Page 2: Water Monitoring Case Study

SITUATION

• A LARGE INDUSTRIAL FACILITY USING 3 MILLION GALLONS OF WATER PER DAY WANTED TO IDENTIFY THE PROCESSES WITHIN THEIR FACILITY THAT WERE USING THE MOST WATER.

• THE FACILITY RUNS 24/7 WITH VERY INFREQUENT DOWN TIME MAKING INSTALLATION VERY DIFFICULT.

• LARGE, OLD FACILITY WITH MANY DIFFERENT BUILDINGS MADE DATA COLLECTION CHALLENGING.

Page 3: Water Monitoring Case Study

ACTION > PLANT SURVEY

• IDENTIFIED IMPORTANT LOCATIONS• RECORDED PIPE SIZES AND MATERIALS• COULD LINES BE ISOLATED FOR

INSTALLATION• DID EXISTING METERS EXIST• DID EXISTING DATA ACQUISITION SYSTEM

EXIST

Page 4: Water Monitoring Case Study

ACTION > PLANT SURVEY

Page 5: Water Monitoring Case Study

ACTION > EVALUATE TECHNOLOGIESCr

iteria • Installatio

n• Operation• Flexibility• Simplicity• Scalability

Met

er Ty

pes • Positive

Displacement

• Turbine• Ultrasonic• Magnetic

Sign

als • Mobus

• 4:20 mA• Pulse• HART

Com

mun

icat

ion• Ethernet

• Cellular

Page 6: Water Monitoring Case Study

RECOMMENDATION > BLUEVUE

• BLUEVUE WATER ANALYTICS• CUSTOM GRAPHS• COMPARE DATE RANGES• GROUPING OF WATER METERS• DAILY REPORTS OF WATER USAGE

AND FLOW• ALARMS

Page 7: Water Monitoring Case Study

RECOMMENDATION

• BADGER METER DYNASONICS METERS• CONSISTENT PLATFORM ACROSS

ANY PIPE SIZE AND MATERIAL.• SIMPLE INSTALLATION.• EXCELLENT ACCURACY• MODBUS COMMUNICATION

Page 8: Water Monitoring Case Study

RECOMMENDATION

• BADGER METER DYNASONICS METERS• CONSISTENT PLATFORM ACROSS ANY PIPE

SIZE AND MATERIAL.• SIMPLE INSTALLATION.• EXCELLENT ACCURACY

Page 9: Water Monitoring Case Study

RECOMMENDATION > BADGER METER DAS

• SINGLE DEVICE COLLECTS ALL DATA

• WIRELESS MESH NETWORK• MODBUS-BASED• ETHERNET ENABLED, LIVES ON

CUSTOMER NETWORK• REMOTE ACCESS

Page 10: Water Monitoring Case Study

RECOMMENDATION > METER ENCLOSURES

• PROTECTS METERS FROM HARSH ENVIRONMENT.

• CLEAN INSTALLATION• EXPANDABLE FOR FUTURE METERS

Page 11: Water Monitoring Case Study

RECOMMENDATION > MESH NETWORK

Page 12: Water Monitoring Case Study

RECOMMENDATION > DATA COMMUNICATION

Data Acquisition Server

Enclosure #2

Enclosure #5Enclosure #3

Enclosure #4Enclosure #1

CustomerNetwork

Internet

blueVUEServer

Page 13: Water Monitoring Case Study

RESULT > FLOW RATE & TOTALS FOR 16 POINTS

Enclosure Item Number Meter # Meter Location Pipe Size Cable ft Modbus Address345WT Wireless Mesh Network Transceiver 10

DTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerSpare 15

Spare 16

345WT Wireless Mesh Network Transceiver 20

DTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerSpare 26

Item Description

216"

30

60

60

60

15

14

13

12

100

10"

8"

6"

14 "

25

24

23

22

1 PM South

FutureFuture

2

Common WW

Wet Room

Acid Plt & HX

Perox Washer

3 PM & Sulfite

4

Future

1 & 2 PM

100

60

60

40

1

14

13

12

11

6"

6"

8"

8"5

6

7

8 1 PM Aisle

Showers

Page 14: Water Monitoring Case Study

Screens

LabStarch

Digest HEX

Steam Digesters Acid Plant Filter Plant Plant

(Raw Water) Screen

Coolers

Sludge(No Enclosure)

HD Tank Bailey

Bleach PlantPump Seals Perox Washer

Pump Seals

Dil Dil Seal Water Water Water

Beater Room

Warm Water Tank

Condensate HEX WW Tank MU

(Machine Level)

Silo MUHoses

2

Suction Roll ShowersMISC: Vac Oil Cool Pump Hoses

Rec

24

23

10”8”6”

8”

6”

6”

8 5/8”

20”

20”

4”

2”

#1 Cond HEXHoses

No. 6B

Pfizer

Bleach Plant (basement)

WhiteWater MU

BW Supply

12 11

13

25

Clear Well

Filters

recirc

Upstairs#1PM?

No. 2 PM No. 1 PM (basement)

No. 3 PM (basement)

Size Press Starch Tank

8”

6”

Pulpers

8 5/8”

4”

33

34

41

Common WW

PiggyBack WW

22

51Spare

Showers 4”

6”

#1 PM Machine Chest

14

21

Aisle

52Spare

3132

3PM North

3PM South

Clarifier In

Clarifier Out

14”

Page 15: Water Monitoring Case Study

Enclosure Item Number Meter # Meter Location Pipe Size Cable ft Modbus Address345WT Wireless Mesh Network Transceiver 10

DTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerSpare 15

Spare 16

345WT Wireless Mesh Network Transceiver 20

DTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerSpare 26

345WT Wireless Mesh Network Transceiver 30

DTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerDTFXB-ZN-ANNN-NN Dynasonics TransitterDTTN-300-N000 Transit Time Flow TransducerSpare 35

Spare 36

Item Description

3460

50

30

60

8 5/8"

8 5/8"

20"

20"

216"

30

60

60

60

15

14

13

12

100

10"

8"

6"

14 "

1

3 PM South

3 PM North

Clarifier Out

Clarifier In

25

24

23

22

33

32

31

1 PM South

FutureFuture

2

3

Common WW

Wet Room

Acid Plt & HX

Perox Washer

3 PM & Sulfite

4

Future

FutureFuture

10

9

3

1 & 2 PM

100

60

60

40

1

14

13

12

11

6"

6"

8"

8"5

6

7

8 1 PM Aisle

Showers

Page 16: Water Monitoring Case Study

RESULT > DAILY REPORTS

Page 17: Water Monitoring Case Study

RESULT > CUSTOM GRAPHS

Page 18: Water Monitoring Case Study

RESULT > SIGNAL STRENGTH

Page 19: Water Monitoring Case Study

THANK YOU FOR YOUR ATTENTION

ANY QUESTIONS?

JON [email protected]