TRANSCRIPT
LINCOLN AIRP ORT
F.A.R. Part 150Noise Compat ib ili ty Study
NOISE COMP ATIBILITY P ROGRAM
P re p a r e d F o r
The Lin co ln Airport Au th ori ty
B y
Co ffm a n As s o c ia t e s , In c .
S e p te m be r 2003
The preparation of th is docum ent was financed in part through a plann ing grant fromthe Federal Aviation Ad m inistration (FAA) as approved u nd er th e Airport and AirwayImprovem ent Act of 1982, as am ended. The conten ts of th is report do not necessarilyreflect th e official views or policy of the FAA . Acceptance of th is report by the FAA doesnot in any way constitute a com m itm ent on th e part of the Un ited S tates to participatein any developm ent d epicted th erein , nor does it ind icate that the proposed developmentis environm entally acceptable in accordance with applicable public laws.
LINCOLN AIRP ORTLincoln , Nebraska
F.A.R. Part 150Noise Compat ib ili ty P rogram
N OIS E COMP ATIB ILITY P ROGRAMSponsor’s Cer t ifica t ion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x
Ch a pte r F ou r
NOISE ABATEMENT ALTERNATIVES
POTENTIAL NOISE ABATEMENT MEASURES . . . . . . . . . . . . . . . . . . . 4-3Runway Use And F light Routes . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3Airport Facilit ies Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6Aircra ft Opera t iona l Pr ocedures . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10Air por t Regu la t ions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15
SELECTION OF MEASURE S F OR DETAILED E VALUATION . . . . . . 4-27Evalua t ion Cr iter ia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-27Alterna t ive 1 - Test The Effectiven ess Of Ut ilizing Runway 17R-35L For Nigh t t ime Opera t ions . . . . . . . . . . . . . . . . 4-28Alt erna t ive 2 - Engine Run-Up Loca t ion Noise Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-31Alt erna t ive 3 - Engine Run-Up Enclosure . . . . . . . . . . . . . . . . . . . 4-33
SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-34
Ch a p te r F iv e
LAN D U S E ALTERN ATIVE S
LAND USE ISSUES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1LAND USE COMPATIBILITY BOUNDARY ESTABLISHMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Boundar ies Established Ut ilizing Aircra ft Opera t ions . . . . . . . . . . 5-2Boundar ies Established By N oise Exposure Contours . . . . . . . . . . . 5-3Exist ing La nd Use P lanning Bounda r ies Wit h in Lincoln Air por t Environs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
LAND USE MANAGEMENT TECHNIQUES . . . . . . . . . . . . . . . . . . . . . . . 5-7Policy Techn iques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8Regula tory Techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9Expenditu re Techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21
PRELIMINARY LAND USE ALTERNATIVES . . . . . . . . . . . . . . . . . . . . 5-28
Cha pte r Six
N OIS E COMP ATIB ILITY P LAN
NOISE ABATEMENT AND LAND USE MEASURES ELIMINATED FROM CONSIDERATION . . . . . . . . . . . . . . . . . . . . . . . . 6-2NOISE ABATEMENT ELEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2LAND USE MANAGEMENT ELEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6PROGRAM MANAGEMENT ELEMENT . . . . . . . . . . . . . . . . . . . . . . . . . 6-14RESIDU AL NOISE IMPACTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18
EXHIBITS
4A POSSIBLE NOISE ABATEMENT TECHNIQUES . . . . a fter pa ge 4-44B ALTERNATIVE RUN-UP LOCATIONS . . . . . . . . . . . . a fter pa ge 4-104C TYPICAL AIRLINE DISTANCE N OISE
ABATEMENT DEPARTURE PROCEDURE . . . . . . . a fter pa ge 4-124D NBAA NOISE ABATEMENT DEPARTURE
PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 4-124E ALTERNATIVE 1 - TEST THE EF FE CTIVEN ESS
