zodiac aerospace h1 2012/2013 results presentation · a new organization for the group zodiac...

50
Zodiac Aerospace H1 2012/2013 Results presentation 24 April 2013

Upload: duongduong

Post on 26-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Zodiac Aerospace H1 2012/2013 Results presentation

24 April 2013

Page 2: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Sustained first half sales revenue growth: 16.7% to €1829.3 million

Current Operating Income rose 6.5% to €238.3 million

Reduction of the net debt/equity ratio (gearing) to 0.52 from 0.59

Pursuit of our external growth strategy: three businesses acquired

during the first half: IMS, IPS and NAT

Its operating income should present an asymmetrical profile with

that of the second half

For the full 2012/2013 fiscal year, the group confirms its projection

of a new fiscal year of organic growth, in a global context of

increasing air traffic and the ramping up of the commercial aircraft

programs

Summary

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 2

Page 3: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Another set of growth in H1

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 3

vs. 0.59 H1 11/12

1567.3

1829.3

0

500

1000

1500

2000

H1 2011/12 H1 2012/13

Sales

+ 16.7%

223.8 238.5

H1 2011/12 H1 2012/13

+ 6.6%

vs. 31.8%* H1 11/12

156.9 154.6

H1 2011/12 H1 2012/13

Net Earnings*

-1.5%

14.3% 13.0%

* Excluding IFRS3 impact

*net financial debt/ equity

Current Operating Income*

Aerosafety 14%

Aircraft Systems

28%

Seats 29%

Cabin & Structures

17%

Galleys & Equipment

12%

Sales breakdown

Aircraft

Interiors

58% *Excl. Contour

Based on trade WCR

* Excluding IFRS3 impact

Page 4: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Reporting into 3 business segments (IFRS 8)

A new organization for the Group

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 4

AEROSAFETY:

Complete systems for enhanced safety: Evacuation slides, life rafts, emergency arresting systems, electrical harnesses, parachutes, fuel tanks…

AIRCRAFT SYSTEMS

High-Technology equipment and systems for essential aircraft functions: Power management and distribution systems, oxygen systems, fuel and inerting systems, cockpit

systems, actuators, hydraulics, lighting solutions, IFE…

AIRCRAFT INTERIORS, o/w 3 activities

CABIN & STRUCTURES

Overall design and implementation of cabin layout: Turnkey Interiors (« floor-to-floor » interiors, walls, side protection panels, luggage bins), retrofit…

GALLEYS & EQUIPMENT

Innovation for optimisation of space aboard: Galleys, inserts, trolleys, cargo containers…

SEATS

The widest and most efficient product line : First Class, Business Class and Economy Class passenger seats, pilot and crew seats…

