15.4. 14, dfe 16, top of bottom...

Post on 30-Sep-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Reviewed For Code Compliance

Approved per comments on theapplication and scope of work(Flood vents installed per R22.2.2,Flood resistant materials perR322.1.8). Field verify. The parcel islocated in an AE flood zone. BFE14, DFE 16, Top of bottom floor15.4.

Approved per comments on the application and scope of work(Flood vents installed per R22.2.2, Flood resistant materials perR322.1.8). Field verify. The parcel is located in an AE flood zone.BFE 14, DFE 16, Top of bottom floor 15.4.

Approved per comments on the application and scope of work(Flood vents installed per R22.2.2, Flood resistant materials perR322.1.8). Field verify. The parcel is located in an AE flood zone.BFE 14, DFE 16, Top of bottom floor 15.4.

Approved per comments on the application and scope of work(Flood vents installed per R22.2.2, Flood resistant materials perR322.1.8). Field verify. The parcel is located in an AE flood zone.BFE 14, DFE 16, Top of bottom floor 15.4.

top related