    Well ControlEquipment

    Chapter 1 Summarization

    1. Conception & function of WCE

    2. Compositions of WCE

    3. Characteristic of hydraulic BOP

    4. Parameters of hydraulic BOP

    5. BOP stacks

    ZPE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    2/100

    ZPE

    What is WCE?

    A complete set of equipment, instruments and tools

    for operations of oil/gas well control.

    1-1 Concept ion & funct ions of WCE

    Functions of WCE

    Blowout preventionKick detectionControl blowout promptlyTreating complications

    ZPE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    3/100

    ZPE

    To shaker

    To mud pit

    1-2 Compos it ions o f WCE

    Accumulator

    Auxiliary

    control panel

    Air control

    lines

    BOP Stack

    Kill line

    Control

    lines

    Choke

    manifold

    Mud pump & tank

    Remote control panel

    Mud tank & accessories

    DegasserVacuum degasser

    Drillers control

    panel

    Upper Kelly cock

    ZPE

    To flare pit

    Remote control unit

  • 5/21/2018 well control equipment1 FHFZ.ppt

    4/100

    ZPE

    1-2 Composit ions o f WCE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    5/100

    ZPE

    1-2 Composit ions o f WCE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    6/100

    ZPE

    1-2 Composit ions o f WCE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    7/100ZPE

    1-2 Composit ions o f WCE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    8/100ZPE

    1-2 Composit ions o f WCE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    9/100ZPE

    1-2 Composit ions o f WCE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    10/100ZPE

    1-3 Characteristic of hydraulic BOP

    ZPE

    1.Fast action

    Shutin time:Ram BOP3~8SAnnular BOP: 30S Gate valve: 3 s2. Convenient operation

    Easy operated with air hydraulic controlledequipment3. Reliable & safe

    Several control points of remote control, drillers control, auxiliary

    control and manual control

    4. Quick site maintenance

    Easy to change parts

  • 5/21/2018 well control equipment1 FHFZ.ppt

    11/100

    ZPE

    1-4 Parameters of h yd raul ic BOP

    ZPE

    Nominaldiameter

    Ratedworking

    pressure

    Definition: Inner fullhole diameter mm

    180mm230mm280mmTypes:346mm426mm476mm

    528mm540mm680mmDefinition: Maximum rating pressure MPa

    Types:14MPa21MPa35MPa70MPa105MPa

    Notes: yellow being available in ZPEB area

  • 5/21/2018 well control equipment1 FHFZ.ppt

    12/100

    ZPE

    1-5 Model num ber of hydraul ic BOP

    ZPE

    Before 1985

    KPY-Maximum workingpressure, kgf/cm2

    Nominal inner diameter, cm

    Exploration, WC & hydraulic

    Note: No mentioned BOP type

  • 5/21/2018 well control equipment1 FHFZ.ppt

    13/100

    ZPE

    1-4 Parameters of h yd raul ic BOP

    ZPE

    Nominaldiameter

    Ratedworking

    pressure

    Definition: Inner fullhole diameter mm

    7 inch,9 inch,11 inch,

    Types:13 5/8 inch,16 inch,18 inch,

    20 inch,21 inch,26 inch

    Definition: Maximum rating pressure MPa

    Types:1 M,2 M,3 M, 5 M,10M,

    15M

    Notes: yellow being available in ZPEB area

  • 5/21/2018 well control equipment1 FHFZ.ppt

    14/100

    ZPE

    1-5 Model num ber of hydraul ic BOP

    ZPE

    After 1985

    -Max. workingpressure, MPaNominal inner diameter, cm

    Type code

    FZSingle ram BOP

    2FZDouble ram BOP3FZThree ram BOP

    FHAnnular BOP

    API code

    R -Ram

    Rd -Double RamsRt -Three Rams

    A -Annular

    S -Spool

  • 5/21/2018 well control equipment1 FHFZ.ppt

    15/100

    ZPE

    1-5 Model num ber of hydraul ic BOP

    ZPE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    16/100

    ZPE

    1-6 BOP Stacks

    ZPE

    Take consideration of:

    1. Size

    Match with wellhead and casing size

    2. Rated working pressure

    Must be higher than predicted maximum

    wellhead pressure

    3. Type & numbers

    Be suitable for sealing in differentborehole condition

  • 5/21/2018 well control equipment1 FHFZ.ppt

    17/100

    ZPE

    1-6 BOP Stacks

    ZPE

    14 MPABOP Stacks

    1S+A 2S+SR+SR 3SR+S+SR S+SR+A

  • 5/21/2018 well control equipment1 FHFZ.ppt

    18/100

    ZPE

    1-6 BOP Stacks

    ZPE

    21MPa35MPa BOP Stacks

    S+SR+SR+A 4SR+S+SR+A

  • 5/21/2018 well control equipment1 FHFZ.ppt

    19/100

    ZPE

    1-6 BOP Stacks

    ZPE

    70MPa105MPa BOP Stacks

    5CH+SR+S+SR+SR+A

    6CH+S+SR+SR+SR+A

    CH+SR+S+SR+SR+SR+RBOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    20/100

    ZPE

    1-6 BOP Stacks

    ZPE

    4 types of Wellhead of ZPEB

    CH+SR+S

    +SR+SR+ACH+S+SR

    +SR+A

    Type 1 Type 2

  • 5/21/2018 well control equipment1 FHFZ.ppt

    21/100

    ZPE

    1-6 BOP Stacks

    ZPE

    4 types of Wellhead of ZPEB

    CH+S+SR+A

    Type 3

    CH+S+SR+SR

  • 5/21/2018 well control equipment1 FHFZ.ppt

    22/100

    ZPE

    1-6 BOP Stacks

    ZPE

    4 types of Wellhead of ZPEB

    CH+S+A

    Type 4

    CH+S+SR

  • 5/21/2018 well control equipment1 FHFZ.ppt

    23/100

    ZPEPE

    Conception and composition of WCEWhich pressure grades and sizes of BOP areoften used in China

    Point out the parameter of each as followsKPY28-210 FZ23-21 FH28-35

    2FZ35-21 KPY35-350 FZ54-14Types of BOP Stacks

    Quest ions

  • 5/21/2018 well control equipment1 FHFZ.ppt

    24/100

    ZPEPE

    2Annular BOP1. Functions of annular BOP

    2. Types of annular BOP

    3. Taper rubber4. Ball rubber

    5. Compound rubber

    6. Comparison of rubbers

    7. Technical specification8. Cautions

    9. Maintenance & repairs

    Well ontrol Equipment

  • 5/21/2018 well control equipment1 FHFZ.ppt

    25/100

    ZPEPE

    2-1 Functions of annular BOP1. Open hole sealing

    No any tubular in borehole

    2.Annulus sealingTubular

    exists in borehole

    3Stripping in/outWith 18o

    tapered drill pipe, reducing

    control pressure

  • 5/21/2018 well control equipment1 FHFZ.ppt

    26/100

    ZPEPE

    2-2 Types of annular BOP

    Ball rubber

    Compound

    rubber

    Tapered rubber

  • 5/21/2018 well control equipment1 FHFZ.ppt

    27/100

    ZPE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    28/100

    ZPE

  • 5/21/2018 well control equipment1 FHFZ.ppt

    29/100

    ZPEPE

    2-3 Taper rubber annular BOP

    Structure

    Scout Rubber

    Dustproof

    ringOil outlet

    Piston

    Open cavity

    Close cavity

    Support

    cylinder

    Body

    Coping

    Oil outlet

  • 5/21/2018 well control equipment1 FHFZ.ppt

    30/100

    ZPEPE

    2-3 Taper rubber annular BOPScout Rubber

    Dustproof

    ringOil outlet

    Open cavity

    Piston

    Close cavity

    Support

    cylinder

    Body

    Coping

    Oil outlet

    Close:OilClosecavityPistonupRubber upconfined bycopingcontracting andbeing squeezed tothe center andclose BOP

    Principle

    Open:OilOpen cavityPiston down Release squeezingforceRubberrecover byelasticity and openBOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    31/100

    ZPE

    1. Rubber

    Taper rubberLarge rubber storeAuto-recoverEasy to change rubber

    Change rubber directly in

    open hole

    Change rubber by cuttingwith tubular in borehole

    ZPE

    2-3 Taper rubber annular BOPCharacteristic

  • 5/21/2018 well control equipment1 FHFZ.ppt

    32/100

    ZPE

    2-3 Taper rubber annular BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    33/100

    ZPE

    2-3 Taper rubber annular BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    34/100

    ZPE

    2-3 Taper rubber annular BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    35/100