Completed by Zodiac Services, a dedicated aftermarket organization to

provide airlines a global network of spares distribution and services

Page 5: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

ZODIAC SEATS

ZODIAC SEATS France

ZODIAC SEATS UK

ZODIAC SEATS US

ZODIAC SEATS SHELLS

ZODIAC AIRBAGS

ZODIAC

AEROSAFETY ZODIAC AIRCRAFT

SYSTEMS

ZODIAC

ELECTRICAL

SYSTEMS

ZODIAC CABIN &

COCKPIT

ZODIAC

ENTERTAINMENT &

SEAT TECHNOLOGIES

ZODIAC DATA

SYSTEMS

ZODIAC FLUID

MANAGEMENT

ZODIAC WATER &

WASTE SYSTEMS

ZODIAC CONTROLS

ZODIAC

GALLEY INSERTS

ZODIAC

PREMIUM GALLEYS

ZODIAC

GALLEYS EUROPE

ZODIAC

GALLEYS USA

ZODIAC

CARGO EQUIPMENT

ZODIAC

MANUFACTURING ASIA

ZODIAC GALLEYS

& EQUIPMENT

ZODIAC SERVICES

ZODIAC

EVACUATION

SYSTEMS

ZODIAC

ARRESTING SYSTEMS

ZODIAC

INTERCONNECT

ZODIAC ELASTOMER

ZODIAC

PARACHUTE &

PROTECTION

ZODIAC SERVICES

EUROPE

ZODIAC SERVICES

AMERICAS

ZODIAC SERVICES

ASIA

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 5

A new organization for the Group

ZODIAC COMMERCIAL

OEM CABIN INTERIORS

ZODIAC BUSINESS

AIRCRAFT CABIN

INTERIORS

ZODIAC AIRLINE CABIN

INTERIORS

ZODIAC ADVANCED

COMPOSITES AND

ENGINEERED MATERIALS

ZODIAC NORTHWEST

AEROSPACE

TECHNOLOGIES

EZ AIR

50 %

ZODIAC CABIN &

STRUCTURES

AIRCRAFT INTERIORS

Page 6: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

H1 2012/2013 Financial performance

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 6

Page 7: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Scope : IMS consolidated over 2 months ; IPS and NAT consolidated as of Feb. 28th

IFRS3 in COI : -0.2M€ in H1 12/13 vs 0 in 11/12

Summary

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 7

€ million H1 2012/2013 H1 2011/2012 % change

Revenues 1829.3 1567.3 +16.7%

Current Operating Income* 238.3 223.8 +6.5%

COI margin 13.0% 14.3%

Non-current operating income

o/w IFRS 3

-10.7

-11.3

-0.7

-6.4

Net Earnings from ongoing activities 146.6 141.4 +3.7%

Net income from operations being sold - 11.0

Net Earnings before IFRS3 154.6 156.9 -1.5%

Net Earnings group share 146.6 152.7 -4.0%

Net Debt 1063.4 1054.6 +1.0%

Gearing 0.52 0.59

Average transaction rate ($) 1.29 1.34

Average conversion rate ($) 1.31 1.34

*o/w -0.2M€ IFRS 3 impact vs. 0

Page 8: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

7.3% organic growth for the

Aerospace activities in H1 +6.2% in Q1 and +8.4% in Q2

A demanding comparison

basis

Good performance from OEM

Aftermarket growing like traffic

Slower growth in retrofit

Continuous increase in sales

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 8

+16.8%

+14.9% +14.0%

+19.7% +20.8%

+17.6%

+13,9%

+15.0%

+6.2%

+8.4%

+0%

+5%

+10%

+15%

+20%

+25%

Q1 Q2 Q3 Q4

2010/2011 2011/2012 2012/2013

+7.3%

Organic growth rates for

Aerospace activities revenues

Page 9: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Another growth of sales in H1 +16.7% to €1829.3m in H1

+7.5% organic growth

+6.8% from acquisitions Contour (6 months)

IMS (2 months)

Increase in COI* +6.6% to €238.5M

Stable on a constant perimeter

+3% favorable on exchange rate impact

Dissymmetry of COI* margin 13% vs. 14.3% in H1 2011/2012

Impact in H1 of the decrease in regional aviation, integration of the UK seats business…

Another increase in H1

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 9

In € million

€/$ (conversion) 1.45 1.35 1.34 1.31

€/$ (transaction) 1.44 1.32 1.34 1.29

In € million

COI/Rev. 7.9% 14.2% 14.3% 13.0%

Revenues

COI

966

1310

1567

1829

0

500

1000

1500

2000

H1 09/10 H1 10/11 H1 11/12 H1 12/13

76

186

224 239

0

50

100

150

200

250

300

H1 09/10 H1 10/11 H1 11/12 H1 12/13

*

*Excluding IFRS3 impact

Page 10: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

+6.6% increase in Current Operating Income*

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 10

In € million

€/$(conversion): 1.31

€/$(transaction): 1.29

€/$(conversion): 1.34

€/$(transaction): 1.34

223.8 +3.3 +3.3 +8.2

-0.1

238.5

0

50

100

150

200

250

300

COI H1 11/12 $ Conversion $ Transaction External growth Organic Growth COI H1 12/13

