Social Monitoring Report September 2015 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh City Prepared by the Central Vietnam Power Projects Management Board for the National Power Transmission Corporation and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: others

Post on 01-Nov-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

Social Monitoring Report

September 2015

VIE: Power Transmission Investment Program,

Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong

Transmission Line

Ho Chi Minh City

Prepared by the Central Vietnam Power Projects Management Board for the National

Power Transmission Corporation and the Asian Development Bank.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

NATIONAL POWER TRANSMISSION CORPORATION

CENTRAL VIETNAM POWER PROJECTS MANAGEMENT BOARD

PLEIKU – MY PHUOC – CAU BONG 500 KV TRANSMISSION LINE PROJECT

FOURTH MONITORING REPORT

INDEPENDENT MONITORING ON

RESETTLEMENT IN

HO CHI MINH CITY

September - 2015

Page 3: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

NATIONAL POWER TRANSMISSION CORPORATION

CENTRAL VIETNAM POWER PROJECTS MANAGEMENT BOARD

PLEIKU – MY PHUOC – CAU BONG 500 KV TRANSMISSION LINE PROJECT

FOURTH MONITORING REPORT

INDEPENDENT MONITORING ON

RESETTLEMENT IN

HO CHI MINH CITY

PROJECT OWNER

Central Vietnam Power Projects

Management Board

IMPLEMENTATION

Investment Consultancy and

Technology Transfer Co., Ltd

Deputy General Director

LE CHI CUONG

September- 2015

Page 4: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 4

TABLE OF CONTENT

I. GENERAL INTRODUCTION ....................................................................... 8

1.1. Overview of the project .........................................................................8

1.2. Independent monitoring of Resettlement Plan (RP) ..........................8

1.2.1. RP independent monitoring in brief .................................................... 8

1.2.2. Objectives of the independent monitoring .......................................... 8

1.2.3. Monitoring location ............................................................................ 9

1.2.4. Sampling .............................................................................................. 9

II. DOCUMENTS REVIEW .............................................................................. 10

2.1. Project document .................................................................................10

2.2. Project impacts according to RP ........................................................10

2.3. Legal basis for determining entitlements ..........................................13

II. THE RESULT AND EVALUATION OF THE FORTH MONITORING

PHASE...................................................................................................................... 14

3.1. Consultation, participation and information dissemination ...........15

3.2. Inventory of assets and compensation plan ......................................16

3.3. Application of price .................................................................................16

3.4. Compensation payment.......................................................................16

3.5. Providing assistances ...........................................................................18

3.5.1. Job changing assistances .................................................................. 18

3.5.2. Assistances for agricultural lands in the ROWs ............................... 18

3.6. Severely affected households ..............................................................19

3.7. Vulnerable households ........................................................................20

3.8. Gender issues .......................................................................................21

3.9. Livelihood rehabilitation program ....................................................21

3.10. Grievances and grievances redress ....................................................24

3.11. Cooperation of agencies ......................................................................40

3.12. Summary the issues of the forth monitoring phase ............................40

IV. CONCLUSION AND RECOMENDATION ............................................. 42

4.1. Conclusion ............................................................................................42

4.2. Recommendation .................................................................................42

ANNEX 1. LIST OF PROJECT’S OFFICIALS APPROACHED .................... 43

ANNEX 2. LIST OF INTERVIEWED HOUSEHOLDS ..................................... 44

Page 5: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 5

ANNEX 3. LIST OF SAHS .................................................................................... 45

ANNEX 4. PROPOSAL REPLACEMENT PRICE AND ACTUAL

COMPENSATION RATE...................................................................................... 46

ANNEX 3. SAMPLE OF QUESTIONAIRES ...................................................... 49

ANNEX 6. IMAGES ............................................................................................... 55

Page 6: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 6

LIST OF TABLES

Table 2: Impacts due to the ROW in Cu Chi district ................................................ 10

Table 3: Percentage of lands has using capacity restricted due to the ROW over the

total lands area ......................................................................................................... 11

Table 4: Comparison between lands owned by AHs and area of permanently

acquired lands ........................................................................................................... 11

Table 5: Ownership of AHs to types of lands ............................................................ 11

Table 6: Number of households permanently acquired land for 500kV Pleiku–My

Phuoc – Cau Bong transmission line project ............................................................ 12

Table 7: Number of households affected by ROWs for 500kV Pleiku - My Phuoc -

Cau Bong transmission line project .......................................................................... 12

Table 8: Trees affected by the 500kV Pleiku – My Phuoc – Cau Bong TL............... 13

Table 9: The result of interviewing APs on methods of information dissermination

and consultation ........................................................................................................ 15

Table 10. The adequacy of asset quantity of AHs ..................................................... 16

Table 11: Number of APs received money and handover land ................................ 17

Table 13: The assistance rate for lands affected by the ROWs in Cu Chi ................ 18

Table 14: Summary of households received job changing assistance and the amount

being paid .................................................................................................................. 19

Table 15: Distribution of severely affected and vulnerable households ................... 20

Table 16: Grievance and grievance solution ............................................................ 25

Page 7: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 7

ABBREVIATION

ADB : Asian Development Bank

AHs : Affected Households

APs : Affected Persons

CSCB : Compensation and Site Clearance Board

CPMB : Central Vietnam Power Projects Management Board

DONRE : Department of Natural Resources and Environment

HCMC : Ho Chi Minh City

HH : Household

LURC : Land Use Right Certificate

NPT : National Power Transmission Corporation

PC : People Committee

PECC4 : Power Engineering Consulting .Jsc No.4

REMDP : Resettlement and Ethnic Minority Development Plan

ROWs : Right of Ways

RP : Resettlement Plan

SAH : Severely Affected Household

SPS : Safeguard Policy Statement

Page 8: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 8

I. GENERAL INTRODUCTION

1.1. Overview of the project

The Government of Vietnam has requested the Asian Development Bank (ADB) to

provide a loan to construct 436,673 km – long Pleiku – My Phuoc – Cau Bong

500kV transmission line that starts from Pleiku, goes through My Phuoc and

finishes at Cau Bong in the South of Vietnam. The proponent and Executing

Agency for the loan is the National Power Transmission Corporation (NPT). The

Central Vietnam Power Projects Management Board (CPMB) is responsible for the

operation of the power system in central Vietnam and will be the Executing Agency

of the Project.

NPT has identified the 500kV Pleiku–My Phuoc -Cau Bong transmission line as a

high priority project and one of several construction projects conducted in order to

meet the target of connecting 90% of the population to electricity by 2020 and

100% by 2025. The proposed 500kV transmission line from Pleiku in the Central

Highlands to Ho Chi Minh City will meet energy demand in the South of Vietnam

which is growing at 14% per year and expected to balloon out to 25% by 2015. The

construction of 500 kV Pleiku – My Phuoc – Cau Bong transmission line together

with the expansion of Pleiku substation will be an enhanced and more reliable

energy supply to the South of Vietnam, especially to industrial zones in the area..

The objectives of the project consist of two following points:

- The 500kV Pleiku – My Phuoc – Cau Bong transmission line Project is a part

of the National electricity transmission network which was developed to

maintain the power supply that meet the demand of economic growth in the

Southern area during 2014-2015. Besides, the Project will ensure the

connection of transmission network within Vietnam, Laos and Cambodia by

2015.

- The Project also helps to increase the reliability of power supply, reducing the

risk of electricity losses. It will also optimize capacity of power plants in order

to provide electricity continuously and safely to the sub-loading lines of the

South in particular and the whole country in general.

1.2. Independent monitoring of Resettlement Plan (RP)

1.2.1. RP independent monitoring in brief

The Sponsor of the project pay significant attention to whether the implementation

of RP has followed the approved plan; the RP has been completed or any lesson has

to be learnt in order to develop other projects. In order to fulfill this requirement, it

is needed to have feedback channels regarding the implementation of RP.

Besides the internal monitoring reports on the implementation of RP conducted by

the CPMB, the Sponsor requires an objective source of information that separate

from the internal report. That is called Independent Monitoring and will be

implemented by an external monitoring agency that is independent from the CPMB.

1.2.2. Objectives of the independent monitoring

Page 9: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 9

The main objective of the consultancy service is to ensure that the APs of the Pleiku

– My Phuoc – Cau Bong 500kV transmission line Project will receive full supports

and benefits as stated in RP as approved. The monitoring activities are conducted in

order to:

(i) Ensure the rehabilitation and improvement of APs’ livelihood;

(ii) Supervise the whole Project to check if the current resettlement activities

are aligning with the RP or not. Propose methods and solution if

necessary;

(iii) Assess if the rehabilitation and compensation methods are fully complied

with the RP or not;

(iv) Detect arising problems during the implementation of the Project and

propose mitigation measures.

1.2.3. Monitoring location

The selected locations for the fourth monitoring phase could be allocates into two

categories: (1) administration agencies related to the Project and (2) at the project

sites, in particular:

(1) At the office of CPMB; Cu Chi district’s CSCB and the PCs of four communes

which are Phu Hoa Dong, Trung An, Tan Thanh Dong and Tan Phu Trung where

the Project take place.