    ZPEPE

    2-3 Taper rubber annular BOP2.Piston

    Long sealingsectioncentralizingAnti-wearingHigh dimension.Auto-sealingBorehole pressurepush piston up so as tosqueeze rubber tight

  • 5/21/2018 well control equipment1 FHFZ.ppt

    36/100

    ZPEPE

    2-3 Taper rubber annular BOP

    4 Sealingposition

  • 5/21/2018 well control equipment1 FHFZ.ppt

    37/100

    ZPEPE

    2-4 Ball rubberannular BOP

    Structure

    Coping

    Dustproof

    ring

    Rubber

    Piston

    Body

    2 4 B ll bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    38/100

    ZPEPE

    2-4 Ball rubberannular BOP

    Principle

    Close cavity outlet

    Open cavity outlet

    Close:OilClose cavity

    Piston upRubber

    up,confined by

    coping, contracting

    and being squeezed to

    the center and closeBOP

    Open:

    OilOpen cavityPiston

    down Release

    squeezing forceRubberrecover by elasticity and

    open BOP

    2 4 B ll bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    39/100

    ZPEPE

    2-4 Ball rubberannular BOP

    Characteristic

    1.Rubber

    Ball typeLarge rubber storeAuto-recoverFunnel efficiencyEasy to change rubber Less friction, largequantity of oil

    for control

  • 5/21/2018 well control equipment1 FHFZ.ppt

    40/100

    ZPE

    Funnel efficiencyWhen closing, rubbermoved up near coping soas to make rubberscollection looks like areversed funnel.Borehole pressure pushbottom of rubber as aauxiliary power forsealing.This help to let tubularjoints pass throughrubber and reduce rubberwearing.

  • 5/21/2018 well control equipment1 FHFZ.ppt

    41/100

    ZPEPE

    2-4 Ball rubberannular BOP

    2.CharacteristicShort sealingsectionBadcentralizingEasy forwearingLower dimension

    2 4 B ll bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    42/100

    ZPEPE

    2-4 Ball rubberannular BOP

    3. Sealingpositions4. Auxiliary sealingsourceBoreholepressure pushbottom ofrubber as aauxiliary powerfor sealing.

    2 5 C d bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    43/100

    ZPE

    Structure of

    compound rubber

    ZPE

    2-5 Compound rubber annu lar BOP

    Structure

    Full

    open

    With tubular Full close

    Distortion of inner

    rubber

    2 5 C d bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    44/100

    ZPEPE

    2-5 Compound rubber annu lar BOP

    Principle

    CloseOilClose cavityPiston

    move-upPusher plate

    pushing outer rubber

    Outer rubber move to

    centerInner rubber

    furlingPacker insert turn

    and move to centerClose

    borehole

    2 5 C d bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    45/100

    ZPEPE

    2-5 Compound rubber annu lar BOP

    Principle

    Open

    OilOpen cavity

    Piston move-down

    Pusher plate returnback-Squeezing force

    removedInner & outer

    rubbers turn back by

    elasticity Open

    borehole

    2 5 C d bb l BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    46/100

    ZPEPE

    2-5 Compound rubber annu lar BOP

    Characteristic

    Inner outer rubbersComplicated structureImproperly close with new rubberLess dimension weightunavailable with cutting rubber changeLess deformation with inner rubber, lessoil for

    controlLess rubber wearing, long rubber life

    2 6 Comparison of annu lar BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    47/100

    ZPEPE

    2-6 Comparison of annu lar BOP

    Structure Simple Simple Complex

    Totally close OK OKWorse with

    new one

    Rubber

    change at site

    Directly or by

    cutting

    Directly or by

    cuttingOnly directly but

    no way by cutting

    Rubber life Short Long Long

    Oil quantity

    of operation

    2

    Medium

    3

    More

    1

    less

    Dimension Thin, high Thick, short Thin, short

    Weight Medium Heavy Light

    Annular BOP Type

    2 7 Specif icat ion of annular BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    48/100

    ZPEPE

    2-7 Specif icat ion of annular BOP

    Model

    Nominal

    diameter

    mm (in)

    Max.

    work

    pressure

    M pa

    Shut-in

    time

    S

    Control

    pressure

    MPa

    Dimension mm

    Outer

    diameter Height

    FH23-35 230(9) 35 < 30 10.5 900 1090

    FH28-35 280(11) 35 < 30 10.5 1000 1205

    FH35-21 346(13) 21 < 30 10.5 1050 1117

    Specification of taper rubber annular BOP

    2 7 Specif icat ion of annular BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    49/100

