Development Project 05/23/09 DOTC 4.793 120 C 0.466 0.200 0.300 - - - 96.60 96.60% Outstanding

R. V. Construction 6110 San Antonio Airport Development Project 05/29/09 DOTC 4.755 90 C 0.452 0.200 0.300 - - - 95.20 95.20% V. Satisfactory

R. V. Construction 6110 San Antonio Airport Development Project 05/29/09 DOTC 2.880 60 C 0.435 0.200 0.300 - - - 93.50 93.50% V. Satisfactory

R. V. Construction 6110 San Antonio Airport Development Project 05/29/09 DOTC 4.702 90 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory

R..V. Rieta Trading & Gen. Construction 28671 Const. of 2-Storey, 2-CL School Building @

Carmona NHS 09/08/09 IVA 2.397 95 C 0.476 0.091 0.300 - - - 86.70 *86.70% Satisfactory

R.A. Del Rosario Construction 4636 Const. of Multi-Purpose Building 06/04/09 IV-A 4.777 90 C 0.500 0.133 0.300 - - - 93.30 83.78% Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page363

Page 372: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.A. Del Rosario Construction 4636 Const. of MPB, Brgy. San Agustin III 11/10/08 IV-A 4.778 90 O 0.322 0.231 0.100 0.015 0.029 0.100 79.70 -

R.A. Del Rosario Construction 4636 Rehab./Reconst. (Concreting) of Indang-Alfonso via Luksuhin Rd. 11/13/08 IV-A 39.525 210 O 0.325 0.300 0.100 0.020 0.028 0.100 87.30 -

R.A. Del Rosario Construction 4636 Rehab./Reconst. (Concreting) of Indang-Alfonso via Luksuhin Rd. 09/10/09 IVA 39.525 256 C 0.444 0.200 0.300 - - - 94.40 90.14%

V. Satisfactory

R.A. Montejo Construction 21718 Const. of Box Culvert 08/21/07 VIII 0.963 90 C 0.332 0.200 0.300 - - - 83.20 *83.20% V.Satisfactory

R.A. Pahati Gravel & Sand 22495 Rehab./Repair of Pangasinan-Tarlac Road, Km. 186+120-Km. 199+930 05/23/09 I 5.789 38 C 0.485 0.179 0.300 - - - 96.40 *96.40%

V.Satisfactory

R.A. Pahati Gravel and Sand 22495 Repair & Rehab. of Daang Maharlika Rd., Km. 125+450-Km. 127+450 05/26/09 III 9.363 7 C 0.455 0.200 0.300 - - - 95.50 *95.50%

V. Satisfactory

R.A. Pahati Gravel and Sand 22495 Rehab./Impvt. of Maculcol Dike/Approach including Impvt. of Access Road 08/16/08 III 7.795 90 C 0.280 0.157 0.300 - - - 73.70 *73.70%

Satisfactory

R.A. Pahati Gravel and Sand 22495 Rehab./Impvt. of River Banks (Abitonan River) 05/26/08 III 3.856 135 C 0.350 0.200 0.300 - - - 85.00 *85.00%

V. Satisfactory

R.A. Pahati Gravel and Sand 22495 Rehab./Impvt. of Concrete Slope Protection along Digmala River Control 05/29/08 III 4.753 90 C 0.289 0.300 0.300 - - - 88.90 *88.90%

V. Satisfactory

R.A. Pahati Gravel and Sand 22495 Conc. of Oscar Villones St., Brgy. Mahabang Parang 02/16/10 IVA 2.010 90 C 0.451 0.200 0.300 - - - 95.10 95.10%

V. Satisfactory

R.A. Yolangco Construction 15602 Const. of MPB (Coop. Union of Cavite) 11/11/08 IV-A 1.433 50 C 0.376 0.247 0.300 - - - 92.30 *92.30% Outstanding

R.A.M. Builders 10549 Rehab./Reconst. of MSR-Diversion Road 05/26/09 IV-A 27.964 114 O 0.352 0.240 0.150 0.030 0.025 0.050 84.70 -

R.A.M. Builders 10549Const. (Road Opening) of Quezon Eco-Tourism Road (LUCBATCR) inc. RROW,

Phase II, Brgy. Bignay II, Maggalang Kiling05/25/09 IV-A 17.689 114 O 0.343 0.240 0.150 0.030 0.025 0.050 83.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page364

Page 373: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.A.M. Builders 10459 Conc. of Quirino Highway, Quezon Side Phase XIV 08/22/07 IV-A 14.420 90 C 0.255 0.199 0.300 - - - 75.40 *75.40%

