ward sabha|shantala nagara #111 23 july 2016 minutes of...

39
Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Upload: others

Post on 23-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Ward Sabha|Shantala Nagara #111 23 July 2016

Minutes of Meeting

Page 2: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

RWAs covered today

Beautify Lavelle Road, The Living Lavelle

Citizen welfare association of Richmond

town, Langford town

MRR RWA

TRIROADS RWA

VIPARVA

Vittal Mallya Road Improvement Group

Page 3: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

MyCityMyBudget Citizen Inputs Status Update

Page 4: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

MyCityMyBudget | Guidelines for referring Minutes of Ward Sabha Meeting

The following slides provide a quick snapshot of each of the issues mentioned by RWAs. All agency responses specific to each input are recorded in the slides as well. All the citizen input slides follow the below table layout:

RWA name

Agency name and concerned officer details

These 3 columns record the gist of the RWA concern. The budget/ grievance column records if money needs to be set aside for resolution or if it require redressal

If budget is required and specific work and job code details are provided by the agency then data is recorded in these columns. Status column indicates whether a a)tender has been issued(T), work order created(WO) or jobcode(JC) has been created for resolving this concern.

If the agency provides specific timelines, the information is recorded here

Additional issue-specific comments that were discussed between agency and RWAs are recorded here

Serial Number recorded here corresponds to the progress report provided during the ward sabha

Page 5: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

RWA discussion items 11-39 (recorded in subsequent slides)were discussed with the MLA, Mr. N A Haris in attendance. In addition to discussing each individual agenda item, Mr. Haris also:

• Committed to resolve all the RWA issues and instructed the BBMP officers to ensure satisfactory resolutions

• Requested the BBMP officers to provide copies of Tenders, Schedule A, Schedule D and other associated work documents upon RWAs’ request

• Requested the BBMP officers to facilitate a direct meeting between RWAs and contractors carrying out the BBMP work.

• MoM will be sent to agency officials who were unable to attend the Ward Sabha

Please note that the budget information mentioned in the subsequent slides were mapped based on POW and other data provided by BBMP, which have also been shared along with minutes.

Although the budget amounts were not specifically addressed by the agency during ward sabha, this information has been provided here as a basis for future conversations with agency representatives.

MyCityMyBudget Citizen Inputs | General Note

Page 6: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline

Notes from Ward Sabha meeting

1 Construction of new footpaths

Lavelle road from Bier club to

Richmond circle. B Y P1771 117.42 IU IU IU

During the course of the discussion on this subject with the Corporator, community and AEE, a conclusion on the way forward to address the construction of new footpath, side drain and desilting issue was not arrived at. A separate meeting to resolve the way forward is to be set up with help from Janaagraha.

2

A) Desilting of Road side drains

Lavelle road from Bier club to

Richmond circle. B Y

POW (2016-

17) 10.00 IU IU IU

B) Road side drains IU IU IU IU IU

Beautify Lavelle Road, The Living Lavelle Agency : BBMP Contact Person : Mr. Mahadev (AEE) Contact Details : 9632284148 IU-Information Unavailable

Page 7: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt.

(Lakh)

Status (JC/T/W

O)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

3

A) Repair of Transformers Lavelle road

near The Bier club

G IU IU IU IU IU IU

Mr. Chakravarthi: Reiterated that the maintenance does not come under the BESCOM’s purview but the consumer Janaagraha: Recommend RWA to visit the spot along with Mr. Chakravarthi to clear out the issue

B) Repair of Electric poles

Lavelle road near The Bier

club G IU IU IU IU IU

Projected Completion date: 06th Aug, 2016

Mr. Chakravarthi: Committed to resolve the issue

4 Require regular door to door garbage collection

Lavelle road from Bier club to Richmond

circle.

G IU IU IU IU IU IU

Citizen: Door to door garbage collection is not happening on regular basis, PKs, are mixing up garden waste, Commercial and residential waste. Mr. Mahadev: Will call concerned contractor and strictly inform him to arrange for segregating collection regularly.

