cost estimate

98
IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUN COST SUMMARY FOR NO. OF SCHOOLS EVALUATED Civil Division District Critically Dangerous Schoo Total No. of Schools Lahore Lahore 20 20 Kasur 21 5 Shekhupura 29 18 Nankana Sahab 20 Total 90 43 Gujranwala Gujranwala 31 27 Hafizabad 2 2 Sialkot 45 Narowal 28 25 Mandi bahauddin 9 9 Gujrat 18 Total 133 63 Rawalpindi Rawalpindi 23 19 Chakwal 4 4 Jehlum 13 Attock 12 3 Total 52 26 Sahiwal Sahiwal 10 10 Pakpattan 6 2 Okara 18 17 Total 34 29 Faisalabad Faisalabad 21 15 Chinniot 4 Toba Tek Singh 8 8 Jhang 52 Total 85 23 Multan Multan 14 14 Khanewal 8 8 Vehari 15 15 Lodhra 12 12 Total 49 49 Bahawalpur Bahawalpur 39 39 Bahawalnagar 40 40 Rahimyarkhan 80 80 Total 159 159 DG Khan DG Khan 75 58 Rajanpur 29 Muzaffargarh 36 36 Layyah 21 6 Total 161 100 Sargodha Sargodha 26 26 Khushab 15 15 Mianwali 42 18 Bhakkar 13 13 Total 96 72 Total 859 564 % age of Schools Evaluated 66% No. of Schools Evaluated

Upload: sabir-hussain

Post on 02-Feb-2016

63 views

Category:

Documents


0 download

DESCRIPTION

cost estimate of schools

TRANSCRIPT

IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCE

COST SUMMARY FOR NO. OF SCHOOLS EVALUATED

Civil Division DistrictCritically Dangerous Schools

Total No. of Schools Estimated Cost (Rs)

Lahore Lahore 20 20 52,750,713 Kasur 21 5Shekhupura 29 18 67,059,852 Nankana Sahab 20

Total 90 43 119,810,565

Gujranwala Gujranwala 31 27 64,943,939 Hafizabad 2 2 3,247,901 Sialkot 45Narowal 28 25 73,767,772 Mandi bahauddin 9 9 18,655,202 Gujrat 18

Total 133 63 160,614,814

Rawalpindi Rawalpindi 23 19 53,373,530 Chakwal 4 4 3,547,720 Jehlum 13Attock 12 3 7,645,334

Total 52 26 64,566,584

Sahiwal Sahiwal 10 10 24,489,074 Pakpattan 6 2Okara 18 17 84,418,224

Total 34 29 108,907,298

Faisalabad Faisalabad 21 15 35,050,278 Chinniot 4Toba Tek Singh 8 8 31,571,754 Jhang 52

Total 85 23 66,622,032

Multan Multan 14 14 17,660,604 Khanewal 8 8 12,048,885 Vehari 15 15 43,979,436 Lodhra 12 12 19,641,627

Total 49 49 93,330,552

Bahawalpur Bahawalpur 39 39 58,193,348 Bahawalnagar 40 40 66,291,194 Rahimyarkhan 80 80 92,166,218

Total 159 159 216,650,760

DG Khan DG Khan 75 58 125,629,719 Rajanpur 29Muzaffargarh 36 36 93,168,214 Layyah 21 6 9,292,341

Total 161 100 228,090,274

Sargodha Sargodha 26 26 69,900,769 Khushab 15 15 69,396,528 Mianwali 42 18 41,929,570 Bhakkar 13 13 29,144,708

Total 96 72 210,371,575

Total 859 564 1,268,964,453 % age of Schools Evaluated 66%

No. of Schools Evaluated

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Lahore Gghc Cdg Qainchi Amer Sidhu 20-May-15 14100.00 19,881,000 300 423,000 42 104,892 20,408,892

2 4 Lahore Gps Mehdi Pur 20-May-15 3352.00 4,726,320 N/A N.A 4,726,320

3 11 Lahore Gps Nisab abad 20-May-15 408 575,280 N/A N.A 575,280

4 16 Lahore Ggps Atari Sarba 20-May-15 1680.00 2,368,800 N/A N.A 2,368,800

5 5 Lahore Gps Dher Pindi 21-May-15 1872 2,639,520 N/A N.A 2,639,520 Under Construction

6 6 Lahore Gps Bhangali 21-May-15 N/A N/A N.A - Under Construction

7 7 Lahore Gps Hera Sing Wala 21-May-15 N/A N/A N.A -

8 10 Lahore Gps Klass Mari 21-May-15 N/A N/A N.A - Under Construction

9 13 Lahore Ggps Klass Mari 21-May-15 N/A N/A N.A - Under Construction

10 15 Lahore Ggps Rakh Tarah 21-May-15 N/A N/A N.A - Under Construction

11 3 Lahore Gps Eno Bhatti 23-May-15 N/A N/A N.A - Under Construction

12 9 Lahore Gps Dhella Virk 25-May-15 1600.00 2,256,000 160 225,600 430 852,180 3,333,780

13 8 Lahore Gps Tatley 25-May-15 2785 3,926,850 22 31,020 N.A 3,957,870

14 12 Lahore Ggps Tatlay 25-May-15 N/A N.A N.A - Under Construction

15 2 Lahore Gps Soora 25-May-15 884 1,246,440 120 169,200 424 840,624 2,256,264

16 14 Lahore Ggps Noor Pur Jagian 26-May-15 1388 1,957,080 70 98,700 42 104,892 2,160,672

17 19 Lahore Ggps Musala 30-May-15 N/A N/A N.A - Under Construction

18 20 Lahore Ggps Kot Sardar Hakim Ali 1-Jun-15 N/A N/A N.A - Under Construction

19 17 Lahore Ges Modren Takia Saduan 4-Jun-15 4465.5 6,296,355 N/A N.A 6,296,355

20 18 Lahore 4-Jun-15 2496 3,519,360 360 507,600 4,026,960 Under Construction

20 Total Amount= 49,393,005 1,455,120 1,902,588 52,750,713

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area

(Sft) Cost (Rs.)

Three Story Building

Total Area of Building 5617 Sft under construction

area 3937 sft.

School Building not Exist

Gges Cdg Junior Model Shahdara Town

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 9 Kasur Gps Nain Wal Jagir 12-Jun-15 969.00 1,366,290 N/A 760 1,487,760 2,854,050

2 6 Kasur Gps Dollay Wala 9-Jun-15 1196.00 1,686,360 N/A 424 840,624 2,526,984

3 10 Kasur Ggps Baig Pur 12-Jun-15 1040.00 1,466,400 N/A N/A 1,466,400

4 11 Kasur Ggps Bonga Ganda Singh Wala 11-Jun-15 N/A N/A 880 1,718,880 1,718,880

5 7 Kasur Gps Kaiser Garh 9-Jun-15 1432.00 2,019,120 N/A 100 216,600 2,235,720

6 -

7 -

8 -

9 -

10 -

11 -

12 -

13 -

14 -

15 -

16 -

17 -

18 -

19 -

20 -

5 Total Amount= 6,538,170 - 4,263,864 10,802,034

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area

(Sft) Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 0 Sheikhupura Gges Monga Dogran 26-May-15 3284.00 4,630,440 98 138,180 510 1,006,260 5,774,880

2 0 Sheikhupura Gps M. Pura F. Abad 26-May-15 2058.00 2,901,780 198 279,180 304 609,504 3,790,464

3 0 Gps Chak No. 43 27-May-15 1509.00 2,127,690 20 28,200 362 721,212 2,877,102

4 2 Ggps Dargahi Gill Qadeem 27-May-15 864.00 1,218,240 28 39,480 923 1,801,698 3,059,418

5 0 Ggps Dmandhiali 27-May-15 360.00 507,600 12 16,920 167 345,642 870,162

6 0 Ggps Dandian 28-May-15 1710.00 2,411,100 12 16,920 252 509,352 2,937,372

7 5 Ggps Bulkhey 28-May-15 1552.00 2,188,320 27 38,070 326 651,876 2,878,266

8 7 Muridke / Sheikhupura Ghs Tapiala Dost Muhammad 28-May-15 9950.00 14,029,500 100 141,000 1632 3,167,232 17,337,732

9 8 Muridke / Sheikhupura Ges Lambray 29-May-15 1380.00 1,945,800 N/A 566 1,114,116 3,059,916

10 10 Muridke / Sheikhupura Gps Chak 47 29-May-15 350.00 493,500 48 67,680 422 836,772 1,397,952

11 11 Muridke / Sheikhupura Gps Chak 48 29-May-15 792.00 1,116,720 25 35,250 252 509,352 1,661,322

12 12 Muridke / Sheikhupura Gps Royan Pur 29-May-15 2112.00 2,977,920 48 67,680 305 611,430 3,657,030

13 13 Muridke / Sheikhupura Gps Ladhewala Virkan 29-May-15 1976.00 2,786,160 24 33,840 836 1,634,136 4,454,136

14 21 Muridke / Sheikhupura Gps Chak Wariach 30-May-15 855.00 1,205,550 60 84,600 420 832,920 2,123,070

15 22 Muridke / Sheikhupura Ggps Dheengran Wali 29-May-15 1416.00 1,996,560 105 148,050 410 813,660 2,958,270

16 26 Gps Chak 14 North 1200.00 1,692,000 N/A 380 755,880 2,447,880

17 27 Sheikhupura Gges Manga Dogran 26-May-15 3284.00 4,630,440 98 138,180 510 1,006,260 5,774,880

18 23 Muridke / Sheikhupura Ggps Saray Narang 29-May-15 N/A N/A N/A - Under Construction

18 Total = 48,859,320 1,273,230 16,927,302 67,059,852

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Ferozwala / Sheikhupura

Ferozwala / Sheikhupura

Ferozwala / Sheikhupura

Ferozwala / Sheikhupura

Ferozwala / Sheikhupura

Sharaqpur / Sheikhupura

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Gujranwala Ges Garjakh 23-May-15 N/A N/A N/A - Under Construction

2 2 Gujranwala Gges Madiala Warraich 23-May-15 5304.00 7,330,128 70 96,740 N/A 7,426,868

3 4 Gujranwala Gps Chander Key 23-May-15 1824.00 2,520,768 N/A N/A 2,520,768

4 5 Gujranwala Gps-1 Rahwali 23-May-15 3292.00 4,549,544 N/A N/A 4,549,544

5 9 Gujranwala Ggps Taj Pura 25-May-15 720.00 995,040 N/A 15 51,465 1,046,505

6 10 Gujranwala Ggps Shama Colony 25-May-15 1884.00 2,603,688 N/A N/A 2,603,688

7 7 Gujranwala Ggps Qila Khana 25-May-15 N/A N/A 600 1,122,600 1,122,600

8 20 Kamonki / Guranwala Gps Mohan Peer Bhattian 25-May-15 800.00 1,105,600 N/A N/A 1,105,600

9 16 Kamonki / Guranwala Gps Dhenser Bala 25-May-15 920.00 1,271,440 N/A N/A 1,271,440

