080225 futuregen web
TRANSCRIPT
1
EAGLE Projectcoal Energy Application for Gas, Liquid and Electricity
Status of the Project
EAGLE Projectcoal Energy Application for Gas, Liquid and Electricity
Status of the Project
--FutureGen Workshop 2008FutureGen Workshop 2008--
February 25, 2008
Wakamatsu Research InstituteEPDC/
2
EAGLE Step1 (2002-’06)EAGLE Step1 (2002EAGLE Step1 (2002--’’06)06)
Project Objectives
Project Support- METI & NEDO
- Final Target of the EAGLE Step1 is to toward IGFC, which is combined with Fuel Cell, GT, and ST.It’s called triple combined cycle.
- Coal must be converted into an ash-free combustible gas with gasification and clean-up to produce a gaseous fuel equivalent to LNG.For the above, we set the following as a final target.1. Development of Oxygen-blown entrained-flow gasifier2. Establishment of Gas clean-up technology for fuel cells
3
EAGLE pilot plant system flowEAGLE pilot plant system flowEAGLE pilot plant system flow
Coal
Gasifier Syngas Cooler
Char Filter
CharSlag
N2
O2
Air
Air FeedCompressor
Rectifying Column
Air
Power Generation
GComp GT
Incinerator
Air Separation Unit
Waste HeatRecovery Boiler
WaterScrubber
MDEAAbsorber
GGH
Fine Desulfurizer
MDEARegenerator
LimestoneScrubber
Gypsum
Stack
Coal Gasification Cold Gas Cleanup
N2
4
Site ViewSite ViewCoal gasification
facilities
Air separation facilities
Gas turbine facilities
Incinerator
Sulfur recovery facilities
Gas clean-up facilities
5
Coal GasifierCoal Feed RateGasification Pressure
Cleanup SystemSyngas FlowSulfur Compounds
Sulfur Recovery Unit
Air Separation UnitAir Feed RateFeed Air PressureOxygen ProductionOxygen Purity
Oxygen-blown Two-stage Entrained-flow150 tons per day2.5 MPa
Cold Cleanup Using Methyldiethanol Amine14,800 m3N/h (MDEA Absorber Outlet)< 50 ppm (MDEA Absorber Outlet)< 1 ppm (Fine Desulfurizer Outlet)Limestone Wet Scrubbing
Pressurized Cryogenic Separation27,500 m3N/h1.09 MPa4,600 m3N/h95.0 vol%
Specifications of EAGLE Pilot PlantSpecifications of EAGLE Pilot PlantSpecifications of EAGLE Pilot Plant
6
Major Test Items during Major Test Items during EAGLE Step1EAGLE Step1
2002 2003 2004 2005 2006
◎ Coal In (March)
Gasifier trial operationFull Plant trial operation
GT Integration operationPerformance Test (Coal A)
Coal Flexibility Test (Coal B,C,D,E)
Long Run Test
EAGLE Plant Modification
ASU-GT Integration Test
7
Project Targets and resultProject Targets and resultProject Targets and result
Total Operation Time : 5,600 hrs (as of Jan, 2008)Total Coal Consumption: 30,200 ton
Item Targets result
Carbon Conversion Efficiency ≧98 % ≧99 %
Cold Gas Efficiency ≧78 % 82%
Calorific Value (HHV) 10,000 kJ/m3N ≧10,100 kJ/m3N
Continuous Operation Time 1,000 hrs 1015 hrs
Kinds of Coal 5Sulfide Compounds ≦1 ppm <1 ppm
Halogenated Compounds ≦1 ppm <1 ppm
Ammonia ≦1 ppm <1 ppm
Particulate Matter ≦1 mg/m3N <1 mg/m3N
in Clean
Syngas
5
8
Results of EAGLE Step1Results of Results of EAGLE Step1EAGLE Step1
- Obtained the know-how for Operation and Maintenance of total plant system.
- Confirmed the reliability through 1,015 hours long-run operation.
- Recognized the gasification property with 5 kinds of coal, having different characteristics.
- Obtained the data for large-scale demonstration plant as a next phase.
9
EAGLE Step2(2007EAGLE Step2(2007--’’09)09)
EAGLE step1 was completed in success. EAGLE step1 was completed in success. EAGLE step2 was started to improve the plant EAGLE step2 was started to improve the plant reliability and further reduce COreliability and further reduce CO22..EAGLE step2 has three major objectives. EAGLE step2 has three major objectives.
1. CO2 capture from coal gas2. Expansion of adaptable coal type3. Survey on behavior of trace elements
10
Coal
Gasifier Syngas Cooler
Char Filter
CharSlag
N2
O2
Air
Air FeedCompressor
Rectifying Column
Air
Combustion Turbine
GComp GT
Incinerator
Air Separation Unit
Waste HeatRecovery Boiler
WaterScrubber
MDEAAbsorber
GGH MDEARegenerator
LimestoneScrubber
Gypsum
Stack
Coal Gasification
Cold Gas Cleanup
N2 Shift reactor
CO2 capture
10% of coal gas after sulfur removal is branched to CO2 capture facilities
COCO22 capture from coal gascapture from coal gas
11
Incinerator
Stack
H2
CO2
Shift reactorCO2 capture
Coal Gasification
Gas Clean-up
Modification ofGasifier
CO2 capture
Remodeling and Installation in Step2Remodeling and Installation in Step2Remodeling and Installation in Step2
Gas Turbine
12
SurveySurvey of trace elements behaviorof trace elements behavior
【Survey on trace elements behavior】• Trace elements (such as Hg, Se, As, Cl, ) from IGCC is uncertain.• Survey for the reliability of plant and environmental assessment.• Development of sampling technique for coal gas (ie. high temp. and press.).
GasifierCoal →O2 →
Scrubber Gas Turbine
Stack
Sulfur recovery
Slug Waste waterSludge
Gypsum Flue gas
(input)
(Output)
13
Potentiality of coal gasification technologyPotentiality of coal gasification technology
Under the SeaUndergroundCoal Mine
CO2
Hydrogen
Coal
Gasifier
Gas Clean Up
Oxygen
Air Separation Unit
Sift Reactor
CO2 Separator
AC GT
HRSG
ST
CO2 Storage
Synthetic Fuel GTL, DME
Electricity IGCC, IGFC
Fertilizer Synthetic Chemical Fertilizer Reactor
Synthetic Chemical Fuel Reactor