Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project Project No. PSP108 Galvanized Flashing and Sheet Metal Tapajunta Galvanizada y Lámina Metálica Construction Specification No. C-CS-20-011 Rev. 0 12 July 2005

Upload: yvan-nunez-escobedo

Post on 20-Nov-2015

6 views

Category:

Documents


2 download

DESCRIPTION

Procedimiento

TRANSCRIPT

  • Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC

    Sociedad Minera Cerro Verde S.A.A.

    Primary Sulfide Project

    Project No. PSP108

    Galvanized Flashing and Sheet Metal

    Tapajunta Galvanizada y Lmina Metlica

    Construction Specification

    No. C-CS-20-011 Rev. 0

    12 July 2005

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 1 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    This document has been revised as indicated below. Changes after revision 0 are identified by vertical bars at the right side of the page, with additions being underlined. Please replace all pages of this specification and destroy the superceded copies. English is the prevailing language of this document.

    Rev No.

    Originator (name/initials)

    Rev Date

    Revision Description

    0 Hernan Alvarez 12Jul05 Issued for Construction

    New Issue Entire Specification Re-issued

    APPROVALS ORIGINAL SIGNED BY

    FLUOR DATE CLIENT DATE

    Project Manager: Engineering Manager: Brad Matthews 12Jul05 Area Project Engineer: Reza Sherkat 12Jul05 Lead Discipline Engineer: Hernan Alvarez 12Jul05 Process Approval:

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 2 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    Table of Contents

    1. GENERAL....................................................................................................................................................... 3 1.1 Summary......................................................................................................................................................3 1.2 Referenced Publications..............................................................................................................................3 1.3 Submittals ....................................................................................................................................................3 1.4 Delivery and Storage ...................................................................................................................................3 1.5 Sequencing and Scheduling ........................................................................................................................4 2. PRODUCTS.................................................................................................................................................... 4 2.1 Materials.......................................................................................................................................................4 2.2 Fabrication ...................................................................................................................................................4 3. EXECUTION ................................................................................................................................................... 5 3.1 Installation....................................................................................................................................................5 4. ATTACHMENTS ............................................................................................................................................ 6 1. GENERALIDADES......................................................................................................................................... 8 1.1 Resumen......................................................................................................................................................8 1.2 Publicaciones Referenciadas ......................................................................................................................8 1.3 Remisiones ..................................................................................................................................................8 1.4 Entrega y Almacenamiento..........................................................................................................................9 1.5 Secuencia y Programacin..........................................................................................................................9 2. PRODUCTOS................................................................................................................................................. 9 2.1 Materiales.....................................................................................................................................................9 2.2 Fabricacin ..................................................................................................................................................9 3. EJECUCIN ................................................................................................................................................. 10 3.1 Instalacin..................................................................................................................................................10 4. ANEXOS....................................................................................................................................................... 11

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 3 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    1. GENERAL

    1.1 Summary

    A. Scope of Specification

    This specification includes but does not necessarily limit materials and labor to furnish, unload, store, and install galvanized flashing and sheet metal for a complete, operational system.

    B. Related Specifications

    The following specifications prescribe items of related Work:

    C-CS-20-006 Rough Carpentry C-CS-20-008 Insulation C-CS-20-010 Metal Panels C-CS-20-012 Joint Sealing C-CS-20-013 Metal Doors and Frames

    Coordinate Work prescribed by this specification with Work prescribed by the above listed specifications.

    1.2 Referenced Publications

    Within this specification shall be the latest revision unless otherwise specified; and applicable parts of the referenced publications shall become a part of this specification as if fully included.

    ASTM (American Society for Testing and Materials) FM (Factory Mutual) SMACNA (Sheet Metal and Air Conditioning Contractors National Association) SPRI (Single Ply Roofing Institute) NRCA (National Roofing Contractors Association) IBC (International Building Code)

    1.3 Submittals

    Shop Drawings

    A. Submit shop showing profiles, interlocking joints, intersections, gages, fabrication and installation details to Fluor for review. Do not start fabrication until Fluor review comments have been received.

    B. Submit shop drawings and samples of sheet metal demonstrating profile and interlocking joints for different types of assemblies.

    1.4 Delivery and Storage

    A. Handling

    Exercise care to prevent damage during transportation and storage.

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 4 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    B. Storage

    Store sheet metal above ground and under cover.

    1.5 Sequencing and Scheduling

    Coordinate installation of sheet metal with related Work to avoid interference.