10 29 Wazirabad / Grw Ggps Jham Wala 26-May-15 1162 1,605,884 30 41,460 N/A 1,647,344

11 8 Gujranwala Ggps Kot Shera 27-May-15 1338.00 1,849,116 50 69,100 45 106,395 2,024,611

12 3 Gujranwala Gges Nai Abadi Dhero Wali 28-May-15 2916.00 4,029,912 48 66,336 N/A 4,096,248

13 14 Kamokey / Grw Gps Kot Bhutta 30-May-15 704.00 972,928 N/A N/A 972,928

14 17 Kamokey / Grw Gps Manhes 30-May-15 1403.00 1,938,946 N/A N/A 1,938,946

15 18 Kamokey / Grw Gps Mc No. 3 1-Jun-15 N/A N/A N/A - Under Construction

16 30 Wazirabad / Grw Ggps Faqiran Wali Kalan 1-Jun-15 900 1,243,800 16 22,112 120 243,720 1,509,632

17 31 Wazirabad / Grw Gmps Chak Ali Sher 1-Jun-15 N/A 64 88,448 N/A 88,448

18 6 Gujranwala Gps Dhidho Duggal 2-Jun-15 2048 2,830,336 72 99,504 80 170,480 3,100,320

19 25 Wazirabad / Grw Ges Ali Pur Chattah 3-Jun-15 5473 7,563,686 121 167,222 N/A 7,730,908

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

20 26 Wazirabad / Grw Gps Gojar Gola 3-Jun-15 1104 1,525,728 N/A N/A 1,525,728

21 27 Wazirabad / Grw Gps Thouyan 4-Jun-15 448 619,136 32.5 44,915 200 390,200 1,054,251

22 22 Noshera Virkan / Grw Ggps Mahia 11-Jun-15 455.00 628,810 20 27,640 N/A 656,450

23 21 Noshera Virkan / Grw Ghs Thatha Manak 6-Jun-15 6081.00 8,403,942 130 179,660 350 664,850 9,248,452

24 12 Kamoke / Grw Gps Eminabad No. 1 5-Jun-15 N/A N/A N/A

25 15 Kamoke / Grw Gps Gorala 5-Jun-15 1497 2,068,854 N/A 56 126,536 2,195,390

26 19 Kamoke / Grw Ggps Gorala 5-Jun-15 2719 3,757,658 20 27,640 N/A 3,785,298

27 23 Noshera Virkan / Grw Ggps Mohalah Rarwal 6-Jun-15 1176 1,625,232 70 96,740 N/A 1,721,972

28 - -

29 - -

30 - -

31 - -

27 Total = 61,040,176 1,027,517 2,876,246 64,943,939

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 2 Hafizabad Gps. Moga Daim 16-May-15 1360.10 60.125 418 - Under Construction

2 1 Hafizabad Gps Thatta Shamsa 16-May-15 1775.00 2,453,050 N/A 421 794,851 3,247,901

2 Total Amount= 2,453,050 - 794,851 3,247,901

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Narowal Ggps Khair Ullah Pur 21-May-15 8907.00 12,309,474 225 310,950 42 100,902 12,721,326

2 5 Narowal Ggps Dhadory 21-May-15 805.00 1,112,510 75 103,650 N.A 1,216,160

3 6 Narowal Ggps kang Bhati Wala 21-May-15 1728 2,388,096 N.A N.A 2,388,096

4 7 Shakargarh / Narowal Gps Sukho Chak 26-May-15 4250 5,873,500 N.A N.A 5,873,500

5 8 Shakargarh / Narowal Gps Nangal Gojran 27-May-15 1196 1,652,872 72 99,504 N.A 1,752,376

6 14 Shakargarh / Narowal Ggps Pindi Bhomain 27-May-15 760 1,050,320 N.A N.A 1,050,320

7 15 Shakargarh / Narowal Ggps Shakar Garh No-2 27-May-15 3847 5,316,554 36 49,752 N.A 5,366,306

8 4 Narowal Ggps Muslmanian 28-May-15 1080 1,492,560 72 99,504 400 756,400 2,348,464

9 10 Shakargarh / Narowal Gps Bhangala 28-May-15 600 829,200 N.A 150 298,650 1,127,850

10 2 Narowal Gps Kotli Plot 25-May-15 N.A N.A N.A -

11 9 Shakargarh / Narowal Gps Shakargarh No. 1 25-May-15 3875.00 5,355,250 60 82,920 N.A 5,438,170

12 23 Zafarwal / Narowal Gps Ghamrola 30-May-15 1035.00 1,430,370 60 82,920 N.A 1,513,290

13 26 Zafarwal / Narowal Ggps Tanda p/o Dinga Nara 30-May-15 1484.00 2,050,888 N.A 350 664,850 2,715,738

14 27 Zafarwal / Narowal Ggps Dudham Kalan Dhala 30-May-15 1035.00 1,430,370 N.A N.A 1,430,370

15 28 Zafarwal / Narowal Ggps (Model) Pind Bhalian 30-May-15 N.A N.A N.A -

16 19 Zafarwal / Narowal Ghs Zafar Wal 1-Jun-15 N.A N.A N.A -

17 20 Zafarwal / Narowal Ghs Islamia Dudhu Chak 1-Jun-15 9525 13,163,550 512 707,584 445 838,795 14,709,929

18 25 Zafarwal / Narowal Ggps Romal 6-Jun-15 1285 1,775,870 98 135,436 350 664,850 2,576,156

19 24 Zafarwal / Narowal Ggps Kartarpur 6-Jun-15 1074 1,484,268 72 99,504 750 1,397,250 2,981,022

20 3 Narowal Ggps (Model) Chahal 8-Jun-15 1038 1,434,516 N.A 100 207,100 1,641,616

21 22 Zafarwal / Narowal Gps Balshahana 8-Jun-15 1144 1,581,008 N.A 75 161,325 1,742,333

22 21 Zafarwal / Narowal Gps Nagrey 5-Jun-15 1140 1,575,480 N.A N.A 1,575,480

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area

(Sft) Cost (Rs.)

Under Construction

Newly Constructed

Building

Newly Constructed

Building

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area

(Sft) Cost (Rs.)

23 18 Shakargarh / Narowal Ggps Bhawani Pur 3-Jun-15 496 685,472 N.A 600 1,122,600 1,808,072

24 11 Shakargarh / Narowal Gps Manjey Toor 3-Jun-15 494 682,708 N.A N.A 682,708

25 17 Shakargarh / Narowal Ggps Jattar 3-Jun-15 480 663,360 N.A 230 445,130 1,108,490

26 - -

27 - -

28 - -

25 Total Amount= 65,338,196 1,771,724 6,657,852 73,767,772

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 3 M.B.Din Gps Chack No. 13 19-May-15 1356.25 37.125 191 - Under Construction

2 9 Phalia / M.B. Din Gps Dera Ariayan 19-May-15 1691.50 172.125 422 - Under Construction

3 8 Phalia / M.B. Din Gps Dera Tarkhana 19-May-15 2172.00 66.105 498 - Under Construction

4 1 Malikwal / M.B. Din Gps Dera Muhammad Baksh 19-May-15 1085.21 1,499,760 156.7325 216,604 351 666,681 2,383,046

5 6 Phalia / M.B. Din Gps Kot Ghulam Rasool 18-May-15 1812.29 93.145 240 - Under Construction

6 7 Phalia / M.B. Din Gps Pindi Kalo Khan 18-May-15 875.17 1,209,478 N/A N/A 1,209,478 Deteriorated

7 5 M.B.Din Ggps Sohawa Jamlani 18-May-15 1331.19 1,839,701 156.7325 216,604 487 915,697 2,972,002

8 2 M.B.Din Ggps Khewa 18-May-15 7015.84 9,695,884 162.5 224,575 330 628,230 10,548,689

9 4 M.B.Din Ggps Faizabad 18-May-15 1017.50 1,406,185 65 89,830 12 45,972 1,541,987

9 Total = 15,651,008 747,614 2,256,580 18,655,202

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 17 Rawalpindi Ghs Pehvli Faizabad 26-May-15 3219.50 4,455,788 75 103,800 145 300,950 4,860,538

2 20 Rawalpindi Gps Dhok Roza 27-May-15 1520.00 2,103,680 60 83,040 480 940,800 3,127,520

3 21 Rawalpindi Ggps Kurar 27-May-15 1363 1,886,392 65 89,960 N.A 1,976,352

4 18 Rawalpindi Gges Chak Khas 29-May-15 3953.00 5,470,952 114 157,776 N/A 5,628,728

5 19 Rawalpindi Gps Ghore Gujran 29-May-15 897.00 1,241,448 48 66,432 300 597,000 1,904,880

6 1 Gujar Khan / R. Pindi Gps Partali Khurd 30-May-15 720.00 996,480 65 89,960 320 635,200 1,721,640

7 5 Gujar Khan / R. Pindi Ggps Dongi Kalan 30-May-15 1481.00 2,049,704 72 99,648 418 822,380 2,971,732

8 6 Gujar Khan / R. Pindi Ggps Ada Sayyed 30-May-15 1292.00 1,788,128 34 47,056 81 178,710 2,013,894

9 3 Gujar Khan / R. Pindi Ggps Changa Mera 1-Jun-15 1568.00 2,170,112 40 55,360 349 690,590 2,916,062

10 4 Gujar Khan / R. Pindi Ggps Dhok Hashoo 1-Jun-15 1403.00 1,941,752 N/A 410 807,100 2,748,852

11 2 Gujar Khan / R. Pindi Ggps New Jarmoot Kalan 2-Jun-15 864.00 1,195,776 N/A 400 788,000 1,983,776

12 7 Kahuta / R. Pindi Gps Samman 3-Jun-15 3728.00 5,159,552 90 124,560 N/A 5,284,112

13 8 Kahuta / R. Pindi Gps Bhunain 4-Jun-15 1672.00 2,314,048 N/A N/A 2,314,048

14 9 Kahuta / R. Pindi Ggps Dhok Gala 4-Jun-15 756.00 1,046,304 48 66,432 1,112,736

15 10 Kahuta / R. Pindi Gps Kanaran 4-Jun-15 845.50 1,170,172 42 58,128 250 501,500 1,729,800

16 23 Taxila / R. Pindi Gps Paswal 5-Jun-15 1260.00 1,743,840 10 13,840 N/A 1,757,680

17 22 Taxila / R. Pindi Gps Malpur 9-Jun-15 1240.00 1,716,160 Ok 270 539,700 2,255,860

18 16 Murree / R. Pindi Gps Palli 9-Jun-15 1430.00 1,979,120 120 166,080 N/A 2,145,200

19 15 Murree / R. Pindi Gghs Murree City 10-Jun-15 3500.00 4,844,000 55 76,120 N/A 4,920,120

19 Total Amount= 45,273,408 1,298,192 6,801,930 53,373,530

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area

(Sft) Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 2 Talagang / Chakwal Ghs Wanhar 21-May-15 N/A N/A N/A - Under Construction

