1 hvacr116 – trade skills plumbing, hvac, electrical overview

31
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

Upload: silvia-blake

Post on 28-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

1

HVACR116 – Trade Skills

Plumbing, HVAC, Electrical Overview

Plumbing, HVAC, Electrical Overview

Page 2: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

2

Plumbing, Heating, and Air Conditioning

Plumbing, Heating, and Air Conditioning

Page 3: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

3

ObjectivesObjectives

• After completing this unit, you will be able to perform the following tasks:o Explain the basic principles of plumbing designo Identify the plumbing symbols used on drawings

• After completing this unit, you will be able to perform the following tasks:o Explain the basic principles of plumbing designo Identify the plumbing symbols used on drawings

Page 4: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

4

IntroductionIntroduction

• Residences have a plumbing system consisting of a water supply system; a water distribution system; and a drain, waste, and vent system (DWV)o Water supply system provides a source of watero Water distribution system provides hot and/or cold watero Drain, waste, and vent system disposes water after use

• Residences have a plumbing system consisting of a water supply system; a water distribution system; and a drain, waste, and vent system (DWV)o Water supply system provides a source of watero Water distribution system provides hot and/or cold watero Drain, waste, and vent system disposes water after use

Page 5: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

5

Plumbing MaterialsPlumbing Materials

• Copper resists corrosion, but is expensive• Plastic is light, noncorrosive, and easily joined

o Must have a temperature rating of 180°Fo Not suitable for some applications

• Cast iron is strong and resists corrosiono Used where DWV piping passes through the

foundation and outside the building• Black iron is used almost exclusively for gas

piping

• Copper resists corrosion, but is expensive• Plastic is light, noncorrosive, and easily joined

o Must have a temperature rating of 180°Fo Not suitable for some applications

• Cast iron is strong and resists corrosiono Used where DWV piping passes through the

foundation and outside the building• Black iron is used almost exclusively for gas

piping

Page 6: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

6

FittingsFittings

• Couplings: join two pipes in a straight line• Union: allows disconnection without cutting• Elbows: change piping direction• Tess and wyes: have three connections to allow a

second pipe to join the first from the side• Cleanouts: provide access to sewage for cleaning• Valves: stop, start, or regulate water flow

• Couplings: join two pipes in a straight line• Union: allows disconnection without cutting• Elbows: change piping direction• Tess and wyes: have three connections to allow a

second pipe to join the first from the side• Cleanouts: provide access to sewage for cleaning• Valves: stop, start, or regulate water flow

Page 7: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

7

Figure 35–1. A coupling is used to permanently join lengths of pipe.

Figure 35–2. A union allows the piping to be disconnected easily.

Figure 35–3. Street 90° elbow and 45° elbow.

Figure 35–4. Sanitary tee and wye.Figure 35–5. A cleanout allows access to the system.

Page 8: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

8

Design of Supply PlumbingDesign of Supply Plumbing

• In most communities, water is distributed through a system of water mains under or near the streeto When a new house is constructed, municipal water

department taps this maino A water meter is installed where water enters the house

and measures water usedo Cold-water and hot-water distribution piping runs through

the house

• In most communities, water is distributed through a system of water mains under or near the streeto When a new house is constructed, municipal water

department taps this maino A water meter is installed where water enters the house

and measures water usedo Cold-water and hot-water distribution piping runs through

the house

Page 9: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

9

Figure 35–6. Hot- and cold-water piping.

Page 10: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

10

Drainage Waste and Vent SystemDrainage Waste and Vent System

• Main purpose of a drainage system is to remove wastewater and solids from a buildingo A drain is installed at each fixtureo All individual drains are connected to create a building

drain, which connects to the sewer Sewer conveys wastewater and solids to a municipal sewer,

septic tank, or other point of disposal

• Main purpose of a drainage system is to remove wastewater and solids from a buildingo A drain is installed at each fixtureo All individual drains are connected to create a building

drain, which connects to the sewer Sewer conveys wastewater and solids to a municipal sewer,

septic tank, or other point of disposal

Page 11: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

11Drainage Waste and Vent System (cont’d.)Drainage Waste and Vent System (cont’d.)

