Basic Design of Wawa No.1 Hydropower Project WAWA RIVER BASIN,MINDANAO ISLAND, PHILIPPINES May 2016 Ernst & Young Shin Nihon LLC Industrial Dicisions,Inc. Chodai Co.,Ltd. Kiso-Jiban Consultants Co.,Ltd

Upload: lekhue

Post on 22-Apr-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

  • Basic Design of Wawa No.1 Hydropower Project

    WAWA RIVER BASIN,MINDANAO ISLAND, PHILIPPINES

    May 2016

    Ernst & Young Shin Nihon LLCIndustrial Dicisions,Inc.Chodai Co.,Ltd.

    Kiso-Jiban Consultants Co.,Ltd

  • Agusan del Sur ProvinceWawa No.1 Hydropower Project site

    Manila, Philippines

    100 km

    KEY MAP

    Location Map

    Scale Date

    Ernst & Young Shin Nihon LLC

    1:50000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 0-1Key Map & Location Map

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Power Station

    Headtank

    Wawa No.1 Intake

    Headrace C

    hannel

    Elipisoide de Reference : WGS84Projection : UTM zone 29 N

  • Headrace Open Channel = 2

    922.000 m

    (Including 84.000 m long Tun

    nel)Total Waterwa

    y Length = 3139.600 m (Horiz

    ontal Length = 3127.500 m

    Headrace

    Open Chan

    nel = 2922

    .000 m

    (Including 8

    4.000 m lon

    g Tunnel)

    Total Wate

    rway Leng

    th = 3139.6

    00 m (Hor

    izontal Le

    ngth = 31

    27.500 m

    Point DescriptionCoordinates

    X-Coordinate Y-CoordinateBP Beginning Point

    of IntakeBP-H Beginning Point

    of HeadraceBP-T Beginning Point

    of TunnelBP-E End Point

    of TunnelEP-H End Point

    of HeadraceBP-P Beginning Point

    of PenstockEP-P End Point

    of PenstockEP-P End Point

    581786.548 994814.602

    581760.391 994761.918

    581151.606 993360.809

    581144.943 993277.074

    580584.781 992515.803

    580551.087 992478.859

    580497.725 992462.171

    580474.503 992468.935

    Waterway

    Scale Date

    Ernst & Young Shin Nihon LLC

    1:5000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 1-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    EL 263.000

    265

    270275280285

    290 295

    235

    240

    245

    250

    255260

    265270

    275

    280

    285

    290

    295

    300

    305310

    315320

    Waterway Plan upto Horizontal Distance +1871.000 m

    Waterway Plan from Horizontal Distance +1871.000 m

    Wawa River

    Wawa River

    265270275280285290

    245

    250255

    26026527027

    5280285

    290295300

    305

    Headrac

    e Tunne

    l

    Length

    = 84.000

    m

    Headrac

    e Tunne

    l

    Length

    = 84.000

    m

    EL 263.000

    BP BP-H

    BP-T

    EP-T

    EP-HBP-P

    EP-P

    EP

  • 2500

    400 2500 400

    2900

    3900

    2100

    Typical Section : Open Channel

    400

    i = 1:1000n = 0.014Q = 10.00 m/sec

    280

    300

    320

    340

    360

    260

    0.00

    0

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th (m

    )

    Poi

    nt N

    o.In

    vert

    Ele

    vatio

    nS

    lope

    BP

    Intake AreaHeadrace(Open Channel

    240

    220

    200

    180

    160

    140

    120

    100

    71.0

    00B

    P-H

    264.

    500

    264.

    900

    1 : 1000

    Wawa RiverIWL 267.000

    TunnelL = 84.00 m

    271.

    000

    264.

    700

    264.

    500

    264.

    300

    264.

    100

    263.

    900

    263.

    700

    263.

    500

    263.

    300

    263.

    000

    BP

    -T

    EP

    -T

    471.

    000

    671.

    000

    871.

    000

    1071

    .000

    1271

    .000

    1471

    .000

    1671

    .000

    1707

    .000

    1791

    .000

    1871

    .000

    263.

    140

    263.

    060

    263.

    260

    263.

    180

    GL

    Wawa RiverTWL 231.000

    Hea

    dtan

    k

    Penstock Power Station

    3043

    .000

    EP

    -H

    BP

    -P

    261.

    900

    258.

    000

    3127

    .500

    EP

    3103

    .500

    EP

    -P

    Headrace(Open Channel

    263.

    000

    262.

    800

    262.

    600

    262.

    400

    262.

    200

    262.

    000

    1871

    .000

    2071

    .000

    2271

    .000

    2471

    .000

    2671

    .000

    2871

    .000

    2993

    .000

    1 : 1000

    GL

    Waterway

    Scale Date

    Ernst & Young Shin Nihon LLC

    1:5000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 1-2Profile & Typical Section

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Waterway Profile upto Horizontal Distance +1871.000 m

    Waterway Profile from Horizontal Distance +1871.000 m

    Scale 1:100

  • 1 : 0.4

    EL 267.400

    EL 264.900

    1 : 0.4

    1 : 0.3

    Typical Section : Type A

    EL 260.000

    Cross Section at Hor. Distance 71.00 m

    EL 264.500

    400 2500 400

    2100 25

    00

    2900

    25003300

    3900

    CL

    GL

    1 : 0.4

    EL 273.000

    1 : 0.4

    EL 267.200

    EL 264.700

    Cross Section at Hor. Distance 271.00 m

    1 : 0.4

    1 : 0

    .4

    Typical Section : Type B

    400 2500 400

    2100 25

    00

    2900

    25003300

    3900

    Shotcrete 10 cm CL

    GL

    1 : 0.4

    EL 264.900

    EL 262.400

    Cross Section at Hor. Distance 2471.00 mTypical Section : Type C

    400 2500 400

    2100 25

    00

    2900

    25003300

    3900

    CL

    GL

    1 : 0.4

    EL 264.400

    EL 261.900

    1 : 0

    .4

    1 : 2

    Cross Section at Hor. Distance 2993.00 mTypical Section : Type D

    400 2500 400

    2100 25

    00

    2900

    25003300

    3900

    CL

    GL

    Waterway

    Scale Date

    Ernst & Young Shin Nihon LLC

    1:100

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 1-3Cross-Sections

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • 1250 1250300 400

    1350

    3200

    2600

    1250

    Tunnel Section

    Pay linet = 10.00 cm

    2500

    R125

    0

    2220

    i = 1:1000n = 0.014Q = 10.00 m/sec

    GL

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th (m

    )

    Poi

    nt N

    o.In

    vert

    Ele

    vatio

    nS

    lope 1 : 1000

    263.

