World Meteorological OrganizationWorking together in weather, climate and water
WMO OMM
WMO www.wmo.int/sat
Jerôme LafeuilleWMO Space Programme Office
WMO Space Programme Activity ReportCM-11, Item 3
CM-11, Geneva, 19 May 2011 2
WMO OMM
WMO Space Programme Main ComponentsWMO Space Programme Main Components(Annex to paragr. 3.7.14 of Cg-XVI/Doc.37)(Annex to paragr. 3.7.14 of Cg-XVI/Doc.37)
Availability and use ofsatellite data & products
Information and training
Satellite operators
CGMS & CEOS
Users: all WMO
& co-sponsored programmes
Integrated Space-based Observing systems
WMOFocal point
Space Weather Coordination
CM-11, Geneva, 19 May 2011 3
WMO OMM
Challenges for space-based GOS
• Short term: – User preparedness for new geostationary programmes in 2015-2018– PM orbit: new programmes (FY-3, NPP/JPSS) to be fully operational
• Long-term: – Implement planned missions identified in new CGMS baseline
• Altimetry, scatterometry, radio-occultation, Total Solar Irradiance, MW imagery• Availability of early morning data (from DWSS) for WMO Members
– Develop plans for remaining gaps wrt the Vision of the GOS in 2025• Complete GEO and LEO hyperspectral sounding, operational precipitation
radars, atmospheric composition (limb sounders)
CM-11, Geneva, 19 May 2011 4
WMO OMM
Data and product availability and accessibility (1)
• Formulate data access requirements at regional level– On going in RA I, RA II, RA III/IV – Linkage with APSDEU-NAEDEX (for NWP centres)Encourage similar initiative in RA V
• DVB-S dissemination systems with integrated data content– Expansion of EUMETCAST, CMACAST, MITRA, GEONETCASTConvergence of Geonetcast/Eumetcast America ?Encourage initiative over the Pacific (USA-Australia Rapidcast)
CM-11, Geneva, 19 May 2011 5
WMO OMM
Data and product availability and accessibility (2)
• Direct Broadcast: unique for real time access to LEO data L-Band (1695-1710 MHz) threatened by broadband mobile
services (now in USA, risk of spreading to other countries)No equivalent in X-Band until next decade
• Retransmission of sounding data from Direct Readout (RARS)– ATOVS data from 74% of the globe available over GTS Include new sounders of FY-3, Metop, NPP/JPSS
CM-11, Geneva, 19 May 2011 6
WMO OMM
User Training: The VLab network in 201112 Centres of Excellence and 8 satellite operators
• New CoE in Republic of Korea
• More than 1300 participants in international training courses
• Technical Support Officer (TSO) funded by NOAA in 2010-2011
Voluntary funding needed for TSO in 2012 and beyond
CM-11, Geneva, 19 May 2011 7
WMO OMM
Space Weather Challenges(Addressed at Space Weather side event on 17 May)
• Greater vulnerability with increased dependence on satellites (observation, communications, navigation), cross-polar flights, electric power lines, radiocommunications…and new solar cycle
• On going work of ICTSW : observations (RRR), data exchange (WIS), products and services (ICAO, service centres)
• Space Weather coordination not funded in current financial period
Raise awareness of WMO Members on Space Weather impacts Demonstrate the benefit of coordination by WMO Prepare for coordinated response to emerging ICAO needs Develop coordinated strategy (including training) with Regional Assoc
CM-11, Geneva, 19 May 2011 8
WMO OMM
Conclusions
• Progress reported in detail in CM-11/Doc.3(Note: SCOPE-CM, Architecture reported in Docs 5 and 6)
• Appreciate contributions to these Space Programme achievements
• CM-11 may provide guidance to Cg-XVI on issues raised e.g. in reinforcing Cg-XVI Doc. 3.7– Space Weather (Paragr. 3.7.11)– Radio-frequency incl. L-Band (Paragr. 3.7.12)
(To be discussed under CM-11 agenda item 7)