acodkplantsig bentley update 20110504

Upload: quiteno-alessandro

Post on 05-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    1/48

       ©

        2   0   1   1

       B  e  n   t   l  e  y   S  y  s   t  e  m  s ,

       I  n  c  o  r  p  o  r  a   t  e   d

    Bentley Plant SIG, May 4th 2011Update from Bentley

    Inge Olerud, Industry Sales Director 

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    2/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    2 | WWW.BENTLEY.COM

    •  AutoPLANT V8i (SELECTseries 3) – 64 bit version

    •  AssetWise

    • OpenPlant SELECTseries 2 Refresh

    Agenda

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    3/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    3 | WWW.BENTLEY.COM

    Bentley Revenues

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    4/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    4 | WWW.BENTLEY.COM

    Plant Solutions in the Lifecycle

    OpenPlant

    ProjectWise Integration & Collaboration Servers

    ProjectWise/ AssetWise [Enterprise Bridge (eB)]

    ata

    Management

    Bentley Navigator Interference Detection

    OpenPlant

    Analyzeonceptualize Design Construct Handover

    Operate &

    Maintain

    AXSYS.Integrity

    I&W

    CloudWorx

    AutoPLANT

    PlantSpace

    AXSYS.Process

    PlantWise

    Process

    Data Manager

    Data Sheets

    Visualization Bentley Navigator

    prom s•

    I&W

    Electrical

    Instrumentation

    STAAD.Pro / SACS

    ProConcrete

    ProSteel

    Structural

    Power Civil

    Civil/

    Architectural

    AutoPIPE

    AutoPLANT

    PlantSpace

    Isometrics

    Process

    Mechanical

    Piping

    ConstructSim

    InRoads/ OnSite

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    5/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    5 | WWW.BENTLEY.COM

    •  AutoPLANT V8i (SELECTseries 3) – 64 bit version

    •  AssetWise

    • OpenPlant SELECTseries 2 Refresh

    Agenda

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    6/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    6 | WWW.BENTLEY.COM

     AutoPLANT P&ID

     AutoPLANT PDW

    ProjectDatabase

    Bentley Navigator 

    Bentley ProSteel

    Bentley AutoPIPEBentley Data Manager  Bentley I&W

    Bentley Vision

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    7/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    7 | WWW.BENTLEY.COM

    • Support for: –  AutoCAD 64-bit

    •  AutoCAD 2010 & AutoCAD 2011

     – Windows 7 64-bit

     – MS Office 2010 Professional• 32-bit & 64-bit

     – MS SQL Server 2008 R2

     – ORACLE 11g Release 2

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    8/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t

       e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    8 | WWW.BENTLEY.COM

    • Support for: – Bentley ProjectWise V8i (SELECTseries 2 & 3)

     – Bentley i-model Composer V8i (SELECTseries 2 & 3)

     – Bentley Navigator V8i (SELECTseries 2 & 3)

     – Bentley View V8i (SELECTseries 2) – Bentley ProSteel V8i (SELECTseries 3)

     – Bentley AutoPIPE V8i (SELECTseries 1 & 2)

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    9/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t

       e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    9 | WWW.BENTLEY.COM

    • New stuff: – Split Pipe command for PDW

     – Ribbon Menus and Tool Palettes for PDW and P&ID

     – i-model creation from within PDW

    • Based on OpenPlant ISO 15926 Schema

     – “1D” List Type data publishable to iRING

     – Data Manager and I&W reports publishable to ProjectWise

    AutoPLANT V8i (SELECTseries 3)

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Splitpipe%20Demo%202011.wmvhttp://localhost/var/www/apps/conversion/tmp/scratch_7/Splitpipe%20Demo%202011.wmv

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    10/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    10 | WWW.BENTLEY.COM

    • Ribbon Menus and Tool Palettes for PDW

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    11/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    11 | WWW.BENTLEY.COM