    300

    BP

    -T

    EP

    -T

    1671

    .000

    1707

    .000

    1791

    .000

    263.

    140

    263.

    060

    263.

    260

    263.

    180

    250

    255

    275

    280

    285

    Waterway

    Scale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 1-4Tunnel Plan & Profile

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    EL 263.000

    260

    265

    270

    Tunnel

    84.000

    m

    Scale 1:100

    Construction Yard

    Culvert

    Tunnel L = 84.000 m

    Tunnel Plan

    Tunnel Profile

    290

    1: 0.5

  • 265

    270

    Wawa River

    265

    270

    275

    280

    285275

    280

    285

    290

    265

    270

    275

    280

    285

    EL.

    267

    .000

    1:0.

    8

    EL.

    263

    .000

    EL. 268.000

    290

    295

    300

    Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    EL.

    262

    .000

    EL. 268.000

  • BP

    5000

    0

    2500

    1200

    5000

    5000 1500 50001200

    6000

    6000

    7000

    1200

    0

    24000

    3000

    1000

    3000

    A

    B B

    C C

    D

    E F

    F

    EL 268.000

    EL 268.000

    EL

    267.

    000

    EL

    263.

    000

    1 : 0

    .8

    33000 3000 6000

    A E

    EL 262.000

    EL

    263.

    000

    Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-2Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • Fish Ladder

    EL 267.000

    FWL 272.000

    Section A-A

    EL 274.000

    EL 262.000

    1 : 0.3

    IWL 267.000

    Scouring Gate W 5.0 m x H 4.0 m

    Regulating Gate W 5.0 m x H 3.0 mEL 264.500

    1 : 0.31 : 0.4

    U-Gutter 300 x 300

    EL 271.000

    EL 268.000

    EL 263.000

    Curtain Wall

    1st Screen

    4000 800 1200 5000 1200

    12200

    1000 6200

    50000

    47800

    25001

    500

    1000

    500

    3000

    500

    1950

    1000

    5002500

    1000500

    300

    1000

    500

    500

    EL 260.500

    EL 262.000

    EL 274.000

    1 : 0

    .4

    1 : 0

    .3

    2200

    1000

    1000

    500

    EL 262.000

    EL 263.000

    2800EL 274.000

    FWL 272.000

    IWL 267.000

    Section B-B

    1 : 0.4

    EL 268.000

    1 : 3

    Fish Ladder

    2000

    1000

    500

    1000

    500

    1000

    1000 200

    11500

    16000

    EL 266.300

    EL 262.000

    7000

    EL 261.000EL 261.500

    EL 267.000

    EL 262.000

    EL 263.000

    Typical Weir Section

    1 : 0.8

    FWL 272.000

    IWL 267.00

    R300

    0

    R30

    00

    15000

    5000

    Section A-A

    Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-3Weir, Intake & Settling Basin-1

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    50000

  • EL 268.000

    IWL 267.000

    1 : 11.50

    Section C-C

    1 : 0.4

    EL 262.000

    EL 260.500

    FWL 272.000

    EL 274.000

    EL 268.000

    EL 267.000

    EL 268.000

    River Bed Level

    1200 5000 2000 4000

    18700

    12700 15000

    2000

    Scouring Gate W 5.0 m x H 4.0 m

    Curtain Wall

    Stoplog

    Curtain Wall

    1 : 0

    .3

    15005000

    River Bed Level

    240006250

    EL 268.000

    EL 264.900

    WL 267.000

    Section D-D

    1 : 12

    1 : 0

    .3

    EL 264.500

    IWL 267.000

    EL 268.000

    Intake Settling BasinHeadraceChannel

    1 : 0

    .3

    Regulating Gate W 5.0 m x H 3.0 m

    1000 500 4500 18150 4250 24000

    4000

    1500 10

    00

    1000

    2500

    1000

    1200 800 1500 500 2000

    40002000

    300 5500

    500

    500

    EL 274.000

    1000 1000 1000

    500

    1000

    2900

    1000

    2600

    6000 17275 Curve

    500

    2900

    400

    8000BP

    EL 264.500 1 : 1000

    Curtain Wall

    1st Screen

    2nd Screen

    FWL 272.000

    2100

    8380 2000

    Artificial Foundation

    WL 267.000

    GL GL

    Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-4Weir, Intake & Settling Basin-2

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • WL 267.0001

    : 0.3

    1 : 0.3

    CL

    EL 263.000

    EL 268.000

    1750

    1000

    1 : 0.3

    1 : 0.4

    500

    1000

    EL 271.000

    U-Gutter 300 x 300

    EL 261.000

    River Bed Level

    12000

    1000

    EL 264.500

    500

    1000 500500

    2500

    3600 4

    600

    Fish Ladder

    Section E-E

    EL 262.000

    EL 264.000

    EL 262.000

    EL 263.000

    GL

    GL

    GL

    WL 267.000

    1 : 0

    .3

    CL EL 268.000

    1 : 0.31 : 0.4

    500

    1000

    EL 271.000

    U-Gutter 300 x 300

    12000

    EL 264.900

    Section F-F

    EL 261.500

    Curtain Wall

    Scouring Gate

    1950

    1000

    3200500

    1 : 12

    EL 261.000 1 :

    0.4

    GL

    GL

    EL 268.000

    1 : 0

    .4

    1 : 0

    .3

    EL 263.000

    EL 264.000

    GL

    Section E-E

    Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-5Weir, Intake & Settling Basin-3

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Design By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • 270

    270

    265

    260

    255

    250 245

    240

    235

    230

    Waw

    a R

    iver

    Penstock AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    IP-P1

    BP-P

    IP-P2

    IP-P3

    BP-SIP-S1

    IP-S2

    Head

    tank

    Pens

    tock

    Spillway

    PowerStation

    Head

    race

    Chan

    nel

    EL 236.000

    Switchyard

    Acce

    ss R

    oadEL 236.000

  • 240

    280

    260

    220

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th, m

    Poi

    ntN

    o.P

    ipe

    Axi

    sE

    leva

    tion

    Slo

    pe 0.00 42.75

    000.

    000

    23.0

    00

    C Turbine

    WL 264.000

    TWL 231.000

    BP

    -P

    IP-P

    1

    Ver

    . + H

    or.

