airport noise and land use compatibility

43
Airport Noise and Land Use Compatibility FAR Part 150 AST 491

Upload: jabir

Post on 07-Jan-2016

56 views

Category:

Documents


5 download

DESCRIPTION

Airport Noise and Land Use Compatibility. FAR Part 150. AST 491. Background. National Environmental Policy Act of 1969 (NEPA) Aviation Noise Abatement Policy, 1976 First identification between FAA, Carriers, Operators and Communities of the Responsibilities for Aircraft Noise Impacts - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Airport Noise and Land Use Compatibility

Airport Noise and Land Use Compatibility

FAR Part 150

AST 491

Page 2: Airport Noise and Land Use Compatibility

Background National Environmental Policy Act of 1969

(NEPA) Aviation Noise Abatement Policy, 1976

» First identification between FAA, Carriers, Operators and Communities of the Responsibilities for Aircraft Noise Impacts

Litigation Began Each person reacts differently to

sound/noise

Page 3: Airport Noise and Land Use Compatibility

Noise

Unattenuated Sound Sound of aircraft noise almost always

intrusive and unwanted John Linen -Music Rap - Noise

Page 4: Airport Noise and Land Use Compatibility

Levels of Sound

Most common measure is decibel (db) Logarithmic scale increasing by powers

of ten Perceived loudness doubles every

increase of ten db’s

Page 5: Airport Noise and Land Use Compatibility

Cumulative/Summation Metrics

Should tell where affected, how many people affected and how badly affected

Needs to indicate cumulative noise exposure» a metric which considers all noise energy

received at a given location during a defined period and averages the sum of the average noise level per second

Page 6: Airport Noise and Land Use Compatibility

Cumulative/Summation Metrics

Developed to define noise in a way subject to objective analysis

Previous techniques such as time above, ASDS, and single event correlation to human response

Page 7: Airport Noise and Land Use Compatibility

Cumulative/Summation Metrics

Developed to correlate highly with human response

Equal Energy Rule» Over a given period of time, people

respond most predictably to the total noise level energy rather than to the characteristics of any single noise event

Page 8: Airport Noise and Land Use Compatibility

Ldn : Day-Night Average Sound Level

The average sound level during a twenty-four hour period with a 10 decibel penalty for nighttime noise events.

The basic element of measure is the Sound Exposure Level (SEL)

Simply adds all noise levels for each second of the day and averages the summation on an equal basis.

Page 9: Airport Noise and Land Use Compatibility

Ldn : Day-Night Average Sound Level

Human response to noise is intensified during nighttime hours. Response is so much greater that it must be treated differently.

Nighttime events (10:00 pm to 7:00 am) are penalized by adding ten decibels to the measurement of each event.

Page 10: Airport Noise and Land Use Compatibility

Noise Contours

Ldn levels are calculated for specific locations. The contours connect points of equal intensity.

Ldn contours most commonly used are Ldn 65,70 and 75. Also mandated by FAA Regulation (FAR PART 150)

Page 11: Airport Noise and Land Use Compatibility

FAA FAR PART 150 Background

1976 Aviation Noise Abatement Policy» voluntary ANCLUC Studies

DOD Air Installations Compatible Use Zones (AICUZ)

Aviation Safety and Noise Abatement Act of 1979 (ANSA).» directed FAA to set forth procedures for noise

and land use compatibility.– started FAA FAR Part 150

Page 12: Airport Noise and Land Use Compatibility

ANSA- Aviation Safety and Noise Abatement

Section 102 - Single system of measuring noise» identifies land use use compatibilities

Section 103 - Funding set aside for noise mitigation and planning» first time ever in federal legislation

Section 104 - Requirements for noise compatibility

Page 13: Airport Noise and Land Use Compatibility

ANSA- Aviation Safety and Noise Abatement

Section 105 - Requirements for noise exposure maps (NEM)

Section 106 - Use of NEM as evidence to suits» seeking damages prohibited» airport can not use to defend

Page 14: Airport Noise and Land Use Compatibility

ANSA- Aviation Safety and Noise Abatement

Section 107 - Limits damages with respect to approved NEM» farmers can not sue

Section 108 - FAA studies process and reports back to congress

If airport plans study, it must give public “constructive Notice” by advertising in the newspaper 3 times

Page 15: Airport Noise and Land Use Compatibility

Components of a Part 150 Study

Two Final Products» Noise Exposure Map» Noise Compatibility Plan

Page 16: Airport Noise and Land Use Compatibility

Noise Exposure Map

Show unabated noise exposure in Ldn for existing year and fifth year following date of submission

Maps must show incompatible land use, discussion of activity forecasts

Assumptions upon which contours are based

explain noise monitoring, if done.

Page 17: Airport Noise and Land Use Compatibility

Noise Exposure Map

Analysis of background noise: if incompatible land uses are impacted by high levels of ambient noise levels then not considered impacted by aviation noise.

Page 18: Airport Noise and Land Use Compatibility

Noise Exposure Map

Noise exposure maps document submitted for review and “approval” by the FAA

Section 107 of ANSA: Once NEMs are approved then it limits liability to recover noise related damages.

Page 19: Airport Noise and Land Use Compatibility

Noise Exposure Map

Subsequent land owners must show significant change in the noise environment after constructive knowledge of maps. (normally at least 15% change), usually within the 65 Ldn contour line.

Constructive knowledge means published in paper 3 times-notice that maps are in existence.

Page 20: Airport Noise and Land Use Compatibility

Noise Compatibility Program

Discussion of analysis of noise abatement and land use management measures that are specifically listed in the regulation. Other measures may be evaluated.

