FutureGen FutureGen Status 7 th Annual SECA WORKSHOP & PEER REVIEW September 12-14, 2006 Philadelphia, PA Joseph P. Strakey National Energy Technology Laboratory U. S. Department of Energy

Upload: buidan

Post on 04-May-2018

220 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

FutureGenFutureGen Status

7th Annual SECA WORKSHOP & PEER REVIEW

September 12-14, 2006

Philadelphia, PA

Joseph P. Strakey

National Energy Technology LaboratoryU. S. Department of Energy

Page 2: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen

• Pioneer advanced hydrogen production from coal

• Emit virtually no air pollutants

• Capture and permanently sequester carbon dioxide

• Integrate operations at full-scale – a key step to proving feasibility

World’s first near zero-emission, coal-based power plant to:

Page 3: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

250 Year Supply of Coal at Current Demand Levels

U.S. Fossil Fuel Reserves / Production Ratio

258

11.7 9.70

100

200

300Coal

Oil

Natural GasAnthracite & Bituminous

Sub-Bituminous

&Lignite

Sources: BP Statistical Review, June 2004, - for coal reserves data - World Energy Council;EIA, Advance Summary U.S. Crude Oil, Natural Gas, and Natural Gas Liquids Reserves, 2003 Annual Report, September 22, 2004 - for oil and gas reserves data

-

Page 4: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

Large Potential Worldwide CO2 Storage Capacity

0

200

400

600

800

1,000

1,200

200,000

Storage Option

DeepOcean

DeepSaline

Formations

DepletedOil & Gas

Reservoirs

CoalSeams

Terrestrial

Cap

acity

(Gig

aton

CO

2)

AnnualWorld

Emissions

24 Gigatons

Maximum Capacity Potential

Storage Options: IEA Technical Review (TR4), March 23, 2004Carbon Capture & Sequestration Program @MIT

World Emissions: DOE/EIA, International Energy Outlook 2003, Table A10

Page 5: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

Current “Best Case” Technologies Costly Using State-of-the-Art Scrubbing Technologies

33

87

100

0

20

40

60

80

100

IGCC PC NGCC

Effect of CO2 Capture on Capital Cost(% Increase Resulting From CO2 Capture)

29

10

60

72

20

0

20

40

60

80

IGCC NGCC PC

Effect of CO2 Capture on Cost of Electricity(% Increase Resulting From CO2 Capture)

• 5 to 30% Parasitic energy loss

• 30 to 100% Increase in capital cost

• 25 to 100% Increase in cost of electricity

2012 Program Goals

Page 6: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

Why IGCC/IGFC?

R&D in the pipeline is reducing cost& improving efficiency

• Gasifier/refractory material• Low-cost oxygen• Gas separation membranes• Fuel cell power

R&D in the pipeline is reducing cost& improving efficiency

• Gasifier/refractory material• Low-cost oxygen• Gas separation membranes• Fuel cell power

• Environmentally superior coal-based power• Easily adapted for CO2 sequestration• High efficiency• Fuel & product flexibility• Promising “coal-to-hydrogen” option

Page 7: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGenIGFC with Sequestration

Gas Cleaning

CO2, CO, H2

Coal

H2O

Marketable Ash/Slag

By-product

Air

O2

SulfurRecovery

MarketableSulfur

By-product

Anode

Cathode

CO2

Gasifier

AirSeparation

EnhancedOil Recovery

Deep SalineAquifer

UnmineableCoal Beds Depleted Oil & Gas

Reservoirs

Sequestration

CO2Separation

Air

SOFCCO, H2

Page 8: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

47%

48%

49%

50%

51%

52%

53%

54%

55%

0 2 4 6 8 10 12 14

Operating Pressure (bar)

Net

Effi

cien

cy (H

HV

Coa

l)Standard

With CO2Separation

GE IGFC StudyPerformance Summary

• 53.4% (HHV) Possible with IGFC• CO2 Separation penalty 2.7 points

Page 9: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen Will Build Upon Experience from Commercial-Scale Coal-Based IGCC Power Plants

