2012/11/12 areva epr dc - areva presentation for nov. 19th ... · 1 arevaeprdcpem resource from:...
TRANSCRIPT
1
ArevaEPRDCPEm Resource
From: WILLIFORD Dennis (AREVA) [[email protected]]Sent: Monday, November 12, 2012 12:32 PMTo: Snyder, AmyCc: Hearn, Peter; [email protected]; STACK Tim (AREVA); KOWALSKI David
(AREVA); [email protected]; OWENS Martin (AREVA)Subject: AREVA Presentation for Nov. 19th Public Meeting to Discuss UHS Design Changes Attachments: November 19 UHS Public Meeting Overview version 10_17_12.pdf
Importance: High
Amy, Attached is an update of AREVA’s portion of the meeting slides for the rescheduled public meeting (Nov. 19th) to discuss UHS Design Changes for the U.S. EPR Design Certification. A separate presentation for the COLA portion will be transmitted separately by UNE. Thanks, Dennis Dennis Williford, P.E. U.S. EPR Design Certification Licensing Manager AREVA NP Inc. 7207 IBM Drive, Mail Code CLT 2B Charlotte, NC 28262 Phone: 704-805-2223 Email: [email protected]
From: WILLIFORD Dennis (RS/NB) Sent: Wednesday, October 24, 2012 11:20 AM To: [email protected] Cc: [email protected]; GARDNER Darrell (RS/NB); STACK Tim (RS/PT); KOWALSKI David (RS/NB); [email protected]; OWENS Martin (RS/NB) Subject: AREVA Presentation for Oct. 30th Public Meeting to Discuss UHS Design Changes Importance: High Amy, Attached is AREVA’s portion of the meeting slides for Tuesday afternoon’s public meeting (Oct. 30th) to discuss UHS Design Changes for the U.S. EPR Design Certification. A separate presentation for the COLA portion will be transmitted separately by UNE. I assume that a projector will be made available for showing the slides for the presentation. Thanks, Dennis Dennis Williford, P.E. U.S. EPR Design Certification Licensing Manager AREVA NP Inc. 7207 IBM Drive, Mail Code CLT 2B Charlotte, NC 28262
2
Phone: 704-805-2223 Email: [email protected]
Hearing Identifier: AREVA_EPR_DC_RAIs Email Number: 4089 Mail Envelope Properties (2FBE1051AEB2E748A0F98DF9EEE5A5D4F24EF5) Subject: AREVA Presentation for Nov. 19th Public Meeting to Discuss UHS Design Changes Sent Date: 11/12/2012 12:32:02 PM Received Date: 11/12/2012 12:32:15 PM From: WILLIFORD Dennis (AREVA) Created By: [email protected] Recipients: "Hearn, Peter" <[email protected]> Tracking Status: None "[email protected]" <[email protected]> Tracking Status: None "STACK Tim (AREVA)" <[email protected]> Tracking Status: None "KOWALSKI David (AREVA)" <[email protected]> Tracking Status: None "[email protected]" <[email protected]> Tracking Status: None "OWENS Martin (AREVA)" <[email protected]> Tracking Status: None "Snyder, Amy" <[email protected]> Tracking Status: None Post Office: auscharmx02.adom.ad.corp Files Size Date & Time MESSAGE 1587 11/12/2012 12:32:15 PM November 19 UHS Public Meeting Overview version 10_17_12.pdf 736323 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
NR
C P
ublic
Mee
ting
U.S
. EPR
Des
ign
Cer
tific
atio
n U
HS
Des
ign
Cha
nges
Ste
phen
C. H
uddl
esto
nR
ockv
ille,
Mar
ylan
d N
ovem
ber 1
9, 2
012
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
22
�In
trod
uctio
n �
UH
S H
eat L
oad
Red
uctio
n�
UH
S B
asin
Incr
ease
�Ex
pect
ed F
SAR
Cha
nges
�Sc
hedu
le
UH
S D
esig
n C
hang
es
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
23
�U
ltim
ate
Hea
t Sin
k (U
HS)
�Fo
ur s
epar
ate
redu
ndan
t, sa
fety
-rel
ated
coo
ling
tow
er (C
T)
trai
ns, t
hat c
ool e
ssen
tial s
ervi
ce w
ater
(ESW
).�
UH
S C
T an
d ba
sin
are
size
d fo
r nor
mal
ope
ratio
n,
star
tup/
shut
dow
n an
d ac
cide
nt o
pera
tion
•U
HS
CT
and
basi
n si
zed
for 7
2-ho
urs
of D
BA
•U
HS
CT
and
basi
n m
axim
um te
mpe
ratu
re li
mit
of 9
5 o F
for D
BA•
Bas
in p
rovi
des
ES
W p
ump
NP
SH
Intr
oduc
tion
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
24
�B
ound
ing
UH
S Si
zing
Eve
nts
�SB
LOC
A•
Low
Hea
d S
afet
y In
ject
ion
heat
exc
hang
er (L
HS
I HX
) in
Res
idua
l Hea
t R
emov
al (R
HR
) mod
e in
itiat
ion
at 3
50o F
•
Con
curr
ent l
oss
of o
ffsite
pow
er (L
OO
P),
Saf
ety
Inje
ctio
n (S
I) S
tage
1
Con
tain
men
t Iso
latio
n (C
I), a
nd E
mer
genc
y D
iese
l Gen
erat
or (E
DG
)sta
rt an
d lo
ad.
