Page 1: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

CEMENT CONCRETE ROAD

Page 2: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every nook and corner of the State with special focus on SC/ST/PVTG (Particularly Vulnerable Tribal Group) habitations.

Fund Allocation: Block is treated as a unit. Fund will be allocated directly to the blocks each year equally.

Flow of Funds: Funds from all sources to be aggregated. Scheme is implemented in convergence with other schemes like Biju KBK/

BRGF/ GGY/ TFC or any other scheme. Untied in nature and supplement to the programme and provide synergy and

convergence to the different development programmes. The labour cost – MGNREGS.

Target:

Certain number of villages will be taken up each year with an aim to cover all the villages under the scheme over a definite time frame with focus on habitations of weaker and most vulnerable social groups in convergence with other schemes.

Guidelines - Cement Concrete Road

Page 3: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Selection of villages:

B.D.O. is authorized to select the villages to be taken up:

i. The villages/habitations inhabited by PVTGs with no coverage of C. C. Road - 1st preference.

ii. PVTG villages partially covered with C. C. Roads – 2nd priority.

iii. Villages inhabited by STs in majority with no coverage of C .C. Road.

iv. ST villages partially covered with C. C. Roads.

v. Villages of SC community with no coverage of C .C. Road.

vi. SC villages partially covered with C. C. Roads.

vii. Bigger habitation having no coverage of C.C. road – Next Priority

viii. In other habitations, the C. C. Roads should be planned for execution from the ST/ SC basti towards the main habitation and not vice-versa.

ix. The villages belonging to other category already covered with 500 metres or more of C.C. Roads should not be ordinarily considered under this scheme.

Page 4: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Preparation of Annual Action Plan:a) BDO shall draw up a perspective plan by listing all the

habitations/villages GPwise for his block in the order of priority described above.

b) The annual action plan should be drawn up out of the perspective plan so prepared keeping in view the availability of resources. Only after coverage of all the habitations/villages mentioned in the category (i) above, category (ii) cases will be included in the plan. Same logic shall apply for category (iii) and subsequently, category (iv) and other villages.

c) List of projects finalized by the B.D.O. shall be submitted to the Collector for his approval.

d)  Collector will draw up a holistic plan Block wise / G.P.wise taking into consideration the likely flow of fund under various schemes and possibility of convergence.

Page 5: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Preparation of Annual Action Plan (contd…):

e) Balance portion of the village can be taken up so as to achieve the target of 500 metre.

f) Complete transparency in the choice of project and location. Block Plan be made available in the website.

g) The Revenue village-wise fund entitlement based on population.

Population Fund entitlement of the village

0 to 500 3.00 Lakh

501 to 1000 5.00 Lakh

Above 1000 7.00 Lakh

Page 6: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Preparation of Annual Action Plan (contd…):

h) Every year, the Action Plan consisting the list of villages to be taken up,

population of the village with specific reference to PVTG, ST/SC and the project

cost for each project shall be prepared by B.D.O. following the procedure

prescribed above and submitted to Collector by 31st January to be considered

for the next financial year. Collector shall ensure approval of the action plan

based on the principles enunciated in para-5 above and communicate the

same to the respective block development officer latest by 28th/29th February.

i) As soon as the first instalment of the allocation is received by the blocks, they

should issue work orders to the already identified VLLs/ Gram Sanjojaks as per

the approved action plan for the year.

Page 7: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Implementing Agency: Panchayat Samiti.

 Execution of Work:

a. Executed either by Gram Sanjojak or through VLL selected by Palli Sabha.

b. Overall responsibility for implementation of the Scheme shall lie with Collector &

Project Director of the district.

c. DRDA shall furnish monthly progress report (MPR)

Social Audit:

Social Audit and vigilance shall be encouraged at grass-roots level.

Collector of the district shall also prepare schedules of inspection which

prescribe the minimum number of field visits for each supervisory level

functionary and shall ensure that the inspection schedules are faithfully followed

by supervisory level functionaries.

