wheatland wind project project...
TRANSCRIPT
FEBRUARY 22, 2017
DEAR STAKEHOLDER:
Re: Wheatland Wind Project - Final Project Information Package
The Wheatland Wind Project LP (“WWLP”) team would like to once again thank you for your continued interest and feedback on the Wheatland Wind Project (“Project”). You are receiving this letter and package because we would like to update you on the Project and provide information on how you can continue to be involved. Since our December 2016 Project Update, we have continued our engagement with the community and have conducted further studies in support of the Project. We plan to submit our wind power plant application to the Alberta Utilities Commission in March 2017. A summary of stakeholder comments will be incorporated into the application.
Included in this package, you will find:
• Newsletter #3• Proposed Project Map #3• The AUC brochure Public involvement in a proposed utility development
WWLP remains committed to sharing information about the Project and working with the public to ensure that stakeholder input and concerns are heard and addressed. This will continue throughout the AUC review process, as well as during construction and beyond. Thank you for your continued interest in the Project.
Sincerely,
Dan Tocher Stakeholder Relations Manager
If you have any questions or concerns that have not been previously addressed, please contact:
Dan Tocher Stakeholder Relations ManagerE: [email protected]: 1.888.270.5743 (toll-free) www.wheatlandwind.com
CONTACT US
PROJECTUPDATE
WHEATLAND WIND PROJECT
ABOUT US Wheatland Wind Project LP (WWLP) is a partnership between Potentia Renewables Inc. and Greengate Power Corporation. Potentia Renewables Inc. is an independent power producer focused on developing, managing and operating renewable energy systems. Potentia Renewables Inc. is a wholly owned subsidiary of Power Corporation of Canada, a diversified international management and holding company.
Greengate Power Corporation is a leading renewable energy company based in Calgary, Alberta. To date, Greengate has successfully developed 450 MW of operating wind projects in Alberta. These projects represent over 30% of the wind energy generated in Alberta and provide a clean source of energy to approximately 200,000 homes.
Wheatland Wind Project LP, by its general partner Wheatland Wind Project Ltd.Suite #124 100, 111 – 5 Ave SW Calgary, AB T2P 3Y6
INTRODUCTION The Wheatland Wind Project LP (“WWLP”) team would like to thank everyone for your continued feedback on the Wheatland Wind Project (the “Project”). We greatly value our relationship with the local communities and appreciate your continued interest in the Project.
Over the last several months we have provided information to stakeholders in the form of public advertisements, open house discussions, and Project specific newsletters. Following our last newsletter we received valuable feedback from stakeholders that we have incorporated into the finalized Project layout. Proposed Project Map #3 included in this newsletter will be used in our submission to the Alberta Utilities Commission (AUC) in March 2017.
PROJECT INFORMATION SUMMARYThe Project is seeking AUC approval for 41 wind turbine locations, the associated underground electrical collector system, access roads, and a Project collector substation, called the Badlands Substation, located at SE 15-26-18 W4M. The Project is planning on using Senvion wind turbine technology that will have a hub height of 110 metres (m), a rotor diameter of 140 m and a power rating capacity of 3.4 megawatts (MW) per wind turbine. The Project will utilize 36 of the 41 wind turbine locations, providing a Project nameplate capacity of 122.4 MW, and delivering a maximum of 120 MW to the Alberta power grid. Proposed Project Map #3 indicates the current wind turbine locations. The final 36 wind turbine locations will be selected based on wind resource, environmental impacts, constructability and Project economics. The WWLP team will continue to provide updates to stakeholders on the Project and final wind turbine locations throughout the AUC process, construction, and beyond.
WHEATLAND WIND PROJECT FEBRUARY 2017 • NEWSLETTER #3
WHEATLAND WIND PROJECT
FEBRUARY 2017 • NEWSLETTER #3
PROJECT UPDATESProposed Project Map #3 shows the updated layout based on Senvion wind turbine technology, Project substation, operation and maintenance building, access roads, and underground electrical collector system.
Since Newsletter #2, which included Proposed Project Map #2, there have been no changes to the number of wind turbines or wind turbine locations and only minor changes to the proposed locations of the underground electrical collector system and access roads.
As was indicated in our open house, and as part of the required Noise Impact Assessment (NIA), WWLP is planning to apply for a Class C2 adjustment in accordance with AUC Rule 012. The Class C2 adjustment accounts for sound caused by wind near a home resulting in the wind masking other sounds, such as the noise level of a wind turbine. The intent of the C2 adjustment is to be better able to demonstrate compliance with the permissible sound levels at homes, by appropriately accounting for existing background sound levels during the wind conditions when wind turbines operate.
