West Waukesha BypassDraft Environmental Impact Statement

Waukesha County Department of Public Works I.D. 2788-01-00

TBG051110133551MKE

Public Hearing HandoutNovember 2012

West Waukesha Bypass Study • Public Hearing

Handout Packet ContentsPage Description

1 Welcome,PurposeofthePublicHearing,EnvironmentalImpactStatementProcess,Information for the Public Hearing Record

2 TestimonyInstructions

3 LocationMap

4 Project Statement

5 ImpactSummaryTable

6 AlternativesExhibit(showsremainingalternatives)

7 DescriptionofHearingExhibits

8 PropertyAcquisition/RelocationAssistanceandBenefits,NextSteps

9 WaukeshaCountyContactInformation

11 WrittenTestimonyForm

13 VerbalTestimonyForm

West Waukesha Bypass Study • Public Hearing 1

WelcomeThankyouforattendingtoday’spublichearingontheWestWaukeshaBypassproject.Thepublichearingispartoftheprocessforinvolvingcitizensintransportationdecisionsandprovidesanopportunitytoparticipateinchoosingtherecommendedcourseofactionforthisproject.

Purpose of Public HearingThemainpurposeofthispublichearingistoobtainpublicopinionregardingtheprojectaspectslistedbelowsothatthisinputcanbeconsideredalongwithallotherjudgementsandopinionstobereviewedbyWaukeshaCountybeforefurtherdecisionsaremadeontheproposedalternatives.Courtreportersareavailabletotakedownalltestimonywhichwillbeenteredintothepublichearingrecordalongwithotherpublichearinginformationandmaterials.

Today’spublichearingwillfocusonthefollowingprojectaspectsoftheWestWaukeshaBypassproject:

• Thelocationanddesignfeaturesoftheproposedimprovementsandalternativesbeingconsidered.

• TheNationalandWisconsinEnvironmentalPolicyActsrequirepublichearingsonprojectsforwhichanEnvironmentalImpactStatement(EIS)isbeingprepared.TheEISisthedecisiondocumentfortheproposedimprovements.CopiesoftheEISareavailableforreviewattoday’shearing.

• ProjectactivitiesthatrequireauthorizationfromtheU.S.ArmyCorpsofEngineersundertheCleanWaterActforplacingfillintowatersoftheU.S.includingwetlands.

Environmental Impact Statement (EIS) ProcessTheEISprocessincludesdevelopingofarangeofdesignalternatives,evaluatingandscreeningthealternatives,andselectingofapreferredalternative.NumerousfactorsareconsideredthroughouttheEISprocessincludingsafety,mobility,engineeringdesignstandards,impactstotheenvironment,cost,andinputfromthepublicandstateandfederalreviewagencies.

TheWestWaukeshaBypassprojectiscurrentlyattheDraftEISstage.TheDraftEISdocumentsthepurposeandneedforproposedimprovements,alternativesconsidered,environmentalimpacts,andpublicinvolvementandagencycoordinationduringdevelopmentandrefinementofthealternatives.TheFinalEISidentifiestheselectedalternative,reasonsforitsselection,andreportstheresultsofthepublichearingandcommentsontheDraftEIS.

Information for the Public Hearing RecordInadditiontothetestimonyprovidedattonight’spublichearing,alloftheexhibits,handouts,anddisplaysavailableforviewingatthehearingtonightwillbeincludedintheofficialpublichearingrecord.Page7ofthishandoutcontainsacompletelistingofthesematerials.Othermaterials,alongwithwrittentestimonyreceivedafterthehearing,willbeaddedtotheofficialpublichearingrecordprovidedtheyarereceivedpriortotheendoftheDraftEIScommentperiod.

West Waukesha Bypass Study • Public Hearing 2

Options and Instructions for Providing TestimonyThereareseveraloptionsforprovidingtestimonyasdescribedbelow.Yourtestimonywillbereviewedandconsideredaspartoftheprocessforchoosingthepreferredalternative.Testimony should be limited to tonight’s public hearing aspects (see page 1), and statements or opinions about the project. Provide comments on thealterative(s)yousupportoropposeandyourreasons.QuestionsrelatedtotheprojectcanbedirectedtoWaukeshaCountyrepresentativesduringinformaldiscussionsandwillnotberecordedbythecourtreporterorincludedinthepublichearingrecord.

