addendum no: 3...maintain field sample panels during construction in an undisturbed condition as a...

23
Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 Phone: 254 / 750-8405 Fax: 254 / 750-8063 [email protected] CITY OF WACO www.waco-texas.com Date: 3/9/2020 RFP No: 2020-005 Commodity: Fire Station #6 & Fire Administration Building Buyer: Kasey Gamblin Closing Time: Part A, 2:00 P.M. CST, March 12, 2020 Closing Time: Part B, 2:00 P.M. CST, March 13, 2020 Opening Time, Part A and Part B, 2:01 P.M. CST, March 13, 2020 Proposal Opening Location: Operations Center, Purchasing Services Office, 1415 N. 4 th St., Waco, TX 76707 ______________________________________________________ Addendum No: 3 The above-mentioned Proposal invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFP response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address. Addendum #3 contains answers for submitted questions. PLEASE SEE THE FOLLOWING PAGES BELOW Firm:_____________________________________________________________________________________ Address___________________________________________________________________________________ Signature of Person Authorized to Sign Proposal:______________________________________________________________________ Signor's Name and Title (print or type):_____________________________________________________________________________ E-mail Address:____________________________________________________________________________ Date:____________________Telephone:___________________________Fax:_________________________ RFP 2020-005 Fire Station #6 & Fire Administration Building 1 of 23

Upload: others

Post on 14-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

Purchasing Services Post Office Box 2570

Waco, Texas 76702-2570 Phone: 254 / 750-8405

Fax: 254 / 750-8063 [email protected]

CITY OF WACO www.waco-texas.com

Date: 3/9/2020 RFP No: 2020-005 Commodity: Fire Station #6 & Fire Administration Building Buyer: Kasey Gamblin

Closing Time: Part A, 2:00 P.M. CST, March 12, 2020 Closing Time: Part B, 2:00 P.M. CST, March 13, 2020

Opening Time, Part A and Part B, 2:01 P.M. CST, March 13, 2020

Proposal Opening Location: Operations Center, Purchasing Services Office, 1415 N. 4th St., Waco, TX 76707

______________________________________________________ Addendum No: 3

The above-mentioned Proposal invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFP response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.

Addendum #3 contains answers for submitted questions.

PLEASE SEE THE FOLLOWING PAGES BELOW

Firm:_____________________________________________________________________________________ Address___________________________________________________________________________________ Signature of Person Authorized to Sign Proposal:______________________________________________________________________ Signor's Name and Title (print or type):_____________________________________________________________________________ E-mail Address:____________________________________________________________________________ Date:____________________Telephone:___________________________Fax:_________________________

RFP 2020-005 Fire Station #6 & Fire Administration Building

1 of 23

Page 2: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

ARCHITECTURE PLANNING INTERIOR DESIGN

ADDENDUM NO. 3 – March 6, 2020 Acknowledge receipt of this addendum by inserting its number and date in your Proposal. Failure to do so may subject proposal to disqualification. This addendum forms a part of the contract documents. It modifies them as follows: ATTACHMENTS: Specifications Section: 033543, 263100 Revised sheets: L1.1, A6.1, A6.2, A8.7, E1.2, E3.2, E4.0, E4.2, E4.3, E4.4 SPECIFICATIONS: 1. SECTION 033543 – STAINED CONCRETE FINISHING; has been revised to “POLISHED

CONCRETE FINISHING” and is attached.

2. SECTION 099600 - HIGH-PERFORMANCE COATINGS; Revise 3.6.A

A. CMU Substrates: 1. Epoxy System MPI INT 4.2F: a. Block Filler: Block filler, latex, interior/exterior, MPI #4.

1.) Sherwin-Williams: Kem Cati Coat Epoxy Block Filler, B42W400/B42V401. b. Intermediate Coat: Epoxy, matching topcoat. c. Topcoat: Epoxy, gloss, MPI #77.

1.) Sherwin-Williams: Pro Industrial Water Based Catalyzed Epoxy, B73-300/B73V300

series.

3. SECTION 087100.01 - DOOR HARDWARE SCHEDULE; Add to Part-2 “Hardware Sets”

Set: 10.00

Doors: A200

Description: ROOF ACCESS

1 Continuous Hinge DFM x Height Required x SLI-HD1

PE 087100

1 Classroom Lock 10 10G37 LL US10BE SA 087100

1 Surface Closer 281 P10 US10BE SA 087100

◼ ◼ ◼

◼ ◼ ◼ rbdr PLLC ◼ Architects

913 Franklin Avenue, Suite 100

Waco, Texas 76701

Phone: 254-776-8380

Fax: 254-776-7390

City of Waco Fire Station #6 & Fire Administration Buildings

Waco, TX RBDR Project No. 18098

RFP 2020-005 Fire Station #6 & Fire Administration Building

2 of 23

Page 3: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

ARCHITECTURE PLANNING INTERIOR DESIGN

1 Kick Plate K1050 10" x 2" LDW (1" LDW Pairs) US10BE RO 087100

1 Door Stop 460 BRZ RO 087100

1 Threshold 2005DT

PE 087100

1 Rain Guard 346D

PE 087100

1 Gasketing 332DS

PE 087100

1 Sweep 315DN

PE 087100

4. SECTION 263100 – PHOTOVOLTAIC COLLECTORS has been added. DRAWINGS:

1. Sheet L1.1 – City of Waco irrigation information added to sheet.

2. Sheet A6.1 – Axiom Indirect Cove Lighting trim changed to Classic Curved profile.

3. Sheet A6.2 – Axiom Indirect Cove Lighting trim changed to Classic Curved profile.

4. Sheet A8.7 – Detail #7 revised to show Axiom Indirect Cove Lighting trim changed to Classic Curved profile.

5. Revised and added Electrical Sheets E1.2, E3.2, E4.0, E4.2, E4.3, and E4.4enclosed.

CLARIFICATIONS: 1. In the Finish Schedule Sheet A7.3, the floor finish SC.1 calls for Sealed and Polished Concrete;

however, Spec section 033543 is for Stained Concrete polished. Could you please clarify RESPONSE: There is no stained or colored concrete. The concrete is polished where scheduled.

2. Can you provide us with the manufacturer referred to in this drawing of the screen wall? RESPONSE: This is a built screen wall, no manufacturer. 3. Does the track and associated hardware for the overhead doors need to have a powder coat

finish or standard galvanized finish? Specification 083613 Section 2.9.A TRACK, SUPPORTS AND ACCESSORIES indicates a galvanized finish. On the plans, Door Details on Page A8.1, indicated track and hardware have a powder coat finish.

RESPONSE: Tracks and associated hardware shall have powder coat finish. 4. In the specs for the standing seam metal roof panels it calls for protective film for panels. Will the

strippable protective covering be required because we roll our panels on site and we purchase coil without film coating and this would mean material and labor prices would be more.

RESPONSE: Protective covering is only required for shipping or storing. 5. Sheet a7.2 general note 5 says all CMU is epoxy but on finish key on A7.3 shows P1 as paint

doesn’t mention epoxy? RESPONSE: We don’t normally specify epoxy on the finish schedule. Info should be in specs. 7. Do we paint exposed structural ceilings and steel or just where it is specifically called out at room

113 & 114? For instance, the apparatus bay is large and it does not say to paint. Then there are electrical rooms, etc. P3 on the finish legend on A7.3 shows the items to paint are gyp ceilings, & primary exposed ceilings paint which leads me to believe all exposed ceilings paint. Reflected ceiling plan does not say paint? RESPONSE: All exposed ceilings to be painted. All to receive P.3, except where P.7 is specifically called out.

8. Do we paint scree wall shown on 2/ A1.3? RESPONSE: The steel of the screen walls is to be powder coated. 9. Are the gyp walls smooth or textured?

RESPONSE: Textured – should be in specs. 10. The specs and plans call out for (2) layers of 2.5” ISO, a tapered insulation system, and a ¼”

coverboard. With the tapered system that is also drawn the insulation thickness at the exterior walls will be up to 16”. The code for the City of Waco is R-25. The two layers of 2.5” ISO get you an R-value of 28.8. The plans are drawn showing a maximum thickness of 9 or 10 inches. It will be substantially more than that and not necessary. Is the city looking an R-30? RESPONSE: Design is based on 1” = R-value of 5 which is 5”(2 layers of 2.5”). Exact R-values

RFP 2020-005 Fire Station #6 & Fire Administration Building

3 of 23

Page 4: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

ARCHITECTURE PLANNING INTERIOR DESIGN

vary among manufacturers so exact thickness may vary. Minimum R-25 is to be maintained over entire roof where shown.

11. Is the insulation to mechanically fastened or fully adhered? RESPONSE: Per the specifications, system is mechanically fastened.

END OF ADDENDUM NO. 3

RFP 2020-005 Fire Station #6 & Fire Administration Building

4 of 23

Page 5: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - ArchitectsWaco, TX

Fire Station #6/Fire Administration BuildingWaco, Texas

RBDR Project No. 18098

SECTION 033543 - POLISHED CONCRETE FINISHING

GENERALPART 1 -

RELATED DOCUMENTS1.1

Drawings and general provisions of the Contract, including General and SupplementaryA.Conditions and Division 01 Specification Sections, apply to this Section.

SUMMARY1.2

Section Includes:A.

Stained concrete finishing, temporary floor covering.1.

Related Requirements:B.

Section 033000 "Cast-in-Place Concrete" for concrete not designated as stained1.concrete.

DEFINITIONS1.3

Design Reference Sample: Sample designated by Architect in the Contract Documents thatA.reflects acceptable surface quality and appearance of stained concrete.

ACTION SUBMITTALS1.4

Product Data: For each type of product.A.

QUALITY ASSURANCE1.5

Field Sample Panels: After approval of verification sample and before casting concrete,A.produce field sample panels to demonstrate the approved range of selections made underSample submittals. Produce a minimum of three sets of full-scale panels, approximately 48 by48 inches minimum, to demonstrate the expected range of finish, color, and appearancevariations.

Locate panels as indicated or, if not indicated, as directed by Architect.1.Maintain field sample panels during construction in an undisturbed condition as a2.standard for judging the completed Work.Demolish and remove field sample panels when directed.3.

FIELD CONDITIONS1.6

Traffic Control: Maintain access for vehicular and pedestrian traffic as required for otherA.construction activities.

PRODUCTSPART 2 -

LIQUID FLOOR TREATMENTS2.1

Penetrating Liquid Floor Treatments for Stained Concrete Finish: Clear, waterborne solution ofA.inorganic silicate or siliconate materials and proprietary components; odorless; that penetrates,hardens, and is suitable for stained concrete surfaces.

Manufacturers: Subject to compliance with requirements, provide products by one of the1.following:

H&C Concrete Care Products; Lithium Protective Finish.a.

TEMPORARY FLOOR COVERING2.2

Disposable Protective CoveringA.

Sika; EZcover.1.

033543-1

RFP 2020-005 Fire Station #6 & Fire Administration Building

5 of 23

Page 6: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - ArchitectsWaco, TX

Fire Station #6/Fire Administration BuildingWaco, Texas

RBDR Project No. 18098

EXECUTIONPART 3 -

POLISHING3.1

Polish: Level 3: High sheen, 800 grit.A.

Apply polished concrete finish system to cured and prepared slabs to match accepted mockup.B.

Machine grind floor surfaces to receive polished finishes level and smooth and to depth1.required to reveal aggregate to match approved mockup.Apply penetrating liquid floor treatment for polished concrete in polishing sequence and2.according to manufacturer's written instructions, allowing recommended drying timebetween successive coats.Continue polishing with progressively finer-grit diamond polishing pads to gloss level, to3.match approved mockup.Control and dispose of waste products produced by grinding and polishing operations.4.

END OF SECTION 033543

033543-2

RFP 2020-005 Fire Station #6 & Fire Administration Building

6 of 23

Page 7: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-1

SECTION 263100 - PHOTOVOLTAIC COLLECTORS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. PV system description. 2. Manufactured PV units. 3. PV module framing. 4. PV array construction. 5. Inverters. 6. System overcurrent protection. 7. Mounting structures.

1.2 DEFINITIONS

A. CEC: California Energy Commission.

B. ETFE: Ethylene tetrafluoroethylene.

C. FEP: Fluorinated ethylene propylene.

D. IP Code: Required ingress protection to comply with IEC 60529.

E. MPPT: Maximum power point tracking.

F. PTC: PVUSA Test Condition. Commonly regarded as a "real-world" measure of PV output. See below for definition of "PVUSA."

G. PV: Photovoltaic.

H. PVUSA: Photovoltaics for Utility Systems Applications.

I. STC: Standard Test Conditions defined in IEC 61215.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for PV panels.

2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Shop Drawings: For PV modules.

1. Include plans, elevations, sections, and mounting details.

RFP 2020-005 Fire Station #6 & Fire Administration Building

7 of 23

Page 8: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-2

2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Detail fabrication and assembly. 4. Include diagrams for power, signal, and control wiring.

1.4 INFORMATIONAL SUBMITTALS

A. Field quality-control reports.

B. Sample Warranty: For manufacturer's special materials and workmanship warranty and minimum power output warranty.

1.5 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For PV modules to include in operation and maintenance manuals.

1.6 WARRANTY

A. Manufacturer's Special Warranty: Manufacturer agrees to repair or replace components of PV modules that fail in materials or workmanship within specified warranty period.

1. Manufacturer's materials and workmanship warranties include, but are not limited to, the following:

a. Faulty operation of PV modules.

2. Warranty Period: Five years from date of Substantial Completion.

B. Manufacturer's Special Minimum Power Output Warranty: Manufacturer agrees to repair or replace components of PV modules that fail to exhibit the minimum power output within specified warranty period. Special warranty, applying to modules only, applies to materials only, on a prorated basis, for period specified.

1. Manufacturer's minimum power output warranties include, but are not limited to, the following warranty periods, from date of Substantial Completion:

a. Specified minimum power output to 80 percent or more, for a period of 25 years.

PART 2 - PRODUCTS

2.1 MANUFACTURED UNITS

2.2 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

RFP 2020-005 Fire Station #6 & Fire Administration Building

8 of 23

Page 9: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-3

B. Hazardous Locations: FM Global approved for NFPA 70, Class 1, Division 2, Group C and Group D.

2.3 PV SYSTEMS DESCRIPTION

A. Interactive PV System: Collectors connected in parallel to the electrical utility; and capable of providing power for Project and supplying power to a distributed network. 1. System Components:

a. PV modules. b. Array frame. c. Utility-interactive inverter. d. Overcurrent protection, disconnect, and rapid shutdown devices. e. Mounting structure. f. Utility meter.

2.4 MANUFACTURED PV UNITS

A. Cell Materials: Amorphous silicon (a-Si).

B. Cell Materials: Micromorphous silicon (a-Si+uc-Si).

C. Cell Materials: Copper indium (di)selenide (CIS).

D. Cell Materials: Copper indium gallium (di)selenide (CIGS).

E. Cell Materials: Cadmium telluride (CdTe).

F. Cell Materials: Cadmium sulfide.

G. Cell Materials: Polycrystalline or Monocrystalline.

1. c-Si. 2. Gallium arsenide (GaAs).

H. Encapsulant: Ethyl vinyl acetate.

I. Front Panel: Fully tempered glass, capable of withstanding 40mm hail

J. Front Panel: Low iron glass.

K. Front Panel: Antireflective coating glass.

L. Front Panel: Laminating film.

M. Front Panel: Laminating material.

N. Backing Material: Tempered glass.

O. Bypass Diode Protection: Internal.

RFP 2020-005 Fire Station #6 & Fire Administration Building

9 of 23

Page 10: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-4

P. Output Cabling: 1. Quick, multiconnect, polarized connectors. 2. Two-Conductor Harness: No traditional return wire is needed from the end of a row back

to the source combiner.

2.5 PV MODULE FRAMING

A. PV laminates mounted in anodized extruded-aluminum frames.

1. Entire assembly UL listed for electrical and fire safety, according to UL 1703, and complying with IEC 61215.

2. Frame strength exceeding requirements of certifying agencies in subparagraph above. 3. Finish: Anodized aluminum.

a. Alloy and temper recommended by framing manufacturer for strength, corrosion resistance, and application of required finish.

b. Color: As indicated by manufacturer's designations.

4. Finish: High-performance organic finish.

a. Fluoropolymer Two-Coat System: Manufacturer's standard two-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent PVC resin by weight.

b. Color: As indicated by manufacturer's designations.

5. Finish: Baked-enamel finish.

a. Color: As indicated by manufacturer's designations.

2.6 PV ARRAY CONSTRUCTION

A. Framing:

1. Material: Extruded aluminum, Galvanized steel or Coated steel. 2. Maximum System Weight: Less than 4 lb/sq. ft..

B. Flat-Roof Mounting:

1. No roof penetrations. 2. Self-ballasting. 3. Wind-tunnel tested to 110-mph wind. 4. Service Life: 25 years. 5. Freestanding system.

2.7 INVERTER

A. Inverter Type: Central

B. Retain one of two "Control Type" paragraphs below.

C. Control Type: Pulse-width-modulation control.

RFP 2020-005 Fire Station #6 & Fire Administration Building

10 of 23

Page 11: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-5

D. Control Type: Maximum power point tracker control. 1. Utility Interface: Utility-interactive inverter.

E. Operating Conditions:

1. Operating Ambient Temperatures: Minus 4 to plus 122 deg F. 2. Storage Temperature: Minus 40 to plus 122 deg F. 3. Relative Humidity: Zero to 95 percent, noncondensing.