Satisfactory

R.A.M. Builders 10549Const. of Quezon Eco-Tourism Road (LUC-

BAT CR) incl. RROW: Phase I, Guisguis-Talaan Sect., Conc. Of Guisguis Section

11/18/08 IV-A 17.780 206 O 0.337 0.300 0.100 0.030 0.037 0.100 90.40 -

R.A.M. Builders 10549 Impvt., Regravelling/Conc. of Road 08/11/08 IV-A 14.387 80 C 0.122 0.300 0.300 - - - 72.20 79.52% Satisfactory

R.A.M. Builders 10549 Rehab./Impvt. of Lucena-Tayabas Road, Gulang-gulang Sect. 02/23/09 IVA 19.209 190 C 0.497 0.123 0.300 - - - 92.00 89.18%

V.Satisfactory

R.A.M. Builders 10549 Rehab./Impvt. of MSR-Old Route 02/24/09 IVA 14.328 277 C 0.432 0.200 0.300 - - - 93.20 89.18% V.Satisfactory

R.A.M. Builders 10549 Rehab./Impvt. of San Pablo-Boundary-Dolores-Pinagdanglayan Road 11/10/08 IV-A 13.424 150 C 0.313 0.300 0.300 - - - 91.30 90.55%

Outstanding

R.A.M. Builders 10549 Rehab./ Reconst. of MSR - Diversion Road 08/27/09 IVA 27.964 114 C 0.456 0.133 0.300 - - - 88.90 86.38% Satisfactory

R.A.M. Builders 10549

Const./Road Opening of Quezon Eco- Tourism Road (LUC-BATCR) inc. RROW

Phase II, Brgy. Bignay II- Manggalang Kiling

08/27/09 IVA 17.689 114 C 0.446 0.133 0.300 - - - 87.90 85.44% Satisfactory

R.A.M. Builders 10549Const. of Quezon Eco-Tourism Road (LUC-

BATCR incl. RROW, Phase I, Guisguis, Talaan Section, Sitio Taiwanak

02/17/10 IVA 17.703 160 C 0.434 0.200 0.300 - - - 93.40 90.70% V. Satisfactory

R.A.M. Builders/ L.S. Abelar Const. (JV) JV-08-229

Impvt. of Quirino-Andaya Highway (Quezon Side/Camarines Sur/ Camarines Norte,

Quirino Highway, Quezon) Brgy. Silang II-Sto. Nino-San Diego (inc. Road slip)

Guinayang & Tangkawayan Sect.

08/26/09 IVA 33.765 90 C 0.393 0.133 0.300 - - - 82.60 83.32% Satisfactory

R.A.M. Builders/L.S. Abelar Construction JV JV-08-229 Impvt. of Quirino-Andaya Highway, Quezon

Side, Brgy. Silang II-Sto. Niño-San Diego 05/28/09 IV-A 33.765 90 O 0.333 0.240 0.150 0.030 0.035 0.050 83.80 -

R.B Soriano Construction 22635 Re-Roofing and Water Proofing of the PSHS-MPG 04/15/10 DOST 5.984 90 C 0.499 0.20 0.30 - - - 99.90 99.90%

Outstanding

R.B. Basista Construction & Supply 26829 Impvt. of San Isidro-Trujillo Road 08/30/08 VIII 4.796 60 C 0.307 0.200 0.300 - - - 80.70 * 80.70% V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page365

Page 374: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.B. Candare Construction 8819 Construction of Multi-Purpose Bldg. (Covered Court), Brgy. Imadejas 06/10/09 XIII 2.240 120 C 0.490 0.133 0.300 - - - 92.30 *92.30%

V. Satisfactory

R.B. Candare Construction 8819 Conc. and Gravelling of Brgy. Camayahan-Basag Road 06/10/09 XIII 1.817 60 C 0.481 0.133 0.300 - - - 91.40 *91.40%

V. Satisfactory

R.B. Candare Construction 8819 Const. of MPB (Covered Court) 05/28/08 XIII 1.875 120 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory

R.B. Candare Construction 8819 Const.of Sampaguita St., Jct. Capitol-Bonbon Rd. at Brgy. Villakanangga 03/10/10 XIII 1.905 60 C 0.483 0.133 0.300 - - - 91.60 91.60%

V.Satisfactory

R.B. Ombao Construction 17042 Concreting of Street Canals, Brgy. A. Rivera 08/27/09 III 0.477 60 C 0.432 0.133 0.300 - - - 86.50 *86.50%

Satisfactory

R.B. Ombao Construction 17042 Rehab. of Multi-Purpose Building @ Brgy. Gen. Lim 08/28/09 III 0.228 24 C 0.413 0.133 0.300 - - - 84.60 *84.60%

