commissioning process plant model
TRANSCRIPT
-
5/20/2018 Commissioning Process Plant Model
1/21
INTRODUCTION
Commissioning Process Plant Model
Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
2/21
SIMPLE?
Commissioning is a complex issue requiring:
Planning
Leadership
Teamwork
Training
Communications
Process start up modelIng. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
3/21
Prime course objectives to raise awareness
of these issues on a general level, as to:
WHAT problems will occur WHY they occur
WHEN they occur
HOW they can be managed and reduced toan acceptable level
Process start up model
PROBLEMS
Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
4/21
FACTORS
Plant size
Process type (continuous or batch)
Client infrastructure
Contractual arrangements
Level of automation or control
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
5/21
ROOT CAUSES
Poor Planning
Ineffective Leadership
Rushed Installation Poor Quality Work
Too Few Resources
Inexperienced Resources
Inadequate training
Poor design
Sabotage
Process start up modelIng. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
6/21
DIFFERING OBJECTIVES 1
Construction personnel: Objectives
to finish plant construction and to leave
site as soon as possible
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
7/21
DIFFERING OBJECTIVES 2
Commissioning personnel: Objectives
to learn the plant
to learn the process
to ensure the as-built plant will work as
intended
to test the installed equipment to fully commission the plant
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
8/21
OBJECTIVES
PROVIDE EXPOSUREto the unique problemsassociated with the start up of process plants.
STIMULATE THINKINGorientation to the startup aspects of any type of plant in any industry.
ESTABLISH A FRAMEWORKfor anticipatingand avoiding financial, technical, operational and
organisational problems associated with a start up.
GENERATE CONFIDENCEin planning for andexecuting a successful plant start up regardless of your
organisational position.
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
9/21
TERMINOLOGY 1
PRECOMMISSIONINGPrecommissioningactivities are the non-operating work responsibilities such
as adjustments, cold alignment checks, etc. performed by
the contractor prior to ready for commissioning ormechanical completion.
READY FOR COMMISSIONINGOccurs when
the plant or any part of the plant has been erected inaccordance with drawings and specifications and the
precommissioning activities have been completed to the
extent necessary to permit commissioning activities to
begin.
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
10/21
TERMINOLOGY 2
MECHANICAL COMPLETION Occurswhen the plant or any part of the plant has beenerected in accordance with drawings,
specifications and applicable codes and theprecommissioning activities have beencompleted to the extent necessary to permit theclient to accept the plant and begincommissioning activities. The terms ready forcommissioning and mechanical completion areoften synonymous.
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
11/21
TERMINOLOGY 3
COMPLETION OF WORKMeans that thecontractor has erected the plant in accordance with
drawings and specifications completed his specified
precommissioning work and completed his final cleanup,painting and thermal insulation work.
COMMISSIONINGCommissioning activities areassociated with preparing or operating the plant or any partof the plant prior to the initial start up and are usually the
owners work responsibilities.
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
12/21
TERMINOLOGY 4
WATER TRIALSare commissioning activities conducted toallow run-in and operational testing of the equipment as well as
provide operator training and familiarisation.
INITIAL START UPoccurs when feedstocks areintroduced to the plant for the express purpose of producing a
product for the first time.
INITIAL OPERATIONSused to describe the entireprocess of precommissioning, commissioning, initial start up,
steady production and performance testing of a plant.
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
13/21
HOW THE TERMS RELATE:
DIAGRAM
Process start up model
-
5/20/2018 Commissioning Process Plant Model
14/21
PROJECT DEFINITION AND
SCOPE
SERVICES
PROCESSES
BUDGETS
SCHEDULES
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
15/21
PROJECT ORGANISATION
MANPOWER
EXPERIENCE
STANDARDS
PROCEDURES
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
16/21
PROJECT CONTROL
COSTS
SCHEDULES
QUALITY CONTROL
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
17/21
PROJECT MANAGERS ROLE
ENGINEERING
ADMINISTRATIVE SERVICES
CONSTRUCTION MANAGEMENT
PLANT START UP
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
18/21
PROJECT EXECUTION DIAGRAM
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
19/21
SUCCESSFUL START-UP
REQUIREMENTS 1
OWNER ORGANISATION
Adequate overall planning Detailed long-term preparation
Supportive organisation
Detailed operating and emergency procedures
Established standard and working practices
Effective resource planning
Competent personnel
Trained personnel
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
20/21
SUCCESSFUL START-UP
REQUIREMENTS 2
PLANT AND EQUIPMENT
Thorough mechanical completion inspection
Closely monitored commissioning procedures
Water trials
Adequate stores and spare part availability
Prepared laboratory
Responsive maintenance support
Process start up model Ing. Luis E. Penuela V.
-
5/20/2018 Commissioning Process Plant Model
21/21
SUCCESSFUL START-UP
REQUIREMENTS 3
WHAT IS AT STAKE
Company profitability Company reputation
Project success
Plant effectiveness
Personal reputations
Your takehome pay
Process start up model Ing. Luis E. Penuela V.