xfer.services.ncdot.gov alamance may... · wbs element: wbs element: bridge replacement. ... state...
TRANSCRIPT
(Version 2; Released April 2014)40078.1.1 TIP No.: B-4953 County(ies): Alamance Page 1 of 1
TIP Number: Date:
Phone: Phone:Email: Email:
County(ies):CAMA County?
No
Design/Future: Year: 2035 Existing: Year:
Threatened/Endangered Species? Comments:
Yes NoNo
Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? N/ADeck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
General Project Information
Project Description
Waterbody Information
Existing SiteProject Length (lin. miles or feet):
ac.
Surface Water Body (1): Water Supply II (WS-II)NCDWR Surface Water Classification for Water Body
ac.Two 9' travel lanes with 4' grassed shoulders and side slopes.
600 2015
Haw River
0.2Proposed Project
Cape Fear No
Buffer Rules in Effect
NoneImpairments:Other Stream Classification:
Primary Classification:
Project Built-Upon Area (ac.)
Annual Avg Daily Traffic (veh/hr/day):B-4953 is a Transportation Improvement Project to replace Bridge #0064 in Alamance County crossing Quaker Creek. The existing bridge is a two span timber deck on I-beams w/one interior bent. The new bridge will be a 70' single span cored slab structure. Minimization and avoidance measures incorporated into the design include elimination of direct discharge, increasing buffer treatment of discharges, utilizing an existing end bent to minimize stream impacts, removal of an interior bent and vegetative treatment of shoulder section discharges.
Typical Cross Section Description:
452
Two 10' travel lanes with 3' to 4.33' paved shoulders,shoulder berm gutter,3' to 6' grassed shoulders and grassed side slopes.
North Carolina Department of Transportation
Highway Stormwater Program STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
1020 Birch Ridge Dr. Address:
3/1/2014
WBS Element:
Bridge ReplacementWBS Element:
City/Town:
919.707.6736
Alamance
Contractor / Designer:
Address:
B-4953Ray Lovinggood
Raleigh, NC 27610
40078.1.1
River Basin(s):
NCDOT Contact:
General Project Narrative:(Description of Minimization of Water Quality Impacts)
NCDWR Stream Index No.:
Surrounding Land Use: Farm land, Historic Property
Quaker Creek 16-18-4-(1)
0.2
Supplemental Classification: High Quality Waters (HQW)None
0.066 miles
(NSW)
Jordan Lake
Wetlands within Project Limits?
WETLAND AND SURFACE WATER IMPACTS PERMIT
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
TS
H.d
gn
mkelly
3/3
1/2014 SHEET __ OF __
PERMIT DRAWING
QUAKER CREEK
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
4
QUAKER CREEK
TO NC 49
TO NC 11
9
-L- SR 1912 (DICKEY MILL ROAD) -L- SR 1
912 (DIC
KEY MILL RO
AD)
BEGIN BRIDGE-L- STA. 15+65.88
END BRIDGE-L- STA. 16+38.13
STA. 14+00.00 -L- BEGIN TIP PROJECT B-4953
STA. 17+50.00 -L- END TIP PROJECT B-4953
JANUARY 20, 2015
DANIEL W. GARDNER, JR., PE
JAMES A. SPEER, PE
ALAMANCE COUNTY
BRIDGE NO. 64 ON SR 1912 (DICKEY MILL ROAD)
OVER QUAKER CREEK
25 50 10050
25 50 10050
5 10 20 10
DHV
D
T
V
=
=
=
=
=
=
600
13
60
3
%
%
MPH
ADT
ADT 2035
% *
* TTST 1% DUAL 2%
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
FUNC CLASS=RURAL LOCAL
VICINITY MAP
1.0
.6
.2 .1.1
.2
.3
.2
.5
.4
.6
.4
1.2
1.4
.9.4
1.0
.3
1.0 .4
.4
.82.0
1.8
.8
.2
.1
.2
.2
1.2
1.5
.5
1.3
.5
.2
.6
.1
.6
.2
1.5
.3
1.3
1.2
.2
.1
.2
.4
1.1
Creek
Scrub
Creek
Cre
ek
Quaker
Cre
ek
Stagg
Quaker Creek
Res.
Creek
.6
1.10
.90
1.8
0
17561794
17931999
1995
1990
1911
1910
1912
1910
1912
1913
1002
1914
2005
1918
19871918
1917
1919
1917
1915
1921
1912
1921 1920
1921
1921
19161752
Cates Rd
Cobb
FarmTr
Cris
p
Tr
Cru
mpto
n
Tr
John
Lewis Rd
Ridge
Tr
Ellis
Jeffers
on
Albert
Jefferies
Rd
Willia
mAlle
nRd
Vaughn
Ln
Hester
Rd
Barn
ett
Rd
Rd
Thomas Rd
Dicke
yMill
Rd
Driveway
Berm
uda
Tr
HighRock
Rd
Store
Rd
Lync
h
Mrs
White
Rd
Virginia
Pine
Tr
Fuller
Rd
Landi
Ln
White
Level
Rd
Tula
La
mbert
Rd
Rd
Mebane
Rogers
Rd
Johnso
n
Rd
King
Headen
Tr
Haith
Fuller
Tr
Miles
Cha
pel
Rd
St
Rd
Albert St R
dGreen
Valley Blvd
Rd
Swann Rd
Level
Rd
Wyatt
Ln
Masse
y
MHP
Whip
poorwill
Tr
Rd
SeamstersMHP
Ray Massey
Tr
Winding Tr
Village MHP
Spring
Loop
Convenie
nt
Dr
Rd
Michelle
Dr
Deer
Run T
r
Qua
ker
Lake
Tr
Foxcliff
Dr
Millstone
Ln
ValleyHighD
r
Hom
e
Ct
Ray Clark
MHP
Pennstar
Tr
Quaker
Rid
ge
Rd
Knollwood
Summit Ridge Rd
St
.1
.10 .09 .0
9
.12
.08
.01
.20
.20
.05
.06
.05
.15
Green
waySt
Pine
brook
Anderson.36
.41
.11
.05
.18.13
.09
.10
.13
.10
.15
.01 .35
.11
.14
.06
Loop
Black
Cre
ek
Tr
.35
G
F
F KimesChapel
F
MilesChapel
G
LongsChapel
CrossroadsCh.
broken at Culvert 65
.08
20432042 Foxfire Ln.
Blue
Moon
Tr.
.22
1909
(49
(49
(119
(119
.32
.25 2042
2044.40
Sundance
Gro
ve
QuakerCreekRes.
QuakerCreekRes.
PROJECT B-4953
1912
DETOUR ROUTE
TOTAL LENGTH OF TIP PROJECT B-4953 = 0.066 MILES
"SUB-REGIONAL TIER"
2015 4520
0
0
PROFILE (HORIZONTAL)
40078.1.1 PE
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
1
DESIGN DATA Prepared in the Office of:
SIGNATURE:
SIGNATURE:
P.E.
P.E.
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEERROADWAY DESIGN
LOCATION:
TYPE OF WORK:
09/08/99
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
1000 Birch Ridge Dr., Raleigh NC, 27610
CO
NT
RA
CT:
C20
3516
TIP P
ROJE
CT:
B-4
953
DE
PA
RT
ME
NT
OF TRANSPO
RT
ATIO
N
ST
A
TE
OF NORTHCA
RO
LIN
A
GRADING, DRAINAGE, PAVING, AND STRUCTURE
-DRV1-
-DRV1- STA. 10+00.00BEGIN CONSTRUCTION
45
LENGTH STRUCTURE TIP PROJECT B-4953 = 0.014 MILES
LENGTH ROADWAY TIP PROJECT B-4953 = 0.052 MILES
-L- STA. 11+50.00BEGIN CONSTRUCTION
-L- STA. 21+20.00END CONSTRUCTION
See Sheet 1-C For Survey Control Sheet See Sheet 1-B For Conventional Plan Sheet Symbols
See Sheet 1-A For Index of Sheets
NSRS 2007
NA
D 83/
CLEARING ON THIS PROJECT SHALL BE PREPARED TO THE LIMITS ESTABLISHED BY METHOD II.
R/W & UTILITIESBRZ-1912(2)
BRZ-1912(2)
40078.2.FD1
B-4953
JANUARY 28, 2014
40078.3.FD1 BRZ-1912(2) CONST.
