    ANNEX 1

    WATER SUPPLY AWARENES RAISING PROGRAMS

    Project Management Board of Water supply and Sanitation in Binh Dinh province

    and Binh Dinh Provincial Center of Rural Clean Water and Sanitation(attached for the contrat no: ./12/2010 between PPMU AND EPA)

    CONTENT

    1 OVERALL ORGANISATION.................................................................................................................... 4

    1.1 STRATEGIC ORIENTATIONS........................................................................................................................ .4

    1.2 OBJECTIVES............................................................................................................................................ 4

    1.2.1 General Objective........................................................................................................................................... 4

    1.2.2 Specific Objectives.........................................................................................................................................4

    1.2.3 Main Actions to achieve the Objectives..........................................................................................................5

    1.2.4 Target Groups................................................................................................................................................6

    1.3 DESIGNOFTHE AWARENESS RAISING PROGRAM............................................................................................. 6

    1.4 IMPLEMENTING GROUPS.............................................................................................................................6

    1.5 PROJECT SITES....................................................................................................................................... 6

    1.6 ORGANISATIONAL STRUCTUREOFTHE PROGRAM.............................................................................................7

    1.6.1 Organisational Chart...................................................................................................................................... 7

    1.6.2 Responsibilities of Involved Teams & Agencies ............................................................................................8

    1.6.2.1 Agencies & teams participating directly in the project.......................................................................................... ..8

    1.6.2.2 Agencies playing a supporting role for the project ............................................................................................. ....9

    1.6.3 Organisational Arrangements to get Started................................................................................................10

    1.6.3.1 Awareness Raising Program in communes............................................................................................................10

    1.6.3.2 Awareness Raising Program in Schools................................................................................................................10

    1.7 TIME FRAME......................................................................................................................................... 11

    1.7.1 Clean water awareness raising program in community...............................................................................11

    1.7.1.1 Pilot phase........................................................................................................................................................... ..11

    1.7.2 Clean water awareness raising program in school......................................................................................11

    1.7.2.1 Pilot phase........................................................................................................................................................... ..11

    1.7.3 CLEAN WATER SUPPLY mass communication program...........................................................................12

    2 CLEAN WATER SUPPLY AWARENES RAISING PROGRAM (ARP) IN COMMUNITIES..................13

    2.1 ARP IN COMMUNITIES PILOT PHASE.......................................................................................................13

    2.1.1 Objectives..................................................................................................................................................... 13

    2.1.2 Participating Agencies & Teams.................................................................................................................. 13

    2.1.2.1 Managing & organising....................................................................................................................................... ..13

    2.1.2.2 Supporting............................................................................................................................................................. 13

    2.1.3 Time frame ..................................................................................................................................................13

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 1/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    2/34

    2.1.4 Project sites ................................................................................................................................................. 13

    2.1.5 Activities & Steps of implementation............................................................................................................14

    2.1.5.1 Establishment of Commune clean water supply communication team ........................................................... ......14

    2.1.5.2 Preparation of training plan ............................................................................................................................ ...... 14

    2.1.5.3 Preparation of IEC materials.................................................................................................................................15

    2.1.5.4 Conducting training ............................................................................................................................................. .16

    2.1.5.5 Preparation of clean water supply communication plan.........................................................................................16

    2.1.5.6 Implementation of clean water supply communication plan ................................................................................. 17

    2.1.6 Monitoring..................................................................................................................................................... 17

    2.1.6.1 Water supply Communication Teams.................................................................................................................... 18

    2.1.6.2 District Task Force............................................................................................................................................. ...18

    2.1.6.3 pCERWASS......................................................................................................................................................... .18

    2.1.6.4 PPMU....................................................................................................................................................................18

    2.1.7 Evaluation..................................................................................................................................................... 18

    2.1.7.1 Internal & external evaluations.............................................................................................................................. 18

    2.1.7.2 Workshop to totalize result of the pilot phase........................................................................................................ 18

    2.1.8 Time Schedule.............................................................................................................................................19

    2.1.9 Budget transfer............................................................................................................................................. 19

    3 WATER SUPPLY AWARENES RAISING PROGRAM IN SCHOOLS ..................................................23

    3.1 ARP IN SCHOOLS PILOT PHASE............................................................................................................23

    3.1.1 Objectives..................................................................................................................................................... 23

    3.1.2 Participant groups........................................................................................................................................ 23

    3.1.2.1 Managing & organising....................................................................................................................................... ..23

    3.1.2.2 Supporting............................................................................................................................................................. 23

    3.1.3 Time frame...................................................................................................................................................23

    3.1.4 Project sites.................................................................................................................................................. 24

    3.1.5 Activities & Steps of Implementation ......................................................................................................24

    3.1.5.1 Organisational arrangement...................................................................................................................................24

    3.1.5.2 Formation of clean water supply teacher group ................................................................................................ ...24

    3.1.5.3 Preparation of training plan...................................................................................................................................25

    3.1.5.4 Preparation of IEC materials.................................................................................................................................26

    3.1.5.5 Conducting training...............................................................................................................................................26

    3.1.5.6 Preparation of clean water supply communication plan.........................................................................................26

    3.1.5.7 Implementation of clean water supply communication plan..................................................................................27

    3.1.6 Monitoring.................................................................................................................................................... 27

    3.1.6.1 Clean water supply communication teamsat school..............................................................................................28

    3.1.6.2 District Task Force.......................................................................................................................................... ..... 28

    3.1.6.3 pCERWASS.........................................................................................................................................................28

    3.1.6.4 PPMU...................................................................................................................................................................28

    3.1.7 Evaluation.................................................................................................................................................... 28

    3.1.7.1 Final evaluation ............................................................................................................................................... ....28

    3.1.7.2 A Workshop to totalize result of the extension phase...........................................................................................29

    3.1.8 Time schedule.............................................................................................................................................29

    3.1.9 Budget transfer............................................................................................................................................30

    3.1.10 Logical framework.....................................................................................................................................30

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 2/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    3/34

    4 WATER SUPPLY MASS COMMUNICATION PROGRAM....................................................................32

    4.1.1 Objective......................................................................................................................................................32

    4.1.2 Types of mass communication program......................................................................................................32

    4.1.3 Responsibilities............................................................................................................................................32

    4.1.4 Activities.......................................................................................................................................................32

    4.1.4.1 Information collection group.................................................................................................................................32

    4.1.4.2 The clean water supply communication program for newspaper and radio...........................................................33

    4.1.4.3 The clean water supply communication program via Binh Dinh television...........................................................33

    4.1.4.4 Evaluation ............................................................................................................................................................34

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 3/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    4/34

    1 OVERALL ORGANISATION

    1.1 ST R A T E G I C OR I E N T A T I O N S

    Our clean water supply awareness raising strategy will be designed based on the following orientations:

    (1) Effectiveness: The awareness raising activities result in the positive changes of knowledge

    perception and behaviour of the community on the importance of the use of clean water and of water

    source protection.

    (2) Participation: The awareness raising activities create the conditions and enable the local people to

    participate in water resource protection and to access clean water service. Their participation includes

    planning, undertaking, supervising and evaluating the awareness raising activities, so that their

    participation leads to the capacity of self-sustaining the clean water supply awareness raising

    activities in the future.