(2) At the Project site: Interview affected households of the Project area, take

photos of typical cases.

1.2.4. Sampling

To ensure the sampling can be represented to all field of survey and must have

VAPs, the consultant chooses the sample of AHs as follows:

(1) All communes in the project area must be involved;

(2) Interview 100% of severely affected households (lost from 10% productive

land or 10% revenue);

(3) Interview 100% displaced households

(4) Interview 10% APs in approved compensation plans.

(5) Define all rights of APs were provided and that is suitable to matrix of

REMDPs/ LARAPs.

Table 1: Number of interviewed affected households

No Commune Number of APs Number of interviewed

APs in the fourth

monitoring phase

SAP AP Total SAP AP Total

1 Hoa Dong 1 57 58 1 7 8

2 Trung An 6 425 431 6 65 71

3 Tan Thanh 0 289 289 0 25 25

Page 10: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 10

Dong

4 Tan Phu Trung 0 46 46 0 15 15

Total 7 817 824 7 112 119

II. DOCUMENTS REVIEW

2.1. Project document

The consultant studied the following documents as follows:

- Resettlement plan (RP) (2012)

- Reviewed reports of project RP (2012)

- MOU of ADB (July 2015)

- DMS of compensation unit for APs

- Progress reports of Compensation and Site Clearance Board of Cu Chi district

- Decisions related to projects of People Committee of Cu Chi district and Ho Chi

Minh City

- Internal monitoring report is made by project implemented consultant

2.2. Project impacts according to RP

In Ho Chi Minh city, the Project goes through four communes of Cu Chi district

including: Phu Hoa Dong commune, Trung An commune, Tan Thanh Dong

commune and Tan Phu Trung commune, with a quite large number of AHs due to

the construction of foundation bases and impact of the Right of Way (ROW).

Summary of Project impacts on local households are as follows:

Table 2: Impacts due to the ROW in Cu Chi district

Commune No. of AHs Lands (m²)

Phu Hoa Dong 58 45.864,1

Trung An 388 280.647,3

Tan Thanh Dong 219 202.059,1

Tan Phu Trung 46 47.326,4

Total 711 575.896,9

Source: Compensation and Site Clearance Board of Cu Chi and AMT

Page 11: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 11

Table 3: Percentage of lands has using capacity restricted due to the ROW

over the total lands area

Commune Paddy Agricultural Residential Garden

Phu Hoa Dong 14.4 28.2 - -

Trung An 13.3 9.2 14.1 10.1

Tan Thanh Dong 14.6 11.7 - -

Tan Phu Trung 21.8 - - -

Scale of impact 11.4 14.0 14.1 10.1

Source: Resettlement Plan

Impacts caused by land acquisition for the construction of towers are presented in

Table 4 and Table 5.

Table 4: Comparison between lands owned by AHs and area of permanently

acquired lands

Commune No. of AHs

Lands (m²)

Total area Acquired %

Phu Hoa Dong 11 77,509 2,785 3

Trung An 58 119,500 7,377 8

Tan Thanh Dong 39 117,395 8,248 4

Tan Phu Trung 5 6,575 718 21

Total 113 320,979 19,128 37

Source: Compensation and Site Clearance Board of Cu Chi and AMT

Table 5: Ownership of AHs to types of lands

Types No. of AHs Lands (m²)

Total area Acquired area %

Paddy 56 200,092 11.739 5.9

Agricultural 35 85,114 5.126 6.0

Residential 6 11,535 1.151,7 10.0

Garden 16 24,238 1.228 5.1

Total 113 320,979 19.244,7 27

Source: Compensation and Site Clearance Board of Cu Chi and AMT

Page 12: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 12

Below are tables comparing the impacts at the time of forth monitoring phase in

September 2015 and those in the RP in Cu Chi district.

Table 6: Number of households permanently acquired land for 500kV Pleiku–

My Phuoc – Cau Bong transmission line project

No.

Content Total AHs

according to RP

Total AHs in

reality (by the

monitoring time)

1 Number of AHs

permanently acquired

land

96 113

2 Total area of permanently

acquired land (Unit: m2)

19,128 19,244.7

Source: Compensation and Site Clearance Board of Cu Chi district and CPMB

From Table 6, there is an insignificant difference in the number AHs permanently

acquired land and total area of the acquired land listed in RP compared with actual

data at the time of the forth monitoring period. Updated data provided by the

compensation-site clearance committee in Cu Chi District showed that number of

AHs in reality increased by 16% compared with the number in the RP and the

acquired land in reality increased only 2.7%. However, there is a huge difference

between number of AHs and affected land area by ROWs in reality and data in RP

shows a huge difference. Table 7 shows comparison between the number of AHs

and land area affected by ROWs and data collected in reality.

Table 7: Number of households affected by ROWs for 500kV Pleiku - My

Phuoc - Cau Bong transmission line project

No. Content According to RP In reality (by the

monitoring time)

1 Number of households

affected by route corridor 105 711

2 Total land area in ROWs

(Unit: m2)

34,676 595,146.6

Source: Compensation and Site Clearance Board of Cu Chi district and CPMB

Accordingly, the number of AHs in reality increased 14.8 times and affected land

area increased 5.8 times compared with data in the RP. After reviewing the RP data,

there are irrational points in assess the impact of ROWs. Specifically, according to

the data in the RP, the total length of lines in Cu Chi is 14.011km; prescribed

ROWs width is 32m from the centerline. With such length and width of ROWs, the

area affected by the ROWs as in RP is unreasonable. This leads to the result that

number of affected households and properties is much lower in RP than in reality.

This is shown in Table 8.

Page 13: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 13

Table 8: Trees affected by the 500kV Pleiku – My Phuoc – Cau Bong TL

No. Types Amount in RP (trees/m2)

Total amount in

reality (trees/m2)

1 Industrial 342 2,581

2 Paddy and grass 1,200 2,785

Source: Compensation and Site Clearance Board of Cu Chi district and CPMB

2.3. Legal basis for determining entitlements

The Resettlement Plan of the Project was compiled on the basis of Policy on

Involuntarily Resettlement of ADB and other laws, regulation of Vietnamese

Government, in particular:

2003 Law on Land, promulgated on November 26th

, 2003 by Vietnam’s

National Assembly.

Government’s Decree No.84/2007/ND-CP, dated May 25th

, 2007, providing

additional guidance on the grant of land use right certificates, land recovery,

exercise of land use rights, order and procedures for compensation, assistance

and resettlement when land is recovered by the State.

Government’s Decree 197/2004/ND-CP, dated December 3rd

, 2004, regulating

compensation, assistance and resettlement when the State acquires the land.

The Decree provides guidance on implementation of land compensation,

assets compensation, support and resettlement policy related to land

acquisition.

Government’s Decree 69/2009/ND-CP, dated August 13th

, 2009, additionally

providing for land use planning, land acquisition, compensation, assistance

and resettlement in case of land acquisition, regulating the land price, land

allocation and lease, and additional requirements related to land use rights.

Government’s Decree 106/2005/ND-CP dated August 17th

, 2005, regulating

the protection and safety corridor of high-voltage power grid works. Some

articles of this decree was amended and supplemented by Decree 81/2009/ND-

CP dated October 12th

, 2009.

Dispatch 5203/BTC-NL dated 13/06/2011 on 500kV Pleiku-My Phuoc- Cau

Bong transmission line project by Ministry of Industry and Trade

Government’s Decision 331/QĐ-EVN dated 27 May 2011 on approved 500kV

Pleiku – My Phuoc – Cau Bong transmission line of Vietnam Electricity

Corporation

Government’s Decision 52/2012/QD-TTg dated November 16th

, 2012 on

employment and vocational training support policies for laborers subject to

agricultural land recovery.

Page 14: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 14

Circular 144/2004/TT-BTC, dated November 26th

, 2004, of the Ministry of

Finance providing guidelines on the implementation of Government’s Decree

188 on land price evaluation.

Circular No. 14/2009/TT-BTNMT dated October 1st, 2009 of the Ministry of

Natural Resources and Environment, detailing the compensation, assistance

and resettlement and order of and procedures for land recovery, allocation and

lease.

Decisions of People Committee of Ho Chi Minh city

Decision 35/2010/QĐ-UBND dated 28/5/2010 on regulating the policies of

compensation and support on house, structure on land, trees and crops when

the State recovered land by PC of Ho Chi Minh city.

Decision 66/2012/QĐ-UBND dated 28/12/2012 regulating on standard tariffs

of investment rate of construction in Ho Chi Minh city

Decision 61/2012/QĐ-UBND dated 22/12/2012 on regulating the land price in

Ho Chi Minh city by PC of Ho Chi Minh city

The dispatch 4772/UBND-ĐTMT dated 17/9/2012 regulating the price on

compensation and support of construction 500kV Pleiku – My Phuoc – Cau

Bong transmission line, Cu Chi district, HCM city by PC of Ho Chi Minh city.