QU
AK
ER
CR
EE
K
TS
TS
IMP
AC
TS
IN S
UR
FA
CE
WA
TE
RD
EN
OT
ES
TE
MP
OR
AR
Y
Scale
: 1"=
10
0’
0’
100’
20
0’
30
0’
100’
R:\Hydraulics\PERMITS_Environmental\Drawings\W etland_Stream\B4953_Hyd_prm_wet_PSH04.dgnmkelly3/31/2014
SH
EE
T _
_ O
F _
_P
ER
MIT
DR
AW
ING
IN S
UR
FA
CE
WA
TE
RT
EM
PO
RA
RY
IMP
AC
T
GR
AS
S L
AW
N
GR
AS
S L
AW
N
PA
ST
UR
E
GR
AS
S L
AW
N
RE
MO
VE
RE
TA
IN
PIP
E C
LE
AN
OU
TP
IPE
CL
EA
N O
UT
PIP
E C
LE
AN
OU
T
PIP
E C
LE
AN
OU
TS
EE
DE
TA
IL B
10
11
12
13
14
15
16
17
18
19
20
21
10
11
12
13
14
15
16
17
18
19
20
21
10
11
12
13
14
15
16
17
18
19
20
21
10
11
12
13
14
15
16
17
18
19
20
21
T
T
T
12" R
CP
15" H
DPE
12" R
CP
15" R
CP
18" C
MP
15" H
DP
E
18" R
CP
18" RCP
15" R
CP
1S
BK
D
1SFD
QUAKER CREEK
1S
FD
CONC
OLD
MIL
L
DA
M
S
SS
1S
FD
ME
TA
L S
HE
D
TO NC 119
10’ GRAVEL
8’ GRAVEL
10’ SOIL
PA
ST
UR
E
5’ W
W
10’ GRAVEL
10’ BST
10’ BST
10’ GRAVEL
8’ SOIL
8’ G
RAVEL
GR
AV
EL
WELL
T
50’ PRIVATE DRIVE
AL
BE
RT
S. H
IGH
TO
WE
R
DB
28
72
PG
71
4P
B 6
6 P
G 3
52
DB
31
4 P
G 3
25
ROY
&
HAZEL HIG
HTO
WER
PB
66 P
G 3
52
WO
OD
S
DA
VID
N. M
AS
SE
Y
DB
28
90
PG
69
1
DA
VID
N. M
AS
SE
Y
PB
54 P
G 4
2
DB
21
33
PG
38
2A
LIC
E M
. AL
LE
N
PB
66 P
G 4
66
5’W
W
60.00’
EXIS
TIN
G R/
W
EXIS
TIN
G R/
W
DA
VID
N. M
AS
SE
Y
WO
OD
S
WO
OD
S
HO
US
EW
EL
L
4’ WW
EXIS
TIN
G R/
WEXIS
TIN
G R/
W
EXIS
TIN
G R/
W
CLYDE &
CARLENE B. W
OODS
DB
1405 P
G 5
86
PB
35 P
G 2
0
RO
DN
EY
& T
YR
A W
OO
DS
DB
1063 P
G 8
99
PB
35
PG
20
3
5’WW
DB
28
90
PG
69
1D
B 2
89
0 P
G 6
91
7’ GRAVEL
INV.=548.92’
SR 1912 DIC
KE
Y MILL ROAD 18’ B
ST
SR 1912 DIC
KE
Y MILL ROAD 18’ B
ST
GA
TE
JB
PO
SS
IBL
E
60.00’
EXIS
TIN
G R/
W
EXIS
TIN
G R/
W
TO NC 49
SE
PT
IC F
IEL
DP
OS
SIB
LE
EL
EV
= 5
41.9
8’
SE
E S
HE
ET
1-C
BM
#2
NAD 83/ NSRS 2007
-L-POT Sta. 10+00.00
-L- PC Sta. 12+28.51
-L- PT Sta. 15+29.78
-L- PC Sta. 17+28.10
-L- PT Sta
. 20+52.58
-L- POT Sta
. 22+00.00
PI S
ta 1
3+
79.2
4DL
= 3
01.2
7’
T =
150.7
3’
R =
3,5
99.8
5’
PI S
ta 1
8+
91.8
5DL
= 3
24
.48
’T
= 1
63
.76
’R
= 9
96
.87
’
-L
-
SE
= S
EE
PL
AN
SS
E =
SE
E P
LA
NS
SE
= S
EE
PL
AN
SS
E =
SE
E P
LA
NS
-DR
V1
-
-DR
V1
- PT
Sta
. 10
+5
0.0
0
-DR
V1- P
OT
Sta
. 10+
70.0
0-L
- PO
T S
TA
. 17
+0
0.0
0=
-L-
PI S
ta 1
0+
15
.03
DL =
25.7
7’
T =
15
.03
’R
= 2
0.0
0’
PI S
ta 1
0+
39.6
2DL
= 2
4.2
3’
T =
13
.85
’R
= 2
0.0
0’
-DR
V1
- PR
C S
ta. 1
0+
25
.77
-DR
V1- P
C S
ta. 1
0+
00.0
0
REVISIONS
HY
DR
AU
LIC
SR
OA
DW
AY
DE
SIG
NE
NG
INE
ER
EN
GIN
EE
R
R/W
SH
EE
T N
O.
SH
EE
T N
O.
PR
OJE
CT
RE
FE
RE
NC
E N
O.
4
B-4953
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$ 8/17/99
DO
NO
T U
SE
FO
R C
ON
ST
RU
CT
ION
PR
EL
IMIN
AR
Y P
LA
NS
SK
ET
CH
SH
OW
ING
BR
IDG
E/P
AV
EM
EN
T R
EL
AT
ION
SH
IP
15
20’
20’
19’
NC
.00
.02.01
.02.01
.02
.02.01
NC
-L- S
TA
. 15
+6
5.8
8B
EG
IN B
RID
GE
-L- S
TA
. 15
+5
4.8
8B
EG
IN A
PP
R. S
LA
B
-L- S
TA
. 16+
38.1
3E
ND
BR
IDG
E-L
- ST
A. 1
6+
49.1
3E
ND
AP
PR
. SL
AB
20’
SE
E S
HE
ET
S S
-1 T
HR
U S
-? FO
R S
TR
UC
TU
RE
PL
AN
SS
EE
SH
EE
T 5
FO
R -D
RV
1- P
RO
FIL
ES
EE
SH
EE
T 5
FO
R -L
- PR
OF
ILE
-L- P
T S
ta. 1
5+
29
.78
-L- P
C S
ta. 1
7+
28.1
0
3’-4"3’-4" 26
’-8"
NT
S
TY
PE
III
TY
PE
IIIT
YP
E III
TY
PE
III
PS
- "PA
VE
D S
HO
UL
DE
R"
SB
G
SB
G
SB
G - "S
HO
UL
DE
R B
ER
M G
UT
TE
R"
RA
ILA
LA
SK
A
535
535
535
535
535
540
540
540
540
540
540
540
540
540
540
540
540
545
545
545
545
545
545
545
545
550
550
550
550
550
550
550
550
550
550
550
555
555
555
555
555
555
555
555555
555
560
560
560
560
560
560
560
560
560
565
565
565
565
565
565
565
565
565
570
570
570570
570
570
570
570
570
570
575
575
575
575
575
580
1
1
2
3
CF
C
CC
CCF
F
CCF
FC
CC
CC
FF
F
F
CF
F
TS TSIMPACTS IN SURFACE WATERDENOTES TEMPORARY
Scale: 1"= 100’
0’ 100’ 200’ 300’100’
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
PS
H04.d
gn
mkelly
3/3
1/2014
SHEET __ OF __PERMIT DRAWING
IN SURFACE WATERTEMPORARY IMPACT
GRASS LAWN
GRASS LAWN
PASTURE
GRASS LAWN
REMOVE
RETAIN
PIPE CLEAN OUTPIPE CLEAN OUT
PIPE CLEAN OUT
PIPE CLEAN OUTSEE DETAIL B
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
T
T
T
12" RCP
15" HDPE
12" RCP
15" RCP
18" CMP
15" HDPE
18" RCP
18"
RC
P
15" RCP
1SBKD
1SFD
QU
AK
ER
CR
EE
K
1SFD
CO
NC
OLD MILL
DAM
S
SS
1SFD
METAL SHED
TO NC 11
9
10’ GRAVE
L
8’ G
RA
VE
L
10’ S
OIL
PASTURE
5’ WW
10’ G
RA
VE
L
10’ B
ST
10’ B
ST
10’ G
RAVEL
8’ S
OIL
8’ GRAVEL
GRAVEL
WELL
T
50’ P
RIV
AT
E
DRIV
E
ALBERT S. HIGHTOWER
DB 2872 PG 714PB 66 PG 352
DB 314 PG 325ROY & HAZEL HIGHTOWER
PB 66 PG 352
WOODS
DAVID N. MASSEY
DB 2890 PG 691
DAVID N. MASSEY
PB 54 PG 42
DB 2133 PG 382ALICE M. ALLEN
PB 66 PG 466
5’WW
60.0
0’
EXISTING R/W
EXISTING R/W
DAVID N. MASSEY
WOODS
WOODS
HOUSEWELL
4’
WW
EXISTING R/W
EXISTIN
G R/W
EXISTIN
G R/W
CLYDE & CARLENE B. WOODS
DB 1405 PG 586
PB 35 PG 20
RODNEY & TYRA WOODSDB 1063 PG 899PB 35 PG 20
3
5’W
W
DB 2890 PG 691DB 2890 PG 691
7’ G
RA
VE
L
INV.=548.92’
SR 1912 DICKEY MILL ROAD 18’ BST
SR 1912 DICKEY MILL
ROAD 18’ BST
GATEJBPOSSIBLE
60.0
0’
EXISTING R/W
EXISTING R/W
TO NC 49
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
NA
D 83/ N
SRS 2007
-L-
PO
T
Sta. 10
+00.0
0
-L-
PC Sta. 12
+28.5
1
-L-
PT
Sta. 15
+29.7
8
-L-
PC Sta. 17
+28.10
-L- P
T Sta. 20+52.5
8
-L- P
OT Sta. 22+00.0
0
PI Sta 13+79.24D
L = 301.27’T = 150.73’R = 3,599.85’
PI Sta 18+91.85D
L = 324.48’T = 163.76’R = 996.87’
-L-
SE = SEE PLANS SE = SEE PLANS
SE = SEE PLANS SE = SEE PLANS
-DRV1-
-DRV1- PT Sta. 10+50.00
-DRV1- POT Sta. 10+70.00-L- POT STA. 17+00.00=
-L-
PI Sta 10+15.03D
L = 25.77’T = 15.03’R = 20.00’
PI Sta 10+39.62D
L = 24.23’T = 13.85’R = 20.00’
-DRV1- PRC Sta. 10+25.77
-DRV1- PC Sta. 10+00.00
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4953
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP
15
20’
20’
19’
NC
.00
.02.