OF UTILIZING RUN WAY 17R-35L FOR NIGHTTIME OPERATIONS . . . . . . . . . . . . . . . . . . . . a fter pa ge 4-28
4F ALTERNATIVE 2 - POTENTIAL RUN-UP ENCLOSURE SITE S EXISTING AND A . . . . . . . . . . a fter pa ge 4-32
E XH IB ITS (Co n t in u e d )
4G ALTERNATIVE 3 - POTENTIAL RUN-UP ENCLOSURE SITE S B, C, AND D . . . . . . . . . . . . . . . a fter pa ge 4-32
4H ALTERNATIVE RUN-UP RAMP LAYOUT . . . . . . . . . a fter pa ge 4-324J POTENTIAL RUN -UP ENCLOSURE DESIGN . . . . . . a fter pa ge 4-34
5A LAND USE PLANNING ISSUES . . . . . . . . . . . . . . . . . . a fter pa ge 5-25B ALTERNATIVE ENVIRONS NOISE DISTRICT
BOUNDARIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 5-65C LAND U SE TECHN IQUES TO P ROMOTE
NOISE COMPATIBILITY . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 5-85D COMPATIBLE LAND USE AND
COMPATIBLE ZONING . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 5-105E POTENTIAL REVISION S TO AIRPORT
ENVIRONS NOISE DISTRICT . . . . . . . . . . . . . . . . . . a fter pa ge 5-165F ALTERNATIVE ENVIRONMENTAL
ZONING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 5-205G NOISE-SENSITIVE LAND USE WITHIN
THE 65 DNL NOISE CONTOUR . . . . . . . . . . . . . . . . a fter pa ge 5-24
6A RUN-UP LOCATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 6-46B SUGGESTED RUN-UP RAMP LAYOUT . . . . . . . . . . . . a fter pa ge 6-46C RECOMMENDED AIRPORT ENVIRONS
NOISE DISTRICT BOUNDARY . . . . . . . . . . . . . . . . . . a fter pa ge 6-86D RECOMMENDED REVISED AIRPORT ENVIRONS
NOISE DISTRICT BOUNDARIES . . . . . . . . . . . . . . . a fter pa ge 6-126E 2002 NOISE EXPOSURE CONTOUR
WITH LAND USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 6-186F 2007 NOISE EXPOSURE CONTOUR
WITH LAND USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 6-186G 2022 NOISE EXPOSURE CONTOUR
WITH LAND USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . a fter pa ge 6-18
Ap p e n d i x A
WELCOME TO THE P LANN ING
ADVIS ORY COMMITTEE
Ap p e n d i x B
COORD INATION , CON S U LTATION ,
AND P U B LIC IN VOLVEME N T
Ap p e n d i x D
IMP LEME N TATION MATER IALS
Ap p e n d i x E
S U P P OR T D OCU ME N TATION F OR LAN D U S E
RE GULATION S WITHIN AN D B ELOW 65 DN L
TE CH N ICAL IN F OR MATION P AP ERS
GLOSSARY OF NOISE COMPATIBILITY TERMSNOISE AND LAND USE COMPATIBILITY GUIDELINES
i
F.A.R. P a r t 150
NOISE COMP ATIBILITY N oi se Com p a t i b i li t y S t u d y Up d a t e
P ROGRAM Li n col n Ai r p or t
Th is is t he Noise Compa t ibilit yProgram (NCP) docum ent prepa red forLincoln Air por t . The NCP is the secondof two par t s required in a Federa lAvia t ion Regu la t ion (F .A.R.) Pa r t 150Noise Compa t ibility St udy. It includesChapters Four , Five, a nd Six inaddit ion to four appendices. The firstvolum e, th e Noise Exposur e Maps,wh ich includes the first Three chaptersof the study, was su bmitt ed to the FAAin F ebruary 2003.
Chapter Four of th e NCP, NoiseAbatement Altern at ives, d iscusses andana lyzes poten t ia l meth ods of reducingor sh ift ing a ircra ft noise away fr omnoise sensitive ar eas.
Chapter Five, Lan d Use Altern at ives,ana lyzes poten t ia l land u se p lanningand zoning t echniques to prevent the
development of new n oise-sen sit ive landuses in a reas exposed t o a ircra ft noise.
Chapt er Six presen t s t he NoiseCompat ibility Program. The pr ogram isorgan ized in to thr ee elemen ts: noiseaba tement , land use management , andprogram management . The fir st twoelements ar e based on t he findings ofChapters Four and F ive. The progra mm a n a ge m e n t e l e m e n t i n clu d e smeasu res to adm in ister , refine, a ndupda te the overa ll program as needed inthe fu ture.