    2. PRODUCTS

    2.1 Materials

    Conform to FM Loss Prevention Data Sheet 1-49 and Architectural Sheet Metal Manual by SMACNA for sizes, shapes, and dimensions. The most stringent requirements shall govern.

    A. Flashing and Sheet Metal

    22-gage galvanized steel sheet conforming to ASTM A 653-G90.

    B. Solder

    ASTM B 32; 60 percent tin and 40 percent lead.

    C. Flux

    Muriatic acid neutralized with zinc.

    D. Plastic Cement

    Commercial type conforming to ASTM D 4586. No asbestos fibers are permitted.

    E. Fasteners

    Annular ring nails, screws, rivets, and bolts of non-corrosive materials.

    F. Lead

    Four pound pig lead; ASTM B 29.

    G. Sealant

    Two-part polyurethane sealant complying with ASTM C920.

    2.2 Fabrication

    Form sheet metal on bending brakes. Shape, trim, and hand-seam sheet metal on the bench with proper tools as far as practicable. Make bends and folds for interlocking metal joints to allow for expansion and contraction. Fabricate in 2440 mm to 3050 mm lengths. Form true, sharply defined straight edges and seams.

    A. Gutters

    Twenty gage galvanized steel, 1-piece construction complete with outlets, fittings, and conductors. Joints shall be lapped 25 mm, riveted, and soldered; rivets shall be spaced no farther than 38 mm apart for the full girth of the section. Ends shall be similarly secured. Outlets shall be flanged and soldered to inside of gutters, shall be provided with a locked seam, and

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 5 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    shall extend into downspout at least 76mm. Provide easily removed and cleaned strainer for each collection box. Provide butt type expansion joints.

    1. Cradles

    Minimum 3 mm by 25 mm cold rolled galvanized steel bands.

    2. Spacers

    Minimum 1.5 mm by 25 mm galvanized flat stock.

    3. EXECUTION

    3.1 Installation

    A. General

    1. Anchor work in place with non-corrosive fasteners, adhesives, setting compounds, tapes, and other materials and devices as recommended by the Manufacturer of each material or system. Provide for thermal expansion and building movements. Comply with recommendations of Architectural Sheet Metal Manual by SMACNA and FM Loss Prevention Data Sheet 1-49.

    2. Seal moving joints in metal work with elastomeric sealants.

    3. Clean metal surfaces of soldering flux and other substances that could cause corrosion.

    4. Nail flanges to substrates in two staggered rows, each row at a spacing of 150 mm o.c.

    5. Install sections in 3050 mm lengths maximum. Lap joints 100 mm and seal with double backer beads of specified sealant.

    6. Solder nonmoving seams using flatlock seams, unless otherwise shown. Clean, tin, and solder in accordance with the metal producer's recommendations. Reinforce soldered lap joints with 3.2 mm rivets spaced no more than 50 mm apart and soldered water tight.

    B. Gutters / Downspouts

    Where shown, install rigid gutters and downspouts. Attach to nailers with 2 wood screws countersunk flush into the cradles.

    C. Vent Flashing

    Flash pipe vents through roof with lead turned 150 mm on roof and turned down 100 mm into pipe.

    D. Coping

    Install continuous cleats to receive both sides of coping. Install coping with 13 mm joints for expansion and contraction. Cover joints in coping with 150 mm wide cover plates. Under the cover plate lay strips of 3 mm thick by 25 mm wide sealant tape, 13 mm behind each edge of the cover and between the cover plate and the metal cover. Fill remaining 13 mm space on each side of the cover plate with sealant. Handvise coping receivers continuously along cleats.

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 6 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    E. Dissimilar Materials

    Where the sheet metal abuts or members into dissimilar materials, the juncture shall be executed in such a manner as to prevent electrolysis between the 2 materials. Paint the aluminum surfaces in contact with dissimilar metals with a heavy coat of bitumastic enamel.

    F. Cleaning

    After Completion of work of this section remove from jobsite Associated debris, tools and equipment. Site to be ready for next subtrade.

    4. ATTACHMENTS

    Not applicable.

    End of Specification

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 7 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    Este documento ha sido revisado como se indica ms abajo. Los cambios posteriores a la revisin 0 son identificados con barras verticales al lado derecho de la pgina, con los agregados subrayados. Por favor reemplazar todas las pginas de esta especificacin y destruya las copias precedentes. El ingls ser el idioma prevaleciente de este documento.