01
.02
.01
.02
.02
.01N
C
-L- STA. 15+65.88BEGIN BRIDGE
-L- STA. 15+54.88BEGIN APPR. SLAB
-L- STA. 16+38.13END BRIDGE
-L- STA. 16+49.13END APPR. SLAB
20’
SEE SHEETS S-1 THRU S-? FOR STRUCTURE PLANSSEE SHEET 5 FOR -DRV1- PROFILESEE SHEET 5 FOR -L- PROFILE
-L- PT Sta. 15+29.78
-L- PC Sta. 17+28.10
3’-
4"
3’-
4"
26’-8"
NTS
TYPE III
TYPE IIITYPE III
TYPE III
PS - "PAVED SHOULDER"
SBG
SBG
SBG - "SHOULDER BERM GUTTER"
RAILALASKA
1
1
2
3
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
TS TSIMPACTS IN SURFACE WATERDENOTES TEMPORARY
Scale: 1"= 30’
0’ 30’30’R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
PS
H04
BU.d
gn
mkelly
3/3
1/2014
SHEET __ OF __PERMIT DRAWING
IN SURFACE WATERTEMPORARY IMPACT
GRASS LAWN
PASTURE
GRASS LAWN
REMOVE
RETAIN14 15 16 17 1814 15 16 17 1814 15 16 17 1814 15 16 17 18
T
18" CMP
15" HDPE
QU
AK
ER
CR
EE
K
CO
NC
OLD MILL
DAM
10’ S
OIL
5’ WW
10’ G
RA
VE
L
10’ G
RAVEL
8’ S
OIL
T
WOODS
4’
WW
INV.=548.92’
GATEJBPOSSIBLE
60.0
0’
EXISTING R/W
EXISTING R/W
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
535
535
535
540
540
540
540
540
540
540
540
540
545
545
545
545
545
545
545
545
550
550
550
550
550
550
550
555
555
555
555
555
555
560
560560
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
TS TSIMPACTS IN SURFACE WATERDENOTES TEMPORARY
Scale: 1"= 30’
0’ 30’30’R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
PS
H04
BU.d
gn
mkelly
3/3
1/2014
SHEET __ OF __PERMIT DRAWING
IN SURFACE WATERTEMPORARY IMPACT
GRASS LAWN
PASTURE
GRASS LAWN
REMOVE
RETAIN14 15 16 17 1814 15 16 17 1814 15 16 17 1814 15 16 17 18
T
18" CMP
15" HDPE
QU
AK
ER
CR
EE
K
CO
NC
OLD MILL
DAM
10’ S
OIL
5’ WW
10’ G
RA
VE
L
10’ G
RAVEL
8’ S
OIL
T
WOODS
4’
WW
INV.=548.92’
GATEJBPOSSIBLE
60.0
0’
EXISTING R/W
EXISTING R/W
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
Work
Pad.d
gn
mkelly
3/3
1/2014
TEMP. WORK PAD
Scale: 1"= 100’
0’ 100’ 200’ 300’100’
SHEET __ OF __PERMIT DRAWING
GRASS LAWN
GRASS LAWNGRASS LAWN
PASTURE
REMOVE
RETAIN
PIPE CLEAN OUTPIPE CLEAN OUT
PIPE CLEAN OUT
PIPE CLEAN OUTSEE DETAIL B
CL B RIP RAP
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
T
T
T
12" RCP
15" HDPE
12" RCP
15" RCP
18" CMP
15" HDPE
18" RCP
18"
RC
P
15" RCP
1SBKD
1SFD
QU
AK
ER
CR
EE
K
1SFD
CO
NC
OLD MILL
DAM
S
SS
1SFD
METAL SHED
TO NC 11
9
10’ GRAVE
L
8’ G
RA
VE
L
10’ S
OIL
PASTURE
5’ WW
10’ G
RA
VE
L
10’ B
ST
10’ B
ST
10’ G
RAVEL
8’ S
OIL
8’ GRAVEL
GRAVEL
WELL
T
50’ P
RIV
AT
E
DRIV
E
WOODS
5’WW
60.0
0’
EXISTING R/W
EXISTING R/W
WOODS
WOODS
HOUSEWELL
4’
WW
EXISTING R/W
EXISTIN
G R/W
EXISTIN
G R/W
3
5’W
W
7’ G
RA
VE
L
INV.=548.92’
SR 1912 DICKEY MILL ROAD 18’ BST
SR 1912 DICKEY MILL
ROAD 18’ BST
GATEJBPOSSIBLE
60.0
0’
EXISTING R/W
EXISTING R/W
TO NC 49
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
NA
D 83/ N
SRS 2007
-L-
PO
T
Sta. 10
+00.0
0
-L-
PC Sta. 12
+28.5
1
-L-
PT
Sta. 15
+29.7
8
-L-
PC Sta. 17
+28.10
-L- P
T Sta. 20+52.5
8
-L- P
OT Sta. 22+00.0
0
PI Sta 13+79.24D
L = 301.27’T = 150.73’R = 3,599.85’
PI Sta 18+91.85D
L = 324.48’T = 163.76’R = 996.87’
-L-
SE = SEE PLANS SE = SEE PLANS
SE = SEE PLANS SE = SEE PLANS
-DRV1-
-DRV1- PT Sta. 10+50.00
-DRV1- POT Sta. 10+70.00-L- POT STA. 17+00.00=
-L-
PI Sta 10+15.03D
L = 25.77’T = 15.03’R = 20.00’
PI Sta 10+39.62D
L = 24.23’T = 13.85’R = 20.00’
-DRV1- PRC Sta. 10+25.77
-DRV1- PC Sta. 10+00.00
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4953
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP
15
20’
20’
19’
NC
.00
.02.
01
.02
.01
.02
.02
.01N
C
-L- STA. 15+65.88BEGIN BRIDGE
-L- STA. 15+54.88BEGIN APPR. SLAB
-L- STA. 16+38.13END BRIDGE
-L- STA. 16+49.13END APPR. SLAB
20’
SEE SHEETS S-1 THRU S-? FOR STRUCTURE PLANSSEE SHEET 5 FOR -DRV1- PROFILESEE SHEET 5 FOR -L- PROFILE
-L- PT Sta. 15+29.78
-L- PC Sta. 17+28.10
3’-
4"
3’-
4"
26’-8"
NTS
TYPE III
TYPE IIITYPE III
TYPE III
PS - "PAVED SHOULDER"
SBG
SBG
SBG - "SHOULDER BERM GUTTER"
RAILALASKA
535
535
535
535
535
540
540
540
540
540
540
540
540
540
540
540
540
545
545
545
545
545
545
545
545
550
550
550
550
550
550
550
550
550
550
550
555
555
555
555
555
555
555
555
555
555
560
560
560
560
560
560
560
560
560
565
565
565
565
565
565
565
565
565
570
570
570
570
570
570
570
570
570
570
575
575
575
575
575
580
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
Work
Pad.d
gn
mkelly
3/3
1/2014
TEMP. WORK PAD
Scale: 1"= 100’
0’ 100’ 200’ 300’100’
SHEET __ OF __PERMIT DRAWING
GRASS LAWN
GRASS LAWNGRASS LAWN
PASTURE
REMOVE
RETAIN
PIPE CLEAN OUTPIPE CLEAN OUT
PIPE CLEAN OUT
PIPE CLEAN OUTSEE DETAIL B
CL B RIP RAP
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
T
T
T
12" RCP
15" HDPE
12" RCP
15" RCP
18" CMP
15" HDPE
18" RCP
18"
RC
P
15" RCP
1SBKD
1SFD
QU
AK
ER
CR
EE
K
1SFD
CO
NC
OLD MILL
DAM
S
SS
1SFD
METAL SHED
TO NC 11
9
10’ GRAVE
L
8’ G
RA
VE
L
10’ S
OIL
PASTURE
5’ WW
10’ G
RA
VE
L
10’ B
ST
10’ B
ST
10’ G
RAVEL
8’ S
OIL
8’ GRAVEL
GRAVEL
WELL
T
50’ P
RIV
AT
E
DRIV
E
WOODS
5’WW
60.0
0’
EXISTING R/W
EXISTING R/W
WOODS
WOODS
HOUSEWELL
4’
WW
EXISTING R/W
EXISTIN
G R/W
EXISTIN
G R/W
3
5’W
W
7’ G
RA
VE
L
INV.=548.92’
SR 1912 DICKEY MILL ROAD 18’ BST
SR 1912 DICKEY MILL
ROAD 18’ BST
GATEJBPOSSIBLE
60.0
0’
EXISTING R/W
EXISTING R/W
TO NC 49
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
NA
D 83/ N
SRS 2007
-L-
PO
T
Sta. 10
+00.0
0
-L-
PC Sta. 12
+28.5
1
-L-
PT
Sta. 15
+29.7
8
-L-
PC Sta. 17
+28.10
-L- P
T Sta. 20+52.5
8
-L- P
OT Sta. 22+00.0
0
PI Sta 13+79.24D
L = 301.27’T = 150.73’R = 3,599.85’
PI Sta 18+91.85D
L = 324.48’T = 163.76’R = 996.87’
-L-
SE = SEE PLANS SE = SEE PLANS
SE = SEE PLANS SE = SEE PLANS
-DRV1-
-DRV1- PT Sta. 10+50.00
-DRV1- POT Sta. 10+70.00-L- POT STA. 17+00.00=
-L-
PI Sta 10+15.03D
L = 25.77’T = 15.03’R = 20.00’
PI Sta 10+39.62D
L = 24.23’T = 13.85’R = 20.00’
-DRV1- PRC Sta. 10+25.77
-DRV1- PC Sta. 10+00.00
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4953
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP
15
20’
20’
19’
NC
.00
.02.