Beautify Lavelle Road, The Living Lavelle Agency : BESCOM & BBMP Contact Person : Mr. Chakravarthi (BESCOM AE) & Mr. Mahadev (AEE)

Contact Details : 9449874214 & 9632284148 IU-Information Unavailable

Page 8: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha

meeting

5 Increase police beat

patrolling

Lavelle road from Bier club to

Richmond circle. G IU IU IU IU IU IU

Ms. Roopa Reddy: Two new Hoysala Patrol cars have been allocated and this has resulted in increased police beat patrols.

6 Noise pollution

Glass house, Margarita bar, The

Attic & The Bier club.

G IU IU IU IU IU IU KSPCB: Agency Representative did not attend the meeting.

Beautify Lavelle Road, The Living Lavelle Agency : BCP & KSPCB Contact Person : Ms. Roopa Reddy (Sub Inspector- Cubbon Park PS) & KSPCB Contact Details : 9060900037 & 080-25581383 IU-Information Unavailable

Page 9: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

7 Repair of existing

footpaths

Alexandria street, Serpentine street,

Renius street, Leonard street, Albert street,

Kingston street and Hayes Road

B Y POW 15 awaiting bid for tender

IU IU

Corporator: 15 lakhs released for this work but no contractor is willing to come forward and take up this work. Mr. Mahadev to provide a copy of tender details to RWAs.

8 Tarring of pothole-

ridden roads

Alexandria street, Serpentine street,

Renius street, Langford cross road,

Cornwell road, Leonard Road,

Convent Road, Hayes Road

B Y POW 15 awaiting bid for tender

IU IU

Citizen welfare association of Richmond town, Langford town Agency : BBMP Contact Person : Mr. Mahadev (AEE) Contact Details : 9632284148 IU-Information Unavailable

Page 10: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

9 Desilting of Storm

water Drains

Alexandria street, Serpentine street,

Renius street, Leonard street, Langford garden,

Richmond road, Kingston street,

Cornwell cross roads, Albert Street, Hayes

Road and Convent Road

B Y POW

(2016-17)

20.00 IU IU IU

Corporator: Ms. Renuka (AEE-SWD) is in-charge of this issue and will be intimated.

10 Installation of

streetlights

Alexandria street, Serpentine street,

Renius street, Leonard street, Hayes Road,

Kingston street

B Y Corporator grant

5.00 IU IU

Projected Completion date: 07th Aug,

2016

Mr. Manjappa: Corporator committed to provide 5 Lakhs for this work. Work has been allotted to contractor Mr. Lakshmikanth. Expected completion of work is with in a 15 days.

Citizen welfare association of Richmond town, Langford town Agency : BBMP

Contact Person : Mr. SH Manjappa (Electrical Engineer) & Ms. Renuka (AEE-SWD) Contact Details : 7259363162 & 9480683667 IU-Information Unavailable

Page 11: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha meeting

11 Build composting

units Richmond town B IU IU IU IU IU IU

Corporator: Identified a place inside Richmond park to build composting units. MLA: Referred another location behind Mud tank place is more suitable. Mr. Mahadev: To inspect the Mud Tank place site for building composting unit.

12 Require regular Door

to door garbage collection

Alexandria street, Serpentine street,

Renius street, Leonard street,

Langford garden, & Richmond road,

Kingston Street

G IU IU IU IU IU IU

Mr. Mahadev: Meeting has been arranged on 25th July, 2016 morning 8:00 am between garbage collection contractor Mr. Krishne Gowda and RWAs. To provide a copy of contractor Agreement to RWAs.

Citizen welfare association of Richmond town, Langford town Agency : BBMP Contact Person : Mr. Mahadev(AEE) Contact Details : 9632284148 IU-Information Unavailable

Page 12: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance

Budget Availabl

e?

Budget Code

Budget Amt.

(Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

13 Repair of existing

footpaths Rest house crescent

road B Y

POW (2016-

17) 20.00 IU IU IU

MLA: No budget allocated this year. To consider for inclusion in 2017-18 budget.

14 Sewage entry into storm water drains

Museum road - PO- Church street

B IU IU IU IU IU IU BWSSB: Agency Representative did not attend the meeting.

15 Desilting of Storm

water Drains Rest house crescent

road B Y

POW (2016-

17) 10.00 IU IU IU

BBMP SWD: Agency Representative did not attend the meeting.

