Welcome toSeneca Lake Park & Marina

Master Plan Update

Please hold questions until after the presentation is complete. MWCD Staff will be

available at the stations set up around the room.

Page 2: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Deputy Chief of Parks‐Joe McGlothlin Deputy Chief of Projects‐Tony Luther Park Manager‐Matt Steffen Marina Manager‐Matt Miller Recreation & Park Planner‐

Eric Stechschulte

Introductions

Chief Engineer‐Boris Slogar Project Engineer‐Jeff Yohe Program Manager Consultant‐

Ken Ricker, MS Consultants

Page 3: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

2013 2014 2015 2016

Master Plan Timeline

• Woolpert completes  overall conceptual master plan

• MWCD Board of Directors approves master plan in October

• Recreation Department prioritized projects

• Completed branding and design guidelines 

• Utilities survey & inventory completed at each park

• MS Consultants contracted as MWCD Project Management Consultant

• Aerial topography surveys completed

• 6 Individual Park Designers contracted and began refining preliminary designs on each park

• Individual Park Designers complete preliminary designs for each park

• Individual Park Designers begin detailed design on campground projects

• First campground park projects will be bid out and construction to begin in late 2016

Page 4: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Project Prioritization  Transitional Seasonal Camping Areas Infrastructure Stand Alone Projects

Seneca Lake Park & MarinaProject Phasing Strategy

Page 5: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Seneca Lake Park & MarinaProject Phasing Strategy

Page 6: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Seneca Lake Park & Marina Approved Projects

FUNDING‐ $20,750,000  Dollars Marina Point Gas Dock Replacement 

and Fuel System Upgrade‐ Area M‐15‐Scheduled 2016 Completion

Cabin Renovations‐ Area P‐26B (Recreation Budget)‐Scheduled 2016 Completion

Beach Concession Building Replacement‐ Area P‐15‐Scheduled 2017 Completion

Parkside Sewer to Senecaville Waste Water Treatment Plant‐Scheduled 2017 Completion

New Transient RV Campground‐ Area P‐13 (79 Lots)‐ Scheduled 2018 Completion

New Boat Launch Ramp‐ Area P‐9‐Scheduled 2018 Completion

New Transient RV Campground‐ Area P‐21A  (26 Lots)‐Scheduled 2018 Completion

Seasonal RV Campground Renovation‐ Area M‐10 (91 Lots)‐Scheduled 2019 Completion

Seasonal RV Campground Renovation‐ Areas M‐8 & M‐9  (107)‐Scheduled 2020 Completion

Page 7: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Map Area P21

Seneca Lake Park & MarinaCut & Fill Plans

Map Area P13

Page 8: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Seasonal Camper TemporaryMoving Transition Plan

MWCD is committed to providing assistance by moving your camper, deck and dock to your temporary site, and then moving them back to your newly renovated area.

Affected Seasonal Campers will be notified by letter one year in advance before you move.

Affected Seasonal Campers will receive a checklist that will address procedures for moving their camper, deck and dock. 

Affected Seasonal Campers relocated in the Fall of the construction year will be moved back to their newlyrenovated area in Fall of the following year.

Page 9: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Proposed Shower/Restroom Building In Campground

Seneca Lake Park & MarinaCamping Lot LayoutProposed Seasonal Camping Lot Layout

Page 10: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Seneca Lake Park & MarinaBeach Concession Building

Proposed Beach Concession/Restroom Building

Page 11: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Master Plan Budget

*Chart based on information from: http://www.macrotrends.net/1369/crude-oil-price-history-chart

Crude Oil Prices 2013-June 2016

The Master Plan is being funded through responsible  stewardship of oil and gas resources.

In October of 2013 the MWCD Board of Directors approved the Master Plan.

$120 Million Dollars have been dedicated to Master Plan Projects over the next several years.

Page 12: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Seneca Lake Park Future Projects

FUTURE PROJECTS AS FUNDING BECOMES AVAILABLE 4 New Cabins‐ Area P‐26A  RV Seasonal Campground Renovation Area 

P‐3 (64 Lots) RV Seasonal Campground Renovation Area 

P‐4, P‐5, P‐7 (52 Lots) Boat Trailer Storage‐Area M‐1 Campground Outdoor Space‐ Splash Pad, 

Game Courts, Picnic Shelter, Playground‐Area M‐2

Public Boat Launch Improvements‐Area M‐3

Boat Storage‐Area M‐4 Marina Service Storage Area‐M‐5 Outdoor Space‐ Tot Lot, Seat Wall & Trellis‐

Area M‐6A Park Office & Laundry Building‐ Area M‐6B Marina Restaurant Improvements‐ Area M‐7 New Tent Campground‐ Area M‐11

Page 13: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Seneca Lake Park Future Projects

FUTURE PROJECTS AS FUNDING BECOMES AVAILABLE New RV Transient Campground‐ Area M‐12       

(20 Lots) Gate House‐ Area M‐13 Marina Improvements‐ Area M‐15 Seasonal Camper Storage‐ Area M‐20 New RV Transient Campground‐ Area 574       

(107 Lots) Primitive Camping & Trails‐ Area P‐1 Boat Trailer Parking‐ Area P‐2 RV Seasonal Campground Renovated Area 

P‐6 (51 Lots)  Landscape Entrance Improvements‐

Area P‐12 Beach Improvements‐ Picnic Shelter & Crib 

Pier‐ Area P‐15 Parking Lot Improvements and Activity 

Center‐ Area P‐16 Water Park‐ Area P‐17 Kayak/Canoe Rental Dock‐ Area P‐18 New RV Transient Campground‐ P19 

(40 Lots) New RV Transient Campground ‐ Area P‐21B     

(49 Lots) New Cabins‐ Areas P‐26B, P‐26C (16 Total)

Page 14: Welcome to Seneca Lake Park & Marina Master …...2016/07/16  · Welcome to Seneca Lake Park & Marina Master Plan Update Please hold questions until after the presentation is complete

Thank You!Individual questions will be

answered at the stations around the room.