    ZPEPE

    2-7 Specif icat ion of annular BOP

    Model

    Nominal

    diameter

    mm (in)

    Max.

    work

    pressureMPa

    Shut-in

    time

    S

    Control

    pressure

    MPa

    Dimension mm

    Outerdiameter

    Height

    FH28-35 280(11) 35 < 30 10.5 1138 1056

    FH35-35 346(13) 35 < 30 10.5 1270 1165

    Specification of ball rubber annular BOP

    2 8 Cautions

  • 5/21/2018 well control equipment1 FHFZ.ppt

    50/100

    ZPEPE

    2-8 Cautions

    No totally close test at siteClose with tubular regular only

    Oil pressure range8.5~10.5MPaMax. pressure: 15MPa

    No totally close annular BOP for long period

    2 8 Cautions

  • 5/21/2018 well control equipment1 FHFZ.ppt

    51/100

    ZPEPE

    2-8 Cautions

    For snub in/out operation, only use 18o shoulder drill pipe,

    meanwhile, adjusting regulate valve to release fluctuation

    pressure as to postpone rubber life

    2 8 Cautions

  • 5/21/2018 well control equipment1 FHFZ.ppt

    52/100

    ZPEPE

    2-8 Cautions

    In closing status, tubular could be movedup/down slowly only. No rotating drill string. No

    releasing pressure through annular BOP.

    Rubber parts must be stored in a lowertemperature of 27 and dry house. Keep awayfrom electric-arc equipment. No using after

    expiration date.

    2 8 Cautions

  • 5/21/2018 well control equipment1 FHFZ.ppt

    53/100

    ZPEPE

    2-8 CautionsDaily maintenance

    After rig-up at site, test BOP as per standard.

    After entering production zone, test BOP ateach tripping time.

    Test annular BOP with

    70% of rated working pressure

    After each opening, check if BOP is fullyopened to avoid damaging rubber by tubular.

    After special operation, wash & clean rubberchamber.

    2 9 Troubleshoot ing

  • 5/21/2018 well control equipment1 FHFZ.ppt

    54/100

    ZPEPE

    2-9 Troubleshoot ingImproperly sealing of annular BOP

    With new rubber,close & open several times. Ifit is a used rubber, and support frame closed

    properly, that means rubber consumed too much.

    Change rubber core.

    Used rubber worn out and some rubber blockdropped off , cause sealing improperly. Change

    rubber core.

    Keeping open long term without moving,impurity deposited in rubber chamber. Clean &move rubber timely.

    2-9 Troubleshoot ing

  • 5/21/2018 well control equipment1 FHFZ.ppt

    55/100

    ZPEPE

    2-9 Troubleshoot ing

    Fail to open BOPLong term closing caused rubber deformation. Or

    cement deposited in rubber chamber after cementingjob. Need to be thoroughly cleaning.

    BOP operating slowlyBefore connecting hydraulic control lines,blow lines with compressed air and cleanconnections.Oil leaking in control lines. Or controllines were blocked by impurities.

  • 5/21/2018 well control equipment1 FHFZ.ppt

    56/100

    ZPEPE

    2Ram BOP1. Functions of ram BOP

    2. Types of ram BOP

    3. Structure of ram BOP

    4. Job principle of ram BOP5. Structure specialty of ram BOP

    6. Side door of ram BOP

    7. Lock device of ram BOP

    8. Specifications of ram BOP9. Properly using of ram BOP

    10. Troubleshooting

    Well ontrol Equipment

    3-1 Functions of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    57/100

    ZPE

    4Replacing spoolSide flangeof BOP to be used as spool for

    connecting choke line and kill line

    ZPE

    3 1 Functions of ram BOP

    2Sealing annulus Seal annulus

    with available pipe ram

    1Totally sealingSeal open hole with

    blind ram

    3Shearing pipeDrill pipe to be

    cut off in case of emergency

    3-2 Types of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    58/100

    ZPE

    Single

    Do

    uble

    Thr

    ibble

    ZPE

    3 2 Types of ram BOP

    As per ram numbers As per ram shape

    Type

    B

    lind

    P

    ipe

    S

    hearing

    V

    ariable

    3-3 Structure of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    59/100

    ZPEPE

    3 3 Structure of ram BOPStructure figure

    Side flange

    Up hinge

    Down hinge

    Side cover

    Body

    Side door

    Locking axle

    Cylinder

    Piston & rod

    Rams

    Injecting outlet

    3-4 Job principle of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    60/100