    • Ribbon Menus and Tool Palettes for P&ID

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    12/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    12 | WWW.BENTLEY.COM

    • i-model Creation from within PDW – Based on ISO 15926 OpenPlant Schema

    • “ An i-model is an immutable container for rich multi-discipline information published from a known source, ata known time, at a known state”. –  A read-only published rendition of the model

     –  A portable, self-describing, rich data file

     –  An interoperable deliverable for change management

     – Bentley’s currency of information exchange

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    13/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    13 | WWW.BENTLEY.COM

    AutoPLANT V8i (SELECTseries 3)

    Large EPC or OO

    OpenPlant Schema

    {ISO 15926}

    Project ABC

    Data

    Project ABC

    Data

    Small/Medium EPC

    • First part of AutoPLANT & OpenPlant interoperability

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    14/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    14 | WWW.BENTLEY.COM

    AutoPLANT V8i (SELECTseries 3)

    • When to use an i-model – Exchanging project information and data

    • Both Bentley and 3rd Party

     – Dynamic review at project milestones

     – For change management – For reuse of project data

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    15/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    15 | WWW.BENTLEY.COM

    AutoPLANT V8i (SELECTseries 3)

    • “1D” List Type data publishable to iRING – Line List, Equipment Lists, Valve Lists, Instrument Lists etc.

    • Publishable from Data Manager and I&W – In ISO 15926 format

    • ISO 15926 Realtime Interoperability Network Grid

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    16/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    16 | WWW.BENTLEY.COM

    • iRING objectives are to deploy an ISO 15926, opensource infrastructure on the internet to enable: – The use of ISO 15926 in modelling business information

     – To provide publically available tools to map legacy systems

    to ISO 15926 – Data exchange between companies using ISO 15926 via the

    internet

    • Bentley are an active partner in this undertaking

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    17/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    17 | WWW.BENTLEY.COM

    • Targeted workflow - Sharing I/O data with DCS vendors – Bentley Systems & Emerson Process plan to work together 

     – EPC publishes I/O data to the iRING

     – DCS vendor consumes, processes & publishes back to

    iRING – EPC consumes the data to complete deliverables

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    18/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    18 | WWW.BENTLEY.COM

    • Sharing I/O data with a control system vendor 

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    19/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    19 | WWW.BENTLEY.COM

    • “Acme” = EPC• “Emca” = Control System Vendor 

    I/O Data

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    20/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    20 | WWW.BENTLEY.COM

    • Loop deliverable now complete

    AutoPLANT V8i (SELECTseries 3)

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    21/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    21 | WWW.BENTLEY.COM

    AutoPLANT V8i (SELECTseries 3)

    • Data Manager and I&W reports publishable toProjectWise

    Project

    Database

    Data Manager/I&W ProjectWise

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    22/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    22 | WWW.BENTLEY.COM

    •  AutoPLANT V8i (SELECTseries 3) – 64 bit version

    •  AssetWise

    • OpenPlant SELECTseries 2 Refresh

    Agenda

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    23/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    23 | WWW.BENTLEY.COM

    Bentley’s SolutionsSpan Project/Infrastructure Asset Operations

    Asset PerformanceManagement

    (Operate & Maintain)

    Project PerformanceManagement(Design & Build)

    Bringing new assets on streamwithin cost, time, quality constraints

    Optimizing return on assets - ensurethey perform safely and profitability

    ContinuousFlow

    ProjectWise AssetWise

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    24/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    24 | WWW.BENTLEY.COM

    • Enterprise Information Management software – based on .NET and SOA

    • Over 25 years experience in the industry

    • 250+ customers, > 60,000 users• Requirements Management and Project Information Management

    used in Energy, Nuclear, EPC, Government, and Transportation.

