23 MARCH 2017 Broad Channel Streets and Bulkheads Reconstruction West 14 th Road – West 19 th Road 1| ENGINEERING, DESIGN AND RELATED CONSULTANT SERVICES FOR RECONSTRUCTION OF WEST 14 th – 19 th BOROUGH OF QUEENS NYCDDC PROJECT ID. HWQ1182B March 23, 2017 PRESENTATION

Upload: ecowatchers

Post on 12-Apr-2017

367 views

Category:

Engineering


1 download

TRANSCRIPT

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road1|

ENGINEERING, DESIGN AND RELATED CONSULTANT SERVICES FOR

RECONSTRUCTION OF WEST 14th – 19th

BOROUGH OF QUEENS

NYCDDC PROJECT ID. HWQ1182B

March 23, 2017

PRESENTATION

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road2|

Agenda

Introduction

Understanding the Need for this Project

Concept of a Shared Street

Proposed Design

Anticipated Project Challenges

Private Property Restoration

Understanding of Critical Schedule Elements

Closing

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road3|

introduction

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road4|

Project SynopsisA keen understanding of rising sea Levels, substandard infrastructure, and the community

Low Lying Property and Streets (most built

before Legal Grade established 1945)

Substandard Storm Drainage System

Rising Sea Levels (expected to rise an

additional 4 to 24 inches for next 20 years)

Parking Constrictions

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road5|

understanding the need for the project

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road6|

Existing FloodingSea level rise of any amount is affects to the Broad Channel community

MHW + 1 MHW + 5

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road7|

Goals, Needs, WantsDeveloping the scope, and prioritizing the elements of this reconstruction project

Goals

Needs

Wants

Reduce frequency and severity of flooding within the public space Preserve the family-oriented residential feel of the community Restore the ecology along the coastline

Raise elevation of public space (streets) Install new public infrastructure (water, sewer, storm, sanitary) Harden coastal line Mitigate impact to private homes and property Install water, storm, and sanitary sewers

Consider aesthetics, ensure the project materials are consistent with community

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road8|

concept of a shared street

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road9|

Innovative way to approach street raising

• Raise the entire public space to an elevation that takes into account historical flooding elevations and future climate change projections

• Create a single surface where pedestrians, bicycles, and automobiles share the space and interact

• R.O.W. is ADA compliant

• Special zone for visually impaired

• Single bi-directional moving lane with pullover zones to allow vehicle passing

Re-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road10|

Innovative way to approach street raising

RBA Technical Memo

Re-thinking street design and flood mitigation on narrow residential streets

NYC Climate Change Report

Other Publications

• Living Streets

• ACOE Coastal Risk Reduction

• NYS GOSR NYRCR Plan

• NYC Special Initiative for Rebuilding and Resiliency (SIRR)

• NACTO Urban Street Design

• FHWA, Shared Streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road11|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road12|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road13|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road14|

Innovative way to approach Street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road15|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road16|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road17|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road18|

Innovative way to approach street raisingRe-thinking street design and flood mitigation on narrow residential streets

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road19|

Innovative way to approach Street raising

FHWA Guidance

Re-thinking street design and flood mitigation on narrow residential streets

No ramps, slopes, or ADA impediments

West 14th Street

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road20|

proposed design

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road21|

Basic Street Elements

Pull Over Zones at Fire Hydrants

Bulkhead at End of Roadway Distinctive Raised

Entrance and Signage

Shared Cross Section at a single elevation with variations in pavement materials and patterns to highlight dominant uses

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road22|

Basic Cross SectionTypical cross section of proposed elements

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road23|

Utility Infrastructure

• Water

• Storm sewer

• Sanitary Sewer

• Outfall to Jamaica Bay

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road24|

Bulkhead / WaterfrontHardened waterfront protection

• Similar in nature to the shorelines proposed under Phase 1

• Bulkhead built to the 100-year FEMA floodplain elevation

• Provides protection against coastal flooding and storm surge

• Prevents natural marsh migration and may create seaward erosion

Bulkhead / WaterfrontHardened waterfront protection

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road26|

Alternative Bulkhead / Living ShorelineCombination of hardened shoreline and Living Shoreline

• Resilient against storm surge

• Natural wave attenuation, decreasing effect of storm surge

• Improves water quality

• Marshes trap sediment from tidal waters allowing them to grow as sea level rises

• Consistent with existing ecology of Jamaica Bay

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road27|

private property restoration

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road28|

Private Property RestorationWood Stairs (23 West 14th Street)

• Decks Preserved

• Stairs Modified

• Restore similar surface in front of home

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road29|

Private Property RestorationWood Stairs (23 West 14th Street)

• Ornaments / Special features will have to be removed prior to private property construction

• Standard material will be rebuilt (such as chain link fence)

• Stairs Modified

• Provide options for surface restoration in front of homes

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road30|

Private Property MitigationWood Stairs (23 West 14th Street)

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road31|

anticipated project challenges

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road32|

Construction Means and MethodsRe-thinking waterfront construction options/techniques

Phase 1 Cofferdam Smaller Cofferdam for Site Specific Work

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road33|

PermittingUnderstanding agency requirements specifically DOT, DEP, DEC, and ACOE

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road34|

understanding of critical schedule

elements

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road35|

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Schedule

NTP

Mass Mailing 2 (80%)

CB One-On-One

CB Meeting

Draft Consent Letter

Bid Documents

Advertise for Bid

2016 2017

23 MARCH 2017

Broad Channel Streets and Bulkheads Reconstruction

West 14th Road – West 19th Road36|

questions