Satisfactory

R.C. Tagala Construction 11597Road Upgrading (Gravel to Paved) MWCR, Sta. Cruz-Mamburao (Mulawin-San Vicente

Section)05/30/09 IV-B 19.205 140 O 0.331 0.239 0.123 0.030 0.030 0.050 80.30 -

R.C. Tagala Construction 11597 Const./Completion of Macagua Bridge aling Brooke's Point-Rio Tuba Road 06/02/09 IV-B 17.950 180 O 0.337 0.222 0.150 0.023 0.020 0.050 80.20 -

R.C. Tagala Construction 11597 Repair/Rehab. of Dumaguete North Road, Km. 15.090-Km. 17.0775 05/26/09 VII 20.194 105 O 0.361 0.240 0.000 0.030 0.051 0.033 71.50 -

R.C. Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Rd. (Occ/Or. Mindoro Bdry) 02/28/09 IV-B 19.108 120 C 0.475 0.191 0.300 - - - 96.60 *96.60%

Outstanding

R.C. Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Road 05/23/08 IV-B 28.854 240 C 0.327 0.300 0.300 - - - 92.70 81.84% V. Satisfactory

R.C. Tagala Construction 11597 Const. of Barokan Flood Control along MWCR, Phase II 11/21/08 IV-B 11.902 130 C 0.282 0.200 0.300 - - - 78.20 *78.20%

Satisfactory

R.C. Tagala Construction 11597 Const. of Libtangin River Control 11/21/07 IV-B 4.748 150 C 0.313 0.296 0.300 - - - 90.90 90.90% Outstanding

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page366

Page 375: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.C. Tagala Construction 11597 Const. of Sch. Bldg. (4 CL) Narra Pilot Sch. 11/10/08 IVB 3.789 150 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory

R.C. Tagala Construction 11597Const. of Tanjay River Control, Brgys.

1,2,3,4 and San Isidro along the Nautical Highway

11/26/08 VII 9.444 110 C 0.336 0.247 0.300 - - - 88.30 70.78% Satisfactory

R.C. Tagala Construction 11597 Const. of Taritien Bridge 02/29/08 IV-B 4.230 240 C 0.369 0.300 0.300 - - - 96.90 86.88% V. Satisfactory

R.C. Tagala Construction 11597 Impvt. of Aramaywan-Berong Road 11/11/08 IV-B 18.964 252 C 0.372 0.200 0.300 - - - 87.20 80.06% V. Satisfactory

R.C. Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road 03/03/09 IV-B 18.950 252 C 0.378 0.133 0.300 - - - 81.10 80.65% Unsatisfactory

R.C. Tagala Construction 11597Rehab./Impvt. of Jct. PPSR-Apurawan

Road, Km. 57+000-Km. 60+000 (intermittent section)

09/11/09 IVB 18.761 210 C 0.482 0.171 0.300 - - - 95.30 *95.30%V. Satisfactory

R.C. Tagala Construction 11597

Road Upgrading (gravel to paved) Conc. of MOOECR (Calawag-Caguray Br. And

Talaba Section) KO 219+141- KO 221+141 to KO 224+456 - KO 224+740

09/01/09 IVB 19.300 176 O 0.341 0.300 0.129 0.030 0.051 0.033 88.40 -

R.C. Tagala Construction 11597 Road Upgrading (gravel to paved) Conc. of MOOECR KO 210+760 - KO 212+248 08/30/09 IVB 33.688 219 O 0.341 0.300 0.129 0.030 0.051 0.033 88.40 -

R.C. Tagala Construction 11597Road Upgrading (gravel to paved) MWCR, Sta. Cruz-Mamburao (Mulawin-San Vicente

Section) KO 383+519-KO 385+002.508/31/09 IVB 19.260 186 O 0.357 0.298 0.150 0.022 0.023 0.033 88.30 -

R.C. Tagala Construction 11597 Const./Completion of Macagua Bridge along Brookes Point-Rio Tuba Road 09/09/09 IVB 17.950 180 O 0.355 0.283 0.150 0.030 0.028 0.033 87.90 -

R.C. Tagala Construction 11597 Rehab./Reconst./Upgrading of Dumaguete North Rd., Tapon Norte-Tandayag Rd. Sect. 09/12/09 VII 28.787 200 O 0.377 0.240 0.150 0.030 0.037 0.033 86.70 -

R.C. Tagala Construction 11597 Rehab./Reconst./Upgrading of Dumaguete North Rd.,CAB-Sta. Cruz Sec. 09/12/09 VII 28.796 200 O 0.350 0.240 0.150 0.030 0.037 0.033 84.00 -