    • Nuclear Market Experience/Background

     – Current customer base account > 20% of commercial plants

    Introducing eB (Enterprise Bridge) Software

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    25/48

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    26/48

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    27/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    27 | WWW.BENTLEY.COM

    Poor Asset Information can be Disastrous

    “… BP told us the modifications on the BOP were extensive. After theaccident, they asked Transocean for drawings of the blowoutpreventer. Because of the modifications, the drawings they receiveddidn't match the structure on the ocean floor.. …”

    Source: House Committee on Energy and Commerce hearings on the Deepwater Horizon disaster 

    “… we learned that the blowout preventer had beenmodified in unexpected ways…”

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    28/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    28 | WWW.BENTLEY.COM

    “Undocumented changes to the

    blowout preventer that should

    have shut down BP PLC’s runaway

    Gulf well slowed efforts to stop

    the flow of oil…”

    “…The controls that the robots

    were trying to use that were

    supposed to close the valves were

    actually connected to a testing

    device that couldn’t shut off the

    well…”

    “…there appeared to be other

    changes made to the blowout

    preventer that BP hadn ’t ordered

    and … Transocean struggled to

    provide blueprints showing the

    device’s updated design…”

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    29/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s

        t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    29 | WWW.BENTLEY.COM

    Source: ICM - Based on 8 data sets used in series and each data set at an integrity level varying from 75% to100%

    0

    10

    20

    30

    4050

    60

    70

    80

    90100

    75 80 85 90 95 100

    E

    m

    p

    o

    E

    e

    v

    n

     

    Average Integrity Level ( )

    When Information integrity

    drops 8 - Employee

    effectiveness drops 50

    Poor Asset Information is Expensive

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    30/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    30 | WWW.BENTLEY.COM

    is an information modeling platform for deliveringlifecycle information management to operators of infrastructure

    assets…

    a suite of applications and on-line services to improvemanagement and operational performance, safety and

    compliance of infrastructure assets.

    &

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    31/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    31 | WWW.BENTLEY.COM

    Information System Architecture for Assets

    ERP

    Human

    Resources

    Finance

    Safety

    Compliance

    Requirements

    Management

    Engineering

    Modifications

    ProjectWise Integration

    Server

    Quality Data

    Services

    Asset Lifecycle Information Management Platform

    (enterprise Bridge (eB))

    Design

    Optimization

    Document

    Approvals

    Data

    Analysis &

    Loading

    ProjectWise Integration Server

    • Document Management• Engineering Collaboration• Design Application Configuration

    Quality Data Services

    • Data Quality Analysis• Milestone Data Loads from Design

    AssetWise enterprise Bridge (eB)

    • Portfolio Management• Bid Compliance

    • Issue Tracking

    • Safety Compliance• Inspection Management

    • Modification Tracking

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    32/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    32 | WWW.BENTLEY.COM

    Information Applications

    AssetWise

    Platform

     Applications

    and On-line

    Services

    Information ServicesRenditioning

    Printing

    Scanning/OCR

    Publishing

    Interfaces to other CMS/EDMS

    Information IntegrityChange Management

    Relationship Management

    Permissions/Rights

    Role Management

     Audit Trails

    Information Modeling

    Tagged Component Hierarchies

    Relationship Models

    Linear Networks

    Spatially Oriented Networks

    Models and Drawings

    Documents

    Unstructured Data

    Point Clouds

    Requirements ManagementDocument Control

    Configuration ManagementRecords Management

    Knowledge ManagementIncident Mgmt/Corrective Action

    Work & Maintenance Mgmt Support

    Packaged

    Interfaces

    B id P ti

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    33/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    33 | WWW.BENTLEY.COM

    Plant, Product,Process Management

    Solutions

    Document & ContentManagement

    Solutions

    CAD

    Email

    Product Data

    Maintenance

    Bridge Perspective

    Solutions for

    InformationManagement

    Rapid access to accurateinformation in context

    SharePoint

    Web

    Office

    ERP

    C ll b ti S l ti

    http://www.kofax.com/go/roadshows/

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    34/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    34 | WWW.BENTLEY.COM

    Requirements Management

    ItemManagementDocument

    ManagementEmail

    CAD

    Office

    Web

    ERP

    CRM

    Marketing

    HR

    Records

    Management

    Closed Loop

    Change Process

    Collaborative Solution

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    35/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    35 | WWW.BENTLEY.COM

    • Oil & Gas

    • Mining

    • EPC

    • Transportation

    • Power 

    What industries do we serve?