F. Charge controllers shall have the following:

1. Overcurrent protection. 2. Generator input breaker box. 3. Automatic transfer relay. 4. Digital display. 5. Transformer. 6. Disconnect switch. 7. Shunt controller. 8. Shunt regulator. 9. Surge overload protection.

G. Enclosure:

1. NEMA 250, Type 3R. 2. Cooling Methods:

a. Fan convection cooling. b. Passive cooling.

3. Protective Functions:

a. AC over/undervoltage. b. AC over/underfrequency. c. Ground overcurrent. d. Overtemperature. e. AC and dc overcurrent. f. DC overvoltage.

4. Standard LCD, four lines, 20 characters, with user display and on/off toggle switch.

H. Disconnects: Rated for system voltage and conductor.

I. Regulatory Approvals:

1. IEEE 1547.1. 2. IEEE 1547.3. 3. UL 1741.

RFP 2020-005 Fire Station #6 & Fire Administration Building

11 of 23

Page 12: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-6

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrate areas and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Do not begin installation until mounting surfaces have been properly prepared.

C. If preparation of mounting surfaces is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

D. Examine modules and array frame before installation. Reject modules and arrays that are wet, moisture damaged, or mold damaged.

E. Examine roofs, supports, and supporting structures for suitable conditions where PV system will be installed.

F. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Comply with NECA 1.

B. Coordinate layout and installation of PV panels with roof assembly and other construction.

C. Support PV panel assemblies independent of supports for other elements such as roof and support assemblies, enclosures, vents, pipes, and conduits. Support assembly to prevent twisting from eccentric loading.

D. Install PV inverters, rapid shutdown, and system control in locations indicated on Drawings.

E. Install weatherseal fittings and flanges where PV panel assemblies penetrate exterior elements such as walls or roofs. Seal around openings to make weathertight. See Section 079200 "Joint Sealants" for materials and application.

F. Seismic Restraints: Comply with requirements for seismic-restraint devices specified in Section 260548.16 "Seismic Controls for Electric Systems."

G. Wiring Method: Install cables in raceways.

H. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools.

3.3 CONNECTIONS

A. Coordinate PV panel cabling to equipment enclosures to ensure proper connections.

B. Coordinate installation of utility-interactive meter with utility.

RFP 2020-005 Fire Station #6 & Fire Administration Building

12 of 23

Page 13: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

RBDR, PLLC - Architects Waco, Texas

Fire Station #6/Fire Administration Building Waco, Texas

RBDR Project No. 18098

263100-7

C. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B.

D. Make splices, terminations, and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.

END OF SECTION 263100

RFP 2020-005 Fire Station #6 & Fire Administration Building

13 of 23

Page 14: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

1L1.2

PLAN NORTH

TRUE NORTH

1 OVERALL LANDSCAPE PLANSCALE: 1/16" = 1'-0"

ALL GRADED AREAS TO HAVE A GENTLE SLOP AWAY FROM ALL STRUCTURES. PROVIDE AUNIFORM ROUNDED CROWN AND BOTTOM OF SLOPES, INCLUDING BREAKS IN GRADE.

FINE GRADE ALL AREAS TO RECEIVE SOD OR SEED TO ACHIEVE THE FINAL CONTOURSSHOWN ON CIVIL/GRADING PLANS. A HARD RACK SHALL BE USED TO REMOVE SURFACESTONES LARGER THAN 1" IN DIAMETER. ALL DISTURBED SOIL SHALL BE COMPLETELY SETTLEDBEFORE SEEDING OR LAYING SOD. (I.E. IRRIGATION TRENCHES AND DRAINAGE SYSTEMS )

7.

1.

2.

GENERAL SOD/LAWN NOTES:

CONTRACTOR SHALL GUARANTEE ESTABLISHMENT OF LAWN AREAS AND MAINTAIN TURFUNTIL FINAL ACCEPTANCE. THIS INCLUDES BUT NOT LIMITED TO: WATERING, WEEDING,MOWING, CULTIVATION, AND REPLACEMENT OF DEAD OR BARE AREAS.

4. ALL SOD AREAS SHALL CONTAIN A MINIMUM OF 1/2" LAYER OF FINELY SEPARATEDPROFESSIONAL BEDDING SOIL WITHOUT LUMPS.

5. HAND LAID SOD SHALL COMPLETELY COVER DESIGNATED AREAS. SOD EDGES ARE TOTOUCH WITH THE CORRECT ANGLED EDGE JOINED. SHORT PIECES OF SOD SHALL BEPLACED TOWARDS THE INTERIOR OF THE DESIGNATED AREA AS TO REDUCING THE SCRAPALONG THE OUTER EDGE. SOD LAID ON STEEP SLOPES SHALL BE LAID PERPENDICULARLY TOSLOP WHERE POSSIBLE.

6. WATER SOD THROUGH THE SOD LAYING PROCESS. SOD SHALL BE ROLLED TO ACHIEVE AWELL BONDED SMOOTH EVEN SURFACE.

LAWN AREAS TO RECEIVE SOD SHALL BE LAID AT A MAXIMUM DEPTH OF 1" BELOW FINALGRADE.

3.

ALL STATE OF TEXAS LAWS/RULES AND ALL LOCAL CODES/ORDINACES SHALL BE MET OREXCEEDED BY THE LANDSCAPE IRRIGATION CONTRACTOR (L.I.C). CONTRACTOR ISCAUTIONED TO INCLUDE ANY AND ALL COST NECESSARY TO MEET OR EXCEED THE LAWSOF STATE OR LOCAL CODES CONCERNING IRRIGATION WORK.

LANDSCAPE IRRIGATION CONTRACTOR (L.I.C) TO VERIFY LOCATION OF WATER SOURCEPRIOR TO BIDDING.

8.

1.

2.

GENERAL IRRIGATION NOTES:

THE (L.I.C) SHALL COORDINATE INSTALLATION OF IRRIGATION SYSTEM WITH LANDSCAPECONTRACTOR TO ENSURE ALL PLANT MATERIAL WILL BE WATERED IN ACCORDANCE WITHTHE INTENT OF THE PLANS AND SPECIFICATIONS.

7. LANDSCAPE IRRIGATION CONTRACTOR (L.I.C) SHALL INSTALL ALL VALVES, QUICKCOUPLERS, WIRE SPLICES AND LOT STUB UPS IN THE APPROPRIATELY SIZED BOXES.

4. ALL NECESSARY PERMITS NEEDED FOR THE SCOPE OF WORK SHALL BE OBTAINED BY THELANDSCAPE IRRIGATION CONTRACTOR (L.I.C).

5. ALL IRRIGATION PLANS ARE TO BE SUBMITTED TO THE ARCHITECT AND OWNER FORAPPROVAL PRIOR TO INSTALLATION.

6. LANDSCAPE IRRIGATION CONTRACTOR (L.I.C) IS RESPONSIBLE FOR LOCATING ALLUNDERGROUND UTILITIES PRIOR TO STARTING WORK INCLUDING COORDINATION WITHGENERAL CONTRACTOR BEFORE DIGGING.

ALL SLEEVES ARE TO BE INSTALLED BY THE (L.IC.). COORDINATE WORK AND ANYADDITIONAL SLEEVES NEEDED TO COMPLETE INSTALLATION. RE: LEGEND AND PLAN FORSLEEVE LOCATIONS

3.

9. THE LANDSCAPE IRRIGATION CONTRACTOR SHALL PROVIDE DETAILED VECTOR DRAWINGSUPON COMPLETION OF PROJECT. DRAWINGS ARE TO INCLUDE BUT NOT LIMITED TO LENGTHOF PIPE AND TUBING, SIZES OF PIPE AND VALVES, AND GPH AMOUNTS.

10. ALL PLANTING AREAS AND LAWN AREAS SHOWN ARE TO BE IRRIGATED. PROVIDE BUBBLERSFOR ALL TREES AND DRIP IRRIGATION FOR ALL PLANTING BEDS UNLESS OTHERWISE SPECIFIEDBY OWNER. ROTORS AND SPRAYS CAN BE USED AS NEEDED FOR LAWN AREAS UNLESSOTHERWISE NOTED ON PLAN.

ALL BED AND LAWN AREAS SHALL BE BUILT UP SO THAT THE BACK OF CURB IS COMPLETELYCOVERED AFTER SETTLING UNLESS OTHERWISE NOTED.

8.

OVERSEED SOD WITH ANNUAL RYEGRASS IF INSTALLATION OCCURS BETWEEN OCTOBER 20TH-FEBRUARY 2OTH

9.

LEGEND:

DOUBLE SHREDDED HARDWOOD MULCH 3" LAYER(NO HATCH BED AREAS)

11. VERIFY EXTENTS OF IRRIGATION OUTSIDE EDGE OF PARKING FACILITY.

4" SCH 40 IRRIGATION SLEEVES

QP1

QP2

QP1 QP

1

QP1

"TIF 419" BERMUDA (CYNODON DACTYLON 'TIF 419') - SOD

COMMON BERMUDA (CYNODON DACTYLON) - SEED SYSTEM DESIGN:-SPECIFY LENGTH OF RECOMMENDED RUN-TIMES FOR EACH ZONE-TOTAL SYSTEM RUN-TIME NOT TO EXCEED 8 HOURS (RUN MULTIPLE ZONES SIMULTANEOUSLY IFNEEDED)

CONTROLLING / MONITORING:-CONTROLLER & SATELLITE ASSEMBLY: WEATHERMATIC “SMARTLINE” CONTROLLER W/ AIRCARDAND ONSITE WEATHER STATION PACKAGE.; WALL MOUNT STAINLESS STEEL ENCLOSURE-FLOW SENSOR: SMART LINK FLOW SENSOR, CONTROLLER-COMPATIBLE-RAIN/FREEZE SENSOR: SMART LINK WEATHER SENSOR (WIRELESS WHEN NECESSARY), CONTROLLERCOMPATIBLE (AS LOCATED ON OVERVIEW)-COMPONENT CABLES: SMART LINK SHIELDED CABLES COMPATIBLE W/ CONTROLLER & WARRANTY

VALVES:-ROOT WATERING ZONE VALVE: RAINBIRD DV 100-TURF ZONE VALVE: RAINBIRD PGA SERIES-BACKFLOW VALVE: WATTS MODEL 007M1QT DOUBLE CHECK (OR WATTS MODEL 009 RPZ WHENNECESSARY)-QUICK COUPLER VALVE: RAINBIRD 44RC, 2-PIECE; (AS LOCATED ON OVERVIEW)-MASTER VALVE(S): NORMALLY OPEN, SMART LINK MASTER VALVE, CONTROLLER-COMPATIBLE

HEADS/EMITTERS:-ROOT WATERING: .5GPM BUBBLER (2 PER TREE) EXTENDED INTO THE TREE WELL ON FLEXIBLETUBING.-POP-UP SPRAY HEAD: RAINBIRD 1800 SAM-PRS-SERIES, 6”-POP-UP NOZZLES: RAINBIRD LOW-ANGLE FAN SPRAY-STREAM ROTARY HEAD: RAINBIRD 5000 SERIES WITH PRS OPTION

LINE CONNECTIONS:-ROTORS ON PRE-MANUFACTURED SPEARS EVERTUFF TURF SWING JOINT RISER ASSEMBLY, ORAPPROVED EQUAL-POP-UPS ON SWING PIPE / FLEXIBLE TUBING

WIRING:-FLOW SENSOR CABLE: WEATHERMATIC “SMARTLINE” COMPATIBLE, SHIELDED, IN CONDUIT 3/4”MIN.-SPLICES: 3M DBY CONNECTORS; ALL OTHER FIELD SPLICES MUST BE LOCATED IN APPROPRIATELYSIZED ROUND AMETEK VALVE BOX.-VALVE WIRING: INDIVIDUAL, SINGLE STRAND COPPER, SIZE DEPENDENT ON LENGTH OF RUN BUTMINIMUM 14AWG, TYPE UF, RED FOR POSITIVE WIRE AND WHITE FOR COMMON WIRE.-TAPE AND BUNDLE WIRING AT 10 FOOT INTERVALS

VALVE BOXES:-ZONE VALVE BOX: 12”X17” RECTANGLE, NDS OR APPROVED EQUAL; INSTALL FLUSH WITH GRADEAND SUPPORT WITH BRICKS; INSTALL 6”OF CLEAN 1” GRAVEL BELOW VALVE-QUICK COUPLER: 12”X17” RECTANGLE, NDS OR APPROVED EQUAL; PURPLE LID

MISCELLANEOUS:-NO MAINLINES WITHIN DRIPLINE OF EXISTING TREES OR WITHIN 6 FEET OF NEW TREES-USE DETECTABLE TAPE / MARKING RIBBON OVER MAINLINES AND WIRING

DEPTHS (NO STACKING; NO TWO COMPONENTS SHOULD BE CLOSER THAN 3 INCHES TOGETHER):-WIRING: 14 INCHES-MAINLINE: 12 INCHES (TOP OF PIPE)-LATERAL LINES: 12 INCHES

PARK IRRIGATION MATERIALSTANDARDS - CITY OF WACO:

1

L1.1

RSMDrafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIPT

ION

JANUARY 2020

18098

KB

CITY

OF

WA

CO

FIRE

STA

TION

#6/

FIRE

ADM

INIS

TRA

TION

BUI

LDIN

GW

AC

O, T

X

13/

6/20

20A

DD

END

UM #

3

RFP 2020-005 Fire Station #6 & Fire Administration Building

14 of 23

Page 15: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

1 REFLECTED CEILING PLAN - 'A'SCALE: 3/16" = 1'-0"ADMINISTRATION BUILDING

CORRIDORA130

1

PLAN NORTH

TRUE NORTH

LOBBYA100

MENSA101

WOMENSA102

COMMUNITY ROOMA103

STORAGEA104

JANITORA108

A/VA107

DATAA105

SECURE STORAGEA109

VIEWINGA112

INTERVIEWA113

SHOWERA119

ASSISTANTA114

OFFICEA115

OFFICEA116

OFFICEA121

OFFICEA111

OFFICEA124

OFFICEA125

OPEN OFFICEA110

CONFERENCEA122

BREAK ROOMA129

ELECTRICALA132 TOILET

A131

TOILETA133

WORKROOMA134

ASSISTANTA123

ASSISTANTA117

CORRIDORA120

CORRIDORA126

STORAGEA128

STORAGEA127

CORRIDORA118

VESTIBULEA106

2A3.2

2A3.1

1A3.1

1A3.2

1A5.1

2A5.1

2A5.4

3A5.4

4A5.4

1A5.4

GENERAL NOTES: KEYED NOTES: X LEGEND 1.

THIS ROOM/AREA SHALL HAVE NO CEILING AND BE EXPOSED TO STRUCTURE ABOVE WITHSPIRAL DUCT WORK. ALL EXPOSED STRUCTURE, DECKING, CONDUITS, ETC. TO BE PAINTEDP.7.

2.1.

REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS OF LIFE SAFETYDEVICES & LIGHT FIXTURE SCHEDULE.PROVIDE ACCESS PANELS IN ALL GYPSUM BOARD CEILINGS SYSTEMS. WHERE REQUIREDFOR MECHANICAL. REFER TO MECHANICAL DRAWINGS FOR SIZES.

THESE DRAWINGS SHOW A GENERAL INTENT TO RECEIVE A QUALITY FINISHED PRODUCT.CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE ALL ITEMS REQUIRED TO COMPLETEPROJECT IN A FINISHED MANNER, WHETHER ALL CONDITIONS ARE SHOWN OR NOT.

WHERE FIXTURE IS NOT DIMENSIONED, CONTRACTOR TO CENTER FIXTURE IN THE ROOM.

3. CEILING HEIGHT SHALL BE 10'-0" A.F.F., UNLESS NOTED OTHERWISE. ANY CEILING HEIGHTSGIVEN ON REFLECTED CEILING PLAN ARE TO FINISH MATERIAL. ALL CEILING HEIGHTSSHALL BE CONFIRMED WITH OWNER AND ARCHITECT IF NOTED HEIGHT CAN NOT BEACHIEVED DUE TO EXISTING CONDITIONS.

4.

5.

6.

ALL WORK TO CONFORM TO CITY OF WACO 2015 INTERNATIONAL CONSTRUCTIONCODES AND 2012 TEXAS ACCESSIBILITY STANDARDS. FOR ACCESSIBILITY GUIDELINES ANDSTANDARDS, REFER TO SHEET A001 AND WEBSITE:http://www.license.state.tx.us/ab/abtas.htm FOR COMPLETE TAS DOCUMENT.

2.

VERIFY & COORDINATE ALL MECHANICAL SUPPLY & RETURN AIR GRILLE LOCATIONS WITHMECHANICAL PLAN.FOR ALL EXIT LIGHTS, REFER TO ELECTRICAL DRAWINGS.FOR ALL SUSPENDED LIGHT FIXTURES, HEIGHTS OF FIXTURES NEED TO BE VERIFIED ON SITEWITH ARCHITECT AND OWNER. HEIGHTS LISTED BELOW ARE ESTIMATED HEIGHTS. BUT DUE TOFIXTURE CHANGES & CEILING HEIGHT CHANGES & VARIATIONS, ACTUAL FIXTURE HEIGHTSMAY VARY FROM WHAT IS WRITTEN BELOW. VERIFY BEFORE FABRICATION OF LIGHTS.