MRR RWA Agency : BBMP & BWSSB Contact Person : Mr. Mahadev(AEE) & Mr. Ragavendra (AEE) & Ms. Renuka (AEE-SWD)

Contact Details : 9632284148 & 9845444049 & 9480683667 IU-Information Unavailable

Page 13: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

16

A) Repair of Transformers

Rest house road - near Dubai plaza

G IU IU IU IU IU IU Mr. Pramodh Kumar: No alternate place to shift the transformer.

B) Repair of Electric poles

Rest house road - near Dubai plaza

B IU IU IU IU IU IU

Mr. Pramodh Kumar: Proposal sent, once sanctioned, the electrical pole issue will be addressed

MRR RWA Agency : BESCOM Contact Person : Mr. Pramodh Kumar (BESCOM - AEE) Contact Details : 9449844673 IU-Information Unavailable

Page 14: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

17 Construction of

sewage lines

Museum Road - section from PO to

Church Road B IU IU IU IU IU IU

BWSSB: Agency Representative did not attend the meeting. 18

Provision of a new water pipeline

Rest house road B IU IU IU IU IU IU

19 Reduce water leakage and

wastage

Rest house Road Transformer

G IU IU IU IU IU IU

MRR RWA Agency : BWSSB Contact Person : Mr. Ragavendra (AEE) Contact Details : 9845444049 IU-Information Unavailable

Page 15: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha

meeting

20

Maintain cleanliness of

streets (sweeping, removal of debris)

Brunton road, Brunton cross road & Ashley road

G IU IU IU IU IU IU Mr Mahadev: to ensure contractor is adhering to schedule of work.

21 Repair of existing

footpaths Brunton road, Brunton

cross road & Ashley road B Y P1771 117.42 IU IU IU

Mr. Mahadev: Committed to resolve the issue.

22 Installation of

streetlights

Brunton road, Brunton Cross road and Ashley

road. B IU IU IU IU IU IU

Mr. Manjappa: Committed to resolve the issue.

TRIROADS RWA Agency : BBMP Contact Person : Mr. Mahadev (AEE) & Mr. SH Manjappa(Electrical Engineer) Contact Details : 9632284148 & 7259363162 IU-Information Unavailable

Page 16: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha

meeting

23 Hawkers/Vendors on

Footpaths

Brunton road, Brunton Cross road

and Ashley road. G IU IU IU IU IU IU

This item was not discussed. To pick up in the next Ward Sabha

24 Stray Dogs Problem Brunton road,

Brunton cross road & Ashley road.

G IU IU IU IU IU IU

25 Require regular Door

to door garbage collection

Brunton road, Brunton cross road &

Ashley road. G IU IU IU IU IU IU

Mr. Murthy to clear the garbage as soon as possible. and arrange a meeting between with garbage contractor Mr. Krishne Gowda and RWAs to understand and monitor work schedule.

TRIROADS RWA Agency : BBMP Contact Person : Mr. Mahadev (AEE) & Mr. Murthy(AE) Contact Details : 9632284148 & 9448241607 IU-Information Unavailable

Page 17: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha meeting

26 Parking violations Brunton road,

Brunton cross road & Ashley road.

G IU IU IU IU IU IU BTP: Agency Representative did not attend the meeting

TRIROADS RWA Agency : BTP Contact Person : Mr. Siraj Ahmed(Traffic Inspector Ashok Nagara PS) Contact Details : 9480801823 IU-Information Unavailable

Page 18: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

27 Repair of existing

parks Victoria layout park B Y P0088 22.15 IU IU IU

MLA: Need to raise the height of the park to avoid flooding. It will take time to finish this work but shall be undertaken by the horticulture dept.

28 Repair of existing

footpaths Victoria Layout and

Palmgrove road. B Y POW 100 T IU IU

Mr. Mahadev: Committed to resolve the issue and provide a copy of tender document to RWAs.

VIPARVA Agency : BBMP

Contact Person : Mr. Mahadev(AEE) Contact Details : 9632284148 IU-Information Unavailable

Page 19: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha meeting

29 Tarring of pothole-

ridden roads

Palmgrove road, Victoria Layout, Anjanaya street,

Linden street

B Y POW

(2016-17)

20.00 T IU IU Mr. Mahadev: Pothole works is under process, to provide a copy of tender document to RWA.

30 Repair of broken

storm water drains Palmgrove road B Y

POW (2016-

17) 45.00 IU IU IU

BBMP SWD: Agency Representative did not attend the meeting.