01
.02
.01
.02
.02
.01N
C
-L- STA. 15+65.88BEGIN BRIDGE
-L- STA. 15+54.88BEGIN APPR. SLAB
-L- STA. 16+38.13END BRIDGE
-L- STA. 16+49.13END APPR. SLAB
20’
SEE SHEETS S-1 THRU S-? FOR STRUCTURE PLANSSEE SHEET 5 FOR -DRV1- PROFILESEE SHEET 5 FOR -L- PROFILE
-L- PT Sta. 15+29.78
-L- PC Sta. 17+28.10
3’-
4"
3’-
4"
26’-8"
NTS
TYPE III
TYPE IIITYPE III
TYPE III
PS - "PAVED SHOULDER"
SBG
SBG
SBG - "SHOULDER BERM GUTTER"
RAILALASKA
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
Scale: 1"= 30’
0’ 30’30’
SHEET __ OF __PERMIT DRAWING
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
Work
Pad
BU.d
gn
mkelly
3/3
1/2014
PASTURE
GRASS LAWNGRASS LAWN
GRASS LAWN
TEMP. WORK PAD
REMOVE
RETAIN
18"
14 15 16 17 1814 15 16 17 1814 15 16 17 1814 15 16 17 18
T
18" CMP
15" HDPE
QU
AK
ER
CR
EE
K
CO
NC
OLD MILL
DAM
10’ S
OIL
5’ WW
10’ G
RA
VE
L
10’ G
RAVEL
8’ S
OIL
T
WOODS
4’
WW
GATE
60.0
0’
EXISTING R/W
EXISTING R/W
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
535
535
535
540
540
540
540
540
540
540
540
540
545
545
545
545
545
545
545
545
550
550
550
550
550
550
550
555
555
555
555
555
555
560
560
560
560
565
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
Scale: 1"= 30’
0’ 30’30’
SHEET9 99999999__ OF __PERMIT DRAWING
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_Hyd
_prm
_wet_
Work
Pad
BU.d
gn
mkelly
3/3
1/2014
PASTURE
GRASS LAWNGRASS LAWN
GRASS LAWN
TEMP. WORK PAD
REMOVE
RETAIN
18"
14 15 16 17 1814 15 16 17 1814 15 16 17 1814 15 16 17 18
T
18" CMP
15" HDPE
QU
AK
ER
CR
EE
K
CO
NC
OLD MILL
DAM
10’ S
OIL
5’ WW
10’ G
RA
VE
L
10’ G
RAVEL
8’ S
OIL
T
WOODS
4’
WW
GATE
60.0
0’
EXISTING R/W
EXISTING R/W
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
PI = 10+30.00EL = 552.15’
(-)0.8667%(+)2.0000%
.02
.02.02
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Wetland_Strea
m\B
4953_H
yd_prm
_wet_
PFL_
PS
H05.d
gn
mkelly
3/3
1/2014
SHEET __ OF __PERMIT DRAWING
10.00’
1:5.1
+/-50 TONSCLASS B RIP RAP
+/-135 TONSCLASS I RIP RAP
TEMP. WORK PAD
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
5/28/99
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
5B-4953
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
-L-
10 11 12 13 14 15 16 17 18 19 20 21
520
530
540
550
560
570
580
520
530
540
550
560
570
580
BEGIN GRADE -L- STA. 14+00.00ELEV. = 550.55’ ELEV. = 555.89’
END GRADE -L- STA. 17+50.00
SEE SHEET 4 FOR PLAN VIEW
ELEV. = 552.41’BEGIN GRADE -DRV1- STA. 10+00.00
ELEV. = 552.75’END GRADE -DRV1- STA. 10+60.00
SEE SHEET 4 FOR PLAN VIEW
10
510
520
530
540
550
560
570
510
520
530
540
550
560
570
K = 26 (DS = 25 MPH)
K = 26 (DS = 25 MPH)
PI = 14+95.00EL = 547.14’
(-)3.5895% (+)2.3111%
VC = 155’
PI = 16+75.00EL = 551.30’
(+)2.3111%(+)6.120
0%
VC = 100’
VC = 60’K = 21 (DS > 20 MPH)
CL
Elev.= 535.4’+/-12/10/12 WS
LEAVE FOOTINGREMOVE ENCASEMENT AND
STR. PAY ITEMTO EL. 541.5’ (+/- 65cy)ABUTMENT EXCAVATION
STR. PAY ITEMTO EL. 543.1’ (+/- 63cy)ABUTMENT EXCAVATION
CROWN GRADE ELEV.= 549.61’90 SKEW1 @ 70’, 24" CORED SLABSTA. 16+02 -L-
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
FT
DATE OF SURVEY
W.S. ELEVATIONAT DATE OF SURVEY FT
= 2100
= 25
= 544.4
= 3000
= 100
= 545.5
= 3700
= 100+/-
= 548.2
=
= 12/10/12
= 535.4+/-
RR SPIKE IN BASE OF 19" RIVER BIRCHL STATION 15+31.00 105’ RIGHTN 871551 E 1908470BM2 ELEVATION = 541.98’
RR SPIKE IN BASE OF 20" PINEDIST. 652.80’L STATION 10+00.00 S 76 22’ 6.55" WN 871566 E 1907315BM1 ELEVATION = 602.90’
10
510
520
530
540
550
560PI = 10+55.00EL = 547.91’
(-)13.8727%(+)1.9481%
10
510
520
530
540
550
560
PI = 10+10.00EL = 545.93’
(+)7.8
000%
PI = 10+27.00EL = 549.47’
(+)20.82
35% (+)4.
9951%
11 11 11
VC = 15’
BEGIN GRADE -DRV2- STA. 10+00.00
ELEV. = 555.54’
K = 1 (DS < 15 MPH)
END GRADE -DRV2- STA. 10+62.70ELEV. = 548.06’
ELEV. = 545.15’
BEGIN GRADE -DRV2A- STA. 10+00.00
ELEV. = 549.98’END GRADE -DRV2A- STA. 10+37.21
VC = 17’K = 1 (DS < 15 MPH)
VC = 17’K = 1 (DS < 15 MPH)
-DRV1- -DRV2- -DRV2A-
BUFFER IMPACTS PERMIT
SHEET __ OF __BUFFER DRAWING
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Buffer\
B4953_H
yd_prm
_buf_
TS
H.d
gn
mkelly
3/3
1/2014
QUAKER CREEK
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
4
QUAKER CREEK
TO NC 49
TO NC 11
9
-L- SR 1912 (DICKEY MILL ROAD) -L- SR 1
912 (DIC
KEY MILL RO
AD)
BEGIN BRIDGE-L- STA. 15+65.88
END BRIDGE-L- STA. 16+38.13
STA. 14+00.00 -L- BEGIN TIP PROJECT B-4953
STA. 17+50.00 -L- END TIP PROJECT B-4953
JANUARY 20, 2015
DANIEL W. GARDNER, JR., PE
JAMES A. SPEER, PE
ALAMANCE COUNTY
BRIDGE NO. 64 ON SR 1912 (DICKEY MILL ROAD)
OVER QUAKER CREEK
25 50 10050
25 50 10050
5 10 20 10
DHV
D
T
V
=
=
=
=
=
=
600
13
60
3
%
%
MPH
ADT
ADT 2035
% *
* TTST 1% DUAL 2%
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
FUNC CLASS=RURAL LOCAL
VICINITY MAP
1.0
.6
.2 .1.1
.2
.3
.2
.5
.4
.6
.4
1.2
1.4
.9.4
1.0
.3
1.0 .4
.4
.82.0
1.8
.8
.2
.1
.2
.2
1.2
1.5
.5
1.3
.5
.2
.6
.1
.6
.2
1.5
.3
1.3
1.2
.2
.1
.2
.4
1.1
Creek
Scrub
Creek
Cre
ek
Quaker
Cre
ek
Stagg
Quaker Creek
Res.
Creek
.6
1.10
.90
1.8
0
17561794
17931999
1995
1990
1911
1910
1912
1910
1912
1913
1002
1914
2005
1918
19871918
1917
1919
1917
1915
1921
1912
1921 1920
1921
1921
19161752
Cates Rd
Cobb
FarmTr
Cris
p
Tr
Cru
mpto
n
Tr
John
Lewis Rd
Ridge
Tr
Ellis
Jeffers
on
Albert
Jefferies
Rd
Willia
mAlle
nRd
Vaughn
Ln
Hester
Rd
Barn
ett
Rd
Rd
Thomas Rd
Dicke
yMill
Rd
Driveway
Berm
uda
Tr
HighRock
Rd
Store
Rd
Lync
h
Mrs
White
Rd
Virginia
Pine
Tr
Fuller
Rd
Landi
Ln
White
Level
Rd
Tula
La
mbert
Rd
Rd
Mebane
Rogers
Rd
Johnso
n
Rd
King
Headen
Tr
Haith
Fuller
Tr
Miles
Cha
pel
Rd
St
Rd
Albert St R
dGreen
Valley Blvd
Rd
Swann Rd
Level
Rd
Wyatt
Ln
Masse
y
MHP
Whip
poorwill
Tr
Rd
SeamstersMHP
Ray Massey
Tr
Winding Tr
Village MHP
Spring
Loop
Convenie
nt
Dr
Rd
Michelle
Dr
Deer
Run T
r
Qua
ker
Lake
Tr
Foxcliff
Dr
Millstone
Ln
ValleyHighD
r
Hom
e
Ct
Ray Clark
MHP
Pennstar
Tr
Quaker
Rid
ge
Rd
Knollwood
Summit Ridge Rd
St
.1
.10 .09 .0
9
.12
.08
.01
.20
.20
.05
.06
.05
.15
Green
waySt
Pine
brook
Anderson.36
.41
.11
.05
.18.13
.09
.10
.13
.10
.15
.01 .35
.11
.14
.06
Loop
Black
Cre
ek
Tr
.35
G
F
F KimesChapel
F
MilesChapel
G
LongsChapel
CrossroadsCh.
broken at Culvert 65
.08
20432042 Foxfire Ln.
Blue
Moon
Tr.
.22
1909
(49
(49
(119
(119
.32
.25 2042
2044.40
Sundance
Gro
ve
QuakerCreekRes.
QuakerCreekRes.