3.

7.

8.9.

LAY-IN SUSPENDED ACOUSTICAL PANELS SAP.1

1'X4' RECESSED FLANGED SEALED LED FIXTURE; RE:ELECTRICAL DRAWINGS

1'X4' LED STRIP LIGHT; RE: ELECTRICAL DRAWINGS

RECESSED CAN FIXTURE; RE: ELECTRICAL DRAWINGS

SUPPLY DIFFUSERS; RE: MECHANICAL DRAWINGS

RETURN/EXHAUST DIFFUSERS; RE: MECHANICAL DRAWINGS

CL CENTER LINE MARKER

2'x4' LAY-IN LED FIXTURE; RE: ELECTRICAL DRAWINGS

LED STRIP LIGHTS UNDER UPPER CABINETS.REFER TO MILLWORK ELEVATIONS AND SECTIONS

10.PROVIDE BLOCKING AS NEEDED AT ALL PENDANT MOUNT, SURFACE MOUNT, AND WALLMOUNT LIGHT FIXTURES.

WHERE CEILINGS ARE SHOWN TO ALIGN WITH WALLS, ALIGN AS SHOWN.11.

GYPSUM FURR DOWN TO BE PAINTED P.6. CENTER LIGHT FIXTURE IN FURR DOWN ASSHOWN, UNLESS DIMENSIONED OTHERWISE.

1" PRE-FINISHED FLUSH METAL SOFFIT PANEL

5/8" GYPSUM BOARD OVER GYPSUM SUSPENSION SYSTEM -OR - 5/8" GYPSUM BOARD OVER METAL STUD FRAMING(USE 5/8" WATER RESISTANT GYPSUM BOARD IN WET AREAS)

4.CENTER FIXTURE IN ROOM.

5.

LIGHT FIXTURES IN THIS ROOM TO BE HUNG FROM STRUCTURE ABOVE W/ BOTTOM OFFIXTURE AT 10'-0" A.F.F.

6.

THIS ROOM/AREA SHALL HAVE NO CEILING AND BE EXPOSED TO STRUCTURE ABOVE.

EXTERIOR WALL PACK; RE: ELECTRICAL DRAWINGS

12. WHERE FURR DOWNS ARE SHOWN TO ALIGN WITH WALLS, ALIGN AS SHOWN.

LINEAR LIGHT/ACOUSTICAL FIXTURE; RE: ELECTRICAL DRAWINGS

EXTERIOR FLUSH MOUNT LED FIXTURE; RE: ELECTRICALDRAWINGS

RECESSED CAN FIXTURE; RE: ELECTRICAL DRAWINGS

SUSPENDED LINEAR FIXTURE; RE: ELECTRICAL DRAWINGS

SUSPENDED PENDENT LIGHT; RE: ELECTRICAL DRAWINGS

INDIRECT COVE LIGHTING; RE: ELECTRICAL DRAWINGS

WALL MOUNTED LIGHT; RE: ELECTRICAL DRAWINGS

WALL SCONCE; RE: ELECTRICAL DRAWINGS

TUBULAR DAYLIGHTING DEVICE (SOLATUBE 300DS/330DSWITH OPTIVIEW LENS OR EQUAL)

2" THICK BLACK FIBERGLASS ACOUSTIC INSULATION SECURED TO BOTTOM OF DECK(OWENS CORNING "SELECT SOUND BLACK ACOUSTIC BLANKET" OR APPROVED EQUAL).

ARMSTRONG AXIOM INDIRECT LIGHT COVE - CLASSIC TRIM OR APPROVED EQUAL; RE:ELECTRICAL DRAWINGS.

7.

SURFACE MOUNTED LIGHT FIXTURE SHALL BE MOUNTED CENTERED ABOVE DOOR.8.METAL COMPOSITE MATERIAL SOFFIT PANEL.9.METAL COMPOSITE MATERIAL PANEL JOINTS. VERTICAL JOINTS SHALL BE 2'-0" FROMRADIUS EDGE. HORIZONTAL JOINTS SHALL ALIGN WITH VERTICAL JOINTS AS SHOWN ANDDIMENSIONED. REFER TO ELEVATIONS.

10.

PANTRY CEILING TO SLOPE AND MATCH ROOF SLOPE; REFER TO PARTITION TYPE 'P' ONSHEET LS2.3. SURFACE MOUNTED LIGHT FIXTURE SHALL BE MOUNTED CENTERED ABOVEDOOR.

11.

1/2" THICK STAIN GRADE VENEERED PLYWOOD FINISH; SPECIES CHERRY; STN.1. PROVIDETYPICAL 2'-6" WIDE PANELS WITH 1/2" REVEALS BETWEEN AS DETAILED. WHERE LIGHTFIXTURES ARE SHOWN RECESSED IN PANELS, CENTER IN PANEL.

12.

13. CENTER LIGHT FIXTURE IN SHOWER AS SHOWN.14. COORDINATE OVER HEAD DOOR TRACK LOCATION WITH FINAL PLACEMENT OF CEILING

MOUNTED FIXTURES.

2"x2" TILE OVER 5/8" WATER RESISTANT GYPSUM BOARDOVER METAL STUD FRAMING

SUSPENDED PENDENT RING LIGHT; RE: ELECTRICAL DRAWINGS

CEILING FAN; RE: ELECTRICAL DRAWINGS

15. LIGHT FIXTURES TO BE PAINTED AN RAL COLOR; VERIFY COLOR SELECTION WITH ARCHITECT.

9'-6" AFF

9'-0" AFF

9'-0" AFF

9'-0" AFF

8'-0" AFF10'-0" AFF

9'-0" AFF

9'-0" AFF

10'-0" AFF

10'-0" AFF

12'-0" AFF

12'-0" AFF

12'-2" AFF

12'-2" AFF

13'-4" AFF

10'-6" AFF

1A5.5

2A5.1

2A5.5

1A5.1

9A8.7

6A8.7

7A8.7

14A8.7

10'-0" AFF

10'-0" AFF

8'-0" AFF 8'-0" AFF

10'-0" AFF

10'-0" AFF10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

10'-0" AFF

1'-0"

3'-0"

Ø12'-0"

EQ EQ EQ EQ

EQ EQ EQ EQEQ

EQ3'

-6"

EQEQ

EQ 4'-0" EQ

EQEQ

EQ 4'-0" EQ

EQEQ

EQ

EQEQ

EQ EQ

EQ 5'-0" EQ

2'-6

"5'

-0"

5'-0

"

1

1

3

3

8 8

2

4

4

3

5'-0"6'-0"6'-0"

EQEQ

9

9

2A6.1

10

10

TYP.

TYP.

2'-0"

EQUAL

EQUAL

2'-0"

10

10

2'-0

"

EQUA

L

EQUA

L

2'-0

"

10'-0" AFF

9'-6" AFF

10'-0" AFF

10'-0" AFF

10'-0

" AFF

9'-6

" AFF

12

12

13

10A8.7

13A8.7

7A8.7

15

15

15 P.5

P.4

P.5

P.6

P.6

P.6

P.6

SAP.2

9'-0" AFF

EQ

EQ 4'-0" EQ

330DS

300DS 300DS 300DS 300DS 300DS

300DS 300DS

300DS

300DS

300DS

300DS300DS300DS

300DS

300DS

300DS

300DS

300DS

2

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

1'-0"

1'-0"

1'-10"1'-10"1'-10"1'-10"1'-10"1'-10"1'-10"1'-10"

R10'-6"

R14'-6"

2'-3

"2'

-3"

2'-3

"2'

-3"

2'-0

"2'

-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

1'-10

"

1'-10"

1'-10"

1'-10"

1'-10"1'-10"1'-10"

2 ENLARGED FRONT CANOPYSCALE: 1/4" = 1'-0"ADMINISTRATION BUILDING

1'-10" 1'-10" 1'-10" 1'-10"1'-10"

1'-10"

1'-10"

R14'-

6"

2'-0"2'-0"

2'-0"

2'-0"2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

1'-0"

R10'-6"

A6.1

RSMDrafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIPT

ION

JANUARY 2020

18098

KB

CITY

OF

WA

CO

FIRE

STA

TION

#6/

FIRE

ADM

INIS

TRA

TION

BUI

LDIN

GW

AC

O, T

X

12/

28/2

020

AD

DEN

DUM

#2

23/

6/20

20A

DD

END

UM #

3

RFP 2020-005 Fire Station #6 & Fire Administration Building

15 of 23

Page 16: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

1 REFLECTED CEILING PLAN - 'B'SCALE: 3/16" = 1'-0"FIRE STATION #6

PLAN NORTH

TRUE NORTH

1A3.1

2A3.1

3A3.1

4A3.1

LOBBYB100

ITB101

TOILETB104

JANITORB106

SHOWERB108

OFFICEB127

MECHANICALB102

ELECTRICALB103

KITCHENB112

FITNESS ROOMB113

DAYROOMB114

STORAGEB115

WORKROOMB116

APPARATUS BAYB133

LAUNDRYB117

STORAGEB118

VESTIBULEB120

SHOWERB107

SLEEPINGUNITB121

PRIVATE SLEEPINGB128

STORAGEB105

STORAGEB129

TOILETB126

CORRIDORB125

CORRIDORB119

CORRIDORB124

SLEEPINGUNITB122

SLEEPINGUNITB123

SLEEPINGUNITB132

SLEEPINGUNITB131

SLEEPINGUNITB130

PANTRYB109

PANTRYB110

PANTRYB111

GENERAL NOTES: KEYED NOTES: X LEGEND 1.

THIS ROOM/AREA SHALL HAVE NO CEILING AND BE EXPOSED TO STRUCTURE ABOVE WITHSPIRAL DUCT WORK. ALL EXPOSED STRUCTURE, DECKING, CONDUITS, ETC. TO BE PAINTEDP.7.

2.1.

REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR LOCATIONS OF LIFE SAFETYDEVICES & LIGHT FIXTURE SCHEDULE.PROVIDE ACCESS PANELS IN ALL GYPSUM BOARD CEILINGS SYSTEMS. WHERE REQUIREDFOR MECHANICAL. REFER TO MECHANICAL DRAWINGS FOR SIZES.

THESE DRAWINGS SHOW A GENERAL INTENT TO RECEIVE A QUALITY FINISHED PRODUCT.CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE ALL ITEMS REQUIRED TO COMPLETEPROJECT IN A FINISHED MANNER, WHETHER ALL CONDITIONS ARE SHOWN OR NOT.

WHERE FIXTURE IS NOT DIMENSIONED, CONTRACTOR TO CENTER FIXTURE IN THE ROOM.

3. CEILING HEIGHT SHALL BE 10'-0" A.F.F., UNLESS NOTED OTHERWISE. ANY CEILING HEIGHTSGIVEN ON REFLECTED CEILING PLAN ARE TO FINISH MATERIAL. ALL CEILING HEIGHTSSHALL BE CONFIRMED WITH OWNER AND ARCHITECT IF NOTED HEIGHT CAN NOT BEACHIEVED DUE TO EXISTING CONDITIONS.

4.

5.

6.

ALL WORK TO CONFORM TO CITY OF WACO 2015 INTERNATIONAL CONSTRUCTIONCODES AND 2012 TEXAS ACCESSIBILITY STANDARDS. FOR ACCESSIBILITY GUIDELINES ANDSTANDARDS, REFER TO SHEET A001 AND WEBSITE:http://www.license.state.tx.us/ab/abtas.htm FOR COMPLETE TAS DOCUMENT.

2.

VERIFY & COORDINATE ALL MECHANICAL SUPPLY & RETURN AIR GRILLE LOCATIONS WITHMECHANICAL PLAN.FOR ALL EXIT LIGHTS, REFER TO ELECTRICAL DRAWINGS.FOR ALL SUSPENDED LIGHT FIXTURES, HEIGHTS OF FIXTURES NEED TO BE VERIFIED ON SITEWITH ARCHITECT AND OWNER. HEIGHTS LISTED BELOW ARE ESTIMATED HEIGHTS. BUT DUE TOFIXTURE CHANGES & CEILING HEIGHT CHANGES & VARIATIONS, ACTUAL FIXTURE HEIGHTSMAY VARY FROM WHAT IS WRITTEN BELOW. VERIFY BEFORE FABRICATION OF LIGHTS.

3.

7.

8.9.

LAY-IN SUSPENDED ACOUSTICAL PANELS SAP.1

1'X4' RECESSED FLANGED SEALED LED FIXTURE; RE:ELECTRICAL DRAWINGS

1'X4' LED STRIP LIGHT; RE: ELECTRICAL DRAWINGS

RECESSED CAN FIXTURE; RE: ELECTRICAL DRAWINGS

SUPPLY DIFFUSERS; RE: MECHANICAL DRAWINGS

RETURN/EXHAUST DIFFUSERS; RE: MECHANICAL DRAWINGS

CL CENTER LINE MARKER

2'x4' LAY-IN LED FIXTURE; RE: ELECTRICAL DRAWINGS

LED STRIP LIGHTS UNDER UPPER CABINETS.REFER TO MILLWORK ELEVATIONS AND SECTIONS

10.PROVIDE BLOCKING AS NEEDED AT ALL PENDANT MOUNT, SURFACE MOUNT, AND WALLMOUNT LIGHT FIXTURES.

WHERE CEILINGS ARE SHOWN TO ALIGN WITH WALLS, ALIGN AS SHOWN.11.

GYPSUM FURR DOWN TO BE PAINTED P.6. CENTER LIGHT FIXTURE IN FURR DOWN ASSHOWN, UNLESS DIMENSIONED OTHERWISE.

1" PRE-FINISHED FLUSH METAL SOFFIT PANEL

5/8" GYPSUM BOARD OVER GYPSUM SUSPENSION SYSTEM -OR - 5/8" GYPSUM BOARD OVER METAL STUD FRAMING(USE 5/8" WATER RESISTANT GYPSUM BOARD IN WET AREAS)

4.CENTER FIXTURE IN ROOM.

5.

LIGHT FIXTURES IN THIS ROOM TO BE HUNG FROM STRUCTURE ABOVE W/ BOTTOM OFFIXTURE AT 10'-0" A.F.F.

6.

THIS ROOM/AREA SHALL HAVE NO CEILING AND BE EXPOSED TO STRUCTURE ABOVE.

EXTERIOR WALL PACK; RE: ELECTRICAL DRAWINGS

12. WHERE FURR DOWNS ARE SHOWN TO ALIGN WITH WALLS, ALIGN AS SHOWN.

LINEAR LIGHT/ACOUSTICAL FIXTURE; RE: ELECTRICAL DRAWINGS

EXTERIOR FLUSH MOUNT LED FIXTURE; RE: ELECTRICALDRAWINGS

RECESSED CAN FIXTURE; RE: ELECTRICAL DRAWINGS

SUSPENDED LINEAR FIXTURE; RE: ELECTRICAL DRAWINGS

SUSPENDED PENDENT LIGHT; RE: ELECTRICAL DRAWINGS

INDIRECT COVE LIGHTING; RE: ELECTRICAL DRAWINGS

WALL MOUNTED LIGHT; RE: ELECTRICAL DRAWINGS

WALL SCONCE; RE: ELECTRICAL DRAWINGS

TUBULAR DAYLIGHTING DEVICE (SOLATUBE 300DS/330DSWITH OPTIVIEW LENS OR EQUAL)

2" THICK BLACK FIBERGLASS ACOUSTIC INSULATION SECURED TO BOTTOM OF DECK(OWENS CORNING "SELECT SOUND BLACK ACOUSTIC BLANKET" OR APPROVED EQUAL).

ARMSTRONG AXIOM INDIRECT LIGHT COVE - CLASSIC TRIM OR APPROVED EQUAL; RE:ELECTRICAL DRAWINGS.

7.

SURFACE MOUNTED LIGHT FIXTURE SHALL BE MOUNTED CENTERED ABOVE DOOR.8.METAL COMPOSITE MATERIAL SOFFIT PANEL.9.METAL COMPOSITE MATERIAL PANEL JOINTS. VERTICAL JOINTS SHALL BE 2'-0" FROMRADIUS EDGE. HORIZONTAL JOINTS SHALL ALIGN WITH VERTICAL JOINTS AS SHOWN ANDDIMENSIONED. REFER TO ELEVATIONS.

10.

PANTRY CEILING TO SLOPE AND MATCH ROOF SLOPE; REFER TO PARTITION TYPE 'P' ONSHEET LS2.3. SURFACE MOUNTED LIGHT FIXTURE SHALL BE MOUNTED CENTERED ABOVEDOOR.

11.

1/2" THICK STAIN GRADE VENEERED PLYWOOD FINISH; SPECIES CHERRY; STN.1. PROVIDETYPICAL 2'-6" WIDE PANELS WITH 1/2" REVEALS BETWEEN AS DETAILED. WHERE LIGHTFIXTURES ARE SHOWN RECESSED IN PANELS, CENTER IN PANEL.

12.

13. CENTER LIGHT FIXTURE IN SHOWER AS SHOWN.14. COORDINATE OVER HEAD DOOR TRACK LOCATION WITH FINAL PLACEMENT OF CEILING

MOUNTED FIXTURES.