Supplemen ta l in format ion is providedin the a ppendices a nd Technica lInforma t ion Pa pers. Appendix A liststhe members of the P lanning AdvisoryCommit t ee (PAC) who were consu ltedthroughout th e plan ning process. Italso includes an explana t ion of the roleof the PAC in the Par t 150 upda te
ii
process. Appendix B, Coordina t ion ,Consulta t ion , a nd Public In volvement ,summarizes the pla nning pr ocess , loca lcoor d i n a t i on , a n d t h e p u b l i cinvolvement process.
Appendix C con ta ins a verba t im copy ofthe In t egra ted Noise Model out putrepor t . This appen dix is conta inedwith in the Noise Exposur e Maps (NEM)document .
Ap p e n d i x D con t a in s s a m p l eimplementa t ion mater ia ls for theva r ious recommenda t ions conta inedwith in the NCP.
Appendix E con t a ins s u ppor t in gin format ion for lan d use r egu la t ionsbelow the 65 DNL contour .
For the convenience of FAA reviewers ,the FAA’s officia l Noise Compa t ibilityChecklist is presen ted on pa ges iiith rough viii.
iii
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : ____________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
I. ID EN TIFICATION AND SUBMISSION OF P ROGRAM:
A. Subm itta l is properly identified:
1. F .A.R. 150 N CP ? Yes Tit le P age; p. i
2. NEM and NCP toge the r? No
3. P rogram revis ion? No
B. Airport an d Airport Opera tor’s na me ident ified? Yes Tit le P age; p. i
C. NCP tr an sm itted by airport operat or cover let ter ? Yes
II . CONS ULTATION: [150.23]
A. Docu men ta t ion in clu des n ar ra t ive of pu blic par t icipa t ion and
consulta tion process?
Yes Appendix B; supplementa l
volum e t itled “Su ppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
B. Identification of consulted par ties:
1. all part ies in 150.23(c) consu lted? Yes Appendix A; Appen dix B;
and supplemen ta l volume
t it led “Suppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
2. public an d plann ing agencies ident ified? Yes Appendix A; Appen dix B;
and supplemen ta l volume
t it led “Suppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
3. agencies in 2, a bove, corres pon d t o those in dicated on the
NE M? Yes Appendix A; Appen dix B;
and supplemen ta l volume
t it led “Suppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
C. Satisfies 150.23(d) requirement s?
1. docu men ta t ion sh ows act ive and d ir ect pa r t icipa t ion of
par ties in B, above? Yes Appendix B; supplementa l
volum e t itled “Su ppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
2. act ive a nd direct pa r t icip a t ion of gener a l public? Yes Appendix A; Appen dix B;
supp lemen ta l volum e titled
“Suppor t ing In forma t ion on
Project Coord ina t ion and
Loca l Con su lt a t ion ”
iv
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : _________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
3. pa rt icipat ion wa s pr ior t o and du rin g developm en t of NCP
and pr ior to subm it ta l t o F AA? Yes Appendix B; supplementa l
volum e t itled “Su ppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
4. indicates a dequate opport un ity afforded to submit views,
da ta , et c.? Yes Appendix B; supplementa l
volum e t itled “Su ppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
D. Eviden ce included of notice and oppor tun ity for a pu blic hea r ing
on N CP ? Yes Appendix B; supplementa l
volum e t itled “Su ppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
E. Docum enta tion of comm ents:
1. includes su mmary of pu blic hea r ing commen ts, if hea r ing
was h eld? Yes Appendix B; supplementa l
volum e t itled “Su ppor t ing
Informat ion on P roject
Coor din a t ion and Loca l
Consu lt a t ion”
2. in clu des copy of a ll wr it t en mater ia l subm it ted to opera tor? Yes Supp lemen ta l volum e titled
“Suppor t ing In forma t ion on
Project Coord ina t ion and
Loca l Con su lt a t ion ”
3. includes opera tor’s res ponses/disposition of writt en a nd
verbal comm ents? Yes Supp lemen ta l volum e titled
“Suppor t ing In forma t ion on
Project Coord ina t ion and
Loca l Con su lt a t ion ”
F . Inform al agreement received from FAA on flight procedures? Yes The local tower m an ager
was involved in the
P lann ing Advisory
Comm itt ee (PAC) meet ings
and ind ica t ed agreemen t
wit h flight pr ocedu res .
FAA rep res en ta t ive from
Air por t s Division of the
Centra l Region also
att ended PAC meetings.
v
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : _________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
II I. NOISE EXP OSUR E MAP S: [150.23, B150.3, 150.35(f)] (This
section of the checklist is not a su bstitute for t he Noise Exposur e
Map Checklist. It deals with ma ps in th e cont ext of the N oise
Compa t ibilit y P rogra m su bm iss ion.)