Page 8: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Progress under CC Road upto March, 2011FINANCIAL ACHIEVEMENT• State Release - ` 75.00 Cr

• Total Funds Availabale - ` 75.00 Cr.

• Funds utilised - ` 39.05 Cr

• Percentage of utilisation - 52%

PHYSICAL ACHIEVEMENT• No. of works Taken up - 3016

• No. of works Completed - 1166

• Percentage of achievement - 39%

• Length of CC Road constructed - 244.42 Km.

Page 9: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of utilisation of TFA under CC Road during 2010-11

Jaga

tsin

ghpu

r

Bala

ngir

Nua

pada

Sam

balp

ur

Deo

garh

Jajp

ur

Cutt

ack

Ang

ul

Barg

arh

Naw

aran

gpur

Boud

h

Keon

jhar

Kala

hand

i

Dhe

nkan

al

Sund

erga

rh

Jhar

sugu

da

Bhad

rak

Bala

sore

Gan

jam

ORI

SSA

Suba

rnap

ur

Gaj

apati

May

urbh

anj

Mal

kang

iri

Nay

agar

h

Kend

rapa

ra

Raya

gada

Puri

Kora

put

Kand

ham

al

Khur

da

91 9084

8178

72 71 68 68 67 67 6562 61

57 56 54 53 52 52 50 48 47 45 44

26 2519

106 4

%

Page 10: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of Physical Achievements under CC Road during 2010-11

%

8886 85

75 75

6459

57 57 56 5552

50 48 4743

40 39 39 37 36

2825

2017

14

84

0 0 0

Page 11: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Financial & Physical Achievements under CC Road during 2010-11Sl. No.

District Financial (` in Lakh) Physical (Projects in Nos.)Total Funds Available Expenditure % Taken up Completed % Length (In

Kms.)1Angul 191.08 130.86 68 64 38 59 5.502Balangir 334.40 301.93 90 155 132 85 19.773Balasore 286.62 151.19 53 102 53 52 2.524Bargarh 286.62 194.58 68 116 65 56 10.265Bhadrak 167.20 90.10 54 120 52 43 16.306Boudh 71.66 48.00 67 36 17 47 1.807Cuttack 334.39 237.84 71 183 137 75 14.208Deogarh 71.66 55.60 78 24 18 75 2.709Dhenkanal 191.08 115.70 61 80 32 40 5.78

10Gajapati 167.20 80.43 48 77 6 8 4.0211Ganjam 525.48 275.04 52 171 43 25 33.00

12Jagatsinghpur

191.08 173.86 91 52 46 88 9.47

13Jajpur 238.85 172.46 72 83 32 39 14.5214Jharsuguda 119.43 66.87 56 31 15 48 3.0815Kalahandi 310.51 191.22 62 131 75 57 9.7616Kandhamal 286.62 17.00 6 23  0 1.4017Kendrapara 214.97 56.12 26 30 6 20 5.9618Keonjhar 310.51 201.64 65 89 33 37 7.9319Khurda 238.85 9.00 4 150  0  20Koraput 334.39 32.00 10 102 14 14 3.3221Malkangiri 167.20 74.83 45 33 0 0  22Mayurbhanj 621.02 289.29 47 151 75 50 14.46

23Nawarangpur

238.85 160.36 67 140 77 55 11.22

24Nuapada 119.43 100.80 84 37 32 86 6.4425Nayagarh 191.08 84.09 44 77 13 17 4.7826Puri 262.74 51.03 19 481 18 4 1.4527Rayagada 262.74 65.99 25 60 17 28 3.4828Sambalpur 214.97 173.63 81 70 45 64 16.0529Subarnapur 143.31 71.80 50 44 16 36 0.5530Sundergarh 406.05 231.25 57 104 59 57 14.70

  TOTAL 7499.99 3904.51 52 3016 1166 39 244.42

Page 12: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

CLUSTER HOUSING

Page 13: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Financial & Physical achievements made (Cumulative up to end of April 2011)

Sl. No.