    ZPEPE

    3 4 Job principle of ram BOPClose

    Oil in close inletOil path in shellHinge

    seatOil path in side doorOil path in

    cylinderOil path in cylinder cover

    Closing port

    OpenOil in open inletOil path in shellHinge

    seatOil path in side doorOpening port

    3-5 Structure specialty of ram BOPBOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    61/100

    ZPEPE

    3 5 Structure specialty of ramBOPBOP

    4. Sidedoor cavity & rod

    3. Side door & shell

    2. Top ram & shell

    1. Front ram & tubular4 sealing areas

    2nd sealing device

  • 5/21/2018 well control equipment1 FHFZ.ppt

    62/100

    ZPE

    3-5 Structure specialty of ramBOPBOP

    3-5 Structure specialty of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    63/100

    ZPEPE

    p y

    Auxiliary source from borehole

    1.Rams to be pushed

    by downhole pressure tostrengthen contact versus

    shell

    2.Even high pressure exist

    in closing process, as surface

    area of piston is larger than rod,

    with lower system pressure easy

    to control borehole higherpressure

    Note: Area ratio of piston versus rod is called pressure ratio

    3-5 Structure specialty of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    64/100

    ZPEPE

    p y

    Auto cleaning

    2 ditches on bottom ofram cavity to be cleaned by

    ram as soon as moving to

    prevent blocking of sand

    Auto centering

    Front bulge of rams to fit

    opposite groove, triangle bulge

    help to push unlined tubular tocenter of borehole

    3-6 Side door of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    65/100

    ZPE

    2.Hinge move

    ZPE

    Functions1.To seal ram port 2.To transfer oil 3.Toinstall two way seals

    1.Straight moveType

    Sid d f BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    66/100

    ZPE

    Side door of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    67/100

    ZPE

    3-6 Side door of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    68/100

    ZPEPE

    Rules of side door operation

    1.Two sidedoors cant be opened at same time

    2.Only using hydraulic control when side door fully

    opened or tightened to shell

    3.Releasing pressure when rotating side door

    4.After opening side door, tight it when usinghydraulic control to prevent moving

    3-6 Side door of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    69/100

    ZPEPE

    Sequence of changing ram

    1.Release pressureSwitch to be in center in accumulator

    2.Open side doorTake off fixing bolts, rotate door open

    3.Hydraulic closing ramMake ram extrude out of cavity

    4.Take off old & fix a newInstall properly

    5.Hydraulic opening ramMake ram shrink to cavity

    6.Close side doorRotate sidedoor to close then tighten up bolts

    7. Pressure testTest BOP as per rated pressure

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    70/100

    ZPEPE

    Auto. lock device

    Lock device Handle lock device

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    71/100

    ZPEPE

    Auto. lock deviceHydraulic

    controlled lock device, locate in place

    where is unavailable for men working

    Operation specialtyAfter closing rams,

    system complete locking automatically,

    before opening rams, system unlock

    device automatically

    Disadvantage: Unavailable closing by

    hand if hydraulic system is out of

    control

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    72/100

    ZPEPE

    Functions of handle lock device

    2.Closing BOP by manpowerIn the

    case of system failure, ram BOPcould be closed by turning lock

    device

    1.Ensure long term closingAfter closing

    ram BOP, by using lock device, control

    pressure could be released to prevent

    control lines leaking and misoperation

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    73/100

    ZPE

    Thread bar

    Types of manual lock device

    ZPE

    Simplicity

  • 5/21/2018 well control equipment1 FHFZ.ppt

    74/100

    ZPE

    Simplicity

    Spline bar

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    75/100

    ZPEZPE

    Makeup of manual lock device

    R o d L o c k s h a f t O i l c y l i n d e r

    Gimbal

    Handwheel

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    76/100

    ZPEZPE

    Thread bar structure

  • 5/21/2018 well control equipment1 FHFZ.ppt

    77/100

    ZPE

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    78/100

    ZPE

    3-7 Lock device of ram BOP

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    79/100

    ZPE

    Ram

    Shell

    Rod

    Side

    door

    V seal ring

    Piston

    Fixing nuts

    Spline bar case

    Spline axis

    Cover

    Seal ringRubber

    bowlCylinder

    Spring clip ring

    Plate

    BoltsThrust

    bearing

    Spline bar structure

  • 5/21/2018 well control equipment1 FHFZ.ppt

    80/100

    ZPE

    weep hole[](, )[]()