Dispatch 1268/SNN-KHTC dated 8/8/2012 regulating on the price on

compensation of trees and crops in the project 500kV Pleiku – My Phuoc –

Cau Bong transmission line, Cu Chi district, HCM city by Department of

Agriculture and Rural Development

Dispatch 8862/VP-ĐTMT dated 7/11/2012 on implementing compensation

and resettlement in the project 500kV Pleiku – My Phuoc – Cau Bong

transmission line, Cu Chi district, HCM city

The decision 2590/QĐ-UBND dated 15/3/2013 on approving compensation,

support and resettlement on approving the compensation, support and

resettlement the foundation location in project 500kV Pleiku – My Phuoc –

Cau Bong transmission line, Cu Chi district, HCM city by PC of Ho Chi Minh

city.

The decision 10616/QĐ-UBND dated 17/10/2013 on approving compensation,

support and resettlement on approving the compensation, support and

resettlement HL location in project 500kV Pleiku – My Phuoc – Cau Bong

transmission line, Cu Chi district, HCM city by PC of Ho Chi Minh city.

II. THE RESULT AND EVALUATION OF THE FORTH MONITORING

PHASE

In the forth monitoring period, recommendation of consultant with the issues of the

third monitoring phase have been solved basically by CSCB of Cu Chi district and

AMT, some issues and recommendation have been continuously implemented in the

forth monitoring phase.

Page 15: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 15

The result of interviewing APs, consultation, information dissemination have to

implement from Project preparation period, the compensation had been public

transparency. The compensation and support policies are in compliance with RP

and get the agreement from APs.

3.1. Consultation, participation and information dissemination

At the time of the forth monitoring phase, the compensation, assistances and

resettlement activities in Cu Chi district has been completed. The dissemination of

information and communication are in compliance with RP. During the monitoring

in Cu Chi district, the Consultant recognized the following methods of information

dissemination that have been executed

- Posting RP at the headquarter of PCs of communes;

- Posting the land acquisition policy at PCs of communes;

- Organizing meetings at PCs of communes to publicize the scale of the project, the

compensation rate and rehabilitation measures;

- Publicly posting the detailed compensation plans at PCs of communes in order to

collection comments of households before approving the compensation payment

plans;

- Publicize the decisions approving detailed compensation plans;

- Disseminating information and providing the resettlement location, house/lot

price.

Therefore, the methods of information dissemination of the Project have been

sufficiently implemented and ensured that the AHs have received complete

information and policies of the Projects. The interview results of these two

monitoring phase have proved that the AHs recognized and appreciated the

information dissemination of the Project. 92% interviewers access the information

by meeting, 97% interviewers access the information by posting public and 100%

interviewers access the information by local media and direct dissermination

Table 9: The result of interviewing APs on methods of information

dissermination and consultation

No Commune

Numb

er of

intervi

ewers

Number of households anser “yes” in each

question

Meeting Public

posting Local media

Direct

dissermin

ation

1 Phu Hoa Dong 8 8 7 8 8

2 Trung An 71 64 69 71 71

3 Tan Thanh

Dong 25 22 25 25 25

4 Tan Phu Trung 15 15 15 15 15

Total 119 109 116 116 119

Page 16: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 16

3.2. Inventory of assets and compensation plan

Up to the time now, inventory of assets has been completed. APs đin’t keep/ kept

the inventory minutes so we can/can’t compare/check. Now, Ho Chi Minh city had

no one who was lack of asset inventory.

These minutes have been the participated of representatives of local authorities and

CSCB. The details of inventories have been recorded in inventory minutes. In the

forth monitoring phase, 100% of the households participating in the DMS and

signed the minutes of inventory.They also had seen the compensation plan before

they received money, the compensation plan was posted in PCC.

Table 10. The adequacy of asset quantity of AHs

(Unit: household)

No Commune

Participate

in the DMS

The

adequacy of

asset

inventory

Sign in the

inventory

minute

Keeping

compensation

value minute

Yes No Yes No Yes No Yes No

1 Phu Hoa Dong 8 0 8 0 8 0 8 0

2 Trung An 71 0 71 0 71 0 71 0

3 Tan Thanh

Dong 25 0 25 0 25 0 25 0

4 Tan Phu Trung 15 0 15 0 15 0 15 0

Total 119 0 119 0 119 0 119 0

3.3. Application of price

The compensation rate of the Project applied in Cu Chi has neither changed nor

adjusted. In general, most of AHs have agreed with applied rate and accepted the

payment. However, in some cases, Cu Chi CSCB has conducted adjustments in the

rate in order to ensure the rehabilitation for these households. In particular, for the

cases of 5 households having houses entirely cleared as they located under the

ROW of the TL, as these 5 households built their houses on agricultural lands, thus

they can only receive assistances equal to 80% of the agricultural lands in the area,

according to the policy. After receiving grievances from these households, District’s

CSCB has proposed to PC of the city to compensate for them in the value that equal

to 100% of the price of residential lands in the area. Accordingly, the PC of Ho Chi

Minh city has accepted the proposal and currently the households has received the

remaining compensation value that come from the difference between price rate of

residential and agricultural lands.

3.4. Compensation payment

Page 17: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 17

As the compensation payments were made along with the construction progress of

the Project, by the forth monitoring phase, those households which have not

received the compensation, the reasons (i) 40 households which lost their Land Use

Right Certificate (LURC), households which sold their lands to other people,

households having lands in dispute or are mortgaged for banks’ capitaland (ii) 23

lands which have not found their owners. These lands belong to families in other

areas that came to Cu Chi to buy lands and cannot be contacted during the Project’s

implementation.

The unpaid amount of 40 households was kept in the banks and the households

might withdraw the original amount and its interest whenever they completed the

procedure and documentation for receiving money. Besides, the amount of

compensation for 23 lands having owners unknown was kept in the local treasury

Up to the forth monitoring phase, number of APs received money and hand over

land is demonstrated in the table below:

Table 11: Number of APs received money and handover land

No 500kV line plan Number

of APs

in plan

Number

of real

APs

No. of

HHs

received

No. of

HHs

having

money

kept in

banks

Number

of land

having

money

kept in

local

treasury

Number

of HH

handover

land

1 Part 54 towers 110 113 108 5 113

2 ROWs 707 711 653 35 23 688

The first phase 307 312 301 11

The second phase 137 138 135 3

The third phase 160 162 146 16

The forth phase

HH 68 76 71 5

lands having

owners unknown 35 23 23

Total 817 824 761 40 23 801

Source: Compensation and Site Clearance Board of Cu Chi district

The summary of the payments of compensation in Ho Chi Minh city is

demonstrated as follows:

Page 18: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 18

No. Items

Paid Unpaid

Paid amount

(VND)

Lands

with

unknown

owners

Unpaid

amount

(VND)

1 Towers 108 10,830,132,319 5 0 379,650,580

2 ROWs 653 127,118,725,260 35 23

Total 761 137,948,957,579 40 23 379,650,580

3.5. Providing assistances

In the forth monitoring phase, the Consultant has reviewed the assistance policies

applied in Cu Chi as well as collected comments from AHs about the assistances.

By the present, the assistance policies in Cu Chi include:

3.5.1. Job changing assistances

In fact, the AHs in Cu Chi district having agricultural lands acquired have been

supported for changing job in a rate equal to 2.4 times the price of agricultural land.

This assistance was provided based on the Dispatch No. 4772/UBND-DTMT of the

PC of Ho Chi Minh city dated 17 September 2012.

3.5.2. Assistances for agricultural lands in the ROWs

Within the scope of 500kV Pleiku – My Phuoc – Cau Bong transmission line

Project in Cu Chi, besides the construction of new 500kV TL, the Project also

includes items of upgrading, renovating the old 500kV and 110kV TLs in the area.

The upgraded 500kV TLs within the Project’s scope are the 500kv Pleiku – Phu

Lam TL.

For the households having agricultural lands affected by the ROWs of the 500kV

Pleiku – My Phuoc – Cau Bong TL Project, the authority of Ho Chi Minh City has

applied the two following assistance policy:

Table 13: The assistance rate for lands affected by the ROWs in Cu Chi

Construction items Assistance rate Reference

Renovating the 500kv

Pleiku – Phu Lam TL

70% of compensation rate

for agricultural lands of

the same position

provided by Dispatch No.

4772/UBND –DTMT

- Announcement No.

620/TB-VP dated 26

August, 2013 of the

Office of HCMC’s PC.

- Dispatch No.

6250/UBND-BTGPMB

dated 21 August, 2013 of

Cu Chi’s PC.

New construction and

upgrade the 500kV North

80% of compensation rate

for agricultural lands of

Dispatch No.

4058/UBND-DTMT dated

Page 19: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 19

Construction items Assistance rate Reference

– South TL, the 110kV

Tan Dinh – Phu Hoa

Dong – Cu Chi

the same position

provided by Dispatch No.