R.C. Tagala Construction 11597Road Upgrading (gravel to paved) Project, Concreting of MOOECR KO 210+760-KO

212+24802/19/10 IVB 33.775 180 C 0.325 0.200 0.300 - - - 82.50 86.04%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page367

Page 376: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.C. Tagala Construction 11597 Const./Completion of Macagua bridge along Brookes Point-Rio Tuba Road 03/02/10 IVB 17.950 180 C 0.446 0.133 0.300 - - - 87.90 85.59%

Satisfactory

R.C. Tagala Construction 11597

Road Upgrading (gravel to paved) Concreting of Calauag-Caguray Bridge & Talaba Sect. KO219+900 - KO221+141 to

KO224+456 - KO224+740

02/19/10 IVB 19.300 245 C 0.349 0.200 0.300 - - - 84.90 85.26% Satisfactory

R.C. Tagala Construction 11597Rehab./Reconst./Upgrading of Damaged National Roads HDM-4, Dumaguete North

Road Tapon Norte-Tandayag Road Section03/02/10 VII 28.800 250 C 0.357 0.200 0.300 - - - 85.70 85.34%

Satisfactory

R.C. Tagala Construction 11597 Rehab./Reconst./Upgrading of Dumaguete North Road, CAB-Sta. Cruz Road Section 03/02/10 VII 28.800 255 C 0.336 0.200 0.300 - - - 83.60 84.71%

Satisfactory

R.C. Tagala Construction 11597 Repair/Rehab. of Dumaguete North Road, Km. 15.090-Km. 17.0775 03/02/10 VII 20.194 151 C 0.479 0.200 0.300 - - - 97.90 82.06%

Satisfactory

R.D. Cobacha Construction 8878 Rehab./Const./Upgrading of Damaged Pavement Calanipawan Road 06/10/09 VIII 4.820 120 C 0.395 0.133 0.300 - - - 82.80 *82.80%

Satisfactory

R.D. Interior Jr. Const./Brostan Const. Dev't. (JV) JV-08-002 Pagadian Airport Development Project 09/04/09 DOTC 0.174 360 C 0.400 0.195 0.300 - - - 89.50 89.50%

V. Satisfactory

R.D. Interior Junior Const./J.H. Pajara Const. Corp. (J.V.)

SL2-SN-000366/JV-

02-019

Const./Impv't. (PCCP) of C.P.B.: Sultan Gumander-Dobliston Jct. Road 09/04/08 KFAED 608.260 1,362 C 0.334 0.300 0.300 - - - 93.40 90.58%

Outstanding

R.D. Interior Junior Construction 6483 Rehab./Reconst. of Daang Maharlika, KO 313+000 - KO 314+000 05/27/09 II 15.434 115 C 0.493 0.133 0.300 - - - 92.60 *92.60%

V. Satisfactory

R.D. Interior Junior Construction 6483 Upgrading/Improvement of Magapit-Mission Road, Lal-lo and Sta. Teresita 05/19/09 II 96.491 330 O 0.385 0.240 0.150 0.030 0.056 0.050 91.10 -

R.D. Interior Junior Construction 6483 Improvement of Access Road, Bagabag Airport 06/01/09 II 35.416 74 O 0.375 0.240 0.150 0.030 0.056 0.050 90.10 -

R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Section with Monkag & San Vicente

Bridge)06/06/09 XIII 289.168 570 O 0.374 0.300 0.106 0.030 0.056 0.050 91.60 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page368

Page 377: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.D. Interior Junior Construction 6483Concreting of Surigao-Davao Coastal

Road, Marihatag-Hinatuan Bislig Section (Tagbina-Hinatuan Subsection)

06/06/09 XIII 232.908 345 O 0.381 0.300 0.055 0.030 0.061 0.050 87.70 -

R.D. Interior Junior Construction 6483 Asphalt Overlay along Cordon-Aurora Brgy. Road 08/28/07 II 4.920 35 C 0.392 0.300 0.300 - - - 99.20 *99.20%

Outstanding

R.D. Interior Junior Construction 6483 Conc. of SDCR, Marihatag-Hinatuan-Bislig Section, (Tagbina-Hinatuan Subsection) 11/27/08 XIII 282.908 345 O 0.331 0.300 0.100 0.030 0.050 0.100 91.10 -

R.D. Interior Junior Construction 6483 Const./Asphalting of Dumabato Norte Brgy. Road 11/20/07 II 0.455 30 C 0.320 0.300 0.300 - - - 92.00 *92.00%

Outstanding

R.D. Interior Junior Construction 6483 Const./Asphalting of Villa Norte Brgy. Road 11/20/07 II 1.388 30 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding

R.D. Interior Junior Construction 6483 Impvt. of Maria Clara-Gabriela Road 03/04/08 II 4.783 277 C 0.312 0.300 0.300 - - - *91.20 91.20% Outstanding

R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-

Bislig Sect. with Monkag & San Vicente Bridge)

11/27/08 XIII 289.168 570 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -

R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-

Bislig Sect. with Monkag & San Vicente Bridge)

03/14/09 XIII 289.168 570 O 0.370 0.300 0.106 0.030 0.061 0.033 90.00 -

R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-

Bislig Sect. with Monkayo & San Vicente Bridge)

03/08/08 XIII 289.168 570 O 0.326 0.300 0.100 0.030 0.038 0.100 89.40 -

R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-

Bislig Sect. with Monkayo & San Vicente Bridge)

05/23/08 XIII 289.168 570 O 0.294 0.281 0.100 0.022 0.055 0.100 85.20 -

R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-

Bislig Sect. with Monkayo & San Vicente Bridge)

08/30-31/08 XIII 289.168 570 O 0.352 0.300 0.100 0.030 0.055 0.100 93.70 -

R.D. Interior Junior Construction 6483 Upgrading/Improvement of Magapit-Mission Road 09/09/09 II 96.491 330 O 0.360 0.300 0.150 0.030 0.042 0.050 93.20 -

R.D. Interior Junior Construction 6482 Improvement of Access Road, Bagabag Airport 08/28/09 II 35.416 89 C 0.476 0.133 0.300 - - - 90.90 90.42%

V. Satisfactory

R.D. Interior Junior Construction 6483Road Impvt. and Rehab. of Central

Mindanao Road Project (Junction Awang-North Upi Road) Contract Package I

08/31/09 XII 412.484 483 O 0.333 0.300 0.088 0.030 0.061 0.033 84.50 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page369

Page 378: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.D. Interior Junior Construction 6483Conc. of Surigao-Davao Coastal Rd./

Hinatuan-Bislig-Lingig Subsection, w/ 2 Bridges & 1 RCBC

09/10/09 XIII 259.760 420 O 0.388 0.300 0.083 0.030 0.060 0.033 89.40 -

R.D. Interior Junior Construction 6483Conc. of Surigao-Davao Coastal Rd.,

Marihatag-Hinatuan-Bislig Sect.,(Tagbina-Hinatuan Subsection)

09/18/09 XIII 232.908 375 O 0.371 0.300 0.027 0.030 0.060 0.033 82.10 -

R.D. Interior Junior Construction 6483Const. / Replacement of Canao Bridge

Tinglayan Brdy.-Lubuangan-Tabuk Section II, Km. 496+233

09/03/09 CAR 168.667 457 O 0.359 0.240 0.150 0.030 0.056 0.033 86.80 -

R.D. Interior Junior Construction 6483Const. / Replacement of Canao Bridge

Tinglayan Brdy.-Lubuangan-Tabuk Section II, Km. 496+233

02/22/10 CAR 168.667 486 O 0.390 0.274 0.139 0.030 0.065 0.033 93.10 -

R.D. Interior Junior Construction 6483 Upgrading/Impvt. of Magapit-Mission Road 02/19/10 II 96.491 330 C 0.422 0.133 0.300 - - - 85.50 89.44% V. Satisfactory

R.D. Interior Junior Construction 6483 Impvt./Rehab. of Daang Maharlika, Km. 338+400-Km. 341+200 w/ exception 03/01/10 II 9.618 45 C 0.425 0.133 0.300 - - - 85.80 85.80%

Satisfactory

R.D. Interior Junior Construction 6483Road Impvt. and Rehab. of Central

Mindanao Rd., Project (Junction Awang-North Upi Road) Contract Package I

02/24/10 XII 412.484 540 O 0.357 0.240 0.150 0.030 0.060 0.050 88.70 -

R.D. Interior Junior Construction 6483Impv't./Conc. of Bislig-Manay Rd. (Boston-Bislig Section) with Monkag & San Vicente

Bridge03/05/10 XIII 289.498 710 C 0.434 0.200 0.300 - - - 93.40 91.58%

V.Satisfactory

R.D. Policarpio & Co., INC. 4414 Construction of Overpasses Project in the Province of Bataan, Pampanga and Tarlac 9/22-24/08 BCDA 208.033 476 C 0.351 0.300 0.300 - - - 95.07 91.17%

Outstanding

R.D. Policarpio & Company, Inc. 4414Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road (Manay-Boston) Baganga Section, Phase I

06/09/09 XI 157.077 492 O 0.371 0.254 0.150 0.030 0.056 0.033 89.40 -

R.D. Policarpio & Company, Inc. 4414

Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan (Bulacan) to Mabalacat (Pampanga) Ph-IV Package VII,

Replacement of Tinajero Bridge & App.

