CEMENT CONCRETE ROAD

Page 2: CEMENT CONCRETE ROAD

The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every nook and corner of the State with special focus on SC/ST/PVTG (Particularly Vulnerable Tribal Group) habitations.Fund Allocation: Block is treated as a unit. Fund will be allocated directly to the blocks each year equally.Flow of Funds: Funds from all sources to be aggregated. Scheme is implemented in convergence with other schemes like Biju KBK/

BRGF/ GGY/ TFC or any other scheme. Untied in nature and supplement to the programme and provide synergy and

convergence to the different development programmes. The labour cost – MGNREGS.

Target:

Certain number of villages will be taken up each year with an aim to cover all the villages under the scheme over a definite time frame with focus on habitations of weaker and most vulnerable social groups in convergence with other schemes.

Guidelines - Cement Concrete Road

Page 3: CEMENT CONCRETE ROAD

Selection of villages:

B.D.O. is authorized to select the villages to be taken up:i. The villages/habitations inhabited by PVTGs with no coverage of C. C. Road -

1st preference. ii. PVTG villages partially covered with C. C. Roads – 2nd priority. iii. Villages inhabited by STs in majority with no coverage of C .C. Road.iv. ST villages partially covered with C. C. Roads. v. Villages of SC community with no coverage of C .C. Road.vi. SC villages partially covered with C. C. Roads.vii. Bigger habitation having no coverage of C.C. road – Next Priorityviii. In other habitations, the C. C. Roads should be planned for execution from the

ST/ SC basti towards the main habitation and not vice-versa.ix. The villages belonging to other category already covered with 500 metres or

more of C.C. Roads should not be ordinarily considered under this scheme.

Page 4: CEMENT CONCRETE ROAD

Preparation of Annual Action Plan:a) BDO shall draw up a perspective plan by listing all the

habitations/villages GPwise for his block in the order of priority described above.

b) The annual action plan should be drawn up out of the perspective plan so prepared keeping in view the availability of resources. Only after coverage of all the habitations/villages mentioned in the category (i) above, category (ii) cases will be included in the plan. Same logic shall apply for category (iii) and subsequently, category (iv) and other villages.

c) List of projects finalized by the B.D.O. shall be submitted to the Collector for his approval.

d)  Collector will draw up a holistic plan Block wise / G.P.wise taking into consideration the likely flow of fund under various schemes and possibility of convergence.

Page 5: CEMENT CONCRETE ROAD

Preparation of Annual Action Plan (contd…):

e) Balance portion of the village can be taken up so as to achieve the target of 500 metre.

f) Complete transparency in the choice of project and location. Block Plan be made available in the website.

g) The Revenue village-wise fund entitlement based on population.

Population Fund entitlement of the village

0 to 500 3.00 Lakh

501 to 1000 5.00 Lakh

Above 1000 7.00 Lakh

Page 6: CEMENT CONCRETE ROAD

Preparation of Annual Action Plan (contd…):

h) Every year, the Action Plan consisting the list of villages to be taken up,

population of the village with specific reference to PVTG, ST/SC and the project

cost for each project shall be prepared by B.D.O. following the procedure

prescribed above and submitted to Collector by 31st January to be considered

for the next financial year. Collector shall ensure approval of the action plan

based on the principles enunciated in para-5 above and communicate the

same to the respective block development officer latest by 28th/29th February.

i) As soon as the first instalment of the allocation is received by the blocks, they

should issue work orders to the already identified VLLs/ Gram Sanjojaks as per

the approved action plan for the year.

Page 7: CEMENT CONCRETE ROAD

Implementing Agency: Panchayat Samiti. Execution of Work:

a. Executed either by Gram Sanjojak or through VLL selected by Palli Sabha.

b. Overall responsibility for implementation of the Scheme shall lie with Collector &

Project Director of the district.

c. DRDA shall furnish monthly progress report (MPR)

Social Audit: Social Audit and vigilance shall be encouraged at grass-roots level.