4772/UBND –DTMT

14 August, 2012 of

HCMC’s PC

The assistance rate for households located under the ROWs of the old 500kV Pleiku

– Phu Lam is set at 70% as they have received the compensation for the affected

land during the construction of the TL in 2001. However, at that time, the

cooperation of relevant parties in implementing the project was not in harmony,

thus the LURCs of households were not acquired. Therefore, the households

continued to live and cultivate on the acquired lands.

According to provided policies, those households would not be able to receive any

compensations or assistances as their lands have been acquired since 2001.

However, in order to minimize the impacts on livelihood of households, the PC of

HCMC has accepted the assistance rate of 70% the compensation rate for

agricultural lands of the same position provided by Dispatch No. 4772/UBND –

DTMT.

Besides, Cu Chi district also applied the temporary residential assistances,

allowances for resettlement for households which have houses relocated due to the

impacts of the ROWs under the 500kV Pleiku – My Phuoc – Cau Bong. Details of

these assistances were mentioned in the table below:

Table 14: Summary of households received job changing assistance and the

amount being paid

No. Communes No. of AHs Paid amount (VND)

1 Phu Hoa Dong 6 413,595,600

2 Tan Thanh Dong 12 367,735,680

3 Tan Phu Trung 5 257,587,200

4 Trung An 21 1,279,430,880

Total 44 2,318,349,360

Source: Compensation and Site Clearance Board of Cu Chi district

3.6. Severely affected households

RP of the Project in HCMC mentioned groups of severely affected households

which were: (i) households lost from 10% productive land or assets ii) have to

relocate and/or lost from 10% their revenue. By the time monitoring, there were 6

displaced house and affected structure and 1 household lost over 10% agricultural

land. These households beside received compensation and assistance in their land,

they received the following assistances:

Page 20: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 20

- Support for replacement cost 4,000,000 VND/household, including

households of Nguyen Van Phuoc, Ho Thi Kim Oanh, Ho Thi Huyn , Duong

Quoc Khanh and Nguyen Thi Ro

- Support for temporary migration cost VND 3,000,000/household/month in

six months for households with four persons or less, including households of

Mr. Nguyen Van Phuoc, Mr. Duong Quoc Khanh and Mrs. Nguyen Thi Ro.

- Support for temporary migration cost 750,000VND/person/month in six

months for households with five persons or more, including households of

Mrs. Ho Thi Huyen and Mrs. Ho Thi Kim Oanh.

- Compensation and support the land area affected by unit land (of the

households in the fact that agricultural land).

- Support for job changing cót 2.4 times agricultural land

After receiving compensation and assistance, these holdhouses displaced

themselves. The list of SAP in Annex 3.

3.7. Vulnerable households

RP of the Project in HCMC mentioned 6 groups of vulnerable households which

were: (i) households with many dependent demographic of female-headed

households, (ii) disabled headed households, (iii) households with incomes below

the poverty level, (iv) households have elderly people and children that do not have

land and other forms of livelihood, (v) households do not have land, and (vi)

households are ethnic minorities. Distribution of vulnerable groups according to the

RP as below

Table 15: Distribution of severely affected and vulnerable households

No.

District/Commune

Number of AHs

SAHs

Vulnerable people

Difficulty

HH

Poor

HH

Female-

headed

HH

Elderly

people

HH

Disable

HH

Policy

HH

Ethnic

minority

1 Tan Thanh Dong 2 0 0 2 0 0 0 0

2 Phu Hoa Dong 6 0 0 5 0 0 0 0

3 Tan Phu Trung 0 0 0 1 0 0 0 0

4 Trung An 0 0 0 1 0 0 0 0

Total 8 0 0 9 0 0 0 0

For poor families, families under preferential treatment policy, the CSCB applies

support in addition to support for land acquisition. Average support levels from 1

million to 5 million for poor households and other policy households depend on

each type of household. These supports have complied with the provisions of RP

about support for vulnerable households. In addition, vulnerable households receive

more attention from project staff in the information dissemination process,

especially for the elderly, single women.

Page 21: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 21

After receiving compensation for properties damage, the living conditions of

vulnerable groups are not lower than those affected by the project. Households have

used the compensation to invest in repairing, renovating houses and deposit in the

bank.

3.8. Gender issues

The Project has no discrimination in impacts between female or male households

head headed households are female or male, land acquisition and land use

restrictions are the same. During Project implementation, AMT comply with ADB's

Policy on Gender and Development (1998) as a key strategy to promote fair. As a

project policy in resettlement and development of ethnic minorities’ framework, the

assets of the female-headed affected households will be assessed like male-headed

households, i.e. compensation is based on replacement cost, before the Project, and

will receive the benefits and proper support.

Through interviews with female-headed households, the consultant noted that 100%

of these households were receiving adequate compensation, assistancet and with no

discrimination with male-headed households. At the communes where the

monitoring team worked, local officials said the consulting and disclosing activities

had the full participation of representatives of Women Organization and the

concerned mass organizations to ensure full benefits to all sectors of the population.

In addition, representatives of Women Organization in Cu Chi District also

involved in the composition of the board of Compensation, Assistance and

Resettlement Council of the Project at Cu Chi. In addition to the above activities,

the women in the commune also participated in the activities such as: female

household headers as well as all women in the commune are provided the interests

of medical care and counseling on reproductive health, and participate in the

process of poverty reduction loans.

Besides, children from poor households are exempt from tuition fees, support health

insurance costs and other support in accordance with regulations. Women and elder

people who are not able to change career, request loans support for dairy farming

and support in job training for children to do and working in the local industrial

park.

3.9. Livelihood rehabilitation program

As mentioned above, this project only recoverd temporary land to build foundation

tower and the affected area was not large, not affected so much to AP’s production.

Th APs in ROWs in Cu Chi district still plant annualy trees like rice, fress grass for

cattle, banana, payaya…

Page 22: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 22

Compensation and site clearance applied all rights for APs as (i) assistance for job

changing for HHs lost productive land; (ii) assistance for displaced house and

livelihood rehabilitation in case of displacement; (iii) assistance for decreasing land

use ability (land in ROW). According to consultant, these assistances are suitable

and useful to APs.

Page 23: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 23

In the forth monitoring phase, the livelihood rehabilitation of AHs as follows:

Table 16: Kinds and rate of affected job and livelihood

No Kinds of affected

Rate of affected job and livelihood

Phu Hoa Dong Trung An Tan Thanh Dong Tan Phu Trung

SAP AP SAP AP SAP AP SAP AP

1 Displaced households 1 0 6 0 0 0 0 0

0,47% 0,00% 2,96% 0,00% 0,00% 0,00% 0,00% 0,00%

2 APs lost under 10% agricultural

land

0 7 0 65 0 25 0 15

0,00% 3,30% 0,00% 32,02% 0,00% 5,21% 0,00% 15,79%

Total

1 7 6 65 0 25 0 15

0,47% 3,30% 2,96% 32,02% 0,00% 5,21% 0,00% 15,79%

Page 24: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 24

3.10. Grievances and grievances redress

About process of grievance and proposal in compensation and resettlement, 100%

interviewers said that they understand this process. Up to monitoring time, the main

complain issues are:

Complaints about compensation prevention due to lands disputes: For the

complaints related to compensation prevention, CSCB of Cu Chi district has

organized meetings with relevant parties and reconciled disputes. Besides,

representatives of CSCB together with cadastral officials of communes have

conducted measurements and verified documentation in necessary cases to ensure

the entitlement of parties.

Complaints about price: In the complaints about price, most households did not

agree with the assistance rates of 80% and 70% the agricultural land price of the

affected areas. At the same time, some households have had the question about the

gap of 10% between the 70% rate for the 500kV Pleiku – Phu Lam TL and the 80%

rate of the old 500kV North – South TL. Similar to the cases mentioned above,

some households did not clearly understand that lands under the ROW would not be

acquired. Therefore, when they received 70% and 80% of the land price, they have

had complained and asked to be compensated with 100% of the value.

Table 16: Kinds of grievances

No. Grievance Number Number that no be solved

1 Land dispute 11 0

2

Lack in inventory of

assets 4 0

3 Compensation rates 62 0

4

Request on acquisition of

remaining area 1 0

Total 78 0

Grievances and grievance solution as belows:

Page 25: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 25

Table 1: Grievance and grievance solution

No Name Address Proposal Solution

1 Bui Hoang Anh

57, group 2, Hoi Thach

hamlet, Trung An

commune, Cu Chi district

Propose PC of Cu Chi district

postpone to pay compensation to Mr

Dang Duy Nha. When the state define

his land, he will be paid compensation

PC Cu Chi had dispatch

6448/UBND-VP-TCD dated

28/8/2013 to solve the complain

letter of Mr Bui Hoang Anh

2 Nguyen Thi Xi

No 132/12, group 2A

Trung An road, Market

hamlet, Trung An

commune, Củ Chi district

To prevent paying compensation land

use right No CH1706 in the map No

33, land lot No 225 dated 20/12/2011

District PC had Dispatch No

38/UBND-VP-TCD dated

7/10/2013 to solve the complain

letter of Ms Nguyễn Thị Xi.