District Financial (` in Lakh) Physical Receipt

During the Year

Exp. upto end of the

month

Balance UC submitted

No. of quarters for which

funds released

No. of quarters taken up

No. of quarters

completed

No. of quarters

in progress

Quarter handed over to the H &

FW Deptt.

1 2 3 4 5 6 7 8 9 10 11

1Angul 77.70 77.70 0.00 19.92 16 16 16 0 16

2Bargarh 110.70 81.80 28.90 0.00 20 20 5 15 3

3Bhadrak 95.25 90.25 5.00 8.73 17 17 6 11 0

4Deogarh 47.10 45.00 2.10 0.00 9 9 8 1 4

5Dhenkanal 99.90 48.78 51.12 24.45 18 18 0 18 0

6Gajapati 248.96 219.39 29.57 104.13 52 52 43 9 20

7Jagatsinghpur 78.75 72.75 6.00 15.58 15 15 14 1 5

8Jajpur 30.90 30.90 0.00 0.00 6 6 6 0 0

9Kandhamal 716.33 378.35 337.98 11.49 150 132 14 118 9

10Keonjhar 579.96 519.65 60.31 433.23 114 114 84 30 68

11Malkangiri 116.85 116.55 0.30 0.00 23 23 19 4 0

12Mayurbhanj 955.33 943.78 11.55 409.07 197 197 174 23 131

13Nayagarh 26.25 26.25 0.00 26.25 5 5 5 0 5

14Sambalpur 373.76 364.14 9.62 176.03 77 77 69 8 67

15Sundergarh 802.33 712.53 89.80 674.70 174 161 144 17 73

  Total 4360.07 3727.82 632.25 1903.58 893 862 607 255 401

Page 14: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

12TH F.C.A.

Page 15: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of utilisation of TFA upto April 2011 (since inception)D

he

nk

an

al

Ga

jap

ati

Kh

urd

a

Pu

ri

Su

ba

rna

pu

r

Ba

lan

gir

Bh

ad

rak

Ke

nd

rap

ara

Su

nd

erg

arh

An

gu

l

Bo

ud

h

Ke

on

jha

r

De

og

arh

Ma

lka

ng

iri

Na

wa

ran

gp

ur

Sa

mb

alp

ur

Ko

rap

ut

Ma

yu

rbh

an

j

Na

ya

ga

rh

Ba

las

ore

Ra

ya

ga

da

Cu

tta

ck

OR

ISS

A

Ka

nd

ha

ma

l

Nu

ap

ad

a

Ja

ga

tsin

gh

pu

r

Ka

lah

an

di

Ja

jpu

r

Ba

rga

rh

Jh

ars

ug

ud

a

Ga

nja

m

100 100100 100100100 100100100 100 100100100100 10010099 99 99 99 98 98 98 98

9897

9696 96

93

89

%

Page 16: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of U.C to Released Amount upto April 2011 (since inception)

%

Ma

yu

rbh

an

j

Na

wa

ran

gp

ur

Na

ya

ga

rh

Ka

lah

an

di

Su

nd

erg

arh

Bh

ad

rak

Ba

lan

gir

Ga

jap

ati

Ma

lka

ng

iri

Ja

jpu

r

Sa

mb

alp

ur

Ra

ya

ga

da

Cu

tta

ck

De

og

arh

Ka

nd

ha

ma

l

OR

ISS

A

Nu

ap

ad

a

Pu

ri

Ga

nja

m

Kh

urd

a

Su

ba

rna

pu

r

Ke

on

jha

r

Ja

ga

tsin

g...