2"x2" TILE OVER 5/8" WATER RESISTANT GYPSUM BOARDOVER METAL STUD FRAMING

SUSPENDED PENDENT RING LIGHT; RE: ELECTRICAL DRAWINGS

CEILING FAN; RE: ELECTRICAL DRAWINGS

15. LIGHT FIXTURES TO BE PAINTED AN RAL COLOR; VERIFY COLOR SELECTION WITH ARCHITECT.

1A5.2

2A5.2

1A5.7

2A5.7

3A5.7

4A5.7

2A5.8

1A5.8

1A5.2

2A5.2

9'-0" AFF

10'-0" AFF

9'-0" AFF

9'-0" AFF

10'-0" AFF

9'-0" AFF

10'-0" AFF10'-0" AFF

8'-0" AFF

8'-0" AFF

11 11 11

1

1

11

1

3

3 3

33

10'-0" AFF 10'-0" AFF 10'-0" AFF

10'-0" AFF10'-0" AFF10'-0" AFF

9'-0" AFF

10'-0" AFF10'-0" AFF

9'-0" AFF

9'-0" AFF

10'-6" AFF

EQ 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" EQ

EQEQ

12'-0

"

EQ 8'-0" 8'-0" EQEQEQ

EQEQ

EQEQ

EQEQ

EQ 7'-0" EQ

EQ 7'-0" EQ

EQ 7'-0" EQ

EQ15

'-0"

15'-0

"15

'-0"

EQ

EQ 11'-0" 11'-0" EQ

EQEQ

3'-0"

6'-0"

3'-8

"6'

-0"

1'-4"

2'-2"

5'-0"5'-0"

6'-6"

3'-0

"

5'-0

"

EQ 4'-0" EQ

EQ4'

-0"

EQ

EQ4'-0"EQ

EQ4'

-0"

EQ

1

15

5

5

6

6

6

7

7

7

1

9A8.7

12A8.7

EQ 5'-0" EQ

EQ4'

-0"

EQ

13

13

11A8.7

14

1414

14

14

14

14

14

1

1

A6.2

RSMDrafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIPT

ION

JANUARY 2020

18098

KB

CITY

OF

WA

CO

FIRE

STA

TION

#6/

FIRE

ADM

INIS

TRA

TION

BUI

LDIN

GW

AC

O, T

X

13/

6/20

20A

DD

END

UM #

3

RFP 2020-005 Fire Station #6 & Fire Administration Building

16 of 23

Page 17: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

6 CEILING DETAILSCALE: 1" = 1'-0"

14 CEILING DETAILSCALE: 1" = 1'-0" 15 CEILING DETAIL

SCALE: 1" = 1'-0"

INDIRECT COVE LIGHTING;RE: ELECTRICAL DRAWINGS

5/8" GYPSUM WALLBOARD 3 5/8" METALSTUDS AT 16" O.C. MAX.

BRACE TO STRUCTUREABOVE AS REQUIRED

SUSPENDED CEILINGPANEL

10 CEILING DETAILSCALE: 1" = 1'-0"

INDIRECT COVELIGHTING; RE:ELECTRICAL DRAWINGS

SUSPENDEDCEILING PANEL

1'-0"

5"

5/8" GYPSUM BOARD OVERGYPSUM SUSPENSION SYSTEM- OR - 5/8" GYPSUM BOARDOVER METAL STUD FRAMING

5/8" GYPSUM BOARD OVERGYPSUM SUSPENSION SYSTEM- OR - 5/8" GYPSUM BOARDOVER METAL STUD FRAMING

1'-0"

4"5"

ALUMINUMREVEAL, CLEARANODIZED FINISH

1/2" PLYWOOD

1/2" THICK, STAIN GRADE VENEER PLYWOOD.MITER ALL OUTSIDE CORNERS. ALL VENEERSEAMS SHALL BE BOOK MATCHED

1/2" PLYWOOD

1/2" THICK, STAIN GRADE VENEERPLYWOOD. MITER ALL OUTSIDECORNERS. ALL VENEER SEAMSSHALL BE BOOK MATCHED

6" 2'-6"

6"

SUSPENDED CEILING PANEL

LIGHT FIXTURE; RE: ELECTRICALDRAWINGS

5/8" GYPSUM BOARDOVER 3 5/8" METALSTUDS @ 16" O.C.

LIGHT FIXTURE; RE:ELECTRICAL DRAWINGS

3 5/8" METAL STUDS@ 16" O.C.

INDIRECT COVE LIGHTING; RE:ELECTRICAL DRAWINGS.

ARMSTRONG AXIOM INDIRECT FIELDLIGHT COVE W/ CLASSIC RADIUS TRIMOR APPROVED EQUAL; RE: ELECTRICALDRAWINGS.

CONTROL JOINT

SEALANT WITH BACKER ROD SET IN 1/2"CONTROL JOINT. SEALANT TO MATCHMORTAR COLOR (TREAT AIR BARRIER ATCONTROL JOINT PER MANUFACTURER'SRECOMMENDATIONS)

BRICK MASONRYVENEER1" CONTINUOUS, RIGIDINSULATION BOARD

6" METAL STUDS @16"O.C. MAXIMUM

5/8" GYPSUM WALL BOARD

CONTINUOUS FLUID APPLIED AIR BARRIER OVER1/2" FIBERGLASS REINFORCED GYPSUMSHEATHING. ALL PENETRATIONS THRU THE AIRBARRIER SHALL BE INSTALLED PER THEMANUFACTURER'S RECOMMENDATIONS

GALVANIZEDMASONRY TIES @ 16"O.C. MAXIMUMVERTICAL & 16" O.C.MAXIMUM HORIZONTAL

KEEP CONTROL JOINT FREEOF ALL MORTAR

DRAIN SUMP ATINTERNAL ROOF DRAIN.ALL SLOPES AT SUMPSHALL BE 1 1/2":12"

COUNTERFLASHING (PARTOF PRE-FAB CURB)

2X FIRETREATEDWOODBLOCKING,EACH SIDE

FRAMING AT OPENING;REFER TO STRUCTURAL

5/8" PAINT GRADE PLYWOOD FORWIDTH OF LADDER AND MOUNTINGBRACKETS, PAINTED TO MATCH WALL

PROVIDE CRICKET ONHIGH SIDE FORPOSITIVE DRAINAGEAWAY FROM HATCH;RE: ROOF PLAN FORLOCATION

SINGLE-PLY ROOFINGMEMBRANE SYSTEMOVER RIGID INSULATIONOVER METAL DECK

ADHEREDMEMBRANEFLASHING WITHWELDED SEAMSEALANT

LADDER WITH SECURITY DOOR ASSPECIFIED; PROVIDE BLOCKINGWITHIN WALL FOR MOUNTING

INTERIORPARTITION ASSCHEDULED

ROOF HATCH W/PREFABRICATED,INSULATED CURB

11 SECTION DETAILSCALE: 1 1/2" = 1'-0" 12 SECTION DETAIL

SCALE: 1 1/2" = 1'-0"

1 TYP. MASONRY CJ DETAILSCALE: 1 1/2" = 1'-0" 5 SECTION DETAIL

SCALE: 1 1/2" = 1'-0"

13 CEILING DETAILSCALE: 1 1/2" = 1'-0"

16 TYPICAL DETAILSCALE: 1 1/2" = 1'-0"ISOMETRIC COPING JOINTS

7 CEILING DETAILSCALE: 1 1/2" = 1'-0"

17 SECTION DETAILSCALE: N.T.S.

2 ROOF HATCH DETAILSCALE: 1 1/2" = 1'-0" 3 ROOF DETAIL

SCALE: 1 1/2" = 1'-0"

DIGITAL MARQUEE

METAL COMPOSITE MATERIAL WALLPANEL

METAL COMPOSITE MATERIAL WALL PANEL OVERCONTINUOUS FLUID APPLIED AIR BARRIER OVER 1/2"FIBERGLASS REINFORCED GYPSUM SHEATHING OVER7/8" FURRING CHANNELS AT 16" O.C. MAX. OVER 1 1/2"COLD ROLLED STEEL CHANNELS AT 4'-0" O.C. MAX.

RE: STRUCTURAL

4 SECTION DETAILSCALE: 1 1/2" = 1'-0"

CONTINUOUS FLUID APPLIED AIR BARRIEROVER 1/2" FIBERGLASS REINFORCEDGYPSUM SHEATHING OVER 4" METALSTUDS AT 16" O.C. MAX.

METAL COMPOSITE MATERIAL WALLPANEL; CORNER PIECE

MARQUEE SUPPORT TO ATTACHDIRECTLY TO STRUCTURE

2X WOOD BLOCKING

6"

4"

4"

1/2"

1/2"

METAL COMPOSITE MATERIALWALL PANEL; PARAPET CAP

METAL COMPOSITEMATERIAL WALL PANEL

CONTINUOUS FLUID APPLIEDAIR BARRIER OVER 1/2"FIBERGLASS REINFORCEDGYPSUM SHEATHING OVER4" METAL STUDS AT 16" O.C.MAX.

DIGITAL MARQUEE

MARQUEE SUPPORT TOATTACH DIRECTLY TOSTRUCTURERE:

STRUCTURAL

ROOF MEMBRANEFLASHING WITH WELDEDCONNECTIONS

SELF ADHERING ROOFMEMBRANE FLASHING OVER1/2" FIBERGLASS MATTGYPSUM ROOF BOARD

LAP ROOFINGMEMBRANE OVER WALL

RAIL LADDER WITH 3" x 1/4" STEEL RAILS16" APART & 3/4Ø RUNGS @ 12" O.C.

7 1/

2"

3" x 3" x 1/4" WELD TO RAIL & BOLT TOFLOOR WITH 1/2"Ø WEJ-IT ANCHORS

3" x 1/4" BENT PL TO WALLW/ 3/8" Ø BOLTS @ 24" O.C.

5/8" PAINT GRADEPLYWOOD, PAINTEDTO MATCH WALL

2X WOOD BLOCKING

WALL PARTITION AS SCHEDULED

2"

2"

3/8"A

URETHANE SEALANTUNDER COVER PLATE

SILICONE TAPE ADHERED OVERJOINT USING MANUFACTURER'SSPECIFIED SILICONE SEALANTALL THREE SIDES

MANUFACTURER'SSPECIFIED SILICONESEALANT

MANUFACTURER'SSPECIFIED SILICONE TAPE

PROVIDE TREATEDWOOD BLOCKING ATALL GRAB BARS,HANDRAILS, ETC.

22 GAUGE SHEET METALBLOCKING BEHINDGYPSUM BOARD. SIZEAND LENGTH MAY VARY

5/8" GYPSUM WALL BOARDOVER 3 5/8" METAL STUDS AT16" O.C. MAX.

RE: R

.C.P

.

SUSPENDEDCEILING PANEL

5/8" GYPSUM WALLBOARD 3 5/8" METALSTUDS AT 16" O.C. MAX.

BRACE TOSTRUCTUREABOVE ASREQUIRED

SUSPENDEDCEILING PANEL

5/8" GYPSUM WALLBOARD 3 5/8" METALSTUDS AT 16" O.C. MAX.

BRACE TO STRUCTUREABOVE AS REQUIREDON CONCEALED SIDE

SUSPENDEDCEILING PANEL

EXTEND GYPSUMBOARD TO DECK ONEXPOSED CEILING SIDE

2"

5/8" GYPSUM WALL BOARDOVER 3 5/8" METAL STUDS AT16" O.C. MAX.

EXTEND GYPSUMBOARD TO DECK ONEXPOSED CEILING SIDE

RE: RCP FOR HEIGHTS

RE: R

.C.P

.

SUSPENDEDCEILING PANEL

5/8" GYPSUM WALLBOARD 3 5/8" METALSTUDS AT 16" O.C. MAX.

METAL CORNERBEAD; TYP.

BRACE TOSTRUCTUREABOVE ASREQUIRED

8 ROOF LADDER DETAILSCALE: 1 1/2" = 1'-0" 9 CEILING DETAIL

SCALE: 1 1/2" = 1'-0"4"

SUSPENDEDCEILING PANEL

PROVIDE SELFADHERING MEMBRANEFLASHING EXTENDINGINTO ROUGH OPENING;LAP OVER END DAMSOF METAL SILL PANFLASHING BELOW

2" THICK WATER DRAINAGE EIFS

FACE BRICK BELOWBRICK SILL BELOW

CONTINUOUS FLUID APPLIED AIRBARRIER (EXTEND INTO ROUGHOPENING) OVER 8" C.M.U.

BRICK SILL ABOVE

CONTINUOUS FLUID APPLIED AIRBARRIER (EXTEND INTO ROUGHOPENING) OVER 8" C.M.U.

FACE BRICK1" RIGID INSULATION BOARD (R-5ci)

GALVANIZED MASONRY TIES@ 16" O.C. MAX. VERTICAL &16" O.C. MAX. HORIZONTAL

HOLLOW METALFRAME ASSCHEDULED

HOLLOWMETAL DOORAS SCHEDULED

HOLLOW METAL FRAMEAS SCHEDULED

HOLLOW METALDOOR ASSCHEDULED

18 PLAN DETAILSCALE: N.T.S. 19 PLAN DETAIL

SCALE: N.T.S.

SPRAY FOAM INSULATION (R-13)

2X WOOD BLOCKING5/8" GYPSUM BOARDOVER 6" METAL STUDS

SPRAY FOAM INSULATION (R-13)

5/8" GYPSUM BOARDOVER 6" METAL STUDS

1/4" SHIM WITHBACKER ROD ANDSEALANT EACH SIDE

METAL JAMB FLASHINGTO BRIDGE CAVITY

PROVIDE SELF ADHERINGMEMBRANE FLASHINGEXTENDING INTO ROUGHOPENING; LAP OVER ENDDAMS OF METAL SILL PANFLASHING BELOW

MEMBRANE FLASHINGOVER LEG OF METALFLASHING AT WALL

1/4" SHIM WITHBACKER ROD ANDSEALANT EACH SIDE

SPRAY FOAMINSULATION (R-13)

5/8" GYPSUMBOARD OVER 6"METAL STUDS

2X WOODBLOCKING

1/4" SHIM WITHBACKER ROD &SEALANT

CONTINUOUS FLUID APPLIED AIRBARRIER OVER 1/2" FIBERGLASSREINFORCED GYPSUM SHEATHING

EXTERIOR STEEL LINTELS SHALL BEGALVANIZED

STAINLESS STEEL METAL FLASHINGW/ 2" TURNED UP BACK LEG ANDEND DAMS; SET IN SEALANT

WEEP HOLES @ 16" O.C. MAX. @VERTICAL JOINTS

TRANSITION MEMBRANE FLASHING

LAP METAL FLASHING W/ SELFADHERING MEMBRANE FLASHINGAND TERMINATION BAR; FASTEN W/GASKETED FASTENERS AND SEAL TOP

CAVITY DRAINAGE SYSTEM, FULLDEPTH OF CAVITY

1" RIGID INSULATION BOARD (R-5ci)GALVANIZEDMASONRY TIES @ 16"O.C. MAX. VERTICAL& 16" O.C. MAX.HORIZONTAL

FACE BRICK

20 SECTION DETAILSCALE: N.T.S.

HOLLOW METALFRAME ASSCHEDULED HOLLOW METAL DOOR AS

SCHEDULED

5/8" GYPSUM BOARD

1

RSM

A8.7

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIPT

ION

JANUARY 2020

18098

KB

CITY

OF

WA

CO

FIRE

STA

TION

#6/

FIRE

ADM

INIS

TRA

TION

BUI

LDIN

GW

AC

O, T

X

13/

6/20

20A

DD

END

UM #

3

RFP 2020-005 Fire Station #6 & Fire Administration Building

17 of 23

Page 18: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

MECH. /WATERHEATER

ELEC

IT

LOBBY

SHOWER

CORRIDOR

BATH

PRIVATESLEEPING

CHIEFOFFICE

DORMITORY

VESTIBULE

WORKROOM

LAUNDRY

STORAGE

FITNESSROOM

KITCHEN

DAYROOM

STORAGEAPPARATUS

BAY

STO.