Collector of the district shall also prepare schedules of inspection which

prescribe the minimum number of field visits for each supervisory level

functionary and shall ensure that the inspection schedules are faithfully followed

by supervisory level functionaries.

Page 8: CEMENT CONCRETE ROAD

Progress under CC Road upto March, 2011FINANCIAL ACHIEVEMENT• State Release - ` 75.00 Cr

• Total Funds Availabale - ` 75.00 Cr.

• Funds utilised - ` 39.05 Cr

• Percentage of utilisation - 52%

PHYSICAL ACHIEVEMENT• No. of works Taken up - 3016

• No. of works Completed - 1166

• Percentage of achievement - 39%

• Length of CC Road constructed - 244.42 Km.

Page 9: CEMENT CONCRETE ROAD

Percentage of utilisation of TFA under CC Road during 2010-11

Jaga

tsin

ghpu

rBa

lang

irN

uapa

daSa

mba

lpur

Deog

arh

Jajp

urCu

ttack

Angu

lBa

rgar

hN

awar

angp

urBo

udh

Keon

jhar

Kala

hand

iDh

enka

nal

Sund

erga

rhJh

arsu

guda

Bhad

rak

Bala

sore

Ganj

amO

RISS

ASu

barn

apur

Gaja

pati

May

urbh

anj

Mal

kang

iriN

ayag

arh

Kend

rapa

raRa

yaga

daPu

riKo

rapu

tKa

ndha

mal

Khur

da

91 9084

8178

72 71 68 68 67 67 6562 61

57 56 54 53 52 52 50 48 47 45 44

26 2519

106 4

%

Page 10: CEMENT CONCRETE ROAD

Percentage of Physical Achievements under CC Road during 2010-11

%

88 86 85

75 75

6459

57 57 56 5552

50 48 4743

40 39 39 37 36

2825

2017

14

84

0 0 0

Page 11: CEMENT CONCRETE ROAD

Financial & Physical Achievements under CC Road during 2010-11Sl. No.

District Financial (` in Lakh) Physical (Projects in Nos.)Total Funds Available Expenditure % Taken up Completed % Length (In

Kms.)1Angul 191.08 130.86 68 64 38 59 5.502Balangir 334.40 301.93 90 155 132 85 19.773Balasore 286.62 151.19 53 102 53 52 2.524Bargarh 286.62 194.58 68 116 65 56 10.265Bhadrak 167.20 90.10 54 120 52 43 16.306Boudh 71.66 48.00 67 36 17 47 1.807Cuttack 334.39 237.84 71 183 137 75 14.208Deogarh 71.66 55.60 78 24 18 75 2.709Dhenkanal 191.08 115.70 61 80 32 40 5.78

10Gajapati 167.20 80.43 48 77 6 8 4.0211Ganjam 525.48 275.04 52 171 43 25 33.0012Jagatsinghpu

r 191.08 173.86 91 52 46 88 9.4713Jajpur 238.85 172.46 72 83 32 39 14.5214Jharsuguda 119.43 66.87 56 31 15 48 3.0815Kalahandi 310.51 191.22 62 131 75 57 9.7616Kandhamal 286.62 17.00 6 23  0 1.4017Kendrapara 214.97 56.12 26 30 6 20 5.9618Keonjhar 310.51 201.64 65 89 33 37 7.9319Khurda 238.85 9.00 4 150  0  20Koraput 334.39 32.00 10 102 14 14 3.3221Malkangiri 167.20 74.83 45 33 0 0  22Mayurbhanj 621.02 289.29 47 151 75 50 14.4623Nawarangpu

r 238.85 160.36 67 140 77 55 11.2224Nuapada 119.43 100.80 84 37 32 86 6.4425Nayagarh 191.08 84.09 44 77 13 17 4.7826Puri 262.74 51.03 19 481 18 4 1.4527Rayagada 262.74 65.99 25 60 17 28 3.4828Sambalpur 214.97 173.63 81 70 45 64 16.0529Subarnapur 143.31 71.80 50 44 16 36 0.5530Sundergarh 406.05 231.25 57 104 59 57 14.70

  TOTAL 7499.99 3904.51 52 3016 1166 39 244.42

Page 12: CEMENT CONCRETE ROAD

CLUSTER HOUSING

Page 13: CEMENT CONCRETE ROAD

Financial & Physical achievements made (Cumulative up to end of April 2011)

Sl. No.