Dh

en

ka

na

l

Ba

las

ore

An

gu

l

Jh

ars

ug

ud

a

Ko

rap

ut

Bo

ud

h

Ba

rga

rh

Ke

nd

rap

ara

95 94 94 93 93 91 90 90 89 89 8785 85 85 83 81 81 80 79 79 79 79

73 73 71 69 69 68 6561 60

Page 17: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Financial Achievements made under 12th FCA upto April 2011 (Since inception)Sl. No.

District Financial (` in lakh)Funds Released Expenditure % of expr UC submitted % UC to Released amount

1Angul 3451.87 3444.82 100 2392.03 692Balangir 4223.05 4223.05 100 3821.70 903Balasore 5022.35 4952.88 99 3590.27 714Bargarh 4373.85 4180.68 96 2671.44 615Bhadrak 3280.08 3280.07 100 2975.94 916Boudh 1018.21 1015.61 100 665.82 657Cuttack 5728.80 5634.62 98 4846.40 858Deogarh 947.16 944.20 100 801.06 859Dhenkanal 2945.16 2945.16 100 2150.06 73

10Gajapati 2325.92 2325.92 100 2103.36 9011Ganjam 7115.98 6332.37 89 5621.41 7912Jagatsinghpur 3271.24 3173.62 97 2391.32 7313Jajpur 4606.67 4408.01 96 4086.90 8914Jharsuguda 1259.57 1176.56 93 870.45 6915Kalahandi 4087.26 3934.17 96 3808.29 9316Kandhamal 2496.35 2447.44 98 2084.34 8317Kendrapara 3877.87 3872.88 100 2330.26 6018Keonjhar 4296.48 4285.48 100 3375.30 7919Khurda 3265.57 3265.57 100 2568.64 7920Koraput 3563.85 3536.20 99 2406.35 6821Malkangiri 1750.74 1744.21 100 1557.52 8922Mayurbhanj 6226.03 6174.15 99 5919.26 9523Nawarangpur 2708.44 2698.07 100 2557.00 9424Nuapada 1645.30 1607.74 98 1326.22 8125Nayagarh 3093.76 3059.02 99 2907.66 9426Puri 4107.17 4107.17 100 3295.31 8027Rayagada 2712.64 2668.81 98 2303.82 8528Sambalpur 2323.40 2314.27 100 2026.60 8729Subarnapur 1565.06 1565.06 100 1229.75 7930Sundergarh 4211.45 4204.21 100 3919.82 93

  TOTAL 101501.29 99522.01 98 82604.29 81

Page 18: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of Physical achievements made upto April 2011 (since inception)

Ba

lan

gir

Bh

ad

rak

De

og

arh

Dh

en

ka

na

l

Ga

jap

ati

Jh

ars

ug

ud

a

Kh

urd

a

Na

wa

ran

gp

ur

Su

ba

rna

pu

r

An

gu

l

Su

nd

erg

arh

Ma

yu

rbh

an

j

Ba

las

ore

Ra

ya

ga

da

Ke

nd

rap

ara

Ke

on

jha

r

Sa

mb

alp

ur

Na

ya

ga

rh

Cu

tta

ck

Ko

rap

ut

Ka

nd

ha

ma

l

Bo

ud

h

Ma

lka

ng

iri

Ka

lah

an

di

Pu

ri

OR

ISS

A

Ba

rga

rh

Ja

ga

tsin

gh

pu

r

Nu

ap

ad

a

Ga

nja

m

Ja

jpu

r

100 100 100 100100 100 100 100100 100100 100100 100100100 100 100100 100100 100 100 99 99 99 9998 98

87 87

%

Page 19: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Physical Achievements under 12th FCA upto April’11(since inception)Sl. No. District Project taken up Projects Completed %

1Angul 7256 7255 1002Balangir 3405 3405 1003Balasore 32754 32745 1004Bargarh 5486 5425 995Bhadrak 3560 3560 1006Boudh 1260 1256 1007Cuttack 5593 5581 1008Deogarh 864 864 1009Dhenkanal 1798 1798 100