    Ben

    d

    Penstock

    250

    230

    EL 236.000

    0.00

    Power StationPenstock

    IP-P

    2

    Ver

    . + H

    or.

    Ben

    d51

    .000

    60.5

    00E

    P-P

    L

    FWL 235.000EL 233.300EL 234.600

    HeadtankHeadtankHeadraceChannel

    IP-P

    3 H

    or. B

    end

    56.5

    00

    9.500 m

    23.000 m

    (Horizontal Length 60.500 m)

    Expansion Joint

    38.006 m

    84.5

    00E

    P

    259.

    000

    259.

    000

    233.

    300

    233.

    300

    233.

    300

    270

    Total Penstock Pipe Length 72.584 m

    EL 265.000EL 264.000

    GL

    S.N. Bend Identification

    1

    2

    3

    IP-P1

    IP-P3

    IP-P8, Bifurcation

    Angle made by firsttangent with horizontal, 1

    Angle made by secondtangent with horizontal, 2

    Deviation anglein Plan,

    Combined Internal Angle (CIA), o

    0.0042.75

    0.00

    42.75

    0.00

    0.00

    56.7545.00

    45.00

    66.2658.72

    45.00

    Combined Internal Angle (CIA) Table

    Penstock AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-2Penstock Profile

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Penstock Profile

  • 240

    260

    220

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th, m

    Poi

    ntN

    o.P

    ipe

    Axi

    sE

    leva

    tion

    Slo

    pe 0.00 34.47

    000.

    000

    47.0

    00

    BP

    -S

    IP-S

    2V

    er. B

    end

    230

    250

    0.00

    5.00

    0IP

    -S1

    Ver

    . + H

    or.

    Ben

    d

    51.0

    00E

    P-S

    231.500

    236.000

    35.000 m 5.000 m

    50.700 m

    4.000 m

    Total Spillway Length 118.700 m (Horizontal Length 110.000 m)

    (Pipe Length 59.700 m)

    24.000 m

    75.0

    00E

    P

    260.

    200

    260.

    200

    231.

    500

    231.

    500

    270

    EL 265.000EL 264.000

    GL

    LC

    300

    1 : 0.5

    1 : 0.4

    300

    500

    500

    750

    300

    8001100

    1600

    Typical Section : Penstock

    120

    20

    00

    1 : 0

    .5

    1 : 0

    .4

    300

    10002500

    Stairway

    3200 1100

    LCSpillway

    300

    1 : 0.5

    1 : 0.4

    300

    500

    500

    750

    300

    8001100

    1600

    Typical Section : Spillway

    120

    1 : 0

    .5

    1 : 0

    .4

    300

    10002500

    Stairway

    3200 1100

    160

    0

    27000

    Penstock

    GL

    Penstock AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-3Spillway Profile

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Scale 1:100

    Scale 1:100

    Spillway Profile

  • HeadtankScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 4-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    250

    255

    260

    265

    Headtank

    Penstock

    Spillway

  • B

    C D

    AA

    Headtank Plan

    BP-P

    1 : 1

    0

    EL

    261.

    900 1 : 17

    EL

    262.

    500

    E

    C D E

    Air Pipe 200

    6000 34000 1000

    1000

    0

    Manhole 1.0 m x 1.0 m

    BP-S

    Air Pipe 200

    2000 3000 1800

    2500

    2200 30002000

    1000

    1600

    EL

    258.

    000

    1: 0.5

    1 : 0.3

    4000

    1000

    1000

    EL 259.400

    1900

    1000

    050

    010

    00

    50002000

    2000

    1 : 11

    Section A-A(Headtank Profile)

    6000 34000 1000 5000

    HeadtankHeadrace Channel Penstock

    1800 2200 5000

    Air Pipe 200

    EL 261.900

    EL 264.000

    EL 265.000

    1 : 0

    .3

    EL 262.500

    EL 265.000

    1 : 17

    BP-P

    Side Over Flow Weir L = 33.000 mWL 264.000

    6000

    4000 7000

    1 : 0.4

    2000

    1 : 1000

    Screen

    EL 259.000

    1000

    2000

    4000

    3000

    EL 259.900

    EL 258.000

    Expansion Joint

    GL

    Headtank Scale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 4-2Plan & Profile

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • EL 262.400

    EL 264.000

    EL 265.000

    1 : 0

    .2

    1 : 11

    Side Over Flow Weir L = 33.000 m

    Section B-B(Spillway Profile)

    Spillway Pipe

    Air Pipe 200EL 265.000

    BP-S

    EL 259.400

    GL

    1 : 0

    .2 1 : 0.3

    1 : 0.2

    Section C-C

    WL 264.000

    500 10000 1000 500

    CLCLEL 265.000

    500

    1 : 2

    EL 261.900

    U-Gutter 300 x 300

    1 : 0.4

    GL

    Section D-D

    WL 264.000

    EL 262.500

    EL 259.400

    EL 260.400

    CLEL 265.000

    1 : 10

    10001600100001000

    77006000 1800

    15500

    U-Gutter 300 x 300 1900

    CL

    1 : 0.4

    1 : 0

    .4

    16

    00 Spillway PipeGL

    Section E-E

    1 : 0.4

    EL 265.000CL

    2000

    1000 2000 1000

    1000

    8000

    WL 264.000

    U-Gutter 300 x 300

    1 : 0

    .4Penstock Pipe

    GL

    4000

    Headtank Scale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 4-3Profile & Section

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • Tailrace

    Wawa River

    235

    240

    245

    250

    Switchyard

    Power Station

    Pen

    stoc

    k

    Spi

    llway

    Access Road

    EL 236.00EL 236.00EnergyDissipator

    231

    230

    231

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • 1000

    5500

    4500

    1000

    6000

    1000

    1900

    0

    1000 6900 1200 9800 1200 13900 1000 1000 2200 1600 2200 1000

    90.00

    8500 11000 21500 4000

    35000 8000

    3000 3000

    5000

    2000

    1000

    3500

    4500

    1000

    1000

    014

    000

    3000

    4000

    8000

    3000

    4000

    3000

    4000

    D

    C

    D

    C

    A

    A

    B

    B

    Pow

    er H

    ouse

    19.

    000

    mTa

    ilrac

    e 5.