2 4 Talagang / Chakwal Gps Nara 21-May-15 N/A N/A N/A - Under Construction

3 3 Talagang / Chakwal Gps No. 1 Tamman 21-May-15 1241.00 1,670,386 30 40,380 N/A 1,710,766

4 1 Chakwal / Chakwal Ggps Khanwal 6-Jun-15 1364.75 1,836,954 N/A N/A 1,836,954 New Construction

4 Total = 3,507,340 40,380 - 3,547,720

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 5 Fateh Jang / Attock Ggps Qutbal 27-May-15 1673.00 2,315,432 20 27,680 63 144,330 2,487,442

2 3 Fateh Jang / Attock Ggps Chak Rala 28-May-15 345.00 477,480 30 41,520 N/A 519,000

3 4 Fateh Jang / Attock Ggps Jogi Mara 28-May-15 910.00 1,259,440 48 66,432 1722 3,313,020 4,638,892

3 Total Amount= 4,052,352 135,632 3,457,350 7,645,334

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area

(Sft) Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 4 Sahiwal GPS Jamia Rashidia No-2 21-May-15 2227.00 2,953,002 N/A N/A 2,953,002

2 6 Sahiwal Ggps 104/9-L 22-May-15 972.00 1,288,872 67.14 89,028 868 1,500,468 2,878,368

3 7 Sahiwal Ggps 62/4-R 23-May-15 573.75 760,793 27.38 36,306 159.5 295,310 1,092,408

4 8 Sahiwal Ggps Jharman 26-May-15 1097.39 1,455,139 N/A 300 534,300 1,989,439

5 10 Sahiwal Ggps 112/9-L Gungaja 30-May-15 1694.07 2,246,337 49.5 65,637 172 316,572 2,628,546

6 5 Sahiwal Gps 155/9-L 1-Jun-15 937.86 1,243,602 68.37 90,659 1110 1,912,110 3,246,371

7 9 Sahiwal Ggps Akbar Shah 2-Jun-15 1360.75 1,804,355 100.34 133,051 N/A 1,937,405

8 1 Gps 112/7-R 3-Jun-15 1547.81 2,052,396 N/A 1485 2,549,985 4,602,381

9 2 Ggps Khair Katia 3-Jun-15 962.00 1,275,612 N/A 370 653,370 1,928,982

10 3 Ggps 179/9-L 8-Jun-15 847.00 1,123,122 N/A 50 109,050 1,232,172

10 Total = 16,203,229 414,680 7,871,165 24,489,074

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Chichawatni / Sahiwal

Chichawatni / Sahiwal

Chichawatni / Sahiwal

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Pakpattan Gps Rang Shah Dakhil 15-Jun-15 918.00 1,207,170 N/A N/A 1,207,170

2 5 Pakpattan Ggps Karam Pur Bhattain 12-Jun-15 1489.00 2,004,194 92.11 123,980 N/A 2,128,174

3 Pakpattan - - -

4 Pakpattan - -

5 Pakpattan - -

6 Pakpattan - -

2 Total = 3,211,364 123,980 - 3,335,344

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 14 Okara Gps mc Lalazar Colony 22-May-15 5651.50 7,493,889 139.86 185,454 N/A 7,679,343

2 13 Okara Gps mc Rail Bazar 22-May-15 6691.80 8,873,327 50 66,300 N/A 8,939,627

3 12 Okara Gps Chak no. 43/3-R Karm Pur 23-May-15 764.88 1,014,224 35.625 47,239 N/A 1,061,463

4 8 Okara Ges Chak No 42/3-R 23-May-15 4190.50 5,556,603 108 143,208 192.5 351,443 6,051,254

5 7 Okara Ghs Chak No 7/4-L 23-May-15 10073.92 13,358,021 101.25 134,258 N/A 13,492,278

6 18 Relana Khurd / Okara Ggps Kali Jamal Singh 25-May-15 1508.00 1,999,608 66.625 88,345 40 92,040 2,179,993

7 11 Okara Gps Chak No 48/2-L 25-May-15 1290.00 1,710,540 68.25 90,500 440 772,440 2,573,480

8 15 Okara Gps Thatha Naam Daar 27-May-15 1008.00 1,336,608 N/A N/A 1,336,608

9 9 Okara Gps Chak No 36 GD 27-May-15 588.00 779,688 N/A 290 517,290 1,296,978

10 17 Relana Khurd / Okara Ghs Mopalke 27-May-15 4737.00 6,281,262 350 464,100 N/A 6,745,362

11 10 Okara Gps Chak 35/4L 28-May-15 968.00 1,283,568 79 104,754 533 930,633 2,318,955

12 16 Okara Gps Chak 22/4L 28-May-15 1443.00 1,913,418 65 86,190 N/A 1,999,608

13 2 Depalpur / Okara Ghs Malhoo Sheikhu 29-May-15 7690.00 10,196,940 N/A N/A 10,196,940

14 5 Depalpur / Okara Gps Daula Pukhta 29-May-15 760.00 1,007,760 N/A N/A 1,007,760

15 1 Depalpur / Okara Ghs Jandran Kalan 2-Mar-15 7846.00 10,403,796 N/A 1700 2,915,700 13,319,496

16 3 Depalpur / Okara Gps Tibbi Joggi 2-Mar-15 802.00 1,063,452 61 80,886 149 277,449 1,421,787

17 4 Depalpur / Okara Gps Bhattian Rajwal 2-Mar-15 1938.00 2,569,788 47 62,322 83 165,183 2,797,293

17 Total = 76,842,492 1,553,555 6,022,178 84,418,224

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Gps MC Farooqabad Fsd 22-May-15 2712.00 3,650,352 N/A N/A 3,650,352

2 2 Gps 232 Rb l 22-May-15 1175.00 1,581,550 N/A 176 337,808 1,919,358

3 4 Ggps Chak 191 Rb West 27-May-15 1515 2,039,190 72 96,912 N/A 2,136,102

4 3 Gps Chak 269 Rb1 29-May-15 1340.00 1,803,640 112 150,752 95 193,385 2,147,777

5 19 Ggps Chak 373 Gb2 2-Jun-15 1440.00 1,938,240 84 113,064 N/A 2,051,304

6 20 Ggps kot Allah Dad 3-Jun-15 1399.00 1,883,054 84 113,064 N/A 1,996,118

7 21 Ggps Thatha Gul Bhore 4-Jun-15 1871.00 2,518,366 165 222,090 N/A 2,740,456

8 18 4-Jun-15 1350.00 1,817,100 112 150,752 135 264,705 2,232,557

9 7 Jaranwala / Faisalabad Ggps Chak 96 Gb 9-Jun-15 1140.00 1,534,440 N/A N/A 1,534,440

10 13 Jaranwala / Faisalabad Ggps Chak 97 Gb 9-Jun-15 757.00 1,018,922 48 64,608 736 1,336,288 2,419,818

11 8 Jaranwala / Faisalabad Gps Chak 273 Gb 10-Jun-15 1173.00 1,578,858 84 113,064 280 523,240 2,215,162

12 9 Jaranwala / Faisalabad Gps 35 Gb 11-Jun-15 1911.00 2,572,206 69 92,874 200 380,600 3,045,680

13 10 Jaranwala / Faisalabad Gps Chak 362 Gb 11-Jun-15 1495 2,012,270 184 247,664 280 523,240 2,783,174

14 15 Jaranwala / Faisalabad Ggps Chak 366 Gb I Satiana 11-Jun-15 1055 1,420,030 158 212,668 250 469,750 2,102,448

15 16 Jaranwala / Faisalabad Ggps Chak 367 Gb I Satiana 11-Jun-15 1472 1,981,312 70 94,220 N/A 2,075,532

15

15 Total = 29,349,530 1,671,732 4,029,016 35,050,278

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Faisalabad City / Faisalabad

Faisalabad Saddar / Faisalabad

Faisalabad Saddar / Faisalabad

Faisalabad Saddar / Faisalabad

Samundari / Faisalabad

Tandianwala / Faisalabad

Tandianwala / Faisalabad

Samundari / Faisalabad

Ggps Chak 53 Gb Bangla Tarhani

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 8 T.T.Singh Gps Chak 270Gb 6-Jun-15 896.77 1,207,052 N/A N/A 1,207,052

2 5 Gojra / T.T.Singh Ggps Chak 341 Jb Thathar 8-Jun-15 581.63 782,867 54 72,684 N/A 855,551

3 1 Gojra / T.T.Singh Gps Chak 365 Jb Kacha 9-Jun-15 1480.75 1,993,090 58.5 78,741 N/A 2,071,831

4 2 Gojra / T.T.Singh Gps Mc Mehdi Mohallah 9-Jun-15 6448.75 8,680,018 140 188,440 67 143,461 9,011,919

5 4 Gojra / T.T.Singh Gps 314 Jb 9-Jun-15 2117.5 2,850,155 N/A N/A 2,850,155

6 3 Gojra / T.T.Singh Gps 245 Gb Tulvindi 10-Jun-15 2597 3,495,562 80.75 108,690 670 1,218,610 4,822,862

7 6 Kamalia / T.T Singh Gps Qazi Galib 16-Jun-15 2129.37 2,866,132 70 94,220 660 1,200,780 4,161,132

8 7 Kamalia / T.T Singh Gps Chak 693/35 Gb II 17-Jun-15 2186.25 2,942,693 70 94,220 1980 3,554,340 6,591,253

8 Total = 24,817,568 636,995 6,117,191 31,571,754

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

New Boundary Wall and One Toilet Block Required

New Boundary Wall, One Toilet Block and 3 Class Rooms Required

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 4 Multan GGPS Thalay Walay (3611028 16-May-15 1031.20 67.2 197.3 Under Construction

2 6 Multan GGPS Wan Chatta (36110328 20-May-15 864.00 1,158,624 32 42,912 300 555,000 1,756,536

3 7 Multan GGPS Basti Nau Dadal (3613 20-May-15 792.00 1,062,072 16 21,456 280 519,600 1,603,128

4 11 Multan Saddar / Multan Ggps Jangle Faiz Pur 21-May-15 768.00 1,029,888 50 67,050 474 862,980 1,959,918

5 12 Multan Saddar / Multan Ggps Jangle Faiz Pur 21-May-15 1368.00 1,834,488 N/A N/A 1,834,488

6 5 Multan city / Multan Ggps Fateh Din Wala 22-May-15 768.00 1,029,888 N/A N/A 1,029,888

7 8 Multan Saddar / Multan Gps Jnai Basti Lohar Wala 22-May-15 792.00 1,062,072 32 42,912 80 165,600 1,270,584

8 9 Multan Saddar / Multan Gps Jalal Shah 22-May-15 1152.00 1,544,832 50 67,050 636 1,149,720 2,761,602

9 1 Jalalpur Pirwala / Multan Gps Joyya Abad p/o Kotla 26-May-15 756.00 1,013,796 154 206,514 N/A 1,220,310

10 2 Jalalpur Pirwala / Multan Ggps Bangla Arain 26-May-15 768.00 1,029,888 N/A N/A 1,029,888

11 3 Jalalpur Pirwala / Multan Ggps Tharo Wali 27-May-15 1152.00 N/A N/A - Under Construction