The application for the C2 adjustment depends on the spatial relationship between a home and the Project, sound level/wind data measured on the Project site and the wind turbine technology selected. If the measured ambient sound level during high winds is higher than the AUC Rule 012 defined ambient sound level, an increase to the permissible sound level at homes may be requested for either the daytime period or nighttime periods. To obtain the adjustment to the permissible sound level, ambient wind sound level surveys and wind measurements must be conducted in accordance with AUC Rule 012. Details of all required measurements, analysis and the specific C2 adjustment requested for each residence will be reported in the Noise Impact Assessment which will accompany the AUC Application for the Project. For more information
please see AUC Rule 012.
IN THIS NEWSLETTER, YOU WILL FIND THE FOLLOWING:
• Project Information Summary• Project Updates• Next Steps• Project Milestones THE INSERT TO THIS NEWSLETTER INCLUDES:• Proposed Project Map #3
Wheatland Wind Project LP, by its general partner Wheatland Wind Project Ltd.
Suite #124 #100, 111 – 5 Ave SWCalgary, AB T2P 3Y6
CONTACT US
Privacy Commitment: WWLP is committed to protecting your privacy. Collected personal information will be protected under the provincial Personal Information Protection Act (PIPA). As part of the regulatory process for new generation projects, WWLP may be required to provide your personal information to Alberta Utilities Commission (AUC). For more information about how WWLP protects your personal information, visit our website at www.wheatlandwind.com or contact us directly via phone toll-free at 1.888.270.5743.
Dan Tocher Stakeholder Relations ManagerEmail: [email protected] Toll Free: 1.888.270.5743Web: www.wheatlandwind.com
WWLP will continue to engage in public consultation with stakeholders in the surrounding area. WWLP is committed to engaging landowners, public stakeholders and potentially affected Aboriginalcommunities about the Project.
After receiving feedback from stakeholders following this mailout, WWLP intends to file a power plant application with the AUC in March 2017. WWLP is committed to continue sharing information about the Project and working with the public to ensure that stakeholder input and concerns are heard and addressed.
Stakeholders are encouraged to participate throughout this process. We hope you will contact us if you have any questions or concerns or if you would like to meet to discuss the Project. A summary of stakeholder comments will be incorporated into the wind power plant application we submit to the AUC.
To learn more about the application and review process, please contact the AUC at:
• 780-427-4903 (toll-free by dialing 310-0000 before the number) • E-mail: [email protected]
NEXT STEPS
Q1 2017Submission of
AUC application
Q4 2018AESO REP
awards contracts
Q2 2019 Project
in-service date
Q2 2019 Project in
service
Q2 2018 Site mobilization and
construction start
PROJECT MILESTONES The current milestones going forward are as follows:
* Schedule is subject to change. The commencement of construction will be influenced by the AESO Renewable Electricity Program (REP) announcements and REP program deployment. WWLP expects to participate in the REP and, if successful, intends to construct the Project as soon as possible after contract award. If the Project is not successful in the first round of the REP, the Project will explore other opportunities to proceed, as well as apply for subsequent rounds of the REP. Opportunities outside the REP are also being pursued and may also influence the construction schedule.
For more information on the AESO REP please visit:
www.aeso.ca/market/renewable- electricity-program/
Q4 2017Submission of Renewable
Electricity Program (REP) bidEngineering