�LB
LOC
A
•LH
SI H
X in
SI m
ode
with
IRW
ST
cool
ing
•C
oncu
rren
t LO
OP
, SI S
tage
1 C
I, an
d E
DG
sta
rt an
d lo
ad
Intr
oduc
tion
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
25
�U
HS
Hea
t Loa
d R
educ
tion
�O
bjec
tive:
gre
ater
reci
rcul
atio
n an
d in
terf
eren
ce
allo
wan
ce, a
nd d
ecre
ased
72
hour
eva
pora
tion
�A
ppro
ach:
elim
inat
e lo
ads
not a
pplic
able
for t
he li
miti
ng
sizi
ng c
ases
:•
Rem
oved
load
s th
at a
re n
ot p
ower
ed d
urin
g a
wor
st c
ase
DB
A/L
OO
P
•R
emov
ed lo
ads
isol
ated
by
DB
A S
I sig
nal a
nd S
tage
1 C
I •
Kep
t lo
ads
pow
ered
by
the
ED
G re
quire
d fo
r miti
gatio
n of
wor
st
case
DB
A
UH
S H
eat L
oad
Red
uctio
n
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
26
�H
eat L
oads
rem
oved
as
not a
pplic
able
for a
LO
CA
D
BA
with
LO
OP
�C
harg
ing
pum
p an
d R
CP
cool
er lo
ads
rem
oved
bec
ause
they
ar
e no
t pow
ered
by
the
EDG
follo
win
g a
LOO
P•
Cha
rgin
g pu
mp
-not
pow
ered
by
ED
G-
mot
or c
oole
r -
oil c
oole
r-
seal
coo
ler
•R
CP
–no
t pow
ered
by
ED
G-
low
er b
earin
g oi
l coo
ler
-m
otor
air
cool
er
-up
per b
earin
g oi
l coo
ler
�Sa
mpl
e C
oole
rs n
ot o
pera
ted
in a
wor
st c
ase
DB
A•
Nuc
lear
Sam
ple
Coo
ler
•S
G S
ampl
e C
oole
rs�
CVC
S H
P C
oole
r let
dow
n is
olat
ed o
n a
SI s
igna
l and
Sta
ge 1
CI
•H
P C
oole
r
UH
S H
eat L
oad
Red
uctio
n
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
27
�7%
Red
uctio
n in
lim
iting
UH
S pe
ak lo
ad
impa
ctin
g to
wer
des
ign
�Es
tabl
ishe
d ne
w re
circ
ulat
ion
and
inte
rfer
ence
allo
wan
ce a
nd re
duce
d ev
apor
atio
n
UH
S H
eat L
oad
Red
uctio
n
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
28
�R
evis
ed U
HS
anal
ysis
in re
spon
se to
RA
I 351
qu
estio
n 27
inco
rpor
ated
a re
vise
d IR
WST
LB
LOC
A te
mpe
ratu
re in
crea
se�
The
LBLO
CA
cha
nge
incr
ease
d th
e am
ount
of
evap
orat
ion
over
the
72 h
our D
BA
per
iod
�B
asin
inve
ntor
y go
vern
ed b
y L
BLO
CA
inte
grat
ed lo
ad�
The
incr
ease
d ev
apor
atio
n re
sulte
d in
the
need
for m
ore
cool
ing
tow
er b
asin
cap
acity
and
a 2
foot
incr
ease
.
�A
ctio
ns ta
ken
to re
duce
the
heat
load
pro
vide
m
argi
n to
the
2 fo
ot in
crea
se
UH
S B
asin
Incr
ease
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
29
UH
S B
asin
Incr
ease
Bas
in D
epth
In
crea
sed
2 fe
et
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
210
�Ti
er 1
, Cha
pter
2.1
.5, 2
.7.1
1�
Tier
2, C
hapt
er 9
FSA
R c
hang
es
�Ta
ble
9.2.
5-1
�Ta
ble
9.2.
5-2
�Fi
gure
9.2
.5-3
�Ti
er 2
, Cha
pter
3.8
�Ti
er 2
, Cha
pter
16
Expe
cted
FSA
R C
hang
es
Pub
lic M
eetin
g to
Dis
cuss
U.S
. EP
R D
esig
n C
ertif
icat
ion
–UH
S –
Nov
embe
r 19,
201
211
�Sc
hedu
le�
AR
EVA
will
sub
mit
a re
vise
d re
spon
se to
RA
I 351
by
Janu
ary
31,
201
3
Sche
dule