    000

    m

    Spi

    llway

    Pip

    e

    Pen

    stoc

    k P

    ipe

    Energy Dissipator

    2000

    8000

    Service Bay

    EL 233.300EL 236.000

    EL 233.300EL 233.300

    EL 233.300 EL 233.300

    EL

    231.

    500

    EL

    231.

    500

    EL 236.000

    7500 4500 7000

    1000

    4000

    5500

    Power Station & EnergyDissipator Plan (EL 236.000)

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-2Plan (EL 236.000)

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • EL 233.300

    C Turbine

    TWL 231.000

    EL 236.000

    Power StationPenstock

    EL 234.600

    L

    FWL 235.000

    EL 236.000

    Section A-A(Power Station Profile)

    Crane Level El. 244.000

    1 : 2

    5000 1000 1000 5000 4000 3000 5000

    12000 7000

    24000

    1000

    2000

    500

    3500

    1000

    1000 2500 1000 500

    4500

    R60

    00

    EL 231.500

    EL 228.000

    EL 230.000

    EL 232.500

    EL 236.000

    Penstock Pipe

    2000

    1200

    EL 230.000

    GL

    EL. 231.500

    EL 236.000

    Section B-B(Energy Dissipator Profile)

    8000

    10000

    1000

    2300

    1200

    1000

    1000

    6500

    1500

    1000

    2200

    1600

    2700

    4500

    14000

    TWL 231.000

    FWL 235.000

    24000

    EL. 230.500

    EL. 229.500

    Spillway Pipe

    EnergyDissipator

    2000

    Air Pipe 200

    GL

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-3Section-1

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • Section C-C

    EL 233.300

    EL 234.600

    EL 228.000

    EL 230.000

    EL 236.000

    EL 232.000

    EL. 229.500

    TWL 231.000

    Service Bay

    CL CL

    1000 6000

    18000

    3000 7000

    4000

    3000

    1000

    EL 228.000

    11000

    1000 3000 1000 6000 1000 3000 1000

    7000 10000

    8000

    4500

    6500

    6000

    Energy Dissipator

    Unit No. 1 Unit No. 2

    EL 236.000

    EL 233.300GL

    EL. 229.500

    EL 231.500

    8000

    4500

    6500

    Energy Dissipator

    Section D-D

    Service Bay

    Unit No. 1CL CL

    4000

    1000

    Unit No. 2

    EL 236.000

    6400 15200 6400 7000

    2000

    EL 236.000

    EL 233.300

    EL 231.500

    EL 230.000

    8500 11000 15500

    3200

    3400

    120

    0

    3200

    3400

    120

    0

    35000

    160

    0

    GL

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.1 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-4Section-2

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • Basic Design of Wawa No.2 Hydropower Project

    WAWA RIVER BASIN,MINDANAO ISLAND, PHILIPPINES

    May 2016

    Ernst & Young Shin Nihon LLCIndustrial Dicisions,Inc.Chodai Co.,Ltd.

    Kiso-Jiban Consultants Co.,Ltd

  • Agusan del Sur ProvinceWawa No.2 Hydropower Project site

    Manila, Philippines

    100 km

    Wawa Intake

    Managon Intake

    Power Station

    Tunnel-1

    Tunnel-2

    Tunnel-3

    Headtank

    KEY MAP

    Location MapScale Date

    Ernst & Young Shin Nihon LLC

    1:50000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 0-1Key Map & Location Map

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Elipisoide de Reference : WGS84Projection : UTM zone 29 N

  • Tunnel-1

    Tunn

    el-2

    Tunnel-3

    Tunnel-1 Length = 3112

    .200 mTunnel-3 Length = 1456.200 m

    Tunn

    el-2

    Len

    gth

    = 10

    68.3

    00 m

    Total Waterway Length =

    5130.000 m (Horizontal

    Length 5090.000 m)

    Wawa River

    Adi

    t

    BP-W

    IP-M6 (Junction)

    BP-M

    IP-W5

    IP-W6

    Spoil Bank

    425

    450475

    500525

    550575

    600625650

    675

    700

    725

    750

    775

    425

    450475

    500525

    550

    575

    300

    325

    350

    375

    400

    425

    450

    450

    475

    500525

    550

    575

    600

    625

    450

    475

    500

    525

    550

    575

    600

    62565067

    570

    072

    5

    7507

    75

    425450

    475500

    525550575

    600625650 675

  • Managon River

    IP-M7

    BP-P BP-S

    EP

    WaterwayScale Date

    Ernst & Young Shin Nihon LLC

    1:10000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 1-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    275

    300

    325

    350

    375

    400

    425

    450

    475

    500

    525

    550

    575

  • 440

    620

    660

    460480500520540560580600

    640

    680

    420

    Waterway Profile

    0.00

    0

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th (m

    )

    Poi

    nt N

    o.In

    vert

    Ele

    vatio

    nS

    lope

    EL (m)

    BP

    -W

    Intake Area Tunnel-1 Tunnel-1 Tunnel-3400380360340320300280260

    74.0

    00

    189.

    000

    673.

    000

    3186

    .000

    IP-W

    5

    IP-W

    6

    IP-M

    6

    BP

    -T1

    438.

    000

    438.

    800

    1 : 1000

    438.

    680

    438.

    200

    435.

    680

    434.

    950

    Wawa RiverIWL 440.000

    Junc

    tion

    GLGL

    200

    950

    1350

    200

    2700

    2300

    Tunnel-1 Section

    1210

    2300

    2001900200

    950 950

    i = 1:1000n = 0.014Q = 3.40 m/Sec

    200

    950

    1350

    200

    2700

    2300

    Tunnel-2 Section

    1420

    200200 1900

    950 9502300

    i = 1:1000n = 0.014Q = 4.20 m/Sec

    200

    950

    1350

    200

    2700

    2300

    Tunnel-3 Section

    1940

    2001900200

    950 9502300

    i = 1:600n = 0.014Q = 7.60 m/Sec

    Tunnel - 2

    FWL 442.000

    1 : 0.

    3IWL 438.000440

    620

    660

    460480500520540560580600

    640

    680

    420

    0.00

    0

    EL (m)

    BP

    -M

    Intake Area Tunnel-2400380360340320300280260

    143.

    000

    1149

    .000

    IP-M

    5

    IP-M

    6

    84.0

    00B

    P-T

    2

    1 : 1000

    436.

    000

    436.

    600

    436.

    541

    435.