12 14 Shuja Abad / Multan Ggps Chishti Wala 27-May-15 768.00 N/A N/A - Under Construction

13 10 Multan Gps Hamidpur Khas 1278.00 1,713,798 N/A N/A 1,713,798

14 13 Shuja Abad / Multan Gps Ghulam Abbas 1104.00 1,480,464 N/A N/A 1,480,464

14 Total Amount= 13,959,810 447,894 3,252,900 17,660,604

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Kabirwal / Khanewal Ggps Muhammad Shah, Sarai 9-Jun-15 768.00 1,029,888 70 93,870 N/A 1,123,758

2 2 Kabirwal / Khanewal 9-Jun-15 768.00 1,029,888 N/A N/A 1,029,888

3 3 Khanewal Ggps 6/Ah, Khanewal 9-Jun-15 1264.00 1,695,024 35 46,935 N/A 1,741,959

4 4 Main Channu / Khanewal Ghps 84/15-L 9-Jun-15 2640.00 3,540,240 N/A N/A 3,540,240

5 5 Main Channu / Khanewal Gps 52/15-L 9-Jun-15 1392.00 1,866,672 N/A N/A 1,866,672

6 6 Main Channu / Khanewal 9-Jun-15 1210.00 1,622,610 70 93,870 N/A 1,716,480

7 7 Main Channu / Khanewal 9-Jun-15 768.00 1,029,888 N/A N/A 1,029,888

8 8 Main Channu / Khanewal 9-Jun-15 1104.00 N/A N/A - Under Construction

8 Total Amount= 11,814,210 234,675 - 12,048,885

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Ggps 13 Ghagh, Abdul Hakim

School Building is non Functional

Only Roof (PC) is Critically Dangerous

School Building is non Functional

Gps Chak No 1/8 Ar Tulamba

Ggps Chak No 1/8 Ar Tulamba

Gmps Baghdad No.3 Tulamba

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 12 Malsi / Vehari Ggps Malku 1-Jun-15 768.00 1,029,888 N/A N/A 1,029,888

2 1 Burewala / Vehari Ges Arabia Islamia 2-Jun-15 4394.00 5,892,354 N/A N/A 5,892,354

3 3 Burewala / Vehari Ggps Chak No 407-EB 2-Jun-15 552.00 70 N/A - Under Construction

4 4 Burewala / Vehari Ggps 273-EB 2-Jun-15 1312.00 1,759,392 70 93,870 N/A 1,853,262

5 2 Burewala / Vehari Ggps MC E-Block 3-Jun-15 3585.00 4,807,485 N/A N/A 4,807,485

6 5 Malsi / Vehari Gps Kharala 3-Jun-15 1454.00 N/A - Under Construction

7 14 Vehari Gps Behram Wah 3-Jun-15 1104.00 1,480,464 N/A N/A 1,480,464

8 13 Vehari Gghs Thingi Colony 3-Jun-15 14350.00 19,243,350 624 836,784 N/A 20,080,134

9 15 Vehari Gps Mumtazabad 3-Jun-15 384.00 514,944 N/A N/A 514,944

10 6 Malsi / Vehari Gps Arouti p/o Fateh Pur 4-Jun-15 768.00 1,029,888 N/A N/A 1,029,888

11 7 Malsi / Vehari Gps Kotli Junaid p/o Saddar 4-Jun-15 1872.00 N/A N/A - Under Construction

12 8 Malsi / Vehari Gps Muradpur P/o Droher 4-Jun-15 1275.00 1,709,775 N/A N/A 1,709,775

13 9 Malsi / Vehari Gps Bairi Wala 4-Jun-15 2362.00 3,167,442 N/A N/A 3,167,442

14 10 Malsi / Vehari Gps 143 WB P/o Dokata 4-Jun-15 1416.00 1,898,856 N/A N/A 1,898,856

15 11 Malsi / Vehari Gps Tahli Wala 4-Jun-15 384.00 514,944 N/A N/A 514,944

15 Total Amount= 43,048,782 930,654 - 43,979,436

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 4 Dunya pur / Lodhran Ggps 31 M No 2 28-May-15 900.00 1,206,900 N/A N/A 1,206,900

2 5 Dunya pur / Lodhran Ggps Canal Colony Qutab 28-May-15 768.00 1,029,888 N/A N/A 1,029,888

3 9 Karor Pacca / Lodhra Gps Choki Subhay Khan 28-May-15 1152.00 N/A N/A - Under Construction

4 7 Dunya pur / Lodhran Gps Chak 19M 28-May-15 1104.00 N/A N/A - Under Construction

5 1 Dunya pur / Lodhran Ghs Muslim Public 363-W 1-Jun-15 7108.00 9,531,828 N/A N/A 9,531,828

6 3 Dunya pur / Lodhran Gps Kotli Wajwa 1-Jun-15 640.00 858,240 N/A N/A 858,240

7 2 Dunya pur / Lodhran Gps 233-WB 1-Jun-15 1012.00 1,357,092 N/A N/A 1,357,092

8 6 Dunya pur / Lodhran Ggps Bappar 26-May-15 1088.00 1,459,008 N/A N/A 1,459,008

9 8 Karor Pacca / Lodhran Gps Bahadi Wahin 768.00 1,029,888 70 93,870 N/A 1,123,758

10 10 Karor Pacca / Lodhran Gps Zeerak Wahin 1013.00 1,358,433 70 93,870 N/A 1,452,303

11 11 Lodhran Ggps Abdullah Wala N/A N/A - Under Construction

12 12 Lodhran Ggps 99/M Adam Wahan 1210.00 1,622,610 N/A N/A 1,622,610

12 Total Amount= 19,453,887 187,740 - 19,641,627

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.)

1 1 Gps Khair Shah 20-May-15 1259.00 1,673,211 55 73,095 N.A 1,746,306

2 11 Gps Chacha Basti 20-May-15 878.00 1,166,862 103 136,887 N.A 1,303,749

3 22 Bahawalpur Gps Uttera 20-May-15 1052.00 1,398,108 27 35,883 N.A 1,433,991

4 23 Bahawalpur Gps Nahar Wali 20-May-15 N.A N.A N.A Under Construction

5 24 Bahawalpur Ggps Sajalwal Wala 20-May-15 1070.00 1,422,030 65 86,385 N.A 1,508,415

6 8 Gps Amir Abad 21-May-15 1544.00 2,051,976 65 86,385 N.A 2,138,361

7 9 Gps Uch Gilani 21-May-15 1290.00 1,714,410 68 90,372 66 137,322 1,942,104

8 10 Gps Hamid Pur Khurd 21-May-15 1372.00 1,823,388 50 66,450 N.A 1,889,838

9 20 Ggps Ninday Lal 21-May-15 429.00 570,141 N.A N.A 570,141

10 12 Gmps Tarand Bisharat 22-May-15 529.00 703,041 N.A N.A 703,041

11 19 Ggps Maulvi Wazeer Ahmad 22-May-15 1008.00 1,339,632 N.A 290 521,930 1,861,562

12 21 Ggps Basti Arain 22-May-15 980.00 1,302,420 42 55,818 414 734,838 2,093,076

13 2 Gps Wahi Bhoja 23-May-15 1000.00 1,329,000 44 58,476 N.A 1,387,476

14 3 Gps Basti Panwaran 23-May-15 811.00 1,077,819 16 21,264 424 752,008 1,851,091

15 4 Gps Ghulam Nabi 23-May-15 791.00 1,051,239 25 33,225 N.A 1,084,464

16 5 Gps Ahmad Bukhas 23-May-15 807.00 1,072,503 34 45,186 N.A 1,117,689

17 6 Gps Mahi Tiba 26-May-15 1345.00 1,787,505 30 39,870 132 250,644 2,078,019

18 7 Gps Arabic Lab Wali 26-May-15 470.00 624,630 50 66,450 N.A 691,080

19 13 Ggps Basti Shakoora 26-May-15 471.00 625,959 39 51,831 N.A 677,790

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

Length (Rft)

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.)

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

Length (Rft)

20 14 Ggps Jafar Ali Channar 26-May-15 N.A N.A 352 628,384 628,384

21 15 Ggps Tibbi Hoti Mahar 26-May-15 1194.00 1,586,826 35 46,515 N.A 1,633,341

22 16 Ggps Basti Lal Din 23-May-15 1440.00 1,913,760 66 87,714 N.A 2,001,474

23 17 Ggps Ghalwan 26-May-15 N.A N.A N.A - New Constructed

24 18 Gps Model Basti Laran 26-May-15 1030.00 1,368,870 65 86,385 N.A 1,455,255

25 30 Hasilpur / Bahawalpur Gps Basti Shareen Wala 28-May-15 1158.00 1,538,982 63 83,727 N.A 1,622,709

26 31 Hasilpur / Bahawalpur Gps Shah Pur 28-May-15 N.A N.A N.A - Shutterless

27 32 Hasilpur / Bahawalpur Gps Chah Pipli Wala 28-May-15 1280.00 1,701,120 45 59,805 N.A 1,760,925

28 33 Hasilpur / Bahawalpur Ggps Basti Admana 28-May-15 471.00 625,959 59 78,411 N.A 704,370

29 34 Yazman / Bahawalpur Gps Chak No 128/Dnb 27-May-15 1015.00 1,348,935 40 53,160 N.A 1,402,095

30 35 Yazman / Bahawalpur Gps Chak No 107/Dnb 27-May-15 918.00 1,220,022 N.A N.A 1,220,022

31 36 Yazman / Bahawalpur Gps Chak No 68/Db (W) 27-May-15 3730.00 4,957,170 51 67,779 229 417,193 5,442,142

32 37 Yazman / Bahawalpur Gps Chak No176/Ab 27-May-15 1544.00 2,051,976 N.A N.A 2,051,976

33 38 Yazman / Bahawalpur Gps Chak No 49/Db (E) 27-May-15 1523.00 2,024,067 65 86,385 203 372,551 2,483,003

34 39 Yazman / Bahawalpur Gps Chak No 102/Db (N) 27-May-15 2023.00 2,688,567 67 89,043 N.A 2,777,610

35 25 Hasilpur / Bahawalpur Gps Chak No. 155/M-B 1-Jun-15 463.00 615,327 N.A N.A 615,327

36 26 Hasilpur / Bahawalpur Gps Chak No. 145/M 1-Jun-15 628.00 834,612 60 79,740 400 710,800 1,625,152

37 27 Hasilpur / Bahawalpur Gps Chak No. 181/M 1-Jun-15 1261.00 1,675,869 64 85,056 1,760,925

38 28 Hasilpur / Bahawalpur Gps Chak No. 158/M 1-Jun-15 1034 1,374,186 66 87,714 1,461,900

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

Ahmadpur east / Bahawalpur

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.)