A. In clu sion of NEMs and s upp or t in g documen ta t ion :
1. Map d ocum en ta tion eit he r in clud ed or incorpora ted by
referen ce? Yes
Noise Exposur e Maps
submit t ed in Februa ry
2003.
2. Ma ps previou sly found in com pliance by FAA? Yes
3. Compliance determ inat ion st ill valid? Yes
4. Does 180-day per iod have to wa it for map com plia nce
findin g? Yes
B. Revised N EMs subm itt ed wit h pr ogra m: (Review u sin g NE M
check list if ma p r evisions in cluded in NCP su bm itt a l?
1. Revised N EMs in cluded wit h pr ogra m? No
2. Ha s air port opera tor r equest ed FAA to ma ke a
deter min at ion on t he N EM(s) when NCP appr oval is ma de? No
C. If progra m ana lysis u ses noise m odeling:
1. INM, HN M, or F AA-appr oved equivalent ? Yes
2. Monitorin g in accorda nce with A150.5? No
D. Existing condition an d 5-year ma ps clearly ident ified as th e
official NEMs? Yes
IV. CONSID ER ATION OF ALTERN ATIVES : [B15 0.7, 150.23(e )]
A. At a minim um , are t he a ltern at ives below considered?
1. land acquisition an d interests th erein, including air right s,
easement s, and development rights? Yes Cha pter 5, pp. 5-21 - 5-23,
5-25 - 5-28
2. ba r r ier s, a coust ical sh ieldin g, pu blic buildin g
soundpr oofing? Yes Cha pter 4, pp. 4-8 - 4-10,
pp. 4-31 - 4-34, Table 4D, p.
4- 35
Cha pter 5, pp. 5-23 - 5-24
3. preferen tial r un way system ? Yes Ch apter 4, p. 4-3 - 4-4
vi
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : _________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
4. flight procedures? Yes Chapt er 4, pp. 4-4 - 4-5, p.
4-6, pp. 4-28 - 4-31
Table 4D, pp. 4-35
5. r es t r ict ion on type/cla ss of air cra ft (at least one r es t r ict ion
below mu st be checked)
a . deny use based on F ederal stan dards? Yes Cha pter 4, pp. 4-15 - 4-19
b. capacity limits based on n oisiness? Yes Cha pter 4, p. 4-20
c. noise abatem ent t akeoff/approach procedures? Yes Cha pter 4, pp. 4-11 - 4-15
d. lan din g fees ba sed on n oise or t ime of da y? Yes Cha pter 4, pp. 4-20 - 4-22
e. nighttime rest rictions? Yes Cha pter 4, pp. 4-24 - 4-26
6. other act ion s with beneficia l im pact? Yes Cha pter 4, pp. 4-20 - 4-26
7. oth er FAA recomm endat ions? N/A
B. Responsible im plemen t in g a u thor it y id en t ified for ea ch
consider ed alter na tive? Yes Cha pter 5, Table 5B, p.5-29
C. Ana lysis of altern ative measur es:
1. mea sur es clearly described? Yes Cha pter 4, pp. 4-3 - 4-35
Cha pter 5, pp. 5-7 - 5-29
2. mea sur es adequa tely ana lyzed? Yes Cha pter 4, pp. 4-3 - 4-35
Cha pter 5, pp. 5-7 - 5-29
vii
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : _________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
3. adequat e reasoning for r ejecting alterna tives? Yes Cha pter 4, pp. 4-3 - 4-35
Cha pter 5, pp. 5-7 - 5-29
D. Ot her act ion s recom mended by the FAA:
Should oth er a ctions be added?