    535

    Managon RiverIWL 438.000

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th (m

    )

    Poi

    nt N

    o.In

    vert

    Ele

    vatio

    nS

    lope

    GL

    Scale 1:100 Scale 1:100 Scale 1:100

  • ManagonRiver

    TWL 273.000

    Tunnel-3

    Hea

    dtan

    k

    Penstock Power StationPenstock

    4508

    .000

    4642

    .000

    4692

    .000

    IP-M

    7

    EP

    -T3

    BP

    -P

    1 : 600

    432.

    750

    432.

    520

    428.

    250

    5090

    .000

    EP

    4670

    .000

    EP

    -P

    GL

    GL

    LC

    Penstock

    LC

    Spillway

    1 : 0

    .5

    1 : 0

    .4

    350

    300

    300

    500 5

    00

    500

    2300

    1500

    1200

    300

    19001800

    120120

    300 800

    1 : 0.5

    1 : 0.4

    300

    500

    1000 1200Stairway

    4800 1100

    1200

    300

    1000

    8001100

    7000

    1250 1850

    Typical Section : Penstock and Spillway

    900

    GL

    WaterwayScale Date

    Ernst & Young Shin Nihon LLC

    1:10000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 1-2Profile & Typical Section

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Scale 1:100

  • Slope 1 : 2EL 441.000

    EL 446.000Acc

    ess Ro

    ad EL 44

    1.000

    425

    450

    475

    500

    525

    Wawa River

    1 : 0

    .41

    : 0.4

    EL. 4

    40.0

    00

    1 : 0.8

    EL. 4

    32.0

    00

    1 : 0

    .4

    450

    475 Wawa Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • Details Weir and Intake Wawa RiverC CA

    A

    B

    EL 4

    40.0

    00

    EL 4

    32.0

    00

    EL 441.000Regulating Gate4.0 m x 2.5 m

    D

    E

    E

    F

    F

    1 : 0.3

    1 : 9

    EL 440.000 Side Overflow Weir L = 26.00 m

    EL 432.000

    Fish Ladder

    1 : 0.4

    1 : 9BP-W

    1 : 10

    IP-W1 IP-W2

    IP-W3

    IP-W4

    EL 432.000

    Scouring Gate 1.0m W x 1.5m H

    B

    EL 438.000

    1 : 4

    R4000R

    4000

    1 : 0.8

    1 : 3

    Manhole 1.0 m x 1.0 m

    1 : 0

    .4

    Curtain Wall

    Curtain Wall

    Scouring Gate

    Stoplog

    1st Screen

    2nd Screen1

    : 0.4

    3300

    060

    00

    8000 27000 9000

    10.00

    Wawa Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-2 Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • EL 441.000

    IWL 440.000

    1 : 4

    1 : 9

    Section C-C

    1 : 0.4

    EL 433.000

    EL 431.000

    FWL 444.500

    EL 446.000

    EL 441.000

    EL 440.000

    EL 441.000

    River Bed Level

    1200 4000 2000 4000

    11200

    5200 20000

    2000 26000

    Scouring Gate W 3.0 m x H 4.0 m

    Curtain Wall

    Stoplog

    Curtain Wall

    1 : 0

    .3

    4000

    2500

    EL 432.000

    Fish Ladder

    EL 440.000

    FWL 444.500

    EL 446.000

    1 : 0

    .4

    Section A-A

    EL 446.000

    1 : 0

    .3

    EL 433.000

    1 : 0.3

    IWL 440.000

    Scouring Gate W 3.0 m x H 4.0 m

    Regulating Gate W 4.0 m x H 2.5 mEL 438.000

    1 : 0.31 : 0.4

    U-Gutter 300 x 300

    EL 446.000

    EL 441.000

    EL 431.000

    Curtain Wall

    1st Screen

    River Bed Level

    4000 800 1200 3000 1200

    10200

    1000 4200

    33000

    28800 2600

    1000

    1000

    7000

    150010

    00

    500

    2500

    500

    2100

    1000

    500

    5002500

    1000500

    300

    1000

    500

    500

    Slope 1 : 2EL 441.000

    EL 446.000Acc

    ess Ro

    ad EL 44

    1.000

    425

    450

    475

    500

    525

    1 : 0

    .4

    EL. 4

    40.0

    00

    Wawa Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-3

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Weir, Intake & Settling Basin-1

  • EL 441.000

    EL 438.800

    WL 440.000

    Section D-D

    1 : 9

    1 : 0

    .3

    EL 438.000

    IWL 440.000

    EL 441.000

    Intake Settling Basin

    Artificial Foundation

    1 : 0

    .3

    Regulating Gate W 4.0 m x H 2.5 m

    1000 1000 4000 7585 8544 28000 8000 5303

    7000

    1500 10

    00

    1000

    2000

    1000

    1200 800 1500 500 2000

    40002000

    300

    4500

    500

    500

    EL 446.000

    1000 1000 1000

    500

    1000

    4300

    1000

    1700

    Curve6000 5585 2000Curve

    500

    4300

    500

    BP-W

    EL 438.000

    Curtain Wall

    1st Screen

    7585

    2nd Screen

    5000

    GLGL

    EL 431.000

    EL 446.000

    FWL 444.500

    IWL 440.000

    Section B-B

    River Bed Level

    1 : 0.4

    EL 441.000

    1 : 3

    Fish Ladder

    2000

    1000

    500

    1000

    500

    1000

    EL 430.500EL 431.000

    1000 200

    23500

    26500

    EL 439.300

    EL 440.000

    EL 431.000

    Typical Weir Section

    1 : 0.8

    FWL 444.500

    IWL 440.00

    R300

    0

    R30

    0020000

    9000

    River Bed Level

    EL 432.000

    EL 446.000

    EL 452.000

    1000

    1000

    500 1000

    500

    1 : 1000

    GL

    Tunnel T1Transition

    10000 4000

    Wawa Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-4

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Weir, Intake & Settling Basin-2

  • WL 440.000

    1 : 0

    .3

    1 : 0.3

    CL

    EL 432.000

    EL 441.000

    2100

    1000

    1 : 0.3

    1 : 0.4

    500

    1000

    EL 446.000

    U-Gutter 300 x 300

    EL 444.000

    1 : 0

    .4

    1 : 0

    .3

    EL 431.000

    River Bed Level

    1000

    1 : 0.4

    500 EL 452.000

    1 : 0.3

    10000

    1000

    EL 438.000

    500

    1000 500500

    2500

    3600 4

    600

    Fish Ladder

    GL

    GL

    CL

    Section F-F

    1 : 10EL 434.000

    EL 441.000WL 440.000

    1 : 0

    .3

    1 : 0.3

    1 : 0.4

    1000 500 EL 446.000

    1 : 0.3

    1 : 0.4

    U-Gutter 300 x 300

    EL 441.000

    1 : 0

    .4

    1 : 0

    .3

    EL 432.000

    500 EL 452.000

    2400

    1000

    500 10000 3200

    Curtain Wall

    Scouring Gate

    GL

    River Bed Level

    Section E-E

    Wawa Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 2-5

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Weir, Intake & Settling Basin-3

  • 500

    475

    450

    450

    EL.