*Excluding IFRS3 impact

Page 11: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Growth in AeroSafety and Aircraft

Systems, weak H1 in Aircraft Interiors

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 11

In € million

223.8 +5.8

+13.7

-3.6 -1.2

238.5

0,0

50,0

100,0

150,0

200,0

250,0

300,0

COI H1 11/12 Aerosafety Aircraft Aircraft Interiors Holding COI H1 12/13

€/$(conversion): 1.31

€/$(transaction): 1.29 €/$(conversion): 1.34

€/$(transaction): 1.34

*Excluding IFRS3 impact

Page 12: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

141.7 +2,0

-1.0

+7.2

-11.9

138.0

0

20

40

60

80

100

120

140

160

180

COI 2/2012 $ Conversion $ Transaction External growth Organic Growth COI 2/2013

-2.6%

COI H1 11/12 $ Conversion $ Transaction External growth Organic growth COI H1 12/13

0,00

100,00

200,00

300,00

400,00

500,00

600,00

700,00

800,00

900,00

1000,00

H1 2010/11 H1 2011/12

Galleys & Equipment

Cabin Systems

Cabin Equipment

Seats

Aircraft Interiors activities - Summary

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 12

+21% reported growth, +7.8%

organic Good growth in Galleys and

Equipement

Q2 organic growth rate higher than Q1

Ramp up in NB galleys for A320

Zodiac Seats UK explains 39.5%

reported increase, 12.3% like-for-like

Weak H1 in Cabin & Structures

-2.6% decrease in COI

Impact in H1 of the decrease in

regional aviation, integration of the

UK seats business, non recurrence

of a retrofit program, ramp up of NB

galleys…

In € million

COI / REV:

13,0%

COI / REV:

16,1%

Revenues

Current Operating Income*

Organic growth: +7.8%

* Excluding IFRS3 impact

0

200

400

600

800

1000

1200

H1 2011/2012 H1 2012/2013

Galleys & Equipment

Cabin & Structures

Seats

+ 21.0%

+ 39.5%

+ 2.3%

+14.6%

1064.8

879.7

In € million

Page 13: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

0

100

200

300

400

500

600

H1 2011/2012 H1 2012/2013

Data Systems

Water & Waste Systems

Entertainment & Seat Technologies

Controls

Fluid Management

11.4% increase in sales in H1

+7.1% organic

2 month consolidation of IMS

Strong increase in Current

Operating Income

+23.3%, owing to organic growth and

positive exchange rate impact

Strong increase in COI margin 14.2% vs. 12.9%

Zodiac Aircraft Systems

Key Events H1 2012/2013

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 13

In € million

Revenues

Current Operating Income

In € million

58.7 +0.7 +4.6 +0.8

+7.6 72.4

0

10

20

30

40

50

60

70

80

90

COI 2/2012 $ Conversion $ Transaction External growth Organic Growth COI 2/2013

+23.3 %

COI H1 11/12 $ Conversion $ Transaction External growth Organic growth COI H1 12/13

Organic growth: +7.1%

+ 11.4% 508.9 456.7

COI / REV :

12.9% COI / REV :