Private verbal testimonyThisoptionmaybepreferredifyouwishtomakeyourstatementprivatelytothecourtreportedratherthaninfrontoftheaudience.Thisoptionisavailableduringtheentirepublichearing(4:00p.m.to8:00p.m.).Followthesignsoraskdirectionstothelocationforprivatetestimony.Waitforanopening,thensitdownandgivethecourtreporteryourcomments.Stateyourname,addressand,ifapplicable,thegroup,organizationorbusinessyouarerepresenting.

Public verbal testimonyPublicverbaltestimonywilltakeplacebetween5:00p.m.and8:00p.m.Completea“RegistrationSlipforPublicVerbalTestimony”(includedinthishandoutpacketandatthesign-intable).GiveittoaWaukeshaCountyrepresentativeanytimebefore,during,orimmediatelyfollowingthepresentation.Yournamewillbecalledintheorderregistrationslipsarereceived.Whenyouarecalledtothemicrophonetoprovidetestimony,pleasestateyourname,address,andifapplicable,thegroup,organizationorbusinessyouarerepresenting.Pleaselimityourtestimonytoapproximately3minutestoallowtimeforotherstoprovidetestimony.

Written testimonyYoumayprovidewrittentestimonyinadditionto,orinplaceof,verbaltestimony.Completethe“WrittenTestimonyForm”(includedatthebackofthishandoutpacketandatthesign-intable).Youmayalsouseyourownstationery.Includeyourname,address,andifapplicablethegroup,organization,orbusinessyouarerepresenting.Ifyoupreparedwrittencommentspriortothepublichearing,youmayalsosubmitthose.Therearetwooptionsforsubmittingyourwrittentestimonyasdescribedbelow.

Submit tonight:Completethewrittentestimonyformandplaceincommentbox.

OR

Mail in: Youmaypreferthisoptionifyouwouldlikeadditionaltimeororganizeyourthoughts/comments.TheWrittenTestimonyFormispre-addressed.Youmayalsosendwrittencommentsviae-mailtowestbypass@waukeshacounty.gov.See“WaukeshaCountyContactInformation”onpage9ofthishandout.Mailedore-mailedcommentsmust be postmarked or received no later than December 10, 2012 to be included in the officialpublichearingrecord.

West Waukesha Bypass Study • Public Hearing 3

Project LocationProject Location

41

45

74

16

J

94

94

43

59

16459

67

67

83

190

99 36

164

59

83

Menomonee Falls

Oconomowoc

Waukesha

Brookfield

New Berlin

Elm Grove

Muskego

WAUKESHA CO.Fox R.

PROJECTLOCATION

Project I.D. 2788-01-00West Waukesha BypassWaukesha, Wisconsin

NN

TBG031610053533MKE B&W.v3

1818

XXX

DDE

TT

West Waukesha Bypass Study • Public Hearing 4

Project StatementWaukeshaCountyisleadingamulti-jurisdictionaleffortundertakinganenvironmentalandengineeringanalysisoftheproposedWestWaukeshaBypass.Inthishearingpacketyouwillfindadetaileddescriptionofthepurposeandneedfortheproject,adescriptionofallhearingexhibitsandhandoutmaterials,theextentofpropertyacquisitionsandimpacts,thenatureoftherelocationandacquisitionprogramandanexhibitshowingBuildAlternativesstillunderconsideration.

ThealternativesunderconsiderationincludetheNoBuildAlternative,theSunset-to-CountyXAlternative,thePebbleCreekWestAlternative,andthePebbleCreekFatWestAlternative.Thealternativeshavevaryingdegreesofimpactstothebuiltandnaturalenvironmentwhicharedetailedinthishandoutpacketonpage5andtheDraftEIS.

Hearingexhibitsincludedetaileddesignsforeachalternativeunderdiscussion,thepurposeandneedfortheproject,includingtrafficandcrashdata,andacomparisonofimpacts.

Propertyacquisitionforthisimprovementisscheduledtobeginin2013ifaBuildAlternativeisselected.Dependingupontheavailabilityoffundsandtheanticipatedcompletionofrelocationsby2014,constructioncouldbeginin2015.

TheWestWaukeshaBypassstudyareaiscurrentlylocatedwithinthemapped100-yearfloodplainsofPebbleCreek.ConstructionoftheWestWaukeshaBypasscrossingwouldbeconsistentwithlocalfloodplainmanagementgoalsandobjectives.AdditionaldetailcanbefoundintheDraftEISinSection3.14.2FloodplainImpacts.