10Gajapati 1559 1559 10011Ganjam 5539 4837 8712Jagatsinghpur 2321 2273 9813Jajpur 2596 2258 8714Jharsuguda 906 906 10015Kalahandi 2610 2595 9916Kandhamal 2915 2908 10017Kendrapara 1868 1867 10018Keonjhar 7281 7276 10019Khurda 1249 1249 10020Koraput 2503 2497 10021Malkangiri 850 846 10022Mayurbhanj 37369 37360 10023Nawarangpur 3954 3954 10024Nuapada 2339 2282 9825Nayagarh 2493 2489 10026Puri 1312 1303 9927Rayagada 15294 15287 10028Sambalpur 2184 2182 10029Subarnapur 1876 1876 10030Sundergarh 18863 18860 100

  TOTAL 179857 178553 99

Page 20: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

13th F.C.A.

Page 21: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Financial Achievements under 13th FCA upto March 2011 during 2010-11

(` In Lakh)

Sl. No

District OB Funds Received during the year

Total Funds Available

Expenditure % of Exp. Balance

1 2 3 4 5 6 7 81Angul - 790.17 790.17 250.77 32 539.402Bolangir - 1058.31 1058.31 493.06 47 565.253Balasore - 1164.57 1164.57 338.92 29 825.654Bargarh - 942.24 942.24 0.00 0 942.245Bhadrak - 760.18 760.18 366.98 48 393.206Boudh - 245.02 245.02 5.18 2 239.847Cuttack - 1302.19 1302.19 445.67 34 856.528Deogarh - 222.98 222.98 78.38 35 144.609Dhenkanal - 753.32 753.32 112.83 15 640.49

10Gajapati - 546.65 546.65 0.30 0 546.3511Ganjam - 1854.42 1854.42 0.00 0 1854.4212Jagatsinghpur - 734.83 734.83 339.42 46 395.4113Jajpur - 1081.34 1081.34 147.89 14 933.4514Jharsuguda - 290.85 290.85 0.00 0 290.8515Kalahandi - 1056.13 1056.13 431.31 41 624.8216Kandhamal - 691.86 691.86 111.21 16 580.6517Kendrapara - 1006.05 1006.05 92.35 9 913.7018Keonjhar - 1169.92 1169.92 410.49 35 759.4319Khurda - 666.99 666.99 413.27 62 253.7220Koraput - 1054.36 1054.36 124.60 12 929.7621Malkangiri - 502.51 502.51 27.40 5 475.1122Mayurbhanj - 1901.47 1901.47 515.05 27 1386.4223Nawarangpur - 859.71 859.71 206.26 24 653.4524Nuapada - 409.56 409.56 13.58 3 395.9825Nayagarh - 675.26 675.26 246.61 37 428.6526Puri - 893.27 893.27 544.02 61 349.2527Rayagada - 794.70 794.70 81.75 10 712.9528Sambalpur - 607.46 607.46 165.43 27 442.0329Subarnapur - 367.79 367.79 34.00 9 333.7930Sundergarh - 1301.57 1301.57 0.00 0 1301.57

  Total 0.00 25705.68 25705.68 5996.73 23 19708.95

Page 22: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

STATE FINANCE COMMISSION AWARD

Page 23: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of utilisation of TFA under SFC upto March’11 during 2010-11

57

44

41 40

3534

32

2928

2624

21 21 20 20 19 18 1816 15

1412 12 12 11

9 9 87 6 6

%

Page 24: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Percentage of physical achievements under SFC upto March’11 during 2010-11

89

75

6965 64 64 64

61

54 54 52 51 50 48 47 46 44 4442

3935 35 35

2825

1713 11

64 2

%

Page 25: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Financial & Physical achievements under SFC upto March 2011 during 2010-11Sl. No.