District Financial (` in Lakh) Physical Receipt

During the Year

Exp. upto end of the

month

Balance UC submitted

No. of quarters for which

funds released

No. of quarters taken up

No. of quarters

completed

No. of quarters

in progress

Quarter handed over to the H &

FW Deptt.

1 2 3 4 5 6 7 8 9 10 111Angul 77.70 77.70 0.00 19.92 16 16 16 0 162Bargarh 110.70 81.80 28.90 0.00 20 20 5 15 33Bhadrak 95.25 90.25 5.00 8.73 17 17 6 11 04Deogarh 47.10 45.00 2.10 0.00 9 9 8 1 45Dhenkanal 99.90 48.78 51.12 24.45 18 18 0 18 06Gajapati 248.96 219.39 29.57 104.13 52 52 43 9 20

7Jagatsinghpur 78.75 72.75 6.00 15.58 15 15 14 1 5

8Jajpur 30.90 30.90 0.00 0.00 6 6 6 0 09Kandhamal 716.33 378.35 337.98 11.49 150 132 14 118 9

10Keonjhar 579.96 519.65 60.31 433.23 114 114 84 30 6811Malkangiri 116.85 116.55 0.30 0.00 23 23 19 4 012Mayurbhanj 955.33 943.78 11.55 409.07 197 197 174 23 13113Nayagarh 26.25 26.25 0.00 26.25 5 5 5 0 514Sambalpur 373.76 364.14 9.62 176.03 77 77 69 8 6715Sundergarh 802.33 712.53 89.80 674.70 174 161 144 17 73

  Total 4360.07 3727.82 632.25 1903.58 893 862 607 255 401

Page 14: CEMENT CONCRETE ROAD

12TH F.C.A.

Page 15: CEMENT CONCRETE ROAD

Percentage of utilisation of TFA upto April 2011 (since inception)D

henk

anal

Gaj

apat

i

Khu

rda

Puri

Suba

rnap

ur

Bal

angi

r

Bha

drak

Ken

drap

ara

Sund

erga

rh

Ang

ul

Bou

dh

Keo

njha

r

Deo

garh

Mal

kang

iri

Naw

aran

gpur

Sam

balp

ur

Kor

aput

May

urbh

anj

Nay

agar

h

Bal

asor

e

Ray

agad

a

Cut

tack

OR

ISSA

Kan

dham

al

Nua

pada

Jaga

tsin

ghpu

r

Kal

ahan

di

Jajp

ur

Bar

garh

Jhar

sugu

da

Gan

jam

100 100100 100100100 100100100 100 100100100100 10010099 99 99 99 98 98 98 98 98

9796

96 96

93

89

%

Page 16: CEMENT CONCRETE ROAD

Percentage of U.C to Released Amount upto April 2011 (since inception)

%

May

urbh

anj

Naw

aran

gpur

Nay

agar

h

Kal

ahan

di

Sund

erga

rh

Bha

drak

Bal

angi

r

Gaj

apat

i

Mal

kang

iri

Jajp

ur

Sam

balp

ur

Ray

agad

a

Cut

tack

Deo

garh

Kan

dham

al

OR

ISSA

Nua

pada

Puri

Gan

jam

Khu

rda

Suba

rnap

ur

Keo

njha

r

Jaga

tsin

g...

