Tim Broeder Marcie Nolan Jo Sesodia Bob Daniels The Sunshine State will always experience growth, whether rapid or slow. This growth will continue to drain the cheap and easy water resources of the State. This session will provide an overview of how three local governments have completely redesigned their long range planning program to incorporate potable water issues into their comprehensive and current plans. The determination of demand, the single utility provider structure, and the costs of these infrastructure projects will be discussed. For local planners, the need and ability to implement long range plans through collaboration between the utility engineer and the planner will be stressed.

TRANSCRIPT

Page 1: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Real water and wastewater costs and its impact on sound municipal

planning

Page 2: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

PRESENTERS

Bob Daniels, Dania BeachTim Broeder, AECOMJo Sesodia, AICP, City of SunriseMarcie Oppenheimer Nolan, AICP, Esq.,

Becker and Poliakoff, Moderator

Page 3: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

FLORIDA

Page 4: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Dania Beach

Sunrise

Davie

Page 5: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Freshwater Supply Cheap and easily accessible water is goneIn South Florida almost 2/3 of potable water is

used for irrigationCosts of alternative water sources are more

costly Cost of wastewater/reuse add to rate increases

THIS IS THE CURRENT REALITY

How are we integrated into this process?

Page 6: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

LEGISLATIVE CHANGES Lower East Coast Water Supply Plan – 2007Regional Water Availability Rule - 2007 10 year Water Supply Plan - Financial Feasibility – part of LUPAYearly CIP updates – Comprehensive PlanOcean Outfall – chapter 2008-232, F.S.Reuse - costs no longer a factor to determine

feasibility when applying for CUP

Page 7: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

DANIA BEACH

Page 8: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

DAVIE

Page 9: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Town of Davie Water

Treatment and Water

Reclamation Facility

Town of Davie Water

Treatment and Water

Reclamation Facility

Page 10: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

10

Current SituationExisting W & WW Systems

Water System I – 3.4 MGD

Two 0.3MG Storage Tanks

Biscayne Wells-

Cap 550-1500gpm each

(2) 10-inch

(2) 12-inch Water System III – 4 MGD

Two 2MG Storage Tanks

Biscayne Wells-

Cap 550-1500gpm each

(2) 20-inch

(1) 16-inch

(1) 18 inch

Wastewater System IIWastewater System II – 5 MGD – 5 MGD

All Effluent pumped to HollywoodAll Effluent pumped to Hollywood

Page 11: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

11

Current Situation Town Constructing New Facilities

Finished Water TankFinished Water Tank

Water Treatment Facility Water Treatment Facility

Administration BuildingAdministration Building

Future Water Tank

Future Water Tank

Water Reclamation FacilityWater Reclamation Facility

Water Reclamation TanksWater Reclamation Tanks

Odor ControlOdor Control

Pocket ParkPocket Park

CapacitiesCapacities

WTP: 6 expandable to 12 MGDWTP: 6 expandable to 12 MGD

WRF: 3.5 expandable to 7 MGDWRF: 3.5 expandable to 7 MGD

CapacitiesCapacities

WTP: 6 expandable to 12 MGDWTP: 6 expandable to 12 MGD

WRF: 3.5 expandable to 7 MGDWRF: 3.5 expandable to 7 MGD

Page 12: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

12

Current SituationCost of New Facilities

Overall Cost approximately $125,000,000

Bonds - $46,245,000 already issued

$45,000,000 issuance scheduled to close

October 19, 2011

Page 13: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

13

Project Drivers•New Water Rules Significantly reduced Town of Davie

Water Supply

• Redevelopment in the TOC and RAC to promote

growth within Town

•New Water Treatment and Water

Reclamation Facilities required to

maintain high quality water

services to the Town residents

Page 14: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Existing Biscayne Aquifer withdrawl limited to 5.6MGD

Regional Water Availability Rule - CUP cut back to approx 5 MGD in 2010

Current water use in Town is 4.4MGD – limited growth without additional water source

Project Drivers- Water

Page 15: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

RAC TOC

IntensityArea – 2,244 acres

Residential – 2,200 d.u.Commercial, Industrial,

Community 19 million s.f. .

