Reconstruction of the Saint-Jacques overpass

Presentation of mitigation measuresMay 15, 2014

Page 2: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

2

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

Page 3: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

3

COMPLETE CLOSURE OF ST-JACQUES BETWEEN GIROUARD AND DÉCARIE

ONE (1) LANE IN EACH DIRECTION ON BOULEVARD DÉCARIE BETWEENDE MAISONNEUVE AND ST-JACQUES (EXPECTED COMPLETION TIME: MID-JUNE)

RUE ST-JACQUES BETWEEN DÉCARIE AND ST-RÉMI: ONE (1) LANE IN EACH DIRECTION

WORK ON RUE SHERBROOKE OUEST, BETWEEN DÉCARIE AND GREY, WITH ONE (1) LANE AVAILABLE WESTBOUND (DURATION: 6 TO 8 WEEKS)

ROADWORK ZONE

COMPLETE CLOSURE OF THE ST-JACQUES ONRAMP TO THE A-720 EASTBOUND

Page 4: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

4

PERMANENT RESERVED LANE ON SHERBROOKE EST & OUEST BETWEEN GIROUARD AND TRENHOLME

OPENING OF THE DE MAISONNEUVE EXIT ON THE A-15 SOUTHBOUND

TEMPORARY RESERVED LANE ON SHERBROOKE EST

OPENING OF THE SHERBROOKE U-TURN AREA

TEMPORARY RESERVED LANE ON UPPER-LACHINE

LEFT-TURN LANE ON SHERBROOKE EST FOR THE A-15 NORTHBOUND

MITIGATION MEASURES

Page 5: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

5

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians• Detour - network for trucks and automobiles• Review• Noise management• Communications media

PRESENTATION PLANNING

Page 6: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

6

MITIGATION MEASURESOpening of the Girouard onramp to the A-15 southboun d

Page 7: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

7

MITIGATION MEASURESAddition of a right-turn lane on chemin de la Côte-S t-Luc

Page 8: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

8

MITIGATION MEASURESOpening of the De Maisonneuve exit on the A-15 south bound

Page 9: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

9

MITIGATION MEASURESOpening of the Sherbrooke U-turn

Page 10: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

10

MITIGATION MEASURESModification of signage in the roadwork area

Page 11: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

11

MESURES D’ATTÉNUATIONModification des feux de circulation du secteur

MODIFICATION OF TRAFFIC LIGHTS IN THE ROADWORK AREA

Page 12: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

12

MITIGATION MEASURESAddition of permanent and temporary reserved lanes on rue Sherbrooke

PERMANENT RESERVED LANE ON SHERBROOKE EST & OUEST BETWEEN GIROUARD AND TRENHOLME

TEMPORARY RESERVED LANE ON SHERBROOKE EST

LEFT-TURN LANE ON SHERBROOKE EST FOR THE A-15 NORTHBOUND

Page 13: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

13

MITIGATION MEASURESImplementation of a temporary reserved lane on chem in Upper-Lachine

Page 14: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

14

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

Page 15: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

15

BICYCLE NETWORK AND DETOUR FOR PEDESTRIANS

Page 16: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

16

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound

• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound • Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area

• Implementation of a reserved lane on rue Sherbrooke• Implementation of a temporary reserved lane on chemin Upper-

Lachine• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

Page 17: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

17

DETOURNetwork for trucks and automobiles

Page 18: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

18

PRESENTATION PLANNING• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn• Modification of signage and traffic lights in the roadwork area

• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

Page 19: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

19

• Mitigation measures offer :• More route flexibility over the road network;• Improved capacity on rue Sherbrooke Est at the onramp to the A-

15 northbound;• More efficient public transportation service thanks to additional

reserved lanes.

• All the preferential measures for buses will favour modal transfer.

• Simulations indicate that the impacts on the Sud-Ouest borough are minor.

REVIEW

Page 20: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

20

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

Page 21: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

21

NOISE BARRIER

Page 22: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

22

NOISE BARRIER

Page 23: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

23

• Roadwork description• Mitigation measures:

• Opening of the Girouard onramp to the A-15 southbound• Addition of a right-turn lane on chemin de la Côte-St-Luc

• Opening of the De Maisonneuve exit on the A-15 southbound

• Opening of the Sherbrooke U-turn

• Modification of signage and traffic lights in the roadwork area• Implementation of a reserved lane on rue Sherbrooke

• Implementation of a temporary reserved lane on chemin Upper-Lachine

• Bicycle network and detour for pedestrians

• Detour - network for trucks and automobiles

• Review• Noise management• Communications media

PRESENTATION PLANNING

Page 24: Reconstruction of the Saint-Jacques overpass Presentation ... · • Opening of the Girouard onramp to the A-15 southbound ... • Communications media PRESENTATION PLANNING. 3 COMPLETE

• Neighbourhood committees• Leaflets distributed door-to-door• Website dedicated to the project www.turcot.gouv.qc.ca• Dedicated telephone line 514 873-1372• Turcot email: [email protected]• Twitter @MTQ_Turcot• Monthly electronic bulletins (subscribe via the Turcot website)• Advertising and notices in newspapers• Radio circulation 730 AM and traffic columnists• Ambient noise monitoring system accessible through the website

COMMUNICATIONS MEDIA