VIPARVA Agency : BBMP

Contact Person : Mr. Mahadev(AEE) & Ms. Renuka (AEE-SWD) Contact Details : 9632284148 & 9480683667 IU-Information Unavailable

Page 20: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha

meeting

31 Repair of

transformers/ electric poles

Victoria layout G IU IU IU IU IU IU

MLA: Will arrange a meeting with the concerned agency officers where these issues will be addressed.

32 Maintanence of

sewage lines

Anjanaya street, Linden street, Loyala

layout 1st main, Victoria road 1st

cross,

B IU IU IU IU IU IU BWSSB: Agency Representative did not attend the meeting

VIPARVA Agency : BESCOM & BWSSB Contact Person : Mr. Pramoda Kumar (BESCOM-AEE) & Mr. Ragavendra (BWSSB-AEE) Contact Details : 9449844673 & 9845444049 IU-Information Unavailable

Page 21: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha

meeting

33 Repair of existing footpaths

From St. Marks road junction to Lamborghini showroom.

B Y P1771 117.42 T IU 26th July, 2016

Mr. Mahadev: To provide a copy of tender document to RWAs.

34 Tarring of mud/unpaved roads

From St. Marks road junction to Lamborghini showroom.

B IU IU IU IU IU IU

Mr. Mahadev : Potholes filled. Citizen: Mentioned pothole filling was not satisfactory and requested redoing the pothole-filling Mr. Mahadev: Committed to resolve the issue

Vittal Malya Road Improvement Group Agency : BBMP Contact Person : Mr. Mahadev (AEE) Contact Details : 9632284148 IU-Information Unavailable

Page 22: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha meeting

35 Desilting of Storm

water Drains

From St.Marks road junction to

Lamborghini showroom.

B Y POW

(2016-17)

20.00 IU IU IU

BBMP SWD: Agency Representative did not attend the meeting.

36

Construction of storm water

drains

Side lane leading towards Bishop

Cotton boys school B IU IU IU IU IU IU

37 Installation of

streetlights

From St.Marks road junction to

Lamborghini showroom.

B IU IU IU IU IU IU This item was not discussed. To pick up in the next Ward Sabha.

Vittal Malya Road Improvement Group Agency : BBMP Contact Person : Ms. Renuka (AEE-SWD) & Mr. SH Manjappa (Electrical Engineer) Contact Details : 9480683667 & 7259363162 IU-Information Unavailable

Page 23: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha meeting

38 Installation of traffic lights

Junction of Vittal Malya road, Walton

road and Lavelle road B N IU IU IU IU IU

This item was not discussed. To pick up in the next Ward Sabha.

39 Provision for

parking

St.Marks road junction to

Lamborghini showroom.

G IU IU IU IU IU IU Mr. Prathap Reddy: Planning to make this a Zero (No)Parking zone.

Vittal Mallya Road Improvement Group Agency : BTP Contact Person : Mr. N Prathap Reddy (Traffic Inspector- Cubbon Park PS) Contact Details : 9480801828 IU-Information Unavailable

Page 24: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance

Budget Available

?

Budget Code

Budget Amt.

(Lakh)

Status (JC/T/WO)

JC/T/WO #

Timeline Notes from Ward Sabha meeting

40 Garbage Entire ward G IU IU IU IU IU IU Corporator: to evaluate contractor performance for entire ward.

41 Remove OFC-Optical

fiber cable Vittal Malya Road G IU IU IU IU IU IU MLA: OFC has been removed.

42 Noise Pollution Near Kasturba Road G

IU IU IU IU IU IU KSPCB: Agency Representative did not attend the meeting

43 Traffic Safety &

Security for Education Institutions

Vittal Malya Road G

IU IU IU IU IU IU

Separate meeting to be called to address parking and traffic issue with BTP, BBMP, School Managements and Communities

Additional RWA/Citizen inputs Agency : BBMP & BTP & KSPCB Contact Person : Mr. Mahadev (AEE) & Mr. N Prathap Reddy (Traffic Inspector) & KSPCB Contact Details : 9632284148 & 9480801828 & 080-25581383 IU-Information Unavailable

Page 25: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

SL No Category Location Budget/

Grievance Budget

Available? Budget Code

Budget Amt. (Lakh)

Status (JC/T/WO)

JC/T/WO # Timeline Notes from Ward Sabha

meeting

44 Parking

Vittal Malya road and city (Parking should be provided

within the school playgrounds)

IU IU IU IU IU IU IU Separate meeting to be called to address parking and traffic issue with BTP, BBMP, School Managements and Communities 45 Parking

City, Multi storied car parking should be provided to avoid traffic and space

and low cost (5 Lakh).