PROJECT B-4953
1912
DETOUR ROUTE
TOTAL LENGTH OF TIP PROJECT B-4953 = 0.066 MILES
"SUB-REGIONAL TIER"
2015 4520
0
0
PROFILE (HORIZONTAL)
40078.1.1 PE
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
1
DESIGN DATA Prepared in the Office of:
SIGNATURE:
SIGNATURE:
P.E.
P.E.
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEERROADWAY DESIGN
LOCATION:
TYPE OF WORK:
09/08/99
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
1000 Birch Ridge Dr., Raleigh NC, 27610
CO
NT
RA
CT:
C20
3516
TIP P
ROJE
CT:
B-4
953
DE
PA
RT
ME
NT
OF TRANSPO
RT
ATIO
N
ST
A
TE
OF NORTHCA
RO
LIN
A
GRADING, DRAINAGE, PAVING, AND STRUCTURE
-DRV1-
-DRV1- STA. 10+00.00BEGIN CONSTRUCTION
45
LENGTH STRUCTURE TIP PROJECT B-4953 = 0.014 MILES
LENGTH ROADWAY TIP PROJECT B-4953 = 0.052 MILES
-L- STA. 11+50.00BEGIN CONSTRUCTION
-L- STA. 21+20.00END CONSTRUCTION
See Sheet 1-C For Survey Control Sheet See Sheet 1-B For Conventional Plan Sheet Symbols
See Sheet 1-A For Index of Sheets
NSRS 2007
NA
D 83/
CLEARING ON THIS PROJECT SHALL BE PREPARED TO THE LIMITS ESTABLISHED BY METHOD II.
R/W & UTILITIESBRZ-1912(2)
BRZ-1912(2)
40078.2.FD1
B-4953
JANUARY 28, 2014
40078.3.FD1 BRZ-1912(2) CONST.
QU
AK
ER
CR
EE
K
1 4
Scale: 1"= 100’
0’ 100’ 200’ 300’100’
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Buffer\
B4953_Hyd
_prm
_buf_
PS
H04.d
gn
mkelly
3/3
1/2014
SHEET __ OF __BUFFER DRAWING
GRASS LAWN
GRASS LAWN
PASTURE
GRASS LAWN
REMOVE
RETAIN
PIPE CLEAN OUTPIPE CLEAN OUT
PIPE CLEAN OUT
PIPE CLEAN OUTSEE DETAIL B
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
10
1112
1314 15 16 17 18
19
20
21
T
T
T
12" RCP
15" HDPE
12" RCP
15" RCP
18" CMP
15" HDPE
18" RCP
18"
RC
P
15" RCP
1SBKD
1SFD
QU
AK
ER
CR
EE
K
1SFD
CO
NC
OLD MILL
DAM
S
SS
1SFD
METAL SHED
TO NC 11
9
10’ GRAVE
L
8’ G
RA
VE
L
10’ S
OIL
PASTURE
5’ WW
10’ G
RA
VE
L
10’ B
ST
10’ B
ST
10’ G
RAVEL
8’ S
OIL
8’ GRAVEL
GRAVEL
WELL
T
50’ P
RIV
AT
E
DRIV
E
ALBERT S. HIGHTOWER
ROY & HAZEL HIGHTOWER
WOODS
DAVID N. MASSEY
DAVID N. MASSEY
ALICE M. ALLEN
5’WW
60.0
0’
EXISTING R/W
EXISTING R/W
DAVID N. MASSEY
WOODS
WOODS
HOUSEWELL
4’
WW
EXISTING R/W
EXISTIN
G R/W
EXISTIN
G R/W
CLYDE & CARLENE B. WOODS
RODNEY & TYRA WOODS
3
5’W
W
7’ G
RA
VE
L
INV.=548.92’
SR 1912 DICKEY MILL ROAD 18’ BST
SR 1912 DICKEY MILL
ROAD 18’ BST
GATEJBPOSSIBLE
60.0
0’
EXISTING R/W
EXISTING R/W
TO NC 49
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
NA
D 83/ N
SRS 2007
-L-
PO
T
Sta. 10
+00.0
0
-L-
PC Sta. 12
+28.5
1
-L-
PT
Sta. 15
+29.7
8
-L-
PC Sta. 17
+28.10
-L- P
T Sta. 20+52.5
8
-L- P
OT Sta. 22+00.0
0
PI Sta 13+79.24D
L = 301.27’T = 150.73’R = 3,599.85’
PI Sta 18+91.85D
L = 324.48’T = 163.76’R = 996.87’
-L-
SE = SEE PLANS SE = SEE PLANS
SE = SEE PLANS SE = SEE PLANS
-DRV1-
-DRV1- PT Sta. 10+50.00
-DRV1- POT Sta. 10+70.00-L- POT STA. 17+00.00=
-L-
PI Sta 10+15.03D
L = 25.77’T = 15.03’R = 20.00’
PI Sta 10+39.62D
L = 24.23’T = 13.85’R = 20.00’
-DRV1- PRC Sta. 10+25.77
-DRV1- PC Sta. 10+00.00
RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4953
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP
15
20’
20’
19’
NC
.00
.02.
01
.02
.01
.02
.02
.01N
C
-L- STA. 15+65.88BEGIN BRIDGE
-L- STA. 15+54.88BEGIN APPR. SLAB
-L- STA. 16+38.13END BRIDGE
-L- STA. 16+49.13END APPR. SLAB
20’
SEE SHEETS S-1 THRU S-? FOR STRUCTURE PLANSSEE SHEET 5 FOR -DRV1- PROFILESEE SHEET 5 FOR -L- PROFILE
-L- PT Sta. 15+29.78
-L- PC Sta. 17+28.10
3’-
4"
3’-
4"
26’-8"
NTS
TYPE III
TYPE IIITYPE III
TYPE III
PS - "PAVED SHOULDER"
SBG
SBG
SBG - "SHOULDER BERM GUTTER"
RAILALASKA
1
1
2
3
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
42
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2RE
VISIO
NS
HYDRAULICSROADWAY DESIGNENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION
Scale: 1"= 30’
0’ 30’30’
SHEET __ OF __BUFFER DRAWING
R:\
Hydra
ulics\P
ER
MIT
S_E
nviro
nm
ental\
Dra
win
gs\
Buffer\
B4953_Hyd
_prm
_buf_
PS
H04
BU.d
gn
mkelly
3/3
1/2014
GRASS LAWN
GRASS LAWN
PASTURE
GRASS LAWN
REMOVE
RETAIN14 15 16 17 1814 15 16 17 1814 15 16 17 1814 15 16 17 18
T
18" CMP
15" HDPE
QU
AK
ER
CR
EE
K
CO
NC
OLD MILL
DAM
10’ S
OIL
5’ WW
10’ G
RA
VE
L
10’ G
RAVEL
8’ S
OIL
T
WOODS
4’
WW
INV.=548.92’
GATE
60.0
0’
EXISTING R/W
EXISTING R/W
SEPTIC FIELDPOSSIBLE
ELEV = 541.98’SEE SHEET 1-C
BM #2
CF
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
CF
F
3 4
Rev. May 2006
ROAD CROSSING BRIDGE
PARALLEL IMPACT
ZONE 1 (ft2)
ZONE 2 (ft2)
TOTAL (ft2)
ZONE 1 (ft2)
ZONE 2 (ft2)
TOTAL (ft2)
ZONE 1 (ft2)
ZONE 2 (ft2)
15+08 to 16+71-L- X 1159.0 1500.0 2659.0
15+67 to 16+37-L- X 1261.0 137.0 1398.0
TOTAL: 2420.0 1637.0 4057.0 0.0 0.0 0.0
IMPACT
BUFFER IMPACTS SUMMARY
TYPE
SITE NO.STRUCTURE SIZE /
TYPESTATION
(FROM/TO)
ALLOWABLE MITIGABLEBUFFER
REPLACEMENT
SHEET OF
PROJECT: 40078.1.1 (B-4953)
3/31/2014
N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS
ALAMANCE COUNTY
4 4
QUAKER CREEK
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
4
QUAKER CREEK
TO NC 49
TO NC 1
19
-L- SR 1912 (DICKEY MILL ROAD) -L- SR
1912 (D
ICKEY MI
LL ROAD)
BEGIN BRIDGE
-L- STA. 15+65.88
END BRIDGE
-L- STA. 16+38.13
STA. 14+00.00 -L- BEGIN TIP PROJECT B-4953
STA. 17+50.00 -L- END TIP PROJECT B-4953
JANUARY 20, 2015
DANIEL W. GARDNER, JR., PE
JAMES A. SPEER, PE
ALAMANCE COUNTY
BRIDGE NO. 64 ON SR 1912 (DICKEY MILL ROAD)
OVER QUAKER CREEK
25 50 10050
25 50 10050
5 10 20 10
DHV
D
T
V
=
=
=
=
=
=
600
13
60
3
%
%
MPH
ADT
ADT 2035
% *
* TTST 1% DUAL 2%
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
FUNC CLASS=RURAL LOCAL
VICINITY MAP
1.0
.6
.2 .1.1
.2
.3
.2
.5
.4
.6
.4
1.2
1.4
.9.4
1.0
.3
1.0 .4
.4
.8
2.0
1.8
.8
.2
.1
.2
.2
1.2
1.5
.5
1.3
.5
.2
.6
.1
.6
.2
1.5
.3
1.3
1.2
.2
.1
.2
.4
1.1
Creek
Scrub
Creek
Cre
ek
Quaker
Cre
ek
Stagg
Quaker Creek
Res.