14.2%

*Excluding IFRS3 impact

Page 14: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

0

50

100

150

200

250

300

H1 2011/2012 H1 2012/2013

Arresting Systems

Interconnect

Elastomer

Parachute & Protection

Evacuation Systems

0,00

50,00

100,00

150,00

200,00

250,00

300,00

350,00

H1 2010/11 H1 2011/12

Airbag

Telemetry

Elastomers &composites

Aircraft ArrestingSystems

Electrical InterconnectSystems

Deceleration Systems

Evacuation Systems

Zodiac AeroSafety

Key Events H1 2012/2013

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 14

Good H1 sales growth for

Arresting Systems,

Elastomer, Parachute &

Protection +10.7% at 255.6 M€

+7.4% organic

+20.1% increase in Current

operating income Mainly coming from internal growth

13.6% vs. 12.5% COI margin

In € million

Revenues

Current Operating Income

Organic growth: +7.4%

+ 10.7%

In € million

269.7 291.1

28.9 +0.6

-0.4 0.0

+5.6 34.7

0,0

10,0

20,0

30,0

40,0

50,0

COI 2/2012 $ Conversion $ Transaction External growth Organic Growth COI 2/2013

-11,9%

+20.1 %

255.6 230.9

COI H1 11/12 $ Conversion $ Transaction External growth Organic growth COI H1 12/13

COI / REV :

12.5%

COI / REV :

13.6%

*Excluding IFRS3 impact

Page 15: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Decrease in financial expenses…

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 15

Decrease in Financial expenses Owing to the decrease of interest

rates

Other P&L items Income tax decrease*

31.8% vs 32.2%

Non current operating items

€-10.7m vs. €-0.7m

Mainly related to IFRS 3

No contribution from held-for-sale

assets

Vs a positive contribution of €11m after

tax in H1 2011/2012

In € million

13.1

14.2 14.5

12.3

0

2

4

6

8

10

12

14

16

H1 09/10 H1 10/11 H1 11/12 H1 12/13

*from continuing activities

Page 16: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

625.7

742.4

820.4

950.7

0

100

200

300

400

500

600

700

800

900

1000

H1 09/10 H1 10/11 H1 11/12 H1 12/13

+7.9% increase in Cash Flow

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 16

In € million In € million Cash Flow Working capital

31.8% of sales*

34.0% of sales*

*excl. Contour

Based on trade WCR

69

155.1

189.1

204

0

50

100

150

200

250

H1 09/10 H1 10/11 H1 11/12 H1 12/13

Page 17: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Intangible capital

expenditures

€31.5 m of capitalized

development costs vs. €36.8m

in H1 2011/2012

Mainly related to the

development of the A350XWB

Capex increase linked to investment in

new programs

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 17

In € million

26.4 24.8

44.0 44.0

16.0 22.9

38.9 35.6

42.4

47.7

82.9 79.6

0

10

20

30

40

50

60

70

80

90

Feb. 2010 Feb. 2011 Feb. 2012 Feb. 2013

Property, Plant & Equipment, financial Intangible assets

Page 18: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Acquisition and WCR increase result in increase in

net debt compared to end 2011/2012

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 18

In € million

Cash flow: net income + Amortization & provisions +

capital gains and losses + differed tax & subventions +

stock options

See Cash Flow statement in appendices for further

details

Acquisitions: IMS, NAT, IPS

832

147 48 9

158 35

43

119 1

75 4 1063

Net debt Aug.2012

Net Income Amortizationand provision

Differed tax& other

Change inWCR

Intangiblecapital

expenditure

Tangiblecapital

expenditure

Acquisitions Otherinvestment

Other financial Currencytranslation

adjustments

Net debt endFeb 2013

(1) Including held-for-sale assets

(2) Including dividends

Page 19: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Gearing is decreasing to

0.52

Zodiac Aerospace has the

capacity to pursue its

external growth strategy

Still a significant external growth potential

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 19

Gearing(1) 0.48 0.34 0.52 0.38 0.59 0.42 0.52

In € million

(1) Net financial debt / equity after dividend

Net debt

646

514

796

586

1054

832

1063

0

200

400

600

800

1000

1200

H1 09/10 FY 09/10 H1 10/11 FY 10/11 H1 11/12 FY 11/12 H1 12/13

Page 20: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Strategy and outlook

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 20

Page 21: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Environment: Set for growth Traffic and production rates are still growing