EXTRACTOR

WASHER

DRYER

20X20LOCKERS

JANITOR

CLOSET

SHOWER

TOILET

LOC

KER

S

6"

8" HOA

1

1

1

1

1

1

1

(208/3)(1 HP)3#12, #12G, 3/4''CMDLD- 55,57,59

(208/3)(1 HP)3#12, #12G, 3/4''CMDLD- 56,58,60

WPLD- 7

WPLC- 8

WPLC- 8

WPLC- 7

WPLC- 7

(208/3)(1 HP)3#12, #12G, 3/4''CMDLC- 36,38,40

GLD- 15

ALD- 48

GLD- 39

WMLD- 24

DRLD- 23

EXLD- 61,63,65

TVLC- 17

AGLC- 5

GLC- 1

GLC- 1

EWCLC- 3

AGLC- 6

AGLC- 1

AGLC- 1

WPLC- 17

HS LC

LD

TC

MTS-E

ATS-S

G24LD- 47

G24LD- 34

G24LD- 37

G24LD- 33

(208/3)(1 HP)3#12, #12G, 3/4''CMDLD- 50,52,54

(208/3)(1 HP)3#12, #12G, 3/4''CMDLD- 49,51,53

G24LD- 31

G24LD- 42

LD- 39

G24LD- 12

LD- 39

LD- 48

ALD- 48

LD- 15

LD- 15

LD- 15

AFCILD- 25

AFCILD- 28

AFCILD- 41

AFCILD- 26

AFCILD- 27

AFCILD- 36

AFCILD- 38

AFCILD- 38

AFCILC- 2

TVLC- 2

AFCILC- 2

AFCILC- 2

LC- 4 LC- 4

LC- 31

LC- 31

LC- 31

LC- 6

LC- 5

LC- 5

LC- 8

LC- 8

LC- 12

LC- 12

LC- 10

LC- 10

LC- 7

LC- 7

LC- 69

LC- 11

LC- 67

LC- 14

LC- 16

LC- 59

LC- 18

LC- 65

LC- 13

LC- 13

LC- 15

LC- 15

LC- 17

LC- 17

TVLC- 15

LC- 17

ICELD- 18

RANGE(GFI BKR)(120/1)(15 A)2#12, #12G, 3/4''C LC- 21

REFLC- 23

REFLC- 26

REFLC- 28

DWLC- 30

AGLC- 25

AGLC- 25

AGLC- 27

AGLC- 27

AGLC- 29

AGLC- 29

TVLD- 15

KH-1AREA BLC- 32

FACP LC- 34

TV

DB

TV

WSP +42''

+48''

ANT

TV

+48''

WSP+144''

+144''

DBWSP+96''

CR

CR CR

8'' GROUND BAR WITH #2 WIRE TIED TO MAIN BUILDING GROUND. PLYWOOD THREE WALLS UP TO 8' A.F.F. COORDINATE FINAL I.T. ROOM LAYOUT WITH OWNER PRIOR TO ANY ROUGH-IN

(2) 4'' CONDUIT TO 17''X30''X24'' PRECAST PULL BOX AT CABLE / FIBER UTILITY LOCATION

CR

CR

DBCR

WSPTV

TVLC- 4

ANT

+36''

TVLC- 31 TV

DB

TV

DB

+48''

CR

+144''

CR

CR

WSP

+120''

SP

SP

SP

SP

SP SP

SP SP

SP

SP

SP

SP

WF-4AREA BLD- 10

WF-3AREA BLD- 10

WF-2AREA BLC- 33 WF-1

AREA BLC- 33UH-1

AREA BLD- 11

UH-2AREA BLD- 20

UH-3AREA BLD- 22

EF-10AREA BHS- 14,16,18

EF-11AREA BLD- 8

EF-7AREA BLD- 5

EF-8AREA BLD- 4

EF-9AREA BLD- 4

CH-1AREA BLC- 35

CH-2AREA BLD- 14,16

CH-3AREA BLD- 19,21

EF-12AREA BLC- 5

AGLC- 37

GLC- 39

GLC- 39

DISPAREA BLC- 41

LD- 38

WH2AREA BLC- 43

CP2AREA BLC- 45

COMBINATION MOTOR STARTER / DISCONNECT

LD- 6

HAND OFF AUTO SWITCH. COORDINATE CONTROL WIRING WITH CARBON MONOXIDE DETECTION PANEL, EXHAUST FANS, AND LOUVERS

UH-4AREA BLD- 35

AHU-3AREA B

LC- 8

1D

1D1D

1D

1D

1D

1D

SIGN LC- 49

LC- 4

LC- 55

ALD- 13

ALD- 13

ALD- 17

ALD- 17

DB

+144''

ABDC

LC- 57

SG

SG

SG

SG

JUNCTION BOX FOR EMERGENCY GAS SHUTOFF BUTTON. REFER TO PLUMBING DRAWINGS FOR SOLENOID VALVE LOCATION

EF-13AREA BLD- 5

INVERTER FOR PHOTOVOLTAIC SYSTEM

LOCKABLE NEMA 3R DISCONNECT FOR PHOTOVOLTAIC SYSTEM. SEE SINGLE LINE FOR MORE INFORMATION

VERIFY CONTROLS LOCATION WITH OWNER PRIOR TO INSTALLATION, TYPICAL (ALL MOTORIZED DOORS)

LIGHTING INVERTER 'INV2'

NEW ELECTRIC UTILITY METER

TEF-1AREA BLD- 62,64,66

1

3

1. THE ELECTRICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL EQUIPMENT MANUFACTURERS THROUGH ALL AREAS OF THE PROJECT FOR INCREASED ACCURACY WHEN INSTALLING DEVICE BOXES.

2. OUTLET BOXES SHALL NOT BE INSTALLED BACK TO BACK IN WALLS. A MINIMUM OF 6" SEPARATION BETWEEN BOXES SHALL BE MAINTAINED TO REDUCE SOUND TRANSMISSION.

3. INSTALL 3/4" CONDUIT TO ALL EXTERIOR DOOR FRAMES TO ACCESSABLE CEILING SPACE FOR DOOR CONTROLS.

4. DEVICE AND COVERPLATES TO BE VERIFIED WITH ARCHITECT. 5. INSTALL 3/4'' CONDUIT FROM ALL THERMOSTATS TO ACCESSIBLE AREA

ABOVE CEILING. REFER TO MECHANICAL SHEETS FOR LOCATIONS OF THERMOSTATS.

6. REFER TO FIRE PROTECTION SHEETS FOR LOCATIONS OF FIRE SPRINKLER TAMPER AND FLOW SWITCHES TO BE INSTALLED BY FIRE ALARM CONTRACTOR (TYPICAL).

7. ALL PENETRATIONS THROUGH FIRE OR SMOKE WALLS SHALL BE MADE USING A UL CLASSIFIED FIRESTOP SLEEVE KIT OF THE APPROPRIATE SIZE (AS MANUFACTURED BY "SPECIFIED TECHNOLOGIES" www.stifirestop.com).

8. RECEPTACLES WITHIN 6'-0'' OF SINKS SHALL BE GFCI TYPE. 9. INSTALL BLANK COVERPLATES ON ALL EMPTY JUNCTION BOXES.10. WHERE ALLOWED BY CODE, ALL FIRE ALARM NOTIFICATIONS DEVICES SHALL

BE CEILING MOUNTED, NOT WALL MOUNTED EXCEPT FOR THE LOBBY / BRIDGE CEILING. ALL DEVICES SHALL BE WHITE WITH RED LETTERING.

11. PER NEC, GFCI PROTECTION SHALL BE PROVIDED FOR ALL 20A TO 50A SINGLE PHASE RECEPTACLES RATED UP TO 150V TO GROUND AND 20A TO 100A THREE PHASE RECEPTACLES RATED UP TO 150V TO GROUND LOCATED IN INDOOR WET LOCATIONS, BATHROOMS, KITCHENS, AND WHERE WITHIN 6 FT OF ANY SINK, OR LOCATED OUTDOORS, ON ROOFTOPS, OR IN VEHICLE GARAGES AND SERVICE BAYS.

12. SHORT MC CABLE WHIPS CAN BE USED FOR CONNECTING FIXTURS AND APPLIANCES IN SUSPENDED / ACCESSIBLE CEILINGS. MC CABLE SHALL NOT BE USED AS A HOME RUN TO A PANEL. MC CABLE SHALL NOT BE USED IN AREAS WITH EXPOSED CEILINGS.

GENERAL POWER NOTES:

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIP

TIO

N

SH

EE

T S

IZE

= A

RC

H D

24X

36

12

/19

/20

AD

DEN

DU

M #

1

22

/28

/20

AD

DEN

DU

M #

2

33

/6/2

0A

DD

EN

DU

M #

3

JANUARY 2020

18098

CIT

Y O

F W

AC

O

FIR

E S

TATI

ON

#6

/FIR

E

AD

MIN

ISTR

ATIO

N B

UIL

DIN

GW

AC

O, TX

., I CNSTNATLUSNOC

Dallas, Texas 75204Suite 635

4144 N. Central Expwy

Fort Worth, Texas 76102Suite 5001300 Summit Avenue

Office 817.878.4242www.summitmep.com

Office 214.420.9111

Texas BPE Registration # F-207 E1.20'

3/16" = 1'-0"

4' 4' 12'8'

03/06/2020

3/16" = 1'-0"1

POWER FLOOR PLAN - AREA 'B'

ELECTRICAL EQUIPMENT SCHEDULE - AREA B

EQ NAME EQUIPMENT DESCRIPTION FEEDER LOAD VA VOLTAGESCHEDULE

NAME PANELCIRCUITNUMBER

AHU-3 AIR HANDLING UNIT (POWERED THRU CU) 0 VA 120 V AREA B

CH-1 COVE HEATER (120/1)(750 W)(3 A) 2#12, #12G, 3/4''C 750 VA 120 V AREA B LC 35

CH-2 COVE HEATER (208/1)(7500 W)(36.1 A) 2#6, #10G, 1''C 7500 VA 208 V AREA B LD 14,16

CH-3 COVE HEATER (208/1)(7500 W)(36.1 A) 2#6, #10G, 1''C 7500 VA 208 V AREA B LD 19,21

CP2 CIRCULATION PUMP (120/1)(1/12 HP) 2#12, #12G, 3/4''C 400 VA 120 V AREA B LC 45

DISP GARBAGE DISPOSAL (120/1)(1000 W) 2#12, #12G, 3/4''C 1000 VA 120 V AREA B LC 41

EF-7 EXHAUST FAN (120/1)(47.8 W) 2#12, #12G, 3/4''C 48 VA 120 V AREA B LD 5

EF-8 EXHAUST FAN (120/1)(52.6 W) 2#12, #12G, 3/4''C 53 VA 120 V AREA B LD 4

EF-9 EXHAUST FAN (120/1)(102 W) 2#12, #12G, 3/4''C 102 VA 120 V AREA B LD 4

EF-10 EXHAUST FAN (480/3)(1.5 HP) 3#12, #12G, 3/4''C 2500 VA 480 V AREA B HS 14,16,18

EF-11 EXHAUST FAN (120/1)(305 W) 2#12, #12G, 3/4''C 305 VA 120 V AREA B LD 8

EF-12 EXHAUST FAN (120/1)(71.6 W) 2#12, #12G, 3/4''C 72 VA 120 V AREA B LC 5

EF-13 EXHAUST FAN (120/1)(92 W) 2#12, #12G, 3/4''C 92 VA 120 V AREA B LD 5

KH-1 KITCHEN VENTILATION UNIT (120/1)(15 A) 2#12, #12G, 3/4''C 1800 VA 120 V AREA B LC 32

TEF-1 PURGE FAN (208/3)(3 HP)(8.8 FLA) 3#12, #12G, 3/4''C 3171 VA 208 V AREA B LD 62,64,66

UH-1 GAS RADIANT HEATER (120/1)(1.9 FLA, 15MOCP)

2#12, #12G, 3/4''C 300 VA 120 V AREA B LD 11

UH-2 GAS RADIANT HEATER (120/1)(4.8 A) 2#12, #12G, 3/4''C 300 VA 120 V AREA B LD 20

UH-3 GAS RADIANT HEATER (120/1)(4.8 A) 2#12, #12G, 3/4''C 300 VA 120 V AREA B LD 22

UH-4 GAS RADIANT HEATER (120/1)(1.9 FLA, 15MOCP)

2#12, #12G, 3/4''C 300 VA 120 V AREA B LD 35

WF-1 OSCILLATING WALL FAN (120/1)(1/4 HP)(220 W) 2#12, #12G, 3/4''C 220 VA 120 V AREA B LC 33

WF-2 OSCILLATING WALL FAN (120/1)(1/4 HP)(220 W) 2#12, #12G, 3/4''C 220 VA 120 V AREA B LC 33

WF-3 OSCILLATING WALL FAN (120/1)(1/4 HP)(220 W) 2#12, #12G, 3/4''C 220 VA 120 V AREA B LD 10

WF-4 OSCILLATING WALL FAN (120/1)(1/4 HP)(220 W) 2#12, #12G, 3/4''C 220 VA 120 V AREA B LD 10

WH2 GAS WATER HEATER (120/1)(2 A) 2#12, #12G, 3/4''C 240 VA 120 V AREA B LC 43

BKH

JSR

1

RFP 2020-005 Fire Station #6 & Fire Administration Building

18 of 23

Page 19: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

WP

RTU-S1ROOF BHS- 19,21,23

RTU-S2ROOF BHS- 20,22,24

RTU-S3ROOF BHS- 25,27,29

EF-5ROOF BLD- 2 EF-4

ROOF BLD- 2

WP

CU-3ROOF BLD- 30,32

WP

PHOTOVOLTAIC SYSTEM MODULES MOUNTED ON ROOF

DC COMBINER BOX. SEE PV SYSTEM SINGLE LINE FOR MORE INFORMATION. COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER

IRONRIDGE #XR RAILS WILL BE ATTACHED TO UNDERSIDE OF PHOTOVOLTAIC SYSTEM MODULES. RAILING AND MODULES WILL BE FLUSH MOUNTED ON STANDING SEAM ROOF WITH S-5! #S-5-N 1.5 CLAMPS. COORDINATE WITH INSTALLER FOR ADDITIONAL MOUNTING DETAILS

2

MAINTAIN A MINIMUM 4-FOOT-WIDE CLEAR PERIMETER AROUND THE EDGES OF THE ROOF IN ACCORDANCE WITH 2018 IFC 1204.3.1

3

3

1. CIRCUITS TO ROOF MOUNTED EQUIPMENT SHALL BE ROUTED TO DISCONNECT WITHOUT RACEWAY PASSING THROUGH MECHANICAL EQUIPMENT. ROOF PENETRATIONS FOR CONDUIT SHALL BE MADE THROUGH EQUIPMENT CURBS OR PIPE CHASES OR PIPING PITCH PANS.

2. FOR ALL ROOF-MOUNTED DEVICES AND EQUIPMENT, ALL HORIZONTAL CONDUIT RUNS SHALL BE INSIDE CEILING CAVITY, NOT ON TOP OF ROOF.

3. ALL RECEPTACLES SHOWN ON ROOF PLAN SHALL BE WP/GFI RECEPTACLES, CONNECTED TO THE NEAREST 120V/20A RECEPTACLE CIRCUIT IN THE BUILDING BELOW UNLESS NOTED OTHERWISE.

4. RECEPTACLES AND DISCONNECTS SHALL NOT BE MOUNTED ON TOP OF EQUIPMENT ACCESS PANELS OR ON TOP OF EQUIPMENT LABELS.

5. SELECTED EXHAUST FANS WILL HAVE AN INTERNAL MOTORIZED DAMPER. REFER TO EXHAUST FAN SCHEDULE ON MECHANICAL SHEETS TO DETERMINE WHICH FANS HAVE INTERNAL DAMPER. DAMPERS SHALL BE CONNECTED TO 120V EXHAUST FAN CIRCUIT.

6. BECAUSE INSTALLED EQUIPMENT MAY VARY FROM THE SPECIFIED EQUIPMENT, THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR AND ADJUST ALL CIRCUIT, FUSE AND BREAKER SIZES AS NECESSARY FOR ACTUAL EQUIPMENT MCA AND MOCP.

7. FOR ALL MOTOR CIRCUITS AND PARALLELED CONDUCTOR SETS, SIZE THE GROUND WIRE BASED ON THE CIRCUIT'S BREAKER SIZE AND NEC TABLE 250.122. REFER TO FEEDER SCHEDULE ON SINGLE LINE SHEET FOR TABLE 250.122.