3 Nguyên Van Xieu Market hamlet, Trung An

commune, Củ Chi district To prevent to pay compensation

District PC had Dispatch No

7480/UBND-VP-TCD dated

1/10/2013 to solve the complain

letter of Mr. Nguyen Van Xieu

4 Pham Thi Chin Hamlet4, Hoa Phu

commune, Cu Chi district To prevent to pay compensation

District PC had Dispatch No

8146/UBND-VP-TCD dated

22/10/2013 to solve the complain

letter of Ms. Phạm Thị Chín.

Page 26: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 26

No Name Address Proposal Solution

5 Phan Thị Hằng Ấp Phú Trung, xã Phú Hòa

Đông To prevent to pay compensation

District PC had Dispatch No

8139/UBND-VP-TCD dated

22/10/ to solve the complain letter

of Ms.Phan Thị Hằng.

6 Nguyễn Thị Hoa

136 Market hamlet, Trung

An road, Trung An

commune, Củ Chi District

To prevent to pay compensation

District PC had Dispatch No

8510/UBND-VP-TCD dated

6/11/2013 to solve the complain

letter of Ms Nguyễn Thị Hoa.

7 Mai Thị Mãnh An Hòa hmalet, Trung An

commune, Củ Chi District To prevent to pay compensation

District PC had Dispatch No

8455/UBND-VP-TCD

dated4/11/2013 to solve the

complain letter of Ms Mai Thị

Mãnh.

8 Hà Văn Sơn No 22/44B Hamlet 6A,

commune Tân Thạnh Đông To prevent to pay compensation

District PC had Dispatch No

7893/UBND-VP-TCD dated

16/10/2013 to solve the complain

letter of Mr Hà Văn Sơn. The

solution is completed

Page 27: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 27

No Name Address Proposal Solution

9 Nguyễn Văn Thanh

No 579, Provincial

Hightway15, group 3, 7A

hamlet, Tân Thạnh Đông

commune, Củ Chi district

To prevent to pay compensation

District PC had Dispatch No

8148/UBND-VP-TCD dated

22/10/2013 to solve the complain

letter of Mr. Nguyễn Văn Thanh.

10 Hồ Thị Kim Oanh

Group 9, Bốn Phú hamlet,

Trung An commune, Củ

Chi district

Propose more suitable compensation

because she lost 566,4m2 in which

having her house that she is living

District PC had Dispatch No

366/UBND-VP-TCD

dated18/3/2013 giải quyết đơn của

Bà Hồ Thị Kim Oanh.

11 Lê Mộng Tuyền

Group1, Market hamlet,

Trung An commune, Cu

Chi district

To prevent to pay compensation

District PC had Dispatch No

1852/BC-BBT dated 19/8/2013 to

solve the complain letter of Ms Lê

Mộng Tuyền.

12 Nguyễn Văn Khoe Hội Thạnh hamlet, Trung

An commune

Increase the compensation from

300.000 VND/m2 to 962.500

đồng/m2 with the area 1.367,7m2

District PC had Dispatch No

7277/QĐ-UBND dated 18/06/2014

to solve the complain letter of Mr

Nguyễn Văn Khoe.

Page 28: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 28

No Name Address Proposal Solution

13 Phạm Văn Giả An Hòa hamlet, Trung An

commune

Increase the compensation from

243.200 VND/m2 to 962.500

đồng/m2 with the area 1.053,6m2

District PC had Dispatch No

2521/QĐ-UBND dated 13/04/2014

to solve the complain letter of Mr

Phạm Văn Giả.

14 Nguyễn Trong Nghia Market hamlet, Trung An

commune

The compensation for 1.8m2 is not

correct, propose to measure again his

affected area

District PC had Dispatch No

5206/UBND-TTH dated

14/07/2014 to solve the complain

letter of Mr Nguyễn Trong Nghia.

15 Đô Văn Hư Group 6 An Hòa hamlet,

Trung An commune

Increase the compensation from

243.200 VND/m2 to 962.500

đồng/m2 with the area 728,3m2

District PC had Dispatch No

2074/QĐ-UBND dated 26/03/2015

to solve the complain letter of Mr

Đô Văn Hư

16 Mai Thị Hà Group 6 An Hòa hamlet,

Trung An commune

Increase the compensation from

243.200 VND/m2 to 962.500

đồng/m2 with the area 702,1m2

District PC had Dispatch No

7245/QĐ-UBND dated 18/06/2014

to solve the complain letter of Ms

Mai Thị Hà

17 Nguyễn Thị Xiêm An Binh hamlet, Trung An

commune

Propose compensation for 300m2

residential land because she

considered that her land use right

certificate is agricultural land but she

built her house in this land from 1992.