Pursuing the external growth strategy 3 strategic deals in H1 2012/2013

…a full range of innovative solutions for aircraft interiors

Seats : The widest and most efficient product line

Innovating for new design to improve LOPAs1

ISIS takes off

Outlook

Summary

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 21

1 LOPA: Layout of Passenger Accommodations

Page 22: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Environment:

Set for growth

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 22

Page 23: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Passenger traffic is still growing

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 23

Source: ID Aero 2013

Revenue Passenger Km –World evolution (% change compared to previous year period)

2012 Leap Year

+rebound / arabic spring

and tsunami in Japan

« Sandy » storm

Change of month

for Chinese New

Year

March Preliminary

Feb 2013 with same

nb of days as Feb

2012

Page 24: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Production rate overall increase at Airbus and Boeing Airbus :

A320 family at 42 a/c per month. Opening of a new FAL in Alabama

A330 at 9 a/c per month

A380 : 2.5 a/c per month

Boeing

737 increasing to 38 a/c per month

777 at 7 a/c per month

787 targets maintained

High order intake and high order book 6-7 years of production in order book at Airbus and Boeing

New programs under development B787

A350XWB

Comac 919

Irkut MC21

Commercial

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 24

Page 25: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Mixed outlook in the short term Decrease in output at Embraer

Stabilize at low level at Bombardier

While new programs are developping Embraer’s new ERJ 170/190

Bombardier CSeries

Regional

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 25

Large RJ backlog market in Units Large RJ backlog market in Value

Source: Deutsche Bank

Page 26: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Fleet in service is +/- 19,000

aircraft 71% of the fleet is based in North

America

Deliveries of bizjets are 700-

800 per year Bulk of the market in value is « Large

and Global » segment

Dassault Falcon, Bombardier, Gulfstream

Market is improving Decrease of bizjets inventory

April 2013 Bizjets for sale represent

11.5% of fleet vs 14.9% in June 2010

Bizjets

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 26

Africa 2%

South America

5%

Asia-Pacific , Middle East 6%

Europe 16% North

America 71%

Light 43%

Medium 15%

Large and

global 39%

"jumbo" 3%

Light 10%

Medium 13%

Large and

global 67%

"jumbo" 10%

8%

9%

10%

11%

12%

13%

14%

15%

16%

Feb

-10

mars

-10

Ap

r-1

0

May-1

0

juin

-10

juil-

10

Au

g-1

0

se

pt-

10

oct-

10

no

v-1

0

Dec-1

0

jan

v-1

1

Feb

-11

mars

-11

Ap

r-1

1

May-1

1

juin

-11

juil-

11

Au

g-1

1

se

pt-

11

oct-

11

no

v-1

1

Dec-1

1

jan

v-1

2

Feb

-12

mars

-12

Ap

r-1

2

May-1

2

juin

-12

juil-

12

Au

g-1

2

se

pt-

12

oct-

12

no

v-1

2

Dec-1

2

jan

v-1

3

Feb

-13

mars

-13

Ap

r-1

3

Bizjets inventory as % of fleet in service

Bizjets deliveries in units Bizjets deliveries in value

Bizjets fleet in service by region

Sourc

e:

Bank o

f A

merica M

err

ill L

ynch

Page 27: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

3 strategic acquisitions in H1 2012/2013

IPS

NAT

IMS

Pursuing the external

growth strategy

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 27

Page 28: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

A successful external growth strategy

Key metrics Be a world leader

In selected aerospace niche markets

With strong barrier to entry

And a good aftermarket content

Profitable companies

Additional metric is operations in dollar and/or in CCC

More than 35 acquisitions in Aerospace since 1978

Our development strategy combines

internal and external growth

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 28

Page 29: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Acquisition of Innovative Power Solutions – IPS Specialist of generators and converters for business jets, helicopters and UAVs.