GENERAL ROOF NOTES:

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIP

TIO

N

SH

EE

T S

IZE

= A

RC

H D

24X

36

12

/19

/20

AD

DEN

DU

M #

1

22

/28

/20

AD

DEN

DU

M #

2

33

/6/2

0A

DD

EN

DU

M #

3

JANUARY 2020

18098

CIT

Y O

F W

AC

O

FIR

E S

TATI

ON

#6

/FIR

E

AD

MIN

ISTR

ATIO

N B

UIL

DIN

GW

AC

O, TX

., I CNSTNATLUSNOC

Dallas, Texas 75204Suite 635

4144 N. Central Expwy

Fort Worth, Texas 76102Suite 5001300 Summit Avenue

Office 817.878.4242www.summitmep.com

Office 214.420.9111

Texas BPE Registration # F-207 E3.20'

3/16" = 1'-0"

4' 4' 12'8'

03/06/2020

3/16" = 1'-0"1

POWER ROOF PLAN - AREA 'B'

ELECTRICAL ROOF EQUIPMENT SCHEDULE - AREA B

EQ NAME EQUIPMENT DESCRIPTION FEEDER LOAD VA VOLTAGESCHEDULE

NAME PANELCIRCUITNUMBER

CU-3 CONDENSING UNIT (7MCA, 15 MOCP)

2#12, #12G, 3/4''C 1165 VA 208 V ROOF B LD 30,32

EF-4 EXHAUST FAN (120/1)(63.6W)

2#12, #12G, 3/4''C 64 VA 120 V ROOF B LD 2

EF-5 EXHAUST FAN (120/1)(87.4W)

2#12, #12G, 3/4''C 88 VA 120 V ROOF B LD 2

RTU-S1 ROOF TOP UNIT W/ GASHEAT (480/3)(10 MCA, 15MOCP)

3#12, #12G, 3/4''C 6651 VA 480 V ROOF B HS 19,21,23

RTU-S2 ROOF TOP UNIT W/ GASHEAT (480/3)(10 MCA, 15MOCP)

3#12, #12G, 3/4''C 6651 VA 480 V ROOF B HS 20,22,24

RTU-S3 ROOF TOP UNIT W/ GASHEAT (480/3)(25 MCA, 30MOCP)

3#10, #10G, 3/4''C 16628 VA 480 V ROOF B HS 25,27,29

BKH

JSR

84 MODULES1 INVERTER

RFP 2020-005 Fire Station #6 & Fire Administration Building

19 of 23

Page 20: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

#12G#10G#10G#10G#10G#10G#8G#8G#8G#6G#6G#6G#6G#6G#4G#4G#3G#3G#2G#2G#2G#1G

#1/0G#1/0G#2/0G#3/0G#4/0G#250G#350G#400G#500G

2030304055707085951101301501752002302553103804004605106707608551005124016752010266030404180

#12#10#10#8#6#4#4#3#2#1#1#1/0#2/0#3/0#4/0#250#350#500#3/0#4/0#250#400#500#300#400#350#400#400#500#500#500

20A/3P25A/3P30A/3P

35A, 40A/3P45A, 50A/3P

60A/3P70A/3P

80A, 90A/3P100A/3P110A/3P125A/3P150A/3P175A/3P200A/3P225A/3P250A/3P300A/3P350A/3P400A/3P450A/3P500A/3P600A/3P700A/3P800A/3P

1000A/3P1200A/3P1600A/3P2000A/3P2500A/3P3000A/3P4000A/3P

1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET1 SET

2 SETS2 SETS2 SETS2 SETS2 SETS3 SETS3 SETS4 SETS5 SETS6 SETS7 SETS8 SETS11 SETS

NEC240.4(B)

NEC TABLE310.15(B)(16)

NEC TABLE310.15(B)(16)

NEC TABLE250.122

(3) HOT,(1) N, (1) G

3/4"3/4"3/4"1"1"

1-1/4"1-1/4"1-1/4"1-1/2"

2"2"2"2"2"

2-1/2"3"3"4"2"

2-1/2"2-1/2"

3"3"

2-1/2"3"3"3"3"3"3"3"

(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)(4)

1.732 x L x IscaN x C x E l-n

'f' factor =

(INFINITE FAULT CURRENT ON PRIMARY)

ADMIN

L (length)Isca NCE l-lfCE l-nfM l-lM l-n

110 FT19.3 kA

113,923480V0.55113,923277V1.4320.6450.411

AVAILABLE FAULT CURRENT CALCULATION

CIRCUIT

BREAKER

CIRCUIT

AMPACITY

CONDUCTOR

SETS, QTY & SIZE

EQUIP.

GROUNDCONDUIT

MAX. 3Φ AFC = 12.5kA

FEEDER & BREAKER SCHEDULE3-PHASE 4-WIRE COPPER

3Φ TRANSFORMER SCHEDULE

75 kVA112.5 kVA150 kVA

225 kVA

#8 CU#6 CU#4 CU#2 CU

#1/0 CU#2/0 CU

#3/0 CU

125A200A225A

350A

60A110A175A300A400A600A

800A

PRI

OCPD

XFMR

SIZE

XFMR

GND

SEC

OCPD

PRIMARY

FEEDERS

WHERE SYMBOL IS SHOWN, INSTALL FEEDERS AS SHOWN BELOW.

15 kVA30 kVA45 kVA

25A50A70A

3#10,#10G,3/4"C3#6,#10G,1"C3#4,#8G,1-1/2"C3#1,#6G,1-1/2"C3#3/0,#6G,2"C3#4/0,#4G,2"C

3#500,#3G,3"C

4#4,#8G,1-1/2"C4#1,#6G,2"C4#2/0,#4G,2"C4#350,#2G,3"C4#600,#1/0G,4"C2 SETS OF(4#350,#2/0G,3"C)2 SETS OF(4#600,#3/0G,4"C)

SECONDARY

FEEDERS

#8G#6G#4G#2G

#1/0G#2/0G#3/0G

14 - 21 - 1/02/0 - 3/03/0+ - 350351 - 600601 - 11001100 +

LARGEST CONDUCTOR

OREQUIVALENT

AREA OF PARALLEL

CONDUCTORS (COPPER)

GEC(CU)

GEC FOR SERVICES, BUILDING FEEDERS AND SEPARATELY DERIVED SYSTEMS & SERVICES

NEC 250.66 GROUNDING ELECTRODECONDUCTOR

FEEDER & BREAKER SCHEDULE NOTES:

1. WHERE SYMBOL IS SHOWN, PROVIDE FEEDER ACCORDING TO THE "CIRCUIT BREAKER" COLUMN SHOWN ABOVE. FEEDER TO BE 4-CONDUCTOR PLUS GROUND UNLESS NOTED OTHERWISE.

2. USE TABLE 250.122 TO DETERMINE SIZE OF EQUIPMENT GROUNDING CONDUCTOR (EGC) FOR BRANCH CIRCUITS, RACEWAY, CONDUIT, MOTOR CIRCUITS, AND WHERE PARALLEL FEEDERS ARE RUN. USE TOTAL EQUIVALENT AREA OF PARALLELED CONDUCTORS FOR SIZING PARALLEL GECs.

3. USE COMPRESSION LUGS FOR FEEDERS OVER 100A.

4. USE TABLE 250.66 TO DETERMINE THE GROUNDING ELECTRODE CONDUCTOR (GEC) SIZE AT THE SERVICE ENTRANCE, AT EACH BUILDING OR STRUCTURE WHERE SUPPLIED BY A FEEDER(S), AT TRANSFORMERS, OR AT ANY OTHER SEPARATELY DERIVED SYSTEM.

5. WHERE SYMBOL IS SHOWN, PROVIDE SERVICE FEEDER WITH AMPACITY EQUAL TO OR GREATER THAN THAT OF THE SERVICE DISCONNECT, WITH NO EQUIPMENT GROUND CONDUCTOR.

S

B

T

===========

1.732 x L x IscaN x C x E l-n

'f' factor =

STATION

L (length)Isca NCE l-lfCE l-nfM l-lM l-n

150 FT19.3 kA

113,923480V0.75113,923277V1.9530.5710.339

MAX. 3Φ AFC = 11.0kA

===========

RTU SCCR RATING:RTU-S1 = 2.0 kARTU-S2 = 3.1 kARTU-S3 = 2.5 kA

RTU SCCR RATING:RTU-A1 = 2.7 kARTU-A2 = 1.9 kARTU-A3 = 2.0 kARTU-A4 = 2.7 kA

3/4" x 10' GROUND ROD SPACED 10'-0"

FINISH GRADE

SERVICE DISCONNECT

NEUTRAL BUS

GROUND BUS

GROUNDING ELECTRODE POINT

CONCRETE ENCASED ELECTRODE (UFER)

METALLIC WATER OR GAS PIPE

CONCRETE FOOTING

#4 CU

#4 CU

SERVICE ENTRANCE GROUNDING DETAIL NOTES: 1. AT THE CONTRACTOR'S OPTION, ANY ONE OF THE THREE ALLOWED

ELECTRODE SYSTEMS SHOWN MAY BE USED AS THE MAIN GROUNDING ELECTRODE POINT (GROUND RODS, UFER, OR BUILDING STEEL) WITH ALL OTHER ELECTRODES BONDED TO IT. THE EXAMPLE SHOWN USES BUILDING STEEL AS THE MAIN ELECTRODE POINT.

2. THE GROUNDING ELECTRODE CONDUCTOR (GEC) SHALL BE SIZED IN ACCORDANCE WITH NEC TABLE 250.66. REFER TO FEEDER SCHEDULE.

BUILDING STEEL

TELECOM DATA GROUND BUS BAR WHERE SHOWN ON PLANS

#4 CU

#4 CU

#3/0 CU

DESIGNATION BRANCH AMPS POLES WCR PRIORITY NOTES

ATS-S STANDBY 200 4 14,000 2 STANDBY LOADS ONLY

AUTOMATIC TRANSFER SWITCH NOTES:1. ALL ATS's SHALL BE MOTOR OPERATED WITH CENTER OFF FEATURE FOR LOAD SHEDDING.2. STANDBY TRANSFER SWITCH SHALL MONITOR GENERATOR LOAD TO PERFORM LOAD SHED FUNCTION3. TRANSFER SWITCHES SHALL INTERFACE WITH ELEVATOR CONTROLLERS. ATSs SHALL SEND "IMPENDING TRANSFER"

SIGNAL AND "EMERGENCY MODE" SIGNAL TO ELEVATOR CONTROLLERS.4. INSTALLATION SHALL BE IN ACCORDANCE WITH ARTICLES 700, 701, AND 702 OF THE NATIONAL ELECTRIC CODE.

GENERATOR SCHEDULEENCLOSURE FUEL FUEL CAPACITY TANK CLASSIFICATIONGENERATOR CLASSIFICATION

WEATHERPROOF, SOUND ATTENUATING DIESEL 24 HOURS UL 2200, NFPA 110, LEVEL 1 UL 142

AUTOMATIC TRANSFER SWITCH SCHEDULE

GENERATOR NOTES:1. CONTRACTOR SHALL INSTALL CONCRETE PAD IN ACCORDANCE WITH GENERATOR MANUFACTURER'S REQUIREMENTS.

NEW POLE-MOUNTED UTILITY TRANSFORMER

NEW UTIL METER

S

NEW PANEL

"HA"

45 KVAXFMR"TA"

T

T

NEW PANEL

"LA"

NEW PANEL

"LB"

B

NEW POLE-MOUNTED UTILITY TRANSFORMER

NEW UTIL METER

"ATS-S"

S

NEW PANEL

"HS"

B

75 KVAXFMR"TC"

T

NEW PANEL

"LC"

NEW PANEL

"LD"

100 kW/ 125 kVA GENERATOR

REFER TO 'ATS GROUNDING

DETAIL'

B

PROVIDE ENCLOSURE MOUNTED BREAKERS IN GENERATOR FOR EMERGENCY AND STANDBY TRANSFER SWITCHES

3-POLE DOUBLE-THROW

DISCONNECT

TVSS

T

B

"MTS-E"200A

DOUBLE-THROW DISCONNECT SWITCH TO COMPLY WITH NEC 700.5 REQUIREMENT FOR TEMPORARY GENERATOR CONNECTION

200A BKR

REFER TO PV SYSTEM SINGLE LINE FOR MORE INFORMATION

2

3

SINGLE LINE DIAGRAM NOTES

1. PROVIDE CONCRETE PAD FOR ALL FLOOR-MOUNTED ELECTRICAL EQUIPMENT INCLUDING TRANSFER SWITCHES AND DRY-TYPE TRANSFORMERS.

2. CONTRACTOR SHALL PROVIDE AND PERFORM COMPLETE OVERCURRENT PROTECTION COORDINATION STUDY IN ACCORDANCE WITH NEC REQUIREMENTS PRIOR TO PURCHASE OF EQUIPMENT AND PROVIDE STUDY WITH SWITCHBOARD AND PANELBOARD SUBMITTALS. CONTRACTOR SHALL SUBMIT COORDINATION STUDY TO CITY INSPECTOR UPON REQUEST.

3. PROVIDE SERVICE ENTRANCE RATED LISTED CONNECTION SURGE PROTECTIVE DEVICE (SPD/ TVSS) WITH SURGE RATING AS RECOMMENDED BY MANUFACTURER FOR THE SERVICE SIZE SHOWN. DEVICE SHALL INCLUDE INTEGRAL DISCONNECT/FUSE MOUNTED TO SIDE OF SWITCHBOARD OR PANEL ENCLOSURE, CONNECTED TO BUS USING MANUFACTURER'S CABLE. CONDUCTORS SHALL BE ROUTED SO AS TO AVOID SHARP BENDS AND MINIMIZE LEAD LENGTHS.

4. SURGE PROTECTION SHALL BE INSTALLED ON ALL EMERGENCY BRANCH PANELS IN ACCORDANCE WITH NEC 700.8.

5. PER NEC, GFCI PROTECTION SHALL BE PROVIDED FOR ALL 20A TO 50A SINGLE PHASE RECEPTACLES RATED UP TO 150V TO GROUND AND 20A TO 100A THREE PHASE RECEPTACLES RATED UP TO 150V TO GROUND LOCATED IN INDOOR WET LOCATIONS, BATHROOMS, KITCHENS, AND WHERE WITHIN 6 FT OF ANY SINK, OR LOCATED OUTDOORS, ON ROOFTOPS, OR IN VEHICLE GARAGES AND SERVICE BAYS.

N

G

SERVICEGROUNDINGELECTRODE

GROUNDTO CABINET

PHASE

NEUTRAL

UTILITY4-POLE - SERVICE

ENTRANCE RATED ATS

TO LOAD

N

G

GENERATOR

GROUNDTO CABINET

FULLY RATED OUTPUTCIRCUIT BREAKER ON

GENERATOR

GROUNDING ELECTRODECONDUCTOR BONDED TOREBAR IN CONCRETESLAB AT GENERATOR.

3/4"x10' COPPERCLAD GROUND ROD

SOLAREDGE #SE33.3KUS 33.3kW INVERTER

1,000V MAXIMUM40A MAXIMUM OUTPUT, 480/277V

INVERTER PROVIDES ARC FAULTPROTECTION IN ACCORDANCE

WITH 2017 NEC 690.11

60A LOCKABLE NEMA 3R DISCONNECT. REFER TO FLOOR PLANS FOR EXACT LOCATION. PROVIDE PLACARD AS REQUIRED BY NEC

CONTRACTOR SHALL PROVIDE A TOTAL OF 84 MODULES. MODULES SHALL BE GROUPED INTO FOUR STRINGS WITH 21 MODULES PER STRING.

LG #LG350N1C-V5 MODULE WITH SOLAREDGE #P730 OPTIMIZER (PER 2 MODULES) IS BASIS OF DESIGN

2#10 CU PV WIRE, #6G IN 1'' CONDUIT RATED AT 90 DEGREE CELSIUS AND 1000VDC (PER STRING)

SOLAR BOS 100A 1000VDC ISOLATING DISCONNECT

COMBINER BOX

4#6, #6G, 1-1/4''C

4#6, #6G, 1-1/4''C

2#6 CU PV WIRE IN 1'' CONDUIT RATED AT 90 DEGREE CELSIUS AND 1000VDC (TYPICAL)

1

PV INTERCONNECTION AT SUPPLY SIDE LUGS AT AUTOMATIC TRANSFER SWITCH 'ATS-S'

3

3

3

ELECTRICAL CONTRACTOR SHALL INSTALL 3/4'' CONDUIT FROM INVERTER TO STATION I.T. ROOM FOR COMMUNICATIONS AND INTERNET ACCESS CAPABILITY

3

3

PV SYSTEM GENERAL NOTES

1. PV MODULE LAYOUT ON THIS SHEET IS SCHEMATIC ONLY, REFER TO ROOF PLAN FOR EXACT LOCATIONS.

2. ALL WORK SHALL BE NEC 2017 COMPLIANT AND SHALL COMPLY WITH ALL RELEVANT LOCAL, STATE, AND NATIONAL CODES AND STANDARDS.

3. ALL PV MODULES, INVERTERS, MODULE RACKING, METERS, ETC. SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR. CONTRACTOR SHALL INSTALL ALL CIRCUITS, WIRE MANAGEMENT, RACEWAYS, CONDUITS, AC PANELS, DISCONNECTS, AND ALL ASSOCIATED LABOR.

4. ALL PV MODULES AND INVERTER SHALL INCLUDE A RAPID SHUTDOWN FIRE SAFETY MODULE PER NEC 2017 SECTION 690.12.

5. STRING HOMERUNS SHALL BE UL LISTED WEATHERPROOF, UV SUNLIGHT RESISTANT, FINGERSAFE, PLUG-AND-RECEPTACLE CONNECTORS, MULTICONTACT TYPE MC4 OR EQUIVALENT LOCKING TYPE.

6. ELECTRICAL CONTRACTOR SHALL SET INVERTER TO MATCH ONCOR REQUIREMENTS FOR PV SYSTEMS.

7. ARRAY WIRING MUST BE PROTECTED FROM ACCESS BY QUALIFIED PERSONS.

8. SOLAR INTERCONNECTION SHALL BE ON OPPOSITE END OF PANEL FROM UTILITY INPUT.

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIP

TIO

N

SH

EE

T S

IZE

= A

RC

H D

24X

36

12

/19

/20

AD

DEN

DU

M #

1

22

/28

/20

AD

DEN

DU

M #

2

33

/6/2

0A

DD

EN

DU

M #

3

JANUARY 2020

18098

CIT

Y O

F W

AC

O

FIR

E S

TATI

ON

#6

/FIR

E

AD

MIN

ISTR

ATIO

N B

UIL

DIN

GW

AC

O, TX

., I CNSTNATLUSNOC

Dallas, Texas 75204Suite 635

4144 N. Central Expwy

Fort Worth, Texas 76102Suite 5001300 Summit Avenue

Office 817.878.4242www.summitmep.com

Office 214.420.9111

Texas BPE Registration # F-207 E4.0

03/06/2020

NTS2

SERVICE ENTRANCE GROUNDINGDETAIL

N.T.S.3

SINGLE LINE DIAGRAM - ADMINN.T.S.