    (3) Sustainability: The awareness raising program will be managed by the adequate government

    agencies (on provincial, district and commune level), so that the experience gained from the

    management of the awareness raising program can contribute to the strengthening of their capacities

    in clean water supply awareness raising of the population; sustainability also means that the

    capacities of the local participants have been strengthened, so that they can and will maintain the

    awareness raising activities in the future.

    (4) Consolidation (for effectiveness): The awareness raising activities should be carried out regularly

    and professionally.

    1.2 OB J E C T I V E S

    1.2.1 GENERAL OBJECTIVE

    The general objective is to improve knowledge and perception of the community about clean water useand water resource protection. Consequently, local people will be well aware of their responsibility and

    show the appropriate behaviour towards the importance of access to clean water service and towards the

    protection of water resources.

    1.2.2 SPECIFIC OBJECTIVES

    Objective 1: Finding the human resources for awareness raising about the importance of access to clean

    water service and towards the protection of water resources in the project areas. These teams, i.e. the

    clean water supply communication teams1, will be trained to have enough capacity to design, implement

    and monitor the communication activities.Objective 2: Enhance the role of the local authority, functional agencies and social organizations in

    organizing, supervising, cooperating and supporting the clean water supply awareness raising activities to

    ensure its sustainability after the project ends.

    Objective 3: Up to 2014, all households in the project areas have access to information on the use of

    clean water and water resource protection.

    1

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 4/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    5/34

    Objective 4: Up to 2014, all schools in the project areas have access to information on the use of clean

    water and water resource protection.

    1.2.3 MAIN ACTIONSTOACHIEVETHE OBJECTIVES

    Objectives Main actions

    Objective 1: Finding the human resources for

    clean water communication in the project

    areas. These teams, i.e. the clean water supply

    communication teams , will be trained to have

    enough capacity to design, implement and

    monitor the communication activities.

    (1) Establishment of Clean water supply

    communication teams in the communes.

    (2) Organisation of the training for the clean

    water supply communication teams to

    strengthen their capacities to design,

    implement and monitor the communication

    activities.

    (3) Establishment of the clean water supply

    teacher groups in schools

    (4) Organisation of clean water training for

    clean water supply teacher group

    Objective 2: Enhance the role of pCERWASS,

    the local authority, functional agencies and

    social organizations in organizing, supervising,

    cooperating and supporting the clean water

    supply awareness raising activities to ensure

    its sustainability after the project ends.

    (1) Each clean water supply communication

    team (including representatives of Women

    Union and Youth Union) participates in the

    design, implementation and supervision of

    the clean water supply awareness raising

    activities of the project

    (2) Local authority and school management

    board participate in supervising clean water

    supply awareness raising activities in the

    local area and school

    (3) Local authority receives results of cleanwater supply awareness raising activities

    after project ended.

    Objective 3: Up to 2014, all households in the

    project areas have access to information on the

    use of clean water and water resource

    protection.

    (1) Organising the clean water supply

    awareness raising activities in the

    residential communities.

    (2) Organising the clean water communication

    mass communication activities.

    Objective 4: Up to 2014, all schools in theproject areas have access to information on the

    use of clean water and water resource

    protection.

    (1) Organising the clean water supplyawareness raising activities in schools.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 5/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    6/34

    1.2.4 TARGET GROUPS

    The target groups of this awareness raising program are:

    Rural population (in the districts Phu Cat and Tuy Phuoc, see below, Project Sites)

    Schools in rural areas (in the districts Phu Cat and Tuy Phuoc, see below, Project Sites)

    1.3 DE S I G N O F T H E AW A R E N E S S RA I S I N G PR O G R A M

    Based on the objectives of the project and the characteristics of the participants, there are three programs

    of clean water supply awareness raising to be set up, particularly:

    1. Clean water awareness raising program in communities

    2. Clean water awareness raising program in schools

    3. Clean watermass communication and Information-Education-Communication (IEC)

    material program

    1.4 IM P L E M E N T I N G GR O U P S

    Id Programs Implementing groups

    1 Clean water awareness raising program in

    communities

    PPPMU

    pCERWASS/DARD

    Executing board of hamlet

    Members of Women Union, Youth

    Union and Health Division

    Households

    2 Clean water awareness raising program in

    schools

    PPPMU

    pCERWASS/DARD

    Teachers and students from grade 3

    (or grade 4) of primary education

    and grade 6 (or grade 7) of

    secondary education

    3 Clean water mass communication and IEC

    material program

    PPPMU

    pCERWASS/DARD

    Members of Women Union and

    Youth Union and Health Division

    Teachers

    1.5 PR O J E C T S I T E S

    The project sites for implementation of the awareness raising activities are described in the Water Supply

    & Sanitation Programs Technical and Financial File. The awareness raising activities will be implemented

    in those communes that are affected by the infrastructure works for water supply.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 6/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    7/34

    1.5.1

    ID District Town, Communes

    1 District Phu Cat 1 - Commune Cat Thang

    2 - Commune Cat Chanh

    3 - Commune Cat Tien

    4 - Commune Cat Tuong

    2 District Tuy Phuoc 1 - Commune Phuoc Thang

    2 - Commune Phuoc Hoa

    1.6 OR G A N I S A T I O N A L ST R U C T U R E O F TH E P R O G R A M

    1.6.1 ORGANISATIONAL CHART

    Direct operational relationship

    Coordinated, supported relationship

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 7/34

    Exeuting

    Board of

    Hamlet

    Commune

    Environmental

    Communication

    Team

    Beneficiaries:

    Villagers, Commune & Village Staff

    Beneficiaries:

    Pupils & Teachers

    Management

    Board of School

    School

    Environmental

    Communication

    Team

    (coordination: district task force)

    District DoNRE (for EPA)

    District DARD (for pCERWASS)

    Provincial Project Management Unit

    for Water Supply & Sanitation

    Mass Media ofBinh Dinh

    Province,

    districts,

    communes

    (newspaper,

    TV, radio)

    Mass Media

    Awareness RaisingProgram

    Commune

    Awareness RaisingProgram

    School

    Awareness RaisingProgram

    DONRE Environment Protection Agency (EPA)

    (topic: solid waste)

    pCERWASS

    (topic: clean water)

    (technical input &

    support)

    District Women Union,

    Youth Union,

    Health Division,

    (technical input &

    support)

    District Education &

    Training division,

    district Health

    Division

    Beneficiaries:

    Population of

    Binh Dinh Province

  • 8/6/2019 Awareness Raising Strategy PCerwass

    8/34

    1.6.2 RESPONSIBILITIESOF INVOLVED TEAMS & AGENCIES

    1.6.2.1 Agencies & teams participating directly in the project

    Agency/Team Responsibility Members Total nr. of

    Teams

    involved

    1 Provincial Project

    Management Unit

    (PPMU)

    PPMU is responsible for the

    overall management (planning,

    supervision, monitoring &

    evaluation) of all action

    programs and promulgation of

    legal documents to support the

    implementation of action

    programs, which are

    recommended by pCERWASS

    and the District Task Forces.