The plan should provide for noise abatement through modification of flight procedures, regulations and even the airfield.

Page 21: Airport Noise and Land Use Compatibility

Noise Compatibility Program

Includes land use provisions to reduce existing noise impacts and prevent future noise impacts.

The NCP must be developed in consultation with airport users and jurisdictions in the area.

Public must be afforded an opportunity to comment on the study - opportunity for public hearing - always plan on one.

Page 22: Airport Noise and Land Use Compatibility

Noise Compatibility Program

Airport proprietors decision to submit. No penalties for not submitting. FAA will review for completeness and publish Notice in the Federal Register. This notice sets the 180 day time frame.

FAA has 180 days to reject NCP.

Page 23: Airport Noise and Land Use Compatibility

Noise Compatibility Program

Approved plan makes airport eligible for funds from noise set aside of AIP. Only eligible items of the NCP can be funded.

NEM - no time limit for the FAA to approve.

Page 24: Airport Noise and Land Use Compatibility

Standards of Review for Approval

The FAR Part 150 NCP must:» Contain measures which are reasonably

consistent with goal of preventing and reducing noncompatible land use.

Not derogate safety or adversely affect use of airspace.

Page 25: Airport Noise and Land Use Compatibility

Noise Compatibility Program

The FAR Part 150 NCP must:» Meet both local and national air

transportation system needs.» Provide for revision every 5 years (if

necessary)» Not adversely affect any other powers,

duties, program, etc.

Page 26: Airport Noise and Land Use Compatibility

Technical and Economic Data Required by the FAA

NEM and supporting documentation. Description and analysis of alternatives

considered by implementation authority. Discussion of rejected alternatives and

why. Development of program that meets

FAA standards.

Page 27: Airport Noise and Land Use Compatibility

Noise Compatibility Program Requirements

Actual or anticipated effect on reducing noise exposure.

How it may change previously adopted plans or actions.

Time Frame. Responsible parties.

Page 28: Airport Noise and Land Use Compatibility

Noise Compatibility Program Requirements

Costs of the program Provision for revising program if

necessary Description of public involvement.

Page 29: Airport Noise and Land Use Compatibility

Alternatives Required for Consideration

Acquisition of land or interest herein. Barriers/Shielding/Sound Proofing and

noise easements. Preferential runway use system by FAA. Flight procedure changes by FAA Restriction on use of airport. Other actions by FAA or others.

Page 30: Airport Noise and Land Use Compatibility

Other Measures

Airport Development measures. Navigational aids. Off-airport land use controls. Noise Monitoring Administrative measures and studies.

Page 31: Airport Noise and Land Use Compatibility

Airport Use Restrictions

Must be reasonably consistent with reducing non-compatible land use, must not create an undue (unreasonable) burden to interstate commerce, must not unjustly discriminate, nor derogate safety.

Airport use restrictions are extremely variable.

Page 32: Airport Noise and Land Use Compatibility

Airport Use Restrictions

Most significant impact occurs when a restriction adversely affects airport capacity and/or excludes certain users from the airport.

Must present magnitude of capacity impacts versus demand impact and the affect of excluding aircraft types.

Page 33: Airport Noise and Land Use Compatibility

Airport Use Restrictions

Analysis of impact on interstate commerce would consider such things as markets served, or cargo served, costs of rescheduling service at the airport, alternative airport available in the area.» not yet been done in the U.S.

Page 34: Airport Noise and Land Use Compatibility

Airport Use Restrictions

For instance: a nighttime restriction on stage 2 aircraft would include considerations of available stage 3 aircraft, shift of flights to daytime hours daytime capacity and alternative airports at night.

Page 35: Airport Noise and Land Use Compatibility

Land Use Controls

Zoning Easement

» Avigation - Runway Protection Zone (RPZ)» Noise (exact easements)» Transfer of development rights

– enabling legislation– Comprehensive planning

Page 36: Airport Noise and Land Use Compatibility

Land Use Controls

Subdivision regulations Building codes

» sound proofing to 30 db’s

Page 37: Airport Noise and Land Use Compatibility

Review and Approval Process

First reviewed at regional level. (both NCP/NEM)» Knowledge of local noise and land use

situations.» NEM final approval level is Region

Then goes to Washington for review and approval. (only NCP)» National Consistency of FAA Determination.

Page 38: Airport Noise and Land Use Compatibility

Review and Approval Process

Each measure is recommended for approval or disapproval.» final authority is with the administrator.

It is a local program.» not a federal program

Page 39: Airport Noise and Land Use Compatibility

Review and Approval Process

NEM’s can be approved at FAA Regional Level.» NCP must be approved/disapproved within

180 days of NEM acceptance.

Page 40: Airport Noise and Land Use Compatibility

When to do a Part 150

Significant amounts of incompatible land use impacted by aircraft noise.

Serious noise complaints received. Urban development pressure threatens

to increase incompatible land uses. Major changes in airport facilities or

aircraft operations which may shift noise patterns.

Page 41: Airport Noise and Land Use Compatibility

Advantages of Part 150

Public relations Intergovernmental coordination Airport facilities development. Improved land use planning. Noise abatement.

Page 42: Airport Noise and Land Use Compatibility

Disadvantages of Part 150

Heightened controversy. Unrealistic expectations. Uncooperative participants in process. Litigation possible.

Page 43: Airport Noise and Land Use Compatibility

Summary

An FAR Part 150 Study can be an important means of improving noise and land use compatibility with the airport environs while achieving other objectives that are important to the airport and local governments. The process is not without risks and pitfalls; however, it must not be seen as a panacea for airports with noise and public relations problems.