Creek
.6
1.10
.90
1.8
0
17561794
17931999
1995
1990
1911
1910
1912
1910
1912
1913
1002
1914
2005
1918
19871918
1917
1919
1917
1915
1921
1912
1921 1920
1921
1921
19161752
Cates Rd
Cobb
Farm
Tr
Cris
p
Tr
Cru
mpto
n
Tr
John
LewisRd
Ridge
Tr
Ellis
Jeffers
on
Albert
Jefferies
Rd
Willia
mAllen
Rd
Vaughn
Ln
Hester
Rd
Barn
ett
Rd
Rd
Thomas Rd
Dicke
yMill
Rd
Driveway
Berm
uda
Tr
High
Rock
Rd
Store
Rd
Lynch
Mrs
White
Rd
Virginia
Pine
Tr
Fuller
Rd
Landi
Ln
White
Level
Rd
Tula
La
mbert
Rd
Rd
Mebane
Rogers
Rd
Johnson
Rd
King
Headen
Tr
Haith
Fuller
Tr
Miles
Chapel
Rd
St
Rd
Albert St R
dGreen
Valley Blvd
Rd
Swann Rd
Level
Rd
Wyatt
Ln
Massey
MHP
Whip
poorwill
Tr
Rd
Seamsters
MHP
Ray Massey
Tr
Winding Tr
Village MHP
Spring
Loop
Convenie
nt
Dr
Rd
Mich
elle
Dr
Deer
Run T
r
Quaker
Lake
Tr
Foxcliff
Dr
Millsto
ne
Ln
Valley
HighD
r
Home
Ct
Ray Clark
MHP
Pennstar
Tr
Quaker
Rid
ge
Rd
Knollwood
Summit Ridge Rd
St
.1
.10
.09 .09
.12
.08
.01
.20
.20
.05
.06
.05
.15
Green
way
St
Pine
brook
Anderson.36
.41
.11
.05
.18.13
.09
.10
.13
.10
.15
.01 .35
.11
.14
.06
Loop
Black
Cr
eek
Tr
.35
G
F
F KimesChapel
F
MilesChapel
G
Longs
Chapel
CrossroadsCh.
broken at Culvert 65
.08
20432042 Foxfire Ln.
Blue
Moon
Tr.
.22
1909
(49
(49
(119
(119
.32
.25 2042
2044.40
Sundance
Gro
ve
QuakerCreekRes.
QuakerCreekRes.
PROJECT B-4953
1912
DETOUR ROUTE
TOTAL LENGTH OF TIP PROJECT B-4953 = 0.066 MILES
"SUB-REGIONAL TIER"
2015 4520
0
0
PROFILE (HORIZONTAL)
40078.1.1 PE
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
1
DESIGN DATA Prepared in the Office of:
SIGNATURE:
SIGNATURE:
P.E.
P.E.
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:
09/08/99
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
28-J
AN-2014 14:3
9R:\
Road
way\
Proj\b4953_rdy
_tsh.d
gn
$$$$
US
ER
NA
ME$$$$
1000 Birch Ridge Dr., Raleigh NC, 27610
CO
NT
RA
CT:
TIP P
ROJE
CT:
B-4953
DE
PA
RT
ME
NT
OF TRANSPO
RT
ATIO
N
ST
A
TE
OF NORTHC
A
RO
LIN
A
GRADING, DRAINAGE, PAVING, AND STRUCTURE
-DRV1-
-DRV1- STA. 10+00.00
BEGIN CONSTRUCTION
45
LENGTH STRUCTURE TIP PROJECT B-4953 = 0.014 MILES
LENGTH ROADWAY TIP PROJECT B-4953 = 0.052 MILES
-L- STA. 11+50.00
BEGIN CONSTRUCTION
-L- STA. 21+20.00
END CONSTRUCTION
See Sheet 1-C For Survey Control Sheet See Sheet 1-B For Conventional Plan Sheet Symbols
See Sheet 1-A For Index of Sheets
CLEARING ON THIS PROJECT SHALL BE PREPARED TO THE LIMITS ESTABLISHED BY METHOD II.
R/W & UTILITIESBRZ-1912(2)
BRZ-1912(2)
40078.2.FD1
B-4953
JANUARY 28, 2014
QU
AK
ER
CR
EE
K
NSRS 2007
NA
D 83/
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Baseline Control Point
RIGHT OF WAY:
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
Proposed Control of Access
Proposed Right of Way Line
C
F
Existing Easement Line
Proposed Temporary Construction Easement
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Utility Easement
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
KProposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Booth
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}
T
p
Q
l
e
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
Recorded U/G Power Line
Recorded U/G Telephone Cable
Designated U/G Telephone Cable (S.U.E.*)
Recorded U/G Telephone Conduit
Designated U/G Telephone Conduit (S.U.E.*)
Recorded U/G Fiber Optics Cable
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
Recorded U/G Water Line
4
I
H
a
TV:
TV Satellite Dish
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
Recorded U/G TV Cable
Recorded U/G Fiber Optic Cable
Designated U/G Fiber Optic Cable (S.U.E.*)
r
|
I]
GAS:
Gas Valve
Gas Meter
Recorded U/G Gas Line
n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Recorded SS Forced Main Line
Designated SS Forced Main Line (S.U.E.*)
d
o
A/G Water
Above Ground Gas LineA/G Gas
Above Ground Water Line
Above Ground Sanitary Sewer A/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole OF
S3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line
?
CONC
CONC WW
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
Designated U/G Power Line (S.U.E.*)
Designated U/G Fiber Optics Cable (S.U.E.*)
Designated U/G Water Line (S.U.E.*)
Designated U/G TV Cable (S.U.E.*)
Designated U/G Gas Line (S.U.E.*)
U/G Test Hole (S.U.E.*)
*S.U.E. = Subsurface Utility Engineering
WLB
EIP
B
ECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
Note: Not to ScaleSHEET NO.PROJECT REFERENCE NO.
1-B B-4953
Abandoned According to Utility Records
WLB
EAB
EPB
RW
RW
RW
CA
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
04/16/11
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
Proposed Permanent Easement with
Iron Pin and Cap Marker
Proposed Temporary Utility Easement TUE
Iron Pin and Cap Marker
Proposed Right of Way Line with
DUEProposed Permanent Drainage / Utility Easement
AUEProposed Aerial Utility Easement
CRProposed Curb Ramp
STATE OF NORTH CAROLINADIVISION OF HIGHWAYS
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
UST
Known Soil Contamination: Area or Site
Potential Soil Contamination: Area or Site
Concrete or Granite R/W Marker
Proposed Right of Way Line with
CA Concrete C/A Marker
Proposed Control of Access Line with
-D
RV1-
>>
E = 1908585.7520
N = 871635.6295
STATION "BL-4"
NCDOT BASELINE
E = 1909074.7338
N = 871682.5981
STATION "BL-5"
NCDOT BASELINE
ELEV = 541.98
BM2
>
ELEV = 602.90BM1
BASELINE DATA
BENCHMARK DATA
NOTES
E = 1908034.1693
N = 871693.3827
STATION "BL-3"
NCDOT BASELINE
QU
AK
ER
CR
EE
K
TO NC 49
TO NC 119
19’ PAVED ROAD
-L- SR 1912 DICKEY MILL ROAD
10’ B
ST10’ B
ST
7’ G
RA
VE
L
8’ G
RA
VE
L
10’ G
RA
VEL
10’ G
RA
VE
LC
ON
C
8’ S
OIL
10’ G
RA
VEL
10’ SOIL
STA. 14+00.00-L- BEGIN TIP PROJECT B-4953
STA. 17+50.00-L- END TIP PROJECT B-4953
NC GRID
NAD 83/NSRS 2007
SHEET NO.PROJECT REFERENCE NO.
Location and Surveys
1-C
R:\
Road
way\
Proj\b4953_ls_1c.d
gn
12/01/2005
B-4953 SURVEY CONTROL SHEET
****************************************
RR SPIKE IN BASE OF 20" PINE
S 76°22’6.55" W Dist 652.80
L STATION 10+00.00
N 871566 E 1907315
BM1 ELEVATION = 602.90
****************************************
****************************************
RR SPIKE IN BASE OF 19" RIVER BIRCH
L STATION 15+31.00 105 RIGHT
N 871551 E 1908470
BM2 ELEVATION = 541.98
****************************************
L
TYPE STATION NORTH EASTPOT 10+00.00 871720.3180 1907949.6830
PC 12+28.51 871687.4079 1908175.8123
PT 15+29.78 871656.5370 1908475.4191
PC 17+28.10 871644.4811 1908673.3680
PT 20+52.58 871677.3845 1908994.8699
POT 22+00.00 871715.9683 1909137.1549
5 BL-5 871682.5981 1909074.7338 576.84 21+31.02 15.87 RT
4 BL-4 871635.6295 1908585.7520 550.11 16+41.18 14.16 RT
3 BL-3 871693.3827 1908034.1693 566.84 10+87.48 14.49 RT
2 B4953-2 871810.7850 1907427.4070 597.69 OUTSIDE PROJECT LIMITS
1 B4953-1 872257.5280 1906866.1960 619.11 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BL
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "B4953-2"
WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF
NORTHING: 871810.785(ft) EASTING: 1907427.407(ft)
ELEVATION: 597.69’(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.9999702313
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
-L- PRELIMINARY DRAINAGE UTILITY EASEMENT
ALIGN STATION OFFSET NORTH EASTL 13+70.00 30.35 871639.6026 1908313.0069
L 13+70.00 45.00 871625.0357 1908311.4686
L 15+29.78 45.00 871611.6203 1908472.6835
L 17+28.10 45.00 871599.5643 1908670.6324
L 17+68.00 45.00 871597.8624 1908712.3150
L 17+75.00 58.00 871584.7372 1908719.4541
L 17+84.00 53.00 871589.6491 1908729.0050
B-4953
THE FILES TO BE FOUND ARE AS FOLLOWS:
B4953_ls_control.txt
https://connect.ncdot.gov/resources/Location/Pages/default.aspx
BY SELECTING PROJECT CONTROL DATA AT:
1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY
SURVEYS UNIT.
IF FURTHER INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND
SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT.