District PC had Dispatch No

6784/UBND-TTH dated

17/09/2014 to solve the complain

letter of Ms Nguyễn Thị Xiêm

Page 29: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 29

No Name Address Proposal Solution

18 Dương Thị Phơ Group 1, hamlet 4, Hòa

Phú commune

Increase the compensation 300.000

VNDm2 to redential land in location

1, hamlet level 1, the surface land in

Provincial highway 8 with the amount

1.917,6m2 because she considered

that her land is nearer Provincial

Highwway 8 to Trung An Road

District PC had Dispatch No

7846/QĐ-UBND dated 30/06/2014

to solve the complain letter of Ms

Dương Thị Phơ

19 Nguyễn Quốc My Group 2, Market hamlet,

Trung An commune

Increase the compensation from

243.200 VND/m2 to 962.500

đồng/m2 with the area 948,2m2

District PC had Dispatch No

7845/QĐ-UBND dated 30/06/2014

to solve the complain letter of Mr

Nguyễn Quốc My

20 Thai Văn Khanh Hội Thạnh hamlet, Trung

An commune

1. Propose the rest area (268,5m2) that

is not affected by ROW District PC had Dispatch No

7843/QĐ-UBND dated 30/06/2014

to solve the complain letter of Mr

Thai Văn Khanh 2. Propose compensation for 300m

2

residential land because he said that

his land use right certificate is

residential land

21 Hồ Thị Kim Oanh

39/33 Road Trung An, Bốn

Phú hamlet, Trung An

commune

Increase land price

District PC had Dispatch No

6295/QĐ-UBND dated 27/56/ to

solve the complain letter of Ms Hồ

Thị Kim Oanh

Page 30: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 30

No Name Address Proposal Solution

22 Nguyễn Thị Diệu Út

22/2A Road 464 Group 6,

An Hòa hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

912.800 VND/m2

Dispatch 548/TB-VP dated

15/12/2014 transfer to

Environment- Resource

Department having consultation of

Expertise Board

23 Nguyễn Thị Rơ

330A Road Trung An, An

Bình hamlet, Trung An

commune

Compensate supplemental area

290,8m2 do chênh lệch giữa gia đất

chuyên dùng và gia đất nông nghiệp

Dispatch 548/TB-VP dated

15/12/2014 transfer to

Environment- Resource

Department having consultation of

Expertise Board

24

Nguyễn Thị Bích Vân

251B Road Sông Lu,

Market hamlet, Trung An

commune

1. Applied compensation area (that

she is affected in this project) with the

price 912.800 VND/m2

District PC had Dispatch No

2897/QĐ-UBND dated 29 tháng 4

năm 2015 to solve the complain

letter of Ms Nguyễn Thị Bích Vân

2. Define her affected location in this

project

25 Võ Thị Đạn

15/3 Road 462, Market

hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

912.800 VND/m2

District PC had Dispatch No 424

dated 29/07/2014 to solve the

complain letter of Ms Võ Thị Đạn

26 Mai Văn He Group 6 An Hòa hamlet,

Trung An commune

Revoked Decision No 9092/QĐ-

UBND dated 14/08/2014

District PC had Dispatch No

574/UBND-TTH dated 23/01/2015

to solve the complain letter of Mr

Mai Văn He

Page 31: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 31

No Name Address Proposal Solution

27 Hồ Văn Trinh

246/B Road Sông Lu, An

Hòa hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

912.800 VND/m2

District PC had Dispatch No

7844/QĐ-UBND dated 30/06/2014

to solve the complain letter of Mr

Hồ Văn Trinh

28 Huỳnh Văn Có Group 3 Market hamlet,

Trung An commune

Applied compensation area (that she is

affected in this project) with the price

912.800 VND/m22.000.000 VND/m

2

District PC had Dispatch No

16432/QĐ-UBND dated

21/11/2014 to solve the complain

letter of Mr Huỳnh Văn Có

29 Nguyễn Thị Hoa

1508A Provincial highway

8, hamlet 4, Hòa Phú

commune

Applied compensation area (that she is

affected in this project) with the price

243.200 VND/m2

District PC had Dispatch No

2681/QĐ-UBND dated 21/04/2015

to solve the complain letter of Ms

Nguyễn Thị Hoa

30 Hồ Văn Cẩu

04 Võ Thị Hồng, Market

hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

912.800 VND/m2

District PC had Dispatch No

976/QĐ-UBND dated 06/02/2014

to solve the complain letter of Mr

Hồ Văn Cầu

31 Trần Đức Anh

30 Võ Thị Hồng, Market

hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

912.800 VND/m2

District PC had Dispatch No

2680/QĐ-UBND dated 21/04/2014

to solve the complain letter of Mr

Trần Đức Anh

32 Trương Tuấn Anh

8/5/1 Road 464, An Hòa

hamlet, Trung An

commune

1. Applied compensation area (that

she is affected in this project) with the

price 500.000 VND/m2

District PC had Dispatch No

977/QĐ-UBND dated 06/02/2014

to solve the complain letter of Mr

Trương Tuấn Anh 2. Compensate supplement trees,

crops that he affected in this project

Page 32: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 32

No Name Address Proposal Solution

33 Hà Yến Loan

19A Road 457, Hội Thạnh

hamlet, Trung An

commune

1. Applied compensation area (that

she is affected in this project) with the

price 962.500 VND/m2

District PC had Dispatch No

9933/QĐ-UBND dated 10/09/2014

to solve the complain letter of Ms

Hà Yến Loan 2. Compensate supplement house and

fence that she affected in this project

34 Hồ Văn Choi

21 Road 467, An Hòa

hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

243.200 VND/m2

District PC had Dispatch No

10801/QĐ-UBND dated

08/10/2014 to solve the complain

letter of Mr Hồ Văn Choi

35 Bùi Văn Trung Group 1 Market hamlet,

Trung An commune

Applied compensation area (that she is

affected in this project) with the price

962.500 VND/m2

District PC had Dispatch No

2076/QĐ-UBND dated 26/03/2015

to solve the complain letter of Mr

Bùi Văn Trung

36 Nguyễn Sơn Hà

23 Road 464 An Hòa

hamlet, Trung An

commune

Applied compensation area (that she is

affected in this project) with the price

912.800 đồng/m2

District PC had Dispatch No

8346/QĐ-UBND dated 18/06/2014

to solve the complain letter of Mr

Nguyễn Sơn Hà

37 Diệp Văn Tiên

No 21, Road 457,Group 5,

Hội Thạnh hamlet, Trung

An commune, Củ Chi

district, Hồ Chí Minh city

Increased compensation from 375,000

VND/m2, coefficient 80% to 962.500

VND/m2 with the area 1.861,2m2

District PC had Dispatch No

8347/QĐ-UBND dated 18/06/2014

to solve the complain letter of Mr

Diệp Văn Tiên

38 Dương Thị Kiền

Group 7, Hội Thạnh

hamlet, Trung An

commune, Củ Chi district,

Increased compensation from 300.000

VND/m2 to 962.500 VND/m2 with

the area 380,3m2

District PC had Dispatch No

397/QĐ-UBND dated 22/01/2015

to solve the complain letter of Ms

Dương Thị Kiền

Page 33: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 33

No Name Address Proposal Solution

39 Dương Thị Ngoc

Danh

No 10/2 Road 123, Group

2 Hamlet 6, Tân Thạnh

Đông commune, Củ Chi

district, Hồ Chí Minh city

Increased compensation from 304,000

VND/m2, coefficient 80% to 912.800

VND/m2 with the area 496,3m2

District PC had Dispatch No

14708/QĐ-UBND dated 4/11/2014

to solve the complain letter of Ms

Dương Thị Ngoc Danh

40 Đô Thị Tấn Group 2, Market hamlet,

Trung An commune

Increased compensation from 243.200

VND/m2 to 962.500 VND/m2 with

the area 1.172,1m2

Rút đơn khiếu nại

41 Đô Văn Ê

No 12/C Road 469, Group

5, An Hòa hamlet, Trung

An commune, Củ Chi

district

Increased compensation from 304,000

VND/m2, coefficient 70% to 912.800

VND/m2 with the area 128.2m2 and

increased compensation from 304,000

VND/m2, coefficient 80% to 912.800

VND/m2 with the area 1.437,6m2

District PC had Dispatch No

11122/QĐ-UBND dated 23 /10/

2014 to solve the complain letter of

Mr Đô Văn Ê

42 Hà Thị Hoa Group 4, Market hamlet,

Trung An commune

Increased compensation from 243.200

VND/m2 to 962.500 VND/m2 with

the area 1.894,4m2

District PC had Dispatch No

11123/QĐ-UBND dated 23 /10/

2014 to solve the complain letter of

Ms Hà Thị Hoa

43 Huỳnh Văn Tia Hội Thạnh hamlet, Trung

An commune

Increased compensation from 243.200

VND/m2 to 962.500 VND/m2 with

the area 1.838,4m2

District PC had Dispatch No

10898/QĐ-UBND dated

14/10/2014 to solve the complain

letter of Mr Huỳnh Văn Tia

44 Nguyễn Tuấn Khanh Hamlet 5, Hòa Phú

commune, Củ Chi district

Increased compensation from 304,000

VND/m2, coefficient 80% to 912.800

VND/m2 with the area 481,1m2

District PC had Dispatch No

10899/QĐ-UBND dated 14/11/

2014 to solve the complain letter of

Mr Nguyễn Tuấn Khanh

Page 34: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 34

No Name Address Proposal Solution

45 Nguyễn Thị Xuân

Tuyết

Hội Thạnh hamlet, Trung

An commune, Củ Chi

district

Increased compensation from 304,000

VND/m2, coefficient 80% to 912.800

VND/m2 with the area 1.067,1m2 tư

District PC had Dispatch No

403/QĐ-UBND dated 22/ 01/ 2015

to solve the complain letter of Ms

Nguyễn Thị Xuân Tuyết

46 Nguyễn Thị Quê Market hamlet, Trung An

commune

Increased compensation from 243.200

VND/m2 to 962.500 VND/m2 with

the area 2.363,5m2

District PC had Dispatch No

404/QĐ-UBND dated 22/01/ 2015

to solve the complain letter of Ms

Nguyễn Thị Quê

47 Nguyễn Thị Thảo

No 17 Road 457, Group 2,

Hội Thạnh hamlet, Trung

An commune, Củ Chi

district

Increased compensation from 375,000

VND/m2, coefficient 80% to 962.500

VND/m2 with the area 112,8m2

District PC had Dispatch No

2888/QĐ-UBND dated 27/ 4/ 2015

to solve the complain letter of Ms

Nguyễn Thị Thảo

48 Nguyễn Văn Cat Group 2, Market hamlet,

Trung An commune

Increased compensation from 300,000

VND/m2, coefficient 80% to 962.500

VND/m2 with the area 958,3m2

District PC had Dispatch No

2889/QĐ-UBND dated 27/ 4/ 2015

to solve the complain letter of Mr

Nguyễn Văn Cat

49 Nguyễn Văn Cu Hội Thạnh hamlet, Trung

An commune

Increased compensation from 300,000

VND/m2 to 962.500 VND/m2 with

the area 1.052,5m2

Withdrawed grievance letter

50 Nguyễn Văn Hòa Hội Thạnh hamlet, Trung

An commune

Increased compensation from 300,000

VND/m2 to 962.500 VND/m2 with

the area 955m2

District PC had Dispatch No

405/QĐ-UBND dated 22/ 01/ 2015

to solve the complain letter of Mr

Nguyễn Văn Hòa

Page 35: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 35

No Name Address Proposal Solution

51 Nguyễn Văn Nhựt

No 394, Road Sông Lu, An

Hòa hamlet, Trung An

commune, Củ Chi district

Increased compensation from 304,000

VND/m2, coefficient 70% to 912.8

00 VND/m2 with the area 2.185,5m2

and increased compensation from

304,000 VND/m2, coefficient 80% to

912.800 VND/m2 with the area

562,7m2

Withdrawed grievance letter

52 Phạm Khăc Vu Group 2, Market hamlet,

Trung An commune

Increased compensation from 243.200

VND/m2 to 962.500 VND/m2 with

the area 1.423,6m2

District PC had Dispatch No

404/QĐ-UBND dated 22/ 01/ 2015

to solve the complain letter of Mr

Phạm Khăc Vu

53 Phạm Thị Ơ

No 5, Road 463, Group 1,

Market hamlet, Trung An

commune, Củ Chi district

Increased compensation from 243.200

VND/m2 to 962.500 VND/m2 with

the area 1.018,4m2

District PC had Dispatch No

406/QĐ-UBND dated 22/ 01/ 2015

to solve the complain letter of Ms

Phạm Thị Ơ

54 Thai Thị Chùm

No 283/3 Road Sông Lu,

Group 5, An Hòa hamlet,

Trung An commune, Củ

Chi district

Increased compensation from 304,000

VND/m2, coefficient 70% to 912.8

00 VND/m2 with the area 123,3m2

and increased compensation from

304,000 VND/m2, coefficient 80% to

912.800 VND/m2 with the area

1.436,6m2

District PC had Dispatch No

10800/QĐ-UBND dated 08/10/

2014 to solve the complain letter of

Ms Thai Thị Chùm

55 Thài Thị Nề

No 11/7/2 Road 469, An

Hòa hamlet, Trung An

commune, Củ Chi district

Increased compensation from 304,000

VND/m2 to 912.800 VND/m2 with

the area 404,1m2

District PC had Dispatch No

2890/QĐ-UBND dated 27/ 4/2015

to solve the complain letter of

MsThài Thị Nề

Page 36: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 36

No Name Address Proposal Solution

56 Trần Thị Hương

Group 5, An Hòa hamlet,

Trung An commune, Củ

Chi district

Increased compensation from 304,000

VND/m2, coefficient 80% to

912.800 VND/m2 with the area

498m2 (agricultural land in the

location that have no surface road)

