Co-ordinator Prof. Robert Kliger
Flexible Processes and Improvedec no og es or r an
Infrastructure Construction Sites
Javier Bonilla Diaz , Acciona
Low-disturbance sustainable urban construction
www. - .
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
2/18
12 P r i i nTwo research institutes + one university
Three SMEs
Low-disturbance sustainable urban construction 2Duration: 2011-2013
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
3/18
the authorities, stakeholders and experts with a comprehensive
instrument (methods, tools and techniques) to prepare and perform brid e construction maintenance re air and renovation rocessesin the most effective and efficient way, in the shortest possible time, with themost efficient, sustainable use of resources and with zero disturbance anddisruption for the urban environment and urban life of the inhabitants.
PANTURA aims to improve highly flexible off-site production and- -
, ,cost-intensive on-site activities in order to achieve the optimalperformance with the most efficient use of resources and zerocarbon emissions . To co-ordinate these rocesses in the most effective waPANTURA aims to develop and use a proactive co-ordinationstrat egy andintegrated ICT tools in order to anticipate and prevent any disturbance in theareas surroundin the construction site and the cit . These novel a roaches
Low-disturbance sustainable urban construction 3
and solutions will be validated through real case studies.
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
4/18
Prove that v er y - l o w or even zer o d i s t u r b a n ce large-scaleconstruct on pro ect n t e ur an env ronment s p o s s i b l e ,f e a s i b l e and p r a c t i ca l
Provide the project stakeholders with the necessary
- Developing a toolbox containing methods, tools, standards- -
testing cases
Low-disturbance sustainable urban construction 4
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
5/18
How we will perform the project? the work packages
WP 1Project management: CHALMERS
ICT coordination tools
Sustainabilitybenchmarking & measures
Developing atoolboxcontaining
Construction processmanagement (strategies +
methods)
methods,tools,standards
WP 4Construction techniques
for new bridges + case
WP 5Refurbishment
techni ues for existin Creating newstudy bridges + case study
WP 7
knowhowbased onreal projects
Low-disturbance sustainable urban construction 5Training & dissemination
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
6/18
The oal is to ro ose an inte rated rocess a roach to achieve sustainable solution b
processes @ urban sites
avoiding the normal sub-optimization of sub processes using:
- virtual planning to avoid conflict and unnecessary transport and achieve zero inventoryan zero was e a cons ruc on s es owar s o zero car on em ss on cons ruc on- system engineering approach to identify the stakeholder values, opportunities and threats
Strategy tool
Choice of methods & technologyDataBIM
scenar os anconstrains
Transport slot timesInternal logistic requirements
Material supply delivery coordination
BIM - coarse
Could allowProcurement,
Urban strategy traffic,
BIM
Detailed designProjectortal
-updates
co a orat on
Low-disturbance sustainable urban construction 6
env ronmen a ,
disturbanceQABIM
Env
BIM fine
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
7/18
n egra on o oo s Open source BIMserver
Urban- & BuildEnvironment Render
interactive tool for monitoring,lannin and co-ordinatin
Viewer C2B
complex urban projects, whichwill supports the flexible
met o or construct onprocesses to be developed in
-
.
.Task 3.2 Open-source semantic web
Low-disturbance sustainable urban construction 7
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
8/18
: us a na y enc -marking & measures
The goal is to use existing and improvedsustainabilit assessment tools and indicators to analyse and benchmark the best practices and toextend measures and standards for the lifec cle sustainability of urban projects
Task 6.1 Best practices and benchmarking . ,
measures and technical standardisation
Low-disturbance sustainable urban construction 8
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
9/18
: us a na y enc -marking & measures
Example of indicators related to
Low-disturbance sustainable urban construction 9
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
10/18
Inter-WP coordination issuesWP6Sustainability indicators
and measures
Select / design data /BIM parameters to
be included
Select / defineindicators of
low-disturbance
Data sources
WP6Sustainability indicatorsand measures
Select / design data /BIM parameters to
be included
Select / defineindicators of
low-disturbance
Data sources
Manualdata
input
Statistics,e.g. traffic
data
3D GIS(urban
area)
BIM(bridge
+ site)
Indicator 1
Manualdata
input
Statistics,e.g. traffic
data
3D GIS(urban
area)
BIM(bridge
+ site)
Indicator 1
Data
T3.1 Open source data & tools integrationUrban
Strategytool
Indicator 2
Indicator 3
Indicator 4
Analysis /calculationData
T3.1 Open source data & tools integrationUrban
Strategytool
Indicator 2
Indicator 3
Indicator 4
Analysis /calculation
BIM-relatedanalysis tools,
e.g. planning, LCC Indicator 5
etc.