.02 .02 .08
4:1
GRADE
POINT
GRADE TO THIS LINE
CL
2:1
GROUNDEXISTING
GROUNDEXISTING
TYPICAL SECTION NO. 1
USE TYPICAL SECTION NO. 1
10’
20’
-L-
TYPICAL SECTION NO. 3
USE TYPICAL SECTION NO. 3
DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
SHEET NO.PROJECT REFERENCE NO.
ROADWAY DESIGNENGINEER ENGINEER
2 B-4953
PAVEMENT DESIGN
6/2/99
28-J
AN-2014 14:3
9R:\
Road
way\
Proj\b4953_rdy_typ.d
gn
$$$$
US
ER
NA
ME$$$$
NOTE: TRANSITION FROM TYPICAL SECTION NO. 1 TO EXISTING
10’8’
NOTE: TRANSITION FROM EXISTING TO TYPICAL SECTION NO. 1
-L- STA. 14+00.00 TO STA. 14+50.00
.02
GRADE
POINT
GRADE TO THIS LINE
CL
.08
GROUNDEXISTING
.08
TYPICAL SECTION NO. 2
GROUNDEXISTING
2:1
4’ 2’
3:1
2’
USE TYPICAL SECTION NO. 2
3:1
-L- STA. 17+00.00 TO STA. 17+50.00
*-DRV1- STA. 10+00.00 TO STA. 10+20.00
DETAIL FOR WEARING SURFACE ON CORED SLAB BRIDGE
GRADEPOINT
10’10’
CL-L-
.02 .02
30’ OUT TO OUT
MIN.MIN.
Detail Showing Method of Wedging
C SURVEY L
3’
6’ W/GR
.08
3’
6’ W/GR
1’-8"1’-8" 26’-8"
-L- STA. 14+50.00 TO STA. 15+65.88 (BEGIN BRIDGE)
-L- STA. 16+38.13 (END BRIDGE) TO STA. 17+00.00
-L- STA. 15+65.88 (BEGIN BRIDGE) TO STA. 16+38.13 (END BRIDGE)
.02
6"
6.5"
C1 C1
E1 E1 TT
T TJ
W W
C1 C1
3" 3"
E2 E2
C1 C1C2 C2
U U
-DRV1-
ALASKA RAIL ALASKA RAIL
1" 1"3’-4" 3’-4"
VAR 2:1 TO 6:1
-DRV1- STA. 10+20.00 TO STA. 10+50.00
12’
*VAR. 6.6’ TO 12’
CL BRG.5.25" @
CL BRG.5.25" @
CL BRG.8.5" @
PAVEMENT SCHEDULE
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
C1AT AN AVERAGE RATE OF 137.5 LBS. PER SQ. YD. IN EACH OF TWO LAYERS.
PROP. APPROX. 2�" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. PER 1" DEPTH. TO
BE PLACED IN LAYERS NOT TO EXCEED 1�" IN DEPTH.C2
AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E1
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO
THAN 5�" IN DEPTH.
BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATERE2
J PROP. 6" AGGREGATE BASE COURSE.
EARTH MATERIAL.T
VARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAIL).W
RETAIN
PIPE CLEAN OUTPIPE CLEAN OUT
PIPE CLEAN OUT
PIPE CLEAN OUT
15+41
BEGIN SBG
Slope
Ditch
Front
Ground
Natural
Geotextile
RE
VISIO
NS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4953
21-
AP
R-2014 14:5
6R:\
Road
way\
Proj\b4953_rdy_psh.d
gn
$$$$
US
ER
NA
ME$$$$
8/17/99
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
SKETCH SHOWING BRIDGE/PAVEMENT RELATIONSHIP
15
20’
20’
19’
NC
.00
.02.0
1
.02
.01
.02
.02
.01N
C
-L- STA. 15+65.88BEGIN BRIDGE
-L- STA. 15+54.88BEGIN APPR. SLAB
-L- STA. 16+38.13END BRIDGE
-L- STA. 16+49.13END APPR. SLAB
20’
SEE SHEETS S-1 THRU S-? FOR STRUCTURE PLANSSEE SHEET 5 FOR -DRV1- PROFILESEE SHEET 5 FOR -L- PROFILE
-L- PT Sta. 15+29.78
-L- PC Sta. 17+28.10
3’-
4"
3’-
4"
26’-8"
NTS
TYPE III
TYPE IIITYPE III
TYPE III
PS - "PAVED SHOULDER"
SBG
SBG
SBG - "SHOULDER BERM GUTTER"
RAILALASKA
R/
W
RE
VISIO
N 04-22-14 (D
WG) -
RE
VIS
ED
TH
E
TC
E
ON P
AR
CE
L 1 (D
AVID
N.
MAS
SE
Y) F
OR
TH
E
AD
DITIO
N
OF -
DR
V2-
AN
D -
DR
V2
A-
LO
CA
TA
TE
D
AT -
L-
ST
A. 15+00.0
0
LT.
GRAU 350
10
15
20
-L-
PO
T
Sta. 10
+00.0
0
-L-
PC Sta. 12
+28.5
1
-L-
PT
Sta. 15
+29.7
8
-L-
PC Sta. 17
+28.10
-L- P
T Sta. 20+52.5
8
-L- P
OT Sta. 22+00.0
0
PI Sta 13+79.24
D
L = 301.27’
T = 150.73’
R = 3,599.85’
PI Sta 18+91.85
D
L = 324.48’
T = 163.76’
R = 996.87’
20’
19’
20’
19’
.00
.02
.02.0
1
NC
.00
.02.0
1
.02
.01
.02
.02
.01N
C
+00.0
0 50’ TAPER
LT. & RT.20’
INC.TYP.
50’ TAPER
LT. & RT.
20’
INC.TYP.
-L-
-L- STA. 14+00.00BEGIN STATE PROJECT B-4953
-L- STA. 17+50.00END STATE PROJECT B-4953
SE = SEE PLANS SE = SEE PLANS
TYPE TL-2
NOTE: PAVE ALL DRIVES TO BACK OF TURNOUT RADIUS
TYPE TL-2 12’
TYP.10’R
12’
SE = SEE PLANS SE = SEE PLANS
-DRV1-
-DRV1- PT Sta. 10+50.00
-DRV1- POT Sta. 10+70.00
-L- POT STA. 17+00.00=
-DRV1- HORIZONTAL ALIGNMENTINSET A
-L-
PI Sta 10+15.03
D
L = 25.77’
T = 15.03’
R = 20.00’
PI Sta 10+39.62
D
L = 24.23’
T = 13.85’
R = 20.00’
-DRV1- PRC Sta. 10+25.77
-DRV1- PC Sta. 10+00.00
+50.0
0
-L- STA. 11+50.00BEGIN CONSTRUCTION
8:1
8:1TYPE TL-2
-L- POT STA. 15+00.00=
-DRV2- POT Sta. 10+72.70
-DRV2- PT Sta. 10+58.76
INSET B
-DRV2- PC Sta. 10+19.28
-DRV2- POT Sta. 10+00.00
-DRV2A- PC Sta. 10+00.00
-DRV2A- P0T Sta. 10+43.26
-DRV2- POC Sta. 10+40.00=
-DRV2-/-DRV2A- HORIZONTAL ALIGNMENT
-DRV2A- PT Sta. 10+35.58
12’
12’
NC
NC
NC
SE = SEE PLANS
-DRV2-
SE = SEE PLANS
PI Sta 10+40.12
D
L = 39.48’
T = 20.83’
R = 50.00’
-DRV2A-
PI Sta 10+18.18
D
L = 35.58’
T = 18.18’
R = 70.00’
-L-
-L- STA. 21+20.00END CONSTRUCTION
-DRV1- STA. 10+00.00BEGIN CONSTRUCTION
-DRV1- STATIONINGSEE ’INSET A’ FOR
BRIDGEREMOVE EXISTING
LT. & RT.20’ TAPER
TYP.10’R
-DRV2- STA. 10+00.00BEGIN CONSTRUCTION
STATIONING-DRV2- & -DRV2A-SEE ’INSET B’ FOR
12’
TYP.10’R
CF
T
T
T
12" RCP
15" HDPE
12" RCP
15" RCP
18" CMP
15" HDPE
18" RCP
18"
RC
P
15" RCP
1SBKD
1SFD
QU
AK
ER
CR
EE
K
1SFD
CO
NC
EIP
EIP
EIP
OLD MILL
DAM
S
SS
1SFD
METAL SHED
TO NC 1
19
10’ G
RAVEL
8’ G
RA
VE
L
10’ S
OIL
PASTURE
5’ WW
10’ G
RA
VE
L
10’ B
ST
10’ B
ST
EIP
EIP10’ G
RAVEL
8’ S
OIL
8’ GRAVEL
GRAVEL
WELL
T
194.5
5’
184.4
1’
EIP
50’ P
RIV
AT
E
DRIV
E
52.98’
244.00’
(296.98
’ TOTAL)
421.0
3’
EIP
33.09’
ALBERT S. HIGHTOWER
DB 2872 PG 714
PB 66 PG 352
DB 314 PG 325
ROY & HAZEL HIGHTOWER
PB 66 PG 352
WOODS
DAVID N. MASSEY
DB 2890 PG 691
DAVID N. MASSEY
PB 54 PG 42
DB 2133 PG 382
ALICE M. ALLEN
PB 66 PG 466
5’WW
60.0
0’
EXISTING R/W
EXISTING R/W
654.0
3’
DAVID N. MASSEY
WOODS
WOODS
HOUSE
WELL
4’
WW
EXISTIN
G R/W
EXISTIN
G R/
W
EXISTIN
G R/
W
212.2
2’
EIP
EIP
330.4
2’
101.63’
88.63’
100.00
’
98.35’
216.19’
48.0
0’
CLYDE & CARLENE B. WOODS
DB 1405 PG 586
PB 35 PG 20
RODNEY & TYRA WOODSDB 1063 PG 899
PB 35 PG 20
85.7
2’
5’W
W
DB 2890 PG 691
DB 2890 PG 691
7’ G
RA
VE
L
23.3
5’
386.0
5’
183.6
6’
SR 1912 DICKEY MILL ROAD 18’ BST
SR 1912 DI
CKEY MILL ROAD 1
8’ BSTGATE
WOOD & STEEL
BRIDGE #64
JB
POSSIBLE
EIP
R/W-EIP
(0.38’)
235.4
5’
0.26’ R/W-EIP
60.0
0’
EXISTING R/W
EXISTING R/W
154.4
1’ (17
7.7
6’
TO
TA
L)
TO NC 49
-BL-3
-BL-4
-BL-5
SEPTIC FIELD
POSSIBLE
23.3
5’
S11°31’12"W
154.4
1’S11°3
1’12"W
30.0
0’
+03.8
7
30.9
2’
+78.9
5
30.2
0’
+64.8
6
47.4
6’
+26.2
0
29.73’
+80.30
ELEV = 541.98’
SEE SHEET 1-C
BM #2
TH 4
TH 1TH 2
TH 3
T
0.0
5 ’, P
L
0.0
5 ’, P
L
0.0
5 ’, PL
0.10’ P
VC
0.10’ P
VC
0.10’ PV
C
0.3
3’
PV
C
0.3
3’ P
VC
70.00’ (LT.)