Founded in 1999 and based in Eatontown (NJ). IPS has 60 employees and

around $8m sales

« gold supplier » at Boeing

Patented technology for manufacturing lighter generators

Completes and reinforces Zodiac Aerospace’s position in

the field of on board electrical power – ATA 24 chapter

Zodiac Aerospace enhances its world

leadership in power management

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 29

ATA 24 parts Zodiac Aerospace IPS

Generation

Conversion

Primary distribution

Secondary distribution

Battery

Fuel Cell

R.A.T. -

Zodiac Aerospace was already the

world leader for primary power

management, and is aboard all

main aircraft programs

Zodiac Aerospace can offer aircraft

manufacturers all the solutions

complying with their different

technological choices

Page 30: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

A growing IFE market Estimated to $1.5bn per year

Zodiac Aerospace has a « passenger centric » solution for

retrofit and Linefit

The first linefit equipped aircraft is an A330 delivered by Airbus

to Corsair in November 2012

Zodiac Aerospace accelerates its development

through the purchase of IMS IMS is the world #4 in IFE and #1 in « Passenger centric » IFE

Around 250 employees (ow 200 in California)

More than $70m revenues

IMS developped « RAVE », a « passenger centric » system

using SD cards for data storage

Lufthansa has chosen IMS for its long range aircraft IFE

Zodiac Aerospace is growing in

« Passenger Centric » IFE

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 30

Page 31: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Northwest Aerospace Technologies (NAT)

is a supplier of engineering services for

commercial aircraft refurbishing Program management

FAA / EASA Certification

Based in Everett, Washington Around 160 employees, ow 100 engineers

Around $50m sales

NAT brings an enhanced access to the

cabin retrofit businesses

NAT reinforces Zodiac Aerospace’s

offer for cabin retrofit

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 31

Page 32: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

A global offer to enhance value creation in the cabin Higher density of seats, while improving comfort

Zodiac Seats: the widest and most efficient line of products

An innovative approach in IFE

Innovation in monuments for better use of space

Galleys, Lavatories…

New pivoting luggage bins

For optimization of space

Better TAT

These innovations result in the ISIS solution

A complete floor to floor offer for the retrofit market Also addressing retrofit owing to engineering services

NAT brings additional capability for certification

Retrofit will generate additional growth on top of OEM growth

Zodiac Aerospace has developped a unique

and comprehensive offer for cabin interiors

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 32

Page 33: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Innovating for new

design to improve

LOPAs

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 33

Page 34: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

The widest and most efficient product line

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 34

SHORT-HAUL

Economy Class

1,425,000

PIT

CH

MORE

25

35

45

55

65

75

85

95

FEATURES / SPACE

FEWER

LONG-HAUL

Business Class

117,000

LONG-HAUL

First Class

13,600

SHORT-HAUL

First/Business Class

53,600 Premium

Economy

Class

22,800

LONG-HAUL

Economy Class

706,000

Regional Aircraft

280,000

DRAGONFLY

Z100

Z300

VENUS

6810 / 6850 /

7070

CIRRUS

PREMIUM

AIRGO FX

SKYLOUNGE

AURA LITE

VANTAGE II

ARCUS

• There are 7 broad seat product segments in airline seating

• Together they represent about 2.6 million seats

• The two largest segments are the short-haul (single aisle) and

long-haul (twin aisle) segments

Page 35: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Innovating for

passenger confort:

Business Class Seats

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 35

Admiral - SIA

Goldwing -

UAE

Silverwing –

Cathay Pacific

Business class (B/C) seats were invented

in 1978

First generation was mechanical seats,

with better recline than Y/C, better

materials, larger width

Second Generation introduced electrical

actuation. Introduction of full flat seats.