IU IU IU IU IU IU IU

46

Road maintenance and Tarring

Lavelle road, Residency road, Vittal Mallya road

B Y

Nagarothana works

165 T Y

IU

Mr. Mahadev: Delay in Tender process. To provide a copy of tender proposal document to RWAs.

47 Open gym Richmond park IU IU IU IU IU IU IU

Gym equipment provided by a corporate pro bono for the park was approved for installation by the MLA and Corporator

Additional RWA/Citizen inputs Agency : BBMP Contact Person : Mr. Mahadev (AEE) & Mr. Santosh Kumar (HS) Contact Details : 9632284148 & 9480685559 IU-Information Unavailable

Page 26: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Other Civic Works Status Update

Page 27: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

A Summary

Category POW(2015-16) POW(2016-17) BBMP Budget Grand Total

Administrative 4.00 4.00

Community Infrastructure & Services

477.79 477.79

Drains 3.00 3.00

Emergency Works 10.00 10.00 20.00

Pedestrian Related Works 115.99 115.99 Public Amenities 3.54 3.54

Road Related Works 45.00 474.10 519.10

Roads, Footpath & Drains 15.00 20.00 35.00

Solid waste management 7.00 7.00

Ward Works 35.00 35.00

Water 51.95 51.95

Grand Total 80.00 65.00 1,127.37 1,272.37

Page 28: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Category Location Est. Amt in

Lakh Status JC/T/WO # Timeline

Improvement to

drains, roads &

footpaths

Markham Road 20.00

Improvement to

drains, roads &

footpaths

Ashok Nagara 15.00

Improvement to

drains, roads &

footpaths

Y G Palya 15.00

Improvement to

drains, roads &

footpaths

Garke Park 3.00

POW 2015-16 Agency : BBMP Contact Person : Mr. Mahadev(AEE) Contact Details : 9632284148

Page 29: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Category Location Est. Amt in

Lakh Status JC/T/WO # Timeline

Improvement to

drains, roads &

footpaths

Ward No 111 Shantala Nagara 10.00

Solid waste

management Ward No 111 Shantala Nagara 7.00

Emergency Works Ward No 111 Shantala Nagara 10.00

POW 2015-16 Agency : BBMP Contact Person : Mr. Mahadev(AEE) Contact Details : 9632284148

Page 30: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Category Location Est. Amt in

Lakh Status JC/T/WO # Timeline

Improvement to

drains, roads &

footpaths

Primrose Cross Roads 20.00

Ward Works Nanda Ground 35.00

Emergency Works Y G Palya 10.00

POW 2016-17 Agency : BBMP Contact Person : Mr. Mahadev(AEE) Contact Details : 9632284148

Page 31: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Quality of Life Inputs Status Update

The Street Quality Score 2015 was conducted on 3,500 km of roads (Arterial, Sub-arterial and Collector) across Bengaluru to measure the quality of infrastructure (including Footpaths, Pedestrian Crossings and Street lighting) at street-level, through the use of simple Android Apps. The survey was conducted between Sept to Nov 2015. Presented below is the street-level information pertinent to your ward.