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

Length (Rft)

39 29 Hasilpur / Bahawalpur Gps Chak No. 86/F 1-Jun-15 1105.00 1,468,545 N.A N.A 1,468,545

39 Total Amount= 51,728,667 1,939,011 4,525,670 58,193,348

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 11 Chishtian / Bahawalnagar Gges Chak No 94 Fateh 23-May-15 1481.00 1,968,249 125 166,125 354 631,818 2,766,192

2 12 Chishtian / Bahawalnagar Gges Chak No 116/M 23-May-15 1445.00 1,920,405 N/A 484 855,028 2,775,433

3 13 Chishtian / Bahawalnagar Gps Chak No 52/F 23-May-15 1200.00 1,594,800 N/A N/A 1,594,800

4 14 Chishtian / Bahawalnagar Gps Chak No 202/M 23-May-15 968.00 1,286,472 N/A N/A 1,286,472

5 15 Chishtian / Bahawalnagar Gmps Chak No 8/Fw Bhattan 24-May-15 1178.00 1,565,562 60 79,740 310 556,270 2,201,572

6 16 Chishtian / Bahawalnagar Ggps Chak No 46/F 24-May-15 1275.00 1,694,475 47 62,463 424 752,008 2,508,946

7 17 Chishtian / Bahawalnagar Ggps Chak No 37/Fa 24-May-15 529.00 703,041 77 102,333 432 765,744 1,571,118

8 1 Bahawalnagar Gps Preetam Wali 25-May-15 656.00 871,824 N/A N/A 871,824

9 2 Bahawalnagar Gps Bukharana 25-May-15 N/A N/A N/A - Under Construction

10 3 Bahawalnagar Gps Kat Deputy Wali 25-May-15 832.00 1,105,728 48 63,792 N/A 1,169,520

11 4 Bahawalnagar Gps Labh Singh East 25-May-15 506 672,474 N/A N/A 672,474

12 5 Bahawalnagar Gps Sher Garah 26-May-15 936.00 1,243,944 N/A N/A 1,243,944

13 6 Bahawalnagar Gps Sher Garah 26-May-15 736.00 978,144 N/A N/A 978,144

14 7 Bahawalnagar Gps Jand Wala Khurd 26-May-15 1509.00 2,005,461 N/A N/A 2,005,461

15 8 Bahawalnagar Ggps Wazir Kot 27-May-15 1026.00 1,363,554 N/A N/A 1,363,554

16 9 Bahawalnagar Ggps Sundar Wali 27-May-15 1512.00 2,009,448 N/A N/A 2,009,448

17 10 Bahawalnagar Ggps Kat Atima Singh 27-May-15 900.00 1,196,100 N/A 70 144,190 1,340,290

18 30 Gps Sobhey Wala 28-May-15 574.00 762,846 24 31,896 372 662,724 1,457,466

19 31 Gps Basti Khokhran 28-May-15 1419 1,885,851 48 63,792 N/A 1,949,643

20 32 Gps Bhani Awan 28-May-15 988.00 1,313,052 30 39,870 N/A 1,352,922

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

21 33 Gps Dubgoma 28-May-15 476.00 632,604 N/A N/A 632,604

22 34 Gps Dhab Said Muhammad 1-Jun-15 1416.00 1,881,864 96 127,584 N/A 2,009,448

23 35 Ggps Pir Ghar Chisti 1-Jun-15 1080.00 1,435,320 N/A 66 137,322 1,572,642

24 36 Ggps Their Peru Wali 1-Jun-15 1377.00 1,830,033 N/A N/A 1,830,033

25 37 Ggps Noor Pur Laleka 2-Jun-15 1440.00 1,913,760 N/A N/A 1,913,760

26 38 Gmps Bahawal Garg Qadeem 2-Jun-15 862.00 1,145,598 N/A 420 745,140 1,890,738

27 39 Ggps Tabqrah 2-Jun-15 512.00 680,448 N/A N/A 680,448

28 40 Ggps Basti Hazara Singh 2-Jun-15 480.00 637,920 32 42,528 404 717,668 1,398,116

29 25 Gps Chak No. 89/5-R 3-Jun-15 1515.00 2,013,435 40 53,160 480 848,160 2,914,755

30 26 Gps Chak No. 6/1-R 3-Jun-15 1092 1,451,268 24 31,896 428 758,876 2,242,040

31 27 Ggps Chak No. 105/6-R 3-Jun-15 541.00 718,989 72 95,688 410 727,970 1,542,647

32 28 Ggps Chak No. 136/6-R 3-Jun-15 955 1,269,195 N/A N/A 1,269,195

33 29 Ggps Chak No. 136/6-R 3-Jun-15 1460.00 1,940,340 66 87,714 440 779,480 2,807,534

34 18 Fortabbas / Bahawalnagar Ggps Chak No. 233/9-R 4-Jun-15 1872.00 2,487,888 N/A 200 367,400 2,855,288

35 19 Fortabbas / Bahawalnagar Ggps City Fort Abbas 4-Jun-15 864.00 1,148,256 48 63,792 60 127,020 1,339,068

36 20 Fortabbas / Bahawalnagar Ggps Chak No. 204/ Hb 4-Jun-15 773.00 1,027,317 N/A N/A 1,027,317

37 21 Fortabbas / Bahawalnagar Ggps Chak No. 259/ Hi 4-Jun-15 624.00 829,296 N/A 60 127,020 956,316

38 22 Fortabbas / Bahawalnagar Ggps Chak No. North 241/ Hi 5-Jun-15 1064.00 1,414,056 N/A N/A 1,414,056

39 23 Fortabbas / Bahawalnagar Ggps Chak No. 175/7-R 5-Jun-15 2030.00 2,697,870 20 26,580 N/A 2,724,450

40 24 Fortabbas / Bahawalnagar Ggps Chak No. 186/7-R-E 5-Jun-15 1190 1,581,510 N/A 318 570,006 2,151,516

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Minchinabad / Bahawalnagar

Haroonabad / Bahawalnagar

Haroonabad / Bahawalnagar

Haroonabad / Bahawalnagar

Haroonabad / Bahawalnagar

Haroonabad / Bahawalnagar

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

40 Total Amount= 54,878,397 1,138,953 10,273,844 66,291,194

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Ges Dera Ismail 6-Jun-15 ok ok ok - Found Satisfactory

2 2 8-Jun-15 3012 4,002,948 ok ok 4,002,948

3 3 7-Jun-15 900 1,196,100 ok ok 1,196,100

4 4 7-Jun-15 1297 1,723,713 ok ok 1,723,713

5 5 Gps Sadiq pur 7-Jun-15 Main building under new construction. Work inprogress ok -

6 6 Gps Butta shakhan 6-Jun-15 ok -

7 7 Gps ghulam nabi lar 8-Jun-15 1210 1,608,090 ok ok 1,608,090

8 8 Gps Neel garh 6-Jun-15 1505 2,000,145 ok ok 2,000,145

9 9 Gps chak no 131/1-L 6-Jun-15 -

10 10 Gps bagh wala 8-Jun-15 558 741,582 ok ok 741,582

11 11 Gps Basti Mosani 6-Jun-15 1009 1,340,961 ok ok 1,340,961

12 12 7-Jun-15 1313 1,744,977 ok ok 1,744,977

13 13 Ggps murri thull 7-Jun-15 Only Roof Damaged ok ok -

14 14 Gps basti bhutian 7-Jun-15 Main building under new construction. Work inprogress ok -

15 15 Gps chak no 137/1-L 8-Jun-15 1282 1,703,778 ok ok 1,703,778

16 16 Ggps basti ghulam 8-Jun-15 936 1,243,944 ok ok 1,243,944

17 17 Ggps malik pur 8-Jun-15 Main building under new construction. Work inprogress ok -

18 18 Ggps Mud gadola 8-Jun-15 936 1,243,944 ok ok 1,243,944

19 19 Ggps chak no 104/1-L 6-Jun-15 ok -

Sr. No.

List Sr. No.

Tehsil / District

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Gges basti haji abdullha

Khan Pur/ Rahimyarkhan

Gps Lara basti Rehmania

Khan Pur/ Rahimyarkhan

Gps Islam khan abbasi

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Main building under new construction. Work Complete 100%

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Main building under new construction. Work Complete 100%

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Gps moadib saeed abad

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Khan Pur/ Rahimyarkhan

Olny boundry wall constructed. Main building are not constructed

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Tehsil / District

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

20 20 Ggps chak no 123/1-L 6-Jun-15 1450 1,927,050 63 83,727 ok 2,010,777

21 40 Gghschak no 140/p 5-Jun-15 6084 8,085,636 126 167,454 198 363,966 8,617,056

22 41 Gps Chak 107/P 2-Jun-15 Main building under new construction. Work inprogress ok -

23 42 5-Jun-15 4746 6,307,434 70 93,030 ok 6,400,464

24 43 Gps chak no 121/p 5-Jun-15 924 1,227,996 ok ok 1,227,996 Double story

25 44 Gps Chak 123/P-B 2-Jun-15 952 1,265,208 ok ok 1,265,208

26 45 Gps chak no 224/p 5-Jun-15 816 1,084,464 ok ok 1,084,464

27 46 Gps Wah Faqeeran 2-Jun-15 464 616,656 ok ok 616,656 Double story

28 47 Gps chak no 82/p 5-Jun-15 1792 2,381,568 ok ok 2,381,568

29 48 Gps Chak 109/P 2-Jun-15 896 1,190,784 ok ok 1,190,784 Double story

30 49 Gps haji pur 4-Jun-15 1169 1,553,601 ok ok 1,553,601

31 50 Gps chak 72/Np 4-Jun-15 Main building under new construction. Work inprogress ok -

32 51 Gps baghoon 4-Jun-15 Main building under new construction. Work inprogress ok -

33 52 Gps basti khokran 4-Jun-15 613 814,677 ok ok 814,677

34 53 Gps chak 18000/rd 4-Jun-15 1148 1,525,692 ok ok 1,525,692

35 54 Gps kot haq nawaz 4-Jun-15 1169 1,553,601 ok ok 1,553,601

Khan Pur/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Gges MC Abbasia mills Area

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Tehsil / District

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

36 55 Gps kot samaba 4-Jun-15 880 1,169,520 ok ok 1,169,520 Double story

37 56 Ggps Mustafa abad 4-Jun-15 936 1,243,944 ok ok 1,243,944

38 57 Ggps chak no 227/p 5-Jun-15 936 1,243,944 54 71,766 292 525,364 1,841,074

39 58 Ggps chak no 56/pb 5-Jun-15 817 1,085,793 54 71,766 ok 1,157,559

40 59 Ggps Chak 121/P 2-Jun-15 1472 1,956,288 70 93,030 82 164,794 2,214,112

41 60 Ggps chak 144/p west 5-Jun-15 936 1,243,944 ok 75 152,775 1,396,719

42 61 Ggps peer pulia sha 5-Jun-15 1053 1,399,437 ok ok 1,399,437

43 62 Ggps Chak 55/Np 4-Jun-15 1469 1,952,301 73 97,017 ok 2,049,318

44 63 Ggps Jeand wali 4-Jun-15 Main building under new construction. Work inprogress ok -

45 64 Ggps chak no 85/p 5-Jun-15 896 1,190,784 ok ok 1,190,784 Double story

46 65 Ggps sultan Pur 4-Jun-15 Main building under new construction. Work Complete 100% ok -