03/11/09 III 45.805 180 C 0.460 0.200 0.300 - - - 96.00 92.64%V. Satisfactory

R.D. Policarpio & Company, Inc. 4414

Impvt./Widening of McArthur Highway (Manila North Road) Phase V Meycauayan

Bulacan) to Mabalacat (Pampanga), (City of San Fernando Section Contract Package II)

08/28/09 III 48.066 160 O 0.354 0.300 0.150 0.030 0.050 0.050 93.40 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page370

Page 379: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.D. Policarpio & Company, Inc. 4414

Impv./Widening/Conc. of MNR-Phase V-Meycuayan, Bulacan to Mabalacat,

Pampanga-Replacement of Del Pilar Bridge and Approaches

08/28/09 III 68.686 210 O 0.362 0.240 0.150 0.030 0.050 0.050 88.20 -

R.D. Policarpio & Company, Inc. 4414Impvt./Conc. of Surigao Sur-Davao Oriental

Coastal Road, (Manay-Boston) Baganga Section Phase I, CP No. 6

09/11/09 XI 157.076 522 O 0.365 0.300 0.150 0.030 0.056 0.033 93.40 -

R.D. Policarpio & Company, Inc. 4414 Tacloban Airport Development Project 12/12/09 DOTC 0.126 180 O 0.390 0.300 0.150 0.030 0.042 0.050 96.20 -

R.D. Policarpio & Company, Inc. 4414CP-6: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal Road, (Manay-

Boston) Baganga Section, Phase I03/04/10 XI 157.076 522 C 0.372 0.200 0.300 - - - 87.20 88.00%

Satisfactory

R.D. Policarpio Company, Inc. 4414CP 6: Impvt./Conc. of Surigao Sur-Davao

Oriental Coastal Road (Manay-Boston) Baganga Section Phase I

11/25/08 XI 157.077 492 O 0.339 0.240 0.100 0.030 0.055 0.100 86.40 -

R.D. Policarpio Company, Inc. 4414

Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan (Bulacan) to Mabalacat (Pampanga) Ph-IV Package VII,

Replacement of Tinajero Bridge & App.

11/11/08 III 45.805 180 O 0.373 0.240 0.100 0.030 0.061 0.100 90.40 -

R.D. Sadsad Const. & Trading 19240 Concrete Reblocking with Rehab., Impvt. of Rizal Ave, 11/12/08 III 5.414 60 C 0.323 0.300 0.300 - - - 92.30 *92.30%

Outstanding

R.D. Sadsad Const. & Trading 19240 Impvt./Rehab. of Anunas-Margot Road 11/12/08 III 2.820 60 C 0.326 0.200 0.300 - - - 82.60 * 82.60% V. Satisfactory

R.D. Sadsad Const. & Trading 19240 Rehab. of Road @ Brgy. Gulod Malagu 08/30/07 IV-A 0.960 30 C 0.387 0.300 0.300 - - - 98.70 *98.70% Outstanding

R.D. Sadsad Const. & Trading 19240 Repair/Rehab., Gapan-San Fernando-Olongapo (GSO) 08/18/08 III 9.653 90 O 0.348 0.200 0.100 0.030 0.058 0.100 83.60 -

R.D. Sadsad Construction and Trading 19240 Concreting of Barangay San Isidro, Phase

II 06/01/09 III 5.709 120 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory

R.D. Sadsad Construction and Trading 19240

Widening of Olongapo-Bugallon Road, San Marcelino Section,

Rehab./Reconst./Upgrading of San Marcelino-San Antonio-San Narciso Road

05/23/09 III 9.638 30 C 0.423 0.133 0.300 - - - 85.60 *85.60%Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page371

Page 380: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.D. Sadsad Construction and Trading 19240 Repair/Rehab. of Gapan-San Fernando-

Olongapo Road 03/04/09 III 9.653 90 C 0.430 0.200 0.300 - - - 93.00 87.36% Satisfactory

R.D. Sadsad Construction and Trading 19240 Const. of Multi-Purpose Building at Calulut 08/24/09 III 5.239 98 O 0.393 0.240 0.150 0.030 0.051 0.050 91.40 -

R.D. Sadsad Construction and Trading 19240 Completion/Const./Rehab./Impvt. of MPB at

Brgy. Sta. Lucia 02/17/10 III 4.014 90 C 0.447 0.147 0.300 - - - 89.40 89.40% V. Satisfactory

