zheng portforlio new

27
P O R T F O L I O Z H E N G L I S T U D E N T A R C H I T E C T M A S T E R S T U D E N T O F M E L B O U R N E U N I V E R S I T Y P R O D U C T D E S I G N 2 0 0 8 - 2 0 1 5

Upload: david-lee

Post on 03-Aug-2016

217 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Zheng portforlio new

P O R T F O L I OZ H E N G L I

S T U D E N T A R C H I T E C T

M A S T E R S T U D E N TO F M E L B O U R N E U N I V E R S I T YP R O D U C T D E S I G N

2 0 0 8 - 2 0 1 5

Page 2: Zheng portforlio new

Master of Architecture, Second YearThe University of Melbourne,Australia

Bachelor of Product Design, Zheng Zhou University of Light Industry China

Zheng LiStudent Architect

Tel: 0424 038 108Email: [email protected]

Page 3: Zheng portforlio new

1CONTENT

DESIGN & VISUALISATION

Pink Porosity (Storefront of Silver Factory)_2016 CAZ Tower, 216 Latrobe St_2015 Vertical Community Tower, 342 Bourke St_2014

CONSTRUCTION & MODELLING CAZ Tower Model_2015

CONSTRUCTION DOCUMENTATION CAD Documentation_2016 CAD Documentation_2015

210

16

20

2224

CONTENTArchitecture Portfolio

Page 4: Zheng portforlio new

2CONTENT

Studio LeaderRennie LiffenVirginia Mannering

The idea of this store front is to encourage everyone engagewith the design of the storefront and each factory person will have their own private and independent gallery to exhibit their works this is inspired by andy warhole’s 15minutes

The architectural composition is to put the solid pink box in the center surrounded by extruded glass boxes which can be extruded to form the facade of the storefront according to designers needs. Factory people design the facade throughthe extruded glass boxes which are independent small gallery too. People will enter the semi-public long ,dark narrow, corridor to watch andy’s films, finally they will arrive the private pink solid box in the center which is the theaterett the free access entrances, semi-public corridor and the private pink theaterette forms the porosity of pink in terms of visiting sequence during that process visitors will experiencing from bright glass galleries to dark quiet film corridor, then gather at the center-theaterette.

This is a storefront which connects the public to the factory, it will give people different visiting experiences both hironzontally and vertically as well as let people use their sensories to feel the design of this storefront.

PINK POROSITYStorefront of Silver Factory (Andy Warhol)

© 2016

First Floor Plan

Page 5: Zheng portforlio new

3CONTENT

Perspective

Page 6: Zheng portforlio new

4CONTENT

Ground Floor Plan Section

Page 7: Zheng portforlio new

5CONTENT

Section

Page 8: Zheng portforlio new

6CONTENT

Summer Party Scenario

Plan Section

Page 9: Zheng portforlio new

7CONTENT

Section Moment Drawing

Page 10: Zheng portforlio new

8CONTENT

Winter Evening Scenario

Plan Section

Page 11: Zheng portforlio new

9CONTENT

Section Moment Drawing

Page 12: Zheng portforlio new

10CONTENT

CAZ Tower ProjectThe intention of this project is to design a new high rise office building which is functional, efficient and aesthetic.

Applied constructionUniversity of MelbourneSchool of Design

© 2016

SupervisorGiorgio MarfellaJamie Mccutcheon

Page 13: Zheng portforlio new

11CONTENT

Page 14: Zheng portforlio new

12CONTENT

CONCRETE COLUMN CONCRETE EDGE BEAMCONCRETE BAND BEAM CONCRETE COLUMN CONCRETE EDGE BEAMCONCRETE BAND BEAM

BELT TRUSS

CONCRETE EDGE BEAMSTEEL COLUMN

LIGHT WEIGHT BRACINGFOR ROOFTOP STRUCTURE

TRUSS ROOF

OUTRIGGER

CONCRETE COLUMN

LATERAL LOADS RESISTING SYSTEM

A2.1 Structure: Plans and Sections

6.004.504.504.504.504.504.504.504.504.50

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

4.506.00

4

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

5 6 7 8 9 10 11 12 13 14 15 16

4

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

5 6 7 8 9 10 11 12 13 14 15 16

ATRIUM ATRIUM

4

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

5 6 7 8 9 10 11 12 13 14 15 16

ATRIUM

Columns:

Core Perimeter Wall Thickness:

Universal Beams:

Edge Beams:

Building Module

A2.101 LOW RISE TYPICAL FLOOR STRUCTURAL PLAN

1:250 @ A2

A2.103 MIDDLE RISE FLOOR STRUCTURAL PLAN

1:1000 @ A2

A2.104 SKY RISE FLOOR STRUCTURAL PLAN

1:1000 @ A2

A2.102 STRUCTURAL PLAN OF CROWN

1:250 @ A2

6.004.504.504.504.504.504.504.504.504.50

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

3.75

4.506.00

4

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

5 6 7 8 9 10 11 12 13 14 15 16

A2.2 Structure: Model and 3D Diagrams

Page 15: Zheng portforlio new

13CONTENT

CONCRETE COLUMN CONCRETE EDGE BEAMCONCRETE BAND BEAM CONCRETE COLUMN CONCRETE EDGE BEAMCONCRETE BAND BEAM

BELT TRUSS

CONCRETE EDGE BEAMSTEEL COLUMN

LIGHT WEIGHT BRACINGFOR ROOFTOP STRUCTURE

TRUSS ROOF

OUTRIGGER

CONCRETE COLUMN

LATERAL LOADS RESISTING SYSTEM

A3.102 ENLARGED ELEVATION PORTION

1:100

INTERIOR VIEW

Page 16: Zheng portforlio new

14CONTENT

Studio LeaderDR Peter Raisbeck Madeleine Beech (BKK)Jeanne Lee (PMDL)Ben De Nardi

Vertical Movement & Horizontal Loop Communal floors’ functions transits from inside to outside through rotation.Visual Relationship is created between inhabitants’ balconies.Horizontal Loop formed by connected balconies.

VERTICALCOMMUNITY342 Bourke St Tower Design

© 2014

Page 17: Zheng portforlio new

15CONTENT

Page 18: Zheng portforlio new

16CONTENT

Page 19: Zheng portforlio new

17CONTENT

Page 20: Zheng portforlio new

18CONTENT

Page 21: Zheng portforlio new

19CONTENT

Page 22: Zheng portforlio new

20 MODELING

236 Latrobe St Tower DesignThe University of MelbourneFaculty of Architecture Building and PlanningMelbourne School of Design

© 2015

CAZ Tower1:500 Lasercut ModelIntersection of Latrobe St and Exhibition St

SupervisorGiorgio MarfellaJamie Mccutcheon

Page 23: Zheng portforlio new

21 MODELING

Page 24: Zheng portforlio new

22 CONSTRUCTION DOCUMENTATION

The University of MelbourneFaculty of Architecture Building and PlanningMelbourne School of Design

© 2015

SupervisorGiorgio Marfella

CONSTRUCTION DOCUMENTATIONCAD Drawings

A4.2 Typical Floor: General Arrangement

A4.201 SECTION

1:50 @ A2

PERSPECTIVE DIAGRAM

A4.203 PLAN

1:50 @ A2

A4.202 ELEVATION

1:50 @ A2

Page 25: Zheng portforlio new

23CONSTRUCTION DOCUMENTATIONA5.2Typical Floor: Details

A5.202 FLOOR BRACKET CONNECTION PLAN

1:2 @ A2A5.201 MECHANICAL FLOOR SECTION

1:10 @ A2

A5.203 TYPICAL OFFICE FLOOR SECTION

1:10 @ A2

A5.3 Parapet: Details

STEEL TUBE250X150X6MM

BRACKET 120X40X5MM

6MM ALUCOBOND ALUMINUM COMPOSITE PANEL WHITE

6MM ALUCOBOND ALUMINUM COMPOSITE PANEL

WHITE

TNALAES NOCILISTNALAES NOCILIS

TRE TIE ROD FORKM25

TIE ROD Ø25mm

MECHANICAL FLOOR

50MM CONCRETE FINISH

CONCRETE FLOOR SLAB

THERMAL INSULATION

600X600 RAISED ACCESS FLOOR

LIQUIDWATERPROOFING

MEMBRANE

WEARING SLAB2MM MORTAR

40MM BLUESTONE

T BRACKETS 200x100x10MM

RIGID GRID PEDESTAL

M16 AGA NUT

ALUMINIUM COMPOSITE PANEL CAPPING 3MM WHITE FINISH

TIMBER PACKING

SILICON SEALANT

ALUMINIUM COMPOSITE SPANDREL PANEL4MM WHITEALUMINIUM COMPOSITE

PANEL4MM WHITE

TOP HAT

50mm 200mm 50mm

LIQUD WATERPROOFING MEMBRANE

SILICON SEALANT

6MM

Ø32MM COMPRESSION SPAR

TCN NODE,12MM OFFSET HOLE

MIG THREADED ROD

MIG GLAZING FIXING

ORIGINAL TENSION TRUSS GRID

ORIGINAL TENSION TRUSS GRID

TRE TIE ROD PORK,MIG, M25

ROD Ø25MM

A5.301 Decorative Facade Section Detail

1:5

A5.303 Retaining wall Section Detail

1:5

A5.305 Crown Floor Section Detail

1:5

A5.304 Spider Section Detail

1:5

A5.302 Decorative Facade Section Detail

1:1

A5.302

Page 26: Zheng portforlio new

24 CONSTRUCTION DOCUMENTATION

The University of MelbourneFaculty of Architecture Building and PlanningMelbourne School of Design

© 2014

SupervisorGiorgio MarfellaDavid O’ BrienGeorge StavriasJames Neil

CONSTRUCTION DOCUMENTATIONCAD Drawings

Page 27: Zheng portforlio new

25CONSTRUCTION DOCUMENTATION