Dhe

nkan

al

Bal

asor

e

Ang

ul

Jhar

sugu

da

Kor

aput

Bou

dh

Bar

garh

Ken

drap

ara

95 94 94 93 93 91 90 90 89 89 87 85 85 85 83 81 81 80 79 79 79 7973 73 71 69 69 68 65

61 60

Page 17: CEMENT CONCRETE ROAD

Financial Achievements made under 12th FCA upto April 2011 (Since inception)Sl. No.

District Financial (` in lakh)Funds Released Expenditure % of expr UC submitted % UC to Released amount

1Angul 3451.87 3444.82 100 2392.03 692Balangir 4223.05 4223.05 100 3821.70 903Balasore 5022.35 4952.88 99 3590.27 714Bargarh 4373.85 4180.68 96 2671.44 615Bhadrak 3280.08 3280.07 100 2975.94 916Boudh 1018.21 1015.61 100 665.82 657Cuttack 5728.80 5634.62 98 4846.40 858Deogarh 947.16 944.20 100 801.06 859Dhenkanal 2945.16 2945.16 100 2150.06 73

10Gajapati 2325.92 2325.92 100 2103.36 9011Ganjam 7115.98 6332.37 89 5621.41 7912Jagatsinghpur 3271.24 3173.62 97 2391.32 7313Jajpur 4606.67 4408.01 96 4086.90 8914Jharsuguda 1259.57 1176.56 93 870.45 6915Kalahandi 4087.26 3934.17 96 3808.29 9316Kandhamal 2496.35 2447.44 98 2084.34 8317Kendrapara 3877.87 3872.88 100 2330.26 6018Keonjhar 4296.48 4285.48 100 3375.30 7919Khurda 3265.57 3265.57 100 2568.64 7920Koraput 3563.85 3536.20 99 2406.35 6821Malkangiri 1750.74 1744.21 100 1557.52 8922Mayurbhanj 6226.03 6174.15 99 5919.26 9523Nawarangpur 2708.44 2698.07 100 2557.00 9424Nuapada 1645.30 1607.74 98 1326.22 8125Nayagarh 3093.76 3059.02 99 2907.66 9426Puri 4107.17 4107.17 100 3295.31 8027Rayagada 2712.64 2668.81 98 2303.82 8528Sambalpur 2323.40 2314.27 100 2026.60 8729Subarnapur 1565.06 1565.06 100 1229.75 7930Sundergarh 4211.45 4204.21 100 3919.82 93

  TOTAL 101501.29 99522.01 98 82604.29 81

Page 18: CEMENT CONCRETE ROAD

Percentage of Physical achievements made upto April 2011 (since inception)

Bal

angi

rB

hadr

akD

eoga

rhD

henk

anal

Gaj

apat

iJh

arsu

guda

Khu

rda

Naw

aran

gpur

Suba

rnap

urA

ngul

Sund

erga

rhM

ayur

bhan

jB

alas

ore

Ray

agad

aK

endr

apar

aK

eonj

har

Sam

balp

urN

ayag

arh

Cut

tack

Kor

aput

Kan

dham

alB

oudh

Mal

kang

iriK

alah

andi

Puri

OR

ISSA

Bar

garh

Jaga

tsin

ghpu

rN

uapa

daG

anja

mJa

jpur

100 100 100 100100 100 100 100100 100100 100100 100100100 100 100100 100100 100 100 99 99 99 9998 98

87 87

%

Page 19: CEMENT CONCRETE ROAD

Physical Achievements under 12th FCA upto April’11(since inception)Sl. No. District Project taken up Projects Completed %

1Angul 7256 7255 1002Balangir 3405 3405 1003Balasore 32754 32745 1004Bargarh 5486 5425 995Bhadrak 3560 3560 1006Boudh 1260 1256 1007Cuttack 5593 5581 1008Deogarh 864 864 1009Dhenkanal 1798 1798 100