    PPMU is responsible for the

    capacity building of its provincial

    implementing partners.

    PPMU-staff 1

    3 Provincial Center

    for Rural Water

    Supply &

    Sanitation

    (pCERWASS)

    pCERWASS is a partner of

    PPMU and implements the

    awareness raising programs in

    the districts Phu Cat and Tuy

    Phuoc.

    Disseminates the results and

    lessons learned through mass

    media and shares experiences

    within its sector

    1. Ho Dac Chuong

    2. Tran Van Minh

    3. Nguyen Kim Dung

    1

    4 District Task

    Force for

    implementation of

    awareness raising

    activities (DTF)

    Works directly under the

    coordination and supervision of

    pCERWASS

    Coordinates the implementation

    of the awareness raising

    program in its district and

    reports to either pCERWASS

    Advises the implementing Clean

    water supply communication

    teams in schools andcommunes on (1) the technical

    content of their program, (2)

    follow-up and monitor of

    programs, and (3) evaluation of

    effectiveness of programs.

    Coordinator: district-

    DARD

    For Commune

    Awareness raising

    Program: a member of

    Women Union and

    Youth Union

    For School Awareness

    raising program: a

    member of DistrictDept. of Education

    and Training

    A member of the

    district Health Division

    2

    5 Commune Clean

    water supply

    Participates in trainings

    organised by PPMU,

    Volunteers of the

    commune where the clean

    2

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 8/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    9/34

    communication

    team(EC Team)

    pCERWASS and DTF to be

    able to implement the clean

    water supply awareness raising

    activities in its commune

    Sets up its plan for and

    implements clean water supply

    communication activities in the

    selected hamlets

    Participates in exchange

    moments with other commune

    WS teams (in a later period), to

    share experiences.

    water supply

    communication activities

    will take place.

    Establishing the commune

    WS teams is one of the

    key activities of the

    program. The team

    composes of those who

    are interested in the water

    supply awareness raising

    activities in the local area

    and therefore, the team

    should include

    representative of all

    population groups in

    community (such as

    women, youth, middle

    aged and elder).

    6 School Clean

    water supply

    communication

    team(EC Team)

    Participates in trainings

    organised by PPMU,

    pCERWASS and DTF to be

    able to implement the clean

    water supply awareness raising

    activities at school

    Sets up its plan for and

    implements clean water supply

    communication activitiesat

    school

    Participates in exchangemoments with other school WS

    teams (in a later period), to

    share experiences.

    The team composes of

    teachers who are

    interested in organising

    extracurricular water

    supply awareness raising

    activities at school

    4

    1.6.2.2 Agencies playing a supporting role for the project

    Agency Responsibility Nr. of

    agencies

    involved

    1 DistrictPeoples

    Committee

    Provides a legal framework for the implementation of theawareness-raising program in the target communes as well as

    support and information (2010-2014).

    2

    2 Commune

    Peoples

    Committee

    Provides the legal proceedings concerning the implementation

    of activities in the commune.

    Provides material support including meeting place and

    communication equipment.

    2

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 9/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    10/34

    3 Management

    Board of School

    Provides the legal proceedings concerning the implementation

    of activities in the school.

    Provides material support including meeting place and

    communication equipment.

    4

    4 Executing Board

    of Hamlet

    Plays the role of community leader. Therefore is considered a

    main partner of the commune clean water supply

    communication team in terms of practical organization and

    implementation of the clean water supply communication

    activitiesin each hamlet.

    N

    1.6.3 ORGANISATIONAL ARRANGEMENTSTOGET STARTED

    >> pCERWASS assign

    a provincial pCERWASS cadre to monitor and follow up the program of all the districts,

    a districtal DARD-cadre (for every district one) to coordinate the program in the two districts.

    1.6.3.1 Awareness Raising Program in communes

    The following organisational arrangements are to be planned:

    (1) The PPMU and pCERWASS, agree upon their roles and responsibilities of the Awareness

    Raising Program in the communes.

    (2) PPMU and pCERWASS ask the 2 District People Committees to establish a District Task

    Force. The PPMU andpCERWASS work on and get agreement with the Districts People

    Committees on the aims, expected outcomes, role of related actors, budget, way of

    implementation of pilot project and extension phase.

    Every District People Committee assigns

    (a) a coordinator of the DTF (district-DARD), and(b) a member of district-DoET (for the school awareness raising program)

    (c) a member of district Health Division (if considered appropriate)

    to be responsible for the implementation and follow-up of the awareness raising program (being

    pilot phase as well as extension phase) in the district.

    (3) Based on approval of District People Committee, Commune People Committees promulgate

    the Decision on implementation of the project in their commune. Content of this Decision will

    be based on the content of the projects program (either pilot or extension phase).

    1.6.3.2 Awareness Raising Program in Schools

    (1) The PPMU and pCERWASS agree upon their roles and responsibilities of the Awareness Raising

    Program in the schools.

    (2) Representatives of PPMU and pCERWASS and coordinator of District Task Force (i.e. DARD)

    work with Districts Education and Training Divisions about the aim, expected outcome, role of

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 10/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    11/34

    related actors, the way of implementation of project and selection of schools for pilot project

    and extension phase.

    (3) After having an agreement on the above issues, pCERWASS sends the official document to

    Districts Education and Training Divisions to get approval of the implementation of both pilot

    project and extension phase.

    (4) District Education and Training Division sends the official document to the selected schools.

    (5) Representatives of pCERWASS and DTF work with management boards of selected schools

    to discuss and get agreement on the implementation of pilot project.

    1.7 T I M E F R A M E

    1.7.1 CLEANWATERAWARENESSRAISINGPROGRAMINCOMMUNITY

    Implementing duration of program is divided into two phases: pilot phase and extension phase and this

    paper is just valid for the pilot phase

    1.7.1.1 Pilot phase

    1 year, from Dec 2010 to Dec 2011.

    Pilot activities are conducted at 2 selected towns and communes of the 2 target districts.

    A Wrap-up workshop for pilot phase will be organized to publicize the results of evaluation as well as to

    record participants contributions on achievements of pilot phase and key contents for the extension

    phase. Results of the wrap-up workshop will be disseminated broadly though mass media and technical

    information channel to make further use by others possible (such as National Cerwass) .

    1.7.2 CLEANWATERAWARENESSRAISINGPROGRAMINSCHOOL

    Implementing duration of program is divided into two phases: a pilot phase and an extension phase.

    1.7.2.1 Pilot phase

    1 year, from Dec 2010 to Dec 2011.

    Pilot activities are conducted at 2 primary schools and 2 secondary schools of 2 Districts, including

    evaluation to draw lessons learned for the extension phase.

    A Wrap-up workshop for the pilot phase will be organized to publicize the results of evaluation as well as

    to record the participants contributions on the achievements of the pilot phase and the key contents for

    the extension phase. Results of the workshop will be disseminated broadly though mass media and

    technical information channels to make further use by others possible (such as Department of Natural

    Resources and Environment and Department of Education and Training).

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 11/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    12/34

    1.7.3 CLEAN WATER SUPPLY MASSCOMMUNICATIONPROGRAM

    1 years, from Dec 2010 to Dec 2011.

