An Employee-Owned Company | © 2013 Kleinfelder. All rights reserved. Kleinfelder is currently serving as the prime consultant responsible for the project management, bridge planning, design engineering, and environmental documentation services for the replacement of this 610-foot-long bridge over the Sweetwater River in the City of Chula Vista. KEEPING THE PROJECT ON SCHEDULE The two most critical issues for this project are the hydraulic analysis and the biological studies. For the hydraulic analysis, the project was evaluated using Federal Emergency Management Agency (FEMA) flow rates and Caltrans guidelines to pass the 100-year event and the 50-year event with two feet of freeboard. The biological studies included protocol surveys for special-status species, wetland delineation, Natural Environmental Study, and a Biological Assessment. On-time completion of these studies was essential in keeping the project on schedule. REPLACEMENT VERSUS REHABILITATION STUDIES As the prime consultant, Kleinfelder is responsible for the preliminary engineering, the development of a joint EA/IS/MND document, and final design activities. This project included detailed replacement versus rehabilitation studies to support the Federal Highway Bridge Program funding guidelines. PROJECT RESULTS This project will be funded through the Federal Highway Bridge Program and is subject to review by Caltrans District 11 and Structures Local Assistance. Kleinfelder successfully gained Caltrans approval and funding for a capacity increasing replacement for this bridge with a sufficiency rating of 65 (ratings above 50 typically result in rehabilitation). Location: Chula Vista, California Project Cost: $7.9 Million Owner: City of Chula Vista Willow Street Bridge Replacement

Upload: others

Post on 06-Jul-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Willow Street Bridge Replacement - Kleinfelder...Title Willow Street Bridge Replacement Author Kleinfelder Subject Kleinfelder is currently serving as the prime consultant responsible

An Employee-Owned Company | © 2013 Kleinfelder. All rights reserved.

Kleinfelder is currently serving as the prime consultant responsible for the project management, bridge planning, design engineering, and environmental documentation services for the replacement of this 610-foot-long bridge over the Sweetwater River in the City of Chula Vista.

keeping the project on scheduleThe two most critical issues for this project are the hydraulic analysis and the biological studies. For the hydraulic analysis, the project was evaluated using Federal Emergency Management Agency (FEMA) flow rates and Caltrans guidelines to pass the 100-year event and the 50-year event with two feet of freeboard. The biological studies included protocol surveys for special-status species, wetland delineation, Natural Environmental Study, and a Biological Assessment. On-time completion of these studies was essential in keeping the project on schedule.

replacement versus rehabilitation studiesAs the prime consultant, Kleinfelder is responsible for the preliminary engineering, the development of a joint EA/IS/MND document, and final design activities. This project included detailed replacement versus rehabilitation studies to support the Federal Highway Bridge Program funding guidelines.

project results

This project will be funded

through the Federal

Highway Bridge Program

and is subject to review

by Caltrans District 11 and

Structures Local Assistance.

Kleinfelder successfully

gained Caltrans approval

and funding for a capacity

increasing replacement

for this bridge with a

sufficiency rating of 65

(ratings above 50 typically

result in rehabilitation).

location:Chula Vista, California project cost:$7.9 Million

owner:City of Chula Vista

Willow street bridge replacement