• Vents allow air circulation to equalize positive and negative piping pressures

• Traps are fittings that fill with water to prevent sewer gas from entering the buildingo As water rushes through a trap, it is possible for a

siphoning action start Vent openings allow air pressure to enter the system and break

trap suction

• Vents allow air circulation to equalize positive and negative piping pressures

• Traps are fittings that fill with water to prevent sewer gas from entering the buildingo As water rushes through a trap, it is possible for a

siphoning action start Vent openings allow air pressure to enter the system and break

trap suction

Page 12: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

12

Figure 35–7. Water hammer arrester.

Figure 35–8. A trap fills with water to prevent sewer gas fromentering the building.

Figure 35–10. Venting a trap allows air to enter the system andprevents siphoning.

Drainage Waste and Vent System (cont’d.)Drainage Waste and Vent System (cont’d.)

Page 13: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

13

Figure 35–11. DWV system.

Page 14: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

14

Plumbing PlansPlumbing Plans

• Floor plans show all plumbing fixtures by standard symbols

• Fixture dimensions are provided by manufacturers on rough-in sheets

• For simple plumbing, plumbers prepare estimates and bids

• For complex plumbing, plumbing contractors draw a plumbing isometric

• Floor plans show all plumbing fixtures by standard symbols

• Fixture dimensions are provided by manufacturers on rough-in sheets

• For simple plumbing, plumbers prepare estimates and bids

• For complex plumbing, plumbing contractors draw a plumbing isometric

Page 15: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

15Heating, Ventilating, and Air ConditioningHeating, Ventilating, and Air Conditioning

• Plans for residential construction do not usually include sheets for HVAC (heating, ventilating, and air conditioning)o Floor plans include basic information

Location of furnace, air-handling unit, or air-conditioning unit Diffuser and air return locations

• Plans for residential construction do not usually include sheets for HVAC (heating, ventilating, and air conditioning)o Floor plans include basic information

Location of furnace, air-handling unit, or air-conditioning unit Diffuser and air return locations

Page 16: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

16

Figure 35–15. The air cycle in a forced-air system.

Page 17: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

17

ElectricalElectrical

Page 18: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

18

ObjectivesObjectives

• After completing this unit, you will be able to perform the following tasks:o Identify the electrical symbols shown on a plano Explain how the lighting circuits are to be controlled

• After completing this unit, you will be able to perform the following tasks:o Identify the electrical symbols shown on a plano Explain how the lighting circuits are to be controlled

Page 19: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

19Current, Voltage, Resistance, and WattsCurrent, Voltage, Resistance, and Watts

• To do work, electrical energy must have movemento Current is movement

Measured in ampereso Voltage is the force behind an electric currento Resistance is the ease or difficulty with which the current

flows As resistance goes up, current flow goes down

• To do work, electrical energy must have movemento Current is movement

Measured in ampereso Voltage is the force behind an electric currento Resistance is the ease or difficulty with which the current

flows As resistance goes up, current flow goes down

Page 20: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

20

Current, Voltage, Resistance, and Watts (cont’d.)Current, Voltage, Resistance, and Watts (cont’d.)

• Amount of work electricity can do depends on current amount and current forceo Electrical work is measured in watts

Watts is found by multiplying amperes by volts

• Amount of work electricity can do depends on current amount and current forceo Electrical work is measured in watts

Watts is found by multiplying amperes by volts

Figure 36–1. Current, voltage, and power ratings of some typical electrical devices.

Page 21: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

21

CircuitsCircuits

• For current to flow, it must have a continuous path from power source, through electrical device, and back to its source (i.e., a circuit)

• For current to flow, it must have a continuous path from power source, through electrical device, and back to its source (i.e., a circuit)

Figure 36–2. A complete circuit includes a path from the supply to the device and back again.

Page 22: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

22

Circuits (cont’d.)Circuits (cont’d.)