Page 32: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Streets requiring most improvement

% unwalk

able Budget

Availability Budget Code

Budget Amt. in

Lakh Status

(JC/T/WO) JC/T/WO

# Timeline Agency Contact Markham Road 68 Residency Cross Road 66 Brunton Road 63 Museum Road 62 Hosur Main Road 62 Lavelle Road 58 Convent Road 51 Linden Street 48 Cariappa Road 43 Primrose Road 41 Langford Road 41 Church Street 38

Footpath Total Kms surveyed 55.4

Unwalkable Kms 16.4 (30%)

No. of obstructions 250

Largest Obstruction Type Missing/Broken Slabs (81 instances)

Page 33: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Benchmark: Every Junction must have a working Traffic Signal and Zebra Crossing

Total Junctions Surveyed 197

Junctions with no zebra crossing(ZC) 141

Junctions with no signals 85

Total Usable PCs 35 (18%)

Streets requiring most improvement

Unusable PCs

Budget Availabi

lity Budget Code

Budget Amt. in

Lakh Status

(JC/T/WO) JC/T/WO # Timeline Agency Contact

Cariappa Road 14

MG Road 13

Kamaraj Road 10

KS General Thimmaiah Road 7

Hosur Main Road 5

Cubbon Road 4

Church Street 4

Pedestrian Crossings (PC)

Page 34: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Benchmark: Safety Benchmark for Streetlighting is 10 Lux (UTTIPEC, DDA)

Ward Average Lux 7 Lux

Unsafely lit Kms 16 Km

Streets requiring improvement Avg. Lux

Budget Availability

Budget Code

Budget Amt. in

Lakh Status

(JC/T/WO) JC/T/WO # Timeline Agency Contact

Cariappa Road 2.7

Cubbon Road 3.1

General K S Thimmaiah Road 3.1

MG Road 6.5

St. Marks Road 7.1

Kamaraj Road 7.5

Streetlighting

Page 35: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Civic Amenities

Civic Facility Issue (Y/N)

Budget Availability

Budget Code

Budget Amt. in

Lakh Status

(JC/T/WO) JC/T/WO # Timeline Agency Contact

Parks and Playgrounds

Bus Stops

Public Toilets

Civic Facility No. of Units Unserviced area Benchmark applied Parks and Playgrounds

16

17%

Each unit services a radius of 500m (UDPFI 2014)

Bus Stops

9

19%

Public Toilets

9

1%

Each unit services a radius of 800m (UDPFI 2014)

Page 36: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Next Steps

Our recommendations: Meet after 3 months

Review status of works

Give inputs into next year’s budgets

We will send you the list of grievances, please register on ICMyC and track, lodge

Page 37: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Civic Directory

Agency Department Name Designation Phone Email

Mr. N A Haris MLA 9900009232

BBMP Mr. M B Dwarakanath (Dalu) Corporator 9449716667

BBMP Engineering Mr. Mahadev Asst Executive Engineer 9632284148

BBMP Health Mr. Gangadhar Health Inspector 9480683709

BBMP Electric/Street Light Mr. Shankar Asst Executive Engineer 9480685407

BBMP Electric/Street Light Mr. S H Manjappa Junior Engineer 7259363162

BBMP Engineering Mr. Murthy Asst Engineer 9448241607

BBMP Horticulture Mr. Santosh Kumar Horticulture Superintendent 9480685559

BBMP Horticulture Mr. Bhaskar Horticulture Inspector 9880274796

BBMP SWD Ms. Renuka Asst Executive Engineer 9480683667

Page 38: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Civic Directory

Agency Department Name Designation Phone Email

BCP Civil

Ms. Roopa Reddy Police Sub Inspector 9343440428

BESCOM Mr. Pramodh Kumar Asst Executive Engineer 9449844673

BESCOM Mr. Narsimha Murthy Asst Engineer 9449874213

BESCOM Mr. Chakravarthi Asst Engineer 9449874214

BTP Traffic Mr. N Prathap Reddy Police Inspector 9480801828

BTP Traffic Mr. Siraj Ahmed Police Inspector 9480801823

BTP Traffic Mr. Umesh Police Sub Inspector 9343440428

BWSSB Mr. Ragavendra Asst Executive Engineer 9845444049

Page 39: Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of ...janaagraha.org/files/ward/Shantala-Nagara-ward-sabha.pdf · Ward Sabha|Shantala Nagara #111 23 July 2016 Minutes of Meeting

Janaagraha Directory

Sapna Karim [email protected]

Justin Ralph [email protected] 9902333155

Janaagraha Centre for Citizenship and Democracy 4th Floor, UNI Building, Thimmaiah Road, Vasanthnagar, Bangalore - 560052 Tel: +91-80-4079-0400 Fax: +91-80-4127-7104 Mob: +91-9902333155 Website: www.janaagraha.org