Introduction of shells to procure better

privacy Majesty - Emirates

Majesty - Etihad

Page 36: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

New generation of B/C

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 36

New B/C generation is facing the

problematic of higher density Reducing pitch

While searching for lie-flat

Newer seats configuration offer

innovative full-flat arrangement

offering To the airline: Higher density in a more modern

cabin

To the passenger: 3 F

Full-flat seat

Full access

Full privacy

Cirrus:

fishbone

configuration

Skylounge III:

staggered

configuration

Innovating for more safety

Anti-Crash criteria increased to 16g vs. 9g in 1996

Reinforced by anti-fire specifications in 2006

Developping airbags in seatbelt, and now in seats or galleys

Reinforced cyclical tests on mecanisms and foams…

Page 37: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Innovating for new

design to improve

LOPAs

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 37

Page 38: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Optimizing Cabin LOPA Layout of Passenger Accommodations

Cabin sqm is the most expensive real

estate which airlines want to optimize

New Galley concepts permetting to gain

more space in cabin For narrowbodies

New lavatories

More compact Galleys

ACP galley selected by Airbus as SFE

For widebodies

Patented new Galley shape for better seat integration and

additional seats in the cabin

Improving LOPA optimisation

• Layout of Passenger Accommodations

Modular Galley concept for easier reconfiguration of aircraft

Innovating in new galley design for

better use of space

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 38

Page 39: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

ISIS takes off

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 39

Page 40: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

ISIS, INNOVATIVE SPACE

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 40

Signature interior design, featuring first ever

PAX-Pod with, integrated cabin lighting

First ever clam-shell pivot bin design, providing

60% increase in carry-on luggage capacity with

improved bin ergonomics and reduced weight.

Significantly reduced cost and weight (over 200

pounds per shipset) through clever integration

and new materials.

Simplified manufacturing, installation and

maintenance through modular design

All existing aircraft interfaces and structures

retained for new build and retrofit markets

New LED lighting solution offering possibility to

create customized ambiance

Page 41: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Sky Airline Sky Airline’s A320 to be refitted with ISIS solution

Upgrade overall passenger experience with ISIS new pivoting

bins, lightweight ceiling panels, cabin brightening LED lighting

Qantas Airways is the launch customer of ISIS

737 Flying on board a Boeing 737-800NG since January 11th, 2013

ISIS recognised by the industry

ISIS takes off

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 41

2013 Crystal Cabin Award

« Industrial Design

and Visionary Concept »

Page 42: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Outlook

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 42

Page 43: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Civilian aerospace market is well oriented

Sales revenue : another year of organic growth Dissymmetrical profile between H1 and H2 margin

Net €/$ budgeted transaction exposure 55% hedged for H2 at 1.265

Net debt/EBITDA ratio should be below the level of 31/8/2012 (excluding potential additional acquisition)

2012/13 outlook

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 43

Page 44: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Development of the Group focused on Commercial aviation

Aboard all new civilian aircraft programs

Leading positions in selected niche markets

Recurring services model providing additional resilience

Leadership in key future technologies

Established track record in acquisitions

A successful strategy

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 44

Page 45: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Providing a full range of Aerospace

equipments and systems

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 45

Page 46: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Appendices

P&L

Cash Flow Statement

Balance Sheet

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 46

Page 47: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Appendices: Simplified P&L statement

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 47

Income Statement H1 2012/2013 H1 2011/2012 % change

Sales revenue 1829.3 1567,3 +16.7%

Depreciation and amortization 39.7 37.6

Charges to provisions 9.5 7.2

Current operating income 238.3 223.8 +6.5%

Non-current operating income -10.7 -0.7

Operating income 227.6 223.1

Cost of net debt -11.9 -14.2 -16.2%

Other financial income and expenses -0.4 -0.4

Tax expense -68.5 -67.1 +2.1%

Income from companies consolidated by the equity method -0.2 -

Income from continuing operations 146.6 141.4 +3.7%

Net income from operations being sold - 11.0

Net income 146.6 152.4 -3.8%

Net income attributable to non-Group shareholders 0.0 -0.3

Net income attributable to Group shareholders 146.6 152.7 -4.0%

Page 48: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Appendices: Cash flow statement