47 66 Ggps basti hasim 5-Jun-15 499 663,171 45 59,805 414 734,838 1,457,814

48 67 4-Jun-15 Main building under new construction. Work Complete 100% ok -

49 68 Gps Chak 161/P 3-Jun-15 960 1,275,840 45 59,805 ok 1,335,645

50 69 Gps Aahata Legari 3-Jun-15 Main building under new construction. Work inprogress ok -

51 70 Ggps Gorrhila 3-Jun-15 Main building under new construction. Work inprogress ok -

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

One side boundry wall damaged

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Rahimyarkhan/ Rahimyarkhan

Ggps Basti mola baksh

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Tehsil / District

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

52 71 Gps Chak No132/P 3-Jun-15 349 463,821 ok ok 463,821

53 72 Ggps Chak No 149/P 3-Jun-15 419 556,851 53 70,437 ok 627,288

54 73 Ggps Chak No 170/P 3-Jun-15 352 467,808 ok ok 467,808

55 74 Ggps 261/P 3-Jun-15 Main building under new construction. Work inprogress -

56 75 Ggps Basti ilam Din 3-Jun-15 Main building under new construction. Work inprogress -

57 76 Ggps Kotila Jaffar 3-Jun-15 Main building under new construction. Work inprogress -

58 77 Ggps Chak No 204/P 3-Jun-15 1506 2,001,474 68 90,372 ok 2,091,846

59 78 Ggps Chak No 216/P 3-Jun-15 Main building under new construction. Work inprogress ok -

60 79 Ggps Chak No 264/P 3-Jun-15 Main building under new construction. Work inprogress ok -

61 80 Ggps Thala sharif 3-Jun-15 Main building under new construction. Work inprogress ok -

62 21 Gps Chak 31/A 9-Jun-15 1316 1,748,964 N/A N/A 1,748,964

63 22 9-Jun-15 1169 1,553,601 N/A N/A 1,553,601

64 23 Gps gulan lar 9-Jun-15 1925 2,558,325 ok N/A 2,558,325

65 24 9-Jun-15 1384 1,839,336 41 54,489 1,893,825

66 25 9-Jun-15 1308 1,738,332 Nill N/A 1,738,332

67 26 Gps Ahmad nagar 9-Jun-15 465 617,985 ok N/A 617,985

68 27 9-Jun-15 1056 1,403,424 ok N/A 1,403,424

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Sadiqabad/ Rahimyarkhan

Liaqat Pur / Rahimyarkhan

Liaqat Pur / Rahimyarkhan

Gps Chah Mehmood Khan

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Gps Sharif mohammad

Liaqat Pur/ Rahimyarkhan

Gps Rehmat ali amin abad

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Gps Basti sher mohammad

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Tehsil / District

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

69 28 Gps Jageer sarani 9-Jun-15 1316 1,748,964 ok N/A 1,748,964

70 29 9-Jun-15 Olny boundry wall & Toilet constructed. Main building are not constructed -

71 30 9-Jun-15 1451 1,928,379 ok N/A 1,928,379

72 31 9-Jun-15 450 598,050 ok N/A 598,050

73 32 Gps Miani achaa 10-Jun-15 Main building under new construction. Work Complete 100% -

74 33 Gps Din md lar 10-Jun-15 1148 1,525,692 45 59,805 N/A 1,585,497

75 34 Gps dufli kabeer khan 10-Jun-15 873 1,160,217 ok N/A 1,160,217

76 35 9-Jun-15 486 645,894 ok N/A 645,894

77 36 9-Jun-15 1105 1,468,545 ok N/A 1,468,545

78 37 Ggps Chak no 9 /A 9-Jun-15 Main building under ner construction instead of existing damage building. -

79 38 Ggps Faiz rasool shah 9-Jun-15 962 1,278,498 45 59,805 N/A 1,338,303

80 39 9-Jun-15 962 1,278,498 ok N/A 1,278,498

80 Total Amount 89,092,173 1,132,308 1,941,737 92,166,218

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Gps Basti hamid gasoora

Liaqat Pur/ Rahimyarkhan

Gps Basti khan mohammad

Liaqat Pur/ Rahimyarkhan

Gps Chak no 116/ ANP

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Ggps Jam jan mohammad

Liaqat Pur/ Rahimyarkhan

Ggps Basti rehman bukhsh

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Liaqat Pur/ Rahimyarkhan

Ggps Allah bachaya behla

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 3 D.G.Khan/D.G.khan Ggmes Ranjhay Wali 16-May-15 216.00 65 640 Under Construction

2 5 D.G.Khan/D.G.khan Gps Sarwar Wali Po Drahma 16-May-15 1498.50 65 N.A Under Construction

3 6 D.G.Khan/D.G.khan Gps Basti Marasi Po Samina 16-May-15 2079.00 2,767,149 - 163.5 309,144 3,076,293

4 17 D.G.Khan/D.G.khan Gps Jalo Wala 16-May-15 348.75 464,186 65 86,515 N.A 550,701

5 29 D.G.Khan/D.G.khan Gmps Mc No. 4 16-May-15 2238.72 2,979,736 63 83,853 120 233,280 3,296,869

6 10 D.G.Khan/D.G.khan Gps Jamala 18-May-15 N.A N.A N.A

7 26 D.G.Khan/D.G.khan Ggps Jan Muhammad Khalry 18-May-15 1474.60 1,962,693 20.25 26,953 160 303,040 2,292,685

8 27 D.G.Khan/D.G.khan 18-May-15 1024.00 1,362,944 20.25 26,953 28.5 73,704 1,463,601

9 35 Kot Chutta/D.G.khan Gps Muhammad Abad 18-May-15 1243.80 1,655,491 22.5 29,948 N.A 1,685,439

10 37 Kot Chutta/D.G.khan Gps Kot Chutta No. 1 18-May-15 702.17 934,588 N.A N.A 934,588

11 9 D.G.Khan/D.G.khan Gps Qadir Wala 19-May-15 736.78 980,648 N.A N.A 980,648

12 16 D.G.Khan/D.G.khan Gps Gamoon Wala 19-May-15 295.21 392,918 53.40 71,079 N.A 463,997

13 18 D.G.Khan/D.G.khan Gps Kanhoon Wala 19-May-15 1235.50 1,644,451 N.A N.A 1,644,451

14 20 D.G.Khan/D.G.khan Ggps Gudpur 19-May-15 508.05 676,215 43.97 58,527 188 351,872 1,086,614

15 23 D.G.Khan/D.G.khan Ggps Desi Wala No. 1 19-May-15 1073.00 1,428,163 27.31 36,353 420 756,480 2,220,996

16 24 D.G.Khan/D.G.khan Ggps Farooq Nagar 19-May-15 1533.75 2,041,421 N.A N.A 2,041,421

17 33 Kot Chutta/D.G.khan Gps Ghaibi Wala 19-May-15 796 1,059,476 20.25 26,953 N.A 1,086,429

18 34 Kot Chutta/D.G.khan Gps Shahal Wala 19-May-15 456.42 607,490 30.25 40,263 N.A 647,753

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Demolished room area is also included in it.

Under Construction and Drawing is attached.

Ggps Mujahid Abad Shakoor Abad Colony

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

19 38 Kot Chutta/D.G.khan Ggps Lurkay Wala 19-May-15 1364.75 N.A 370 Under Construction

20 40 Kot Chutta/D.G.khan Ggps Basti Malana 2 19-May-15 1448 1,927,288 20.25 26,953 N.A 1,954,241 Residential Area

21 4 D.G.Khan/D.G.khan Gps Nawan Janubi 20-May-15 N.A N.A N.A Under Construction

22 13 D.G.Khan/D.G.khan Gps Kalay Wala 20-May-15 521.7 694,383 N.A N.A 694,383

23 21 D.G.Khan/D.G.khan Ggps Walan Buzdar 20-May-15 884 1,176,604 61.02 81,218 196 365,824 1,623,646

24 25 D.G.Khan/D.G.khan Ggcms Basti Sheroo 20-May-15 N.A N.A N.A

25 32 Kot Chutta/D.G.khan Gps Dilshad Wala No 2 20-May-15 599.5 797,935 N.A 11000 19,208,000 20,005,935

26 36 Kot Chutta/D.G.khan Gps Tibba Jalbani 20-May-15 1111.25 1,479,075 34.88 46,419 N.A 1,525,494

27 39 Kot Chutta/D.G.khan Ggps Model Basti Doosa 20-May-15 1005 1,337,655 31.63 42,093 N.A 1,379,748

28 8 D.G.Khan/D.G.khan Gps Shadan Lund No 2 21-May-15 877.5 1,167,953 54 71,874 284.25 519,732 1,759,559

29 19 D.G.Khan/D.G.khan Gps Bait Cheen Wala 21-May-15 533.83 710,528 N.A N.A 710,528

30 22 D.G.Khan/D.G.khan Ggps Basti Darkhan 21-May-15 530.63 706,269 N.A N.A 706,269

31 1 D.G.Khan/D.G.khan Gghs Kot Mubarak 22-May-15 6504 8,656,824 123.5 164,379 N.A 8,821,203

32 28 D.G.Khan/D.G.khan Ggps Basti Laghore 22-May-15 1315 1,750,265 N.A N.A 1,750,265

33 11 D.G.Khan/D.G.khan Gps Pathan Mole 22-May-15 825.31 1,098,491 128 170,368 N.A 1,268,859

34 7 D.G.Khan/D.G.khan Gps Rakh Kala 23-May-15 506.25 673,819 N.A N.A 673,819

35 14 D.G.Khan/D.G.khan Gps Subzani 23-May-15 N.A N.A N.A - Under Construction

School is in Fair Condition but Electrification work is required. Repair Work in Room No.1 is needed.

Boundary Wall Does not Exist.

Toilet block Does not Exist.

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

36 15 D.G.Khan/D.G.khan Gps Bait Chunrah 23-May-15 660 878,460 N.A N.A 878,460

37 30 D.G.Khan/D.G.khan Ggps Mc No.6 D.G. Khan 23-May-15 1286.5 1,712,332 27 35,937 210 390,240 2,138,509

38 64 Taunsa/D.G.khan Ggcms Peharah 23-May-15 5346 7,115,526 315 419,265 420 756,480 8,291,271

39 65 Taunsa/D.G.khan Ggps Malkani 23-May-15 1309 1,742,279 70 93,170 420 1,835,449

40 48 Taunsa/D.G.khan Gps Harni Wali 23-May-15 1261 1,678,391 N.A N.A 1,678,391

41 67 Taunsa/D.G.khan Gmps Jhangi Darmiani 25-May-15 1442 1,919,302 - N.A 1,919,302

42 44 Taunsa/D.G.khan Ges Kath Garh 25-May-15 3336.69 4,441,131 N.A N.A 4,441,131

43 51 Taunsa/D.G.khan Gps Babi 25-May-15 540 718,740 45 59,895 322 778,635

44 66 Taunsa/D.G.khan Ggps Bubi Taunsa 25-May-15 397.76 529,419 - - 529,419

45 68 Taunsa/D.G.khan Ggps Nutkani No.2 P/O Nutkani 25-May-15 5052.25 6,724,545 42 55,902 428 770,432 7,550,879

46 43 Taunsa/D.G.khan Ges Bughlani 26-May-15 N.A N.A N.A -

47 46 Taunsa/D.G.khan Gges Mundrani 26-May-15 5123.54 6,819,425 N.A N.A 6,819,425

48 61 Taunsa/D.G.khan Gps Munda 26-May-15 615 N.A N.A

49 49 Taunsa/D.G.khan Gps Baichra 27-May-15 852.11 1,134,158 N.A N.A 1,134,158

50 47 Taunsa/D.G.khan Gges Jind Wanga 5-Jun-15 2702 3,596,362 N.A N.A 3,596,362

A new building has already been constructed in nearby area.In future, this school staff will be shifted there.