(lis t se pa ra tely or on ba ck of th is form act ion s a nd d iscuss ion s
with a ir por t ope ra tor to have them in clu ded p r ior to the s ta r t of
th e 180-day cycle)
N/A
V. ALTERNATIVES RECOMMENDED FOR IMPLEMENTATION:
[150.23(e), B150.7(c); 150.35(b), B150.5]
A. Docum ent clearly indicates:
1. a lt er na t ives r ecom men ded for im plem en ta t ion ? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
2. fina l r ecom men da t ion s a re a ir por t ope ra tors, not those of
consu lt an t or t h ird pa r ty? Yes Sp onsor ’s Cer t ifica t ion ,
p. x
B. Do all progra m r ecomm endat ions:
1. rela te dir ectly or indirectly to reduction of noise and
noncompat ible lan d uses? Yes Cha pter 6, pp. 6-2 - 6-19
2. cont ain description of cont ribut ion t o overa ll effectiveness
of pr ogra m? Yes Cha pter 6, pp. 6-2 - 6-19
3. noise/lan d use ben efits qua nt ified to exten t possible? Yes Cha pter 6, pp. 6-2 - 6-19
4. include actu al/an ticipated effect on reducing noise exposur e
with in n oncompa tible ar ea s hown on NE M? Yes Cha pter 6, pp. 6-2 - 6-19
5. effects based on r elevant an d rea sonable expressed
assum ptions? Yes Chap te r 4, Cha pt er s 5 & 6
6. have adequ a te s upp or t in g da ta to su pp or t it s con t r ibu t ion
to noise/land u se comp at ibility? Yes Chap te r 4, Cha pt er s 5 & 6
C. Ana lysis a ppear s t o suppor t pr ogra m st anda rds s et for th in
150.35 (b) an d B150.5? Yes Chap te r 4, Cha pt er s 5 & 6
viii
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : _________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
D. When u se rest rictions a re r ecomm ended:
1. a re a lt er na t ives with poten t ia lly sign ifica n t
noise/compat ible lan d use benefits thoroughly analyzed so
th at appr opriate compar isons a nd conclusions can be ma de? N/A No use r e st r ict ions
recomm ended.
2. use r est r ictions coord ina ted wit h APP -600 pr ior t o ma kin g
determ ination on star t of 180-days? N/A
E. Do the following also meet P ar t 150 analytical stan dards:
1. form al recomm endat ions which cont inue existing practices? N/A
2. new r ecom mendat ion s or changes proposed a t end of P ar t
150 process? N/A
F . Docum en ta t ion in dicat es h ow recommen da t ions m ay cha nge
previously adopted plan s? N/A
G. Docu men ta t ion a lso:
1. iden t ifies agencies wh ich a re r esp ons ible for implem en t ing
each r ecommenda t ion? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
2. indicat es whet her th ose agencies ha ve agree t o implem ent ? Yes Sponsor’s Certificat ion on p.
x. By app roving NCP ,
Airpor t Author ity has
agr eed to seriously consider
implemen ta t ion of t he
measures for which it has
sole respons ibility, provided
th at fun ding is available. It
has also agreed to
encour age other
organizat ions a nd a gencies
to ta ke a ny r ecomm ended
a ct ion s p er N CP .
3. indicat es e ssen t ial gover nmen t actions necessary to
implement recomm endat ions? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
H. Timefram e:
1. includes agreed-upon schedule to implement altern atives? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
ix
F .A .R . P A R T 1 5 0
N O IS E C O MP A T IB IL IT Y P R O G R AM C H E C K LIS T
A I R P O R T N A M E : L in c o l n A i r p o r t R E V IE W E R : _________________
L i n c o l n , N e b r a s k a
Yes /No/NA
Page No . /
Other Reference
2. indicat es per iod cover ed by t he pr ogra m? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
I. Fu nding/Costs:
1. includes costs to implement a lterna tives? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
2. includes anticipated fun ding sour ces? Yes Cha pter 6, pp. 6-2 - 6-19,
Table 6C, pp.6-20 - 6-22
VI. PROGRAM REVISION [150.23(e)(9)] Supp ort ing
d o cu m e n ta ti on i n cl ud e s pr ov is io n fo r r ev is io n ? Yes Cha pter 6, pp. 6-16 -6-18
x
S P ON S OR’S CER TIFICATION
The Noise Compat ibility P rogr am and accompanying documenta t ion for LincolnAir por t , includin g the descrip t ion of consu lta t ion and opportunity for pu blicinvolvement , submit ted in accordance with F .A.R. P ar t 150, a nd hereby cer t ified ast rue and complet e t o the best of my kn owledge and belief. It is h ereby cert ified t ha tadequa te oppor tunity has been afforded in teres ted persons to subm it views, da ta , andcomments on the Noise Compat ibility Program.
_________________________ ___________________________________
Date of S igna ture J ohn Wood, E xecut ive DirectorLincoln Airport Author ity