IntensityArea – 925 acres

Residential - 6400 d.u.Commercial. Industrial Type

Development – 4.3 million s.f.

Project Drivers – Redevelopment

Page 16: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Effluent disposal to COH limited due to Outfall Legislation

Reuse - Required for plant expansion (CUP and NPDES)

Reuse – Required to meet Outfall Legislation Rules (60% of outfall discharge)

Project Drivers – Water Reclamation

Page 17: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

17

What will the Davie reclaimed water be used for?

Golf course

irrigation

Landscape

irrigation

Chiller makeup

water

Admin Bldg Toilets

WRF Process

Equipment

Arrowhead Golf

Grand Oaks Golf

NSU Landscape

UF IFAS Landscape

Sunforest Landscape

NSU Chiller Makeup

FAU Landscape

BC Landscape

Project Site

Water Reuse

Page 18: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Phase 1

Final Design

Equip. & Sub Procurement

Construction & Commissioning

Time and Dollar Investment

± 0%

± 15%

± 30%

Co

st A

ssu

ran

ce I

nd

ex

Preliminary Engineering

Guaranteed Maximum Price (GMP)

Planning

Design Development & Permitting

Project Scope Defined, Costand Schedule Established

Project in Operation

Phase 2

Project ImplementationTwo-Phase Design-Build

Page 19: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

19

Project ScheduleConstruction started September 2010

Commissioning of WTP & WRF in January 2013

Completion slated for August 2013

Construction started September 2010

Commissioning of WTP & WRF in January 2013

Completion slated for August 2013

Page 20: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

20

SummaryTown of Davie will experience significant growth due to RAC and TOC

redevelopment projectsTown needs to expand water treatment and reclamation facilities to support

growthReclaimed water will be primarily used for irrigation, golf courses, and

educational facilitiesWater Treatment and Water Reclamation Facility to be completed by late

early 2013

Page 21: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

21

SUNRISE

Page 22: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

SUNRISE

Page 23: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Public Investment Renewal and Replacement Accommodate Projected Growth Regulatory Compliance

Source: Capital Improvement Plan, Sunrise Utilities Water & Wastewater Master Plan, 2008

Page 24: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Plans and More Plans Feb. 2007 LEC Water Supply Plan adopted May 2008 20 year CUP approved:

o Can borrow 2.3 mgd from Biscayne aquifero Must be phased out by 2013.

Aug 2008 Adopted Water Supply Plan

Apr. 2009 Utilities Master Plan July 2009 City Rate Study Sept. 2009 Bond issue Dec. 2009 CIE Update FY 2010/14

Oct. 2010 CIE update FY 2011/15 2011 Update Water Supply Plan (draft) 2011 Comp. Plan Amendment

Page 25: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Policy Issues “Recession Effect” - less demand “Conservation Effect” – less revenue “Political Effect” – less capacity for rate increases and debt Revised Capital Program:

o Accommodates deferred growth o Provide less costly projects

“Regulatory Effect”o DCA and SFWMD requirement to update to Comprehensive Plan

will create internal inconsistencies o Comp. Plan amendment cycle is not flexible enough for the

reality of utility planning

Page 26: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

In the past fat, dumb, and happy

Page 27: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

Present SituationFlorida is in the Lead ReuseAlternative Water SupplyOcean Outfall

THIS HAS NOT BEEN CHEAP…..OR PAINLESS

 

Page 28: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

REGULATIONS/PLANSCapital Improvement PlansLand Use Plan Amendments –Comprehensive Plans 10 year water supply plansLower East Coast Water Supply PlanConsumptive Use Permit (CUP)Utility Master Plans (stormwater, potable water,

wastewater, reuse)BondingPopulation Projections

Page 29: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

RecommendationsEconomics IS the biggest factorEducation ConservationOne Size Does Not Fit AllRegional conversations, local decisionsIntegrated planningCoordination with Utility Providers

 

Page 30: 9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth

QUESTIONS AND ANSWERSBob Daniels, Dania BeachTim Broeder, AECOMJo Sesodia, AICP, City of SunriseMarcie Oppenheimer Nolan, AICP, Esq.,

Becker and Poliakoff, Moderator