BIM & Information Integration
Ahmed Balawi BIM Manager 11 September, 2014 UAE
Arabtec-Introduction
Midfield Terminal (MTB)
Al Ain New Hospital
Fairmont Abu Dhabi Hotel & Apartments
Louvre Abu Dhabi
Musheireb Downtown Doha
BIM Functional chart
BIM
Engineering Info graphics & Data
Visualization Research &
Development Construction Scenarios
& Simulation
Our BIM Understanding
PROCESS
TECHNOLOGY PEOPLE
Client: Abu Dhabi Health Services Company PJSC-SEHA
Project Manager: Allen & Shariff Corporation
Principle Consultants:
• I.C.M.E. Healthcare
• FAUST CONSULT
• OBERMEYER Middle East
Main Contractor: Arabtec Construction & Constructora San Jose S.A. Joint Venture (ATS)
Cost (estimated): 1.17bn USD
Area: 315,000 m^2
Specialty: 713 bed
Award: Best Hospital Design Award-at the Hospital Middle East 2010 Exhibition & Congress
New Al Ain Hospital Main Works Package
Structural Model
Architectural Model MEP Model
Al-Ain project Deliverables
4D BIM for Al-Ain Project
4D
Engineering &
Procurement
Site Logistics
Safety Analysis
Technology
Information Integration
Automation Interoperability
BIMMS Integration with other Platforms
Documents
BIM Automated Workflow Processes
Tasks Management
Model Comparison & Quantity take off
Project setup & Execution plan
RFI workflow
Unique auto-generated barcode for each RFI Models & Drawings
Management
Accuracy
Time Consumption
Al-Ain Project Performance Improvement
Performance Indicator
= Average Time Saved
× Average Errors Reduced
BIM tasks performance chart for Al Ain Hospital
Project creation and execution plan
Task Manegment RFIs' workflow Models and Drawings workflow
Coordination
Manual Automated
Conclusion
Challenges
• Maturity of the stakeholders in BIM understanding
• Subcontractors deliveries in CAD
• Under estimating time required for BIM process appliance.
• Lack of communication and collaboration with MEP BIM service provider.
Actions
• Take responsibility of doing the major subcontractors work.
• Train and lead the subcontractors to follow our standards & processes.
• Invest time to understand challenges to provide solution for the future projects and enhance the BIM process through a dedicated team.
• Took responsibility to do MEP on behalf of subcontractors to ensure early delivery & minimize the risk