studies complete AUC approval
Q4 2017 Q4 2017
41 TURBINE
PROPOSED PROJECT MAP #3
Note: Turbine numbers are not in sequential order
Date: 2017-02-22
Current Project Boundary
Proposed Turbine Location
Proposed Project Substation and Proposed O&M Building
Proposed Underground Electrical Collector System (34 kV)
Proposed New Road
Minor Highway
Paved Road
Unpaved Road
Residence
Existing Turbine (Wintering Hills)
Existing Transmission Line (138 kV)
Township Line
Section Line
")
")
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")")")
")
")
")
")
")
")")
")
")
")")")
")
")
")")
")
") ")
")
")
")
")
")
")
")
")
")
")
")
")
")
17
29
31
7 8
31 32
6
8
1617
20
26
31 36
4
141617
23 24
2627
31 32 35
15
7 8
20 23
2529
33 36
3
8 10
1416
20 21 23 24
27
32 33 35
235
8 11
2
18
19
34
2
11
17
24
29
32
29
1416
26
15
12
1517
22
13
19 22
29
33 35
3
9
22
25
3334 36
10
46
9
19
30
3
19
11
20
25
18
30
14
10
13
15
13
20
5
7
27
34
11
26
13
2
20
2828
21
17
1
7 10 12
15
30
9
28
4
5
32
4
28
18
24
6
32
18
21
22
15
23
30
36
27
35
8
25
1
12
34
9
6
21
5
29
12
6
9101112
C o u n t y o f P a i n t e a r t h N o . 1 8
1
2
34
6
5
7
9 10
11
12
16
17
1819 20
24
25
26
27
28
29
30
31
34
3536
37 38 39
41
44 45
46
4748
49
50 51
52
53
54
55
56
57
58
ÃÆ
855
Township Road 370
Ran
ge R
oad
145
Township Road 364
Ran
ge R
oad
155
Township Road 373
Ran
ge R
oad
150
Ran
ge R
oad
160
Township Road 380
Township Road 372
Township Road 374
Highway 12
Ran
ge R
oad
164
Ran
ge R
oad
161A
Ran
ge R
oad
154
Ran
ge R
oad
161
Ran
ge R
oad
151Ran
ge R
oad
153
Ran
ge R
oad
163
Ran
ge R
oad
162
LanesLake
SullivanLake
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M BuildingPotential Underground or Above Ground Collector (34 kV)Potential New Road
") Residence
!( Existing Turbine (Halkirk)
Major Highway
Minor Highway
Paved Road
Other Road
Municipal District and CountyBoundaryTownship Line
Section Line
T.36
T.37
Paintearth Wind ProjectProposed Project Map #2
(Subject to Change)
T.38
Hanna
Ponoka
Airdrie
LacombeStettlerRed Deer
Innisfail
Drumheller
Wainwright
0 1 2 30.5
Kilometers ´
Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity
Version: 10Date: 2016-11-30Layout: 20161104Prepared By: WSP
Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000
R.15 R.14 W4MR.16
")
")
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")")")
")
")
")
")
")
")")
")
")
")")")
")
")
")")
")
") ")
")
")
")
")
")
")
")
")
")
")
")
")
")
17
29
31
7 8
31 32
6
8
1617
20
26
31 36
4
141617
23 24
2627
31 32 35
15
7 8
20 23
2529
33 36
3
8 10
1416
20 21 23 24
27
32 33 35
235
8 11
2
18
19
34
2
11
17
24
29
32
29
1416
26
15
12
1517
22
13
19 22
29
33 35
3
9
22
25
3334 36
10
46
9
19
30
3
19
11
20
25
18
30
14
10
13
15
13
20
5
7
27
34
11
26
13
2
20
2828
21
17
1
7 10 12
15
30
9
28
4
5
32
4
28
18
24
6
32
18
21
22
15
23
30
36
27
35
8
25
1
12
34
9
6
21
5
29
12
6
9101112
C o u n t y o f P a i n t e a r t h N o . 1 8
1
2
34
6
5
7
9 10
11
12
16
17
1819 20
24
25
26
27
28
29
30
31
34
3536
37 38 39
41
44 45
46
4748
49
50 51
52
53
54
55
56
57
58
ÃÆ
855
Township Road 370
Ran
ge R
oad
145
Township Road 364
Ran
ge R
oad
155
Township Road 373
Ran
ge R
oad
150
Ran
ge R
oad
160
Township Road 380
Township Road 372
Township Road 374
Highway 12
Ran
ge R
oad
164
Ran
ge R
oad
161A
Ran
ge R
oad
154
Ran
ge R
oad
161
Ran
ge R
oad
151Ran
ge R
oad
153
Ran
ge R
oad
163
Ran
ge R
oad
162
LanesLake
SullivanLake
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M BuildingPotential Underground or Above Ground Collector (34 kV)Potential New Road
") Residence
!( Existing Turbine (Halkirk)
Major Highway
Minor Highway
Paved Road
Other Road
Municipal District and CountyBoundaryTownship Line
Section Line
T.36
T.37
Paintearth Wind ProjectProposed Project Map #2
(Subject to Change)
T.38
Hanna
Ponoka
Airdrie
LacombeStettlerRed Deer
Innisfail
Drumheller
Wainwright
0 1 2 30.5