• A switch allows the continuous path to be broken• Using two 3-way switches, the circuit can be

controlled from two places• Material carrying electric current is a conductor

o When two or more wire conductors are bundled together, they make a cable

• A switch allows the continuous path to be broken• Using two 3-way switches, the circuit can be

controlled from two places• Material carrying electric current is a conductor

o When two or more wire conductors are bundled together, they make a cable

Page 23: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

23

Figure 36–3. A switch is used to break (or open) the circuit.

Figure 36–4. Three-way switches allow a device to be controlled from two locations. Notice that if either switch is activated, the device will be energized.

Figure 36–5. This cable has two circuit conductors and one ground conductor. Courtesy of Anaconda Wire and Cable Division.

Page 24: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

24

Circuits (cont’d.)Circuits (cont’d.)

• Conduits are made by pulling individual wires through steel or plastic pipes o Used in larger buildings

• In houses, cables containing wires plus one ground conductor are commono Ground does not carry current and protects from shock

• Conduits are made by pulling individual wires through steel or plastic pipes o Used in larger buildings

• In houses, cables containing wires plus one ground conductor are commono Ground does not carry current and protects from shock

Page 25: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

25

Circuits (cont’d.)Circuits (cont’d.)

o Ground-fault circuit interrupter measures current flow in hot and neutral conductor

• If a faulty device allows current to flow through a person, GFCI stops all current flow immediately

National Electric Code® requires their use on circuits for outlets installed outdoors, in kitchens, bathrooms, garages, and near water hazards

o Ground-fault circuit interrupter measures current flow in hot and neutral conductor

• If a faulty device allows current to flow through a person, GFCI stops all current flow immediately

National Electric Code® requires their use on circuits for outlets installed outdoors, in kitchens, bathrooms, garages, and near water hazards

Page 26: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

26

Circuits (cont’d.)Circuits (cont’d.)

• Service feeder cable ends at a distribution panelo From the distribution panel, electrical system splits into

several branch circuits Each branch includes a circuit breaker or fuse

o Circuit breaker or fuse opens the circuit if current flow exceeds rated circuit capacity

• Service feeder cable ends at a distribution panelo From the distribution panel, electrical system splits into

several branch circuits Each branch includes a circuit breaker or fuse

o Circuit breaker or fuse opens the circuit if current flow exceeds rated circuit capacity

Page 27: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

27

Figure 36–6. The electrical service is split up into branch circuits at the distribution panel.

Page 28: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

28

Circuits (cont’d.)Circuits (cont’d.)

• National Electrical Code® specifies the design of safe electrical system o Items include:

Kinds and sizes of conductors Locations of outlets and devices Overcurrent protection Number of conductors allowed in a box Safe construction of devices Grounding Switches

• National Electrical Code® specifies the design of safe electrical system o Items include:

Kinds and sizes of conductors Locations of outlets and devices Overcurrent protection Number of conductors allowed in a box Safe construction of devices Grounding Switches

Page 29: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

29

Electrical Systems on PlansElectrical Systems on Plans

• Residential construction drawings include electrical information on floor planso Only symbols for outlets, light fixtures, switches, and

switch wiring are includedo Exact location may not be includedo Wiring is left to electrician’s judgment and electrical code

regulations

• Residential construction drawings include electrical information on floor planso Only symbols for outlets, light fixtures, switches, and

switch wiring are includedo Exact location may not be includedo Wiring is left to electrician’s judgment and electrical code

regulations

Page 30: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

30

Electrical Systems on Plans (cont’d.)Electrical Systems on Plans (cont’d.)

• Switch wiring for light fixtures show which switch controls each light fixture

• Switch wiring for light fixtures show which switch controls each light fixture

Figure 36–7. Switch legs on a plan.

Page 31: 1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview

31

Electrical Systems on Plans (cont’d.)Electrical Systems on Plans (cont’d.)

• In split wiring, one-half of the outlet is always hot; the other half can be opened by a switch

• In split wiring, one-half of the outlet is always hot; the other half can be opened by a switch

Figure 36–8. Split-wired outlet.