    The clean water supply mass communication program composes of 3 components using the following

    mass media on provincial, and (if existing) district and commune level:

    (1) An clean water supply communication program on newspaper

    (2) An clean water supply communication program via television

    (3) An clean water supply communication program via radio.

    All programs aim to disseminate general, easy-to-understand, educational messages on the importance

    use of water supply and on the projects activities.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 12/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    13/34

    2 CLEAN WATER SUPPLY AWARENES RAISING PROGRAM(ARP) IN COMMUNITIES

    2.1 ARP I N CO M M U N I T I E S P I L O T P H A S E

    2.1.1 OBJECTIVES

    The general objective is to experiment a new model of community water supply awareness raising.

    The specific objectives are:

    To establish a community clean water supply communication team. This team collaborates with

    communities/hamlets to organize and implement clean water supply communication activities in the

    local.

    To improve knowledge, attitude and behaviour of community inhabitants in importance use of clean

    water.

    To build capacity of local authority and mass organizations in organizing and managing water supply

    community activities in the local.

    2.1.2 PARTICIPATING AGENCIES & TEAMS

    2.1.2.1 Managing & organising

    District Task Force (DTF) for supporting of awareness raising activities:

    o coordination by by pCERWASS (Phu Cat, Tuy Phuoc), and

    o membership of Women Union and Youth Union (for Commune awareness raising

    program)

    o membership of Health Care Division (for support on communication about health issues)

    Water supply communication Team of the commune implementing the activities Supervision: is done by Pcerwass and PPMU.

    2.1.2.2 Supporting

    Commune People Committee

    Executing boards of hamlets

    Local mass organizations

    2.1.3 TIMEFRAME

    1 year, from July 2010 to July 2011

    2.1.4 PROJECTSITES

    2 districts located in the projects area participate in the pilot activities. In each district, 1 commune

    (having around 2.000 households) will be selected. Each commune is considered a pilot project. In total,

    there are 2 communes participating in the pilot project.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 13/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    14/34

    Identification of these sites has been agreed upon during the organisational arrangements, before the

    start of the pilot phase.

    2.1.5 ACTIVITIES & STEPSOFIMPLEMENTATION

    2.1.5.1 Establishment of Commune clean water supply communication team

    The clean water supply communication activities in the locality must be carried out by the local core-team.

    Therefore, the establishment of an clean water supply communication team per commune is one of the

    key contents to ensure the effectiveness of the program.

    (1) Clean water supply communication team must be established at the beginning phase of pilot

    project. To do that, Commune People Committee should commit to be responsible for gathering

    personnel to establish the team as well as to create advantageous conditions for the teams

    activities (such as organization of neighbour meetings for discussing clean water supply

    communication activities in the commune).

    (2) The main role of the team is to organize clean water supply communication activities with topics

    and contents that are suitable to each target group in the commune. Clean water supply

    knowledge and communication skills of members of the team will be improved though training

    organized by PPMU and pCERWASS at the beginning phase of the pilot project.

    (3) Due to access to various target groups in community, the composition of the team should be

    diversified, including youth, middle-aged and elderly, especially female. In the beginning,

    however, the core team should be Commune Women Union and Youth Union in order to

    guarantee the dynamical characteristic of the team. Then, in the progress of operation, the team

    will mobilize more other actors to participate in the team (e.g. volunteers from Health Care

    Center..etc). In the pilot project, it is estimated that each team composes of 10-15 members.

    (4) The team will collaborate with the Executing Boards of the Hamlets where they will organise their

    awareness raising activities, to get the approval to organise, and to get material support (e.g. for

    meeting places).(5) Types of team meeting will be flexible in order to appropriate to the availability of time of

    members as well as to each target groups in community.

    (6) In the pilot phase, the project provides a certain supporting budget for the teams meetings to

    discuss about organization and implementation of clean water supply communication activities.

    (7) In the pilot phase, the expert of awareness rising of PPMU and PCERWASS meets with the team

    regularly in order to provide timely consultancy support for activities of the team.

    2.1.5.2 Preparation of training plan

    This includes the following activities: PPMU, with pCERWASS prepares terms of reference for and selects qualified trainer(s) for the

    training of the Clean water supply communication teamsof the communes

    Trainer(s) prepare content of training and training methodology; trainers are responsible for

    gathering of/compiling training tool-kits

    PPMU, together with pCERWASS prepare evaluation forms

    pCERWASS prepares logistics (venues, lightings, speakers, drinks, invitation letters)

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 14/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    15/34

    The selected trainer submits to the PPMU and pCERWASS his training plan, which includes:

    Objectives

    Expected results

    Content and methodology (participatory approach)

    Training material (books/handouts/IEC examples/...)

    Training programs/schedules: Timings, number of sections, duration and training contents

    Budget

    Training evaluation: forms for comments on the trainings.

    List of numbers, names and organizations of training participants

    List of trainers

    The training plan should be submitted to PPMU and pCERWASS for comments and approval before

    implementation.

    Trainers design the training content. Nevertheless, recommended training topics and approach are as

    follows:

    (1) Recommended training topics

    Topic/Approach Content

    Topic one:

    Clean water

    1- What is clean water?

    2- What is polluted water?

    3- Polluted water and diseases

    4- Fundamental knowledge about water provision system

    5- Regulations concerning clean water fee.

    6- Benefits of clean water fee

    7- Importance of payment of household towards clean water fee.

    8- Do and dont towards water source protection and reasonable

    water use

    Topic two:Clean water

    supply

    communication

    1- Overview of clean water supply communication2- Types of clean water supply communication

    3- Design, implementation and monitor of water supply

    communication plan

    Approach 1- Participatory approach

    (2) Recommended training schedule

    Day Training content

    Day 1: Morning + afternoon Knowledge of Clean water

    Day 2: Morning + afternoon Water supply communicationDay 3: Morning + afternoon Exercise: Design clean water supply communication plan

    2.1.5.3 Preparation of IEC materials

    In order to support communication activities in the communes, pCERWASS and a graphical designer

    gather feedback of the training participants (i.e. the commune water supply communication teams) on

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 15/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    16/34

    suitable IEC materials for their activities. They discuss and get agreement about the IEC materials that

    will be produced to support the activities in the communes.

    A graphical designer may be recruited for the design of the IEC materials.

    2.1.5.4 Conducting training

    During the training implementation, responsibilities of the PPMU and pCERWASS are:

    Follow up training sections and taking note of comments

    After each training section, carry out the evaluation to obtain comments of participants

    Process the evaluation data

    Write summary report

    2.1.5.5 Preparation of clean water supply communication plan

    (1) After being trained, clean water supply communication teams set up the detailed plan of clean water

    supply communication for their commune, which includes the following issues:

    Problem

    Objective Expected results

    Time frame and activities going to be implemented

    Human resource allocation

    Evaluation

    Budgeting (budget of plan depends on PPMU budget allocation for this activity)

    During preparation of the plan, the team will receive the consultancy support of expert of

    awareness rising of pCERWASS and District Task Force.

    (2) After being trained, clean water supply communication team designs the clean water supply

    communication contents and tools.