4SINGLE LINE DIAGRAM - STATION

BKH

JSR

N.T.S.1

ATS GROUNDING DETAIL 4-POLE -SERVICE ENTRANCE

N.T.S.5

PV SYSTEM SINGLE LINE

1

RFP 2020-005 Fire Station #6 & Fire Administration Building

20 of 23

Page 21: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIP

TIO

N

SH

EE

T S

IZE

= A

RC

H D

24X

36

12

/19

/20

AD

DEN

DU

M #

1

22

/28

/20

AD

DEN

DU

M #

2

33

/6/2

0A

DD

EN

DU

M #

3

JANUARY 2020

18098

CIT

Y O

F W

AC

O

FIR

E S

TATI

ON

#6

/FIR

E

AD

MIN

ISTR

ATIO

N B

UIL

DIN

GW

AC

O, TX

., I CNSTNATLUSNOC

Dallas, Texas 75204Suite 635

4144 N. Central Expwy

Fort Worth, Texas 76102Suite 5001300 Summit Avenue

Office 817.878.4242www.summitmep.com

Office 214.420.9111

Texas BPE Registration # F-207 E4.2

03/06/2020

Schedule Notes:

Receptacle 55951 VA 58.94% 32975 VA Total Demand Amps: 100 A

Motor 19224 VA 100.00% 19224 VA Total Demand Load: 83 kVA

Lighting 6844 VA 125.00% 8554 VA Total Connt. Amps 125 A

Heating 17190 VA 100.00% 17190 VA Total Conn. Load: 104 kVA

Cooling 31095 VA 100.00% 31095 VA

Load Classification Connected Load Demand Factor Estimated... Panel Totals

Total Amps: 128 A 119 A 131 A

Total Load: 35 kVA 33 kVA 36 kVA

41 SPARE 20 1 -- 0 0 -- 1 20 SPARE 42

39 SPARE 20 1 -- 0 0 -- 1 20 SPARE 40

37 SPARE 20 1 -- 0 0 -- 1 20 SPARE 38

35 SPARE 20 1 -- 0 0 -- 1 20 SPARE 36

33 SPARE 20 1 -- 0 0 -- 1 20 SPARE 34

31 SPARE 20 1 -- 0 0 -- 1 20 SPARE 32

29 5543 0 -- 1 20 SPARE 30

27 5543 0 -- 1 20 SPARE 28

25

RTU-S3 30 3 20

5543 0 -- 1 20 SPARE 26

23 2217 2217 24

21 2217 2217 22

19

RTU-S1 15 3 8

2217 2217

8 3 15 RTU-S2

20

17 30216 833 18

15 28877 833 16

13

TC 125 3 108

30875 833

3 3 20 EF-10

14

11 SPARE 20 1 -- 0 0 -- 1 20 SPARE 12

9 SPARE 20 1 -- 0 0 -- 1 20 SPARE 10

7 Lighting 20 1 4 1197 0 -- 1 20 SPARE 8

5 Lighting 20 1 5 1376 3032 11 1 20 Lighting 6

3 SPARE 20 1 -- 0 0 -- 1 20 SPARE 4

1 Exterior Lighting 20 1 1 273 370 1 1 20 Exterior Lighting 2

CKT Circuit Description

BKR

(A) PLoad(A)

A B C Load(A) P

BKR

(A) Circuit DescriptionCKT

Enclosure: NEMA 1 Wires: 4 Mains Rating: 200 A

Supply From: Phases: 3 Mains Type: MCB

Mounting: SURFACE Volts: 480/277 Wye A.I.C. Rating: 14,000 AIC

Branch Panel: HS

Schedule Notes:

Receptacle 55951 VA 58.94% 32975 VA Total Demand Amps: 186 A

Motor 16742 VA 100.00% 16742 VA Total Demand Load: 67 kVA

Lighting 572 VA 125.00% 715 VA Total Connt. Amps 250 A

Heating 17190 VA 100.00% 17190 VA Total Conn. Load: 90 kVA

Cooling 1165 VA 100.00% 1165 VA

Load Classification Connected Load Demand Factor Estimated... Panel Totals

Total Amps: 259 A 241 A 254 A

Total Load: 31 kVA 29 kVA 30 kVA

83 SPARE 20 1 -- 0 0 -- 1 20 SPARE 84

81 SPARE 20 1 -- 0 0 -- 1 20 SPARE 82

79 SPARE 20 1 -- 0 0 -- 1 20 SPARE 80

77 SPARE 20 1 -- 0 0 -- 1 20 SPARE 78

75 SPARE 20 1 -- 0 0 -- 1 20 SPARE 76

73 SPARE 20 1 -- 0 0 -- 1 20 SPARE 74

71 SPARE 20 1 -- 0 0 -- 1 20 SPARE 72

69 Receptacle 20 1 8 1000 0 -- 1 20 SPARE 70

67 Receptacle 20 1 8 1000 0 -- 1 20 SPARE 68

65 Receptacle 20 1 8 1000 0 -- 1 20 SPARE 66

63 SPARE 20 1 -- 0 0 -- 1 20 SPARE 64

61 SPARE 20 1 -- 0 0 -- 1 20 SPARE 62

59 Receptacle 20 1 8 1000 0 -- 1 20 SPARE 60

57 Receptacle 20 1 4 500 0 -- 1 20 SPARE 58

55 Receptacle 20 1 4 500 0 -- 1 20 SPARE 56

53 Strobe Lights 20 1 0 48 0 -- 1 20 SPARE 54

51 Strobe Lights 20 1 1 100 0 -- 1 20 SPARE 52

49 Receptacle 20 1 4 500 0 -- 1 20 SPARE 50

47 Gate Access Control 20 1 5 600 0 -- 1 20 SPARE 48

45 CP2 20 1 3 400 15581 46

43 WH2 20 1 2 240 17525 44

41 Garbage Disposal 20 1 8 1000 17248

140 3 175 LD

42

39 Receptacle 20 1 8 1000 567 40

37 Receptacle 20 1 4 500 567 38

35 CH-1 20 1 6 750 567

5 3 20 Motorized Door

36

33 WF-1, WF-2 20 1 4 440 1000 8 1 20 FACP 34

31 Receptacle 20 1 6 720 1800 15 1 30 KH-1 32

29 Receptacle 20 1 8 1000 1500 13 1 20 Dishwasher 30

27 Receptacle 20 1 8 1000 1500 13 1 20 Refrigerator 28

25 Receptacle 20 1 8 1000 1500 13 1 20 Refrigerator 26

23 Refrigerator 20 1 13 1500 2500 24

21 Range 20 1 15 1800 2500 22

19 Battery Charger 20 1 8 1000 2500

21 3 40 Block Heater

20

17 Receptacle 20 1 6 720 1000 8 1 20 Receptacle 18

15 Receptacle 20 1 5 540 1000 8 1 20 Receptacle 16

13 Receptacle 20 1 6 720 1000 8 1 20 Receptacle 14

11 Receptacle 20 1 8 1000 720 6 1 20 Receptacle 12

9 SPARE 20 1 -- 0 720 6 1 20 Receptacle 10

7 Receptacle 20 1 6 720 900 8 1 20 Receptacle 8

5 Receptacle, EF-12 20 1 5 612 360 3 1 20 Receptacle 6

3 EWC 20 1 4 500 1080 9 1 20 Receptacle 4

1 Receptacle 20 1 6 720 720 6 1 20 Receptacle 2

CKT Circuit Description

BKR

(A) PLoad(A)

A B C Load(A) P

BKR

(A) Circuit DescriptionCKT

Enclosure: NEMA 1 Wires: 4 Mains Rating: 300 A

Supply From: TC Phases: 3 Mains Type: MCB

Mounting: SURFACE Volts: 120/208 Wye A.I.C. Rating: 10,000 AIC

Branch Panel: LC

Schedule Notes:

Receptacle 22726 VA 72.00% 16363 VA Total Demand Amps: 122 A

Motor 11396 VA 100.00% 11396 VA Total Demand Load: 44 kVA

Lighting 448 VA 125.00% 560 VA Total Connt. Amps 140 A

Heating 16200 VA 100.00% 16200 VA Total Conn. Load: 50 kVA

Cooling 1165 VA 100.00% 1165 VA

Load Classification Connected Load Demand Factor Estimated... Panel Totals

Total Amps: 146 A 148 A 130 A

Total Load: 17 kVA 18 kVA 16 kVA

83 SPARE 20 1 -- 0 0 -- 1 20 SPARE 84

81 SPARE 20 1 -- 0 0 -- 1 20 SPARE 82

79 SPARE 20 1 -- 0 0 -- 1 20 SPARE 80

77 SPARE 20 1 -- 0 0 -- 1 20 SPARE 78

75 SPARE 20 1 -- 0 0 -- 1 20 SPARE 76

73 SPARE 20 1 -- 0 0 -- 1 20 SPARE 74

71 SPARE 20 1 -- 0 0 -- 1 20 SPARE 72

69 SPARE 20 1 -- 0 0 -- 1 20 SPARE 70

67 SPARE 20 1 -- 0 0 -- 1 20 SPARE 68

65 2642 1057 66

63 2642 1057 64

61

Extractor 30 3 22

2642 1057

9 3 20 TEF-1

62

59 567 567 60

57 567 567 58

55

Motorized Door 20 3 5

567 567

5 3 20 Motorized Door

56

53 567 567 54

51 567 567 52

49

Motorized Door 20 3 5

567 567

5 3 20 Motorized Door

50

47 Receptacle 20 1 4 500 540 5 1 20 Receptacle 48

45 SPARE 20 1 -- 0 0 -- 1 20 SPARE 46

43 SPARE 20 1 -- 0 0 -- 1 20 SPARE 44

41 Receptacle 20 1 3 360 500 4 1 20 Receptacle 42

39 Receptacle 20 1 5 540 0 -- 1 20 SPARE 40

37 Receptacle 20 1 4 500 540 5 1 20 Receptacle 38

35 UH-4 15 1 3 300 360 3 1 20 Receptacle 36

33 Receptacle 20 1 4 500 500 4 1 20 Receptacle 34

31 Receptacle 20 1 4 500 583 32

29 Motorized Gate 35 1 17 2000 5836 2 15 CU-3

30

27 Receptacle 20 1 3 360 360 3 1 20 Receptacle 28

25 Receptacle 20 1 3 360 360 3 1 20 Receptacle 26

23 Dryer 20 1 15 1800 1800 15 1 20 Washing Machine 24

21 3750 300 3 1 15 UH-3 22

19CH-3 50 2 36

3750 300 3 1 15 UH-2 20

17 Receptacle 20 1 6 720 1400 12 1 20 Ice Machine 18

15 Receptacle 20 1 8 900 3750 16

13 Receptacle 20 1 6 720 375036 2 50 CH-2

14

11 UH-1 15 1 3 300 500 4 1 20 Receptacle 12

9 Ceiling Fans 20 1 3 300 440 4 1 20 WF-3, WF-4 10

7 Receptacle 20 1 2 180 305 3 1 20 EF-11 8

5 EF-7, EF-13 20 1 1 140 180 2 1 20 HOA Switch 6

3 Lighting 20 1 1 100 155 1 1 20 EF-8, EF-9 4

1 Lighting 20 1 0 48 152 1 1 20 EF-4, EF-5 2

CKT Circuit Description

BKR

(A) PLoad(A)

A B C Load(A) P

BKR

(A) Circuit DescriptionCKT

Enclosure: NEMA 1 Wires: 4 Mains Rating: 175 A

Supply From: LC Phases: 3 Mains Type: MLO

Mounting: RECESSED Volts: 120/208 Wye A.I.C. Rating: 10,000 AIC

Branch Panel: LD

BKH

JSR

1

3

RFP 2020-005 Fire Station #6 & Fire Administration Building

21 of 23

Page 22: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

STRING WIRING ELEVATION DETAIL

CONDUIT (3" MAX) SECURED TO RACKING TO INVERTERS

PVC SCH80 CONDUIT FOR INTER-ROW JUMPERS

STRING HOMERUNS SECURED TO RACKING USING SUNBUNDLERS (TYP). ENSURE THAT DC HOMERUNS DO NOT TOUCH THE ROOF.

CONDUIT SECURED TO RACKING (TYP)

STRING HOMERUN BUNDLES (TYP)

STRING WIRING RAPID SHUDTOWN MODULE DETAIL

NOTES:1. WIRE CLIPS (BURNDY #ACC-PV OR EQUAL) SHALL BE MOUNTED ON THE MODULE FRAME OR RACKING RAIL. USE POSITION CLIPS TO REMOVE SLACK FORM THE

WIRE AND KEEP CONNECTOR AND WIRING UP AGAINST THE MODULE. DO NOT OVERSTRESS THE WIRING AND CONNECTORS BY PULLING TOO TIGHT.2. STRING WIRE BUNDLES SHALL BE SECURED TO MODULE FRAMES AND BALLAST RAILS USING SUNBUNDLERS.3. INTER-ROW WIRING SHALL BE ROUTED THROUGH PVC SCH80 OR RMC WITH BELLE ENDS.4. ALL COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.5. EQUIMENT GROUNDING CONDUCTORS FOR THE PV ARRAY AND RACKING SYSTEM (SUPPORT STRUCTURE) SHALL BE CONTAINED IN THE SAME RACEWAY AND

ALONG THE SAME ROUTE AS THE PV CIRCUIT CONDUCTORS IN ACCORDANCE WITH NEC 690.43(C).6. PV MODULE FRAMES, ELECTRICAL EQUIPMENT, CONDUIT ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH NEC 250.134 AND 250.136(A).7. MODULE RACKING SYSTEM SHALL HAVE IDENTIFIED BONDING JUMPERS BETWEEN SEPARATE METAL SECTIONS IN ACCORDANCE WITH NEC 690.43(B).8. DETAIL IS SCHEMATIC IN NATURE, REFER TO RACKING PLAN FOR MOUNTING ANGLES OF MODULES.

INVERTER

SOLAREDGE #P730, INSTALLED BY CONTRACTOR ON REAR OF EVERY (2)MODULES.

MODULES

STRING WIRING

INSTALL BONDING JUMPERS BETWEEN SEPARATE SECTIONS OF METAL RACKING SYSTEM UNLESS RACKING SYSTEM CONNECTIONS ARE IDENTIFIED AND LISTED FOR EQUIPMENT BONDING. RACKING SYSTEM SHALL BE CONNECTED TO EQUIPMENT GROUNDING CONDUCTOR.

STRING WIRING NOTES:1. ALL COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.2. EQUIMENT GROUNDING CONDUCTORS FOR THE PV ARRAY AND RACKING SYSTEM (SUPPORT

STRUCTURE) SHALL BE CONTAINED IN THE SAME RACEWAY AND ALONG THE SAME ROUTE AS THE PV CIRCUIT CONDUCTORS IN ACCORDANCE WITH NEC 690.43(C).

3. PV MODULE FRAMES, ELECTRICAL EQUIPMENT, CONDUIT ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH NEC 250.134 AND 250.136(A).

4. MODULE RACKING SYSTEM SHALL HAVE IDENTIFIED BONDING JUMPERS BETWEEN SEPARATE METAL SECTIONS IN ACCORDANCE WITH NEC 690.43(B).

5. ONLY MC4 CONNECTORS SHALL BE USED. MC4 "COMPATIBLE" CONNECTORS ARE NOT ACCEPTABLE.

USE AMPHENOL CONNECTORS AT INVERTERS. CONTRACTOR SHALL ONLY USE OEM AMPHENOL CRIMPERS FOR TERMINATIONS.

USE MC4 CONNECTORS FOR STRING CONNECTIONS BETWEEN MODULES. "MC4 COMPATIBLE" CONNECTORS ARE NOT ACCEPTABLE. CONTRACTOR SHALL ONLY USE OEM MC4 CRIMPERS FOR TERMINATIONS.CONTRACTOR SHALL ONLY USE OEM AMPHENOL CRIMPERS FOR TERMINATIONS.

1. PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY:IN ACCORDANCE WITH NFPA 1 11.12.2.1.1.1.1, THE LABEL "EMERGENCY RESPONDER: THIS SOLAR PV SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN. TURN RAPID SHUTDOWN SWITCH TO THE OFF POSITION TO SHUT DOWN ENTIRE PV SYSTEM."• LABEL SHALL BE PERMANENTLY AFFIXED TO EACH SWITCHBOARDS PV1 AND PV3. • LABEL SHALL BE REFLECIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A MINIMUM HEIGHT OF 3/8", IN

WHITE ON A RED BACKGROUND.• LABEL SHALL INCLUDE SIMPLE DIAGRAM OF A BUILDING WITH A ROOF. DIAGRAM SECTIONS IN RED SHALL

SIGNIFY SECTIONS OF THE PV SYSTEM THAT ARE NOT SHUT DOWN WHEN THE RAPID SHUTDOWN SWITCH IS OPERATED. SECTIONS OF THE DIAGRAM IN GREEN SHALL SIGNIFY SECTIONS OF THE PV SYSTEM THAT ARE SHUT DOWN WHEN THE RAPID SHUTDOWN SWITCH IS OPERATED.

