comparative simulation study of intermodal yard operations in automated container...

21
June 29 th , 2010 Comparative Simulation Study Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminal TRB CMTS Conference June 29 th , 2010 Arnold and Mabel Beckman Center of the National Academies Irvine, California

Upload: duongkhuong

Post on 21-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminal

TRB CMTS Conference June 29th, 2010

Arnold and Mabel Beckman Center of the National Academies Irvine, California

Page 2: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Presentation Outline• Background• Simulation of the two proposed intermodal

yard layout• Results and conclusions

2

Page 3: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Moffatt & Nichol• A consultant firm providing many engineering

services.

• Expertise in maritime related infrastructures included planning and designing

• Port planning group• Mainly container terminal planning and design

3

Page 4: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Container Terminal Operation - Berth

4

Berth Area

Page 5: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Container Terminal Operation - Yard

5

Container Storage Yard

(CY)

Page 6: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Container Terminal Operation - Gate

6

Gate

Page 7: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Container Terminal Operation – Intermodal

7

Intermodal Yard (IY)

Page 8: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Project Background• US west coast automated container terminal• 3 M+ TEU annual throughput capacity• Large vessels• Limited backland• High percentage of Intermodal Yard (IY)

throughput

8

Page 9: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Proposed Option – Wheeled Buffer

Working Tracks

Wheeled Buffer

RMG Crane

Page 10: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Alternative Option – Grounded Buffer

10

Grounded Buffer

Track RMGBuffer RMG

Page 11: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

High Level Comparison of Two Options

11

Wheeled Buffer Grounded Buffer

Space + -Cost + -

Experience - +Flexibility - +

Equipment ? ?

Can proposed layouts finish given throughput?Equipment requirement?Which layout to recommend?

Page 12: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Operational Constraints• Trains are double stacked• 20’ containers go to the bottom tier• One trains assigned to two tracks• Safety rule

– Cranes cannot work on a train segment while wheel change is taking place

– Cranes cannot move a container over a moving train engine

– Cranes cannot move a container over workers or inspectors

Page 13: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Example Simulation Animation• Simulation Demo of Container Terminal

Operation

13

Page 14: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Simulation Logic Flow – One Train

14

Train arrives according to schedule

Each train assigned to two empty tracks

Start strip-inspect-load process for each half train on tracks

One track finishes strip-inspect-load process

Wait until available

Two empty tracks available?

Wait until finish

Both half-trains finished?

YN

NY

Train departs

Page 15: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Train Strip-Inspect-Load Process

1. Unlock Cones2. Unload Top Tier3. Remove Cones4. Unload Bottom Tier5. Inspection & Repair6. Load Bottom Tier7. Place Cones8. Load Top Tier9. Lock Cones and

Begin Exit Sequence

A Well Car

Page 16: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Simulation Screen Captures

16

Grounded Buffer

Wheeled Buffer

Page 17: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Simulation Experiments

• Scenarios– Two layouts– Different working shift assumptions– Various equipment configurations

• Number of RMGs• Number of trucks

17

Page 18: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Example Simulation Outputs

18

Number of Working Shifts 3 3 3 2 2 2 2Number of RMG's 3 3 3 5 5 5 4Number of Trucks 5 10 15 15 20 25 40

Avg Train Turn Time (hr) 44.8 9.7 8.9 12.1 10.2 10.2 12.3Max Train Turn Time (hr) 58.3 10.4 9.5 24.2 13.5 13.2 23.9Avg Track Occupancy (%) 100 34.7 31.8 43.3 36.4 36.4 43.9

RMG Net Prod (mph) 23.4 35.9 38.1 33.8 36.6 36.9 35.2RMG Utilization (%) 0.71 0.71 0.66 45.2 41.6 41.3 54.1

Truck Turn Time at Buffer (min) 4.09 3.76 3.78 5.49 3.7 3.74 3.86Truck Utilization (%) 99.46 88.9 67.3 75.2 68.2 57.6 41.2

RMG Blocked Time (%) 1.8 0.7 0.3 2 0.6 0.4 0.4Weekly Throughput (boxes) 8956 12763 12581 12788 12766 12766 12788

Wheeled Buffer Option Scenarios

Page 19: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Recommended Equipment Configuration

19

Page 20: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Conclusions• Both layouts can finish the given throughput

– Number of tracks– Buffer size

• Safety rules appears not incur significant delays

• Perpendicular layout is recommended– Less RMG’s & trucks– Less Space

• Simulation can help client make smart investment decisions in container terminal master planning

20

Page 21: Comparative Simulation Study of Intermodal Yard Operations in Automated Container Terminalonlinepubs.trb.org/onlinepubs/mb/MTS/Zhang.pdf · Intermodal Yard Operations in Automated

June 29th , 2010

Comparative Simulation Study

Thank you!

21