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    36/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    37 | WWW.BENTLEY.COM

    • Single Source of Truth for all Asset andrelated Information. Information is trustedand users are confident.

    •  Asset information is visible. Allinformation about an asset and relatedinformation visible on a single screen.

    • Easy access to all Asset and relatedInformation in context. Easy to findinformation.

    • When change occurs communicationsto all impacted parties is proactive,tracked and audited..

    The Business Value of AssetWise

    • Identification of the asset and allinformation objects related to theasset throughout the life cycle.

    • Status accounting. Knowing thecurrent status of any asset and theirrelated information.

    • Auditing. Tracking and documentingthe life cycle of all asset information.

    • Management of change. Certifiedchange process that assesses theimpact of change with properauthorization and approvals.

    Based on a core set of information

    configuration management principles .

    Bentley’s AssetWise solution provides

    significant business value in managingthe life cycle of an Asset.

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    37/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    38 | WWW.BENTLEY.COM

    Interoperable Information Management Platforms

    ProjectWise

    for 

    Project TeamCollaboration

    AssetWise

    For 

     Asset Lifecycle Info

    Mgt.

    Portals

    Office

    ApplicationIntegration

    Federated

    Search

    In-Depth

    Understanding

    of Engineering

    Content

    Accelerated

    Access for

    Distributed

    Teams

    Multi-Vendor 

    Software

    Support

    Context

    Integrity

    Relevance   • Document Search• Full Text Search

    • Inter-document

    relationships• Meta-document

    relationships

    • External Repositories

    Granular, role basedpermission model

    •  Audit trail

    • Centralized store

    • Transmittal / Distribution

    •  Assets

    • Requirements

    • Regulations

    Outlook integration• Word/Excel integration

    • Wiki

    • Discussion threads

    •Surveys

    • Workflow

    • Reporting dashboards

    • CAD standards management

    • Reference file management

    • Dependency Management

    • Dynamic Review

    • MicroStation

    •  AutoCAD

    •OpenPlant

    • Revit

    • InRoads

    • PDMS

    • SmartPlant

    • Etc…

    for

    Business

    Collaboration

    • Delta File Transfer 

    • Caching Servers

    • Data Compression

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    38/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y   s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    39 | WWW.BENTLEY.COM

    AssetWise

     Configuration Control

     Controlled Docs

     Records Management

     Engineering Design

     Corrective Action

     Human Performance

     Knowledge Management

    Asset Maintenance

    Collaboration

    Human Resources

    Program Management

    Users

    Information Management

    Legacy

    Enterprise Users

     Collaboration

     Visibility

     Information Quality

     Compliance

     Governance

     Change Control

    Enterprise Integration

    Financials

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    39/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    40 | WWW.BENTLEY.COM

    eB: An Enterprise Citizen

    40NEAC 2009

    Implementation and integration of a number of fleet-wide applications:

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    40/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    41 | WWW.BENTLEY.COM

    •  AutoPLANT V8i (SELECTseries 3) – 64 bit version

    •  AssetWise

    • OpenPlant SELECTseries 2 Refresh

    Agenda

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    41/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    42 | WWW.BENTLEY.COM

    OpenPlant Interoperable Environment

    OpenPlant ModelServer

    OpenPlant Schema

     ISO 15926 )

    ProjectWise Integration Server

    OpenPlant

    Modeler

    OpenPlant

    Isometrics

    Manager

    OpenPlant

    Reporting

    OpenPlant

    PowerPID

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    42/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    43 | WWW.BENTLEY.COM