Purpose and Need for the ProjectThepurposeoftheWestWaukeshaBypassistoprovideasafeandefficientnorth-southarterialroadwayonthewestsideoftheCityofWaukeshatocompletethelong-plannedcircumferentialroutearoundWaukesha;toaccommodategrowingtrafficvolumesalongthecorridor;andtoimproveroadwaydeficienciesthatincludetightcurves,steephills,narrowlanes,andlackofshoulders.Theproposedimprovementshavetwoobjectives:

• Improvesafetybyprovidingaroadwaythatmeetscurrentdesignstandards.

• Accommodatetrafficdemandgeneratedbyexistingandplanneddevelopmentwithinandoutsidethe studycorridor.

Theneedfortheproposedactionisdemonstratedthroughacombinationoffactorsthatincludethefollowing,eachofwhichisdiscussedintheDraftEIS:

• Projecthistory

• Regional/localtransportationandland-useplanning

• Trafficdemand

• Safetyconcerns

• Existingroadwaydeficiencies

• Systemlinkage

• Environmental aspects

West Waukesha Bypass Study • Public Hearing 5

AlternativeResource No-Build Sunset-to-County X Pebble Creek West Pebble Creek Far West

Residential displacements 0 10 4 4

New right-of-way acquired 0 59 acres 67 acres 66 acres

Transportation—travel time between I-94 and WIS 59

Travel time will in-crease over time

38-second to 1.5-minute less travel time than No-Build Alternative in 2035

2- to 3-minute less travel time than No-Build

Alternative in 2035

2- to 3-minute less travel time than No-Build

Alternative in 2035Traffic level of service in 2035 (on A to F scale) C to F B to D B to C B to C

Transportation—predicted crash rateFor segment south of railroad tracks

Predicted crash rate 220 per 100 million vehicle miles of

travel (73 injury and fatal, 147 property damage only) in 2035

Predicted crash rate 146 per 100 million vehicle miles

of travel (59 injury and fatal, 119 property dam-

age only). 34 percent lower than No-Build Alternative

Predicted crash rate 128 per 100 million vehicle miles of travel (40 injury and

fatal, 88 property damage only). 42 percent lower

than No-Build Alternative

Predicted crash rate 128 per 100 million vehicle miles

of travel (40 injury and fatal, 88 property damage

only). 42 percent lower than No-Build Alternative

Cost ($2011) $0 $53 million $55 million $55 million

Public input Previous Public Information Meeting input and CSS advisory group ratings favor Pebble Creek Alternatives over Sunset-to-County X Alternative and No-Build Alt, though there have been comments in support of the Sunset-to-County X and No-Build Alternatives

Groundwater None

No major cuts into slope required; would affect ground-

water fed wetland north of Sunset Drive. Mitigation measures would reduce groundwater impacts.

Approx 25-foot cut into slope may affect groundwater

flow. Would directly affect fen south of Sunset Drive. Mitigation measures would

reduce groundwater impacts.

Approx 32-foot cut into slope required; more likely than

other alternatives to intercept groundwater that supports

down-slope wetlands. Mitiga-tion measures would reduce

groundwater impacts.

Threatened and endangered resources None

Seaside crowfoot population would be eliminated; potential for transplant exists, although

DNR has no experience with transplanting this plant species. 7.8-acre impact to

Butler’s garter snake. Great-est impact on Butler’s garter snake1 and Blandings turtle because of wider Sunset Dr.

barrier between habitat areas.

8.3-acre impact to Butler’s garter snake habitat. Less

impact on Butler’s gar-ter snake and Blandings turtle because it lies on

the edge of habitat area.

6.5-acre impact to Butler’s garter snake habitat. Less

impact on Butler’s gar-ter snake and Blandings turtle because it lies on

the edge of habitat area.

Wetland None12 acres of wetland af-

fected. Potential for on-site/near-site mitigation.

14 acres of wetland af-fected. Would affect 0.3

acre of a fen just south of Sunset Drive. Potential for on-site/near-site mitigation

11 acres of wetland af-fected. Potential for on-site/

near-site mitigation

Water qualityLess than Build

Alternatives, but untreated run-off will continue to run directly into Pebble Creek

from existing bridges.

Net increase of 9 acres of impervious area south of railroad. Run-off from

roadway would discharge adjacent to Pebble Creek.

Net increase of 13 acres of impervious area south of railroad. Run-off would

discharge several hundred feet from Pebble Creek.

Net increase of 13 acres of impervious area south of railroad. Run-off would

discharge several hundred feet from Pebble Creek.

Noise None70 houses with noise im-pact; some are eligible for

mitigation measures.