R.D. Sadsad Construction and Trading 19240 Construction of Pathwalk, Brgy. Malaya 02/17/10 IVA 0.594 30 C 0.333 0.200 0.300 - - - 83.30 83.30%

Satisfactory

R.F. Diaz Construction 3998 Impvt./Rehab. of MPB 11/20/07 NCR 2.387 90 C 0.369 0.300 0.300 - - - 96.90 85.21% V. Satisfactory

R.F. Varquez Const. 24302 Completion of Timamana MPB, Brgy. Timamana 08/23/08 XIII 1.638 90 C 0.332 0.300 0.300 - - - 93.20 *93.20%

Outstanding

R.F. Varquez Construction 24302 Completion of Municipal Multi-Purpose Building 03/10/09 XIII 2.341 90 C 0.450 0.168 0.300 - - - 91.80 *91.80%

V. Satisfactory

R.F. Vasquez Construction 24302Rehab./Reconst. of Damaged Paved

National Road along Dinagat-Loreto Road, Loreto Sect.

06/02/09 XIII 6.270 288 C 0.429 0.133 0.300 - - - 86.20 *86.20% Satisfactory

R.F.G. Construction 13188 Const. of MPB @ Brgy. 12 08/25/08 XIII 1.925 104 C 0.336 0.131 0.000 - - - 46.70 68.54% Fair

R.F.G. Construction 13188 Const. of Toledo S. Pantilo MPB 08/27/07 XIII 0.927 60 C 0.343 0.300 0.000 - - - 64.30 71.30% Satisfactory

R.G. Diaz Builders & Trading 23814 Construction of Concepcion Public Market at San Nicolas Poblacion 03/09/09 III 5.721 150 C 0.471 0.141 0.300 - - - 91.20 *91.20%

V. Satisfactory

R.G. Erillo Construction Incorporated 932Rehab./Reconst./Upgrading of Bacolod

Circumferential Road Km. 11+552 (South) to Km. 4+567 (North) w/ exceptions

09/12/09 VI 14.466 250 O 0.298 0.300 0.150 0.030 0.040 0.050 86.80 -

R.G. Erillo Construction Incorporated (Formerly: R.G. Erillo Construction &

Supply)932

Rehab./Reconst./Upgrading of Bacolod Circumferential Rd. Km. 11+552 (South) top

Km. 4+567 (North) w/ exceptions03/06/10 VI 14.466 250 C 0.460 0.200 0.300 - - - 96.00 90.48%

V. Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page372

Page 381: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.G. Tabin Construction & Supply 26830 Agno River Integrated Irrigation Project 7/13-18/09 NIA 3.880 90 C 0.363 0.279 0.150 0.015 0.042 0.050 89.88 *89.88% V. Satisfactory

R.J. Ibarra Construction 23538 Construction of DPWH-Zambales 2nd District Engineering Office Building 05/23/09 III 18.901 180 O 0.368 0.239 0.150 0.030 0.029 0.050 86.60 -

R.J. Ibarra Construction 23538 Completion of Bangal Bridge 11/12/08 III 5.644 60 C 0.366 0.237 0.300 - - - 90.30 *90.30% Outstanding

R.J. Ibarra Construction 23538 Completion of Multi-Purpose Building, Brgy. Magsaysay 03/04/09 III 0.476 45 C 0.478 0.195 0.300 - - - 97.30 *97.30%

Outstanding

R.J. Ibarra Construction 23538 Const of 2 Classroom School Building Secondary 03/04/09 III 2.062 90 C 0.353 0.200 0.300 - - - 85.30 80.12%

Unsatisfactory

R.J. Ibarra Construction 23538 Const. of 2 CL Sch. Bldg. Secondary 11/12/08 III 2.062 90 O 0.260 0.266 0.100 0.030 0.023 0.100 77.90 -

R.J. Ibarra Construction 23538 Const. of MPB @ San Marcelino 08/18/08 III 2.072 90 C 0.305 0.151 0.300 - - - 75.60 76.23% Satisfactory

R.J. Ibarra Construction 23538Repair/Rehab. of Slope Protection along

Linasin Creek, San Marcelino-San Antonio Road

05/27/08 III 1.930 90 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory

R.J. Ibarra Construction 23538 Const. of DPWH-Zambales 2nd District Engineering Office Building 09/01/09 III 18.901 180 C 0.409 0.133 0.300 - - - 84.20 85.88%

Satisfactory

R.J. Ibarra Construction 23538 Partial Completion of Gordon Heights National High School 09/01/09 III 1.958 90 O 0.320 0.240 0.150 0.030 0.048 0.033 82.10 -