    OpenPlant Interoperable Environment

    PDS Projects

    with

    PDx

    Dynamic

    Review

    OpenPlant

    Modeler

    OpenPlant

    Isometrics

    Manager

    OpenPlant

    Reporting

    OpenPlant

    PowerPID

    ProjectWise Integration Server

    AutoPLANT

    PDW

    PlantSpace

    Design

    Series

    Bentley

    Application

    Civil

    Process

    Structural

    iRING

    (ISO

    15926)

    AutoPLANT

    PDW

    OpenPlant ModelServerpenPlant ModelServer

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    43/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    44 | WWW.BENTLEY.COM

    OpenPlant Product Summary

     – Posted to SELECT Downloads• December 26th , 2010

     – Version Number• OpenPlant ModelServer (SELECTseries 2) - 08.11.07.515

    • OpenPlant ModelServer Administrator(SELECTseries 2) - 08.11.07.515

    • OpenPlant Modeler (SELECTseries 2) - 08.11.07.516• OpenPlant Isometrics Manager (SELECTseries 2) - 08.11.07.506

    • OpenPlant Reporting (SELECTseries 2) - 08.11.07.505

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    44/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    45 | WWW.BENTLEY.COM

    Release Feature Summary

     – OpenPlant ModelServer – Server • New Backup and Delete options for component instances in ModelServer

    repository (Need ProjectWise V8i 08.11.7.456 or later)

    • Checkin / Checkout performance enhancements

    • Defect corrections

     – OpenPlant ModelServer - Administrator • The Bentley Class Editor module is now integrated with the OpenPlant

     Administrator

    • Defect corrections

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    45/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    46 | WWW.BENTLEY.COM

    Initial Feature Summary

     – OpenPlant Modeler •  Added support for Mixed Metric projects•  Allow editing/replacement of graphics to User Defined Equipment

    • Enhancements to Nozzle Manager 

    • Trimmed elbow placement

    • Enhanced branch placement while using Auto Fitting• Reinforced Stub-in and Set-on branches

    • Unreinforced Stub-in and Set-on branches

    • Enhancements to mitered bends

    • Specification Generator enhancements

    • OpenPlant Configuration Manager • Support the use of “,” (comma) rather than “.” (period) as a separator 

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    46/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    47 | WWW.BENTLEY.COM

    Initial Feature Summary

     – OpenPlant Isometrics Manager • Support for mixed metric projects• Various minor enhancements and defect corrections

     – OpenPlant Reporting

    • Various minor enhancements and defect corrections

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    47/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    d

    48 | WWW.BENTLEY.COM

    Application Compatibility

     – OpenPlant PowerPID V8i 

    (SELECTseries 3)• Common OpenPlant schema

     – ProjectWise V8i (SELECTseries 2)• Integration Server 

    •  Automation Services

    • Orchestration Framework• Explorer 

     – ProjectWise Navigator V8i  (SELECTseries 2)• Partial integration with Markup workflow

  • 8/15/2019 Acodkplantsig Bentley Update 20110504

    48/48

        ©

        2    0    1    1    B   e   n    t    l   e   y    S   y

       s    t   e   m   s ,

        I   n   c   o   r   p   o   r   a    t   e    dSystem Certification

     – Operating System – ModelServer • Windows Server 2003 (32-bit), Windows Server 2003 (64-bit), Windows Server

    2008 (32-bit), Windows Server 2008 (64-bit)

     – Operating System – Desktop Applications• Windows XP Professional (SP2 or later), Windows XP Professional x64,

    Windows 7, Windows 7 x64

     – Databases – ModelServer • Microsoft SQL Server 2008 R2, Standard / Enterprise Edition

    • Microsoft SQL Server 2005 SP3, Standard / Enterprise Edition

    • Oracle Database 11g (11.2.0.1.0), Standard / Enterprise Edition