10Gajapati 1559 1559 10011Ganjam 5539 4837 8712Jagatsinghpur 2321 2273 9813Jajpur 2596 2258 8714Jharsuguda 906 906 10015Kalahandi 2610 2595 9916Kandhamal 2915 2908 10017Kendrapara 1868 1867 10018Keonjhar 7281 7276 10019Khurda 1249 1249 10020Koraput 2503 2497 10021Malkangiri 850 846 10022Mayurbhanj 37369 37360 10023Nawarangpur 3954 3954 10024Nuapada 2339 2282 9825Nayagarh 2493 2489 10026Puri 1312 1303 9927Rayagada 15294 15287 10028Sambalpur 2184 2182 10029Subarnapur 1876 1876 10030Sundergarh 18863 18860 100

  TOTAL 179857 178553 99

Page 20: CEMENT CONCRETE ROAD

13th F.C.A.

Page 21: CEMENT CONCRETE ROAD

Financial Achievements under 13th FCA upto March 2011 during 2010-11(` In Lakh)

Sl. No

District OB Funds Received during the year

Total Funds Available

Expenditure % of Exp. Balance

1 2 3 4 5 6 7 81Angul - 790.17 790.17 250.77 32 539.402Bolangir - 1058.31 1058.31 493.06 47 565.253Balasore - 1164.57 1164.57 338.92 29 825.654Bargarh - 942.24 942.24 0.00 0 942.245Bhadrak - 760.18 760.18 366.98 48 393.206Boudh - 245.02 245.02 5.18 2 239.847Cuttack - 1302.19 1302.19 445.67 34 856.528Deogarh - 222.98 222.98 78.38 35 144.609Dhenkanal - 753.32 753.32 112.83 15 640.49

10Gajapati - 546.65 546.65 0.30 0 546.3511Ganjam - 1854.42 1854.42 0.00 0 1854.4212Jagatsinghpur - 734.83 734.83 339.42 46 395.4113Jajpur - 1081.34 1081.34 147.89 14 933.4514Jharsuguda - 290.85 290.85 0.00 0 290.8515Kalahandi - 1056.13 1056.13 431.31 41 624.8216Kandhamal - 691.86 691.86 111.21 16 580.6517Kendrapara - 1006.05 1006.05 92.35 9 913.7018Keonjhar - 1169.92 1169.92 410.49 35 759.4319Khurda - 666.99 666.99 413.27 62 253.7220Koraput - 1054.36 1054.36 124.60 12 929.7621Malkangiri - 502.51 502.51 27.40 5 475.1122Mayurbhanj - 1901.47 1901.47 515.05 27 1386.4223Nawarangpur - 859.71 859.71 206.26 24 653.4524Nuapada - 409.56 409.56 13.58 3 395.9825Nayagarh - 675.26 675.26 246.61 37 428.6526Puri - 893.27 893.27 544.02 61 349.2527Rayagada - 794.70 794.70 81.75 10 712.9528Sambalpur - 607.46 607.46 165.43 27 442.0329Subarnapur - 367.79 367.79 34.00 9 333.7930Sundergarh - 1301.57 1301.57 0.00 0 1301.57

  Total 0.00 25705.68 25705.68 5996.73 23 19708.95

Page 22: CEMENT CONCRETE ROAD

STATE FINANCE COMMISSION AWARD

Page 23: CEMENT CONCRETE ROAD

Percentage of utilisation of TFA under SFC upto March’11 during 2010-11

57

44

41 40

3534 32

29 2826

24

21 21 20 20 19 18 1816 15

1412 12 12 11

9 9 8 7 6 6

%

Page 24: CEMENT CONCRETE ROAD

Percentage of physical achievements under SFC upto March’11 during 2010-11

89

75

6965 64 64 64

61

54 54 52 51 50 48 47 46 44 4442

3935 35 35

2825

1713 11

64 2

%

Page 25: CEMENT CONCRETE ROAD

Financial & Physical achievements under SFC upto March 2011 during 2010-11Sl. No.