55 houses with noise im-pact; some are eligible for

mitigation measures.

55 houses with noise im-pact; some are eligible for

mitigation measures.Floodplain None 10-acre floodplain impact 7-acre floodplain impact 7-acre floodplain impact

1 The DNR is considering removing the Butler’s garter snake and Blandings turtle from the state’s threatened species list.

Impact Summary Table

West Waukesha Bypass Study • Public Hearing 6

Sunset Drive

Madison Street

Genesee Road

Pebble Creek

Pebb

le Cr

eek

Wisconsin & Southern Railroad

Tow

n of

Del

afie

ldC

ity o

f Pew

auke

e

City of Waukesha

Tow

n of

Gen

esee

Tow

n of

Wau

kesh

a

City ofWaukesha

FaithBaptistChurch

Substation

GoodTimes

Kisdon HillPark

MeadowBrookSchool

Glacial Drumlin State Trail

Apostolic LifeTabernacle

Green Lane

WaukeshaChristianAcademy

KameTerrace

Shoppes atFox River

St. John NeumannCongregation

Meadowview Park

Waukesha SchoolDistrict Property

Northview Road

draveluoB

wei vdnarG

Crites Field

Roll in g Ridge Drive

Mea

dow

broo

k R

oad

Sayl

esvi

lle R

oad

Sunset Drive

Brandy BrookFo

x Ri

ver

Merrill HillsCountry Club

RetzerNature Center

MacArthur Road

Mer

rill H

ills

Road

St. Paul Avenue

dravel uoB

dnal er oM

Sunset Park

Tow

n Li

ne R

d.

Pebble CreekPark

Grandview Park

Pebble Creek

Sunset-to-County X

Summit Avenue

Draft Environmental Impact Statement Waukesha Bypass - Waukesha CountyTBG052510032618MKE WB_2-25_BuildAltStillUnderConsideration_v1.ai 4-3-12 mjl

Exhibit 2-25Build Alternatives Still Under Consideration

LegendRiver/StreamRailroadWetlandsMunicipal BoundaryFEMA Floodplain

ParcelIsolated Natural Resource AreaPrimary Environmental CorridorSecondary Environmental Corridor 0 1,400 2,800

Feet

Notes:

1. 2008 Aerial Photography from the National Agriculture Imagery Program (NAIP)

FiddlersCreek

FiddlersCreek

LegendRiver/StreamRailroadWetlandsMunicipal BoundaryFEMA FloodplainParcelIsolated Natural Resource AreaPrimary Environmental CorridorSecondary Environmental Corridor

Notes:1. 2008 Aerial Photography from the National Agriculture Imagery Program (NAIP)

West Waukesha Bypass Study • Public Hearing 7

Description of Hearing ExhibitsDisplay Boards and Roll Plots (on easels and tables)• Alternatives Still Under Consideration Maps–Showseachalternative’salignmentoveranaerialphotograph

andhighlightsresourcesthroughouttheprojectcorridor.

• Typical Finished Sections–ShowscrosssectionsoftheproposedWestWaukeshaBypass4–laneroadway.

• Environmental Impact Maps and Matrix –Showstheenvironmentalimpactsofeachoftheremainingalternatives.

• Roadway Level of Service–Showstheeffectivenessofthecurrentroadwayandremainingalternativesbygivingagradetoeachsegmentandintersectionintheprojectcorridor.

• 2035 Average Weekday Traffic Volumes–Showstrafficvolumesforeachoftheremainingalternatives.

• Groundwater Flow Maps –Showsgroundwaterflowpatternsandlocationswheregroundwaterdischargesatthesurfaceinandaroundtheprojectarea.

• Stormwater Recharge, Management and Mitigation Maps –Showsareaswithpermeablesurfaceandpotentialstrategiesformanagingandmitigatingstormwaterimpacts.

• Noise Receptor Location Maps –Showsimpactednoisereceptorsandpossiblenoisebarrierlocations.

• Soil Boring Locations –Showssoilboringlocationsandsoilprofiles.

Handouts (at sign-in table)• Handout Packet

• Registration Slips for Public Verbal Testimony –Formstofilloutforindividualswishingtopresentverbaltestimonyinfrontoftheaudience.ThesearealsoattachedtotheHandoutPacket.

• Written Testimony Forms–Formsthatcanbefilledouttoprovidewrittentestimonywhichcanbeplacedinthecommentboxormailedinafterthehearing.ThesearealsoattachedtotheHandoutPacket.