District Financial (` in Lakh) Physical (No. of Projects)TFA Expenditure % Taken up Completed %

1Angul 437.84 193.52 44 106 79 752Balangir 852.31 162.65 19 171 109 643Balasore 612.58 70.78 12 157 84 544Bargarh 685.37 73.91 11 200 83 425Bhadrak 394.91 64.20 16 66 11 176Boudh 228.62 92.91 41 60 30 507Cuttack 1097.22 355.34 32 344 178 528Deogarh 196.42 66.00 34 46 21 469Dhenkanal 488.98 44.50 9 79 38 48

10Gajapati 316.03 93.15 29 141 55 3911Ganjam 1446.55 91.49 6 319 111 3512Jagatsinghpur 319.85 37.97 12 127 81 6413Jajpur 1040.64 214.25 21 250 134 5414Jharsuguda 456.53 95.00 21 9 1 1115Kalahandi 795.16 48.09 6 107 14 1316Kandhamal 472.27 31.90 7 48 2 417Kendrapara 812.90 111.50 14 208 91 4418Keonjhar 536.36 212.88 40 77 39 5119Khurda 810.62 198.19 24 83 21 2520Koraput 417.52 63.45 15 164 113 6921Malkangiri 247.20 69.96 28 41 25 6122Mayurbhanj 1144.37 210.57 18 201 89 4423Nawarangpur 345.89 40.36 12 67 19 2824Nuapada* 268.27 23.30 9 44 1 225Nayagarh 635.43 222.60 35 195 69 3526Puri 484.70 86.10 18 175 156 8927Rayagada 589.25 46.71 8 109 7 628Sambalpur 660.43 169.95 26 166 106 6429Subarnapur 369.15 209.40 57 74 48 6530Sundergarh 798.44 159.97 20 88 31 35

  Total 17961.80 3560.60 20 3922 1846 47

Page 26: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Financial & Physical Achievements under SFC during April 2011 Sl. No.

District Financial (` in Lakh) Physical (No. of Projects)TFA Expenditure % Taken up Completed %

1Angul 244.32 0.00 0 27 0 02Balangir 689.66 0.00 0 62 0 03Balasore 541.80 0.00 0 73 0 04Bargarh 611.46 0.00 0 117 0 05Bhadrak 330.71 0.00 0 55 0 06Boudh 170.91 0.00 0 30 0 07Cuttack 741.88 0.00 0 166 0 08Deogarh 130.42 0.00 0 25 0 09Dhenkanal 444.48 0.00 0 41 0 0

10Gajapati 222.88 0.00 0 86 0 011Ganjam 1355.06 39.02 3 208 0 012Jagatsinghpur 281.88 0.00 0 46 0 013Jajpur 826.39 0.00 0 116 0 014Jharsuguda 361.53 0.00 0 8 0 015Kalahandi 747.07 0.00 0 93 0 016Kandhamal 440.37 0.00 0 46 0 017Kendrapara 701.40 0.00 0 117 0 018Keonjhar 329.22 0.00 0 38 0 019Khurda 612.43 0.00 0 62 0 020Koraput 354.07 1.00 0 51 0 021Malkangiri 177.24 0.00 0 16 0 022Mayurbhanj 936.05 0.00 0 112 0 023Nawarangpur 305.53 0.00 0 48 0 024Nuapada* 244.97 0.00 0 43 0 025Nayagarh 412.83 27.40 7 126 4 326Puri 398.60 0.00 0 19 0 027Rayagada 548.04 0.00 0 102 0 028Sambalpur 490.48 0.00 0 60 0 029Subarnapur 159.75 0.00 0 26 0 030Sundergarh 685.42 0.00 0 57 0 0

  Total 14496.85 67.42 0 2076 4 0

Page 27: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

RASTRIYA GRAM SWARAJ YOJANA(RGSY)

Page 28: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

SUBMISSION OF UC OF RGSY SCHEMES RELATING TO GPS BUILDING IN REVISED UC FORMAT(Rs. In Lakh)

