15.4. 14, dfe 16, top of bottom...
TRANSCRIPT
![Page 1: 15.4. 14, DFE 16, Top of bottom floordocuments.brunswickcountync.gov/BCMS/0/edoc/388017/Elevation... · Expiration Date: July 31 , 2015 FOR INSURANCE COMPANY USE Policy Number: Company](https://reader034.vdocuments.site/reader034/viewer/2022052008/601d5959d001c541031c9f29/html5/thumbnails/1.jpg)
Reviewed For Code Compliance
Approved per comments on theapplication and scope of work(Flood vents installed per R22.2.2,Flood resistant materials perR322.1.8). Field verify. The parcel islocated in an AE flood zone. BFE14, DFE 16, Top of bottom floor15.4.
![Page 2: 15.4. 14, DFE 16, Top of bottom floordocuments.brunswickcountync.gov/BCMS/0/edoc/388017/Elevation... · Expiration Date: July 31 , 2015 FOR INSURANCE COMPANY USE Policy Number: Company](https://reader034.vdocuments.site/reader034/viewer/2022052008/601d5959d001c541031c9f29/html5/thumbnails/2.jpg)
Approved per comments on the application and scope of work(Flood vents installed per R22.2.2, Flood resistant materials perR322.1.8). Field verify. The parcel is located in an AE flood zone.BFE 14, DFE 16, Top of bottom floor 15.4.
![Page 3: 15.4. 14, DFE 16, Top of bottom floordocuments.brunswickcountync.gov/BCMS/0/edoc/388017/Elevation... · Expiration Date: July 31 , 2015 FOR INSURANCE COMPANY USE Policy Number: Company](https://reader034.vdocuments.site/reader034/viewer/2022052008/601d5959d001c541031c9f29/html5/thumbnails/3.jpg)
Approved per comments on the application and scope of work(Flood vents installed per R22.2.2, Flood resistant materials perR322.1.8). Field verify. The parcel is located in an AE flood zone.BFE 14, DFE 16, Top of bottom floor 15.4.
![Page 4: 15.4. 14, DFE 16, Top of bottom floordocuments.brunswickcountync.gov/BCMS/0/edoc/388017/Elevation... · Expiration Date: July 31 , 2015 FOR INSURANCE COMPANY USE Policy Number: Company](https://reader034.vdocuments.site/reader034/viewer/2022052008/601d5959d001c541031c9f29/html5/thumbnails/4.jpg)
Approved per comments on the application and scope of work(Flood vents installed per R22.2.2, Flood resistant materials perR322.1.8). Field verify. The parcel is located in an AE flood zone.BFE 14, DFE 16, Top of bottom floor 15.4.