Kilometers ´
Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity
Version: 10Date: 2016-11-30Layout: 20161104Prepared By: WSP
Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000
R.15 R.14 W4MR.16
")
")
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")")")
")
")
")
")
")
")")
")
")
")")")
")
")
")")
")
") ")
")
")
")
")
")
")
")
")
")
")
")
")
")
17
29
31
7 8
31 32
6
8
1617
20
26
31 36
4
141617
23 24
2627
31 32 35
15
7 8
20 23
2529
33 36
3
8 10
1416
20 21 23 24
27
32 33 35
235
8 11
2
18
19
34
2
11
17
24
29
32
29
1416
26
15
12
1517
22
13
19 22
29
33 35
3
9
22
25
3334 36
10
46
9
19
30
3
19
11
20
25
18
30
14
10
13
15
13
20
5
7
27
34
11
26
13
2
20
2828
21
17
1
7 10 12
15
30
9
28
4
5
32
4
28
18
24
6
32
18
21
22
15
23
30
36
27
35
8
25
1
12
34
9
6
21
5
29
12
6
9101112
C o u n t y o f P a i n t e a r t h N o . 1 8
1
2
34
6
5
7
9 10
11
12
16
17
1819 20
24
25
26
27
28
29
30
31
34
3536
37 38 39
41
44 45
46
4748
49
50 51
52
53
54
55
56
57
58
ÃÆ
855
Township Road 370
Ran
ge R
oad
145
Township Road 364
Ran
ge R
oad
155
Township Road 373
Ran
ge R
oad
150
Ran
ge R
oad
160
Township Road 380
Township Road 372
Township Road 374
Highway 12
Ran
ge R
oad
164
Ran
ge R
oad
161A
Ran
ge R
oad
154
Ran
ge R
oad
161
Ran
ge R
oad
151Ran
ge R
oad
153
Ran
ge R
oad
163
Ran
ge R
oad
162
LanesLake
SullivanLake
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M BuildingPotential Underground or Above Ground Collector (34 kV)Potential New Road
") Residence
!( Existing Turbine (Halkirk)
Major Highway
Minor Highway
Paved Road
Other Road
Municipal District and CountyBoundaryTownship Line
Section Line
T.36
T.37
Paintearth Wind ProjectProposed Project Map #2
(Subject to Change)
T.38
Hanna
Ponoka
Airdrie
LacombeStettlerRed Deer
Innisfail
Drumheller
Wainwright
0 1 2 30.5
Kilometers ´
Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity
Version: 10Date: 2016-11-30Layout: 20161104Prepared By: WSP
Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000
R.15 R.14 W4MR.16
")
")
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")")")
")
")
")
")
")
")")
")
")
")")")
")
")
")")
")
") ")
")
")
")
")
")
")
")
")
")
")
")
")
")
17
29
31
7 8
31 32
6
8
1617
20
26
31 36
4
141617
23 24
2627
31 32 35
15
7 8
20 23
2529
33 36
3
8 10
1416
20 21 23 24
27
32 33 35
235
8 11
2
18
19
34
2
11
17
24
29
32
29
1416
26
15
12
1517
22
13
19 22
29
33 35
3
9
22
25
3334 36
10
46
9
19
30
3
19
11
20
25
18
30
14
10
13
15
13
20
5
7
27
34
11
26
13
2
20
2828
21
17
1
7 10 12
15
30
9
28
4
5
32
4
28
18
24
6
32
18
21
22
15
23
30
36
27
35
8
25
1
12
34
9
6
21
5
29
12
6
9101112
C o u n t y o f P a i n t e a r t h N o . 1 8
1
2
34
6
5
7
9 10
11
12
16
17
1819 20
24
25
26
27
28
29
30
31
34
3536
37 38 39
41
44 45
46
4748
49
50 51
52
53
54
55
56
57
58
ÃÆ
855
Township Road 370
Ran
ge R
oad
145
Township Road 364
Ran
ge R
oad
155
Township Road 373
Ran
ge R
oad
150
Ran
ge R
oad
160
Township Road 380
Township Road 372
Township Road 374
Highway 12
Ran
ge R
oad
164
Ran
ge R
oad
161A
Ran
ge R
oad
154
Ran
ge R
oad
161
Ran
ge R
oad
151Ran
ge R
oad
153
Ran
ge R
oad
163
Ran
ge R
oad
162
LanesLake
SullivanLake
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M BuildingPotential Underground or Above Ground Collector (34 kV)Potential New Road
") Residence
!( Existing Turbine (Halkirk)
Major Highway
Minor Highway
Paved Road
Other Road
Municipal District and CountyBoundaryTownship Line
Section Line
T.36
T.37
Paintearth Wind ProjectProposed Project Map #2
(Subject to Change)
T.38
Hanna
Ponoka
Airdrie
LacombeStettlerRed Deer
Innisfail
Drumheller
Wainwright
0 1 2 30.5
Kilometers ´
Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity
Version: 10Date: 2016-11-30Layout: 20161104Prepared By: WSP
Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000
R.15 R.14 W4MR.16
")
")
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")")")
")
")
")
")
")