+60.00 -L-
30.45’ (RT.)
+29.78 -L-
45.00’ (RT.)
+28.10 -L-
45.00’ (RT.)
53.00’ (RT.)
58.00’ (RT.)
45.00’ (RT.)
+68.00 -L-
+75.00 -L-
+84.00 -L-
+73.00 -L-
1
1
2
3
+50.00 -L-
29.52’ (LT.)
+05.00 -L-
70.00’ (LT.)
+20.00 -L-
29.48’ (LT.)
@ PL
63.00’ (LT.)
+50.00 -L-
40.00’ (LT.)
+70.00 -L-
45.00’ (RT.)30.35’ (RT.)
+00.00 -L-
29.57’ (LT.)
1
+75.00 -L-
80.00’ (LT.)
+40.00 -L-
60.00’ (LT.)
+50.00 -L-
40.00’ (LT.)
REMOVE
15"
15"
TB 2GI
15"
15" RCP-V
TO
B
TO
B
TOB
TOB
GRASS LAWN
GRASS LAWNGRASS LAWN
PASTURE
0404
04060401
0402
0403
0405
0407
18"
SEE DETAIL A
SEE DETAIL B
CL B RIP RAP
2:1D
Flatter4:
1 or
d
( Not to Scale)
SPECIAL CUT DITCH
FROM -L- STA. 12+85 TO STA. 13+21 LT.+/-
Ground
Natural
DETAIL B
Type of Liner= PSRM Max d=2.0 Ft.
Min. D=1.0 Ft.
FROM -L- STA. 15+37 TO STA. 15+70 LT.+/-
Fill Slope
2:1 or Flatter
b=3.0 Ft.d=2.0 Ft.
Type of Liner= B Rip-Rap
b
DETAIL A
( Not to Scale)TOE PROTECTION
d
15" RCP-V
2GITB 2GI
TB
18" 0408
C
C
C
C
CF
F
C
C F
F
C
C
C
C
C
F
F
F
F
C
FF
NA
D 83/ N
SRS 2007
LEAVE FOOTING
REMOVE ENCASEMENT AND
PI = 10+30.00
EL = 552.15’
(-)0.8667%(+)2.0000%
.02
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
5/28/99
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
5B-4953
28-J
AN-2014 14:3
9R:\
Road
way\
Proj\b4953_rdy_pfl.d
gn
$$$$
US
ER
NA
ME$$$$
-L-
-DRV1-
10 11 12 13 14 15 16 17 18 19 20 21
520
530
540
550
560
570
580
520
530
540
550
560
570
580
BEGIN GRADE -L- STA. 14+00.00
ELEV. = 550.55’ ELEV. = 555.89’
END GRADE -L- STA. 17+50.00
SEE SHEET 4 FOR PLAN VIEW
ELEV. = 552.41’
BEGIN GRADE -DRV1- STA. 10+00.00
ELEV. = 552.75’
END GRADE -DRV1- STA. 10+60.00
SEE SHEET 4 FOR PLAN VIEW
10
510
520
530
540
550
560
570
510
520
530
540
550
560
570
K = 26 (DS = 25 MPH)
K = 26 (DS = 25 MPH)
PI = 14+95.00
EL = 547.14’
(-)3.5895% (+)2.3111%
VC = 155’
PI = 16+75.00
EL = 551.30’
(+)2.3111%
(+)6.120
0%
VC = 100’
VC = 60’
K = 21 (DS > 20 MPH)
CL
Elev.= 535.4’+/-
12/10/12 WS
STR. PAY ITEM
TO EL. 541.5’ (+/- 65cy)
ABUTMENT EXCAVATION
STR. PAY ITEM
TO EL. 543.1’ (+/- 63cy)
ABUTMENT EXCAVATION
CROWN GRADE ELEV.= 549.61’
90 SKEW
1 @ 70’, 24" CORED SLAB
STA. 16+02 -L-
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
FT
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2100
= 25
= 544.4
= 3000
= 100
= 545.5
= 3700
= 100+/-
= 548.2
=
= 12/10/12
= 535.4+/-
RR SPIKE IN BASE OF 19" RIVER BIRCHL STATION 15+31.00 105’ RIGHTN 871551 E 1908470BM2 ELEVATION = 541.98’
RR SPIKE IN BASE OF 20" PINEDIST. 652.80’L STATION 10+00.00 S 76 22’ 6.55" WN 871566 E 1907315BM1 ELEVATION = 602.90’
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
28-J
AN-2014 14:3
9R:\
Road
way\
Corridor
Modeling\b4953_rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
8/23/99
PROJ. REFERENCE NO. SHEET NO.0
550 550
555 555
560 560
565 565
545 54513+75.00
550 550
555 555
560 560
545 54514+00.00
545 545
550 550
555 555
560 560
540 540
14+25.00
545 545
550 550
555 555
560 560
540 540
14+50.00
X-2B-4953
-L-
2.5 5
DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
Note: Approximate quantities only. Unclassified Excavation, Fine Grading, Clearing and Grubbing, and Removal of Existing Pavement will bepaid for at the contract lump sum price for "Grading."
551.49
550.55
EXIST.EXIST.
549.74
2:1
2:14:14:1
0.0200.012
547.22547.36
549.11
2:1
4:1
0.0200.020
546.53
5.4:1
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
28-J
AN-2014 14:3
9R:\
Road
way\
Corridor
Modeling\b4953_rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
8/23/99
PROJ. REFERENCE NO. SHEET NO.0
545 545
550 550
555 555
560 560
540 540
14+75.00
545 545
550 550
555 555
540 540
15+00.00
545 545
550 550
555 555
540 54015+25.00
540 540
545 545
550 550
555 555
535 53515+50.00
X-3B-4953
-L-
2.5 5
548.67
3:1
2:1
4:1
0.0200.020
546.04
548.36
2:1
4:1
0.0200.020
545.81
3:1
548.39
2:14:1
0.0200.020
545.82
3:1
548.56
0.0200.020
2:12:1
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
28-J
AN-2014 14:3
9R:\
Road
way\
Corridor
Modeling\b4953_rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
8/23/99
PROJ. REFERENCE NO. SHEET NO.0
535 535
540 540
545 545
550 550
555 555
530 530
15+75.00
535 535
540 540
545 545
550 550
555 555
530 53016+00.00
540 540
545 545
550 550
555 555
535 53516+25.00
X-4B-4953
-L-
2.5 5
544.56
0.0200.020
536.13
0.0200.020
540.04
0.0200.020
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
28-J
AN-2014 14:3
9R:\
Road
way\
Corridor
Modeling\b4953_rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
8/23/99
PROJ. REFERENCE NO. SHEET NO.0
545 545
550 550
555 555
540 540
16+50.00
550 550
555 555
545 545
16+75.00
550 550
555 555
560 560
545 54517+00.00
545 545
550 550
555 555
560 560
565 565
565
17+25.00
X-5B-4953
-L-
2.5 5
565
560 560
540540
540 540
550.93
0.0200.020
3:15.4:1
551.89
2:1 2:14:14:1
0.020
549.36549.32
0.018
553.07
SH
EA
R LIN
E-D
RV1- 0.0050.020
4:1 2:1
550.72
554.42
2:12:1
4:14:1
0.0080.020
552.28551.95
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
28-J
AN-2014 14:3
9R:\
Road
way\
Corridor
Modeling\b4953_rdy_xpl_
L.d
gn
$$$$
US
ER
NA
ME$$$$
8/23/99
PROJ. REFERENCE NO. SHEET NO.0
555 555
560 560
565 565
550 55017+50.00
555 555
560 560
565 565
17+75.00
X-6B-4953
-L-
2.5 5
555.89
EXIST.EXIST.
557.49
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
28-J
AN-2014 14:3
9R:\
Road
way\
Corridor
Modeling\b4953_rdy_xpl_drv1.d
gn
$$$$
US
ER
NA
ME$$$$
8/23/99
PROJ. REFERENCE NO. SHEET NO.0
540 540
545 545
550 550
555 555
560 560
535 53510+00.00
545 545
550 550
555 555
560 560
540 54010+25.00
540 540
545 545
550 550
555 555
560 560
535 53510+50.00
X-7B-4953
-DRV1-
2.5 5
552.41
EXIST.
554.902:13:13:1
0.0200.020
550.73550.73
2:1
552.47
2:13:13:1
0.0200.020
550.96550.96
2:1