NAPPS Preventive Maintenance Program Goals
and Objectives • Maintain all HVAC/R equipment at peak physical
and operational condition to:o Minimize unexpected and lengthy down timeo Keep equipment operating at highest
potential efficiency• Identify service and maintenance issues in
advance of failure• Identify equipment replacement needs for
reliability and/or economic reasons• Measure and log HVAC/R equipment operating
conditions
The Comfortable Choice In East Texas Since 1957
NAPPS Preventive Maintenance Program Goals
and Objectives (Cont)• Maintain HVAC/R equipment maintenance and
repair records• Identify and number all HVAC/R equipment
described in scope of work• Communicate with Your Company’s
representative througho Open and timely dialog relating to ongoing
HVAC/R equipment maintenance and repair work.
o Monthly and quarterly reporting including a presentation of program status and accomplishments
The Comfortable Choice In East Texas Since 1957
NAPPS Preventive Maintenance Program Goals
and Objectives (Cont)
• During Preventative Maintenance activity, Your Company’s representative will be notified of any malfunctions that are identified and a Repair Work Order will be initiated if authorized.
• Practices for inspection and maintenance meets or exceeds ANSI/ASHRAE/ACCA Standard 180-2008. (Standard Practices for Inspection and Maintenance of Commercial Building HVAC Systems)
The Comfortable Choice In East Texas Since 1957
ANSI/ASHRAE/
ACCA Standard I80-
2008
Current Unit Inventory
Package Units; 12Condensing Units; 14
Air Han-
dlers; 14
VAV Units; 16
Window Units; 14
Chillers; 5
Wall Pack Units; 6
Ice Ma-chines; 6
Make up Air Units; 5
Exhaust Fans; 4
Walk in Freezer; 2 Walk in Cooler; 1 Water Fountains; 3
102 Units Total
The Comfortable Choice In East Texas Since 1957
3rd Quarter CompletionRate as of Aug 31st
0
5
10
15
20
1214 14
1614
5 6 6 5 42 1
3
89 9
119
3 4 4 3 31 1 2
102 Units scheduled67 Units Complete66% Complete
The Comfortable Choice In East Texas Since 1957
Service Orders Found During PM’s
3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr0
2
4
6
8
10
12
14
16
18
16
13
7
8
4
Total Service Orders found during PM’s
48 (15 months)
The Comfortable Choice In East Texas Since 1957
Trouble Service Orders
3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr0
2
4
6
8
10
12
14
13
10
66
3
Total Trouble Service Orders
38 (15 months)
The Comfortable Choice In East Texas Since 1957
Maintenance Items
• Currently there have been 2 Service orders created under the preventative maintenance program in August.
The Comfortable Choice In East Texas Since 1957
LabelsEquipment Numbering System
Your Company
Building Number
Component Number
Type of Unit (see next slide)
YC-001-001-AHU-001System Number
The Comfortable Choice In East Texas Since 1957
System Identification(label on thermostat)
Type of Unit Identification
• CDU- Condensing Unit• WPU- Wall pack Unit• CHU- Chiller Unit• AHU- Air Handler Unit• EXU- Exhaust Fan• WDU- Window Unit• PKU- Package Air Conditioning Unit• MAU- Make Up Air Unit• ICU- Ice Machine Unit• WRU- Walk in Refrigerator Unit• WFU- Walk in Freezer Unit• FCU- Fan Coil Unit
The Comfortable Choice In East Texas Since 1957
Equipment Condition Report
• To be completed on units that require extensive repair or replacement.
The Comfortable Choice In East Texas Since 1957