    Rev. No.

    Origen (nombre/iniciales)

    Fecha Rev.

    Descripcin de la Revisin

    0 Hernan Alvarez 16May05 Emitida para Construccin

    Nueva Edicin Especificacin Totalmente Re-

    editada

    APROBACIONES ORIGINAL FIRMADO POR

    FLUOR FECHA CLIENTE FECHA

    Gerente de Proyecto: Gerente de Ingeniera: Brad Matthews 12Jul05 Ingeniero de Proyecto del rea:

    Reza Sherkat 12Jul05

    Ingeniero Jefe de la Disciplina:

    Hernan Alvarez 12Jul05

    Aprobacin del Proceso:

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 8 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    1. GENERALIDADES

    1.1 Resumen

    A. Alcance de la Especificacin

    Esta especificacin incluye pero no necesariamente se limita a los materiales y mano de obra para suministrar, descargar, almacenar e instalar la tapajunta galvanizada y la lmina metlica para un sistema operacional completo.

    B. Especificaciones Relacionadas

    Las siguientes especificaciones establecen tems de trabajo relacionado:

    C-CS-20-006 Carpintera Gruesa C-CS-20-008 Aislamiento C-CS-20-010 Paneles Metlicos C-CS-20-012 Sellado de Juntas C-CS-20-013 Puertas y Marcos Metlicos

    Coordinar el trabajo prescrito por esta especificacin con el trabajo prescrito por las especificaciones enlistadas anteriormente.

    1.2 Publicaciones Referenciadas

    Dentro de esta especificacin deber estar la ltima revisin, a menos que se especifique de otra manera; y las partes aplicables de las publicaciones referenciadas debern convertirse en parte de esta especificacin como si estuvieran totalmente incluidas.

    ASTM (Sociedad Americana Para Ensayos y Materiales) FM (Corporacin de Ingeniera Mutual de Fbricas) SMACNA (Asociacin Nacional de Contratistas de Ductos Metlicos y Aire Acondicionado) SPRI (Instituto del Techado con Membranas de una Capa) NRCA (Asociacin Nacional de Contratistas para Techados) IBC (Norma Internacional de Construccin)

    1.3 Remisiones

    Planos de Fbrica

    A. Remitir los planos de fbrica mostrando los perfiles, juntas de interconexin, intersecciones, calibres, detalles de fabricacin e instalacin, a Fluor para revisin. No comience la fabricacin hasta que los comentarios de la revisin de Fluor hayan sido recibidos.

    B. Remitir los planos de fbrica y muestras de la lmina metlica, demostrando el perfil y las juntas de interconexin para los diferentes tipos de ensambles.

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 9 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    1.4 Entrega y Almacenamiento

    A. Manipulacin

    Mantener cuidado para prevenir dao durante el transporte y almacenamiento.

    B. Almacenamiento

    Almacenar la lmina metlica sobre el suelo y bajo cubierta.

    1.5 Secuencia y Programacin

    Coordinar la instalacin de la lmina metlica con el trabajo relacionado para evitar interferencias.

    2. PRODUCTOS

    2.1 Materiales

    Sern conforme a la Hoja de Datos para Prevencin de Prdidas 1-49 de FM y al Manual de Lmina Metlica Arquitectnica de SMACNA para los tamaos, formas y dimensiones. Los requerimientos ms exigentes debern prevalecer.

    A. Tapajunta y lmina metlica

    Lmina de acero galvanizado de calibre 22 conforme a ASTM A 653-G90.

    B. Soldadura

    ASTM B 32; 60 por ciento estao y 40 por ciento plomo.

    C. Fundente

    cido Muritico neutralizado con zinc.

    D. Cemento Plstico

    Del tipo comercial conforme a ASTM D 4586. No se permiten fibras de asbesto.

    E. Sujetadores

    Clavos anillados, tornillos, remaches, y pernos de materiales no corrosivos.

    F. Plomo

    Lingote de Plomo de cuatro libras; ASTM B 29.

    G. Selladores

    Sellador de poliuretano de dos partes cumpliendo con ASTM C920.

    2.2 Fabricacin

    Forme la lmina metlica en plegadora de chapa. Forme, corte y junte a mano la lmina metlica en un banco, con las herramientas apropiadas tanto como sea factible. Realizar los dobleces y pliegues para juntas metlicas de interconexin, para permitir la expansin y contraccin. Fabricadas en

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 10 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    longitudes de 2440mm hasta 3050mm. Forme extremos y costuras derechos, claramente definidos y alineados.

