construction manager pre-proposal briefing · •engineers rfp issued oct 18, 2016 •engineers...

13
Walden Athletic Complex 320 Irwin Street, NE, Atlanta, GA 30312 Construction Manager Pre-Proposal Briefing Atlanta Public Schools Facilities Service Center March 25, 2010 Facilities Services Department February 28, 2017

Upload: others

Post on 31-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Walden Athletic Complex320 Irwin Street, NE, Atlanta, GA 30312

Construction ManagerPre-Proposal BriefingAtlanta Public Schools Facilities Service Center

March 25, 2010

Facilities Services Department

February 28, 2017

Page 2: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Overview

• Abatement and demolition of the existing 3 level, +/- 88,000 sf building• Drainage and storm water management systems• Site utilities, sewer, water, gas, electric, etc. • Grading and retaining structures• Sidewalk, ramps, steps, etc.• Parking and drives• Fencing, netting and gates• Drinking water to the fields • Irrigation to natural turf • Competition athletic lighting • Score boards and control systems• Public Address System • Synthetic turf football and multi-sport field with GHSA competition game markings• Natural turf baseball / softball field convertible by season with GHSA competition

game markings • Field markers, goals, bases, dugouts, backstops, benches and support equipment• Concrete pads and bleachers

Page 3: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Overview (continued)

• Construction of a Field House (full program TBD) Likely include the following items: male and female, lockers, restrooms, showers and dressing areas, public restrooms, concessions, field storage, mechanical, offices for athletics operations and security, etc.

• Safe and efficient bus, car and pedestrian access and flow.• Comprehensive ADA accessibility• Attention to security through environmental design• Security lighting • Low Voltage systems, data, voice, video, security, etc. • Monument signage, exterior and interior signage and landscaping• All facilities, structures, fields, etc. to meet Georgia High School Association

requirements for athletic competition and practice.

Page 4: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Site Plan

Existing Site Plan

Page 5: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Location

Aerial View of Existing Site

Page 6: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Photo

Southeast View from Street

Page 7: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Photo

View of Existing Field

Page 8: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Photo

Southwest View from Street

Page 9: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Concept Plan

Conceptual Site Plan

Page 10: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Project Timeline (Tentative)

• Engineers RFP Issued Oct 18, 2016

• Engineers Pre-Proposal Briefing Nov 01, 2016

• Site Inspection Nov 04, 2016

• Engineers Proposals Due Nov 17, 2016

• Select Engineer Jan 04, 2017

• Request for Proposal out to CMs Feb 21, 2017

• CMs Pre-Proposal Briefing Feb 28, 2017

• Site Inspection Mar 02, 2017

• CM Proposals Due Mar 23, 2017

• Draft Design Narrative TBD

• Project Committee Meeting TBD

• Select CM TBD

• Recommend CM to Board TBD

• Construction Documents Complete Jul 1, 2017

• Project Start Oct 2017

• Project Completion Jul 2018

Page 11: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Site Inspection Date and Time

10:00 amThursday, March 02, 2016

at the Walden Middle School Site

If you have any questions contact the Project Manager.

Page 12: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Proposal Due Date and Time

2:00 pmThursday, March 23, 2017

at APS Facilities Service Center

Page 13: Construction Manager Pre-Proposal Briefing · •Engineers RFP Issued Oct 18, 2016 •Engineers Pre-Proposal Briefing Nov 01, 2016 •Site Inspection Nov 04, 2016 •Engineers Proposals

Questions & Answers

During Construction progress reports for the Walden Athletic Complex can be accessed at:

http://www.atlanta.k12.ga.us