    Lecture-3

    Overview of Surveying and Indian Topographic Map

    Overview of Land Surveying

    The fundamental objective of land surveying is to prepare aplanormapof an area. The mapthus prepared serves as the primary source of information about the surface of the earth for

    further engineering works.The data required for making of a map gets collected through fieldsurveying. To start field surveying, it is required to know very accurately, the geographical

    coordinates (latitude, longitude)of at least one point, known ascontrol pointand the length aswell as azimuth of a line, known asbaseline(Figure 3.1).

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    2/21

    The Latitude of the point and the azimuth of the line are determined through astronomical surveyand longitude from time measurement. The length of the line is measured with a distance

    measuring instrument.

    From thecontrol pointin association with the base line, a number of intervisible points are

    selected such that on joining these points well shaped triangles are required to be formed. Thesetriangles carry forward points whose geographical positions are calculated from the

    measurements (horizontal distance, horizontal angles)taken from the network of triangles. Thecalculated parameters undergo further adjustment by satifying the geometrical conditions

    associated with the parameters as well as with figures. This helps in minimisation of errors whichmay creep in further surveying operation. Inside the big triangles formed by widely spaced

    control points, network of smaller triangles get established (Figure 3.2).

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    3/21

    This process gets repeated materialising the basic priciple of surveying "to work from whole to

    part". Thus the entire area to be surveyed gets covered with network of triangles.

    The detail surveying is then carried out within the smallest triangle. During surveying,measurements (distance, direction, angles, height etc.) for important objects/ points are taken.

    The measurements are then used for necessary calculations and adjustments resulting inidentification and finding positions (with respect to standard reference) of salient objects.

    To prepare map, first a grid of medians and parallels of latitudes is being prepared to provide aframe work of map. Control points are then plotted by their spherical coordinates.

    Then objects are graphically represented in a rectangular coordinate system for depicting

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    4/21

    planimetric position. Terrain height is depicted by usingcontoursat regular interval. The

    identification of objects are depicted using conventional symbols and coloursFigure 2.1.

    To prepare map of the area, inside the marked area inFigure 3.3,

    first the surveying measurements and plotting are being carried out for plot number 1(Figure3.4).

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    5/21

    Next, detail surveying (Figure3.5)

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    6/21

    and plotting are being carried out for plot number 2 (Figure 3.6)

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    7/21

    and subsequently detail mapping is carried out for plot number 3 and plot number 4. Then, afinal map of the whole area is being prepared by mosaicing the component maps (Figure 3.7)

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/20.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    8/21

    Indian Topographic Maps

    Topographic maps provides the graphical portrayal of objects present on the surface of the earth.These maps provide the preliminary information about a terrain and thus very useful for

    engineering works. For most part of India, topographic maps are available which are prepared bythe Survey of India. To identify a map of a particular area, a map numbering system has been

    adopted by Survey of India. The system of identification is as follows:

    An International Series (within 4 N to 40 N Latitude and 44 E to 124 E Longitude) at thescale of 1: 1,000,000 is being considered as base map. The base map is divided into sections of

    4 latitude x 4 longitude and designated from 1 (at the extreme north-west) to 136, coveringonly land areas and leaving any 4 square if it falls completely in the sea (Figure 3.8).

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    9/21

    For Indian Topographic maps, each section is further divided into 16 sections (4 rows by 4

    columns), each of 1 latitude x 1 longitude (1:250,000), staring from a letter A (North-West

    corner) and ending on P, column-wise. These degree sheets are designated by a number and an

    alphabet such as 53 C (Fig 3.9).

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    10/21

    These degree sheets are further sub-divided in the following ways:

    Each sheet is divided into four parts (2 rows by 2 columns),, each of 30' latitude x 30' longitude(1:100,000) designating them by cardinal directions NW, NE, SW, and SE. Such sheets are

    identified as 53 M/SE (Figure 3.10).

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    11/21

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    12/21

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    13/21

    Fig 3.10 Map Numbering System for India topographic map

    Degree sheets have also been divided into 16 sheets (4 rows by 4 columns), each 15' latitude x

    15' longitude (1:50,000) and numbered from 1 (at the north-west corner of the particular degree

    sheet) to 16 column wise and are identified as 53 B/3 (Figure 3.11)

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    14/21

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    15/21

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    16/21

    Each 1:50,000 scale sheet contains four (2 rows by 2 columns) 1:25,000 sheet ( 7' 1/2 latitude x

    7' 1/2 longitude ) which are numbered NW, NE, SW, and SE. Such sheets are identified as 53

    O/14/NE (Figure 3.12).

    http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htmhttp://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/21.htm
  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    17/21

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    18/21

  • 7/23/2019 3.Overview of Surveying and Indian Topographic Map

    19/21

    In this way, the topographic map of most of the area of India may be acqiured at the scale

    available and subsequently can be updated and upgraded as required for a particular project. For

    large scale maps, further surveying needs to carried out.