    A. Canaletas

    Acero galvanizado de calibre veinte, construido en 1-pieza completa con salidas, accesorios, y conductores. Las juntas debern ser traslapadas 25 mm, remachadas y soldadas; los remaches debern estar espaciados a no ms de 38 mm aparte de la circunferencia completa de la seccin. Los extremos debern asegurarse similarmente. Las salidas debern ser flanqueadas y soldadas al interior de las canaletas, debern estar provistos con una costura de cerrado, y debern extenderse dentro del canaln al menos 76mm. Proveer un colador de fcil remocin y limpieza para cada caja colectora. Proporcionar juntas de expansin del tipo a tope.

    1. Soportes

    Bandas de acero galvanizado, laminado en fro, mnimo de 3 mm por 25 mm.

    2. Espaciadores

    Corriente, plano galvanizado, mnimo de 1.5 mm por 25 mm.

    3. EJECUCIN

    3.1 Instalacin

    A. Generalidades

    1. Anclar el trabajo en el lugar con sujetadores no corrosivos, adhesivos, compuestos fijadores, cintas, y otros materiales y dispositivos de acuerdo a lo recomendado por el fabricante de cada material o sistema. Proporcionar holguras para la expansin trmica y movimientos de edificios. Cumpla con las recomendaciones del Manual de Lmina metlica arquitectnica por SMACNA y la Hoja de Datos de Prevencin de Prdidas 1-49 de FM.

    2. Sellar las juntas mviles en el trabajo de metal con selladores elastomricos.

    3. Limpiar las superficies metlicas de fundente de soldadura y otras sustancias que pudieran causar corrosin.

    4. Clavar las pestaas a sustratos en dos hileras escalonadas, cada hilera a un espaciado de 150mm en centros.

    5. Instalar secciones de longitud mxima de 3050mm. Traslapar juntas a 100mm y sellar con doble cordn de respaldo del sellador especfico.

    6. Soldar juntas inmviles usando costuras de conexin planas, a menos que se muestre de otro modo. Limpiar, estaar y soldar de acuerdo con las recomendaciones del productor del metal. Reforzar las juntas a traslape soldadas con remaches de 3.2mm espaciados a no ms de 50mm aparte, y soldadas aprueba de agua.

    B. Canaletas / Bajantes

    Donde se muestre, instale canaletas y bajantes rgidos. Fijar a las claveras con 2 tornillos para madera avellanados al ras en los soportes.

  • Client Name: Sociedad Minera Cerro Verde S.A.A. Specification C-CS-20-011 Project Name: Primary Sulfide Project Page 11 of 11 Project Number: PSP108 Rev. 0 FLUOR Mining & Minerals GALVANIZED FLASHING AND SHEET METAL

    Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC ARCHITECTURAL

    C. Tapajuntas de Ventilacin

    Tapar las juntas de los tubos de ventilacin que pasan a travs del techo con plomo doblado 150mm en el techo y doblado hacia abajo 100mm dentro del tubo.

    Nota al Especificador!!!! Use tapajuntas de drenaje del techo solo con sistemas de techado construidos.

    D. Coronamiento

    Instalar listones continuos para recibir ambos lados del coronamiento. Instalar el coronamiento con juntas para expansin y contraccin de 13mm. Cubrir las juntas en el coronado con placas de cubierta de 150mm de ancho. Bajo las placas de cubierta coloque listones de cinta selladora de 3mm de espesor por 25mm anchos, 13mm atrs de cada extremo de la cubierta y entre la placa de cubierta y la placa metlica. Rellenar los 13mm de espacio remanente en cada lado de la placa de cubierta con sellador. Atornillar a mano los receptores de coronamiento continuamente a lo largo de los listones.

    E. Materiales Diversos

    Donde la lmina metlica o miembros empaten con materiales diferentes, la junta deber ser realizada de tal manera que se evite la electrolisis entre los 2 materiales. Pintar las superficies de aluminio en contacto con metales distintos con un esmalte bitumstico de capa pesada.

    F. Limpieza

    Despus de terminar el trabajo de esta seccin, retirar del lugar de trabajo los desechos relacionados, herramientas y equipo. El lugar quedar listo para el siguiente sub-oficio.

    4. ANEXOS

    No se aplica.

    Fin de la Especificacin