")")
")
")
")")")
")
")
")")
")
") ")
")
")
")
")
")
")
")
")
")
")
")
")
")
17
29
31
7 8
31 32
6
8
1617
20
26
31 36
4
141617
23 24
2627
31 32 35
15
7 8
20 23
2529
33 36
3
8 10
1416
20 21 23 24
27
32 33 35
235
8 11
2
18
19
34
2
11
17
24
29
32
29
1416
26
15
12
1517
22
13
19 22
29
33 35
3
9
22
25
3334 36
10
46
9
19
30
3
19
11
20
25
18
30
14
10
13
15
13
20
5
7
27
34
11
26
13
2
20
2828
21
17
1
7 10 12
15
30
9
28
4
5
32
4
28
18
24
6
32
18
21
22
15
23
30
36
27
35
8
25
1
12
34
9
6
21
5
29
12
6
9101112
C o u n t y o f P a i n t e a r t h N o . 1 8
1
2
34
6
5
7
9 10
11
12
16
17
1819 20
24
25
26
27
28
29
30
31
34
3536
37 38 39
41
44 45
46
4748
49
50 51
52
53
54
55
56
57
58
ÃÆ
855
Township Road 370
Ran
ge R
oad
145
Township Road 364
Ran
ge R
oad
155
Township Road 373
Ran
ge R
oad
150
Ran
ge R
oad
160
Township Road 380
Township Road 372
Township Road 374
Highway 12
Ran
ge R
oad
164
Ran
ge R
oad
161A
Ran
ge R
oad
154
Ran
ge R
oad
161
Ran
ge R
oad
151Ran
ge R
oad
153
Ran
ge R
oad
163
Ran
ge R
oad
162
LanesLake
SullivanLake
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M BuildingPotential Underground or Above Ground Collector (34 kV)Potential New Road
") Residence
!( Existing Turbine (Halkirk)
Major Highway
Minor Highway
Paved Road
Other Road
Municipal District and CountyBoundaryTownship Line
Section Line
T.36
T.37
Paintearth Wind ProjectProposed Project Map #2
(Subject to Change)
T.38
Hanna
Ponoka
Airdrie
LacombeStettlerRed Deer
Innisfail
Drumheller
Wainwright
0 1 2 30.5
Kilometers ´
Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity
Version: 10Date: 2016-11-30Layout: 20161104Prepared By: WSP
Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000
R.15 R.14 W4MR.16
")
")
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")")
")
")
")
")
")
")
")
")
")
")")
")")")")
")
")
")
")
")
")")
")
")
")")")
")
")
")")
")
") ")
")
")
")
")
")
")
")
")
")
")
")
")
")
17
29
31
7 8
31 32
6
8
1617
20
26
31 36
4
141617
23 24
2627
31 32 35
15
7 8
20 23
2529
33 36
3
8 10
1416
20 21 23 24
27
32 33 35
235
8 11
2
18
19
34
2
11
17
24
29
32
29
1416
26
15
12
1517
22
13
19 22
29
33 35
3
9
22
25
3334 36
10
46
9
19
30
3
19
11
20
25
18
30
14
10
13
15
13
20
5
7
27
34
11
26
13
2
20
2828
21
17
1
7 10 12
15
30
9
28
4
5
32
4
28
18
24
6
32
18
21
22
15
23
30
36
27
35
8
25
1
12
34
9
6
21
5
29
12
6
9101112
C o u n t y o f P a i n t e a r t h N o . 1 8
1
2
34
6
5
7
9 10
11
12
16
17
1819 20
24
25
26
27
28
29
30
31
34
3536
37 38 39
41
44 45
46
4748
49
50 51
52
53
54
55
56
57
58
ÃÆ
855
Township Road 370
Ran
ge R
oad
145
Township Road 364
Ran
ge R
oad
155
Township Road 373
Ran
ge R
oad
150
Ran
ge R
oad
160
Township Road 380
Township Road 372
Township Road 374
Highway 12
Ran
ge R
oad
164
Ran
ge R
oad
161A
Ran
ge R
oad
154
Ran
ge R
oad
161
Ran
ge R
oad
151Ran
ge R
oad
153
Ran
ge R
oad
163
Ran
ge R
oad
162
LanesLake
SullivanLake
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M BuildingPotential Underground or Above Ground Collector (34 kV)Potential New Road
") Residence
!( Existing Turbine (Halkirk)
Major Highway
Minor Highway
Paved Road
Other Road
Municipal District and CountyBoundaryTownship Line
Section Line
T.36
T.37
Paintearth Wind ProjectProposed Project Map #2
(Subject to Change)
T.38
Hanna
Ponoka
Airdrie
LacombeStettlerRed Deer
Innisfail
Drumheller
Wainwright
0 1 2 30.5
Kilometers ´
Data Credits: Alberta Township System, roads andwater: AltaLIS (c) Government of Alberta.Imagery: Source: Esri, DigitalGlobe, GeoEye,Earthstar Geographics, CNES/Airbus DS, USDA,USGS, AeroGRID, IGN, and the GIS UserCommunity
Version: 10Date: 2016-11-30Layout: 20161104Prepared By: WSP
Datum: NAD 83Projection: UTM Zone 12NScale: 1:100,000
R.15 R.14 W4MR.16
")
!(
!(
!(
!(
!(
!(
!(!( !(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!( !(
!(
!(
!(
!( !(!(
!(!(
!(!(
!(
!( !( !(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(!( !(