District PC had Dispatch No

2890/QĐ-UBND dated 27/ 4/ 2015

to solve the complain letter of Ms

Thài Thị Nề

57 Võ Thị Minh Market hamlet, Trung An

commune

Increased compensation from 300,000

VND/m2 to 962.500 VND/m2 with

the area 242,7m2

District PC had Dispatch No

2893/QĐ-UBND dated 28/ 4/ 2015

to solve the complain letter of Ms

Võ Thị Minh

58 Võ Thị Nga Market hamlet, Trung An

commune

Increased compensation from 375,000

VND/m2 to 962.500 VND/m2 with

the area 109,4m2

District PC had Dispatch No

2894/QĐ-UBND dated 28/ 4 /2015

to solve the complain letter of Ms

Võ Thị Nga

59 Võ Văn Dạn Hội Thạnh hamlet, Trung

An commune

Increased compensation from 300,000

VND/m2 to 962.500 VND/m2 with

the area 1.665,6m2

District PC had Dispatch No

2895/QĐ-UBND dated 28/ 4/ 2015

to solve the complain letter of Mr

Võ Văn Dạn

60 Dương Thị Găng

No 17, Road 457, Group 2,

Hội Thạnh hamlet, Trung

An commune, Củ Chi

district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

9759/QĐ-UBND dated 05/9/2014

to solve the complain letter of Ms

Dương Thị Găng

61 Hồ Thị Thân

No 17/1 Road 469, An Hòa

hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

2584/QĐ-UBND dated 15/4/2015

to solve the complain letter of Ms

Hồ Thị Thân

Page 37: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 37

No Name Address Proposal Solution

62 Nguyễn Thị Lang Market hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

17050/QĐ-UBND dated

28/11/2014 to solve the complain

letter of Ms Nguyễn Thị Lang

63 Nguyễn Thị Minh Market hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

10957/QĐ-UBND dated 14/10/ to

solve the complain letter of Ms

Nguyễn Thị Minh

64 Nguyễn Văn Ảnh Market hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

401/QĐ-UBND dated 22/01/2015

to solve the complain letter of Mr

Nguyễn Văn Ảnh

65 Nguyễn Văn Hồng

No 251C, Group 1, Market

hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

399/QĐ-UBND dated 22/01/2015

to solve the complain letter of Mr

Nguyễn Văn Hồng

66 Nguyễn Văn Tài

No 1488 Provincial

highway 8, Group 9,

Hamlet 12, Tân Thạnh

Đông commune, Củ Chi

district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

400/QĐ-UBND dated 22/01/2015

to solve the complain letter of Mr

Nguyễn Văn Tài

67 Phạm Văn Thuộc An Hòa hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

2583/QĐ-UBND dated 15/4/2015 v

to solve the complain letter of Mr

Phạm Văn Thuộc

Page 38: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 38

No Name Address Proposal Solution

68 Võ Thị Gai

No 8/1/3B Road Sông Lu,

Group 6, An Hòa hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

2584/QĐ-UBND dated 15/4/2015

to solve the complain letter of Ms

Võ Thị Gai

69 Võ Thị Reo Market hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

18585/QĐ-UBND dated

09/12/2014 to solve the complain

letter of Ms Võ Thị Reo

70 Võ Thị Vân Market hamlet, Trung An

commune, Củ Chi district

Increase land price from

304.000VND/m2 to 500.000VND/m2

District PC had Dispatch No

10483/QĐ-UBND dated 30/9/2014

to solve the complain letter of Ms

Võ Thị Vân

71 Võ Văn Hùng Em

Group 2, Market hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

18587/QĐ-UBND dated

09/12/2014 to solve the complain

letter of Mr Võ Văn Hùng Em

72 Nguyễn Thị Hương

No 155, Trung An road,

Group 5, Market hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount 912.8000đ/m2

District PC had Dispatch No

1714/QĐ-UBND dated 06/3/2015

to suspend grievance solution of

Ms Nguyễn Thị Hương (because of

withdrawing grievance letter)

73 Võ Thị Chat Group 6, An Hòa hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

9756/QĐ-UBND dated 05/9/2014

to suspend grievance solution of Võ

Thị Chat (because of withdrawing

grievance letter)

Page 39: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 39

No Name Address Proposal Solution

74 Võ Thị Đèn Group 6, An Hòa hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

9758/QĐ-UBND dated 05/9/2014

to suspend grievance solution of

Ms Võ Thị Đèn (because of

withdrawing grievance letter)

75 Võ Thị Em Group 3, An Hòa hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

9757/QĐ-UBND dated 05/9/2014

to suspend grievance solution of

Ms Võ Thị Em (because of

withdrawing grievance letter)

76 Võ Thị Hằng

No 79, Trung An road,

market hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount

962.5000VND/m2

District PC had Dispatch No

10655/QĐ-UBND dated 02/10/ to

suspend grievance solution of Ms

Võ Thị Hằng (because of

withdrawing grievance letter)

77 Võ Thị Ơi

Group 4, market hamlet,

Trung An commune, Củ

Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount 304.000đ/m2

District PC had Dispatch No

18584/QĐ-UBND dated

09/12/2014 to suspend grievance

solution of Ms Võ Thị Ơi (because

of withdrawing grievance letter)

78 Nguyễn Văn Thói An Hoa hamlet, Trung An

commune, Củ Chi district

Land compensation as agricultural

land rate in the land lot with house

inside with the amount 304.000đ/m2

District PC had Dispatch No

797/TB-UBND dated 21/11/2014

to refuse the petition of Mr Nguyen

Van Thoi because it expires the

grievance

Page 40: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 40

3.11. Cooperation of agencies

PC of city and CPMB: at the preparation period for construction, CPMB under guidance

of city’s PC has combined with relevant branches and agencies to prepare the Project’s

location, route direction, project scale as well as request for principle on compensation on

the Project area. City’s PC has directly conducted the meeting to instruct relevant parties

to support CPMB at their best, in site clearance, construction activities, to complete the

Project’s implementation in the earliest time.

District’s PC/ CSCB: PC of Cu Chi district has directed the District’s CSCB to ensure the

progress of site clearance for the construction unit. District’s CSCB has closely

coordinated with CPMB in conducting information dissemination, asset inventory,

compensation plan establishment and payment for households, receiving and settling

complaints and questions. Until now, those works are conveniently implemented.

CPMB: appoints officials to regularly monitor the Project’s implementation, combining

with local authorities to timely detect difficulties and report to the higher level for

settlement. So that all raising matters during the Project’s implementation can be settled

in time to ensure project’s progress.

Communal PC: consulting AHs, appointing officials to participate in the inventory of

land and asset in the affected land, identifying the legality of affected assets; supporting

Board of compensation and site clearance of district to publicly post the compensation

plan and payment for households. A special element contributing to the rapid settlement

of complaints of AHs is that communal PC is the office directly receiving complaints and

questions of AHs. If possible, the communal PC shall directly explain to households, or

they can transfer the complaints to higher level for settlement as regulated by law.

Due to the close combination during the Project’s implementation, progress of site

clearance and compensation has been accelerated.

3.12. Summary the issues of the forth monitoring phase

Issues Contents of issues Propose solution Responsibilty Time

A. Compensation

1. Issue

- 40

households

haven’t

received

compensation

yet;

- 23 land lots

haven’t

found their

owners

- The HHs haven’t

received

compensation

because they lost

their LURC, sold

land for the others,

land in the period of

disputation, land that

is morgaged in the

bank

- For the APs who lost

LURC, the CSCB of Cu

Chi will work with other

authorities to help them to

make recopy.

- For the APs whose land

are mortgaged in the bank,

the CSCB will work with

the bank to borrow their

LURC, after receiving the

APs receive their

compensation, they will

pay that amount to the

bank.

CSCB of Cu Chi

district and AMT

Dec

2015

Page 41: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 41

Issues Contents of issues Propose solution Responsibilty Time

- 23land lots that haven’t

found the owners, continue

inform in newspaper and

media

B. Grievance and grievance solution

1. Issue

- Some

grievance

and propose

of APs

- CSCB of Cu Chi

district and AMT

haven’t found the

solution for APs

because the APs

recomend over

policy frame

- Although APs received

compensation and handed

over land, they still had

grievance. Need to solve

their grievances.