    438

    .000

    EL. 439.000

    EL. 439.000

    EL. 444.000Slope 1 : 2EL. 439.000

    Access Road

    Managon RIver

    1 : 0

    .4

    1 : 0

    .4

    1 : 0

    .4

    EL.

    433

    .000 1 : 0

    .8

    Managon Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-1General Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • EL

    438.

    000

    EL

    433.

    000

    1 : 0.3

    1 : 9

    EL 438.000 Side Overflow Weir L = 26.00 m

    EL 433.000

    Fish Ladder1

    : 10

    EL 433.000

    Scouring Gate 1.0m W x 1.5m H

    F

    F E A

    A

    B

    C

    1 : 4

    1 : 0.4

    BP-M

    1 : 9

    Regulating Gate5.0 m x 2.5 m

    IP-M3

    IP-M2

    IP-M1

    EL. 439.000

    EL. 438.000

    IP-M4

    C

    D

    R5000

    Cre

    st W

    idth

    35.

    000

    m

    1200

    3000

    6000

    E

    1 : 0.4

    1 : 0

    .4

    EL. 439.000

    1 : 2EL. 439.000

    B

    R10

    000

    1 : 0.8

    1 : 3

    Manhole 1.0 m x 1.0 m

    Managon Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-2 Plan

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

  • Crest EL 438.000

    FWL 442.000

    1 : 0.4

    Section A-A

    EL 444.000

    1 : 0.3

    1 : 0

    .3IWL 438.000

    Scouring Gate W 3.0 m x H 4.0 m

    Regulating Gate W 5.0 m x H 2.5 m EL 436.000

    1 : 0

    .3

    1 : 0

    .4

    U-Gutter 300 x 300

    EL 439.000

    EL 432.000

    EL 444.000EL 444.000

    EL 434.000

    1 : 0

    .31 : 0

    .4

    1000

    500EL 450.000

    35000 1200 3000 1200 4000

    4200 1000

    2000

    4000

    1500 10

    0025

    0050

    0

    500

    1000

    1000

    1000 4000 10500

    800

    2500500 1000 500

    300

    1000

    500

    500

    Fish Ladder

    Curtain WallCurtain Wall

    1st Screen

    River Bed Level

    EL 439.000

    IWL 438.000

    1 : 41 : 9

    Section C-C

    1 : 0

    .4

    EL 434.000

    EL 432.000

    EL 433.000

    FWL 442.000

    EL 444.000

    EL 439.00

    EL 438.000

    EL 439.000

    River Bed Level

    1200500020004000

    620015000

    2000

    1 : 0

    .35000

    2500

    Managon Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-3

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Weir, Intake & Settling Basin-1

  • EL 432.000

    EL 444.000

    FWL 442.000

    IWL 438.000

    Section B-B

    River Bed Level

    1 : 0

    .4

    EL 439.000

    1 : 3Fish L

    adder

    14000

    19000

    River Bed Level

    20003000

    EL 431.000EL 431.500

    2000

    1000

    500

    1000

    500

    1000

    1000200

    Stoplog

    FWL 442.000

    EL 444.000

    1 : 0.3

    IWL 438.000

    EL 436.000

    EL 439.000

    1 : 9

    1 : 0.3

    28000

    100010001000

    500

    1000

    4100

    1000

    1900

    500

    4100

    500

    8000100010470Curve

    120080015005002000

    4000 2000

    1000100040002000785420008382

    IntakeSettling Basin

    Curve

    Section D-D

    EL 436.000EL 436.600

    EL 439.000

    BP-M

    EL 433.000

    2nd Screen1st Screen

    Curtain Wall

    Regulating Gate

    GL

    GL

    10470Curve

    Tunnel T2

    Transition60004000

    EL 444.000

    EL 450.000

    1 : 1000

    GL

    EL 438.000

    EL 432.000

    1 : 0.

    8

    IWL 438.000

    Typical Weir Section

    River Bed Level600

    0

    15000

    R3000

    R30

    00

    EL 433.000

    Settling Basin

    Managon Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-4

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Weir, Intake & Settling Basin-2

  • U-Gutter 300 x 300

    1000

    1 : 0

    .3

    500EL 444.000

    1 : 0

    .4

    GL

    1 : 0.4

    1 : 0.3

    1 : 0.3

    WL 438.000

    1 : 0

    .3

    C

    EL 433.000

    L

    Section E-E

    EL 439.000

    EL 432.000

    EL 444.000

    1 : 0

    .31 : 0

    .4

    1000

    500EL 450.000

    50010000

    1000

    1000

    2000

    500

    1000 500500

    2500

    500

    800 18

    00

    Fish Ladder 15005900

    3800

    CL

    Section F-F

    1 : 10EL 432.000

    EL 439.000WL 438.000 1 : 0.3

    1 : 0

    .31 : 0

    .4

    1000500EL 444.000

    1 : 0

    .3

    1 : 0

    .4

    U-Gutter 300 x 300

    500EL 450.000

    3800 10000 500

    GL

    Managon Intake AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 3-5

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Weir, Intake & Settling Basin-3

  • BP-S

    BP-P

    IP-S2

    IP-P2IP-P1

    IP-S5

    IP-P5

    IP-S6

    IP-P6

    P-IP8

    P-IP9

    IP-S1

    IP-S3

    IP-P3

    IP-S4

    IP-P4

    P-IP7

    IP-S7

    IP-S8

    Power Station

    Headtank

    Spillway

    Penstock

    Spillway

    450

    425

    400

    375

    350

    325

    300

    425

    400 37

    5 350

    325 3

    00

    275

    Managon River

    Switchyard300

    Penstock AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:1000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 4-1

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    General Plan

  • 440

    460

    420

    400

    320

    380

    360

    340

    280

    300

    BP-P

    0.00

    0

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th, m

    Poi

    ntN

    o.P

    ipe

    Axi

    sE

    leva

    tion

    Slo

    pe

    BP

    -P

    IP-P

    1

    0.00 30.00

    429.