!(!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
")
")
")
")")
")
") ")
")
")
")
")")
") ")
")")
")
")
") ")
")
")")
")")")")
")
")
")
")
")
") ")")
")")")")
")")
")")")
")")
")
")
")")
")
")")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
17
20
34
4
7 8
1617
21
31 3333 35
1315
19 20 23
30
33 35 36
45
12
14
21 22 24
2730
1415
23
26
34
14
12
22
27
34 35
19
24
9 11
19
22
28
9
34 36
1316
21
35
3
16
21
26
36
16
26
31
36
8
1316
20
26
15
22
29
33
36
22
28
32
22
2
18
29
2
18
18
28
5
15
18
27
25
28
1011
30
32
29
33
27
25
34
17
10
25
30
21
32
23
3634
24
16
27
15
27
14
31
24
10
28
20
25
7
17
19 21
9
28
32
31
29
1
131415
23
33
1
2 3 45 6 7
8 910 11
12
1314
16
17
1819
2021
23
24 25
26
27
28
29 30
32
35
36
37
3839
40
41 4243
44
45 46
W h e a t l a n d C o u n t y
ÃÆ
564
ÃÆ
848
Township Road 260
Ran
ge R
oad
184
Highway 564
Ran
ge R
oad
191
Ran
ge R
oad
193
Township Road 263
Ran
ge R
oad
182
Ran
ge R
oad
175 R
ange
Roa
d 17
3
Township Road 254
Township Road 254A
Ran
ge R
oad
185
Ran
ge R
oad
190
Township Road 264
Ran
ge R
oad
180
High
way
848
Township Road 262
Red Deer River
SeiuLake
RGE 17 W4M
RGE 18 W4M RGE 17 W4M
RGE 18 W4MRGE 19 W4M
RGE 19 W4M
TWP
26TW
P 25
TWP
26TW
P 25
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M Building
Potential Underground or Above Ground Collector (34 kV)
Potential New Road
") Residence
!(Existing Turbine (WinteringHills)
Minor Highway
Paved Road
Unpaved Road
Existing Transmission (138 kV)
Municipal District and CountyBoundary
Township Line
Section Line
Hanna
Brooks
Calgary
Airdrie
High River
Drumheller
Data Credits: Alberta Township System, roadsand water: AltaLIS (c) Government of Alberta.Imagery: BlackBridge Geomatics (image dateJune 2014).
Wheatland Wind ProjectProposed Project Map #3
(Subject to Change)
Version: 10Date: 2017-01-26Layout: 20161104BOP: 20170124
Datum: NAD 83Projection: UTM Zone 12NScale: 1:60,000Prepared By: WSP
0 1 2 30.5
Kilometers
´
")
!(
!(
!(
!(
!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(!(
!(
!( !( !(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(!( !(
!(!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
")
")
")
")")
")
") ")
")
")
")
")")
") ")
")")
")
")
")")
")
")")
")")")")
")
")
")
")
")
") ")")
")")")")
")")
")")")
")")
")
")
")")
")
")")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
7L17
17L
153
7L85
17
20
34
4
7 8
1617
21
31 3333 35
1315
19 20 23
30
33 35 36
45
12
14
21 22 24
2730
1415
23
26
34
1
12
22
27
34 35
19
24
9 11
19
22
34 36
13
35
3
26
36
16
26
31
36
8
1316
20
26
15
22
29
33
36
22
28
32
22
2
18
29
2
18
18
28
5
15
18
27
25
28
1011
30
32
2927
25
34
17
10
25
30
21
32
23
3634
24
16
27
15
27
14
31
24
10
20
25
7
17
19 21
9
28
32
31
29
1
131415
23
1
2 3 45 6 7
8 910 11
12
13
14
16
17
1819
2021
23
24 25
26
27
28
29 30
32
35
36
37
3839
40
41 4243
44
45 46
W h e a t l a n d C o u n t y
ÃÆ
564
ÃÆ
848
Township Road 260
Ran
ge R
oad
184
Ran
ge R
oad
191
Township Road 263
Ran
ge R
oad
175
Ran
ge R
oad
182
Ran
ge R
oad
173
Township Road 254
Township Road 254A
Ran
ge R
oad
185
Ran
ge R
oad
190
Township Road 264
Highway 564
Hig
hway
848
Ran
ge R
oad
180
Township Road 262
SeiuLake
RGE 17 W4M
RGE 18 W4M RGE 17 W4M
RGE 18 W4MRGE 19 W4M
RGE 19 W4M
TWP
26TW
P 25
TWP
26TW
P 25
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M Building
Proposed UndergroundCollector (34 kV)
Proposed New Road
") Residence
!(Existing Turbine (WinteringHills)
Minor Highway
Paved Road
Unpaved Road
Existing Transmission (138 kV)
Municipal District and CountyBoundary
Township Line
Section Line
Hanna
Brooks
Calgary
Airdrie
High River
Drumheller
Data Credits: Alberta Township System, roadsand water: AltaLIS (c) Government of Alberta;Existing transmission lines manually digitized byWSP; Existing turbine locations from FAA DOF.Imagery: BlackBridge Geomatics (image dateJune 2014).
