california’s high-speed train -...
TRANSCRIPT
![Page 1: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/1.jpg)
CALIFORNIA’S HIGH-SPEED TRAIN
A presentation to Los Angeles Metropolitan Transportation Authority
By Jeff Barker, Deputy Director, California High-Speed Rail Authority
May 2010
![Page 2: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/2.jpg)
BACKGROUND
• First discussions started 30 years ago
• Proposition 1A
• Environmental review
• Studies reflect input from the people
![Page 3: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/3.jpg)
CALIFORNIA’S HIGH-SPEED TRAIN SYSTEMLargest public infrastructure project in U.S. history
• 800-mile system (520 miles in phase one)
• Operating speeds: 110-125 mph in urban areas; 220 mph in rural areas
• 100% clean electric power
• Safely grade-separated
• Reliable, easy way to travel
• Environmentallyresponsible
• Creates jobs/ stimulates economy
![Page 4: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/4.jpg)
PHASE 1
• San Francisco-San Jose
• San Jose-Merced
• Merced-Fresno
• Fresno-Bakersfield
• Bakersfield-Palmdale
• Palmdale-Los Angeles
• Los Angeles-Anaheim
![Page 5: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/5.jpg)
SUBSEQUENT SECTIONS AND ALTAMONT CORRIDOR
• Los Angeles-San Diego (via Inland Empire)
• Merced-Sacramento
• Altamont Corridor Rail Project
![Page 6: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/6.jpg)
Jobs
• 600,000 full-time, one-year, construction-related job-equivalents
• 5,000 permanent operations and maintenance jobs
• 450,000 economy-wide jobs by 2035
Mobility
• “Economic power is how fast you move people and goods around the state.” Gov. Arnold Schwarzenegger, January 15, 2008.
Environment
• Reduced air pollution
• AB 32: California’s 2006 landmark legislation to reduce greenhouse gas emissions 25% by 2020
WHY WE NEED IT
![Page 7: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/7.jpg)
Sustainable Communities:“Smart Growth”
Vision California:
• How can land use and transportation investments help solve California’s environmental and fiscal challenges?
Transit-oriented development:
• Minimize urban sprawl and impacts to open space
• Enhance connectivity with local transportation systems
WHY WE NEED IT
![Page 8: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/8.jpg)
WHY WE NEED ITStatus quo is not an option
Population Growth
• California’s population now: 38 million By 2035: 50 million
We can build…
• New freeways, airport runways and more departure gates to address our expected population growth
or
• 800-mile high-speed train system, powered by 100% renewable electricity generated by clean wind and solar energy
![Page 9: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/9.jpg)
MOMENTUM
In 2008 Californians passed Proposition 1A
• $9.95 bond measure – first state to pass funding in the nation
The Federal Government supports helping fund the system throughthe American Recovery & Reinvestment Act
• $2.25B grant awarded in January 2010
• Largest award for high-speed train funding received by any state
Private sector interest
• Seeking $10-12B through public-private partnerships (P3)
• Request for Expressions of Interest issued spring 2008
• Next: solicit preliminary comments on planned RFQ process in late 2010
International interest
• MOUs to share expertise with China, France, Germany, Italy, Japan, Korea and Spain
![Page 10: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/10.jpg)
WHERE WE ARE NOWTransitioning from Planning to Implementation
Project-level EIR/EIS in process for all nine sections
All sections have completed scoping and completed the analysis of alternative alignments or have it underway
Receiving public input on alternative alignments
September 2011-October 2012: Target dates for state and federal certification of all seven Phase 1 sections
On track to meet requirements for ARRA funding
![Page 11: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/11.jpg)
FUNDING
Projected overall construction cost: $42.6 billion
(Anticipated funding sources)
• California Funding: $9B
• Federal Funding: $17-19B
• Local Funding: $4-5B
• Private Investment: $10-12B
![Page 12: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/12.jpg)
WHERE WE ARE NOWTransitioning from Planning to Implementation
Federal Funding: A Key Component for Success
• Completed – American Recovery and Reinvestment Act (ARRA) grant of $2.25B awarded in January 2010
• In Process – Three applications for Passenger Rail Investment and Improvement Act (PRIIA) grants submitted in mid-May, could provide as much as $16.6M
• Coming Up – Innovative finance and loan programs that the Authority or a private investment concessionaire could use to reduce borrowing costs
![Page 13: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/13.jpg)
RECOVERY ACT FUNDING: WHERE?
ARRA projects:
• Los Angeles-Anaheim
• Fresno-Bakersfield
• Merced-Fresno
• San Francisco-San Jose
![Page 14: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/14.jpg)
RECOVERY ACT FUNDING:LOS ANGELES-ANAHEIM
Los Angeles to Anaheim section –
92,000 construction-related jobs generated over the course of construction
High-speed train facilities at Los Angeles Union Station, Norwalk Station and the Anaheim Regional Transportation Intermodal Center
Grade separations, utility relocation, guideway structures, tunneling, earthwork and track
Environmental mitigation and right-of-way acquisition
![Page 15: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/15.jpg)
Developing collaborative
planning agreements with regional governments
WHERE WE ARE NOWTransitioning from Planning to Implementation
![Page 16: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/16.jpg)
NEXT STEPS
• 2012
– EIR/EIS process complete in all Phase 1 (Anaheim-Los Angeles-San Francisco) sections, construction start-up
• 2015
– Begin testing the first prototype trainsets
• 2018-20
– Launch operations on Anaheim-Los Angeles-San Francisco
![Page 17: CALIFORNIA’S HIGH-SPEED TRAIN - Metromedia.metro.net/about_us/sustainability/images/2010/...CALIFORNIA’S HIGH-SPEED TRAIN SYSTEM Largest public infrastructure project in U.S. history](https://reader033.vdocuments.site/reader033/viewer/2022051321/5ad7512f7f8b9a6b668cc5fe/html5/thumbnails/17.jpg)
LOOKING AHEAD
Contact Info
– California High-Speed Rail Authority
– 925 L St., Suite 1425 Sacramento, CA 95814
– 916-324-1541
– www.cahighspeedrail.ca.gov