In this PPT we will confer on Work Break Down Structure,why it is essential in project management with benefits and challenges . It helps in monitoring the funds

TRANSCRIPT

Page 1: WBS Structure –Essential Element In Project Management

Work Breakdown Structure (WBS)

Page 2: WBS Structure –Essential Element In Project Management

cccc

Project System is a component of the SAP system that we use to plan, execute, and account for projects as part of your business processes.

Tight integration to the Controlling, Human Resources, and Logistics modules.

An essential element of project controlling consists in monitoring the funds committed.

What is a Project system

Page 3: WBS Structure –Essential Element In Project Management

Hierarchy of objects within an SAP PS

3

Page 4: WBS Structure –Essential Element In Project Management

Integration of ps with other module

Page 5: WBS Structure –Essential Element In Project Management

Work Breakdown Structure

Network

Two key objects that define the Project in SAP are:

Page 6: WBS Structure –Essential Element In Project Management

What is a Work Breakdown Structure ? A work breakdown structure (WBS) is a model of the work to be

performed in a project organized in a hierarchical structure.

The WBS is an important tool which helps to keep an overview of the project.

Work Breakdown Structure -Defines tasks and assign resources to those tasks

It forms the basis for organization and coordination in a project.

WBS element is nothing but a bucket where all the activities belonging to that particular part of the project are captured.

6

Page 7: WBS Structure –Essential Element In Project Management

Benefit of Work Breakdown Structure Simplifying the project execution.

Defines the total scope of the project

Accurate and readable project organization.

Help to estimate the cost ,time, and risk.

Page 8: WBS Structure –Essential Element In Project Management

Customer Requirement

Report to show detailed cost(Actual, Budget, and Commitment).

Simple selection screen.

Hierarchical output displaying total cost at each header level.

Report output export into excel .

Page 9: WBS Structure –Essential Element In Project Management

Why not standard report S_ALR_87013558

Complex selection screen

Report output not showing total at each header level.

No option for exporting the output to excel.

Page 10: WBS Structure –Essential Element In Project Management

Custom development of New Report The custom report is developed in OO ABAP.

Table Involved AUFK,BKPF,PROJ,PRPS,COEP,COOI.

The output of the report is display in a hierarchical.

Here i used the global class ,CL_GUI_ALV_TREE ,

CL_GUI_TOOLBAR , CL_GUI_CUSTOM_CONTAINER

Page 11: WBS Structure –Essential Element In Project Management

Challenges in this scenario/Report. Define the flow of the report.

To gather all detail tables involve in it.

Creating The folder for each Wbs and its project.

Creating proper hierarchical order.

Display total at each header level.

Page 12: WBS Structure –Essential Element In Project Management

Benefit of this Report

The output is vary simple and cleare to Understand.

Value of different field is calculated at each wbs and project level.

Simple Selection screen for user .

Report output export to excel.

Help in find out different cost at each header level.

Reduce the effort of calculating the total for each wbs.

12

Page 13: WBS Structure –Essential Element In Project Management

Questions ?

13

Email Us @ [email protected] 

Page 14: WBS Structure –Essential Element In Project Management

Thank You !