This School is already under construction with the help of Local People.

Requires Extra Room due to large enrollment of students.

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

51 45 Taunsa/D.G.khan Ges Sardar Kalat 6-Jun-15 4404.75 5,862,722 N.A N.A 5,862,722

52 62 Taunsa/D.G.khan Gps Kohr Khantik 6-Jun-15 1674 2,228,094 N.A N.A 2,228,094

53 71 Taunsa/D.G.khan Ggps Thalang Bun 6-Jun-15 1311 1,744,941 86.25 114,799 374 676,256 2,535,996

54 72 Taunsa/D.G.khan Ggps Bharti No.1 6-Jun-15 957 1,273,767 89.25 118,792 420 756,480 2,149,039

55 31 Taunsa/D.G.khan Ggps Chanala 8-Jun-15 1053 1,401,543 N.A N.A 1,401,543

56 54 Taunsa/D.G.khan Ggps Makha 8-Jun-15 512 681,472 N.A N.A 681,472

57 59 Taunsa/D.G.khan Ggps Lari 8-Jun-15 612 814,572 N.A N.A 814,572

58 70 Taunsa/D.G.khan Ggps Marki 8-Jun-15 1471.5 1,958,567 45 59,895 N.A 2,018,462

58 Total Amount= 98,110,402 2,048,353 25,470,964 125,629,719

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 27 Kot Adu / Muzaffargarh Ggps Malik Wala 23-May-15 999.83 1,330,774 47.537 63,272 290 529,760 1,923,805

2 17 Kot Adu / Muzaffargarh Gges /507 25-May-15 2747.21 3,656,530 117.29 156,113 1199.64 2,116,172 5,928,815

3 18 Kot Adu / Muzaffargarh Gps 503/tda 25-May-15 1216.00 1,618,496 46.125 61,392 520.32 931,438 2,611,326

4 22 Kot Adu / Muzaffargarh Ggps 600 25-May-15 1366.40 1,818,678 49.5 65,885 285 521,040 2,405,603

5 25 Kot Adu / Muzaffargarh Ggps 510 25-May-15 540.00 718,740 36 47,916 436 784,384 1,551,040

6 19 Kot Adu / Muzaffargarh Gps Pirzada 26-May-15 1600.00 2,129,600 60 79,860 440 791,360 3,000,820

7 20 Kot Adu / Muzaffargarh Gps Nazar Abad 26-May-15 980.00 1,304,380 115 153,065 420 756,480 2,213,925

8 26 Kot Adu / Muzaffargarh Ggps 541 26-May-15 1044.00 1,389,564 24 31,944 420 756,480 2,177,988

9 21 Kot Adu / Muzaffargarh Gps Chah Chokhan Wala 30-May-15 687.00 914,397 30 39,930 420 756,480 1,710,807

10 23 Kot Adu / Muzaffargarh Ggps Noor Muhammad Wala 30-May-15 1436.00 1,911,316 60 79,860 420 756,480 2,747,656

11 28 Kot Adu / Muzaffargarh Ggps Mochi Wala 30-May-15 1948.00 2,592,788 60 79,860 420 756,480 3,429,128

12 29 Muzaffargarh Gps Sheray Wala 2-Jun-15 710.00 945,010 60 79,860 416 749,504 1,774,374

13 32 Muzaffargarh Gps Jal Wala 3-Jun-15 960.00 1,277,760 90 119,790 1380 2,430,720 3,828,270

14 35 Muzaffargarh Gps Masood Abad 4-Jun-15 1120.00 1,490,720 72 95,832 420 756,480 2,343,032

15 30 Muzaffargarh Gps Panjgrain 4-Jun-15 820.00 1,091,420 60 79,860 680 1,209,920 2,381,200

16 36 Muzaffargarh Ggps Dera Fazil 5-Jun-15 1200.00 1,597,200 72 95,832 420 756,480 2,449,512

17 31 Muzaffargarh Gps Biloo Sandila 5-Jun-15 2186.00 2,909,566 60 79,860 1400 2,465,600 5,455,026

18 33 Muzaffargarh Gps Basti Samajay Wala 6-Jun-15 704.00 937,024 60 79,860 420 756,480 1,773,364

19 34 Muzaffargarh Gps Kashif Nagar 6-Jun-15 1820.00 2,422,420 60 79,860 420 756,480 3,258,760

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

20 15 Jatoi / Muzaffargarh Ggps Tamghay Wala 8-Jun-15 1436.00 1,911,316 60 79,860 408 735,552 2,726,728

21 11 Jatoi / Muzaffargarh Gges Bakaini 8-Jun-15 3048.00 4,056,888 45 59,895 561 1,002,384 5,119,167

22 16 Jatoi / Muzaffargarh Ggps Basti Laghari Wala 8-Jun-15 1412.00 1,879,372 90 119,790 420 756,480 2,755,642

23 5 Alipur / Muzaffargarh Gps Peer Jhandeer 10-Jun-15 523.00 696,113 90 119,790 435 782,640 1,598,543

24 6 Alipur / Muzaffargarh Gps Basti Namberdar 10-Jun-15 480.00 638,880 90 119,790 1070 1,890,080 2,648,750

25 10 Alipur / Muzaffargarh Ggps Aghrani 10-Jun-15 936.00 N/A N/A N/A 420 N/A N/A New Construction

26 2 Alipur / Muzaffargarh Gps Karch Wala 9-Jun-15 887.50 1,181,263 60 79,860 531 950,064 2,211,187

27 1 Alipur / Muzaffargarh Gps Ali Wali 9-Jun-15 1680.00 2,236,080 180 239,580 1523 2,680,112 5,155,772

28 9 Alipur / Muzaffargarh Ggps Noorani 9-Jun-15 1412.00 1,879,372 90 119,790 221 409,424 2,408,586

29 24 Kot Adu / Muzaffargarh Ggps Haji Wala No. 2 15-Jun-15 936.00 1,245,816 60 79,860 358 648,352 1,974,028

30 8 Alipur / Muzaffargarh Ggps Yaki Wali No. 2 13-Jun-15 980.00 1,304,380 90 119,790 418 752,992 2,177,162

31 7 Alipur / Muzaffargarh Gps Basti Qureshi 13-Jun-15 880.00 1,171,280 90 119,790 114 222,816 1,513,886

32 4 Alipur / Muzaffargarh Gps Ameer Pur Daha 12-Jun-15 728.00 968,968 90 119,790 1,088,758

33 3 Alipur / Muzaffargarh Gps Mohib Shah 12-Jun-15 352.00 468,512 90 119,790 420 756,480 1,344,782

34 13 Jatoi / Muzaffargarh Gps Kach Pak 11-Jun-15 2808.00 3,737,448 60 79,860 800 1,419,200 5,236,508

35 14 Jatoi / Muzaffargarh Gps Jatoi Road 11-Jun-15 528.00 702,768 50 66,550 769,318

36 12 Jatoi / Muzaffargarh Gps Azizabad 11-Jun-15 506.00 673,486 60 79,860 400 721,600 1,474,946

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

36 Total Amount= 56,808,324 3,293,496 33,066,394 93,168,214

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 Chaubara / Layyah Gps Chak No 343 Tda - - 24,000 24,000

2 Chaubara / Layyah Gps Chak No 300 Tda - - 24,000 24,000

3 Chaubara / Layyah Gps Chak No 331 Tda - - 24,000 24,000

4 Chaubara / Layyah Ggps Chak No 312 Tda - - 24,000 24,000

5 Chaubara / Layyah Ggps Chak No 313 Tda - - 24,000 24,000

6 Karor Lalisan / Layyah Gps Chak No 237 Tda - - 24,000 24,000

7 Karor Lalisan / Layyah Gps Chak No 92 / MI - - 24,000 24,000

8 Karor Lalisan / Layyah Gps Chak No 96 / MI - - 24,000 24,000

9 Karor Lalisan / Layyah Gps Chak No 112 / MI - - 24,000 24,000

10 Karor Lalisan / Layyah Gps Jhalareen - - 24,000 24,000

11 Karor Lalisan / Layyah Gps Garay Wala Ward No. 13 - - 24,000 24,000

12 Karor Lalisan / Layyah Gps Chak No 254 Tda - - 24,000 24,000

13 Karor Lalisan / Layyah Gps Chak No 115-A Tda - - 24,000 24,000

14 Karor Lalisan / Layyah Ggps Basti Allah Yar - - 24,000 24,000

15 Karor Lalisan / Layyah Gps Chak No 253 Tda - - 24,000 24,000

16 16 Layyah 10-Jun-15 882.00 1,173,942 N/A N/A 1,173,942

17 17 Layyah Gps Chak No 173 Tda 10-Jun-15 1035.00 1,377,585 N/A N/A 1,377,585

18 18 Layyah 5-Jun-15 3360.00 4,472,160 90 119,790 N/A 4,591,950

19 19 Layyah Gps Mc No. 5 Layyah 5-Jun-15 N/A N/A N/A - Rental Building

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Gps Zafar Wala Jadeed Chak No. 170 Tda

Gps Mc No. 3 Near Railway Station

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

20 20 Layyah Gps Basti Qazi 10-Jun-15 384.00 511,104 N/A N/A 511,104

21 21 Layyah Gps Chak No 150-A Tda 960.00 1,277,760 N/A N/A 1,277,760

6 Total Amount= 8,812,551 119,790 360,000 9,292,341

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 15 SARGODHA Ggps Fazil Down 21-May-15 1983.33 2,645,762 164.25 219,110 458.72 839,604 3,704,476

2 13 SARGODHA Ggps Dera Ramzan 21-May-15 1382.65 1,844,455 67.86 90,525 407 747,646 2,682,626

3 9 SARGODHA Gps Chak No.27 Nb 21-May-15 1270.42 1,694,740 86.31 115,138 366 674,748 2,484,626

4 12 SARGODHA Ggps Chak No.25 Nb 21-May-15 1748.17 2,332,059 75 100,050 384 706,752 3,138,861

5 16 SARGODHA Ggps Sher Dil Chowk 21-May-15 2087.76 2,785,072 122.59 163,535 100 201,800 3,150,407

6 10 SARGODHA Gps Chak No.54 Nb 22-May-15 1325.61 1,768,364 98.54 131,452 1187 2,134,486 4,034,302