    Communication contents should follow the following requirements:

    To display the main local water problems

    To be suitable with the various needs of population groups in community

    To be easy to understand, easy to remember and easy to do

    Communication approaches and tools should follow the following requirements:

    To meet the interests of the local people

    To include direct/indirect or in-width/in-depth communication tools (including neighbour meeting,

    information board, loud speaker, poster, painting, context, game show, theatre, household

    visit.etc.,)

    To utilize the local resource in making communicational tools

    The clean water supply communication plan should be submitted to Commune People Committee, District

    Task Force and pCERWASS for comments and approval before implementation.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 16/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    17/34

    2.1.5.6 Implementation of clean water supply communication plan

    It consists of the following activities:

    Clean water supply communication team carries out the clean water supply communication plan

    under the supervision and monitoring of District Task Force (DTF) and Commune People

    Committee.

    The team writes monthly report on achieved results of activities, constraints emerging and

    solution. It will be sent to Commune People Committee and DTF.

    The team prepares the plan of maintenance of activities after pilot project finished.

    2.1.6 MONITORING

    Detailed guidelines for monitoring will be submitted to PCERWASS.

    Overview:

    Who monitors &

    reports

    Who receives report Report includes Frequency

    Water supply

    Communication Teams

    District Task Force progress report

    lessons learned planning for next month

    Monthly

    District Task Force PCERWASS Review of EC-team

    reports

    Lessons learned from

    supporting EC-teams

    Planning for next month

    further support of EC-

    teams

    Monthly

    PCERWASS PPMU Discussion on progress

    of ongoing activities,lessons learned, based

    on EC-team-reports,

    DTF-reports and field

    visits

    Planning for next 2

    months

    Comments on strategy

    Lessons learnt

    Monthly

    (report+meeting)

    PPMU PCERWASS Discuss progress and

    planning of the program

    conduct field visits to

    the WS teams to check

    up with reality.

    Comments on strategy

    and implementation

    methodology

    Lessons learnt

    Monthly

    Timely

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 17/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    18/34

    2.1.6.1 Water supply Communication Teams

    The EC team writes a quarterly progress report (including lessons learned and planning for next

    quarter) and submits this report to the district task force and pCERWASS.

    2.1.6.2 District Task Force

    The district task force reviews the EC-team-reports, makes a planning for the next quarter for the further

    support of the WS teams, and submits this to pCERWASS for review and discussion.

    2.1.6.3 pCERWASS

    pCERWASS conducts timely field visits to support and discuss the ongoing activities, lessons learned

    and planning of the activities of the district task forces and the WS teams.

    pCERWASS submits a monthly progress report to the PPMU.

    2.1.6.4 PPMU

    PPMU holds a monthly meeting with pCERWASS to discuss progress and planning of the program, and

    conducts field visits to the WS teams to check up with reality.

    2.1.7 EVALUATION

    2.1.7.1 Internal & external evaluations

    Evaluation activities will be conducted in the last month of pilot phase with technical support from PPMU.

    It consists of the following activities:

    External evaluation: pCERWASS carries out a rapid assessment with participation of those whoare directly involved in the pilot project activities, such as Districts DARD, clean water supply

    communication teams, Commune People Committees, executing boards of hamlets and

    households, etc. This rapid assessment can be done through a workshop.

    Internal evaluation: In each commune, clean water supply communication team makes its own

    evaluation on activities being undertaken and writes the wrap-up report and submits this report to

    the Commune People Committee, district task force and pCERWASS.

    Independent evaluation: is done by international expert

    2.1.7.2 Workshop to totalize result of the pilot phase

    A wrap-up workshop of the pilot phase is organized with all the 2 pilot projects together, to:

    draw lessons learned

    make suggestions for and design the extension phase, based on the lessons learned

    make a planning for the maintenance of clean water supply communication in the pilot

    communes

    publicize the achieved results, by inviting mass media.

    A summary report is written and disseminated amongst the partners.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 18/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    19/34

    2.1.8 TIME SCHEDULE

    Id Activities 2010 2011

    Nov Dec Jan Feb Mar Apri May Jun Jul Aug Sep Oct

    1 Organizationarrangement

    2 Identification of pilot project sites

    3 Formation of water supply

    CommunicationTeam

    4 Preparation of training plan

    5 Conductingtrainings

    6 Preparation of workplan for watersupplycommunication

    7 Implementation of clean water supplycommunicationplan

    8 Evaluation andwrap-up workshop(incl. design ofmaintenance planfor clean watersupply awarenessraising in the pilotareas)

    9 Review clean water supply awarenessraising plan for theextension phasebased on lessonslearned of pilotproject

    10 Maintenance of clean water supplyawareness raising(after end of pilotactivities)

    2.1.9 BUDGETTRANSFER

    Budget transfer for implementation of activities will be carried out under the following modality:

    (1) The clean water supply communication team sets up the detailed working plan (including financial

    allocation for each activity) under the assistance of pCERWASS and district DARD (being the

    coordinator of the District Task Force).

    (2) The team will submit the detailed plan to District Task Force to get comment and approval;

    (3) The District DARD (being the coordinator of the District Task Force) will submit the plan to

    pCERWASS and then to PPMU to get comment and approval;

    (4) After the plan is ratified, budget will be transferred to Pcerwass and then Pcerwass will transfer

    directly to clean water supply communication team .

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 19/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    20/34

    (5) After each activity, the clean water supply communication team and pCERWASS has the duty of

    gathering regular vouchers and invoices under the stipulations of Ministry of Finance, and submit

    these vouchers and invoices to pCERWASS. Content of these documents have to correspond with

    ratified content in order to balance the budget with PPMU. Pcerwass must be accountable to PPMU

    for right expenditure.

    (6) PPMU does not make any new advance unless there are approved financial report and approved

    workplan

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 20/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    21/34

    Logical framework

    Objectives Indicators Sources of verification

    1- To establish the commune

    clean water supply

    communication team. The

    team collaborates with

    communities to organize and

    implement clean water supply

    communication activitiesin the

    local.

    1a- Clean water supply

    communication team has been

    established

    1b- Clean water supply

    communication team has developed

    its water supply communication plan

    for its area

    2- Ways to mobilize and involve the

    community in clean water supply

    communication activities in local

    3- % Households participating in

    clean water supply communication

    activities in local

    1- Contract of

    implementation of project

    2- Clean water supply

    communication plan

    3- External evaluation

    report

    4- Independent

    evaluation report

    5- Monitoring and

    progress report

    2- To improve knowledge,

    attitude and behaviour of

    community in environmental

    protection activities, especially

    on clean water.

    1- The following information of clean

    water is provided:

    - Regulations concerning clean

    water fee.

    - Benefits of clean water fee

    - Importance of payment of

    household towards clean water fee.