• Wisconsin Relocation Rights – Business, Farm and Nonprofit Organizations

• Wisconsin Relocation Rights – Residential

• The Rights of Landowners Under Wisconsin Eminent Domain Law

Documents Available for Viewing (limited copies provided; please do not remove from tables)• DraftEnvironmentalImpactStatement(EIS)–Thisisthecurrentversionofthereportthathasbeenapproved

bytheFederalHighwayAdministrationandmadeavailableforpublicreview.

• Legal Notice –NoticethatwaspublishedinWaukeshaFreemanadvertisingthePublicHearingandtheavailabilityoftheDraftEISforpublicreview.

• Impact Analysis Methodology –Documentthatexplainshowtheproject’spotentialimpactswillbeevaluatedduringtheEnvironmentalImpactStatementEISprocess.

• Coordination Plan –DocumentthatidentifieshowprojectinformationwillbecommunicatedandhowinputfromagenciesandthepublicwillbesolicitedandconsideredduringtheEISprocess.

West Waukesha Bypass Study • Public Hearing 8

Property Acquisition/Relocation Assistance and BenefitsBeforeanypropertyacquisitionactivitiesareinitiated,theWaukeshaCountyDepartmentofPublicWorks’realestatestaffwillcontactthepropertyownertoexplainthedetailsoftheacquisitionprocessandWisconsin’sEminentDomainLaw.Allpropertiestobeacquiredwillbeinspectedandappraisedbyoneormoreprofessionalappraisers.Thepropertyownerwillbeaskedtoaccompanytheappraiserduringinspectionofthepropertytobeacquired,toassurethatitsvalueisrecognizedintheappraisal.Basedupontheappraisalorappraisalsmade,thefairmarketvalueofthepropertytobeacquiredwillbedetermined,andthatamountwillbeofferedtotheowner.

Relocationassistancewillbemadeavailabletoanyonedisplacedbythisproject.AsurveyofavailablehousingandbusinesslocationswascompletedinJune2012.Thissurveyindicatesthattherewillbesufficienthousingandbusinesslocationsavailableintheprojectvicinityatthetimeoftheproposedrelocations,withinthemeansoftherelocatesandmeetingtherequirementsforreplacementhousingandbusinesses.The“RelocationAssistance”brochuremadeavailabletoyoutonightanswersmanyofthefrequentlyaskedquestionsconcerningrelocationassistance.Inadditiontothecostofreplacementhousingand/orbusinesslocations,additionalmoniesareavailabletocovermovingexpenses,increasedrentalandmortgagepaymentsandinterestrates,andanyclosingcostsincurred.

Nopersonshallberequiredtovacateuntilacomparablereplacementpropertyismadeavailable.Intheeventarelocatedpersonisdissatisfiedwiththedecisionastoeligibilityforpaymentsoramountsofferedundertherelocationassistanceprogram,heorshewillbepromptlyadvisedoftheproceduretofollowinmakinganappeal.

Propertyacquisitionforthisprojectisscheduledtotakeplacethroughout2013and2014.ThelocationsofdisplacedhomesandbusinessesareshownonthepublichearingdisplaysanddetailedinformationisprovidedintheDraftEIS.

Next StepsAttheendofthepubliccommentperiodallpublichearingtestimonyandcommentsreceivedontheDraftEISwillbereviewedandconsidered.Thisinputwillassistinselectingthepreferredalternative.UpcomingmilestonesincompletingtheengineeringandenvironmentalstudyfortheWestWaukeshaBypassprojectincludethefollowing:

• Winter2012–TheFinalEISwillbeavailableforpublicreview.TheFinalEISwillidentifythepreferredalternativesandwillsummarizeinputreceivedfromthispublichearingandcommentsontheDraftEIS.

• Spring2013–AnticipatedRecordofDecisionfromFHWA.TheRecordofDecisionidentifiestheselectedalternative,mitigationmeasuresthatwillbetaken,andisthefinalenvironmentalapprovalthatisneededbeforeaprojectmayproceedtodesignandlatertoconstruction.

• Summer2013andbeyond–IfaBuildAlternativeisselected,finaldesignandengineering,realestateacquisitionandutilityrelocations,wouldoccurin2014.Theearliestconstructionwouldbeginis2015.Publicparticipationinthedesignandconstructionplanningwillcontinueintheupcomingmonthsandyearsahead.

