detailed cost estimate

18

Upload: others

Post on 20-Feb-2022

27 views

Category:

Documents


0 download

TRANSCRIPT

SCOPE OF WORK:

1. Wiring and installation of Service Entrance

2. Installation of Main Protection Circuit Breaker

3. Construction of Concrete Metering Pole

4. Certification of Insulation Resistance Test

ITEM

NO.UNIT QTY. UNIT COST TOTAL COST

A.

Temporary Lighting & Water Facilities days 60 P P

Steel Barricade with caution tape (Rental) each 41

pc 1

Construction Safety and Healthpcs 9

pcs 9

pcs 7

pcs 7

pcs 9

pcs 7

pcs 7

Direct Cost A P

B

I

set 2

pcs 3

pairs 8

pcs 6

pcs 12

pc 1

pcs 5

pcs 3

pcs 1

set 2

pcs 2

pcs 4

II

mtrs 40

mtrs 80

mtrs 70

mtrs 20

roll 1

III

set 1

QC INFRA PROJECT

DETAILED COST ESTIMATE

WORK DESCRIPTION & SCOPE OF WORKS

PROGRAM OF WORK

PROJECT TITLE : PROPOSED INSTALLATION OF ELECTRICAL SERVICE ENTRANCE OF

GENERAL REQUIREMENT

Billboard

Safety Helmet

Safety Shoes

LAGRO SENIOR HIGH SCHOOL

LOCATION : ASENCION AVE., BARANGAY GREATER LAGRO, DISTRICT 5, QUEZON CITY

Safety Gloves

Vest

Face mask

Harness

Goggles

INSTALLATION OF ELECTRICAL SYSTEM

Roughing-ins

5Omm0 Entrance Cap Diecast US

5Omm0x 10' IMC Pipe

5Omm0 x 3/8" 0 U-bolt w/ nut and washer

2"0x1O'PVC Pipe

1 1/2"0x 10' PVC Pipe

1"0 x 10' PVC Pipe

2"0 x PVC Lonq Elbow

1 1/2"0 x PVC Long Elbow

1"0 x PVC Long Elbow

1 1/2"0 Entrance Cap Diecast US

1OOmm0 Solderless Connector w/two bolt

6Omm0 Solderless Connector w/two bolt

Wires & Cables

100mm2 THHN Wire (black)

60mm2 THHN Wire (black)

58mm2 THHN Wire (black)

30mm2 THHN Wire (white)

3.5mm2 THHN Wire

Panel board

Moulded Case Circuit Breaker 225 AT, CB, 2P, 230V, w/

Ground Terminal Enclosure Weatherproof Type in

"NEMA 12"

Industrial Type Page 1 of 3

ITEM

NO.UNIT QTY. UNIT COST TOTAL COST

IV Miscellaneous & Consumables

rolls 20

rolls 20

pcs 15

pcs 6

unit 1

Material Cost P

Labor Cost

Direct Cost B P

C.

lot 1

Direct Cost C P

D.

bags 18

cum 2

cum 3

kgs 170

kgs 4

kgs 4

bdft 300

3/4" x 4' x 8' Form plywood pcs 2

Material Cost P

Labor Cost

Direct Cost D P

E.

lot 1

Direct Cost E P

P

P

Duly authorized to sign Bid/Quote for and on behalf of

[Signature Over Printer Name] [in the capacity of]

350 MCM Solderiess Connector w/two bolt

Pipe/Conduit Supports, Brackets and Other Accessories

Electrical Tape

Rubber Tape Nitto

WORK DESCRIPTION & SCOPE OF WORKS

FABRICATED PVC BRACKETS

Fabricated PVC Brackets Ls

Cement

Sand

Gravel

Assorted RSB

Assorted CWN

2" x 3" x 12' Form lumber

GITie WireGa16

Certification of Insulation ResistanceTtest

INSULATION RESISTANCE TEST

500 MCM Solderless Connector w/two bolt

CONSTRUCTION OF CONCRETE DISTRIBUTION

POLE

Total Direct Cost

OCM

Profit

VAT

PROJECT COST

Page 2 of 3

A. P

B.

C.

D.

E.

P

P

Amount in Words: ________________________________________________________________________________

NAME OF COMPANY: _____________________________________________________________________

ADDRESS: _____________________________________________________________________

_____________________________________________________________________

Duly authorized to sign Bid/Quote for and on behalf of

[Signature Over Printer Name] [in the capacity of]

SUMMARY

GENERAL REQUIREMENT

SENIOR HIGH SCHOOL

Location: ASENCION AVE., BARANGAY GREATER LAGRO, DISTRICT 5, QUEZON CITY

ABC: P521,886.78

PROFIT

VAT

TOTAL ESTIMATED COST

Name of Project: PROPOSED INSTALLATION OF ELECTRICAL SERVICE ENTRANCE OF LAGRO

INSTALLATION OF ELECTRICAL SYSTEM

FABRICATED PVC BRACKETS

CONSTRUCTION OF CONCRETE DISTRIBUTION POLE

INSULATION RESISTANCE TEST

TOTAL DIRECT COST

OCM

Page 3 of 3

Item of Work MATERIALS INDIRECT AGGREGATE

(Description) COST COST COST

A. GENERAL REQUIREMENT

B.INSTALLATION OF ELECTRICAL SYSTEM

C. FABRICATED PVC BRACKETS

D. CONSTRUCTION OF CONCRETE

DISTRIBUTION POLEE. INSULATION RESISTANCE TEST

T O T A L

Amount in Words: ______________________________________________________________________________________

NAME OF COMPANY: _______________________________________________________________________

ADDRESS: ______________________________________________________________________________

Duly authorized to sign Bid/Quote for and on behalf of

[Signature Over Printer Name] [in the capacity of]

BREAKDOWN OF COST

LABOR COST

SENIOR HIGH SCHOOL

ABC: P521,886.78

Location: ASENCION AVE., BARANGAY GREATER LAGRO, DISTRICT 5, QUEZON CITY

Name of Project: PROPOSED INSTALLATION OF ELECTRICAL SERVICE ENTRANCE OF LAGRO