    000

    30.0

    00

    253.

    00

    6.00

    0

    100.

    000

    170.

    000

    Ver

    . Ben

    d

    IP-P

    2

    Ver

    . + H

    or.

    Ben

    d

    IP-P

    3

    IP-P

    4V

    er. B

    end

    IP-P

    5

    Ver

    . + H

    or.

    Ben

    d

    32.36 32.36 11.47

    28.000

    83.000

    83.000

    84.000

    75.000

    Total Penstock Pipe Length 417.000 m (Horizontal Length 377.500 m)

    HeadtankTunnel 3 Penstock

    6.000

    Crest EL. 434.460

    429.

    000

    414.

    930

    370.

    580

    326.

    280

    309.

    540

    9.03

    S.N. Bend Identification

    1

    2

    3

    4

    5

    6

    7

    8

    9

    IP-P1

    IP-P2

    IP-P3

    IP-P4

    IP-P5

    IP-P6

    IP-P7

    IP-P8, Bifurcation

    IP-P9

    Angle made by firsttangent with horizontal, 1

    Angle made by secondtangent with horizontal, 2

    Deviation anglein Plan,

    Combined Internal Angle (CIA), o

    0.0030.00

    32.36

    32.36

    11.47

    9.0315.66

    45.04

    0.00

    30.00

    32.36

    32.36

    11.47

    9.03

    15.66

    45.04

    0.000.00

    0.0054.70

    0.00

    68.49

    37.40

    45.00

    45.00

    0.00

    0.00

    30.0046.34

    0.00

    67.29

    42.99

    60.02

    45.00

    20.89

    6.63

    Combined Internal Angle (CIA) Table

    50.000

    GL

    GL

  • LC

    Penstock

    LC

    Spillway

    1 : 0

    .5

    1 : 0

    .4

    350

    300

    300

    500 5

    00

    500

    2300

    1500

    1200

    300

    19001800

    120120

    300 800

    1 : 0.5

    1 : 0.4

    300

    500

    1000 1200Stairway

    4800 1100

    1200

    300

    1000

    8001100

    7000

    1250 1850

    Typical Section : Penstock and Spillway

    900

    GL

    IP-P

    8

    IP-P

    9

    CL

    367.

    000

    374.

    000

    384.

    000

    Bifu

    rcat

    ion

    IP-P

    7

    Ver

    . + H

    or.

    Ben

    d

    45.04

    IP-P

    6V

    er. B

    end

    0.00

    75.000

    25.000

    22.000

    Total Penstock Pipe Length 417.000 m (Horizontal Length 377.500 m)

    FWL 278.000

    TWL 273.000

    275.

    000

    275.

    000

    EP

    15.66

    EL 280.000

    9.03

    11.000

    327.

    0039

    7.76

    0

    390.

    880

    275.

    000

    351.

    00

    377.

    500

    275.

    000

    EP

    -P

    398.

    500

    GL

    Penstock AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:1000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 4-2

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Penstock Profile

    Scale 1:100

  • 0.00

    0

    15.0

    00

    BP

    -S

    IP-S

    1

    5.10

    430.

    100

    428.

    800

    BP-S

    IP-S

    2

    Ver

    . + H

    or.

    Ben

    d

    IP-S

    3

    IP-S

    4V

    er. B

    end

    IP-S

    5

    Ver

    . + H

    or.

    Ben

    d

    40.0

    00

    111.

    000

    181.

    000

    262.

    000

    30.00 32.36 32.36 10.74 9.03

    30.000

    84.000

    83.000

    82.000

    73.500

    Total Spillway Length 470.000 m (Horizontal Length 430.000 m)

    270

    280

    290

    300

    310

    320

    330

    340

    350

    360

    370

    380

    390

    400

    410

    420

    430

    440

    450

    15.000Spillway

    413.

    940

    368.

    83

    324.

    540

    309.

    210

    33.000

    Pipe Length 430.000 m

    Hor

    izon

    tal

    Cum

    ulat

    ive

    Leng

    th, m

    Poi

    ntN

    o.P

    ipe

    Axi

    sE

    leva

    tion

    Slo

    pe

    GL

    GL

  • Managon River

    IP-S

    6

    Ver

    . + H

    or.

    Ben

    d33

    5.00

    0

    73.500

    390.

    000

    21.17 0.00

    IP-S

    7V

    er. B

    end

    IP-S

    8V

    er. B

    end

    End

    -S

    19.000

    22.000

    21.000

    297.

    670

    275.

    000

    275.

    000

    EP

    7.500

    45.04

    352.

    000

    290.

    720

    368.

    000

    397.

    000

    GL

    Penstock AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:1000

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 4-3

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Spillway Profile

  • Headtank

    450

    425

    400

    375 350 3

    25

    Headtank AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-1

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    General Plan

  • B

    C D E

    B

    A

    Headtank Plan

    BP-P

    1 : 1

    0

    EL

    429.

    540

    EL

    432.

