building the future on a foundation of excellence
TRANSCRIPT
![Page 1: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/1.jpg)
BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE
![Page 2: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/2.jpg)
ABOUT US
• Established in year 1995 at Baramati, District Pune.
• More than 25 Years of Experience in all type of Civil
work like Industrial Infra, Road Construction, RCC
Construction.
• Worked For Industries, PWD, Irrigation, Maharashtra
State Warehouse Dept.
• We Have 20 Competent Team Members having work
experience of more than 10 Yrs.
• As well as highly skilled & efcient contract teams.
• In house construction machinery.
01
Sunil BhosaleFounderB.E
Viraj BhosaleDirector BusinessB.E & MBA
Harshwardhan BhosaleDirector Project ExecutionM.E Civil
![Page 3: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/3.jpg)
AREAS OF BUSINESS
INDUSTRIAL CIVIL & PEB WORK
GOVERNMENT PROJECTS
ROADS & BRIDGES
TELECOM INFRASTRUCTURE
RESIDENTIAL DEVELOPER
02
![Page 4: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/4.jpg)
MISSION
Ÿ To deliver sustainable & cost effective
infrastructure solution.
Ÿ To Encourage Innovation, Team Work,
Professional Integrity, Commitment,
Upgradation of knowledge & Employee
skills under Safe working environment.
Ÿ To be responsible corporate citizen
committed to the social cause.
03
Ÿ To Become Top 10 Industrial Infra
Company by 2030.
Ÿ Achieve Turnover of Rs.100 Cr. By
2030.
GOAL
![Page 5: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/5.jpg)
BRIEF ABOUT PEB STRUCTURE
Ÿ Pre Engineered Buildings (PEB) are the buildings
which are engineered at a factory and assembled at
site.
Ÿ Usually PEBs are steel structures. Built-up sections
are fabricated at the factory to exact size,
transported to site and assembled at site with bolted
connections.
Ÿ This type of Structural Concept is generally used to
build Industrial Buildings, Metro Stations,
Warehouses etc.
04
![Page 6: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/6.jpg)
ADVANTAGES OF PEB STRUCTURES
Quality Control is the main
advantage as all the structural
member are engineered
beforehand, standards of
different codes also taken into
consideration & these
components are made in
factory under the supervision
of Quality Control Engineer.
05
QUALITY CONTROL
Lower cost due to the saving
in design, manufacturing and
on site erection cost.
LOWER COST
Low Maintenance due to use of
standard quality of paints over
steel members, which increases
the ability to withstand &
nally the maintenance cost
will be low as compare to
conventional steel building.
LOW MAINTENANCE
Minimizing time of
construction, as all the
members are Pre Manufactured
& skilled labor is used for
connections of different
components.
MINIMIZING TIME OF CONSTRUCTION
`
![Page 7: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/7.jpg)
BENEFITS OF PEB SHED STRUCTURE
06
Completely Air - Tight,
These Sheds have Heat
Insulated Walls
regulating temperature.
These are Acclaimed for
their Highly Robust
Designs.
Mobility, The Sheds are
Easy to Assemble &
Dis-Assemble.
Weather Proof
Structures.
Easy to Customize on
Various Specications
According to the Site
Requirements.
Warranty on PEB,
mostly warranty period
of 20 years given by
manufactures for PEB.
AIR - TIGHT HIGHLY ROBUST DESIGNS
MOBILITY WEATHER PROOF
EASY TO CUSTOMIZE
WARRANTY ON PEB
![Page 8: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/8.jpg)
PROJECTS COMPLETED IN LAST 3 YRS
07
Project : Filtrum Separation Solution Pvt Ltd.
Location : Wai MIDC, Maharashtra
Area : 5,000 SqFt.
Category : Automotive Filters
Project : Filtrum Seperation Solution Pvt Ltd
Location : Wai MIDC, Maharashtra
Area : 15,000 SqFt.
Category : Automotive Filters
Project : Trimix Flooring Construction
Location : Wai MIDC, Maharashtra
Area : 15,000 Sq.ft
Category : Automotive Filters
![Page 9: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/9.jpg)
INDUSTRIAL, CIVIL & PEB
Project Name - Jubiliant Plant
Location - Nira, Maharashtra
Area - 15,000 SqFt.