    - Dos and donts towards water

    source protection and reasonable

    water use

    2- % Households understand thefollowing issues:

    - The importance and benefits of

    water fee

    - Way of saving clean water and

    using water properly and

    economically

    3- % Households save clean water

    and use water properly and

    economically4- % Households pay water fee

    5- % Households participate in

    environmental protection activities in

    local

    1- Monthly reports of (a)

    Clean water supply

    communication

    teams(including

    pictures), (b) district task

    forces, (c) pCERWASS

    2- Internal evaluation

    report (including

    pictures)

    3- External evaluation

    report (including

    pictures)

    4- Before&After-surveyon knowledge, attitude

    and behaviour of

    commune inhabitants, by

    pCERWASS

    5- Independent

    evaluation report

    6- Monitoring and

    progress report

    3- To build capacity of

    pCERWASS, local authority

    1- Members of pCERWASS

    participate in supporting the clean

    1- List of pCERWASS

    staff joining in the project

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 21/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    22/34

    and mass organizations in

    organizing and managing

    water supply community

    activities in the local.

    water supply awareness raising of

    the project

    2- Members of local Women union

    and Youth union participate in the

    clean water supply communication

    team

    3- % Members of local Women

    union and Youth union in the team

    have sufficient capacity to design,

    implement and supervise water

    supply community activities.

    4- Commune People Committee has

    enough capacity to promote,

    instigate and support on the basis of

    a legal framework the organisation

    and management (M&E) of water

    supply community activities in the

    local

    2- Member list of each

    env. Communication

    team

    3a- Existence of a

    qualitative action plan

    (incl. budget) designed

    by the teams

    3b- Internal evaluation

    report

    3b- External evaluation

    report

    4a- Existence of a legal

    framework for the

    support of the

    organisation of water

    supply community

    activities

    4b- Feedback of CPC

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 22/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    23/34

    3 WATER SUPPLY AWARENES RAISING PROGRAM INSCHOOLS

    3.1 ARP I N SC H O O L S P I L O T P H A S E

    3.1.1 OBJECTIVES

    The general objective is to experiment a new model of clean water supply awareness raising in school.

    The specific objectives are:

    A new model on clean water supply awareness raising activities in school has been built.

    Teachers capacity in clean water supply communication activities has been strengthened.

    Better knowledge, attitude, and behaviour of students towards the environment, especially on

    clean water and water use have been achieved

    Water supply awareness raising activities in schools have been strengthened (content wise and

    methodology-wise)

    3.1.2 PARTICIPANTGROUPS

    3.1.2.1 Managing & organising

    District Task Force (DTF) for supporting of awareness raising activities:

    o coordination by District DARD and managed by pCERWASS (Phu Cat, Tuy Phuoc)

    o membership of District of Education & Training Division

    o membership of Health Care Division (for support on communication about health issues)

    Water supply communication Team of the School, implementing the awareness raising activities

    being:

    o Teachers: Primary school: teachers of grade 3 (or grade 4)

    Secondary school: teachers of grade 7 (or grade 8)

    o Students:

    Primary school: students of grade 3 (or grade 4)

    Secondary school: students of grade 7 (or grade 8)

    3.1.2.2 Supporting

    Management Board of schools

    3.1.3 TIMEFRAME

    1 year, from Dec 2010 to Dec 2011.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 23/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    24/34

    3.1.4 PROJECTSITES

    Pilot activities are conducted at 2 primary schools and 2 secondary schools in two communes of the

    project Districts Phu Cat and Tuy Phuoc (1 primary school and 1 secondary school per commune per

    district). Hence, 4 schools will participate in the pilot phase.

    Identification of these schools has been agreed upon during the organisational arrangements, before the

    start of the pilot phase.

    3.1.5 ACTIVITIES & STEPSOF IMPLEMENTATION

    3.1.5.1 Organisational arrangement

    At the start of the project, the organisational arrangement has been set up between PPMU (as overall

    manager), pCERWASS (partner-manager of PPMU), District Task Force coordinator (district DARD),

    District of Education & Training Division, and the managing board of each school (see 1.3).

    3.1.5.2 Formation of clean water supply teacher group

    Management boards of schools set up their clean water supply teacher group s. In each school, the

    group consists of 3 5 teachers. Criteria of selecting teachers to join the group are as follow:

    In primary schools:

    o Teachers of grades 3 and 4, who are teaching the subjects of Civics, Natural and social

    science, Vietnamese, History, Geography and Arts (Musics and Fine art) and who are in

    charge of school activities. These subjects have contents related to water supply issues.

    o Participating in Youth Union activities in schools

    o Being volunteers

    In secondary schools:

    o Teachers of grades 7 and 8, who are teaching the subjects Biology, Civics and

    Geography, which relate to the clean water supply issues.

    o Participating in Youth Union activities in schools

    o Being volunteers

    The team will be lead by the (vice-)director of the school. Involving the management level in the EC team

    creates more chance to make the experiences sustainable for future clean water supply awareness

    raising.

    The clean water supply teacher group has the following duties:

    Carry out clean water supply communication activities in school

    Write the monthly reports for management board of school, District Education and Training

    Division and DTF

    Project provides a certain supporting budget for teams meetings to discuss about organization

    and implementation of clean water supply communication activities.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 24/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    25/34

    3.1.5.3 Preparation of training plan

    This includes the following activities:

    pCERWASS with the support of PPMU prepares terms of reference for and selects qualified

    trainer(s) for the training of the Clean water supply communication teamsof the communes

    Trainer(s) prepare content of training and training methodology; trainers are responsible for

    gathering/compiling of training tool-kits

    PPMU and pCERWASS prepare evaluation forms

    pCERWASS prepares logistics (venues, lightings, speakers, drinks, invitation letters)

    The selected trainer submits to the PPMU and pCERWASS his training plan, which includes:

    Objectives

    Expected results

    Content and methodology ( participatory approach)

    Training material (books/handouts/IEC examples/...)

    Training programs/schedules: Timings, number of sections, duration and training contents

    Budget

    Training evaluation: forms for comments on the trainings.

    List of numbers, names and organizations of training participants List of trainers

    The training plan should be submitted to PPMU and pCERWASS for comments and approval before

    implementation.

    Trainers design the training content. Nevertheless, recommended training topics and approach are as

    follows:

    Recommended training topics

    Topics/Approach Contents

    Topic one:Clean water supply

    communication in school

    - Introduction of water supply education activities in schools- Design, implement and monitor clean water supply education

    activities

    Topic two:

    Clean water

    - Water allocation in the Earth

    - Role of water in the life

    - Clean water and polluted water

    - Polluted water and diseases

    -Do and dont towards water resource protection and reasonable

    water use

    Approach Participatory approach

    (2) Recommended training schedule

    Day Training content

    Day 1: Morning + afternoon Clean water supply communication activities at school

    Day 2: Morning + afternoon Knowledge of Clean water

    Day 3: Morning + afternoon Exercise: Design clean water supply communication plan

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 25/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    26/34

    3.1.5.4 Preparation of IEC materials

    In order to support communication activities in the schools, trainer, expert of awareness rising of PPMU

    and a graphical designer gather feedback of the training participants (i.e. the teacher water supply

    communication teams) on suitable IEC materials for their activities. They discuss and get agreement

    about the IEC materials that will be produced to support the activities in the schools.

    An important IEC material is an educational film, that can be used in all schools and after the project,

    used for broadcasting on television and disseminated for use in other schools in Vietnam.

    A graphical designer might be recruited for the design of the IEC materials.