Wheatland Wind ProjectProposed Project Map #3
(Subject to Change)
Version: 10Date: 2017-02-22Layout: 20161104BOP: 20170216
Datum: NAD 83Projection: UTM Zone 12NScale: 1:55,000Prepared By: WSP
0 1 2 30.5
Kilometres
´
")
!(
!(
!(
!(
!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(!(
!(
!( !( !(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(!( !(
!(!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
")
")
")
")")
")
") ")
")
")
")
")")
") ")
")")
")
")
")")
")
")")
")")")")
")
")
")
")
")
") ")")
")")")")
")")
")")")
")")
")
")
")")
")
")")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
7L17
17L
153
7L85
17
20
34
4
7 8
1617
21
31 3333 35
1315
19 20 23
30
33 35 36
45
12
14
21 22 24
2730
1415
23
26
34
1
12
22
27
34 35
19
24
9 11
19
22
34 36
13
35
3
26
36
16
26
31
36
8
1316
20
26
15
22
29
33
36
22
28
32
22
2
18
29
2
18
18
28
5
15
18
27
25
28
1011
30
32
2927
25
34
17
10
25
30
21
32
23
3634
24
16
27
15
27
14
31
24
10
20
25
7
17
19 21
9
28
32
31
29
1
131415
23
1
2 3 45 6 7
8 910 11
12
13
14
16
17
1819
2021
23
24 25
26
27
28
29 30
32
35
36
37
3839
40
41 4243
44
45 46
W h e a t l a n d C o u n t y
ÃÆ
564
ÃÆ
848
Township Road 260
Ran
ge R
oad
184
Ran
ge R
oad
191
Township Road 263
Ran
ge R
oad
175
Ran
ge R
oad
182
Ran
ge R
oad
173
Township Road 254
Township Road 254A
Ran
ge R
oad
185
Ran
ge R
oad
190
Township Road 264
Highway 564
Hig
hway
848
Ran
ge R
oad
180
Township Road 262
SeiuLake
RGE 17 W4M
RGE 18 W4M RGE 17 W4M
RGE 18 W4MRGE 19 W4M
RGE 19 W4M
TWP
26TW
P 25
TWP
26TW
P 25
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M Building
Proposed UndergroundCollector (34 kV)
Proposed New Road
") Residence
!(Existing Turbine (WinteringHills)
Minor Highway
Paved Road
Unpaved Road
Existing Transmission (138 kV)
Municipal District and CountyBoundary
Township Line
Section Line
Hanna
Brooks
Calgary
Airdrie
High River
Drumheller
Data Credits: Alberta Township System, roadsand water: AltaLIS (c) Government of Alberta;Existing transmission lines manually digitized byWSP; Existing turbine locations from FAA DOF.Imagery: BlackBridge Geomatics (image dateJune 2014).