West Waukesha Bypass Study • Public Hearing 9

Additional Information and Waukesha County Contact InformationAdditional InformationADraftEISthatdiscussestheneedfortheproposedimprovements,alternativesconsidered,andenvironmentaleffectshasbeenpreparedandfiledaccordingtotheStateandNationalEnvironmentalPolicyActs.TheDraftEISisavailableatthepublichearingandisavailableforreviewandcopyingattherepositorieslistedbelowandontheprojectwebsite:http://waukeshabypass.org/eis.

CityofWaukesha PublicLibrary 321 Wisconsin Avenue Waukesha, WI

CityofWaukesha Department of Public Works 130DelafieldStreet Waukesha, WI

WisDOTSoutheastRegionOffice 141N.W.BarstowStreet Waukesha, WI

TownofWaukesha TownHall W250 S3567 Center Road Waukesha, WI

WaukeshaCounty Department of Public Works 515 Moreland Boulevard Waukesha, WI

WisDOT BureauofEquityand Environmental Services 4802SheboyganAvenue–Room451 Madison, WI

Submittal of written testimonyAdditionalwrittenpublichearingtestimonyand/orcommentsontheDraftEISaftertoday’spublichearingshouldbesenttotheWaukeshaCountyprojectmanagerattheaddressgivenbelow.Additionaltestimonyandcommentsshould be received or postmarked no later than December 10, 2012 to be included in the public hearing record andconsideredintheFinalEIS.

GaryEvans,PE WaukeshaCountyDepartmentofPublicWorks 515 Moreland Boulevard Waukesha, WI 53188 (262)548-7740 [email protected]

Property acquisition/relocation questions Questionsspecifictopropertyacquisitionand/orrelocationofhomesandbusinessescanbemostefficientlyansweredbyWaukeshaCounty’srealestatestaff.

Karen Braun WaukeshaCountyDepartmentofPublicWorks 515 Moreland Boulevard Waukesha, WI 53188 (262)548-7740 [email protected]

Scanwithyoursmartphone to e-mail

West Waukesha Bypass Study • Public Hearing 11

West Waukesha Bypass Study DraftEnvironmentalImpactStatement

Public Hearing Written Testimony FormYoumayleavethiscompletedformwithustodaybydroppingitintotheCOMMENTBOX.ThisformmaybemailedtotheaddressshownonthebackofthisformonorbeforeDecember10,2012.Youmayalsoe-mailyourcommentstoGaryEvans,WaukeshaCountyProjectManager,[email protected]

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

_____________________________________________________________________________

Name: ___________________________________________________________________________________Address: _________________________________________________________________________________City: _______________________________________ State: __________________ Zip: _________________E-Mail: __________________________________________________________________________________

West Waukesha Bypass Study • Public Hearing 13

Registration Slip for Public Verbal TestimonyWest Waukesha Bypass Project Public Hearing Waukesha North High School November 13, 2012

Verbalpublictestimonywillbeheardfrom5:00p.m.to8:00p.m.intheauditorium.Completethis“RegistrationSlipforPublicVerbalTestimony”andgiveittoaWaukeshaCountyrepresentative.Yournamewillbecalledintheorderregistrationslipsarereceived.Whenyouarecalledtothemicrophonetoprovidetestimony,pleasestateyourname,address,andifapplicable,thegroup,organizationorbusinessyouarerepresenting.Pleasespeakslowlyandclearly.Acourtreporterwillrecordyourtestimony.Pleaselimityourtestimonytoapproximately3minutestoallowtimeforotherstoprovidetestimony.

Ifyoudonotwishtospeak,butwouldliketousethisregistrationsliptorecordyourpositiononthealternativesbeingconsideredatthepublichearing,pleasechecktheapplicableboxesbelow.

Name:___________________________________________________________________________________

Address:_________________________________________________________________________________

_________________________________________________________________________________

Ifapplicable-group,organization,orbusinessyouarerepresenting: _________________________________________________________________________________________

oWishing to speak

oNot wishing to speak, but please record my position on the alternatives being considered at the public hearing:

No Build Alternative

oSupport

oDo not support

Pebble Creek West Alternative

oSupport

oDo not support

Pebble Creek Far West Alternative

oSupport

oDo not support

Sunset-to-County X Alternative

oSupport

oDo not support

West Waukesha Bypass Study • Public Hearing 12

---------------------------------------------------------- Fold Here ---------------------------------------------------------- -

Gary EvansWaukesha CountyDepartment of Public Works515 Moreland BoulevardWaukesha, WI 53188

------------------------------------------------------------- Fold Here ------------------------------------------------------- --

Place Stamp Here