7 19 SARGODHA Ggps Chak No.60 Nb 22-May-15 692.21 923,408 68.62 91,539 414 760,092 1,775,039

8 18 SARGODHA Ggps Chak No.53 A-Nb 22-May-15 1606.00 2,142,404 46.25 61,698 259 484,502 2,688,604

9 11 SARGODHA Gps Wattian Wali 22-May-15 474.50 632,983 28.15 37,552 450 824,100 1,494,635

10 17 SARGODHA Ggps Chak No.5 Rakh dharema 22-May-15 1478.50 1,972,319 67.79 90,432 406 745,868 2,808,619

11 14 SARGODHA Ggps Chak No.101 Nb New 23-May-15 954.00 1,272,636 45.8 61,097 760 1,375,280 2,709,013

12 26 Sillanwali / Sargodha Ggps Chak No.126 Nb 23-May-15 447.65 597,165 31.25 41,688 230 432,940 1,071,793

13 25 Sillanwali / Sargodha Ghs Chak No.156 Nb 23-May-15 4786.00 6,384,524 N/A 1700 3,046,600 9,431,124

14 1 Bhalwal / Sargodha Gps Chak No.22 Nb Jinnah 24-May-15 932.00 1,243,288 81.98 109,361 278 518,284 1,870,933

15 3 Bhalwal / Sargodha Gps Islam pura Chak No.17 Nb 24-May-15 1289.00 1,719,526 48 64,032 544 991,232 2,774,790

16 2 Bhalwal / Sargodha Gps Naryala 24-May-15 968.00 1,291,312 52 69,368 418 767,204 2,127,884

17 4 Bhalwal / Sargodha GPS Pul Nehar Salam 24-May-15 705.00 940,470 37 49,358 263 491,614 1,481,442

18 5 Bhalwal / Sargodha Ggps Jewan wal 24-May-15 468.00 624,312 93 124,062 318 589,404 1,337,778

19 20 Shahpur / Sargodha GPS Ichhar 25-May-15 1337.00 1,783,558 63 84,042 467 854,326 2,721,926

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

20 22 Shahpur / Sargodha Ggps Radha Nagar 25-May-15 1215.00 1,620,810 67.85 90,512 291 541,398 2,252,720

21 21 Shahpur / Sargodha Gps Suleman Abad 25-May-15 2521.87 3,364,175 56 74,704 1046 1,883,788 5,322,667

22 23 Shahpur / Sargodha Ggps Chak Umer 25-May-15 871.50 1,162,581 41.94 55,948 349 644,522 1,863,051

23 24 Shahpur / Sargodha Ggps Kahoot 25-May-15 918.00 1,224,612 38 50,692 190 361,820 1,637,124

24 7 Sahiwal / Sargodha Gps Chack Chajoo 26-May-15 808.00 1,077,872 N/A N.A 1,077,872

25 8 Sahiwal / Sargodha Gps Ali Pur 26-May-15 686.00 915,124 42 56,028 337.5 624,075 1,595,227

26 6 Kot Momin / Sargodha Gmps Haveli Mian Sher Ali 27-May-15 1557.56 2,077,785 85 113,390 252 472,056 2,663,231

26 Total = 46,041,316 2,145,312 21,714,141 69,900,769

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 2 Khushab Gges Jaswal 29-May-15 1575.00 2,101,050 92 122,728 681 1,234,818 3,458,596

2 3 Khushab Gps Thalhi Sandral 29-May-15 1373.00 1,831,582 65 86,710 440 806,320 2,724,612

3 7 Khushab Ggps Chak No. 59 MB 29-May-15 1425.00 1,900,950 71 94,714 380 699,640 2,695,304

4 8 Khushab Ggps Pindi Mehrwal 29-May-15 910.00 1,213,940 102 136,068 318 589,404 1,939,412

5 9 Khushab Ggps Waheer 29-May-15 1281.00 1,708,854 106 141,404 358 660,524 2,510,782

6 4 Khushab Gps Sheikhu 30-May-15 1336.00 1,782,224 66 88,044 544 991,232 2,861,500

7 5 Khushab Gps Kamray Wala 30-May-15 966.00 1,288,644 65 86,710 4005 7,144,890 8,520,244

8 6 Khushab Ggps Nikhamal 30-May-15 1425.00 1,900,950 71 94,714 194 368,932 2,364,596

9 10 Khushab Gmps Hussain Abad 30-May-15 1482.00 1,976,988 56 74,704 397 729,866 2,781,558

10 13 Quaidabad / Khusab Ghs Bhan Sultan Wala 30-May-15 10503.00 14,011,002 135 180,090 1415 2,539,870 16,730,962

11 14 Quaidabad / Khusab Ggps Chusoo 30-May-15 1280.00 1,707,520 57 76,038 418 767,204 2,550,762

12 15 Quaidabad / Khusab Ggps Gunjail 30-May-15 1436.00 1,915,624 58 77,372 306 568,068 2,561,064

13 1 Khushab Ges Lukoo 31-May-15 6144.00 8,196,096 130 173,420 1540 2,762,120 11,131,636

14 11 Gps Dera Farid Khail 31-May-15 661.00 881,774 68 90,712 430 788,540 1,761,026

15 12 Ggps Easan Khail 31-May-15 1465.00 1,954,310 66 88,044 1540 2,762,120 4,804,474

15 Total = 44,371,508 1,611,472 23,413,548 69,396,528

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)

Noor Pur Thal / Khushab

Noor Pur Thal / Khushab

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School Date of Visit

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 37 Mianwali Ggps Khanqa Baba Hafiz Gi 6-Jun-15 1386.00 1,848,924 68 90,712 418 767,204 2,706,840

2 36 Mianwali Ggps Dhok Zaman Chakrala 6-Jun-15 1043.00 1,391,362 42 56,028 418 767,204 2,214,594

3 38 Mianwali Ggps Dhok Karamullah 6-Jun-15 1020.00 1,360,680 64 85,376 418 767,204 2,213,260

4 22 Mianwali Gps Dhok Gazi Khail 6-Jun-15 372.00 496,248 33 44,022 210 397,380 937,650

5 18 Mianwali Gps Jewaan Shah 9-Jun-15 679.00 905,786 130 173,420 410 752,980 1,832,186

6 20 Mianwali Gps Esab Khan Wala 9-Jun-15 841.00 1,121,894 80 106,720 440 806,320 2,034,934

7 40 Piplan / Mianwali Gps Winota 10-Jun-15 1192.00 1,590,128 120 160,080 295 548,510 2,298,718

8 39 Piplan / Mianwali Gges Chak No 18 Ml 10-Jun-15 7267.00 9,694,178 213 284,142 1046 1,883,788 11,862,108

9 41 Piplan / Mianwali Ggps Baharay Wala 11-Jun-15 956.00 1,275,304 69 92,046 201 381,378 1,748,728

10 42 Piplan / Mianwali Ggps Ahmad Shah Wali 13-Jun-15 949.00 1,265,966 65 86,710 230 432,940 1,785,616

11 29 Mianwali Ggps Hakim Khan Wala 15-Jun-15 949.00 1,265,966 25 33,350 1,299,316

12 30 Mianwali Ggps Muzaffar Pur Colony 15-Jun-15 1419.00 1,892,946 85 113,390 2,006,336

13 27 Mianwali Ggps Mohamad Khelan Wala 15-Jun-15 495.00 660,330 30 40,020 700,350

14 19 Mianwali Gps Baig Khelan Wala 15-Jun-15 940.00 1,253,960 50 66,700 1,320,660

15 25 Mianwali Ggps Hanif Khelan Wala 15-Jun-15 1234.00 1,646,156 37.12 49,518 1,695,674

16 28 Mianwali Ggps Dera Mohammad Bakhs 15-Jun-15 1404.00 1,872,936 65 86,710 1,959,646

17 31 Mianwali Ggps Dewan Khelan Wala 16-Jun-15 950.00 1,267,300 65 86,710 198 376,044 1,730,054

18 26 Mianwali Ggps Aziz Kehan Wala 17-Jun-15 936.00 1,248,624 30 40,020 152 294,256 1,582,900

19

Sr. No.

List Sr. No.

Total Cost (Rs.) Covered

Area (Sft)Covered Area (Sft)

Cost (Rs.)

Building is in good condition

20

21

18 Total Amount= 32,058,688 1,695,674 8,175,208 41,929,570

PROJECT: IDENTIFICATION AND RECONSTRUCTION OF DANGEROUS SCHOOL BUILDINGS IN PUNJAB PROVINCEFORM TO BE FILLED IN BY THE CONSULTANT

A- CATEGORY- CRITICALLY DANGEROUS

Tehsil / District Name of School

Approximate Cost for Reconstruction of Critically Dangerous School Buildings

RemarksSchool Building Toilet Block Boundary Wall

Cost (Rs.) Length (Rft) Cost (Rs.)

1 1 Bhakkar Ggps Khanan Wala 2-Jun-15 982.00 1,309,988 118 157,412 657 1,192,146 2,659,546

2 2 Bhakkar Ggps Chak No. 78 ML 2-Jun-15 943.00 1,257,962 63 84,042 418 767,204 2,109,208

3 3 Bhakkar Ggps Dera Saidoo Shah 2-Jun-15 1001.00 1,335,334 65 86,710 418 767,204 2,189,248

4 4 Bhakkar Ggps Firdous Bungla 2-Jun-15 935.00 1,247,290 65 86,710 418 767,204 2,101,204

5 5 Bhakkar Ggps Namay Wala 2-Jun-15 990.00 1,320,660 65 86,710 616 1,119,248 2,526,618

6 10 Mankera / Bhakkar Gps Dullo Abad 3-Jun-15 559.00 745,706 63 84,042 402 738,756 1,568,504

7 11 Mankera / Bhakkar Gps Khand Shahian wala 3-Jun-15 743.00 991,162 61 81,374 600 1,090,800 2,163,336

8 12 Mankera / Bhakkar Ggps Islamabad 3-Jun-15 934.00 1,245,956 65 86,710 418 767,204 2,099,870

9 13 Mankera / Bhakkar Ggps Jhangi Peer Bakhsh 3-Jun-15 743.00 991,162 61 81,374 600 1,090,800 2,163,336

10 6 Kallur Kot / Bhakkar Gps Angra Shumali 4-Jun-15 962.00 1,283,308 63 84,042 836 1,510,408 2,877,758

11 7 Kallur Kot / Bhakkar Gps Choorri 4-Jun-15 934.00 1,245,956 65 86,710 418 767,204 2,099,870

12 8 Kallur Kot / Bhakkar Ggps Naswarain 4-Jun-15 1288.00 1,718,192 65 86,710 350 646,300 2,451,202

13 9 Kallur Kot / Bhakkar Ggps Dera Hakim Khaliq Wala 4-Jun-15 981.00 1,308,654 63 84,042 404 742,312 2,135,008

13 Total = 16,001,330 1,176,588 11,966,790 29,144,708

Sr. No.

List Sr. No.

Date of Visit Total Cost

(Rs.) Covered Area (Sft)

Covered Area (Sft)

Cost (Rs.)