Sl. No. Name of the District Grant released UC submitted Balance UC to be submitted1 2 3 5 6

1ANGUL 6.00 6.00 0.002BALANGIR 23.25 23.25 0.003BALASORE 22.50 22.50 0.004BARGARH 10.50 10.50 0.005BHADRAK 12.00 12.00 0.006BOUDH 0.00 0.00 0.007CUTTACK 27.00 20.00 7.008DEOGARH 0.00 0.00 0.009DHENKANALA 16.50 16.50 0.00

10GAJAPATI 21.75 0.00 21.7511GANJAM 20.63 0.00 20.6312JAGAT SINGHPUR 3.75 0.00 3.7513JAJPUR 17.25 0.00 17.2514JHARSUGUDA 17.25 0.00 17.2515KALAHANDI 22.50 0.00 22.5016KANDHAMAL 0.00 0.00 0.0017KENDRAPADA 37.50 0.00 37.5018KEONJHAR 4.50 0.00 4.5019KHURDA 13.88 0.00 13.8820KORAPUT 24.75 0.00 24.7521MALKANGIRI 15.00 0.00 15.0022MAYURBHANJ 21.75 0.00 21.7523NABARANGPUR 53.25 53.25 0.0024NUAPADA 14.25 14.25 0.0025NAYAGARH 37.50 0.00 37.5026PURI 15.00 0.00 15.0027RAYAGADA 9.75 0.00 9.7528SAMBALPUR 18.00 0.00 18.0029SUBARNAPUR 6.00 0.00 6.0030SUNDERGARH 0.00 0.00 0.00

TOTAL 492.00 178.25 313.75

Page 29: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

DISTRICT LEVEL VIGILANCE &

MONITORING COMMITTEE MEETING(DLVMC)

Page 30: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

Details meetings of Distrct-level Vigilance & Monitoring Committee held during 2010-11

Sl. No Districts Dates of V &MC meeting conducted during 2010-111st Quarter 2nd Quarter 3rd Quarter 4th Quarter Remarks

1 Angul 05.06.10   05.10.10 02.02.11  2 Bargarh   11.07.10      3 Balasore 18.06.10   20.11.10    4 Bhadrak 07.04.10 17.09.10 06.10.10    5 Bolangir   02.09.10   19.01.11  6 Boudh     06.11.10    7 Cuttack 03.06.10        8 Dhenkanal 20.05.10 22.09.10      9 Deogarh Nil Nil Nil Nil  10 Ganjam   25.09.10 02.11.10 10.02.11  11 Gajapati   10.07.10   28.01.11  12 Jajpur 05.06.10   04.11.10    13 Jagatsinghpur   21.08.10   27.01.11  14 Jharsuguda   12.07.10      15 Kandhmal 09.04.10   20.11.10    16 Kalahandi Nil Nil Nil Nil  17 Khurdha 29.06.10   30.12.10 16.05.11 date fixed18 Koraput   09.09.10      19 Keonjhar   07.07.10      

20 Kendrapada08.04.10, 09.06.10

14.09.10      

21 Mayurbhanj 18.06.10     12.05.11 date fixed22 Malkangiri   20.09.10      23 Nayagarh   03.07.10      24 Nabarangpur Nil Nil Nil Nil  25 Nuapada 05.04.10        26 Puri 18.06.10     19.01.11  27 Rayagada Nil Nil Nil Nil  28 Sambalpur Nil Nil Nil Nil  29 Sonepur 11.06.10 06.09.10   06.02.11  30 Sundargarh   08.07.10   12.01.11  

Page 31: CEMENT CONCRETE ROAD. The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every

• Timely submission of MPRs and other reports.

• C.B. & O.B. to be matched.

• Any change in the O.B. to be intimated and

prior permission to be obtained from the

Department.

ISSUES OF M.I.S