District Financial (` in Lakh) Physical (No. of Projects)TFA Expenditure % Taken up Completed %

1Angul 437.84 193.52 44 106 79 752Balangir 852.31 162.65 19 171 109 643Balasore 612.58 70.78 12 157 84 544Bargarh 685.37 73.91 11 200 83 425Bhadrak 394.91 64.20 16 66 11 176Boudh 228.62 92.91 41 60 30 507Cuttack 1097.22 355.34 32 344 178 528Deogarh 196.42 66.00 34 46 21 469Dhenkanal 488.98 44.50 9 79 38 48

10Gajapati 316.03 93.15 29 141 55 3911Ganjam 1446.55 91.49 6 319 111 3512Jagatsinghpur 319.85 37.97 12 127 81 6413Jajpur 1040.64 214.25 21 250 134 5414Jharsuguda 456.53 95.00 21 9 1 1115Kalahandi 795.16 48.09 6 107 14 1316Kandhamal 472.27 31.90 7 48 2 417Kendrapara 812.90 111.50 14 208 91 4418Keonjhar 536.36 212.88 40 77 39 5119Khurda 810.62 198.19 24 83 21 2520Koraput 417.52 63.45 15 164 113 6921Malkangiri 247.20 69.96 28 41 25 6122Mayurbhanj 1144.37 210.57 18 201 89 4423Nawarangpur 345.89 40.36 12 67 19 2824Nuapada* 268.27 23.30 9 44 1 225Nayagarh 635.43 222.60 35 195 69 3526Puri 484.70 86.10 18 175 156 8927Rayagada 589.25 46.71 8 109 7 628Sambalpur 660.43 169.95 26 166 106 6429Subarnapur 369.15 209.40 57 74 48 6530Sundergarh 798.44 159.97 20 88 31 35

  Total 17961.80 3560.60 20 3922 1846 47

Page 26: CEMENT CONCRETE ROAD

Financial & Physical Achievements under SFC during April 2011 Sl. No.

District Financial (` in Lakh) Physical (No. of Projects)TFA Expenditure % Taken up Completed %

1Angul 244.32 0.00 0 27 0 02Balangir 689.66 0.00 0 62 0 03Balasore 541.80 0.00 0 73 0 04Bargarh 611.46 0.00 0 117 0 05Bhadrak 330.71 0.00 0 55 0 06Boudh 170.91 0.00 0 30 0 07Cuttack 741.88 0.00 0 166 0 08Deogarh 130.42 0.00 0 25 0 09Dhenkanal 444.48 0.00 0 41 0 0

10Gajapati 222.88 0.00 0 86 0 011Ganjam 1355.06 39.02 3 208 0 012Jagatsinghpur 281.88 0.00 0 46 0 013Jajpur 826.39 0.00 0 116 0 014Jharsuguda 361.53 0.00 0 8 0 015Kalahandi 747.07 0.00 0 93 0 016Kandhamal 440.37 0.00 0 46 0 017Kendrapara 701.40 0.00 0 117 0 018Keonjhar 329.22 0.00 0 38 0 019Khurda 612.43 0.00 0 62 0 020Koraput 354.07 1.00 0 51 0 021Malkangiri 177.24 0.00 0 16 0 022Mayurbhanj 936.05 0.00 0 112 0 023Nawarangpur 305.53 0.00 0 48 0 024Nuapada* 244.97 0.00 0 43 0 025Nayagarh 412.83 27.40 7 126 4 326Puri 398.60 0.00 0 19 0 027Rayagada 548.04 0.00 0 102 0 028Sambalpur 490.48 0.00 0 60 0 029Subarnapur 159.75 0.00 0 26 0 030Sundergarh 685.42 0.00 0 57 0 0

  Total 14496.85 67.42 0 2076 4 0

Page 27: CEMENT CONCRETE ROAD

RASTRIYA GRAM SWARAJ YOJANA(RGSY)

Page 28: CEMENT CONCRETE ROAD

SUBMISSION OF UC OF RGSY SCHEMES RELATING TO GPS BUILDING IN REVISED UC FORMAT(Rs. In Lakh)