CSCB of Cu Chi

district and AMT

Dec

2015

Page 42: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 42

IV. CONCLUSION AND RECOMENDATION

4.1. Conclusion

From the abve analisys, we can conclude that in basically, the RP implementation in local

area complied approved RP.

1. Organization structure: the relevant organizations as regulted in RP implemented

their function and task well. This helped the project implementation favorably

2. Information dissermination was implemented adequately in project information,

compensation policy, grievance process and prievance solution, etc to AHs.

Therefore, up to now, there haven’t got any grievance in project information.

3. Inventory of assets, compensation plan and compensation payment implemented

with high agreement of AHs. Almost interviewers said that their assets was

invented,made compensation plan and paid adequately, no AHs complained about

lack of asset. It means the compensation complied adequately and in time

4. Compensation price: compensation price is sentative and it is the reason for

grievance of many projects. For 500KV Pleiku – My Phước – Cau Bong

transmission line project, through analysis and comparation the compensation

price in actual to compensation price in Vietnam law, the compensation price that

was applied in actual was higher than in Vietnam law. And up to the monitoring

time, there was no principal grievance in compensation price. This means the

compensation price had agreement of AHs.

5. Resettlement: All resettlement households were consulted and arranged as their

aspiration. Although displaced households were arranged in local current

resettlement place, 5 displacement households found the house for themselves

because they didn’t want to live far from their old houses. This means the

resettlement for HHs was complied.

6. Grievance and grievance solution: almost grievance of AHs was received and

solved satisfied. All grievance in the first, second and third report have been

solved.

Beside the positive points, there were some issues in RP implementation.

4.2. Recommendation

By researching the outstanding issues of the Project in Cu Chi, the Consultant have the

following recommendation as follows:

(i) The CSCB of Cu Chi cooperates with local authorities to find 23 land lots that

have found the owners in order to pay the compensation for them;

(ii) The relevant departments need to focus on stable livelihood rehabilitation for

AHs especially for VAPs, need to have long-term strategy for them in order

they have better living condition than after resettlement.

(iii) Build detail livelihood rehabilitation

(iv) Design livelihood model or activities for SAPs as each job that they are

working and their wishes.

(v) Livelihood rehabilitation program needs to have cooperation with local

authorities and relevant parties to make the best condition for SAPs in order

they can restore their income

Page 43: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 43

ANNEX 1. LIST OF PROJECT’S OFFICIALS APPROACHED

No. Agency Name of officials Position Number

I Central Power Projects Management Board

Mr. Le Dinh Quang Deputy Director 1

Mr. Nguyen Ngoc Tuan Deputy head of

Compensation

Department

1

Ms. Le Ngoc Hoang Official of Appraisal

Department

1

II Cu Chi CSCB

Mr. Nguyen Van Mieng Deputy head of CSCB 1

Mr. Nguyen Thanh Son Staff 1

III Phu Hoa Dong commune

Ms. Pham Thi Kim

Duyen

Vice President 1

IV Trung An commune

Mr. To Van Vung Vice President 1

V Tan Thanh Dong commune

Ms. Le Thi Mai Vice President 1

VI Tan Phu Trung commune

Mr. Tran Van Trung Cadastral Official 1

Page 44: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 44

ANNEX 2. LIST OF INTERVIEWED HOUSEHOLDS

No. Name Address

1 Hồ Thị Kim Oanh Village of Bon Phu, Trung An

commune

2 Nguyễn Văn Phước Village of Bon Phu, Trung An

commune

3 Mai Thị Hà Village of An Hoa, Trung An

commune

4 Hồ Văn Trinh Village of An Hoa, Trung An

commune

5 Nguyễn Thị Diệu Út Village of An Hoa, Trung An

commune

6 Dương Quốc Khanh Village of An Binh, Trung An

commune

7 Nguyễn Thị Xiêm

Village of An Binh, Trung An

commune

8 Nguyễn Thị Rỡ Village of An Binh, Trung An

commune

9 Võ Thị Đạn Village of Market, Trung An

commune

10 Huỳnh Văn Có

Village of Market, Trung An

commune

Page 45: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 45

ANNEX 3. LIST OF SAHs

No Name Address Type of

afection

Area in

plan

(m2)

Total of money

in plan (VND)

Area in

approved

compensation

plan (m2)

Total of money in

approved

compensation plan

(VND)

I Trung An

1

Nguyễn Văn Phước (kc:

8204-8205)

Group 2,

Village of Bon

Phu, Trung An

commune, Cu

Chi district

House and

structure 1747,8 357.341.460 1.747,8 378.023.640

2

Dương Quốc Khanh

(kc: 8211-8212)

Village of An

BinhTrung An

commune, Cu

Chi district

House and

structure 326,9 1.204.659.420 326,9 1.343.250.920

3

Nguyễn Thị Rơ (kc:

8211-8212)

Village of An

BinhTrung An

commune, Cu

Chi district

House and

structure 1698,4 2.002.823.320 1.698,4 2.092.845.640

4

Hồ Thị Kim Oanh (kc:

8211-8212)

Group 9,

Village of Bon

Phu, Trung An

commune, Cu

Chi district

House and

structure 566,4 279.709.920 566,4 468.420.760

Page 46: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 46

5

Hồ Thị Huyền (kc:

8210-8211-8212)

Village of Bon

Phu, Trung An

commune, Cu

Chi district

House and

structure 392,7 366.104.240 392,7 508.860.800

Total 4.732,2 4.210.638.360,0 4.732,2 4.791.401.760

II Phu Hoa Dong

6

Dự Lộ Lâm

MP113/19, KP

10, Tân Chánh

Hiệp ward,

District12

Lost over

10%

agricultural

land

580,6 120.764.800 569,5 152.331.000

Total 580,6 120.764.800,0 569,5 152.331.000

Total

5.312,8

4.331.403.160,0 5.301,7 4.943.732.760,0

ANNEX 4. PROPOSAL REPLACEMENT PRICE AND ACTUAL COMPENSATION RATE

No

Compensation

asset

Compensation price in RP Actual compensation price

Diễn giải

Tan

Thanh

Dong

Trung

An

Phu

Hoa

Dong

Tan

Phu

Trung

Tan Thanh

Dong Trung An Phu Hoa Dong

Tan Phu

Trung

Faça

de

locati

on

No

façade

location

Façad

e

locatio

n

No

façade

location

Façade

location

No

façad

e

locati

on

Faça

de

locati

on

No

façad

e

locati

on

I Đất (m2)

1

Residenital

land 440 240 240 240 No affection 2.500 697 No affection No affection

- RP (Decision

No

Page 47: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 47

2 Garden land 152 152 152 152 375 300 375 300 375 300 375 300

82/2011/QĐ-

UBND dated

18/12/2011 and

actual

compensation

(dispatch no

4772/UBND-

ĐTMT dated

17/9/2012)

3

Agricultural

land in

residential area 121 130 130 130

304 250 304 250 304 250 304 250

Agricultural

land outside

residential area 304 250 304 250 304 250 304 250

4

Paddy and

crop land 130 162 162 104 300 200 300 200 300 200 300 200

II House and structure (m2)

1

The grade 4th

house 3.000 3.000 3.000 3.000

No affection

4.500

No affection No affection

RP (Decision

12/2008/QĐ

- UBND) and

actual

compensatio

n price

applied in the

decision no

66/12/QĐ-

UBND dated

28/12/2012

2 Kitchen 1.150 1.150 1.150 1.150 1.300

3 Well,tank 750 750 750 750 1.000

4 Cattle barn (1) 450 450 450 450 1.250

5 Toilet 410 410 410 410 1.300

6 Yard 240 240 240 240 335

III Long-year trees (tree)

1 Eucalyptus 30 30 30 30 60 60 60 60

RP applied

decision

12/2008/QĐ

- UBND and

actual 2 Jackfruit 388 388 388 388 661 661 661 661

Page 48: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 48

3 Cashewnut 228 228 228 228 360 360 360 360

compensatio

n price

applied as

dispatch no

1268/SNN-

KHTC dated

8/8/2012 and

decision

35/2010/QĐ-

UBND

4 Lemon 190 190 190 190 300 300 300 300

5 Tamarind 140 140 140 140 185 185 185 185

Page 49: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 49

ANNEX 3. SAMPLE OF QUESTIONAIRES

Page 50: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 50

Page 51: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 51

Page 52: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 52

Page 53: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 53

Page 54: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 54

Page 55: VIE: Power Transmission Investment Program, Tranche 2 ... · VIE: Power Transmission Investment Program, Tranche 2 – 500kV Pleiku-My Phuoc-Cau Bong Transmission Line Ho Chi Minh

INVESTCONSULT GROUP 55

ANNEX 6. IMAGES

Working with Mr Nguyễn Văn Miêng –

Vice head of CSCB department of Cu

Chi district

Working with Mr Nguyễn Thanh Sơn-

official of CSCB department of Cu Chi

district

Line goes through Trung An commune Interviewing Ms Trần Thị Diệu Út –

Village of An Hoa, Trung An commune,

Cu Chi district