R.K.X. Odiamar Construction 16107 Conc. of Nabua-Balatan Road 09/09/09 V 4.777 120 C 0.436 0.133 0.300 - - - 86.90 *86.90% Satisfactory

R.L. Colico Construction 24914 Const. of Day Care Center @ Barangay Ikirin 02/22/10 IVA 1.447 40 C 0.454 0.200 0.300 - - - 95.40 95.40%

V. Satisfactory

R.M. Dela Cruz Construction 15895 Const., Repair, Rehab. and Completion of Multi-Purpose Building at Brgy. Sto. Niño 05/20/09 III 2.377 90 C 0.359 0.200 0.300 - - - 85.90 *85.90%

Satisfactory

R.M. Dela Cruz Construction 15895 Concreting/Improvement of Virgen delos Remedios-Ligaya Road 06/10-11/09 BCDA 9.951 60 C 0.343 0.300 0.200 - - - 84.28 84.28%

Satisfactory

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page373

Page 382: Cover Report 11th Release...CIAP-PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) 11TH RELEASE (ON-GOING/COMPLETED PROJECTS) FROM JULY 1, 2007 to JUNE 30, 2010

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009

FINAL RATING/ QUALITATIVE DESCRIPTION

AMOUNT (Php, M) DUR (C.D.)

CONTRACT

ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC*IMPL.

AGENCYNAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF

EVALUATION

R.M. Dela Cruz Construction 15895 Const. of Barangay Aranguren Farm to Market Road Sta.0+000 to Sta. 0+163 03/09/09 III 0.945 30 C 0.352 0.200 0.300 - - - 85.20 *85.20%

Satisfactory

R.M. Dela Cruz Construction 15895 Const., Repair, Rehab. and Completion of MPB at Brgy. Sta. Lucia 03/09/09 III 2.378 90 C 0.451 0.146 0.300 - - - 89.70 *89.70%

V. Satisfactory

R.M. Dela Cruz Construction 15895 Repair/Rehab. of Road at Brgy. San Nicolas Poblacion, Sta. 0+000-Sta. 0+332 (Road 1) 09/01/09 III 2.789 30 C 0.484 0.133 0.300 - - - 91.70 *91.70%

V. Satisfactory

R.M. Dela Cruz Construction 15895 Const./Repair & Rehab. of FMR at Brgy. San Nicolas (Isabel) 02/25/10 III 0.482 60 C 0.417 0.200 0.300 - - - 91.70 91.70%

V. Satisfactory

R.M. Nuñez Construction 26206Asphalt Overlay of Ninoy Aquino Ave., North Bound Kabihasnan Duty Free w/

exception11/29/07 NCR 4.937 30 C 0.300 0.200 0.300 - - - 80.00 *80.00%

Satisfactory

R.M. Nuñez Construction 26206 Const. of Lower Bicutan Bridge 11/23/07 NCR 3.297 50 C 0.235 0.200 0.300 - - - 73.50 *73.50% Satisfactory

R.M. Nuñez Construction 26206 Const./Rehab. of Road inc. Drainage at Brgy. Alabang (Santan St. and it's vicinity) 02/18/10 NCR 1.427 45 C 0.488 0.133 0.300 - - - 92.10 92.10%

V. Satisfactory

R.M. Nuñez Construction 26206 Road Impvt./Rehab. of G.G. Cruz St. Brgy. Baclaran 02/17/10 NCR 3.832 15 C 0.438 0.133 0.300 - - - 87.10 87.10%

Satisfactory

R.M. Padillo Builders 31206 Const./Repair of Multi-Purpose Building (San Isidro Parish MPC), Poblacion 05/26/09 VIII 0.709 90 C 0.389 0.133 0.300 - - - 82.20 84.02%

Satisfactory

R.M. Padillo Builders 31206 Completion of MPB @ Remedios T. Romualdez Elem. Sch. 11/25/08 VIII 0.964 60 C 0.274 0.200 0.300 - - - 77.40 *77.40%

Satisfactory

R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ Alang-alang NHS 02/25/08 VIII 0.503 60 C 0.364 0.200 0.000 - - - 56.40 71.10%

Satisfactory

R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ San Jose NHS 12/06/07 VIII 0.501 45 C 0.381 0.100 0.300 - - - 78.10 *78.10%

Satisfactory

R.M. Padillo Builders 31206 Const./Repair/Rehab of MPB (San Isidro Parish MPC), Poblacion 03/05/09 VIII 0.710 90 O 0.336 0.272 0.150 0.015 0.025 0.050 84.80 -

07 June 2010* 1st/Final* For DPWH, only the region and PMO office are listed 11thCPES Release Page374