Copyright of Royal Dutch Shell plc CONFIDENTIAL Copyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc Wind Development in Alberta Erin Bradley April 7, 2011

Upload: ports-to-plains-blog

Post on 07-Nov-2014

1.035 views

Category:

Documents


0 download

DESCRIPTION

Ports-to-Plains Energy SummitOmni Interlocken ResortBroomfield, COApril 7, 2011The Ports-to-Plains Corridor runs through the middle of North America’s wind corridor. Learn about the issues affecting this growing industry throughout the region.

TRANSCRIPT

Page 1: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIALCopyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc

Wind Development in Alberta

Erin Bradley

April 7, 2011

Page 2: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.

Top of Iowa

80MW

Cabazon Pass, CA

41MW

Whitewater Hill, CA

61.5MW

Brazos, TX

160MW

Colorado Green

162MWMount Storm, WV

264MW

Rock River, WY

50MW

White Deer, TX

80MW

U.S. Developer, Owner & Operator

Involved in 8 wind projects in the U.S. that are 50/50 JV

722 wind turbines

Total capacity – 900 MW

Page 3: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.

Harburg

Hamburg, Germany

3.6MW

NoordZeeWind

Egmond aan Zee, The Netherlands

108 MW

La MuelaZaragoza, Spain

99MW

Europe - Developer, Owner & Operator

Involved in 3 wind projects in Europe that are 50/50 JV

170 wind turbines

Total capacity – 200 MW

Page 4: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIALCopyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.

Wild Steer Butte - General Project Information

Date 05/04/2011 4

Location: Southeast of the town of Bow Island;

50 km west and 30 km south of Medicine Hat

Capacity: up to 775 MW

Site Control: 93,000 acres under option

Transmission Solution:Southern Alberta Transmission Reinforcement (SATR) project

Schedule: – Dependent on SATR timing

Environmental: – Avian, bat, visual, noise baseline studies complete

Shell Wind Energy - Wild Steer Butte Project

Page 5: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIALCopyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.

Wind in Alberta

Market design

— Merchant market

— One of the most deregulated markets in North America

Climate Change Legislation

— Functioning carbon offset market

Generation capacity

— 13,447 MW existing generation, 805 MW of which is wind

Interconnection queue

— >12,000 MW of projects known, about 5,700 MW of which is advanced enough to be in the queue

— Almost 7,000 MW of wind projects known, about 3,400 MW of which is in the queue

Transmission

— Southern Alberta Transmission System (SATR) being built to accommodate 2,700 MW of wind

— Load pays for transmission build

Date 05/04/2011 Shell Wind Energy - Wild Steer Butte Project 5Date 05/04/2011 5

Page 6: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIALCopyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.

Wind in Alberta - Challenges

Economics

— Few long term Power Purchase Agreements (PPA)

— Low power prices

— No federal or provincial incentives

Climate Change Legislation

— Canadian government has stated intention to follow US lead

— Uncertainty on future of Alberta system and future price

Date 05/04/2011 Shell Wind Energy - Wild Steer Butte Project 6Date 05/04/2011 6

Page 7: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.

Thank you!Thank you!

Page 8: Wind Policy and Developments in Canada

Copyright of Royal Dutch Shell plc CONFIDENTIAL Shell WindEnergy Inc.