Wabash River• W. Terre Haute, IN• 296 MWe (gross); 262 MWe (net)• Operations began 11/95

Tampa Electric• Mulberry, FL• 315 MWe (gross); 250 MWe (net)• Operations began 9/96

Page 10: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen Will Build on Two Non-Integrated One Million TPY CO2 Sequestration Projects

Weyburn CO2 EOR Project• Pan Canadian Resources• 200-mile CO2 pipeline from Dakota

Gasification Plant• Enhanced Oil Recovery in Canada

Sleipner North Sea Project • Statoil• CO2 sequestered - Utsira Formation• Currently monitoring CO2 migration• Separates CO2 from natural gas• $36–50 / tonne CO2 tax

Page 11: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

Cutting-Edge Candidate R&D Technologies for FutureGenFutureGen

Traditional Technology Research Invention Examples

Commercial Gasifier Advanced Transport Reactor

Cryogenic Air Separation O2 Membranes

Gas Stream Clean-Up Warm Gas Cleanup - Transport Desulfurizer

Amine Scrubbers H2 Membranes, “Clathrate” CO2

Syngas Turbine Ultra-Low NOx Hydrogen Turbine

Fuel Cell ($4,000/kW) SECA Fuel Cell ($400/kW Design)

EOR Based Sequestration Technology

Plant Controls “Smart” Dynamic Plant Controls & CO2 Management Systems

System Integration “First of a Kind” System Integration

Page 12: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen Industrial Alliance, Inc.Signed Cooperative Agreement with DOE on Dec. 2, 2005

• American Electric Power• AngloAmerican• BHP Billiton• China Huaneng Group• CONSOL Energy

• Foundation Coal• Peabody Energy• PPL• Rio Tinto Energy America• Southern Company

Page 13: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen Project Schedule

BP- 0 BP- 4BP- 3BP- 2BP- 1 BP- 5

Dec. 2, 2005

Jan 31, 2007

January 2008

Construction Start

July 2009

Operations Start

July 2012July 2016

July 2018

Siting, NEPA, and Permitting

Project Structuring

&Conceptual

Design

Phase 2CooperativeAgreement

Negotiations

PreliminaryDesign

Final Design

Facilities Construction

PlantStart-Up

&Shakedown

Initial Full Scale Plant Operations Full Scale Plant Operation Continues

Site MonitoringLimitedCooperativeAgreementAwarded

Full ScopeCooperativeAgreementAwarded

NEPA RODJuly 2007

Final Site SelectionLong Lead Time OrdersSeptember, 2007

Page 14: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen Funds / Estimated Costs

Cost Elements $ MillionPlant Definition, Baselining & NEPA 81Plant Procurement & Construction 480Shakedown & Full-Scale Operation 188Sequestration (Design & Construction) 191

TOTAL $950Site Monitoring 10

DOEIndustryInternational

62025080

Page 15: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

FutureGenFutureGen Status

Odessa Brazos

Texas

Tuscola

Mattoon

Illinois

• Industry-led cooperative project with government oversight & international participation

• Industry will choose project site, backbone technologies, etc.

• DOE has invited other nations to join FutureGen

• Gov’ts of India & South Korea have each pledged $10 Million

Page 16: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

FutureGenFutureGen Public Scoping Meetings

Jewett, TX – Aug. 22, 2006

Odessa, TX – Aug. 24, 2006

Tuscola, IL – Aug. 29, 2006

Mattoon, IL – Aug. 31, 2006

Page 17: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06

Visit the FutureGenFutureGen Websites

• NETL website:− www.netl.doe.gov

• Office of Fossil Energy website:− ww.fe.doe.gov

• FutureGen Alliance website:− www.futuregenalliance.org

Page 18: FutureGen Status - National Energy Technology … Library/Events/2006/seca/Strakey---FG...FutureGen Status 7th Annual SECA ... DOE/EIA, International Energy Outlook 2003, Table A10

Strakey – SECA – 09-13-06