    3.1.5.5 Conducting training

    It consists of the following activities:

    Follow up training sections and taking note of comments

    After each training section, carry out the evaluation to obtain comments of participants

    Process of evaluation data

    Write summary report

    3.1.5.6 Preparation of clean water supply communication plan

    (1) After being trained, clean water supply communication teamsset up the detailed plan of clean water

    supply communication for their commune, which includes the following issues:

    Problem

    Objective

    Expected results

    Time frame and activities going to be implemented

    Human resource allocation

    Evaluation

    Budgeting (budget of plan depends on PPMU budget allocation for this activity)

    (2) After being trained, clean water supply communication team designs the clean water supply

    communication contents and tools.

    Communication contents should follow the following requirements:

    To display the main water problems

    To be suitable with existing knowledge of students

    To be easy to understand, easy to remember and easy to do

    Communication approaches and tools should follow the following requirements:

    To meet the expectations of students

    To include direct/indirect or in-width/in-depth communication tools (including, information

    board, loud speaker, poster, painting, context, game, school and class cleansing, small plan,

    theatre etc.,)

    To utilize the school resources in making communicational tools

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 26/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    27/34

    During preparation of the plan, the team will receive the consultancy support of expert of awareness

    raising of pCERWASS, District Task Force and Districts Education and Training Division..

    Detailed plan of clean water supply communication should be submitted to management board of school,

    District Education and Training Division, DTF, and pCERWASS for comments and approval before

    implementation.

    3.1.5.7 Implementation of clean water supply communication plan

    It consists of the following activities:

    Clean water supply teacher group carries out water supply training for students and clean water

    supply communication activities in school. These activities are considered the extra-curriculum

    ones and theyre under the supervision and monitoring of management board of school, District

    Education and Training Division and District Task Force, pCERWASS

    The group writes quarterly report on achieved results of activities, constraints emerging and

    solution. It will be sent to the management board of school, District Education and Training

    Division, District Task Force, PPMU and pCERWASS.

    The group prepares the plan of maintenance during the extension phase activities and after pilot

    project finished.

    3.1.6 MONITORING

    Detailed guidelines for monitoring will be submitted to PCERWASS.

    Overview:

    Who monitors &

    reports

    Who receives report Report includes Frequency

    Water supply

    Communication Teams

    Management Board of

    school, DistrictEducation and Training

    Division, district Task

    Force

    progress report

    lessons learned planning for next month

    Monthly

    District Task Force PCERWASS Review of EC-team

    reports

    Lessons learned from

    supporting EC-teams

    Planning for next month

    further support of EC-

    teams

    Monthly

    PCERWASS PPMU Discussion on progress

    of ongoing activities,

    lessons learned, based

    on EC-team-reports,

    DTF-reports and field

    visits

    Planning for next 2

    Monthly

    (report+meeting)

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 27/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    28/34

    months

    PPMU PCERWASS Discuss progress and

    planning of the program

    conduct field visits to

    the WS teams to check

    up with reality.

    Support EPA

    Build capacity

    Supervise awareness

    raising plan

    Monthly

    Timely

    3.1.6.1 Clean water supply communication teamsat school

    As mentioned above, the groups write a quarterly report on achieved results and activities, constraints

    emerging, lessons learned, and solutions. This report is to be submitted to management board of school,

    district education and training division, district task force and pCERWASS.

    3.1.6.2 District Task Force

    The district task force reviews the EC-team-reports, makes a planning for the next quarter for the further

    support of the WS teams, and submits this to pCERWASS for review and discussion.

    3.1.6.3 pCERWASS

    pCERWASS conducts timely field visits to support and discuss the ongoing activities, lessons learned

    and planning of the activities of the district task forces and the WS teams.

    pCERWASS submits a quarterlyprogress report to the PPMU.

    3.1.6.4 PPMU

    PPMU holds a monthly meeting with pCERWASS to discuss progress and planning of the program, and

    conducts field visits to the WS teams to check up with reality.

    3.1.7 EVALUATION

    Detailed guidelines for evaluation will be submitted to DoNRE-EPA

    3.1.7.1 Final evaluation

    Evaluation activity will be conducted in the last month of the pilot phase (Dec 2014). It consists of the

    following activities:

    External evaluation: pCERWASS carries out a rapid assessment with participation of those who

    are directly involved in the pilot project activities, such as District task force, school clean water

    supply communication teams, students, etc. This rapid assessment can be done through a

    workshop.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 28/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    29/34

    Internal evaluation: In each school, clean water supply teacher group makes its own evaluation

    on activities being undertaken and writes the wrap-up report and submits this report to the

    Management Board of School, District Education and Training Division, district task force and

    pCERWASS.

    Independent evaluation: is done by the outside consultant.

    3.1.7.2 A Workshop to totalize result of the extension phase

    It consists of the following activities:

    Two wrap-up workshops of the extension phase are organized: one for primary schools and

    one for secondary schools.

    Aims of workshop are to

    o Publicize achieved results, external and internal evaluation results

    o Write the synthesizing report and draw the lessons learned

    o To make suggestions for the extension phase

    o Make suggestions for and plan the maintaining phase of clean water supply

    communication at school

    o Hand over de results to the relevant authorities

    3.1.8 TIMESCHEDULE

    Schooling year 2010-2011

    Dec 2010 Jan 2010 Feb 2010 Jun 2011 June July

    2011

    - Get agreement

    with District

    Education and

    Training Division

    about pilot project- Working with

    management

    boards of schools

    about pilot project

    - Formation of

    clean water

    supply teacher

    group

    - Conduct

    training for

    clean water

    supply teacher

    group- The group

    prepares

    detailed plan

    of clean water

    supply

    communication

    in school

    - Clean water supply teacher group carries out

    water supply training for students

    - Clean water supply teacher group undertakes

    clean water supply communication activities in

    school

    - Evaluation

    of pilot project

    -Wrap-up

    workshop of

    pilot projectfor primary

    and

    secondary

    schools

    - Design

    water supply

    awareness

    raising plan in

    the extension

    phase

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 29/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    30/34

    3.1.9 BUDGETTRANSFER

    Budget transfer for implementation of activities will be carried out under the following modality:

    (1) The clean water supply teacher group sets up the detailed plan (including financial allocation for

    each activity) under the assistance of pCERWASS and District Education and Training Division.

    (2) The group will submit the detailed plan to management board of school and District Education

    and Training Division to get comment and approval;

    (3) The District Education and Training Division will submit the plan to DTF, pCERWASS and PPMU

    to get comment and approval;

    (4) After the plan is ratified, budget will be transferred to pCERWASS and pCERWASS transfers

    directly to the school WS teams .

    (5) After each activity, school WS teams together with pCERWASS have the duty of gathering

    regular vouches and invoices under the stipulations of Ministry of Finance. Content of these

    documents have to correspond with ratified content in order to balance the budget with PPMU.

    3.1.10 LOGICALFRAMEWORK

    Objectives Indicators Sources of verification

    1- A sustainable model on clean

    water supply awareness raising

    activities in school has been set

    up.

