west 7th/university -...
TRANSCRIPT
Commercial Corridors Revitalization Strategy: Final Report of the Commercial Corridors Task Force
65City of Fort Worth Planning Department
WEST 7TH/UNIVERSITY
THE VILLAGE
The village is located at the six-point intersection of West 7th Street, Camp Bowie Boulevard, UniversityDrive and Bailey Avenue. Several renowned art museums, the Will Rogers Memorial Center, University ofNorth Texas Health Science Center, and the historic Seventh Street Theatre anchor the area. Other landuses include boutique retail, restaurants, urban-scale apartments, and professional offices.
Several community organizations promote business and community in the area, including the WestsideAlliance, the Associated Businesses of the Cultural District, the Cultural District Committee, HistoricCamp Bowie, Inc., and the FPA/MPA Foundation.
Issues which dominated village planning discussions included: the impacts of current and proposedtransportation improvements, challenges to pedestrian movement and comfort presented by the lack ofvisual and physical linkages between large land uses within the Cultural District, preservation andadaptive reuse of historic resources, and the need for development that attracts visitors and servesemployees and residents of the Cultural District and Downtown. As mentioned before, the West 7th Streetcorridor has gained a significant amount of attention in recent years, positioning both of the corridor’svillages as promising redevelopment areas within the central city.
URBAN DESIGN ELEMENTSAND PLAN• Neighborhood-scale mixed-use development
is proposed for both sides of West SeventhStreet between Foch and Norwood.
• West 7th Street becomes an attractive boule-vard with a comfortable pedestrian environ-ment that encourages walking. Buildings frontWest 7th, creating an attractive sequence ofstorefronts at the sidewalk’s edge.
• The Linwood neighborhood is further inte-grated with land uses along West 7th Streetthrough improved pedestrian connections.
• A modern roundabout creates a unifyinggateway landmark and improve vehicular andpedestrian circulation in the village.
• A boutique hotel adds to the urban ambiance.
Commercial Corridors Revitalization Strategy: Final Report of the Commercial Corridors Task Force
66 City of Fort Worth Planning Department
WEST 7TH/UNIVERSITY
INVESTMENT CHALLENGES• Vacant lots and auto-oriented development
along West 7th create an environment inwhich walking is impractical and uncomfort-able. Some vacant lots are not maintained, andothers are used for parking. Pedestrianconnections to surrounding streets are limited.Strategies to address this issue includepolicies that encourage more intense use ofdevelopable land, rezoning to apply moreappropriate urban development standards, andurban design strategies such as pedestrianimprovements and landscaping. Wherepossible, the City should facilitate theacquisition of vacant parcels to expedite landassembly necessary for short-term catalystproject
• Both villages along the 7th Street Corridorhave the opportunity to capitalize on theirproximity to employment centers and culturalattractions. Downtown serves as Fort Worth’slargest business district, and the CulturalDistrict includes major cultural and medicalinstitutions. The City should provide pre-development and, as appropriate, financingassistance to encourage redevelopment in thearea. The City should also encourage a mix ofuses that supports economic and culturalactivity in Downtown and the CulturalDistrict.
• While the Historic Camp Bowie Inc. PublicImprovement District (PID) supports im-provement projects in the area, PID resourcesare limited. To supplement the CommercialCorridor Revitalization Strategy, the West 7th
Street and Camp Bowie corridors shouldcomplete an urban design framework plan thataddresses the function and design of transitand pedestrian circulation systems.
MARKETING OPPORTUNITIESshort-term long term1-5 years 5-10 years
HousingRental
Ownership (Mid/Hi-rise)
Senior
RetailNeighborhood-Serving
Destination/Entertainment
Specialty
OfficeClass A/B
Service/Boutique
Incubator Space
OtherHotel
Public
Transit Station
Parking
DEVELOPMENT STRATEGYThe village, centered around a six-point
intersection, serves as a gateway to the CulturalDistrict and Downtown. Transportation improve-ments at the intersection should help improvetraffic flow and aesthetic conditions in an areathat includes the city’s major cultural institu-tions and some of the City’s largest employers –the UNT Health Sciences Center and the JustinBoot / Acme Brick Company headquarters. Thecontinued presence of these regional employersis a key component of the village concept.
New development should increase employ-ment and housing options in the area, andshould increase business at existing stores andrestaurants. People are already drawn to culturalvenues in the district, and the introduction of alively, mixed-use urban neighborhood with agreater variety of retail and entertainmentattractions should help increase activity.
