  • 5/20/2018 Commissioning Process Plant Model

    1/21

    INTRODUCTION

    Commissioning Process Plant Model

    Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    2/21

    SIMPLE?

    Commissioning is a complex issue requiring:

    Planning

    Leadership

    Teamwork

    Training

    Communications

    Process start up modelIng. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    3/21

    Prime course objectives to raise awareness

    of these issues on a general level, as to:

    WHAT problems will occur WHY they occur

    WHEN they occur

    HOW they can be managed and reduced toan acceptable level

    Process start up model

    PROBLEMS

    Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    4/21

    FACTORS

    Plant size

    Process type (continuous or batch)

    Client infrastructure

    Contractual arrangements

    Level of automation or control

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    5/21

    ROOT CAUSES

    Poor Planning

    Ineffective Leadership

    Rushed Installation Poor Quality Work

    Too Few Resources

    Inexperienced Resources

    Inadequate training

    Poor design

    Sabotage

    Process start up modelIng. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    6/21

    DIFFERING OBJECTIVES 1

    Construction personnel: Objectives

    to finish plant construction and to leave

    site as soon as possible

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    7/21

    DIFFERING OBJECTIVES 2

    Commissioning personnel: Objectives

    to learn the plant

    to learn the process

    to ensure the as-built plant will work as

    intended

    to test the installed equipment to fully commission the plant

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    8/21

    OBJECTIVES

    PROVIDE EXPOSUREto the unique problemsassociated with the start up of process plants.

    STIMULATE THINKINGorientation to the startup aspects of any type of plant in any industry.

    ESTABLISH A FRAMEWORKfor anticipatingand avoiding financial, technical, operational and

    organisational problems associated with a start up.

    GENERATE CONFIDENCEin planning for andexecuting a successful plant start up regardless of your

    organisational position.

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    9/21

    TERMINOLOGY 1

    PRECOMMISSIONINGPrecommissioningactivities are the non-operating work responsibilities such

    as adjustments, cold alignment checks, etc. performed by

    the contractor prior to ready for commissioning ormechanical completion.

    READY FOR COMMISSIONINGOccurs when

    the plant or any part of the plant has been erected inaccordance with drawings and specifications and the

    precommissioning activities have been completed to the

    extent necessary to permit commissioning activities to

    begin.

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    10/21

    TERMINOLOGY 2

    MECHANICAL COMPLETION Occurswhen the plant or any part of the plant has beenerected in accordance with drawings,

    specifications and applicable codes and theprecommissioning activities have beencompleted to the extent necessary to permit theclient to accept the plant and begincommissioning activities. The terms ready forcommissioning and mechanical completion areoften synonymous.

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    11/21

    TERMINOLOGY 3

    COMPLETION OF WORKMeans that thecontractor has erected the plant in accordance with

    drawings and specifications completed his specified

    precommissioning work and completed his final cleanup,painting and thermal insulation work.

    COMMISSIONINGCommissioning activities areassociated with preparing or operating the plant or any partof the plant prior to the initial start up and are usually the

    owners work responsibilities.

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    12/21

    TERMINOLOGY 4

    WATER TRIALSare commissioning activities conducted toallow run-in and operational testing of the equipment as well as

    provide operator training and familiarisation.

    INITIAL START UPoccurs when feedstocks areintroduced to the plant for the express purpose of producing a

    product for the first time.

    INITIAL OPERATIONSused to describe the entireprocess of precommissioning, commissioning, initial start up,

    steady production and performance testing of a plant.

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    13/21

    HOW THE TERMS RELATE:

    DIAGRAM

    Process start up model

  • 5/20/2018 Commissioning Process Plant Model

    14/21

    PROJECT DEFINITION AND

    SCOPE

    SERVICES

    PROCESSES

    BUDGETS

    SCHEDULES

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    15/21

    PROJECT ORGANISATION

    MANPOWER

    EXPERIENCE

    STANDARDS

    PROCEDURES

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    16/21

    PROJECT CONTROL

    COSTS

    SCHEDULES

    QUALITY CONTROL

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    17/21

    PROJECT MANAGERS ROLE

    ENGINEERING

    ADMINISTRATIVE SERVICES

    CONSTRUCTION MANAGEMENT

    PLANT START UP

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    18/21

    PROJECT EXECUTION DIAGRAM

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    19/21

    SUCCESSFUL START-UP

    REQUIREMENTS 1

    OWNER ORGANISATION

    Adequate overall planning Detailed long-term preparation

    Supportive organisation

    Detailed operating and emergency procedures

    Established standard and working practices

    Effective resource planning

    Competent personnel

    Trained personnel

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    20/21

    SUCCESSFUL START-UP

    REQUIREMENTS 2

    PLANT AND EQUIPMENT

    Thorough mechanical completion inspection

    Closely monitored commissioning procedures

    Water trials

    Adequate stores and spare part availability

    Prepared laboratory

    Responsive maintenance support

    Process start up model Ing. Luis E. Penuela V.

  • 5/20/2018 Commissioning Process Plant Model

    21/21

    SUCCESSFUL START-UP

    REQUIREMENTS 3

    WHAT IS AT STAKE

    Company profitability Company reputation

    Project success

    Plant effectiveness

    Personal reputations

    Your takehome pay