Wheatland Wind ProjectProposed Project Map #3
(Subject to Change)
Version: 10Date: 2017-02-22Layout: 20161104BOP: 20170216
Datum: NAD 83Projection: UTM Zone 12NScale: 1:55,000Prepared By: WSP
0 1 2 30.5
Kilometres
´
")
!(
!(
!(
!(
!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(!(
!(
!( !( !(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(!( !(
!(!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
")
")
")
")")
")
") ")
")
")
")
")")
") ")
")")
")
")
")")
")
")")
")")")")
")
")
")
")
")
") ")")
")")")")
")")
")")")
")")
")
")
")")
")
")")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
7L17
17L
153
7L85
17
20
34
4
7 8
1617
21
31 3333 35
1315
19 20 23
30
33 35 36
45
12
14
21 22 24
2730
1415
23
26
34
1
12
22
27
34 35
19
24
9 11
19
22
34 36
13
35
3
26
36
16
26
31
36
8
1316
20
26
15
22
29
33
36
22
28
32
22
2
18
29
2
18
18
28
5
15
18
27
25
28
1011
30
32
2927
25
34
17
10
25
30
21
32
23
3634
24
16
27
15
27
14
31
24
10
20
25
7
17
19 21
9
28
32
31
29
1
131415
23
1
2 3 45 6 7
8 910 11
12
13
14
16
17
1819
2021
23
24 25
26
27
28
29 30
32
35
36
37
3839
40
41 4243
44
45 46
W h e a t l a n d C o u n t y
ÃÆ
564
ÃÆ
848
Township Road 260
Ran
ge R
oad
184
Ran
ge R
oad
191
Township Road 263
Ran
ge R
oad
175
Ran
ge R
oad
182
Ran
ge R
oad
173
Township Road 254
Township Road 254A
Ran
ge R
oad
185
Ran
ge R
oad
190
Township Road 264
Highway 564
Hig
hway
848
Ran
ge R
oad
180
Township Road 262
SeiuLake
RGE 17 W4M
RGE 18 W4M RGE 17 W4M
RGE 18 W4MRGE 19 W4M
RGE 19 W4M
TWP
26TW
P 25
TWP
26TW
P 25
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M Building
Proposed UndergroundCollector (34 kV)
Proposed New Road
") Residence
!(Existing Turbine (WinteringHills)
Minor Highway
Paved Road
Unpaved Road
Existing Transmission (138 kV)
Municipal District and CountyBoundary
Township Line
Section Line
Hanna
Brooks
Calgary
Airdrie
High River
Drumheller
Data Credits: Alberta Township System, roadsand water: AltaLIS (c) Government of Alberta;Existing transmission lines manually digitized byWSP; Existing turbine locations from FAA DOF.Imagery: BlackBridge Geomatics (image dateJune 2014).
Wheatland Wind ProjectProposed Project Map #3
(Subject to Change)
Version: 10Date: 2017-02-22Layout: 20161104BOP: 20170216
Datum: NAD 83Projection: UTM Zone 12NScale: 1:55,000Prepared By: WSP
0 1 2 30.5
Kilometres
´
")
!(
!(
!(
!(
!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(!(
!(
!( !( !(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(!( !(
!(!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!( !(!(
!(
!(!(
")
")
")
")")
")
") ")
")
")
")
")")
") ")
")")
")
")
")")
")
")")
")")")")
")
")
")
")
")
") ")")
")")")")
")")
")")")
")")
")
")
")")
")
")")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
7L17
17L
153
7L85
17
20
34
4
7 8
1617
21
31 3333 35
1315
19 20 23
30
33 35 36
45
12
14
21 22 24
2730
1415
23
26
34
1
12
22
27
34 35
19
24
9 11
19
22
34 36
13
35
3
26
36
16
26
31
36
8
1316
20
26
15
22
29
33
36
22
28
32
22
2
18
29
2
18
18
28
5
15
18
27
25
28
1011
30
32
2927
25
34
17
10
25
30
21
32
23
3634
24
16
27
15
27
14
31
24
10
20
25
7
17
19 21
9
28
32
31
29
1
131415
23
1
2 3 45 6 7
8 910 11
12
13
14
16
17
1819
2021
23
24 25
26
27
28
29 30
32
35
36
37
3839
40
41 4243
44
45 46
W h e a t l a n d C o u n t y
ÃÆ
564
ÃÆ
848
Township Road 260
Ran
ge R
oad
184
Ran
ge R
oad
191
Township Road 263
Ran
ge R
oad
175
Ran
ge R
oad
182
Ran
ge R
oad
173
Township Road 254
Township Road 254A
Ran
ge R
oad
185
Ran
ge R
oad
190
Township Road 264
Highway 564
Hig
hway
848
Ran
ge R
oad
180
Township Road 262
SeiuLake
RGE 17 W4M
RGE 18 W4M RGE 17 W4M
RGE 18 W4MRGE 19 W4M
RGE 19 W4M
TWP
26TW
P 25
TWP
26TW
P 25
Current Project Boundary
!( Proposed Turbine Location
")Proposed Project Substationand Proposed O&M Building
Proposed UndergroundCollector (34 kV)
Proposed New Road
") Residence
!(Existing Turbine (WinteringHills)
Minor Highway
Paved Road
Unpaved Road
Existing Transmission (138 kV)
Municipal District and CountyBoundary
Township Line
Section Line
Hanna
Brooks
Calgary
Airdrie
High River
Drumheller
Data Credits: Alberta Township System, roadsand water: AltaLIS (c) Government of Alberta;Existing transmission lines manually digitized byWSP; Existing turbine locations from FAA DOF.Imagery: BlackBridge Geomatics (image dateJune 2014).
Wheatland Wind ProjectProposed Project Map #3
(Subject to Change)
Version: 10Date: 2017-02-22Layout: 20161104BOP: 20170216
Datum: NAD 83Projection: UTM Zone 12NScale: 1:55,000Prepared By: WSP
0 1 2 30.5
Kilometres
´