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    81/100

    ZPEZPE

    Simplicity structure

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    82/100

    ZPEZPE

    Manual lockTurn

    clockwise in

    place then

    ~ round

    back

    Manual unlockTurn counter

    clockwise in

    place then~ round

    back

    Main points of operation

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    83/100

    ZPEZPE

    Closing steps of ram BOP

    1.Closing BOP with hydraulic system

    Normal practice

    2.Using manual lock device

    3.Releasing hydraulic pressure

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    84/100

    ZPEZPE

    Closing steps of ram BOP

    1.Handle of switch to be in closing position

    Special practice(Failure of hydraulic control)

    2.Manual closing ram BOP

    3.Handle of switch to be in central position

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    85/100

    ZPEZPE

    Opening steps of ram BOP

    1.Manually unlock device

    2.Open rams with hydraulic control

    3.Releasing hydraulic pressure

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    86/100

    ZPEZPE

    Status judgement of lock mechanism

    Status figure of Thread bar structure

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    87/100

    ZPEZPE

    Status judgement of lock mechanism

    Status figure of Spline bar structure

    3-7 Lock device of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    88/100

    ZPEZPE

    Status judgement of lock mechanism

    Status figure of Simplicity structure

    3-8 Specifications of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    89/100

    ZPEZPE

    Size

    9 11 13 5/8 21

    28

    Rated pressure

    1000 psi

    2000 psi

    3000 psi

    5000 psi10000 psi

    15000 psi

    3-9 Properly using of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    90/100

    ZPEZPE

    Cautions

    Size of rams to be applied to tubularBlind rams to be used in open hole condition onlyManual lock device to be used for long term closing,leave rams control switch in central position

    3-9 Properly using of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    91/100

    ZPEZPE

    Before releasing lock device, dont open rams withhydraulic system, dont move tubularDont rotate tubular before opening ramsManual lock device cant open rams, onlyway to open rams is to release lock device firstly

    and then open rams with hydraulic system

    3-9 Properly using of ram BOP

  • 5/21/2018 well control equipment1 FHFZ.ppt

    92/100

    ZPEZPE

    Daily maintenance

    After entering production zone,function test rams each trip

    Use lock device for long term closing, hanging upwarning sign in control panel

    Test ram BOP with full rated workpressureCleaning inside BOP thoroughly after cementing jobNever release borehole pressure by opening ramBOP

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    93/100

    ZPE

    1.Change seal ring

    2.Tighten all nuts3.Cleaning seal area

    ZPE

    1. Downhole fluid

    flows out from

    connectionbetween shell and

    sidedoor

    1. Sealing damagebetween shell and

    sidedoor

    2. Loose bolts

    connection between

    shell and sidedoor3. Impurities exist in

    seal ring

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    94/100

    ZPE

    Rearrange BOP control lines

    ZPE

    2. Ram

    movingdoesnt fit to

    switch plate Control linesbeing connectedwrong

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    95/100

    ZPE

    Clean rams and sidedoor

    ZPE

    3. Rams

    couldnt be in

    place even

    control system

    seems ok

    Sand, muddy silt

    or impurities

    exist in ram

    contacting area

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    96/100

    ZPE

    Change rod O ring,repair damaged rod

    ZPE

    4.Downhole

    fluid flows to

    cylinder mixing

    with hydraulic

    oil

    Rod O ring

    damaged, rod

    deformed or rod

    surface damaged

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    97/100

    ZPE

    Change O ring or new

    parts, repair sealing

    surface

    ZPE

    5. Unstable

    hydraulic system of

    BOP control Damage of

    cylinder, rod,

    rod O ring or

    sealing surface

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    98/100

    ZPE

    Repair sealing surface,Or change O ring

    ZPE

    6. Oil leaking inhinge area

    Damage of

    sealing surface

    or O ring

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    99/100

    ZPE

    Change rubber seal,repair sealing area

    ZPE

    7.Impropersealing after

    closing BOPRubber seal

    damage, or sealing

    area failure of ram

    chamber

    3-10 Troubleshooting

  • 5/21/2018 well control equipment1 FHFZ.ppt

    100/100

    Clean silt/sand,raise control pressure

    8.Fail to open

    BOP even

    control system

    seems ok

    Ram stuck by

    silt and sand