Sl. No. Name of the District Grant released UC submitted Balance UC to be submitted1 2 3 5 6

1ANGUL 6.00 6.00 0.002BALANGIR 23.25 23.25 0.003BALASORE 22.50 22.50 0.004BARGARH 10.50 10.50 0.005BHADRAK 12.00 12.00 0.006BOUDH 0.00 0.00 0.007CUTTACK 27.00 20.00 7.008DEOGARH 0.00 0.00 0.009DHENKANALA 16.50 16.50 0.00

10GAJAPATI 21.75 0.00 21.7511GANJAM 20.63 0.00 20.6312JAGAT SINGHPUR 3.75 0.00 3.7513JAJPUR 17.25 0.00 17.2514JHARSUGUDA 17.25 0.00 17.2515KALAHANDI 22.50 0.00 22.5016KANDHAMAL 0.00 0.00 0.0017KENDRAPADA 37.50 0.00 37.5018KEONJHAR 4.50 0.00 4.5019KHURDA 13.88 0.00 13.8820KORAPUT 24.75 0.00 24.7521MALKANGIRI 15.00 0.00 15.0022MAYURBHANJ 21.75 0.00 21.7523NABARANGPUR 53.25 53.25 0.0024NUAPADA 14.25 14.25 0.0025NAYAGARH 37.50 0.00 37.5026PURI 15.00 0.00 15.0027RAYAGADA 9.75 0.00 9.7528SAMBALPUR 18.00 0.00 18.0029SUBARNAPUR 6.00 0.00 6.0030SUNDERGARH 0.00 0.00 0.00

TOTAL 492.00 178.25 313.75

Page 29: CEMENT CONCRETE ROAD

DISTRICT LEVEL VIGILANCE &

MONITORING COMMITTEE MEETING(DLVMC)

Page 30: CEMENT CONCRETE ROAD

Details meetings of Distrct-level Vigilance & Monitoring Committee held during 2010-11

Sl. No Districts Dates of V &MC meeting conducted during 2010-111st Quarter 2nd Quarter 3rd Quarter 4th Quarter Remarks

1 Angul 05.06.10   05.10.10 02.02.11  2 Bargarh   11.07.10      3 Balasore 18.06.10   20.11.10    4 Bhadrak 07.04.10 17.09.10 06.10.10    5 Bolangir   02.09.10   19.01.11  6 Boudh     06.11.10    7 Cuttack 03.06.10        8 Dhenkanal 20.05.10 22.09.10      9 Deogarh Nil Nil Nil Nil  

10 Ganjam   25.09.10 02.11.10 10.02.11  11 Gajapati   10.07.10   28.01.11  12 Jajpur 05.06.10   04.11.10    13 Jagatsinghpur   21.08.10   27.01.11  14 Jharsuguda   12.07.10      15 Kandhmal 09.04.10   20.11.10    16 Kalahandi Nil Nil Nil Nil  17 Khurdha 29.06.10   30.12.10 16.05.11 date fixed18 Koraput   09.09.10      19 Keonjhar   07.07.10      

20 Kendrapada 08.04.10, 09.06.10 14.09.10      

21 Mayurbhanj 18.06.10     12.05.11 date fixed22 Malkangiri   20.09.10      23 Nayagarh   03.07.10      24 Nabarangpur Nil Nil Nil Nil  25 Nuapada 05.04.10        26 Puri 18.06.10     19.01.11  27 Rayagada Nil Nil Nil Nil  28 Sambalpur Nil Nil Nil Nil  29 Sonepur 11.06.10 06.09.10   06.02.11  30 Sundargarh   08.07.10   12.01.11  

Page 31: CEMENT CONCRETE ROAD

• Timely submission of MPRs and other reports.

• C.B. & O.B. to be matched.

• Any change in the O.B. to be intimated and

prior permission to be obtained from the

Department.

ISSUES OF M.I.S