BIM-relatedanalysis tools,
e.g. planning, LCC Indicator 5
etc.
User input panel/ user criteria
definition
Dashboardvisualisation &
reporting
User input panel/ user criteria
definition
Dashboardvisualisation &
reporting
T3.2 End-user application tool (software)T3.2 End-user application tool (software)
Low-disturbance sustainable urban construction 10
WP2Construction process,
coordination & decision-makingprocesses by th e stakeholders
Request forinformation
Gained
knowledge& insight
WP2Construction process,
coordination & decision-makingprocesses by th e stakeholders
Request forinformation
Gained
knowledge& insight
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
11/18
: ex e cons ruc ontechniques for new bridges
The goal is to develop methods and technologiesdevelop methods and technologies thatrovide alternative effective methodsalternative effective methods for the new new
construction of bridgesconstruction of bridges in densely populated urbanenvironments coverin :
Task 4.1 Integral design and engineering
. - -Task 4.3 Flexible assembly methods
Low-disturbance sustainable urban construction 11
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
12/18
WP4: Objectives and scopeNewNew construction processconstruc tion process for new bridges in the densely populated urban area:for new bridges in the densely populated urban area:
Efficient off-site manufacturing
Effective connections
Standardised design solut ions
Long service life
Rapid on-site assembly Low maintenance costs
- -
beam weight jus t 200 kg/ linear m
Implementation of BIM and DFMAconcepts in the design process
Selection of the best desk types
Off-site production of lightweight FRPbridges and LCA
Definition of main connections and
On-site assembly process adjusted tothe stakeholders needs and requirements
Implementation of robotics, intelligent
practical case studya ora ory es s
Catalogue of ready bride components
Detailed description of assembly proces
Low-disturbance sustainable urban construction 12
Validation of the solutions through practical case study br idge in La Palma on the Canary Island
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
13/18
and engineering solutions for the
ff- i f ri i n
Low-disturbance sustainable urban construction 13
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
14/18
: ons ruc on ec n uesfor existing bridges
The goal is to develop new bridge strengthening andu radin techni ues and enhance existin ones that focus on avoiding traffic disruption andenvironmental disturbance in densel o ulated cities
Task 5.1: Management of strengthening and repair of bridges
Task 5.2: Flexible refurbishment techni ues
Low-disturbance sustainable urban construction 14
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
15/18
as . : anagemen o s reng en ngand repair of bridges
Mapping the need forSahil Salvi
Identification of
repair
bottlenecksMapping the problems with existing solutions
Low-disturbance sustainable urban construction 15
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
16/18
Task 5.2: Flexible
refurbishment techniques
Existing ResearchImprovement of existing methods
Application
(Phares et al. 2003)
Low-disturbance sustainable urban construction 16
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
17/18
: ssem na on an ra n ng
The goal is to assure the sustainable knowledge transfer
and implementation of PANTURA results to clients, theconstruction industry and other stakeholders and tostimulate new market opportunities and knowledge
.use the new knowledge in practice.
Task 7.1 Stakeholders Panel: It has been established
Task 7.2 Training documentation and pilot training coursesTask 7.3 PANTURA Public Website: www.pantura-project.euTask 7.4 Dissemination and implementation roadmap
Low-disturbance sustainable urban construction 17
-
7/24/2019 2 Pantura Presentation_ECTP Conference 2011
18/18
Thank you for your attention!
The Pantura project is co-financed by the European Commision with contract No.: 265172.
Copyright 2011-2013. All rights reserved. All rights reserved. Any duplication or use of objects such as diagrams in other electronic or
rinted ublications is not ermitted without the author's a reement.
Low-disturbance sustainable urban construction 18