    520

    1 : 17EL 435.500

    BP-SAir Pipe 200

    F

    IP-P1

    IP-S1

    C D E F

    Air Pipe 200

    6000 34000 5000 5000

    1000

    0

    Manhole 1.0 m x 1.0 m

    WL 434.460

    EL 432.520

    CL

    Section C-C

    EL 435.500

    GL

    1 : 0

    .4

    500EL 440.000

    1 : 0

    .3

    1000

    EL 445.000

    1 : 0.4

    500 EL 440.000

    1 : 0.3

    1000

    EL 445.000

    500

    1000

    U-Gutter 300 x 300

    1 : 0.21 : 0

    .2

    10000

    1000

    Headtank AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-2

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Headtank & Spillway-1

  • WL 434.460

    EL 432.517

    CL

    EL 432.500

    Section D-D

    1 : 0.4

    500 EL 440.000

    1 : 0.3

    1000

    EL 445.000

    EL 435.500

    1 : 0

    .4

    500EL 440.000

    1 : 0

    .3

    1000

    EL 445.000

    EL 435.500

    U-Gutter 300 x 300

    1 : 0.21 : 0

    .2

    1600 10000

    1000

    GL

    EL 432.520

    EL 434.460

    EL 435.500

    1 : 0

    .3

    EL 431.500

    EL 435.500

    1 : 17

    BP-P

    Side Over Flow Weir L = 28.000 m

    Section A-A

    WL 434.460

    6000 5000

    4000 7000

    6000 34000

    1 : 0.5

    EL 428.250

    45001000 20007000

    500 900 3100

    2000

    2000

    1 : 0.5

    1 : 0.5

    EL 429.000

    2600

    1 : 0.4

    500 EL 440.000

    1 : 0.3

    1000

    EL 445.0005001000

    EL 450.000

    EL 430.000

    1 : 0.2

    R30

    00

    HeadtankTunnel 3 Penstock

    Air Pipe 200

    1 : 600 Screen

    Anchor Block

    Headtank AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-3

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Headtank & Spillway

  • EL 432.500

    EL 429.500

    1 : 10

    Section B-B

    30000 3000

    1 : 0

    .3

    EL 430.100

    EL 435.500

    BP-SAir Pipe 200

    EL 428.800

    1000 2000

    2000

    1 : 0.5

    1 : 0.5

    1 : 0.4

    500 EL 440.000

    1 : 0.3

    1000

    EL 445.0005001000

    EL 450.000

    1 : 0.2

    Section B-B

    Air Pipe 200

    Support Pier

    1000

    Anchor Block

    CLCL

    EL 429.000

    Section F-F

    WL 434.460

    1 : 0.3

    1 : 0

    .4

    500

    1 : 0

    .3

    1 : 0.2

    1 : 0

    .2

    1000 3500 1000

    15001200

    GL

    WL 434.460

    EL 431.500

    CL

    EL 429.500

    Section E-E

    EL 435.500

    EL 400.500

    CLEL 435.500

    1 : 101 : 0.3

    EL 435.500

    1 : 0

    .4

    500EL 440.000

    1 : 0

    .3

    1 : 0.2

    1 : 0

    .2

    500 3000 2300 10000 1000

    GL

    Headtank AreaScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 5-4

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Headtank & Spillway-3

  • Switchyard

    EL. 280.000

    EL. 280.000

    Power Station

    Pens

    tockS

    pillw

    ay

    TailraceEnergyDissipator

    Managon River

    Acces

    s Roa

    d

    275

    280

    285

    290

    295

    305

    275

    310

    300

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:500

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 6-1

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    General Plan

  • 1 : 2

    .5

    1 : 2

    .5

    C

    1000

    1050

    010

    00

    5500

    5000

    Pow

    er H

    ouse

    12.

    500

    mTa

    ilrac

    e 13

    .500

    m

    1000125001000055001000

    30000

    1500

    2600

    6000

    5004600500

    C

    A

    AB

    B

    D D

    E E

    3500

    5000

    1000

    5500

    30001000 1000 5000 1000 3000 10005500 9500

    90.00

    900900

    1500

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 6-2

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Plan EL 275.000

  • Managon RiverEL. 273.000 TWL 273.000

    FWL 278.000

    1000 5500 6000 2500

    6000 2500

    12500 8500 3000 1000

    21000 4000

    EL 272.500

    CraneLevel

    1 : 2.5

    EL 268.000

    EL 280.000EL 280.000

    5000 1000

    Section A-A

    4000 1000

    CL

    EL 272.400

    R180

    0

    EL. 275.000 Air Pipe 300EL. 275.000

    GL

    1000

    1050

    010

    00

    5500

    5000

    10001000

    30000

    Power Station Plan EL 280.000

    7000 10000 11000

    6000

    1050

    0

    Generator

    Entrance

    Inlet Valve Opening

    Entrance

    1900

    0

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 6-3

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Section & Plan EL 280.000

  • EL. 275.000

    Section C-C

    1000 1000 4000 1000 8000 10004000

    30000

    EL. 268.0007000 10000 12000

    3500

    3500

    1000

    1200

    0

    4000

    C of Turbine # 1 C of Turbine # 2

    1 : 0

    .3

    EL. 280.000

    1000 4000 1000 4000

    EL. 272.000

    C of Penstock # 1 C of Penstock # 2

    CL of Spillway

    EL. 280.000

    6500 10000 13500

    1200

    2200

    1 : 0.3

    EL. 275.00022

    00

    1 : 0.3

    GL

    L

    L

    LL

    EL. 275.000

    EL. 273.000

    EL. 276.500

    Section D-D

    EL. 280.000

    1000 1000 4000 1000 8000 10004000

    30000

    EL. 268.0007000 10000 12000

    3500

    3500

    1000

    1200

    0

    4000

    C Turbine # 1 C of Turbine # 2

    1 : 0

    .3

    EL. 280.000

    1000 4000 1000 4000

    1200

    2200

    1 : 0.3

    5000

    EL. 275.000

    2200

    1 : 0.3

    CL of SpillwayGL

    L L

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 6-4

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Section

  • Managon River

    EL 275.000

    EL 280.000

    EL 274.000

    5000 6000 1000 3300

    4500 7500

    700

    300

    4000

    800

    1900

    8001100

    300

    Section B-B

    Air Pipe 200

    Energy Dissipator

    Spillway Pipe

    Air Pipe 200

    GL

    WL. 273.000

    EL 280.000

    WL. 273.000

    500 4600 500

    800

    1700

    1000

    200

    5600

    4500

    500

    3500

    500

    1000 3000 1000

    5000

    1000 3000 1000

    5000

    1000

    5500

    1000

    7500

    35002

    600

    Section E-E

    10000

    5000

    13000

    1700

    1 : 0

    .3

    Tailrace CulvertEnergy Dissipator

    C of Turbine # 1 C of Turbine # 2C of Spillway Pipe

    EL. 273.400

    EL. 270.000 EL. 270.0001 : 2.5 1 : 2.5

    GL

    L L L

    Power StationScale Date

    Ernst & Young Shin Nihon LLC

    1:200

    Industrial Dicisions,Inc.

    May 2016

    Wawa No.2 Hydropower Project

    Chodai Co.,Ltd.

    Drawing No. 6-5

    Kiso-Jiban Consultants Co.,Ltd

    Drawn By :Dongol

    Designed By :Takase

    Checked By :Takase

    Approved By :Tsuda

    Philippines Mini-Hydro Power ProjectPreparatory Study for the Wawa Riverin the Province of Agusan del Sur

    Tailrace & Energy Dissipator

    Basic Design of Wawa No.1 Hydropower ProjectBasic Design of Wawa No.2 Hydropower Project