Reconstruction of the Saint-Jacques overpass

Presentation of mitigation measuresMay 15, 2014

2

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

3

COMPLETE CLOSURE OF ST-JACQUES BETWEEN GIROUARD AND DÉCARIE

ONE (1) LANE IN EACH DIRECTION ON BOULEVARD DÉCARIE BETWEENDE MAISONNEUVE AND ST-JACQUES (EXPECTED COMPLETION TIME: MID-JUNE)

RUE ST-JACQUES BETWEEN DÉCARIE AND ST-RÉMI: ONE (1) LANE IN EACH DIRECTION

WORK ON RUE SHERBROOKE OUEST, BETWEEN DÉCARIE AND GREY, WITH ONE (1) LANE AVAILABLE WESTBOUND (DURATION: 6 TO 8 WEEKS)

ROADWORK ZONE

COMPLETE CLOSURE OF THE ST-JACQUES ONRAMP TO THE A-720 EASTBOUND

4

PERMANENT RESERVED LANE ON SHERBROOKE EST & OUEST BETWEEN GIROUARD AND TRENHOLME

OPENING OF THE DE MAISONNEUVE EXIT ON THE A-15 SOUTHBOUND

TEMPORARY RESERVED LANE ON SHERBROOKE EST

OPENING OF THE SHERBROOKE U-TURN AREA

TEMPORARY RESERVED LANE ON UPPER-LACHINE

LEFT-TURN LANE ON SHERBROOKE EST FOR THE A-15 NORTHBOUND

MITIGATION MEASURES

5

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians• Detour - network for trucks and automobiles• Review• Noise management• Communications media

PRESENTATION PLANNING

6

MITIGATION MEASURESOpening of the Girouard onramp to the A-15 southboun d

7

MITIGATION MEASURESAddition of a right-turn lane on chemin de la Côte-S t-Luc

8

MITIGATION MEASURESOpening of the De Maisonneuve exit on the A-15 south bound

9

MITIGATION MEASURESOpening of the Sherbrooke U-turn

10

MITIGATION MEASURESModification of signage in the roadwork area

11

MESURES D’ATTÉNUATIONModification des feux de circulation du secteur

MODIFICATION OF TRAFFIC LIGHTS IN THE ROADWORK AREA

12

MITIGATION MEASURESAddition of permanent and temporary reserved lanes on rue Sherbrooke

PERMANENT RESERVED LANE ON SHERBROOKE EST & OUEST BETWEEN GIROUARD AND TRENHOLME

TEMPORARY RESERVED LANE ON SHERBROOKE EST

LEFT-TURN LANE ON SHERBROOKE EST FOR THE A-15 NORTHBOUND

13

MITIGATION MEASURESImplementation of a temporary reserved lane on chem in Upper-Lachine

14

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

15

BICYCLE NETWORK AND DETOUR FOR PEDESTRIANS

16

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound

• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound • Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area

• Implementation of a reserved lane on rue Sherbrooke• Implementation of a temporary reserved lane on chemin Upper-

Lachine• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

17

DETOURNetwork for trucks and automobiles

18

PRESENTATION PLANNING• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn• Modification of signage and traffic lights in the roadwork area

• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

19

• Mitigation measures offer :• More route flexibility over the road network;• Improved capacity on rue Sherbrooke Est at the onramp to the A-

15 northbound;• More efficient public transportation service thanks to additional

reserved lanes.

• All the preferential measures for buses will favour modal transfer.

• Simulations indicate that the impacts on the Sud-Ouest borough are minor.

REVIEW

20

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

21

NOISE BARRIER

22

NOISE BARRIER

23

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

• Neighbourhood committees• Leaflets distributed door-to-door• Website dedicated to the project www.turcot.gouv.qc.ca• Dedicated telephone line 514 873-1372• Turcot email: turcot.commentaires@mtq.gouv.qc.ca• Twitter @MTQ_Turcot• Monthly electronic bulletins (subscribe via the Turcot website)• Advertising and notices in newspapers• Radio circulation 730 AM and traffic columnists• Ambient noise monitoring system accessible through the website