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 48

Simplified cash flow statement

In millions of euros H1 2012/2013 H1 2012/2013

OPERATIONS D’EXPLOITATION OPERATING ACTIVITIES

Cash flow from operations 204.0 189.1

Change in WCR -157.7 -164.9

Cash flow from continuing operations 46.3 24.2

Cash flow from operations of businesses being sold

INVESTMENT OPERATIONS

Acquisition of intangible fixed assets -35.6 -38.9

Acquisition of tangible and other fixed assets -43.8 -42.2

Changes to the scope of consolidation -119.2 -396.1

Cash flow from investments in continuing operations -190.9 -477.2

Cash flow from investments in operations being sold and

assets held for sale 27.4

FINANCING ACTIVITIES

Change in debt 123.8 340.0

Treasury stock -1.5 2.1

Changes in equity 2.7 4.5

Dividends -76.1 -64.8

Cash flow from the financing of continuing operations 48.9 281.8

Currency translation adjustments, beginning of period -4.1 17.2

Change in cash position -107.6 -126.6

Page 49: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

Appendices: Balance sheet

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013

Page 49

ASSETS 02/2013 08/2012 02/20112 EQUITY &

LIABILITIES 02/2013 08/2012 02/2012

Goodwill 1558.5

1502.8 1 448.3 Equity

Intangible assets 534.8 513.7 482.5 Capital 1906.6 1738.5 1 627.9

Property, Plant & Equipment 323.9 314.2 297.4 Net Income 146.6 318.3 152.3

Other non-current 14.5 16.3 17.9 Equity 2053.2 2056.8 1 780.2

Non current provisions and

deferred taxes 206.8 198.4 173.5

Non-current Debt 764.0 716.1 901.6

Non current assets 2431.7 2347.0 2 246.1 Non-current Liabilities 970.8 914.5 1 075.1

Current provisions 66.1 67.1 68.4

Inventories 842.7 783.1 749.9 Current financial liabilities 389.5 282.3 250.2

Trade Receivables 769.5 655.6 636.3 Accounts Payables 310.0 338.4 287.5

Others 73.5 65.3 61.9 Liabilities to employees and

payroll liabilities 158.7 161.5 140.5

Cash and Cash Equivalents 88.1 161.8 97.3 Others 258.6 193.6 191.0

Current Assets 1773.8 1665.8 1 545.4 Current Liabilities 1182.7 1042.9 937.6

Held-for-sale assets 1.4 1.4 1.4 Held-for-sale liabilities

Total ASSETS 4206.9 4014.2 3 792.9 TOTAL EQUITY &

LIABILITIES 4206.9 4014.2 3 792.9

(1) Excluding restatement of the Driessen Services disposal

Page 50: Zodiac Aerospace H1 2012/2013 Results presentation · A new organization for the Group Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013 ... Power management and distribution

ZODIAC AEROSPACE CONTACTS

Pierre-Antony VASTRA

Tel: +33 (0)1 61 34 25 68

[email protected]

Valérie AUGER

Tel: +33 1(0) 61 34 22 71

[email protected]

61 rue Pierre Curie

CS20001

78373 PLAISIR CEDEX

MEDIA CONTACTS – IMAGE 7

Flore LARGER

Tel: +33 (0)1 53 70 74 91 / [email protected]

Priscille RENEAUME

Tel: +33 (0)1 53 70 74 61 /

[email protected]

ANALYSTS CONTACTS – KEIMA

COMMUNICATION

Emmanuel DOVERGNE

Tel: +33 1(0) 56 43 44 63 /

[email protected]

Next meetings: Q3 and 9 months sales revenue June, 13th 2013 (after stockmarket closure)

Q4 sales revenue September, 17th 2013 (after stockmarket closure)

Page 50

Zodiac Aerospace - H1 2012/2013 results - April, 24th 2013