08
![Page 10: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/10.jpg)
PROJECTS
09PEB Shed During Construction
Trimix Flooring Construction
![Page 11: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/11.jpg)
SUCCESS STORY
10
CHALLENGE
Ÿ Work location was critical for material movement so no disturbance was allowed
Ÿ Running plant with 3 shifts more than 300 labours so safety challenge
Ÿ Diwali Holidays so challenge of labour availability.
Ÿ Prolonged rainy season causing work delays.
Ÿ Locals nuisance
5,000 sq.ft of Shed Extension & Trimix Flooring of 5000 sq.ft. had to be done within 15 working days.
SOLUTION
Ÿ Constructed temporary ramp & alternative route for material movement
Ÿ Worked in 2 shifts to overcome labour shortage problem
Ÿ Locals issue mitigated after discussion & making them part of the project
RESULTS
Ÿ Completed work on 14th Day it self
Ÿ Company awarded another big project of 15000 sq.ft
![Page 12: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/12.jpg)
11
Project : Fleetguard Filters Pvt. Ltd.Completed in only 25 days
Location : Nandur, Pune, Maharashtra
Area : Trimix Flooring 5,000 sqft
Category : PEB Shed Extension
![Page 13: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/13.jpg)
12
Project : Garware Bestrecth
Location : Wai MIDC, Maharashtra
Area : 26,000 Sq.ft
Category : Healthcare - PEB Shed with Civil Work
Project : Vishal Nazirkar
Location : Jejuri MIDC, Maharashtra
Area : 40,000 Sq.ft.
Category : Warehouse
Project : Ameya Industires
Location : Baramati, Maharashtra
Area : 9,000 Sq.ft
Category : Solar Energy
1
2
![Page 14: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/14.jpg)
13
Project : Unique Papers
Location : Chakan MIDC, Maharashtra
Area : 21,000 Sq.ft
Category : Paper Industry
Project : Industrial Warehouse - Mr. Anil Kate
Location : Chakan, Pune, Maharashtra
Area : 30,000 Sq.ft.
Category : Warehouse
1
2
Project : Someshwar Sugar Factory
Location : Baramati, Maharashtra
Capacity : 1 lac Ltrs.
Category : Sugar Industry
![Page 15: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/15.jpg)
14
1ONGOING PROJECT
Project : Khodiyar Industries
Location : Wai, MIDC, Maharashtra
Area : 15,000 Sq.ft
Category : PET Bottles Manufacturer
![Page 16: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/16.jpg)
OWNEDMACHINERY
15Backhoe LoadersCompactors Excavators Concrete Mixers Tractors
![Page 17: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/17.jpg)
COMMITMENT TO QUALITY
16
Environmental responsibility can be integrated
with business priorities to ensure the
protection of environmental concerns whilst
simultaneously ensuring protability.
VIRAJ CONSTRUCTION works conscientiously
towards reducing the burden placed on the
environment
![Page 18: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/18.jpg)
HEALTH, SAFETY& ENVIRONMENT
17
We have maintained an exemplary record
for health and safety. All employees at
VIRAJ CONSTRUCTION receive the latest in
levels of training for safety, health,
support and resources that are required to
meet our objectives, thereby ensuring a
safe healthy and productive working
environment.
![Page 19: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/19.jpg)
GIVES
18
![Page 20: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/20.jpg)
SPECIFIC ASK
19
![Page 21: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE](https://reader031.vdocuments.site/reader031/viewer/2022012921/61c912a143b25f6b2a726d27/html5/thumbnails/21.jpg)
REGISTERED &BRANCH OFFICE
Registered Ofce:
Wanewadi, Someshwar Nagar, Baramati, Pune - 412306 Maharashtra
Branch Ofce:
Continental Chambers, ofce 18, Karve Road, Pune - 411004 Maharashtra
Email: [email protected]
Contact:
Phone: 02112 282128
Mob: +91 9623232727 | +91 9503905045 | +91 9545554477
Clic
kme
dia
- 8
83
0 7
98
70
8