    1- Clean water supply teacher

    group has been established

    2- Clean water supply

    communication activities in

    school are carried out under the

    plan3- Clean water supply

    communication plan in school is

    designed with the participatory

    approach

    4- Types of clean water supply

    communication activities in

    school are diversified

    1- Contract of

    implementation of project

    2- Clean water supply

    communication plan

    3- External evaluation

    report4- Independent

    evaluation report

    5- Monitoring, progress

    report

    2- Teachers capacity in clean

    water supply communication

    activities has been strengthened

    3- Clean water supply teacher

    group have enough capacity to

    carry out the water supply

    training for students as well as

    to undertake the clean water

    supply communication activities

    in school.

    1- Monthly reports of (a)

    clean water supply

    teacher group , (b)

    pCERWASS

    2- Internal evaluation

    report

    3- External evaluation

    report

    4- Independent

    evaluation report

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 30/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    31/34

    5- Monitoring, progress

    report

    3- Better knowledge, attitude, and

    behaviour of students towards the

    environment, especially on clean

    water and water use have been

    achieved

    1- The following information of

    clean water is provided:

    - Clean water and polluted

    water

    - Polluted water and diseases

    -Do and dont towards water

    resource protection and

    reasonable water use

    2- % Students understand the

    following issues:

    -

    Clean water and polluted water

    - Polluted water and diseases

    -Do and dont towards water

    resource protection and

    reasonable water use

    3- Students communicate clean

    water related issues to their

    families and friends

    4- Under guiding of clean water

    supply teacher group ,

    students organize clean water

    supply communication activities

    in school

    5- Under guiding of clean watersupply teacher group ,

    students organize

    environmental protection

    activities in school

    1- Monthly report of

    clean water supply

    teacher group

    2- Internal evaluation

    report (incl. Pictures)

    3- External evaluation

    report (incl. pictures)

    4- Before&After-survey

    on knowledge, attitude

    and behaviour of

    students and teachers,

    by pCERWASS

    5- Independent

    evaluation report

    6- Monitoring, progress

    report

    4- Environmental protection

    activities in schools have been

    strengthened (content and

    methodology-wise)

    1- Environmental protection

    activities in school are

    undertaken under the plan.

    2- Number of water supply

    awareness raising activities in

    school are organised beforeand after project.

    3- Sanitation status of classes

    and school

    1- Clean water supply

    communication plan

    2- Monthly report of

    clean water supply

    teacher group

    3- Internal evaluationreport

    4- External evaluation

    report

    5- Independent

    evaluation report

    6- Monitoring, progress

    report

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 31/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    32/34

    4 WATER SUPPLY MASS COMMUNICATION PROGRAM

    4.1.1 OBJECTIVE

    The overall objective is to help transmit the project activities and water supply messages to the targeted

    population.

    4.1.2 TYPESOFMASSCOMMUNICATIONPROGRAM

    The Mass Communication Program will be set up as follows:

    (1) The clean water supply communication program on newspaper,

    (2) The clean water supply communication program via television,

    (3) The clean water supply communication program via radio,

    These mass media (newspaper, television, radio) will be involved on provincial, district and commune

    level.

    4.1.3 RESPONSIBILITIES

    Type of mass medium Provincial level District level Local level

    Television (only province)PPMU, together with

    pCERWASSpCERWASS and DTF

    EC team and

    communesNewspaper

    Radio

    On provincial level, pCERWASS takes the final responsibility to compose the content of and have

    produced news, articles and films with the approval from PPMU.

    4.1.4 ACTIVITIES

    For every broadcasting medium (newspapers, television & radio stations on provincial, district, local

    level), there will be two types of dissemination:

    Short news: these are meant to be informational and disseminate information about the

    progress of the project (news).

    Long news: these are meant to be informational and educational and disseminate information and

    educate about a certain topic (documentary)

    4.1.4.1 Information collection group

    Depending on the subject (clean water), establish:

    an information collection group belonging to pCERWASS (for clean water awareness raising program)

    (1)

    The group above has the function of collecting and editing project related information to serve the

    television, radio and newspapers.

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 32/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    33/34

    4.1.4.2 The clean water supply communication program for newspaper and radio

    Depending on the level of responsibility (see above, 4.1.3), the responsible implementing agency

    (pCERWASS, DTF and WS teams) should undertake the following steps:

    (1) Discuss (with partners) and identify the number and topics of articles to be published in the

    newspaper and on the radio.

    Recommended topics (or more)Topic 1: Introduction of project

    Topic 2: Introduction of rural water supply component

    Topic 3: Community clean water supply awareness raising program

    Topic 4: School clean water supply awareness raising program

    Topic 5: Totalize result of project

    (2) Work on and get agreement with the editorial board of newspaper and radio station for the

    release of the information of project per month and specific articles.

    (3) The Contract of implementation of program is signed between pCERWASS and editorial

    board of newspaper and radio stations.

    (4) Prepare information publishing on newspaper

    Set up a timely planning and involve the relevant partners to gather and collect information that will be

    used for writing or broadcasting articles and news.

    (5) Write articles publishing on newspaper

    In each article, steps of implementation are as follows:

    The information collection group gathers information to serve selected article

    The information collection group writes the draft of article

    The draft of article will be sent to pCERWASS for comments and approval before

    implementation.

    The group modifies the draft of article under the comments of pCERWASS

    The group sends the completed article to newspaper for publication

    The group follows up the publication of every article

    4.1.4.3 The clean water supply communication program via Binh Dinh television

    (1) PPMU and the information collection group of pCERWASS discuss and identify the number and

    topics of films for broadcasting on television.

    (2) Representative of PPMU and pCERWASS works and get agreement with the editorial board of

    Binh Dinh television for the broadcast of the films of project

    (3) The Contract of implementation of program that being signed between pCERWASS and

    editorial board of Binh Dinh television

    Awareness Raising Program of PPMU WSSP Binh Dinh together with pCERWASS update 15/06/2011 33/34

  • 8/6/2019 Awareness Raising Strategy PCerwass

    34/34

    . Recommended topics of film

    Film 1: Introduction of project (such as activities at the office of project, interview the PPMU,

    improvement activities, etc.)

    Film 2: Introduction of rural water supply component

    Film 3 Community clean water supply awareness raising program

    Film 4: School clean water supply awareness raising program

    Film 5: Totalized result of project

    (4) In each film, steps of implementation are as follow:

    Prepare the film script.

    The draft sends to the PPMU to get feedback and approval

    Modify the draft of film script

    Send the completed film script to Binh Dinh television

    Binh Dinh television undertakes the film.

    Follow up the broadcasting program of the film.

    4.1.4.4 Evaluation

    Evaluation activity will be conducted:

    1. after every publication or broadcasting of news/message/

    It consists of the following activities:

    The information collection group carries out a rapid assessment, hearing all envolved actors, and

    writes wrap-up report for pCERWASS and PPMU.

    2. at the end of program.

    It consists of the following activities:

    The responsible agency (PPMU, pCERWASS) carries out a rapid assessment withparticipation of those who are directly involved in the program, such as information collection

    group, representatives of editorial board of newspaper and television and audience.

    Information Collection Group of pCERWASS writes wrap-up report for PPMU and makes

    evaluation on its own activities.

    Detailed guidelines for evaluation will be submitted to pCERWASS.

    The suggested indicators of evaluation include:

    Benefits of program towards local people

    Effectiveness of program towards local communities in using clean water supply.