ihep cryomodule status

Post on 31-Dec-2015

52 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

IHEP Cryomodule Status. Jiyuan Zhai On behalf of the IHEP ILC SRF R&D Team AWLC14, May 14, Fermilab. Outline. IHEP ILC-TC1 Cryomodule Assembly Horizontal Test Facilities Cavity Fabrication. IHEP ILC-TC1 Cryomodule. - PowerPoint PPT Presentation

TRANSCRIPT

IHEP Cryomodule Status

Jiyuan Zhai

On behalf of the IHEP ILC SRF R&D Team

AWLC14, May 14, Fermilab

2

Outline

• IHEP ILC-TC1 Cryomodule Assembly

• Horizontal Test Facilities

• Cavity Fabrication

IHEP ILC-TC1 Cryomodule

3

• Short cryomodule with one low-loss large grain 9-cell cavity (VT 20MV/m, Q0=1.4E10)

• Cylindrical magnetic shield inside helium vessel

• STF type input coupler and tuner• Module assembly to complete in

July 2014, horizontal test in 2015

4

Cryomodule Assembly

Assembly Hall in IHEP Building #2

5

Cavity Clean Room Assembly

6

Cavity Clean Room Assembly

Careful Clean Room Assembly Operations (PFFA)

Beam Tube Assembly Gate Valve Assembly Cavity Assembly Prep

7

Cavity Clean Room Assembly

• Coupler Mounting Test

• Slow Pumping and N2 Purging

• Middle-position slide jack tuner with four guiding rods

• Helium vessel bellow and tuner flanges sagging when loose the support fixtures; will be restored when the tuner is installed.

2mm

8

Outline

• IHEP ILC-TC1 Cryomodule Assembly

• Horizontal Test Facilities

• Cavity Fabrication

9

Horizontal Test Facility Layout

Power SourceDeliver in end 2014

Cryogenic PlantIn commissioning

TunnelHorizontal test & beam test

Vertical test DewarDeliver in September

IHEP Building #1

10

Cryogenic System in Commissioning

Cold box and compressor: refrigeration 1000W@4.5K, liquefication: 284 L/h

2K pumps: 8000 m3/h @ 3100 Pa

11

1.3 GHz Klystron and Modulator Ordered• 1.3 GHz 5 MW Klystron and Marx Modulator will deliver in end 2014

12

Outline

• IHEP ILC-TC1 Cryomodule Assembly

• Horizontal Test Facilities

• Cavity Fabrication

13

TESLA-like Cavity Fabrication

• End groups EBW ongoing

• Cavity EBW to be done in July

• Process and test at KEK

14

TESLA Cavity Production

• HERT Company• FG TESLA 9-cell cavity• Pressing and EBW test

and optimization• One prototype in 2014

15

Summary

• IHEP ILC test cryomodule assembly is ongoing and will be finished in July 2014.

• Hardware preparation, environment and component cleanliness, vacuum, alignment and assembly procedures are studied and conducted carefully for cavity clean room assembly.

• Cryogenic system and power source will be ready in end 2014 for the module horizontal test.

• Prototype production of a fine grain TESLA-like 9-cell cavity and a fine grain TESLA 9-cell cavity will be done in mid and end 2014 respectively.

16

Thank you!

top related