Commercial Corridors Revitalization Strategy: Final Report of the Commercial Corridors Task Force
67City of Fort Worth Planning Department
ECONOMIC ANALYSIS
Estimated Project ValueEstimated Project Value
Total Office/Retail Rentable SF 35,000
Rent/SF* $18.00
Total Residential Rentable SF 100,000
Rent/SF* $13.20
Total Hotel Room Nights 21,900
Avg. Daily Rate $90.00
Gross Income $3,329,700
Occupancy 90%
Effective Gross Income $2,996,730
Operating Costs $795,000
Net Operating Income $2,201,730
Capitalization Rate 10%
Project Value – Office/Retail/Residential $22,017,300
Total Housing Units 25
Sales Price/Unit $225,000
Gross Revenue $5,625,000
Less Marketing Costs $393,750
Project Value – Ownership Housing $5,231,250
Total Project Value $27,248,550
Development Cost EstimateProperty Purchase (Acquisition/Demolition) $2,200,000
On-Site Improvements (Parking) $3,300,000
Building Construction Costs $17,700,000
Construction Contingency $1,800,000
Soft Costs (% of Hard Costs) $3,700,000
Total Project Cost $28,700,000
Total Project Value $27,248,550
Project Margin/”Gap” ($1,451,450)
* Rates based on triple net lease.
WEST 7TH/UNIVERSITY
Existing land use
Proposed land use
Commercial Corridors Revitalization Strategy: Final Report of the Commercial Corridors Task Force
68 City of Fort Worth Planning Department
JOB CREATION AND ECONOMICIMPACT SUMMARY
short-term1-5 years
Permanent Employees 265
Annual Income/Permanent Employment $15,900,000
Construction Employees 520
Annual Income Construction Employment $5,195,000
PUBLIC INVESTMENT LEVERAGESUMMARY
short-term1-5 years
Development SF 196,500
Project Value $27,200,000
Project Cost $28,700,000
Margin/”Gap” ($1,500,000)
Public Investment Required $1,500,000
Private Investment Leveraged $27,200,000
Private/Public Investment Ratio 18.1
PUBLIC INVESTMENT ESTIMATEFunding/Time Period
Investment Required: 0-2 Years 3-5 Years
Streetscape Improvements* $1,500,000 $1,000,000
Utility Improvements $100,000 $100,000
Street/Access Improvements $0 $0
Parks/Open Space $300,000 $0
* Include pedestrian enhancements (e.g., special
paving, lighting, etc.)
PRIVATE DEVELOPMENT PROGRAMCATALYST PROJECT
short-term1 - 5 years
Housing
Rental 100 units
Retail 20,000 sq. ft.
Mixed-Use (Housing/Retail) 25/15,000 sq. ft.
Hotel 60 rooms
Parking Structure 330 spaces
WEST 7TH/UNIVERSITY
Commercial Corridors Revitalization Strategy: Final Report of the Commercial Corridors Task Force
69City of Fort Worth Planning Department
COMMERCIAL CORRIDORS REINVESTMENT STRATEGIES
WEST 7TH/UNIVERSITY Key word presented in bold for reference to glossary.
Regulatory Financial Market Physical
Source: Leland Consulting Group, HNTB & Interstar
Note: Village-specific strategies are to be used in combination with the standard strategies.
Immediate (1)Participate in disseminating housingdemand survey results and participate inemployee focus groups from the CulturalDistrict to ascertain demand for specifichousing products in the village (1)
Near Term (2)Ramp up economic development efforts –earmark funding to area CDC to work witharea employers in an effort to retain andexpand their presence (see businessrecruitment/retention) (2)
Promote increase in PID assessment and/or earmark funds for construction of non-auto connections to activity centers (seeimprovement district) (2)
Work with Chamber and Convention &Visitor’s Bureau to coordinate incentivespackage to attract hotel operators (2)
Immediate (1)Adjust level-of-service on roads toencourage pedestrian environment andbalance the level-of-service for cars usingmechanisms including: median placement,placement of traffic lights and their timing,posted speeds, etc.) (1)
Near Term (2)Establish a program to assist with theretention and/or business relocation ofbusinesses impacted by reinvestmentwithin the village (2)
Commercial Corridors Revitalization Strategy: Final Report of the Commercial Corridors Task Force
70 City of Fort Worth Planning Department
WEST 7TH/UNIVERSITY
Current Projects Public Funding SecuredModern Art Museum
UNT Health Science Center expansion
$ 3.5 million CMAQ
Neighborhoods
CrestwoodCultural DistrictLinwoodMonticello
Suggested NEZ
Population 1,838Land Area 0.84 Sq. MilesPercent in Central City 84%Percent CDBG Eligible 84%
Suggested NEZ Boundary
Suggested Urban Village Boundary