• THE RAPID SHUTDOWN SWITCH SHALL HAVE A LABEL LOCATED ON OR NO MORE THAN 3' FROM THE SWITCH THAT INCLUDES THE FOLLOWING WORDS: "RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM". THIS LABEL SHALL BE REFLECTIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A MINIMUM HEIGH OF 3/8", IN WHITE ON RED BACKGROUND.

• EACH PV SYSTEM DISCONNECTING MEANS SHALL BE PERMANENTLY MARKED TO IDENTIFY IT AS A PV SYSTEM DISCONNECT AND SHALL INDICATE WHETHER IN THE OPEN OR CLOSED POSITION.

2. MARKING FOR DC PV SOURCE AND DC OUTPUT CIRCUITS ON OR INSIDE A BUILDING:IN ACCORDANCE WITH NFPA 1 11.12.2.1.3, THE FOLLOWING WIRING METHODS AND ENCLOSURES THAT CONTAIN PV POWER SOURCE CONDUCTORS SHALL BE MARKED WITH THE WORDS "WARNING: PHOTOVOLTAIC POWER SOURCE" BY MEANS OF PERMANENTLY AFFIXED LABELS OR OTHER APPROVED PERMANENT MARKING:• EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS• COVERS OR ENCLOSURES OF PULL BOXES AND JUNCTION BOXES• CONDUIT BODIES IN WHICH ANY OF THE AVAILABLE CONDUIT OPENINGS ARE UNUSED

3. MARKING LOCATIONS AND METHODSIN ACCORDANCE WITH NFPA 11.12.2.1.3.1, THE LABELS OR MARKINGS SHALL BE VISIBLE AFTER INSTALLATION. THE LABELS SHALL BE REFLECTIVE AND SHALL HAVE ALL LETTERS CAPITALIZE WITH A MINIMUM HEIGH OF 3/8" ON WHITE ON RED BACKGROUND, AND SHALL REFERENCE CODE SECTION NFPA 1 11.12.2.1.3. MATERIAL SHALL BE REFLECTIVE AND SUITABLE FOR THE ENVIRONMENT. PV POWER CIRCUIT LABELS SHALL APPEAR ON EVERY SECTION OF THE WIRING SYSTEM THAT IS SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. SPACING BEETWEEN LABELS OR MARKINGS , OR BETWEEN A LABEL AND A MARKING, SHALL NOT BE MORE THAN 10'. LABELS REQUIRED BY THIS SECTION SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE THEY ARE INSTALLED.

NFPA 1 REQUIRED LABELS

1. MAIN SERVICE DISCONNECT - THE LABEL SHALL SHOW BOTH LOCATIONS OF SERVICES ON SITE PLAN.2. INVERTER DISCONNECTS - THE LABEL "PHOTOVOLTAIC DISCONNECT" SHALL BE PERMANENTLY AFFIXED TO

EACH AC COMBINER BOX WHERE SERVING THE INVERTERS. LABEL SHALL BE CONTRASTING COLORS CAPITAL LETTERS AT LEAST 3/8" HIGH IN NONSERIF FONT. MATERIAL SHALL BE REFLECTIVE AND SUITABLE FOR THE ENVIRONMENT.

3. SOLAR RACEWAYS - THE LABEL "WARNING: PHOTOVOLTAIC POWER SOURCE" SHALL BE PERMANENTLY AFFIXED TO EACH AC COMBINER BOXES. LABEL SHALL BE CONTRASTING COLORS CAPITAL LETTERS AT LEAST 3/8" HIGH IN NONSERIF FONT. MATERIAL SHALL BE REFLECTIVE AND SUITABLE FOR THE ENVIRONMENT. PROVIDE LABELS NO GREATER THAN 10 FEET APART ON ALL EXPOSED RACEWAYS, CABLE TRAYS, PULL BOXES, AND JUNCTION BOXES.

ADDITIONAL REQUIRED LABELS

1. CONTRACTOR SHALL PROVIDE AND INSTALL ALL SYSTEM LABELING AS REQUIRED BY CODE AND AS DETAILED IN PLANS AND SPECIFICATIONS.

2. CLEARLY LABEL ALL CIRCUIT BREAKERS IN SWITCHBOARDS. THE LABEL SHALL INDICATE THE NAME OF THE DEVICE IT SERVES.

3. NAMEPLATE LABELS SHALL BE ENGRAVED MELAMINE TAGS WITH MINIMUM 1/2" LETTERS.4. PV SOURCE CIRCUITS, PV OUTPUT CIRCUITS AND INVERTER INPUT AND OUTPUT CIRCUITS SHALL BE

IDENTIFIED AT ALL POINTS OF TERMINATION, CONNECTION, AND SPLICES.A. STRING HOMERUNS AT ARRAYB. DC INPUT TERMINALS OF COMBINER BOXC. DC OUTPUT TERMINALS OF COMBINER BOXD. DC INPUT TERMINAL OF INVERTERE. AC OUTPUT TERMINALS OF INVERTERF. AC INPUT & OUTPUT TERMINALS OF EACH SUCCESSIVE DEVICE (WHERE APPLICABLE)

GENERAL NOTES FOR LABELING

1. FORMAT 1: ENGRAVED MELAMINE, WHITE TEXT ON RED BACKGROUND, TITLES MIN. 3/8" ALL OTHER TEXT 5/32". 2. FORMAT 2: ENGRAVED MELAMINE, BLACK TEXT ON WHITE BACKGROUNDS, MIN. 3/8" TEXT.3. FORMAT 3: REFLECTIVE UV RATED LABEL. RED BACKGROUND WITH WHITE CAPITAL LETTERS AT LEAST 3/8"

TALL. LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE INSTALLED.4. FORMAT 4: ENGRAVED MELAMINE, WHITE TEXT ON RED BACKGROUNDS, TITLES MI. 5/32" ALL OTHER TEXT 3/32".

LABEL FORMAT NOTES

INSTALL ON OR WITHIN 3' OF RAPID SHUTDOWN INTIATION DEVICE AND SERVICE DISCONNECTING MEANS. FOR USE ON PV SYSTEMS THAT SHUTDOWN THE ARRAY AND

CONDUCTORS LEAVING ARRAY. TITLE TEXT SHALL BE 3/8" BLACK TEXT ON RED BACKGROUND. ALL OTHER TEXT SHALL BE 3/16" BLACK TEXT ON WHITE BACKGROUND.

SHALL BE PERMANENTLY AFFIXED TO ALL DC EXPOSED RACEWAYS, CABLE TRAYS, PULL BOXES, AND JUNCTION BOXES. LABELS SHALL

BE SPACED NO AGREATER THAN 10' APART.

OUTDOOR RATED STICKER MOUNTED ON ALL OUTDOOR AC AND DC EQUIPMENT

PER NFPA1 11.12.2.1.5, INSTALL ON MAIN PV SYSTEM DISCONNECTS. ENGRAVED MELAMINE, WHITE TEXT ON RED BACKGROUNDS, TITLES

MIN. 5/32", ALL OTHER TEXT 3/32"

SHALL BE PERMANENTLY AFFIXED TO RAPID SHUTDOWN SWITCH. REFLECTIVE UV RATED LABEL. RED BACKGROUND WITH CAPITAL

LETTERS AT LEAST 3/8" TALL. LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE INSTALLED.

INSTALL ON MAIN PV SYSTEM DISCONNECTS. ENGRAVED MELAMINE, WHITE TEXT ON RED BACKGROUND, TITLES MIN

3/8", ALL OTHER TEXT 5/32", FILL OUT CURRENT AND VOLTAGE INFORMATION

INSTALL ON EVERY INVERTER. ENGRAVED MELAMINE, WHITE TEXT ON RED BACKGROUND, TITLES MIN 3/8",

ALL OTHER TEXT 5/32", FILL OUT CURRENT AND NOMINAL INFORMATION

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIP

TIO

N

SH

EE

T S

IZE

= A

RC

H D

24X

36

12

/19

/20

AD

DEN

DU

M #

1

22

/28

/20

AD

DEN

DU

M #

2

33

/6/2

0A

DD

EN

DU

M #

3

JANUARY 2020

18098

CIT

Y O

F W

AC

O

FIR

E S

TATI

ON

#6

/FIR

E

AD

MIN

ISTR

ATIO

N B

UIL

DIN

GW

AC

O, TX

., I CNSTNATLUSNOC

Dallas, Texas 75204Suite 635

4144 N. Central Expwy

Fort Worth, Texas 76102Suite 5001300 Summit Avenue

Office 817.878.4242www.summitmep.com

Office 214.420.9111

Texas BPE Registration # F-207 E4.3

03/06/2020

BKH

JSR

3

RFP 2020-005 Fire Station #6 & Fire Administration Building

22 of 23

Page 23: Addendum No: 3...Maintain field sample panels during construction in an undisturbed condition as a standard for judging the completed Work. 3. Demolish and remove field sample panels

TABLE 250.122OVERCURRENT DEVICE

CIRCUIT NOT EXCEEDING

(AMPERES)

15

20

60

TABLE 250.102(C)(1)

SIZE OF LARGEST UNGROUNDED CONDUCTOR OR

EQUIVALENT AREA FOR PARALLEL CONDUCTORS

(AWG/KCMIL)

COPPER

2 OR SMALLER

1 OR 1/0

2 OR 2/0

OVER 3/0 THROUGH 350

OVER 350 THROUGH 600

OVER 600 THROUGH 1100

OVER 1100

SIZE OF GROUNDED CONDUCTOR OR BONDING

JUMPER (AWG/KCMIL)

COPPER

8

6

4

2

1/0

2/0

REFER TO NOTES IN NEC TABLE 250.102(C)(1)

100

200

300

400

500

600

800

1000

1200

1600

2000

2500

3000

4000

COPPER

14

12

10

8

6

4

3

2

1

1/0

2/0

3/0

4/0

250

350

400

500

SIZE (AWG OR KCMIL)

EXISTING SERVICE PANEL

LOAD SIDE EQUIPMENT BONDING JUMPERSUPPLY SIDE BONDING JUMPERS (SSBJ)

BONDING BUSHING GROUNDING DETAILGROUND LUG DETAIL MYER'S HUB GROUNDING DETAIL

PULL BOX/TROUGH GROUNDING DETAIL

TYPICAL GROUNDING DETAIL

CU EGC, E2-1 FOR SIZE, SIZED PER NEC 250.122

CU EGC, E2-1 FOR SIZE, SIZED PER NEC 250.122

EGC:#10 CU WHERE PROTECTED FROM PHYSICAL DAMAGE. #6 CU IN OTHER LOCATIONS PER NEC 250.120(C) GREEN THWN-2 (NO BARE). INSTALL DEDICATED GROUND TO EACH STRING.

TYCO #2106831-1 GROUND LUG, AT LEAST ONE LUG PER PHYSICAL SUB-ARRAY. REFER TO PANELCLAW FR INSTALLATION MANUAL.

MODULES & RACKING BONDED VIA INTEGRATED GROUNDING. SOLAR MODULE CLAW.

REPRESENTATIVE CONDUCTORS

BONDING BUSHING PER DETAILS ON THIS

DRAWING

ENCLOSURE GROUND BAR

CONDUIT TO PANELBOARD

LOCK NUT

COMPRESSION FITTING

CONDUIT

ENCLOSURE WALL

REPRESENTATIVE CONDUCTORS

LOCK NUT

COMPRESSION FITTING

CONDUIT

ENCLOSURE WALL

CONTINUOUS BONDING JUMPER, STRIP INSULATION AT LUG.

ALTERNATIVELY, THE EGC MAY BE USED (AS SHOWN).

GROUND LUGS USED OUTDOORS MUST BE

WET RATED

GROUNDING BUSHING WITH LAY-IN LUG

TIN PLATED COPPER LUG, LAY IN TYPE RATED FOR DIRECT BURIAL

ILSCO GBL-4DBT OR EQUIV.

WASHERS BETWEEN BOLT HEAD AND LUG

STAR WASHERS BETWEEN LUG AND FRAME

BARE TINNED COPPER WIRE CONNECTION SIZED PER NEC TABLE 250.122

PV METAL FRAME

LAY IN LUGS ATTACHED USING THE FOLLOWING STAINLESS STEEL HARDWARE:BOLT: 1"L, #10-32, 5/16" HEX HEADNUT: #10, 5/16" HEX HEAD STAR LOCK WASHERS

SOLAR AC DISCONNECT

SWITCH

INVERTER

PV MODULES& RAILS GROUNDED

PER NEC 690.43

CONDUIT TO INVERTERS OR OTHER EQUIPMENT

CONTINUOUS GROUND

NEC 250.102(C)(1)SSBJ IS SIZED PER TABLE

250.102(C)(1) BASED ON THE SIZE OF PHASE

CONDUCTORS IN EACH INDIVIDUAL CONDUIT

NEC 250.102(C)(2)SSBJ IS SIZED PER TABLE 250.102(C)(1) BASED ON THE COMBINED AREA OF PARALLEL PHASE CONDUCTOR

INDIVIDUAL COMBINED

A) FOR CONCENTRIC KNOCKOUTS, USE BONDING JUMPERS AS FOLLOWS:

FOR PARALLEL FEEDERS - NEC 250.102(D)EQUIPMENT BONDING JUMPER IS SIZED PER TABLE 250.122, REGARDLESS IF COMBINED OR INDIVIDUAL BONDING JUMPERS ARE USED

1) INDIVIDUAL

2) COMBINED

B) FOR NON-CONCENTRIC KNOCKOUTS, THE FOLLOWING METHODS SHALL BE PERMITTED (PER NEC 250.97)

1. THREADLESS COUPLINGS AND CONNECTORS FOR CABLES WITH METAL SHEATS2. TWO LOCKNUTS, ON RIGID METAL CONDUIT OR INTERMEDIATE METAL CONDUIT, ONE

INSIDE AND ONE OUTSIDE OF BOXES AND CABINETS3. FITTINGS WITH SHOLDERS THAT SEAT FIRMLY AGAINST THE BOX OR CABINET, SUCH AS

ELECTRICAL METALLIC TUBING CONNECTORS, FLEXIBLE METAL CONDUIT CONNECTORS4. LISTED FITTINGS (SUCH AS METERS HUB)

EXISTING GROUNDING ELECTRODES

TO UTILITY TRANSFORMER

GENERAL NOTES:1. ALL CONDUCTORS SHALL BE COPPER, ALUMINUM WILL NOT BE

ALLOWED, PER OWNER'S REQUIREMENT.2. ALL ENCLOSURES HOUSING GROUNDING ELECTRODE

CONDUCTORS SHALL COMPLY WITH NEC 250.64(E):

NEC 250.64(E) - ENCLOSURES FOR GROUNDING ELECTRODE CONDUCTORSFERROUS METAL ENCLOSURES FOR GROUNDING ELECTRODE CONDUCTORS SHALL BE ELECTRICALLY CONTINUOUS FROM THE POINT OF ATTACHMENT TO CABINETS OR EQUIPMENT TO THE GROIUNDING ELECTRODE AND SHALL BE SECURELY FASTENED TO THE GROUND CLAMP OR FITTING. NONFERROUS METAL ENCLOSURES SHALL NOT BE REQUIRED TO BE ELECTRICALLY CONTINUOUS. FERROUS METAL ENCLOSURES THAT ARE NOT PHYSICALLY CONTINUOUS FROM CABINETS OR EQUIPMENT TO THE GROUNDING ELECTRODE SHALL BE MADE ELECTRICALLY CONTINUOUS BY BONDING EACH END OF THE RACEWAY OR ENCLOSURE TO THE GROUNDING ELECTRODE CONDUCTOR. BONDING METHODS IN COMPLIANCE WITH 250.92(B) FOR INSTALLATIONS AT SERVICE EQUIPMENT LOCATIONS AND WITH 250.92(B)(2) THROUGH (B)(4) FOR OTHER THAN SERVICE EQUIPMENT LOCATIONS SHALL APPLY AT EACH END AND TO ALL INTERVENING FERROUS RACEWAYS, BOXES, AND ENCLOSURES BETWEEN THE CABINETS OR EQUIPMENT AND THE GROUDNING ELECTRODE. THE BONDING JUMPER FOR A GROUNDING ELECTRODE CONDUCTOR.RACEWAY SHALL NOT BE USED AS A GROUNDING ELECTRODE CONDUCTOR OR EQUIPMENT GROUNDING CONDUCTOR.

Drafted By:

Checked By:

Date Drawn:

Project #:

REV

#D

ATE

REV

ISIO

N D

ESC

RIP

TIO

N

SH

EE

T S

IZE

= A

RC

H D

24X

36

12

/19

/20

AD

DEN

DU

M #

1

22

/28

/20

AD

DEN

DU

M #

2

33

/6/2

0A

DD

EN

DU

M #

3

JANUARY 2020

18098

CIT

Y O

F W

AC

O

FIR

E S

TATI

ON

#6

/FIR

E

AD

MIN

ISTR

ATIO

N B

UIL

DIN

GW

AC

O, TX

., I CNSTNATLUSNOC

Dallas, Texas 75204Suite 635

4144 N. Central Expwy

Fort Worth, Texas 76102Suite 5001300 Summit Avenue

Office 817.878.4242www.summitmep.com

Office 214.420.9111

Texas BPE Registration # F-207 E4.4

03/06/2020

BKH

JSR

3

12" = 1'-0"1

GROUNDING DETAILS

RFP 2020-005 Fire Station #6 & Fire Administration Building